AN ARCHITECTURAL BRIEF FOR A PROPOSED 100-BEDDED HOSPITAL DISSERTATION WORK DONE BY Dr. Preet Matani AT HOSMAC (India) Pvt. Ltd

Upload: drhaidarali

Post on 17-Nov-2014

36.956 views

Category:

Documents


66 download

TRANSCRIPT

Page 1: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED100-BEDDED HOSPITAL

DISSERTATION WORK DONE BYDr. Preet Matani

AT

HOSMAC (India) Pvt. Ltd

Page 2: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

ACKNOWLEDGEMENT

The dissertation period gave me an opportunity to explore the field which has

always intrigued me and where my interest was- that of facility planning.

I am indebted to Dr. Vivek Desai – Director HOSMAC (India) Pvt. Ltd. for giving me an

opportunity to work in his organization as there are but a handful of such organizations where

I could have pursued such a study.

I am extremely grateful to Mr. Hussain Varawalla- Sr. Architect HOSMAC (India) Pvt. Ltd., my

guide who took a lot of efforts for my sake.

I am also extremely grateful for the support provided by my seniors Mr. Sameer Mehta and

Mr. Kapil Rawal who were a constant source of encouragement at HOSMAC.

I would like to thank Brig. S.K. Puri, my guide, for having faith in me and I hope that I would

be able to live up to his expectations.

I am also indebted to my teachers Dr. S.G. Kabra and Dr. Hari Singh for their guidance

throughout my academic career.

Lastly but not the least I would like to thank my friends - Shekhar, Rupesh, Gaurav Tripathi

and Benjamin for always being with me throughout my stay at IIHMR.

PREET MATANI

14 2

Page 3: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

TABLE OF CONTENTS

CHPT

NO

TOPIC PAGE

NO.

1 STUDY DESIGN

1.1 INTODUCTION AND BACKGROUND INFROMATION 1

1.2 RATIONALE FOR THE STUDY 3

1.3 OBJECTIVE 4

1.4 SPECIFIC OBJECTIVES 4

1.5 METHODOLOGY 4

1.6 LIMITATIONS OF THE STUDY 5

1.7 TIME PERIOD AND PLACE 5

2 ABOUT THE ORGANIZATION 6

3 LITERATURE REVIEW 15

4 SPACE PROGRAM 23

5 OPERATION THEATRE 38

6 INTENSIVE CARE UNITS 50

7 RADIOLOGY 61

8 LABORATORY 72

9 CENTRAL STERILE PROCESSING DEPARTMENT 80

10 PATIENT ROOM 87

BIBLIOGRAPHY 89

ANNEXURES

1 LIST OF LICENCES, REGISTRTIONS AND APPROVALS 90

2 AERB SPECIFICATIONS FOR MEDICAL DIAGNOSTIC

EQUIPMENT (X-Rays)

91

14 3

Page 4: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

EXECUTIVE SUMMARY

This study was carried out at HOSMAC (India) Pvt. Ltd, a consultancy firm of

repute. HOSMAC has experience of building several hospitals with many new

projects in the pipeline. This study is about a brief for a proposed 100-bed

hospital. It is both exploratory and descriptive in nature.

Once a decision has to build the hospital has been taken the next step is its

architectural design. A detailed architects brief has to be first prepared to enable

the architect in drawing up his plans. The landscape, facility mix, bed mix,

availability of utilities in the vicinity will have to be considered. Considerable

inputs from other agencies like air-conditioning, electrical, plumbing, etc. will be

required to finalize the working plan for the building. Inputs from the equipment

vendors especially in specialty areas like Cath-labs, CT-scanners, MRI, linear

accelerators, operation theatres etc. will be essential. In India a common thing is

lack of emphasis given to support services like kitchen, laundry, CSSD, back-up

electricity and so on. Not only are these services vital, but these also have high

capital cost and recurrent expense and hence should be properly planned. Just to

illustrate the standards for healthcare design in India, we are still designing

facilities where total area per bed is hardly 600 sq. ft. whereas western standards

are close to 1,400 – 2,000 sq.ft. per bed and WHO recommends an area of 800-

1200 sq. ft per bed. While it may not be prudent to follow the western concepts

blindly, one needs to pick up the good things from the modern methods. Some of

the issues that could be adapted from developed countries are flexibility for

future expansion, larger secondary areas for better patient comfort, proper

utilities for wait areas, nurse stations, storage, changing rooms, alcoves for

stretchers/ wheelchairs, adequate transport facilities, parking facilities, proper

light and ventilation etc.

In the case of hospitals functional complexities far outweigh physical complexities

and demand an addition to the planning and design team of persons who

understand not only the work process of individual departments but those of the

hospital operating system as a whole.

The study will help in formulating a functional brief or an architects brief that will

have an analysis of functional needs, interrelationship of departments, area

requirements, major equipment, the grouping of accommodation and the main

outline of traffic flow.

14 4

Page 5: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

This document would help the architect in understanding the complex needs of

hospital functioning and enable him to build a hospital that is functional, efficient

and yet economical without compromising on the design aspect.

14 5

Page 6: An Architectural Brief for a Proposed 100-Bedded Hospital

1.1 INTRODUCTION AND BACKGROUND INFORMATION:

Planning can be defined as ' The specification of the means necessary for the

accomplishment of goals and objectives before action towards these goals has

begun'

What are the various things that must be addressed to during healthcare

programming and design process?

1. Provide a functional design that ensures efficient, safe and appropriate work

spaces.

2. Accommodate technical requirements for highly sophisticated equipment.

3. Create clear, segregated paths for movement of people and material within

the building.

4. Create a humane environment for patients and staff.

5. Develop building systems that can accommodate rapid change.

6. Blend technical and functional requirements into a design that brings delight

to those who use the building and those who pass by it.

Architects and construction oriented professionals acting alone may provide a

building that operates efficiently as a physical structure, however, it is equally

possible that they may entirely miss the mark in terms of operational

functionality.

And Functionality as a prime determinant of operational efficiency is a major

factor in the total life cycle cost of all hospital structures. There is also little doubt

that quality of care and treatment is also affected by the degree to which design

accommodates both inter and intra-departmental functions. Hence a new

discipline called functional planning has emerged over the past few years, which

augurs well for the future of hospital design. Individuals possessing adequate

training and experience in this field have made and are making substantial

contributions to the planning and design process. Usually such planners have

backgrounds in hospital management. They could also be architects who have

specialized in hospital architecture or trained personnel of consulting firms.

Responsibilities of a functional planner:

Page 7: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

1. Physical evaluation of existing facilities (along with architect)

2. Functional evaluation of existing facilities.

3. Preparation of workload projections.

4. Functional programming.

5. Space programming (along with architect).

6. Master site planning (along with architect).

Although functional planning of hospitals has not reached its maturity and indeed

may never do so, concepts springing from its practice are burgeoning yearly as

intense study is made of alternative operational and building systems. There are

even more innovative changes in operational methods and procedures on the

horizon as demands for greater employee productivity are considered. All this

will directly depend upon architectural design for implementation and few can be

brought into being without direct input to the design process by functional

planners.

Determination of the services to be provided in quantitative terms requires

consideration of the following:

Functions

Locations

Relationship

Utilization

Staffing pattern

Space requirements

Work flow.

Before an architect can develop a hospital design that will best serve its

functions he has to be provided a written programme explaining these

requirements. This is the architects brief from the interpretation of which he

prepares schematic drawings and sketch plans.

The brief would contain the permission required from various regulatory bodies,

spatial needs of various departments, manpower required, special requirements

of various departments, inter and intra departmental relationships.

1.2 RATIONALE FOR THE STUDY:

14 2

Page 8: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

The future will see a continued demand for the construction of healthcare

facilities including completely new or replacement facilities and projects involving

major additions and modernization. The annual value of healthcare construction

projects will see an uptrend in the immediate years ahead owing to various

factors like opening up of the insurance sector and privatization initiatives.

Therefore planning and design will continue to merit prime emphasis amongst

other responsibilities of healthcare officials. In the case of hospitals functional

complexities far outweigh physical complexities and demand an addition to the

planning and design team of persons who understand not only the work process

of individual departments but those of the hospital operating as a single

functional system. Functional planning is the responsibility of a trained hospital

administrator who should be capable of interpreting complex relationships,

internal traffic flows (personnel and supplies),

Technological requirements and operational procedures to the extent a product of

beauty, reasonable cost and optimal utility will result. A functional design can

promote skill, economy, conveniences and comforts whereas a nonfunctional

design can impede activities of all types, detract from the quality of care and

raise costs. A non-functional building is the nemesis of any hospital striving to

compete in the current climate of competition and emphasis on productivity. Thus

this stage consisting of preparation of the architects brief is important as the

design of the hospital will become crystallized during this phase. Time and trouble

spent during this stage will be well repaid and will enable the whole project to

proceed smoothly with a minimum of subsequent revision.

