what we heard - city of edmonton :: home · • integrate other transit with lrt • no large art...
Post on 14-Sep-2018
212 Views
Preview:
TRANSCRIPT
What We HeardKey Themes Area 3
Infrastructure, Overall Design, Art
Stops
Other
• Maintain and/or replace the mature street tree planting and add planting where possible
• Landscaping is very important: include texture and colour
• Keep communities walkable
• Integrate sidewalks and bike paths where possible
• Bike connections are important
• Re� ect the Mill Creek ravine in the theme and colours for Holyrood and 73 Avenue stop
• Use the historic, French theme for Bonnie Doon (and Strathearn)
• Play on the small town feel
• Consider snow removal requirements
• Parasitic parking is a concern
• Maintain the existing crosswalks to keep the same pedestrian movement throughout the neighbourhood – minimize barriers
• There is an aging population – select materials that are easy to navigate
• Integrate other transit with LRT
• No large art – should be integrated
• No modern art
• Add art to Argyll overpass
View A - Existing Condition View A - Concept RenderingCross-section (Looking South)Note: Cross-section to be con� rmed through Preliminary Design.
73rd AvenueStop Plan
Stop Site Plan
73rd AvenueStop Analysis
AvonmoreSchool
AvonmorePark
NeighborhoodRetail
Community ofChrist Church
Mill CreekRavine South
Argyll Park
1.2 Km To Bonnie Doon Stop
1.4 Km To Wagner Stop
73rd Ave StopSouthbound
73rd Ave StopNorthbound
North
LEGEND Platform
Roadway
Median
Sidewalk
Existing Bus Route
Existing Bike Route
Existing Bus Stop
Destination/Origin
400m Radius/5 minute walk
ProposedPedestrianConnection
LRT Line
Proposed Bike Route
Signage/Wayfinding
Existing PedestrianCrossing73 Avenue NW
76 Avenue NW
83
Str
ee
t N
W
81
Str
ee
t N
W
85
Str
ee
t N
W
89 Street NW
87
Street N
W73rd AvenueArea Connectivity
73rd Avenue Stop: Theme
RAILINGRETAINING WALLSBENCHES GARBAGE BINS PAVING COLUMN WRAPS
“Natural – to re� ect Mill Creek ravine that runs the length of this area”
“Small town atmosphere”
Design Theme: What We Heard from Stage 2
73 Avenue Stop Options
BENCHES GARBAGE BINS RETAINING WALLS PAVING COLUMN WRAPS RAILINGBENCHES GARBAGE BINS RETAINING WALLS PAVING COLUMN WRAPS RAILING
HAVE YOUR SAY
Have Your Say: This design theme is based on your input from Stage 2. Which elements best re� ect your neighbourhood?
View A - Existing Condition View A - Concept Rendering
Stop Site Plan
Cross-section (Looking South)Note: Cross-section to be con� rmed through Preliminary Design.
Bonnie DoonStop Plan
Stop Site Plan
Bonnie DoonStop Analysis
Bonnie Doon Shopping Centre
Bonnie Doon Stop
Edmonton Korean Presbyterian Church
Retail
Good Samaritan Place
Ascension Lutheran Church
Idylwylde Park
Melrose Court
Medium DensityResidential
North
LEGEND Platform
Roadway
Median
Sidewalk
Existing Bus Route
Existing Bike Route
Existing Bus Stop
Destination/Origin
400m Radius/5 minute walk
ProposedPedestrianConnection
LRT Line
Proposed Bike Route
84 Avenue NW
82 Avenue NW
79 Avenue NW
83
Str
ee
t N
W
79
Str
ee
t N
W
85
Str
ee
t N
W
0.96 Km To Holyrood Stop
1.1 Km To 73rd Avenue Stop
Existing PedestrianCrossing
Bonnie DoonArea Connectivity
Bonnie DoonStop: Theme
RAILINGRETAINING WALLSBENCHES GARBAGE BINS PAVING COLUMN WRAPS
“French theme around Bonnie Doon mall”
“Bonnie Doon – lots of history”
Design Theme: What We Heard from Stage 2
Bonnie DoonStop Options
BENCHES GARBAGE BINS RETAINING WALLS PAVING COLUMN WRAPS RAILING
HAVE YOUR SAY
Have Your Say: This design theme is based on your input from Stage 2. Which elements best re� ect your neighbourhood?
View A - Existing Condition View A - Concept Rendering
Stop Site Plan
Cross-section (Looking South)Note: Cross-section to be con� rmed through Preliminary Design.
HolyroodStop Plan
Stop Site Plan
HolyroodStop Analysis
Capilano-VimySchool
Church of Jesus Christ of Latter Day Saints
Ecole PubliqueGabrielle-Roy
Southeast Edmonton Seniors Association
BoardwalkResidential
Holyrood BoulevardResidential
Holyrood StopNorthbound
Holyrood StopSouthbound
North
LEGEND Platform
Roadway
Median
Sidewalk
Existing Bus Route
Existing Bike Route
Existing Bus Stop
Destination/Origin
400m Radius/5 minute walk
ProposedPedestrianConnection
LRT Line
Proposed Bike Route
Signalized Intersection
93 Avenue NW
90 Avenue NW
82
Str
ee
t N
W
85
St
NW
Connors Road NW
0.8 Km To Strathearn Stop
0.96 Km To Bonnie Doon Stop
Existing PedestrianCrossing
HolyroodArea Connectivity
Holyrood Stop: Theme
“Natural environment as a theme – use natural colours and materials – no bright
colours or shiny gold”
Design Theme: What We Heard from Stage 2
RAILINGRETAINING WALLSBENCHES GARBAGE BINS PAVING COLUMN WRAPS
BENCHES GARBAGE BINS RETAINING WALLS PAVING COLUMN WRAPS RAILING
HAVE YOUR SAYHolyrood
Stop OptionsHave Your Say: This design theme is based on your input from Stage 2. Which elements best re� ect your neighbourhood?
top related