AN INTRODUCTIONTO THE CONSTRUCTION FRAMEWORKS
CONNECTING PROJECT DELIVERY FOR THE PUBLIC SECTOR
![Page 2: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/2.jpg)
- 2 -NORTH WEST CONSTRUCTION HUB
North West Construction Hub
The North West Construction Hub (NWCH) is much more than a public sector construction delivery vehicle. It is a place where like-minded organisations come together to do business collaboratively. Lowest price tendering is replaced with long-term relationships between clients, professionals and contractors, formed around shared objectives and common values. The result is less waste, less duplication, local engagement and greater efficiencies, all generating better value for money; the cost to use NWCH is lower than any of our competitors.
The NWCH was established in 2009 in response to Central Government’s drive to improve efficiencies within the public sector. It is led by a Board comprising of representatives from public sector organisations across the North West. The legal entity behind NWCH is Manchester City Council.
Introduction to North West Construction Hub (NWCH)
![Page 3: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/3.jpg)
- 3 -Structure of Frameworks www.nwconstructionhub.org
Projects have been delivered through the NWCH’s Construction Frameworks since 2010. There are three frameworks covering the following value bands:
3 Clients who are delivering projects in the North West
3 Clients with bases in the North West delivering projects in the UK
3 North West based clients with public sector funding in their project
The frameworks can be used by:
High Value: £8m - £35m+Medium Value: £2m - £10mLow Value: £500k - £2m
The third generation of the High Value and Medium Value frameworks are in operation with the Low Value currently being reprocured for 2020. These now include modifications following comprehensive consultation with Clients and Construction Partners.
Each value band is broken down into Lots; all of which cater for Design and Build or Construct Only projects.
Construction Frameworks
Cumbria
Lancashire
MerseysideGreater
Manchester
Cheshire
![Page 4: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/4.jpg)
- 4 -NORTH WEST CONSTRUCTION HUB
North West Construction Hub
Track Record
The original high and medium value
frameworks (£500k+) operated from
2010 – 2014
Since 2010, we have delivered over 375 projects with a combined value of £1.9bn.
The types of projects delivered include....Schools, colleges and university buildings, theatres, civic buildings, leisure
facilities, fire stations, offices, hospital extensions, houses, care centres and care homes, museums, crematoria, traveller sites, waste transfer depots,
and transport interchanges.
For this type of client...Councils, Blue Light Authorities, Local Government, Universities, Colleges
and Schools, Transport Boards, NHS Foundation Trusts and Housing Trusts.
Paddington Village welcomes exchange students from Augsburg
One Central Park
Lymm Response Hub and Safety Central
The second generation of frameworks operated
from 2014 – 2018.
The current and third generation of the HV & MV frameworks are in operation
from approximately 2019 - 2023
Blackpool Council Municipal Buildings refurbishment
![Page 5: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/5.jpg)
- 5 -Structure of Frameworks www.nwconstructionhub.org
81,427 members of the workforce were employed,
of which 59% were local.
98% of projects were
delivered on time or early.
“....have surpassed expectations in meeting the City Council’s targets and requirements for handover. The Tier 1 & 2 Local
Labour targets have been achieved with an impressive 95% on both schemes which has been particularly pleasing.”
Bob Turner, Liverpool City Council
“We’ve often found it difficult to engage with national contractors
and get on supply chain lists. We’ve been fortunate to find a contractor following its words
with deeds by using local suppliers and believe that the time invested in our company
has led to a general increase in business opportunities.”
Chris Dermody, StycX Ltd
“… a result of the design solution resulted in an extra 24% teaching space for our 2 form entry school budget.”
Mike Horne, Liverpool City Council
Ben Street Regeneration
Manchester Creative and Media Academy
Breaking ground - Sandside Lodge SEN SchoolAmbleside Student Accommodation
Crewe Market Hall render
![Page 6: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/6.jpg)
- 6 -NORTH WEST CONSTRUCTION HUB
North West Construction Hub
Track Record
“I have found [the contractor] to have worked as a committed partner to us through their flexible, pro-active and open
approach, not only with the colleagues connected with the project team but also with Council members and officers.
Their ‘can do, will do’ approach has been exemplary.”Paul McKevitt, Wigan Council
“The team displayed an excellent, collaborative work ethos, with a clear
end goal in sight to deliver the building to a
high specification.”John Taylor, Liverpool
City Council
“Whilst there is a steep learning curve at the beginning of the BIM
implementation plan, the end package of information is much
more co-ordinated and it offers an invaluable tool for the programme
and cost teams to feed into the design at an early stage.”