In undertaking any complex activity it is well to examine the experiences of

others in similar situations if such information can easily be found and properly

interpreted.

1.3 OBJECTIVE:

To prepare an architectural brief that would help the architect to build a

functional, economical and efficient hospital.

1.4 SPECIFIC OBJECTIVES:

14 3

Page 9: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

1. To study/understand the issues involved in functional planning of a hospital.

2. To determine the recent trends and changes in the healthcare facility needs

and to evolve a document that can incorporate these changes so as to enable

the architects to build hospitals in tune with modern requirements.

3. To draw up a space plan for the proposed hospital.

4. To study certain departments in greater detail and to provide a brief that may

be used as a basis for detailed programming later on.

1.5 METHODOLOGY :

Both primary and secondary research was carried out with more emphasis on

the latter.

Primary research will involve in-depth interviews with hospital consultants and

architects experienced in building healthcare facilities.

Secondary research will involve descriptive studies of the functional planning

carried out while building hospitals in the recent past. This will also involve

literature review by going through different books and journals.

Thus the study design is both exploratory and descriptive in nature.

1.6 LIMITATIONS OF THE STUDY:

Considering the time factor all the departments of the hospital were not

dealt with: only certain key departments were covered.

The study could provide only a preliminary brief for the architect. It would

be the basis for the development of a more detailed brief.

1.7 TIME PERIOD AND PLACE:

14 4

Page 10: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

The study was carried out at HOSMAC (India) Pvt. Limited, Mumbai from 24th

January till 17th April 2003.

Chpt. 2 ABOUT THE ORGANIZATION:

HOSMAC India Private Limited is a pioneering name in the field of Hospital

Planning & Management consultancy in India. Since its inception in 1996,

HOSMAC has grown rapidly to become a Unique hub of skill sets which cuts

14 5

Page 11: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

across various facets of a health care facility be it architecture, engineering,

management, or information technology.

In a short span of 6 years, HOSMAC has notched up an impressive string of more

than 80 projects in India and abroad. HOSMAC provides the entire range of

services that any health care service provider, may require: undertaking market

research, feasibility studies, detailed architectural design, project co-ordination,

equipment procurement, commissioning assistance, conducting an operational

audit for existing hospitals.

To provide such wide ranging services HOSMAC has a motivated team of highly

qualified and experienced professionals (doctors, MBAs, architects, engineers and

project managers). On a cumulative basis these professionals have more than

245 man years of experience and have rendered more than 60,000 hours of

management consulting services, designed 1.4 million sq feet of hospital space,

and are coordinating hospital projects worth more than 3.34 billion INR.

Unlike other industries, the health care industry is extremely complex in terms of

the wide spectrum of specialties, technologies, and the skilled/unskilled

manpower. The smooth interplay of these factors only will lead to a successful

health care organization. The alarming rise in cost for providing quality health

care will drive hospitals to cut costs rather than only enhancing revenue.

Some of HOSMAC’s services

OSPITAL PLANNING & PROJECT MANAGEMENT

 Market Research For Project Conceptualization

A comprehensive market research is undertaken to ascertain the needs in the

local health care market. HOSMAC's field workers are specifically trained to

conduct surveys and gather secondary data from various governmental and non-

governmental agencies.

The survey could include –

households

medical professionals

14 6

Page 12: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

diagnostic centres

nursing homes

hospitals.

relevant data from census report, demographic surveys,

government/media publications, and various other sources is also

searched

Such a market study is essential:

to primarily know the deficiencies in the health care market, thereby

assisting us arriving at a proper facility & bed mix.

to helps us finalizing the project size

for existing hospitals to undertake benchmarking in areas like tariff

rationalization, compensation policies, utilization reviews for various

services etc.

 Feasibility Reports

Having decided on the facility mix, the next value added service provided by

HOSMAC includes a very detailed and comprehensive feasibility study of the

project. This has been our major strength and we have to credit more than 30

such studies. We are proud to mention here that many of our reports have been

accepted by leading Financial Institutions in the country like IDBI, ICICI, IL&FS and

also multilateral agencies like the World Bank, Kfw etc.

The feasibility report would essentially contain the following vital information:

Brief description on the major findings of the market research

Proposed facilities plan

Detailed project cost inclusive of land & building, medical equipment, non-

medical equipment, furniture & fixtures, utilities, pr-operative costs,

contingencies, and working capital requirement, and the means of finance

Income and expenditure projections based on the feedback from the

market research and form HOSMAC's exhaustive database

14 7

Page 13: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Profit and Loss/ Balance sheet/Cash flow statements

Break even analysis

Sensitivity analysis

Architectural Designing

It is a known fact that Hospital Architecture in India is a neglected specialty.

HOSMAC's aim is to bridge this gap by providing modern yet practical cost-

effective solutions to the health care industry.

Healthcare architecture differs from that of other building types in the complexity

of the functional relationships between the various parts of the hospital. In the

residential and commercial building types the design brief is relatively easy to

understand and cater to. Healthcare architecture, however, requires specialized

knowledge on the part of the architect and the supporting engineering team. The

lack of such trained professionals results in many of the hospitals in India today

being ill conceived and costing their promoters much more in construction and in

inefficient operation than they need to. Eventually it is the patient who bears the

brunt of this incompetence through lack of quality in the medical care provided,

physical and mental discomfort and increased cost of hospitalization.

Specialized healthcare architecture is a field that is still in its infancy in India. As

pioneers in the field, HOSMAC is uniquely positioned to advise its' clients. This

advice is based on the combination of the skills and knowledge of our varied team

of professionals, which consists of doctors, architects, engineers and hospital

management graduates and the resource of an extensive database of information

compiled over the years.

However, this specialized field is not only about satisfying the stringent functional

demands that the hospital makes on its designer. The emphasis of healthcare

architecture is also on improving the quality of the environment for patient and

caregivers alike. It must meet the needs of people who use such facilities in times

of uncertainty, stress, and dependency on doctors and nurses. It must recognize

and support patients' families and friends by providing pleasant spaces. At the

same time the building should project an underlying reassurance that the patient

is in the hands of competent medical staff and in a technically sound healthcare

facility.

14 8

Page 14: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

In the future patients will be increasingly demanding of healthcare organizations.

Those facilities that are designed to be most responsive to patients in terms of

convenience, caring encounters, service orientation and the quality of care will do

best in meeting these new demands.

Architects are regarded as talented problem solvers. The problem here is to find a

way to deliver a high quality of care and access in a setting that is also highly

supportive of human relationships during times of great anxiety and fear. The

particular skills of HOSMAC's design team are well suited to meeting this

challenge.

We invite you to proceed to learn more about how HOSMAC (India) can help you

design and construct your proposed healthcare facility.

 Project Management

Apart from providing Architectural Designing solutions, HOSMAC also provides the

most vital project management services. An ardent need was felt for this as most

hospital projects in India suffer from lack of co-ordination between various

agencies like the promoters, architects, contractors, consulting agencies, doctors,

equipment vendors etc. HOSMAC thus identified this as a vital growth area and

has been rendering such services to help our clients in combating TIME/COST

overrun apart from giving functionally sound infrastructure solutions.

This service includes important activities

Liaison with all Agencies - Architects/contractors/equipment vendors/utility

service consultants and suppliers

Monitoring Project with PERT/CPM

Managing Change in Project Plans - most vital and complicated component

due to the various fall outs from the change in project design

Managing equipment planning schedule including cost-feature analysis,

procurement process, installation etc.

MANEMENT CONSULTANCY

  Management Consultancy Services

Turn Around Strategies

14 9

Page 15: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Such assignments include studying the historical trends of the hospital in terms of its

income/expenditure patterns, identifying cost/profit centers, identifying the key

success criteria for improving the bottomline. Having done this we provide a strategic

business plan with definite milestones to implement our recommendations and

monitor the same.

 Operational Audits

This is again a niche service provided by HOSMAC for health care institutions

requiring specific departments to be studied for improvement which may be

qualitative and/or efficiency related. An example of studies could include:

improvement of the lab services

operation theatre utilization reviews

manpower audits

medical audits

infection control programs

reorganization of profit centres

support service audits etc.

