Page 1: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

AN INTRODUCTIONTO THE CONSTRUCTION FRAMEWORKS

CONNECTING PROJECT DELIVERY FOR THE PUBLIC SECTOR

Page 2: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 2 -NORTH WEST CONSTRUCTION HUB

North West Construction Hub

The North West Construction Hub (NWCH) is much more than a public sector construction delivery vehicle. It is a place where like-minded organisations come together to do business collaboratively. Lowest price tendering is replaced with long-term relationships between clients, professionals and contractors, formed around shared objectives and common values. The result is less waste, less duplication, local engagement and greater efficiencies, all generating better value for money; the cost to use NWCH is lower than any of our competitors.

The NWCH was established in 2009 in response to Central Government’s drive to improve efficiencies within the public sector. It is led by a Board comprising of representatives from public sector organisations across the North West. The legal entity behind NWCH is Manchester City Council.

Introduction to North West Construction Hub (NWCH)

Page 3: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 3 -Structure of Frameworks www.nwconstructionhub.org

Projects have been delivered through the NWCH’s Construction Frameworks since 2010. There are three frameworks covering the following value bands:

3 Clients who are delivering projects in the North West

3 Clients with bases in the North West delivering projects in the UK

3 North West based clients with public sector funding in their project

The frameworks can be used by:

High Value: £8m - £35m+Medium Value: £2m - £10mLow Value: £500k - £2m

The third generation of the High Value and Medium Value frameworks are in operation with the Low Value currently being reprocured for 2020. These now include modifications following comprehensive consultation with Clients and Construction Partners.

Each value band is broken down into Lots; all of which cater for Design and Build or Construct Only projects.

Construction Frameworks

Cumbria

Lancashire

MerseysideGreater

Manchester

Cheshire

Page 4: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 4 -NORTH WEST CONSTRUCTION HUB

North West Construction Hub

Track Record

The original high and medium value

frameworks (£500k+) operated from

2010 – 2014

Since 2010, we have delivered over 375 projects with a combined value of £1.9bn.

The types of projects delivered include....Schools, colleges and university buildings, theatres, civic buildings, leisure

facilities, fire stations, offices, hospital extensions, houses, care centres and care homes, museums, crematoria, traveller sites, waste transfer depots,

and transport interchanges.

For this type of client...Councils, Blue Light Authorities, Local Government, Universities, Colleges

and Schools, Transport Boards, NHS Foundation Trusts and Housing Trusts.

Paddington Village welcomes exchange students from Augsburg

One Central Park

Lymm Response Hub and Safety Central

The second generation of frameworks operated

from 2014 – 2018.

The current and third generation of the HV & MV frameworks are in operation

from approximately 2019 - 2023

Blackpool Council Municipal Buildings refurbishment

Page 5: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 5 -Structure of Frameworks www.nwconstructionhub.org

81,427 members of the workforce were employed,

of which 59% were local.

98% of projects were

delivered on time or early.

“....have surpassed expectations in meeting the City Council’s targets and requirements for handover. The Tier 1 & 2 Local

Labour targets have been achieved with an impressive 95% on both schemes which has been particularly pleasing.”

Bob Turner, Liverpool City Council

“We’ve often found it difficult to engage with national contractors

and get on supply chain lists. We’ve been fortunate to find a contractor following its words

with deeds by using local suppliers and believe that the time invested in our company

has led to a general increase in business opportunities.”

Chris Dermody, StycX Ltd

“… a result of the design solution resulted in an extra 24% teaching space for our 2 form entry school budget.”

Mike Horne, Liverpool City Council

Ben Street Regeneration

Manchester Creative and Media Academy

Breaking ground - Sandside Lodge SEN SchoolAmbleside Student Accommodation

Crewe Market Hall render

Page 6: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 6 -NORTH WEST CONSTRUCTION HUB

North West Construction Hub

Track Record

“I have found [the contractor] to have worked as a committed partner to us through their flexible, pro-active and open

approach, not only with the colleagues connected with the project team but also with Council members and officers.

Their ‘can do, will do’ approach has been exemplary.”Paul McKevitt, Wigan Council

“The team displayed an excellent, collaborative work ethos, with a clear

end goal in sight to deliver the building to a

high specification.”John Taylor, Liverpool

City Council

“Whilst there is a steep learning curve at the beginning of the BIM

implementation plan, the end package of information is much

more co-ordinated and it offers an invaluable tool for the programme

and cost teams to feed into the design at an early stage.”