Quentin Keohane, Bellerive Sixth Form Lead Architect
“In Trafford, through a collaborative approach, we put 7 projects into a programme and created 14 apprenticeships
with 5 different contractors, all enabled by the NWCH.”Jocelyne Underwood, GM Chamber of Commerce
9,243 social value activities
delivered, including 1,524 apprentice
placements
98% of waste diverted.
91% average client satisfaction score.
Merseyside Police Operational Command Centre MMU Arts and Humanities render Students taking part in a ‘Have a Go’ event
![Page 7: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/7.jpg)
- 7 -Structure of Frameworks www.nwconstructionhub.org
All KPI figures are based on projects completed and data submitted by end August 2017
98% of projects* delivered on or under budget.
“We’ve been a client of the Hub for 5 years and we
wouldn’t keep going back if it didn’t deliver.”
Clare Huber, Cheshire West and Cheshire Council
“We achieved completion one month ahead of schedule on what was already an extremely tight
timescale. This project was highly challenging yet the team were extremely helpful, professional and highly
effective at all times.”Richard Farrow, University of Chester
“[The contractor’s] expertise assisted in progressing the design
to the construction stage and greatly assisted in the risk management and value engineering exercises
to ensure the project was delivered within the affordability envelope, whilst retaining the
key design quality features of the original concept.”
Matt Templeton, Alder Hey Children’s Hospital
*Projects based on a Target Cost / Agreed Maximum Price commercial agreement
Track replacement at HSBC National Cycling Centre
Huntington Primary SchoolSpanish Hall Winter Gardens
Wolverhampton Interchange renderStoryhouse Theatre
![Page 8: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/8.jpg)
- 8 -NORTH WEST CONSTRUCTION HUB
North West Construction Hub
Awards
A selection of the numerous awards NWCH contractors’ have won or been nominated for:
EBN Schools Programme of Works - North West Regional Construction Awards 2019 - Offsite Construction
Award winner
Storyhouse Theatre - Royal Town Planning Institute Award for Collaboration 2016 winner
NWCH Team - Integration and Collaborative Working Award
NWRCA 2017 winners
St. Hilda’s High School - LABC Best Educational
Building Award 2017 winner
FA Parklife - North West Regional Construction Awards
2019 - Project of the Year
2016
![Page 9: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/9.jpg)
- 9 -Structure of Frameworks www.nwconstructionhub.org
Women in Construction and Engineering Awards - Best
Project Manager 2015 winner
Ambleside Student Accommodation - Construction
News Award 2017 finalist
Paddington Village Infrastructure and Public Realm - North West Regional Construction Awards
2019 - Value Award
Crewe Lifestyle Centre - North West Regional Construction
Awards 2017 - Cheshire, Wirral & Warrington Sub-Regional
Project of the Year
WINNERTEAM OF THE YEAR
![Page 10: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/10.jpg)
- 10 -NORTH WEST CONSTRUCTION HUB
North West Construction Hub
OJEU COMPLIANTThe frameworks were procured through an
OJEU compliant process.
TRIED AND TESTEDThe first framework became active in 2010,
followed shortly after by two more. They have now been reprocured. The percentage of clients who come back to use the frameworks is very high.
NO FEEThe client pays no direct fee to use the re-procured
frameworks. The Framework Management Fee is now recovered from the Constructor Partner through their competitively tendered overheads
percentage upon appointment to a project.
FLEXIBLEThe type of contract can be selected by the client so long as it is partnering and
collaborative; procurement can take place from RIBA Stage 0 through to Stage 4, according to
the needs of the project.
VALUE FOR MONEYA rigorous selection process to select Constructor
Partners to the frameworks was undertaken which included both price and quality. Open book accounting principles enable client commercial managers to ensure that competitive best value
rates are obtained in all instances.
The Benefits
DEVELOPED BY THE PUBLIC SECTOR
The frameworks have been developed and revised (through comprehensive consultation) by public sector organisations who understand
the needs of their peers.
BIM KNOWLEDGEAn important enabling element of
Government Construction Strategy supporting collaborative working.
NWCH projects have served as a test bedfor using BIM for a number of clients. Our
contractors have evidenced their experience in delivering BIM and their strategy to stay
ahead in this constantly evolving field.
BESPOKE BENEFITSProject benefits can be tailored to each project,
over and above the core KPIs which cover elements of social value and sustainability.
![Page 11: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/11.jpg)
- 11 -Structure of Frameworks www.nwconstructionhub.org
QUICK AND EFFICIENT PROCESSA rigorous pre-qualification process already undertaken saves the client time and effort.
Furthermore, this enables the appointment of a contractor in a minimum of six weeks if the
programme is demanding.
