AMS-02: Anti-Coincidence-Counter
The ACC detects unwanted particle tracks running through the tracker volume outside the main acceptance mimicking anti-nuclei.
Requirements:• High detection efficiency • operational in high field• fast response for trigger
Stefan Schael, RWTH Aachen
ACC System
Panel: Bicron BC414 826.5mm x 230mm x 8mmWLS: Kuraray Y-11(200)MCLF: Bicron BCF-98PMT’s: Hamamatsu R5946
ACC AMS-01 ETH Zürich July 1997
machining (grooves) all (16+2) done
Panel machining
Fibres are thermally preconditioned=> less mechanical stress during insertion and hence less damages, => more homogeneous light transport
First flight panel in cosmic test stand
0 missed out of 25977 triggers and still running ...
ACCT1
T2
T3
Attenuation LengthWLS Fibers
PMTPMT
10 - 185 cm
LED (λ=375 nm)
λ=398±33 cm
Attenuation Lengthclear fibers
PMTPMT
LED (λ=375 nm)
λ=659±101 cm
Clear fiber cable in test
WLS (from ACC panel)matching end PMT
matching end
PMT
matching end
ACC System Status
• All flight componentsin hand
• Assembly of flightpanels has started(1 week/panel)
• Optimization ofclear fiber cableis ongoing tillend Oct. 06
• Production of PMTboxes start Dec. 06
• ACC System will bedelivered June 07 toCERN for integrationinto AMS-02.