 Costing of Services

This is a highly specialized service which we provide. It is a well known fact that

hospitals in India set their tariffs in comparison to the market rates. This leads to

skewed rate setting and the customer is the looser. HOSMAC has conducted several

costing exercises for our clients to help them understand the real cost of providing

services by virtue of which our clients have an advantage over their competitors. In

many cases we found that hospitals were under pricing their services hoping that

volumes will cover up the cost, whilst they were actually increasing their losses. We

have developed an in-house format for costing of various services on a department

wise basis which enables us to conduct our studies in a systematic manner within a

short span of time.

 Systems Study & Re-design

14 10

Page 16: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Though HOSMAC does not provide computerization solutions, we are thorough in

system analysis and provide vital interface solution with the agency providing the

computer solutions. Also such assignments are essential for hospitals which do not

have computerized systems for various activities. The activities involved include

'walking through' the processes, identifying the stumbling blocks, finding solutions,

redesigning the systems/processes/forms/reports/records, implementing the 'changed'

processes and providing online correctional interventions. Many of our clients have

found our association to be invaluable whilst implementing the computerization

modules.

 Manpower Audit & Training

Hospitals are labour intensive institutions and salary expenditure forms the major

head of expenditure. Therefore it is of paramount importance that a proper manpower

plan is formed and implemented. Also notable feature is that in hospital setting the

interaction between the highly skilled and unskilled workforce is of a very high

magnitude leading to IR problems. Whilst conducting such study, we undertake an

exhaustive manpower audit of all departments and benchmark it with the industry

standards to ascertain the deficiencies. Wherever required re-distribution of

manpower, job enlargement, and job enrichment solutions are recommended.

Customized training programs are conducted targeting specific needs like attitudinal

change, team building, grooming in etiquettes, etc.

 Marketing Strategies

This has been one of our most popular services and we have devised and

implemented successfully our marketing plans. We begin our assignment by

benchmarking the services against the best hospitals in the client's service segment

and conducting a customer satisfaction survey to understand the drawbacks in our

services and products to be marketed. This followed by a proper product development

for marketing, which includes improvement in the service delivery mechanisms,

proper pricing, identification of target audience, preparation of brochures/mailers, and

setting milestones for productivity enhancement. We help our clients in

14 11

Page 17: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

implementation of the strategy by making visits to the corporates and monitoring the

overall process of marketing.

L EQUIPMENT PLANNING

 Biomedical Equipment - Planning & Procurement Norms

Advances in Engineering and Information Technology in the recent years have

brought about several changes in the field of Medical Science. Medical Equipment

play a very significant role in the field of medicine and healthcare delivery

system. Sophisticated biomedical equipment requires a host of utilities like the air

conditioning and refrigeration, stabilized power supply systems etc. The design

criteria of these support systems are of paramount importance.

Hospital equipment fall into an extremely wide spectrum ranging right from a hi-

tech MRI and CT scanner to a simple patient trolley. These all account for a major

part of any hospital project cost, which could go upto almost 60%. Of this,

biomedical equipment could account for nearly 50% of the cost. Keeping this in

view it is essential to ensure maximum utilization of the equipment with minimum

downtime.

The health care industry is experiencing a new era in cost containment. In the

past, little attention was given to the financial impact of equipment related

decisions. Today, however, times have changed. In this new environment, "state-

of-the-art" is no longer sufficient as planning criteria for selecting new technology.

Today, for a technology to be appropriate, it must address the needs for

efficiency, cost-effectiveness, and productivity and at the same time, improve or

maintain the quality of patient care. In addition, hospitals are finding themselves

in an extremely competitive arena, which puts an additional emphasis on a

technology's marketability. The challenge faced by hospital executives today is to

gain the management and control required to make effective equipment planning

decisions.

Whilst medical devices can be broadly categorized into diagnostic and

therapeutic equipment, the selection criteria for procurement would need to take

into account several factors viz. type of hospital & level of services provided;

services available in the neighbourhood and technology employed; background of

the staff that would operate the equipment; proposed tariff for the services

employing medical devoices; etc. Having addressed these issues one would need

to carry out a separate financial feasibility for the major and critical equipment

14 12

Page 18: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

and then set out to prepare the specifications and features of the medical devices

that would be considered most appropriate for the hospital. After having

undergone this exercise too there are multiple products that one can choose

from. For this one would need to apply further criteria and do a detailed analysis

of factors related to the technology and design base of the equipment; the

maintenance convenience and available service support; forthcoming technology

and interchangeability with the current generation; presence of the

manufacturer / vendor in the existing market place; and once again the factors

are several!

Product Development Assistance

Provide benchmarking data regarding market expectation from a hospital

management system

Details hospital best practices

Undertake detailed reviews of newer modules and upgrade versions and

provide recommendation of any enhancements/modification

Periodic comprehensive review and study of the existing modules to update

and upgrade continuously

Implementation Assistance

Jointly prepare implementation plan with solution provider

Undertake a comprehensive system study

Gap analysis

Preparing specification for customization

Site monitoring assistance

Undertake audits of the sites where software is already installed to identify

areas of problem

14 13

Page 19: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

  Business Development Assistance

Provide business development assistance in terms of identifying new leads,

represent and recommend the business partner during presentation to key

clients as hospital consultants.

LITERATURE REVIEW:

Since Henri Fayol's pioneering treatise on management in 1916, planning has

involved two considerations, i) Assessing the future and ii) making provisions for

it.

According to Robert M. Fuller "Planning is of course decision Making because it

involves selecting from among established alternatives" Certainly the adoption of

a systematic planning process is imperative in any hospital facility. Failure to

adopt and to adhere to a specific methodology almost invariably results in a

deterioration of the quality of planning. Architectural design represents the most

definitive act of planning any building project. Although representing a new

discipline, functional planning already has achieved recognition through its

contribution to operational functionality and has become a key factor in hospital

14 14

Page 20: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

design. Future research in this area of planning and design process may further

enhance productivity in the healthcare field.

In terms of broad categories of activities the process of hospital project planning

can be a multistep process.

The steps are as follows:

1. Perception of need for a building program.

2. Strategic Planning and feasibility assessments.

3. Organizing for planning, design and construction.

4. Determining the planning, design and construction approach.

5. Scheduling planning, design and construction.

6. Opening the completed project.

The role of the Functional planner is most important in steps 3 and 4.

Selection of the professional planning team

A complete team should possess capabilities in

Financial Feasibility Consulting.

Functional Planning.

Architectural and Engineering services

Construction Management.

Selection Timing :

The Functional Planner, the architect and the construction manager can all

make valuable contributions in the early stages of a project and should be

contracted at approximately the same time. Because the functional planner has

the most intense involvement in the very first stages, he might be brought in first,

but the other two must closely follow.

14 15

Page 21: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

The possibility to influence a project and its cost is reduced during the course of

its development after the client has decided to establish the requirements of the

user and started to investigate the problems. The largest reduction of possibilities

to influence the design occurs at point 1, which marks the clients decision

concerning implementation. The figure is based on a study by Stig Nordquist.

Responsibilities of a Functional Planner :

1. Physical evaluation of existing facilities (along with architect)

2. Functional evaluation of existing facilities.

3. Preparation of workload projections.

4. Functional Programming.

5. Space programming (along with architect)

6. Master site planning (along with architect)

1. Physical evaluation of existing facilities :

This is a study to determine the degree of physical obsolescence of existing

facilities and to identify major code violations and physical problems and to

project future usability.

2. Functional evaluation of existing facilities :

14 16

Page 22: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

This is a study to define functional problems that detract from operational

efficiency, quality of patient care, and convenience of building inhabitants to

evaluate traffic flows and physical relationships, to determine space

insufficiencies in terms of current requirements to study the need for

modernization, alterations and expansion, according to strategic plan findings

and to note possible alternative future uses of the structure as a whole as well

as of various departmental areas.

3. Preparation of workload projections :

The functional planner can determine and formulate concepts of operation for

the proposed project according to previous study findings. These concepts will

be incorporated in the functional program. These projections form the basis

for functional programming, revenue projections and staffing estimates.

4. Functional programming :

Using approved recommendations and findings of the strategic plan, findings

of physical and functional evaluations and workload projections, the functional

planner formulates recommendations for operational concepts, the detailed

room composition of the project, required phasing, alterations, internal and

external traffic flows, interdepartmental relationships and operating systems.

5. Space programming :

Based on the functional program, as amended and approved by the hospital a

room by room listing is made of all areas in the proposed project. Net square

footage is assigned to each space, and totals accumulated for every

department or functional entity. using the net figures, appropriate calculations

are then made to set gross totals for each department or functional entity as

well as the total for the entire project.