CONTINUOUS IMPROVEMENTSpecial Interest Groups (SIGs) are
established to deliver the Construction Strategy agenda covering topics such as
Social Value and Digital Technologies
MANAGEMENT SUPPORTThe NWCH team support the client (or their
advisors) giving guidance on the preparation of the Expression of Interest and the Mini-Competition. Performance management is also undertaken
during project delivery.
MEMBER OF THE NACFNWCH is a partner and active supporter of the
National Association of Construction Frameworks (NACF) which is working together with the
Local Government Association (LGA) to shape and promote best practice in using 2-stage
collaborative frameworks, and to help shape the future of the national procurement strategy.
Week 1
• Contact NWCH and sign Access Agreement
• Prepare 1 page Brief for Expression of Interest. Issued by NWCH
• Constructor Partners respond on basis of Capacity and Capability
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6
Weeks 2 - 4
Mini-Competition (issued by Client, supported by NWCH)
Week 5
Scorings and clarifications
Week 6
Appointment
The Process
![Page 12: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/12.jpg)
- 12 -NORTH WEST CONSTRUCTION HUB
North West Construction Hub
The High Value Construction Framework is for projects over £8m in value. This is a regional framework and covers the whole of the North West. There are three value Lots; all of which cater for Design & Build or Construct only projects.
OJEU Procurement Notice Information:
High Value Construction Framework
Reference: 2018/S 029-062493 10/02/2018Award: 2019/S 010-018043 14/01/2019
Lot 1£8m - £15m
Lot 2 £15m - £35m
Lot 3 £35m+
Balfour Beatty
Bouygues
Bowmer and Kirkland
Conlon Construction
Eric Wright
ISG
John Graham
Kier
Laing O’Rourke
Seddon
Vinci
Wates
![Page 13: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/13.jpg)
- 13 -Structure of Frameworks www.nwconstructionhub.org
OJEU Procurement Notice Information:OJEU Procurement Notice Information: Reference: 2018/S 174-393729 07/09/2018Award: 2019/S 170-414644 29/08/2019
Medium Value Construction Framework
The Medium Value Construction Framework is for projects between £2m and £10m (with two value lots). There is one regional and five sub-regional Lots; all cater for Design and Build or Construct only projects.
Lot 1 Cumbria
(£2m - £5m)
Lot 2 Lancashire(£2m - £5m)
Lot 3 Greater Manchester(£2m - £5m)
Lot 4 Merseyside(£2m - £5m)
Lot 5 Cheshire
(£2m - £5m)
Lot 6 North West(£5+ - £10m)
Conlon Construction
Engie Regeneration
Eric Wright
Galliford Try Building
Harry Fairclough
ISG Construction
Kier Construction
Laing O’Rourke
Morgan Sindall
Robertson Construction
The Casey Group
Warden Construction
Wates Construction
![Page 14: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/14.jpg)
- 14 -NORTH WEST CONSTRUCTION HUB
North West Construction Hub
Low Value Construction Framework
The Low Value Construction Framework is for projects between £500k and £2m in value. There are ten sub-regional Lots for Construct only and the same for Design and Build.
Reference: 2015/S 017-025888 21/01/2015 Award: 2016/S 032-051260 20/01/2016
OJEU Procurement Notice Information:
Sub Regional Lots, Construct Only, £500,000 - £2m Sub Regional Lots, Design and Build, £500,000 - £2m
Lot 1 Cumbria
Lot 2Lancashire
Lot 3Greater
ManchesterLot 4
MerseysideLot 5
CheshireLot 6
CumbriaLot 7
Lancashire
Lot 8Greater
ManchesterLot 9
MerseysideLot 10
Cheshire
Aspect
Conlon
Cruden
F Parkinson
Harry Fairclough
Henry Boot
Engie
Kier
Read
Seddon
Wates
![Page 15: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/15.jpg)
- 15 -Structure of Frameworks www.nwconstructionhub.org
The Contractors
High Value Framework Contractors
Low Value Framework Contractors
Medium Value Framework Contractors
![Page 16: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were](https://reader033.vdocument.in/reader033/viewer/2022042414/5f2e30e7a94c24124806e02f/html5/thumbnails/16.jpg)
CONTACT THE NWCH FRAMEWORK MANAGEMENT TEAM
Delivering throughout the North West
0161 219 6213
FOR CASE STUDIES AND MORE INFORMATION
www.nwconstructionhub.orgor
scan the QR code below to go directly to the website
All information correct as of October 2019
Cumbria
Lancashire
Merseyside
Greater Manchester
Cheshire
NORTH WEST CONSTRUCTION HUB
NORTH WEST CONSTRUCTION HUB
NW
CH
_IN
TRO
_201
910_
V01
This document has been printed on 100% recycled materials and FSC certified paper. The Forest Stewardship Council (FSC) promote environmentally appropriate, socially beneficial, and economically viable management of the world's forests.
100%