Quentin Keohane, Bellerive Sixth Form Lead Architect

“In Trafford, through a collaborative approach, we put 7 projects into a programme and created 14 apprenticeships

with 5 different contractors, all enabled by the NWCH.”Jocelyne Underwood, GM Chamber of Commerce

9,243 social value activities

delivered, including 1,524 apprentice

placements

98% of waste diverted.

91% average client satisfaction score.

Merseyside Police Operational Command Centre MMU Arts and Humanities render Students taking part in a ‘Have a Go’ event

Page 7: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 7 -Structure of Frameworks www.nwconstructionhub.org

All KPI figures are based on projects completed and data submitted by end August 2017

98% of projects* delivered on or under budget.

“We’ve been a client of the Hub for 5 years and we

wouldn’t keep going back if it didn’t deliver.”

Clare Huber, Cheshire West and Cheshire Council

“We achieved completion one month ahead of schedule on what was already an extremely tight

timescale. This project was highly challenging yet the team were extremely helpful, professional and highly

effective at all times.”Richard Farrow, University of Chester

“[The contractor’s] expertise assisted in progressing the design

to the construction stage and greatly assisted in the risk management and value engineering exercises

to ensure the project was delivered within the affordability envelope, whilst retaining the

key design quality features of the original concept.”

Matt Templeton, Alder Hey Children’s Hospital

*Projects based on a Target Cost / Agreed Maximum Price commercial agreement

Track replacement at HSBC National Cycling Centre

Huntington Primary SchoolSpanish Hall Winter Gardens

Wolverhampton Interchange renderStoryhouse Theatre

Page 8: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 8 -NORTH WEST CONSTRUCTION HUB

North West Construction Hub

Awards

A selection of the numerous awards NWCH contractors’ have won or been nominated for:

EBN Schools Programme of Works - North West Regional Construction Awards 2019 - Offsite Construction

Award winner

Storyhouse Theatre - Royal Town Planning Institute Award for Collaboration 2016 winner

NWCH Team - Integration and Collaborative Working Award

NWRCA 2017 winners

St. Hilda’s High School - LABC Best Educational

Building Award 2017 winner

FA Parklife - North West Regional Construction Awards

2019 - Project of the Year

2016

Page 9: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 9 -Structure of Frameworks www.nwconstructionhub.org

Women in Construction and Engineering Awards - Best

Project Manager 2015 winner

Ambleside Student Accommodation - Construction

News Award 2017 finalist

Paddington Village Infrastructure and Public Realm - North West Regional Construction Awards

2019 - Value Award

Crewe Lifestyle Centre - North West Regional Construction

Awards 2017 - Cheshire, Wirral & Warrington Sub-Regional

Project of the Year

WINNERTEAM OF THE YEAR

Page 10: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 10 -NORTH WEST CONSTRUCTION HUB

North West Construction Hub

OJEU COMPLIANTThe frameworks were procured through an

OJEU compliant process.

TRIED AND TESTEDThe first framework became active in 2010,

followed shortly after by two more. They have now been reprocured. The percentage of clients who come back to use the frameworks is very high.

NO FEEThe client pays no direct fee to use the re-procured

frameworks. The Framework Management Fee is now recovered from the Constructor Partner through their competitively tendered overheads

percentage upon appointment to a project.

FLEXIBLEThe type of contract can be selected by the client so long as it is partnering and

collaborative; procurement can take place from RIBA Stage 0 through to Stage 4, according to

the needs of the project.

VALUE FOR MONEYA rigorous selection process to select Constructor

Partners to the frameworks was undertaken which included both price and quality. Open book accounting principles enable client commercial managers to ensure that competitive best value

rates are obtained in all instances.

The Benefits

DEVELOPED BY THE PUBLIC SECTOR

The frameworks have been developed and revised (through comprehensive consultation) by public sector organisations who understand

the needs of their peers.

BIM KNOWLEDGEAn important enabling element of

Government Construction Strategy supporting collaborative working.

NWCH projects have served as a test bedfor using BIM for a number of clients. Our

contractors have evidenced their experience in delivering BIM and their strategy to stay

ahead in this constantly evolving field.

BESPOKE BENEFITSProject benefits can be tailored to each project,

over and above the core KPIs which cover elements of social value and sustainability.

Page 11: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 11 -Structure of Frameworks www.nwconstructionhub.org

QUICK AND EFFICIENT PROCESSA rigorous pre-qualification process already undertaken saves the client time and effort.

Furthermore, this enables the appointment of a contractor in a minimum of six weeks if the

programme is demanding.

CONTINUOUS IMPROVEMENTSpecial Interest Groups (SIGs) are

established to deliver the Construction Strategy agenda covering topics such as

Social Value and Digital Technologies

MANAGEMENT SUPPORTThe NWCH team support the client (or their

advisors) giving guidance on the preparation of the Expression of Interest and the Mini-Competition. Performance management is also undertaken

during project delivery.