14 17

Page 23: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Some pointers to successful hospital planning

Good planning is critical to the hospitals success :

If a hospital has to be successful it must be built on the bedrock of three sound

principle namely good planning, good design and construction and good

management. The absence of the first two of the equally important but closely

related triad, good planning and good design and construction means failure to

design the facilities for the optimum utilization of staff and services. This in turn

results in a mediocre hospital that fails to realize its economic goals.

Efficient, Functional and economical hospital :

The real test of any hospital is the quality of healthcare it provides. If the hospital

has to pass this test- a truly rugged test-planning and design must result in a

functional, efficient and economical hospital. It should be remembered that even

minor defects in designing could make the operation of a hospital inefficient. The

corollary of this is that an inefficient hospital costs significantly more to operate,

staff and maintain, not to mention the fact that the patients within it get less

health services for the money they pay.

It should be borne in mind that economy of operation and maintenance over the

life of the building as well as the quality care to patients depends in a large

measure on the proper planning and designing of the hospital and is more

important than the economy of construction. The initial cost of building a hospital

is insignificant when compared to the cost of running and maintaining it over the

years- by one reckoning eighteen to twenty times over a period of say twenty

years. Another study says that the running cost of a hospital over 4 to 5 years

from the date of completion is about the same as the capital cost. and if the

facilities are not planned and designed properly this intangible cost can be

enormous. the efficiency with which the physicians and their assistants can

function has been greatly handicapped by obsolete design. Patient comfort and

provision for expansion have often been overlooked. Growing efficiency and

innovative ideas have revolutionized hospital building construction to meet

among other things, the special needs of patients. It is believed that a pleasant

environment that makes for an enthusiastic and more productive staff also

benefits the patients albeit indirectly.

14 18

Page 24: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Promoters and hospital planners often overlook to include in the facilities design

what helps to preserve the patients' dignity and status as a human being or

details that would make the hospital more livable. Many patients complain that

hospitals as institutions reduce privacy, individuality and more importantly human

dignity. Many of these details and facilities can be incorporated with little or no

extra cost.

While planning and designing a hospital the patients needs and expectations

should be kept uppermost in mind and any design should aim at his satisfaction

and comfort.

Today's healthcare facility is by its very nature a complicated entity and planning

and designing such a facility to serve the increasingly complex needs of its

patients, staff and management team is difficult and complicated. The problem is

compounded by rapid changes and advances that are taking place in the fields of

technology and medicine and the constant need to modernize, renovate, replace

and expand healthcare facilities.

 Process of planning :

A common understanding should be established between the architect and the

engineers on one hand and the promoters, doctors, administrators and planners

on the other. A wide variety of professionals need to be integrated into a planning

team that is responsible for the implementation of this complex process.

Initial planning encompasses the general physical facilities that are being

considered, the space requirements, cost constraints, time schedules, standards

that must be included.

In the next step details of the operational plan for each department should be

considered- location of each department, requirement of floor space,

intradepartmental and interdepartmental relationships, circulation, traffic flow

and requirements in relation to equipment, personnel and patients.

 

 

Operational and Functional planning first :

Before any plans can be drawn by the architect an understanding of the

requirements of the hospital in terms of services it is going to provide, number of

beds, departmental functions, departmental needs, major equipment, space

requirements, required personnel, relationships and adjacencies must be agreed

14 19

Page 25: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

upon. All this must form a written document. This is called operational planning- a

written programme needed for any architectural project.

Operational planning establishes a dept-by dept description of needed space by

outlining for example, the no. and type of surgeries, X ray rooms, outpatient

services, laboratory services etc. the exercise thus determines current and

projected needs within the facility. A consultant or an administrator who is

knowledgeable and has experience in the operation of the hospital is by far the

best person to develop this document. Normally there is either no briefing of the

architect or the brief given to him is inadequate. The promoters must clearly tell

the architect the requirements of the hospital and not the other way round. The

architect should not dictate to them nor should he conjecture what the

requirements are or what he should design. More often than not there is no

written brief or operational program and to know what is needed the architect has

to fend for himself. Sometimes he is asked to prepare his building schedules with

the help of doctors, at other times he is asked to observe other hospitals and take

guidelines from them. Both these are unsatisfactory methods.

 

Key to Functional planning :

The proper sequence is the development of operational planning that defines

the major requirements and needs first. The operational plan is then developed

into a functional plan. Planning of the hospital on a functional basis-that lists

every room and suggests net sizes for major functional rooms and the total size

of the department. The key to functional planning is not just a room list but

understanding that travel and adjacencies will affect operational cost for the life

of the facility says David R. Porter the renowned hospital architect.

Mistakes in planning may prove costly :

Instances are aplenty of hospitals that were not planned with these critical factors

in mind-within five to ten years they found that the cost of construction had been

equalled or surpassed by operating expenses.

Functional grouping of high traffic areas such as X-ray, laboratories, surgical and

delivery suites, physical therapy and clinics on two floors is desirable. It permits

concentration of hospital activities in a manageable unit. When future expansion

or changes becomes necessary, they can be accomplished without disturbing the

nursing areas.

14 20

Page 26: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Operational Plan and Functional Plan must precede Architectural Plans :

Planning and Building a hospital to serve the increasingly complex needs of

modern healthcare is an intricate job. The architect though competent in his

profession may not be competent in the technical aspects of hospital architecture

and may lack knowledge of some of the specialized clinical and administrative

areas and matters. This document called the operational plan and functional plan

developed from it form the basis and are necessary prerequisites for the architect

to prepare the architectural plans.

Hospitals must be planned for the future :

A fundamental rule that promoters should remember is that the hospital should

be planned for at least 10 to 15 years ahead or else experts say plans will be

obsolete when they come to the drawing board. With the rapid development and

advances in technological, medical and administrative sciences and innovative

techniques and therapies, space requirements of every department has increased

markedly. New departments come to be needed, and more space is required to

some specialties. In addition to space needs, technology is imposing a host of

physical demands on our hospitals. Well planned systems must be built into them

to keep pace with the changes. Said one design expert ' We have got to design

`Smart` hospitals that respond to present needs while anticipating future change.

Within the building all departments must be planned in such a way that they can

stand individually. This can be done by freely locating each department with

space around for expansion. Further care should be taken that expensive

permanent fixtures and fixed equipment such as plants and elevators are not

located at the free ends of the departments as they would permanently block

expansion plans. Future expansion is rendered easy with free ended buildings

with extendable corridors.

14 21

Page 27: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Space Program:

The space plan is made on the basis of personal interviews with hospital

administrators experienced in building hospitals and also with the help of

literature review and would help the architect in finalizing his plans. Hospitals are

a difficult planning subject as explained earlier. The maxim ‘Design follows

function’ must be kept in mind while allocating space details. The area

specifications may be taken as indicative as suitable alterations would have to be

made by the architect to conform to the grid matrix.

The total space area including the parking space, HVAC and water is 1,05,319 sq

ft which works out to be 1053.19 sq ft. This is in concurrence with modern

standards of constructing hospitals which provide for an area of 800-1200 sq ft

per bed.

Ground Floor:

Key Departments like OPD, Emergency, Radiology, Laboratory would be situated

on the ground floor. The Radiology dept. would be situated near the Emergency

dept.(According to a study nearly 40% of cases coming to Emergency require X

rays)

The administration department would be located on the 1st floor along with the

Blood bank and General and Paediatric wards.

The Labour room, Obstetric ward and NICU would be located on the 2nd floor along

with the semi-private ward.

The CSSD would also be located on the 2nd floor just below the operation theatre

with provision for dumb waiters between the CSSD and the OT.

The OT’s will not be located on the top floor to avoid the excess heating nor will

they be located near the major traffic areas.

The ICU’s and private wards will also be located on the 3rd floor.

14 22

Page 28: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

The residential area will be located on the 4th floor just above the ICU’s and the

OT’s. So a doctor can easily attend to the patient when called.

30% of the area is kept for circulation.

