AMS TRD GSE Systems GSE 1: TRD Pressure Stabilization GSE 2: TRD-GAS Supply Vessel Filling Collaboration of: RWTH Aachen (TRD) MIT LNS (TRD-GAS System) for the collaboration: Th.Siedenburg, MIT

Upload: others

Post on 15-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AMS TRD GSE Systems · 2008. 9. 5. · 220 bar. 8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 8 Xenon NIST ISOTHERMALS MDP: 3000 psi 200 bar. Created Date:

AMS TRD GSE Systems

GSE 1: TRD Pressure StabilizationGSE 2: TRD-GAS Supply Vessel Filling

Collaboration of: RWTH Aachen (TRD)MIT LNS (TRD-GAS System)

for the collaboration: Th.Siedenburg, MIT

Page 2: AMS TRD GSE Systems · 2008. 9. 5. · 220 bar. 8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 8 Xenon NIST ISOTHERMALS MDP: 3000 psi 200 bar. Created Date:

8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 2

TRD Pressure Stabilization GSE

TRD Straws must be kept above outside pressure to avoid collapsingTRD-GAS will monitor gas-loss when AMS is powered(“gastight” = 2l CO2 / week) Data-Logger to display pressure and record when TRD-GAS is without powerGas bottle to provide refill without access to AMS (Cargo flight, KSC clear out) without using up any flight gas stored in TRD-GAS supply vessels

Commercial Gas Bottle300 bar proof tested

Page 3: AMS TRD GSE Systems · 2008. 9. 5. · 220 bar. 8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 8 Xenon NIST ISOTHERMALS MDP: 3000 psi 200 bar. Created Date:

8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 3

TRD GSE (De)Installation- Remain Operable during power-outage

up to shuttle launch- Deinstall with cryomagnet GSE

- Deinstallation: Remove Gas Bottle < 50 lbRemove Line to GSE connectorCap and secure GSE connector

AMS2 in Shuttle Cargo Bay

Page 4: AMS TRD GSE Systems · 2008. 9. 5. · 220 bar. 8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 8 Xenon NIST ISOTHERMALS MDP: 3000 psi 200 bar. Created Date:

8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 4

TRD-GAS GSE ConnectionAccessible in AMS flight configurationEasy to operateNASA qualified for launch-pad GSE & flight

=> 1/4” VCR with clip retained gasket Install blind-plug before flight Pot against loosening

Test-potting of 1/8” VCR connection

Swagelok SS-4-VCR

GSE line endRetained onBox-C bracket

Bottle

Page 5: AMS TRD GSE Systems · 2008. 9. 5. · 220 bar. 8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 8 Xenon NIST ISOTHERMALS MDP: 3000 psi 200 bar. Created Date:

8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 5

TRD-GAS Backup Vessel Filling GSE

Tested successfully for 100% CO2 transfer at MIT OPTIONAL USE AT KSC ONLY

Page 6: AMS TRD GSE Systems · 2008. 9. 5. · 220 bar. 8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 8 Xenon NIST ISOTHERMALS MDP: 3000 psi 200 bar. Created Date:

8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 6

TRD-GAS Vessel Filling GSE Operation- Supply Vessel Filling at KSC only as BACKUP RECOVERY from

Pressure Loss in Box-S Supply Vesselsdetected during Pre-Launch Wait

- Operation: As part of Payload Preparation

Always manned (by two persons)

Manually controlled Valves

Define Maximum Bottle Pressure before connectingto avoid supply vessel COPV overfilling

Three manual pressure gages on GSE

Four PC recorded pressure gages on GSE & TRD-GAS

Heated bottle is caged against accidental touchingto allow undisturbed weight measurement

Close TRD-GAS supply vessel fill port (triple-seal)and remount TRD-GAS debris shield

Fill-Port Triple-Seal

Page 7: AMS TRD GSE Systems · 2008. 9. 5. · 220 bar. 8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 8 Xenon NIST ISOTHERMALS MDP: 3000 psi 200 bar. Created Date:

8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 7

CO2 NIST ISOTHERMALS

MDP: 3200 psi 220 bar

Page 8: AMS TRD GSE Systems · 2008. 9. 5. · 220 bar. 8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 8 Xenon NIST ISOTHERMALS MDP: 3000 psi 200 bar. Created Date:

8.Sep.2008 AMS Phase II Ground Safety Review Th. Siedenburg AMS TRD-GSE 8

Xenon NIST ISOTHERMALS

MDP: 3000 psi 200 bar