MEMBER OF THE NACFNWCH is a partner and active supporter of the

National Association of Construction Frameworks (NACF) which is working together with the

Local Government Association (LGA) to shape and promote best practice in using 2-stage

collaborative frameworks, and to help shape the future of the national procurement strategy.

Week 1

• Contact NWCH and sign Access Agreement

• Prepare 1 page Brief for Expression of Interest. Issued by NWCH

• Constructor Partners respond on basis of Capacity and Capability

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Weeks 2 - 4

Mini-Competition (issued by Client, supported by NWCH)

Week 5

Scorings and clarifications

Week 6

Appointment

The Process

Page 12: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 12 -NORTH WEST CONSTRUCTION HUB

North West Construction Hub

The High Value Construction Framework is for projects over £8m in value. This is a regional framework and covers the whole of the North West. There are three value Lots; all of which cater for Design & Build or Construct only projects.

OJEU Procurement Notice Information:

High Value Construction Framework

Reference: 2018/S 029-062493 10/02/2018Award: 2019/S 010-018043 14/01/2019

Lot 1£8m - £15m

Lot 2 £15m - £35m

Lot 3 £35m+

Balfour Beatty

Bouygues

Bowmer and Kirkland

Conlon Construction

Eric Wright

ISG

John Graham

Kier

Laing O’Rourke

Seddon

Vinci

Wates

Page 13: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 13 -Structure of Frameworks www.nwconstructionhub.org

OJEU Procurement Notice Information:OJEU Procurement Notice Information: Reference: 2018/S 174-393729 07/09/2018Award: 2019/S 170-414644 29/08/2019

Medium Value Construction Framework

The Medium Value Construction Framework is for projects between £2m and £10m (with two value lots). There is one regional and five sub-regional Lots; all cater for Design and Build or Construct only projects.

Lot 1 Cumbria

(£2m - £5m)

Lot 2 Lancashire(£2m - £5m)

Lot 3 Greater Manchester(£2m - £5m)

Lot 4 Merseyside(£2m - £5m)

Lot 5 Cheshire

(£2m - £5m)

Lot 6 North West(£5+ - £10m)

Conlon Construction

Engie Regeneration

Eric Wright

Galliford Try Building

Harry Fairclough

ISG Construction

Kier Construction

Laing O’Rourke

Morgan Sindall

Robertson Construction

The Casey Group

Warden Construction

Wates Construction

Page 14: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 14 -NORTH WEST CONSTRUCTION HUB

North West Construction Hub

Low Value Construction Framework

The Low Value Construction Framework is for projects between £500k and £2m in value. There are ten sub-regional Lots for Construct only and the same for Design and Build.

Reference: 2015/S 017-025888 21/01/2015 Award: 2016/S 032-051260 20/01/2016

OJEU Procurement Notice Information:

Sub Regional Lots, Construct Only, £500,000 - £2m Sub Regional Lots, Design and Build, £500,000 - £2m

Lot 1 Cumbria

Lot 2Lancashire

Lot 3Greater

ManchesterLot 4

MerseysideLot 5

CheshireLot 6

CumbriaLot 7

Lancashire

Lot 8Greater

ManchesterLot 9

MerseysideLot 10

Cheshire

Aspect

Conlon

Cruden

F Parkinson

Harry Fairclough

Henry Boot

Engie

Kier

Read

Seddon

Wates

Page 15: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

- 15 -Structure of Frameworks www.nwconstructionhub.org

The Contractors

High Value Framework Contractors

Low Value Framework Contractors

Medium Value Framework Contractors

Page 16: AN INTRODUCTION · 2019-11-04 · Blackpool Council Municipal Buildings refurbishment. Structure of Frameworks - 5 - 81,427 members of the workforce were employed, of which 59% were

CONTACT THE NWCH FRAMEWORK MANAGEMENT TEAM

Delivering throughout the North West

0161 219 6213

[email protected]

FOR CASE STUDIES AND MORE INFORMATION

www.nwconstructionhub.orgor

scan the QR code below to go directly to the website

All information correct as of October 2019

Cumbria

Lancashire

Merseyside

Greater Manchester

Cheshire

NORTH WEST CONSTRUCTION HUB

NORTH WEST CONSTRUCTION HUB

NW

CH

_IN

TRO

_201

910_

V01

This document has been printed on 100% recycled materials and FSC certified paper. The Forest Stewardship Council (FSC) promote environmentally appropriate, socially beneficial, and economically viable management of the world's forests.

100%