         

  Department wise area allocation                          Department Area sq.ft                        General ward 3978      Semiprivate + deluxe 8437      Private+deluxe 8437      Obstetric Ward 3679      Paediatric Ward 2847      NICU 4921      ICU 7235      OT 5844      OPD 4940      Physiotherapy dept 975      Radiology 5005      Other diagnostic Facilities (ECG, 3380      EEG, Stress test, Endoscopy)        Laboratory 2425      Blood Bank 1840      Pharmacy Outlet 260      Pharmacy Store 520      MRD 1430      CSSD 1957      Laundry 1918      Kitchen 2300      Restaurant 2860      Housekeeping 325      Telecommunication 390      PR Department 260      Security 195      Auditorium 1950      Prayer Room 260      Mortuary 975      Library 390      Manifold Room 390    

14 23

Page 29: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

  Administration 2314      A/c Department 780      Stores 2405      EDP 780      Emergency Room 1937      Ambulance 325      Telephone Booth 260      Shoppe 130      Executive health checkup 1300      Residents 15000      Total Space for 100 beds 105319      Area per bed 1053.19      (Current standards 800-1200 sq ft)                 Parking Space 46875      Electrical+HVAC+Water 4550               Distribution of floor space by wards and departments                 Wards 45378 43%    Diagnostic Facilities 12650 12.01%    OPD+ Emergency+ Related Areas 10117 9.60%    Administrative Area 11349 10.78%    Service departments 10790 10.25%    Residential Areas 15000 14.25%        100%             Breakdown of Space Requirements of key departments       Area Sq ft per bed      Nursing Units 273.78      ICUs 121.56      Operation Theatres 58.44      Radiology 50.05      Laboratory 24.25      Pharmacy 7.8      CSSD 19.57      Dietary 23      MRD 14.3      Housekeeping Dept 3.25      Laundry 19.18      Mechanical Installations 49.4      Stores 24.05      Administration 30.94               Distribution of Beds        General 16      Semi- Private (two in one) 26      Private 13      Deluxe 6      ICU 10    

14 24

Page 30: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

  NICU 9      Obstetric Ward 10      Paediatric 10      Total 100      Other Beds        Pre -op 4      Post op 6      Emergency 4               Allocation of Departments floor wise        G+0        OPD 4940      Emergency 1937      Radiology 5005      Laundry 1918      Kitchen 2300      Physiotherapy 975      Pharmacy outlet 260      PR Dept 260      Manifold room 390      Shoppe 130      Telecommunications 390      Prayer Hall 260      Ambulance 325      Telephone booth 260      Mortuary 975      Laboratory 2425               Total space 22750               G+1        Restaurant 2860      Housekeeping 250      Administration 2314      Security 195      Accounts Department 780      Executive Health Check Up 1300      Blood Bank 1840      MRD 1430      General Ward 3978      Paediatric 2847      Other Diagnostic Facilities 3380      Pharmacy Stores 520      EDP Dept 780               Total space 22474               G+2        CSSD 1957      Semiprivate ward + Deluxe beds 8437    

14 25

Page 31: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

  Stores 2405      Obstetric ward 3679      NICU 4921             Total Space 21399               G+3        OT 5844      ICU 7235      Private + Deluxe 8437               Total space 21516                        G+4        Residential Area 15000      Library 390      Auditorium 1950               Total space 17180                                          Department Wise Space Plan        General Ward                 Beds 16 120 1920  Nursing Station 1 200 200  Doctors room 1 100 100  Nurses room 1 100 100  Treatment room 1 100 100  Staff toilet 1 50 50  Store 1 60 60  Pantry 1 60 60  Clean utility room 1 60 60  Dirty utility room 1 60 60  Toilets General 3 50 150  Waiting Area 1 200 200        3060  Add 30% circulation space     918  Total space     3978                    Semi private (2 in 1)                 Beds 26 175 4550  Beds deluxe 3 350 1050  Nursing station 1 200 200  Dr's room 1 100 100

14 26

Page 32: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

 Nurses rest room 1 100 100

  Store 1 60 60  Pantry 1 60 60  Clean utility room 1 60 60  Dirty utility room 1 60 60  Toilet 1 50 50  Waiting area 1 200 200        6490  Add 30% circulation space     1947  Total Space     8437          Single Room\ Private                 Beds 13 350 4550  Beds deluxe 3 350 1050  Nursing station 1 200 200  Dr's room 1 100 100  Nurses rest room 1 100 100  Store 1 60 60  Pantry 1 60 60  Clean utility room 1 60 60  Dirty utility room 1 60 60  Toilet 1 50 50  Waiting area 1 200 200        6490  add 30% circulation space     1947  Total Space     8437                    ICU        Beds 8 225 1800  Beds - Isolation room 2 250 500  Nursing Station 1 350 350  Equipment Room 1 250 250  Stat Lab 1 50 50  Doctors Room 1 100 100  Nurses Rest room 1 100 100  Toilet (staff) 1 50 50  Toilets -General 2 50 100  Store 1 60 60  Pantry 1 60 60  Clean Utility Room 1 60 60  Dirty utility Room 1 60 60  Waiting Area 1 300 300  Beds For Relatives 10 150 1500  Toilets cum Bath 3 75 225 

      5565  Add 30% circulation space     1670

14 27

Page 33: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

  Total space     7235                    NICU                 Open Care units 9 125 1125  Nursing Station 1 200 200  Equipment store room 1 200 200  Doctors room 1 100 100  Nurses rest room 1 100 100  Toilets staff 2 50 100  Component milk formula room 1 50 50  Feeding room 1 60 60  Nursing room 1 100 100  Toilets - General 3 50 150  Waiting Room 1 250 250  Beds for relatives 9 150 1350        3785  Add 30% circulation space     1136  Total space     4921                    Obstetric Ward        Beds 10 120 1200  Nursing Station 1 200 200  Doctors room 1 100 100  Nurses room 1 100 100  Clean utility 1 60 60  Dirty utility 1 60 60  Pantry 1 60 60  Staff toilet 1 50 50  General toilets 2 50 100  Store 1 100 100  Labour rooms 2 300 600  Waiting Area 1 200 200        2830  Add 30% circulation space     849  Total space     3679                    Paediatric Ward        Beds 10 120 1200  Nursing Station 1 200 200  Doctors room 1 200 200 

Nurses room 1 100 100  Clean utility 1 60 60  Dirty utility 1 60 60  Pantry 1 60 60  Store 1 60 60

14 28

Page 34: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

  Toilet- Staff 1 50 50  Toilet- General 2 50 100  Waiting Area 1 200 200        2190  Add 30% circulation Space     657  Total space     2847           Operation Theatre        OT rooms        General OT Room 2 450 900  Specialty OT Room 1 625 625  Scrub room 2 100 200  Instrument room 2 100 200  Wash room/ Dirty utility 2 60 120  Store room 1 200 200  Chief anaesthetist room 1 100 100  Dr's room 1 150 150  OT incharge room 1 60 60  Nurse room 1 60 60  Dumbwaiters 2 20 40  Pantry 1 40 40  Equipment room 1 200 200  Trolley bay 1 150 150  Toilet 2 40 80  Change rooms 3 50 150  Reception 1 60 60  Waiting room 1 100 100  Pre operation room 4 beds   350  Post operation room 6 beds   600        4495  Add 30% circulation space     1349  Total     5844           OPD        May I help you desk 1 50 50  Registration/billing 1 200 200  Waiting area-- Reception 1 500 500  Toilets (M&F) 8 25 200  Reception and Records room 1 250 250  OPD waiting area 1 400 400  Consultants rooms (Medicine, 5 150 750 

Surgery, Gyn obs, Paed & Ortho)        Sub Waiting Areas 5 50 250  Staff toilets 2 50 100  Doctors toilets 1 75 75  Trolley/ Wheelchair bay 1 200 200  Collection room 1 50 50  Minor OT 1 300 300  OPD Store 1 75 75

14 29

Page 35: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

  Staff room 1 250 250  Administrators office 1 150 150        3800  Add 30% circulation space     1140  Total     4940           Other Diagnostic Facilities        ECG Room 1 300 300  EEG Room 1 350 350  2 D echo room 1 500 500  Stress Test Room 1 750 750  Endoscopy Dept        Reception 1 50 50  Waiting 1 200 200  Consultation 1 100 100  Endoscopy room 1 350 350        2600  Add 30% circulation Space     780  Total     3380           Physiotherapy Department 1 750 750  add 30% circulation space     225  total     975                    Radiology        MRI 1 750 750  Ultrasound 1 350 350  Ultrasound Room        Change room        Sub Waiting        X ray- General 1 650 650  Radiography room        Control room        Change room        Sub waiting        Special X ray 1 900 900  Radiography room       

Control room        Change room        Toilet        Barium Preparation        Sub- Waiting                 Staff room 1 100 100  Radiologist room 1 100 100  Waiting room 1 300 300  Reception 1 100 100  Technicians room 1 100 100

