winter '15 & spring '16

Post on 11-Apr-2017

196 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Winter ’15/ Spring ‘161

Assembly Area and Process Engineering

Since Last Presentation…2

• Slightly modified and manufactured

• Manufactured and built

• Future: Producing more…

Work Instructions & Time Studies3

• Napkin Dispenser

• 120V & 230V carts (cirrus/visante)

• Avanta cart

Floor Layouts

• New Welding Layout

• Updated Production Floor Layout

• Front Office

Layout

4

Training• Part Number Creation & Doc. • Routing Documentation• Formula’s for Paint Step & Laser Step• RFC’s- Implementation &

Documentation• Laser Programming

5

6

Fixtures

• Always ongoing

• Think outside the box

• Staying up-to-date

• Tool #’s

7

Assembly Area

• Improvements • Before:

• After:

8

Process Engineering • CI Team Project

Shadow Boards Bringing UWM and Internship together

Design Aspects

• Electrical Safety DocumentationGeneral, higher level guidelines

Hazards, safety zone, industry standards

• Astro DocumentationSummer long project

• 13485 AuditResearch

• Forming Set-Up SheetsCollaborating w/ Paul

• Quoting Sheets

top related