14 30

Page 36: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

  Staff toilets 2 50 100  Records room 1 150 150  Film Store 1 150 150  Reporting room 1 100 100        3850  Add 30% circulation space     1155        5005           Laboratory        Reception 1 75 75  Biochemistry 1 300 300  Haematology & clinical pathology 1 200 200  Histopathology 1 200 200  Microbiology 1 200 200  Serology 1 200 200  Sample collection 1 150 150  Toilet 1 40 40  Toilets (staff) 2 50 100  Waiting 1 100 100  Report dispatch area 1 100 100  Staff room 1 100 100  Technicians 1 100 100        1865  Add 30% circulation space     560  Total     2425           Blood Bank        Waiting area 1 200 200  Examination room 1 75 75  Recovery& refreshment room 1 150 150  Bleeding room 1 150 150  Staff room 1 60 60  Blood bank in charge room 1 100 100  Component separation room 1 400 400  Toilet (staff/visitors) 2 40 80 

Issue counter 1 50 50  Store room 1 150 150        1415  Add 30% circulation space     425  Total     1840                    Pharmacy        Store area 1 400 400  Retail area 1 200 200        600  Add 30% circulation space     180  Total     780         

14 31

Page 37: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

  MRD        Process room 1 500 500  Office room 1 100 100  Record cum store room 1 500 500        1100  Add 30% circulation space     330  Total     1430           CSSD        Receipt area 1 100 100  Wash room 1 200 200  Gloves sterilizing room 1 75 75  Change room 1 50 50  CSSD Supervisor room 1 100 100  Clean area for packing 1 100 100  Actual sterilizing room 1 450 450  Sterile store room 1 200 200  Staff toilets 2 40 80  Trolley Park 1 150 150  Dumb Waiters 2 20 40        1505  Add 30% circulation space     452  Total     1957           Laundry        Receipt area 1 100 100  Dirty area 1 150 150  Ironing/ wash area 1 400 400  Laundry incharge room 1 150 150  Toilet 1 50 50  Store room 1 200 200  Mending room 1 100 100 

Delivery/ Distribution 1 100 100  Trolley Park 1 100 100        1350  Add 30% circulation space     443  Total     1918           Kitchen        Receipt area 1 80 80  Dietician room 1 100 100  Store room 1 100 100  Utensils area for storage 1 100 100  Dry area 1 150 150  Cold area 1 100 100  Preparation area 1 150 150  Cooking Area 1 350 350  Washing area 1 150 150  Trolley park 1 150 150

14 32

Page 38: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

  Change area 1 50 50  Toilet 1 40 40  Dining room 1 200 200  Garbage room 1 50 50        1770  Add 30% circulation space     531  Total     2301           Restaurant        Sitting area 1 1500 1500  Preparation 1 500 500  Store 1 200 200        2200  Add 30% circulation space     660  Total     2860           Housekeeping        Office 1 50 50  Store 1 200 200        250  Add 30% circulation space     75  Total     325           Telecommunication        Office 1 50 50  Cable area 1 250 250        300  Add 30% circulation space     90  Total     390 

         Personnel Relation department        Office 1 200 200  Add 30% circulation space     60  Total     260           Security        Office 1 150 150  Add 30% circulation space     45  Total     195           Mortuary 1 750 750  Add 30% circulation space     225  Total Space     975                    Auditorium 1 1500 1500  Add 30% circulation space     450  Total     1950         

14 33

Page 39: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

  Prayer room 1 200 200  Add 30% circulation space     60  Total     260           Library 1 300 300  Add 30% circulation space     90  Total     390           Electrical HVAC +Water+Boiler 1 3500 3500  Compressor air & Vacuum        Add 30% circulation space     1050  Total     4550                    Manifold room        Area 1 250 250  Office 1 50 50        300  Add 30% circulation space     90  Total     390                    Administration        MD/CEOs office 1 250 250  MS office 1 200 200  Office (secretary) 2 50 100 

Waiting room 1 200 200  Manager administration 1 150 150  Clerical office 1 350 350  Nursing superintendent 1 200 200  Staff for nursing superintendent 1 200 200  Toilets        MD/CEO/MS 1 50 50  Clerical staff 2 40 80

        1780  Add 30% circulation space     534  Total     2314           A/C department        Office 1 200 200  Process area 2 200 400        600  Add 30% circulation space     180  Total     780           Stores        Receipt area 1 100 100  Storage area 1 1500 1500

14 34

Page 40: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

  Office 1 250 250        1850  Add 30% circulation space     555  Total     2405           EDP        Office 1 100 100  Server room 1 500 500        600  Add 30% circulation space     180  Total     780           Emergency room        Triage 4 beds 500 500  Med. Officer 1 100 100  Nursing station 1 100 100  Dr change room 1 75 75  Nurse change room 1 75 75  Toilet 1 40 40  Minor OT 1 250 250  Waiting area 1 250 250  Reception 1 100 100        1490 

Add 30% circulation space     447  Total     1937           Ambulance        Control room 1 250 250  Telephone Booth 2 50 100  Shoppe 1 100 100        450  Add 30% circulation space     135  Total     585           Residential Area     15000           Executive Health Check Up        Reception 1 100 100  Waiting area 1 300 300  Doctors rooms 3 150 450  Collection room 1 50 50  Records & Storage 1 100 100  Toilets 2 50 100        1000  Add 30% circulation space     300  Total     1300           Parking space        Area for 1 car = 275 sq.ft      

14 35

Page 41: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

  Area for parking 150 cars     41250  30 staff, 120 general                 Area for I scooter = 75        Area for 75 scooters     5625  25 staff, 50 general                 Total     46875

Operation Theatre

Function:

The function of this department is to receive patients after diagnosis, to

anaesthetize them, to operate upon them and to supervise their post-operative

condition before returning them to their wards. The surgical patients account for

30% to 40% of the in-patient admissions.

Location:

The OTs can be grouped together in a centralized form to have an entire OT

complex or they can be decentralized. However for having decentralized OTs eg

like those for gynaecology, ophthalmology and ENT the quantum of work should

justify the need for them. Centralized OTs are preferred normally as there is

greater economy of staff and equipment, better professional supervision and

greater efficiency.

There will be 3 OT’s- 2 General and 1 Specialty OT. They will be located on the 3 rd

floor. The location will be such that they will be away from major traffic areas and

also not on the top floor. This will avoid overheating. They will be located close to

the ICU’s for the easy transport of patients. They will also be located close to

vertical transport and above the CSSD. There will be 2 dumbwaiters- one for clean

linen and one for soiled linen.

14 36

Page 42: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Key Factors influencing OT complex Planning:

The total volume of expected operations alongwith the anticipated work period is

used to calculate the no. of operating rooms needed. Around 1 operating suite is

recommended for every 50 beds. The number of operating rooms has also been

indicated to be 5 per cent of the total number of surgical beds. OR in larger

hospitals a thumb rule 0.1 operations per bed per day has been used. For Indian

theatres conducting general surgeries it is estimated that the average time taken

for each surgery will be around 75 minutes per operation. Hence one OT can

perform around 5 general surgeries daily. A separate emergency OT would be

justified when 50 or more cases are reported in the casualty. The other factors

that would influence the planning are the case mix and the type of operations to

be performed and also the ALOS of surgical patients.

The no. of operating rooms forms the basis for determining the number of pre-op

beds and the post-op beds.

Number of operations per day = No. of surgical beds

ALOS of surgical patients

Number of OT rooms = Total no. of operations in hospitals

Capacity of 1 OT

Basic Functions:

Reception and identification of the patient.

Pre- op supervision of the patient.

Depilation of the patient if not done in the ward.

Transfer of patient to the operating table.

Induction/ Intubation/ Positioning

Preparation of the operative area and surrounding skin.

Draping of patient

SURGERY

Sewing up/ Removing drapes/ Extubation

Transfer of patient to post- anaesthetic recovery area.

Post- operative supervision of the patient/ Step down.

Layout :

14 37

Page 43: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

The OT will be independent of the general traffic and movements of the rest of

the hospital. The rooms should be arranged in a manner that allows continuous

progression from the entrance through the various zones that become

increasingly clean. The various zones in the OT are

Protective Zone

Restricted Zone

Clean zone

Super clean Zone

Ultra clean Zone.

The protective zone is the area where the entry is restricted to the patients, the

staff and their relatives. It is till the waiting areas for the relatives.

The entry to the restricted zone is limited to the patients and the staff. This

area includes the patient reception area, the staff changing rooms.

The clean zone, which is the next zone, consists of the pre and post op areas,

the administrative areas, the stores, laboratory, space for equipment storage.

The superclean zone consists of the operating theatre and its ancillary rooms

like the scrub room, the instrument room and wash room.

The ultraclean zone consists of an area of 1 metre on either side of the

operating table.

An operating room for general surgery will have an area of 450 sq ft. However

operating room for specialty surgeries like orthopaedic and Neurosurgery will be

around 625 sq ft. The operation suite will consist of an operating room, a scrub

room, a waste disposal room and an exit room. The waste disposal room will lead

into the dirty corridor so that waste can be disposed off without it being allowed

to renter the clean zones. There will be a service lift to carry away the waste and

also a dumb-waiter to carry the soiled linen to the CSSD.

In older times it was believed that it was desirable to have a separate induction

room. However while such a room reduces the operating rooms occupancy time

as the patients can receive pre-operative anaesthesia while other patients are on

the operating table. The disadvantages however outweigh the benefits. The main

disadvantage may be the huge increase in capital as well as running costs

incurred in such a room. Also there will be the cost of additional equipment and

the utilization of the room will be low.

The preop holding area and post op recovery room should have piped and

medical gas outlets.

Provisions should also be made for flash sterilizers.

14 38

Page 44: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

If the operating room has windows this will increase the heat load inside and

provision should be made for it. Windows provide for visual relaxation but

whether operating rooms should have them or not is a debatable question as they

may cause distraction if provided.

The temperature inside the OTs will be maintained at 21 degrees. The airflow

is laminar airflow i.e. positive pressure is created such that air flows from the

clean zones to the dirty zones. The laminar airflow is created through a plenum in

the ceiling. The velocity of air flowing through this plenum is 60 ft/min. The size of

the plenum will be around 6 by 6 feet. This will be enough to cover the patient on

the operating table and also the entire operating team. The air moves outwards

through outlets, piped gas, suction and nitrous oxide are provided through

pendants in the OT.

HEPA filters which can filter air upto 0.3 microns will be used.

Between 20- 100% fresh air is used. The rest is recycled.

Humidity levels will be 55% plus or minus 5%

The floor of the OT will be granite with brass strips. This helps in earthing

purposes for the electrostatic current. The walls can be of stainless steel or

marble whereas the ceiling can be of stainless steel or Plaster of Paris. The

theatre corridors will preferably be 3.2 metres and not less than 2.85 metres

wide.

Circulation within the department:

Patient flow:

In-patient nursing units Holding area Operating room

Pt rooms Post op recovery

Staff:

Entrance Changing rooms Working area Rest room/changing room

14 39

Page 45: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Exit

Equipment & supplies:

Clean Entrance Supply area Theatre area User Area

Sterile:

CSSD Theatre Preparation area User Area

Dirty linen and instruments:

Theatre Disposal room CSSD Laundry

Relationships with other departments:

- Patient areas

- Support areas

The surgery dept will be related to patient areas like the emergency dept, the

ICU, patient rooms. They should have direct horizontal or vertical access to

surgery. Support areas such as pharmacy, laboratory, CSSD and housekeeping

services should have access to surgery through nonpublic and non-sterile

corridors.

CSSD will have vertical adjacency to surgery and will be connected by

dumbwaiters with the Operation Theatre.

Equipment required:

Movable Equipment

Surgical tables

C arm machines

Anaesthesia machines

Heart lung Machines

Flash sterilizers

Fixed Equipment:

Medical gas

Surgery lights

Laminar flow

14 40

Page 46: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Functional Areas:

Control Station: The control station is primarily a clerical area located in a

position to control traffic into the surgery department. A control station differs

from a nurse station in that less people work out of this area. Surgeries are

scheduled; records and administrative functions are maintained. Space is

provided for requisite items to be delivered or picked up by other departments.

Casework and furniture required:

Computer support components

File drawers

Form trays to organize the large volume of paper and forms.

Marker board for posting daily surgery schedule.

Pre-Operative Holding:

Patients arriving for surgical operations will be held in this area until the operating

room is ready. Here patients may be given medications or intravenous fluids

under close observation of the nursing staff.

Casework and furniture required:

A small workstation for filling out forms and paperwork.

Locker to hold patient care supplies.

Sink unit.

Medicine prep/ Storage

Specialty procedure carts.

Scrub Area:

They are placed with access to the operating rooms. Surgical scrub sinks are

generally ceramic or stainless steel with foot or knee controls. Shelves will be

placed above the sink to hold scrub brushes and masks.

Casework and furniture required:

Overhead storage of 2 feet per sink is required.

Operating room:

It is the area where surgical procedures are performed under sterile techniques.

14 41

Page 47: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Operating room will have positive pressure ventilation systems, with controlled

temperature and humidity, to prevent corridor air from entering.

The work surface for the circulating nurse will be placed near the entrance door

and the movable modular casework on the wall at the foot end of the table

depending on the head orientation of the patient.

Modular casework applications:

Procedure/supply carts used for

Anaesthesia supplies and equipment

Suction and cautery equipment

Monitoring equipment

Prep and dressing

Anaesthesia carts.

Lockers used for

General supply storage

Backup supplies

Specialty procedure carts.

Dirty utility:

Used linens, instrument sets and equipment are placed in soiled utility

immediately after surgery. This room may hold soiled linen and instruments until

they are returned to central supply.

This opens outside to the dirty corridor from where the things are removed via

the dumbwaiter to the CSSD or to the laundry via the service lift.

Movable modular caseworks:

Process tables or work surfaces for receiving soiled items.

Sink unit.

Staffs lounge:

A staff lounge is used primarily for coffee breaks, snacks and as a place for staff

to rest from the pressures of patient care. Space should be provided for a

refrigerator, microwave oven and large coffee maker.

Staff change rooms usually adjacent to staff lounge are provided for male and

female staff to change from street clothing to surgery attire. Clothing lockers,

toilet facilities and showers are provided.

14 42

Page 48: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Movable modular caseworks and furniture:

Tables and seating

Base cabinets for storage

Overhead storage for coffee maker and supplies.

Administrative office:

The following positions will require an administrative office

Director/ Head of Anaesthesiology

OT in charge

Operating room materials manager/ Store room

Movable Modular Casework and furniture systems:

Cantilevered work surfaces

Work surfaces for keyboard drawers or trays to accommodate computers and

printers

Overhead storage and marker boards for displaying information.

Task lights and personal lights.

Lighting:

Intensity:

At the plane of the incision it would be desirable to achieve an all round intensity

of about 40,000 lux.

Luminance:

Normal luminance brightness for the central field during an operation should be

2,000 to 3,000 cd/sq.m The floor around the surgical table should have a

luminance of 200 to 300 cd/sq m, the walls 300 to 500 cd/sq m and the ceiling

lights 1,000 cd/sq m at most.

Operation lamp characteristics:

The intensity of light be variable, but generally at least 40,000 lux at the

working plane, and at least 8,000 lux at the bottom of a 13 cm deep and 5

cm wide incision.

The operation lamp should with no part hang lower than 2.0 m above the

floor.

General Lighting in operation room:

14 43

Page 49: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

General lighting in the operation room should attain a minimum of 400 lux. In the

U.S. general illumination capability of 2,000 lux uniformly distributed throughout

the room with provision for reducing this level has been recommended.

Lighting in Operation room:

A reasonable level of illumination at washbasins is 300 to 500 lux. In the U.S. for

scrub rooms the illumination level of 2000 lux has been recommended as

members of the surgical team will encounter in the operating room.

Lighting in post anaesthetic recovery room:

Patients are disoriented and aware of bright lights during the awakening period.

Therefore light fittings must be placed where they will not disturb the patient.

A lighting intensity of about 300 lux is recommended. A mounted wall or ceiling

source of higher intensity spot illumination about 10,000 lux must be available for

performing procedures if required.

Colour in surgical department:

Generally in the UK pale blue, grey and green have found to be most suitable.

Blues and yellows should be avoided. A light grey colour for the operating room

floor has been recommended.

For the scrub up room yellowish or red shades may be used.

For the anaesthetic room the reflections on the patients face would not obstruct

the anaesthesiologists judgement of the patients condition. The colour scheme in

the anaesthetic room may be the same as that for the operating room, possibly

softer and warmer.

Noise levels

In operating room:

The noise level in operation rooms should be below 50 decibels.

In anaesthetic rooms as well as in the labour and delivery rooms the noise levels

should be below 45 decibels.

In recovery room:

A special sensitivity to noise and need for protection from it is found in newly

operated persons whose autonomic nervous system is in disorder. One of the

patients greatest irritations in the recovery area is the laughter and other noises

of the staff.

14 44

Page 50: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

In recovery rooms sound absorbent ceiling materials and wall finishes with a

reflection factor of about 50 per cent should be used.

Temperature in the operating room:

The temperature in the operating room will be maintained between 21 to 23

degrees.

Humidity:

The acceptable limits for relative humidity as regards static electricity and

comfort are 45 to 60 per cent. Low relative humidity has been reported to be an

optimal condition for Kleibsiella pneumoniae Type A while high humidity in the

hospital enhances the danger of growth of Ps. Aeruginosa.

Humidity in the operation room is believed to contribute to the prevention of

dehydration of exposed tissues.

At a relative humidity of about 50 per cent a very thin invisible film of moisture

forms on operation equipment and other surfaces. The film of moisture conducts

static to earth before a spark producing potential is built up.

A standard of relative humidity between 40 to 65 per cent has been fixed for

operating rooms. (55 % + or – 5%)

Flooring in operation room and anaesthetic room:

The rooms flooring in the operation rooms and the anaesthetic rooms should be

Non slippery when wet.

Withstand intensive application of water and disinfectants

Not absorb physically foreign molecules

Be elastic and recover after the removal of heavy objects.

Have a high resistance to breakdown.

Be fire resistant.

Be colourfast.

PVC flooring is the floor finishing that satisfies the majority of the requirement

of the operating room flooring.

Walls:

Suitable surface materials include laminated polyesters with an epoxy finish

and hard vinyl coverings which can be heat sealed.

14 45

Page 51: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Semi matt wall surfaces reflect less light than high gloss finishes and are less

tiring to the staff.

The corners in the operating room should be rounded with the wall surfaces to

make cleaning routines easier.

Doors:

Door hardware should be designed with single lever action and should require

no more than 4 kg of pressure to open the door.

In the operation department, staff dressed in sterilized garments require a

minimum door opening width of 90 cm. A clearance of about 10 cm on either

side of the bed including special equipment is required to move it through an

opening.

A width of 150 cm for two leaf door openings can be recommended.

A device that holds the door open must be provided to simplify equipment

moving.

The sound insulation properties of the doors should be good.

Operating rooms and anaesthetic rooms should be provided with safety

glazed openings with blinds to save unnecessary opening.

In the post- operative recovery area the doorways should pass beds easily. A

door width of about 145 cm is recommended.

Electrical outlets and switches:

Electrical outlets should not be placed so that the power cords between the

wall outlets and the junction boxes and apparatus hinder the staff.

In operating rooms about 20 outlets are needed for advanced operations.

Electrical outlets in the vicinity of the operating table should be combined in a

control panel comprising switches, fuses and plug outlets for main voltage and

low voltage for electronic appliances. It is preferred to have the control panel

hanging from the ceiling from the pendant.

In post anaesthetic units upto 8 electrical points are necessary for each bed.

Medical gases, piped air, vacuum.

Oxygen, compressed air, nitrous oxide and vacuum are supplied via gas pipes

identified by colours according to international standards.

To maintain homeostasis the inspired gases should be warm and humidified.

Heated humidifiers which supply gases at 35 degrees centigrade and at 100

14 46

Page 52: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

per cent relative humidity. The temperature of gases should be monitored to

prevent tracheobronchial burn.

Gas outlet points shall be at least 20 cm from electrical components to avoid

generation of sparks.

For preoperative areas oxygen, suction and compressed air are required.

For the operation theatre and postoperative areas oxygen, compressed air,

nitrous oxide and suction are required.

v

Intensive Care Units:

Function:

14 47

Page 53: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

ICUs are specialty nursing units designed, equipped and staffed with specially

skilled personnel for treating very critical patients or those requiring specialized

care and equipments.

Location:

The ICU’s should be located in a geographically distinct area within the hospital

with controlled access. No through traffic to other departments should occur.

Location should be chosen so that the unit is adjacent to or within direct elevator

travel to and from the Emergency Department, operating room, Intermediate care

units and Radiology department.

There are 2 schools of thought-

One suggests that ICUs should be in a centralized place and be contiguous with or

readily accessible to one another. Having intensive care facilities in a centralized

place allows the specially trained professionals and equipment an almost instant

access to patients in all clinical services when an emergency develops. Such an

arrangement also eliminates the need for duplication of costly equipment and

personnel.

The second school of thought favors that the location should be dependent on the

type of patients eq.-The surgical ICU should be close to the operating rooms.

- The Medical ICU should be in close proximity to the medical wards.

- The NICU should be close to the obstetrics ward.

- The Neurosurgical ICU can be located close to the emergency department

Layout:

12 to 16 beds per unit are considered best from a functional perspective. There

will be 10 beds in the ICU. There will also be 2 isolation rooms within the ICU to

accommodate increasing incidence of contagious and immunocompromised

patients. Supply corridors should be separated from public/patient corridors.

The ICU consists of the following areas

Patient rooms.

Central/ Nursing Station

X ray viewing areas/ Storage areas

14 48

Page 54: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Clean and dirty utility rooms

Equipment storage

Food prep area/ Pantry

Staff areas/ Doctors Room/ Nurses rest room

Supply and service corridors.

Stat lab

Visitors waiting room.

Doctors room.

Patient rooms:

Patient rooms must be designed to support all necessary healthcare

functions. There will be at least 225 square feet area per bed.

An emergency alarm button must be present at every bedside within the ICU. The

alarm must sound automatically in the central nursing station and the origin of

these alarms must be discernible.

The patient bed should be located permanently away from the wall to give staff a

360 degree access to the patient. There is generally a headwall behind each

patients bed for a freestanding utility column to mount monitors and equipment

and to supply suction, air, oxygen and regular electrical and emergency electrical

services. Space for computer terminals and patient charting should be

incorporated in the design. Storage for computer terminals and patient charting

should be incorporated in the design. Storage for patients personal belongings,

patient care supplies and pharmaceuticals should be provided at the bedside. An

ICU design should consider natural illumination and view. Windows are an

important aspect of sensory orientation and every room should have the patient

facing the windows to reinforce day/ night orientation if possible.

The patients must be situated so that direct visualization by healthcare providers

is possible at all times. This approach permits the monitoring of patient status

under both routine and emergency situations.

Movable Modular Casework:

Bedside supplies placed in an L cart with drawers or in a storage unit.

Locker within or adjacent to the patient room to house immediate necessary

supplies and linen.

Cantilevered work surface or mobile table with a keyboard tray as a station for

nurse charting done on a bedside computer.

14 49

Page 55: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Isolation rooms:

There will be 2 isolation rooms in the ICU.

Isolation rooms are used by patients with highly communicable diseases or those

who are unusually susceptible to infection. Cleanliness and contamination are key

concerns in these rooms. Each isolation room will contain at least 250 square

feet of floor space with an anteroom. Each anteroom should contain at least 20

square feet to accommodate hand washing, gowning and storage. An attached

toilet must be provided in the isolation rooms.

Movable Modular Casework:

Same as that required for patient rooms.

Central station:

A central nursing station should provide a comfortable area of sufficient size to

accommodate all necessary staff functions. Within the nurses station the staff

manages patient records and charts, communicates regarding the patients

conditions, views patient monitors, orders tests and treatments and dispenses

medications. Adequate space for computer terminals and printers is essential.

Patient records should be easily accessible and adequate space must be provided

for them. Adequate surface space and seating for medical charting by both

physicians and nurses should be provided. Shelving file cabinets and other

storage for medical record forms must be located so that they are readily

accessible by all personnel requiring their use.

A refrigerator for pharmaceuticals and a sink with hot and cold running water

must be provided.

Behind the nursing station a small area may be provided as a rest room for

nurses. This area can contain a bed, which can be utilized by pregnant nurses to

rest in between work.

Doctors Dictation:

An area should be provided for physicians to review patients charts, dictate

progress notes and write patients orders. It should have access to telephones.

Charting:

A stand up or sit down area should be provided with access to patients charts by

nurses and physicians. This area is generally maintained by the unit clerk or the

unit secretary.

14 50

Page 56: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Cart Storage:

An area must be provided to store and quickly access crash carts and procedure

carts. This area should be accessible to supplies for restocking carts and have

electrical access to maintain rechargeable equipment.

Movable Modular Casework and Furniture:

Cantilevered work surfaces

Monitor shelves

Computer tools and keyboard trays.

Lateral filing components.

Procedure and crash carts.

X ray viewing area

A separate area at the nursing station or near each cluster of ICUs must be

provided for the view of the patient radiographs.

Storage areas:

Provision should be made for storage of crash carts and portable monitors/

defibrillators near each set of ICUs.

Stat Lab/Equipment storage:

A separate storage area behind the nursing station for storage of large patient

care items not in active use such as mobile X ray must be provided. Space should

be adequate enough to provide for easy access, easy location and easy retrieval.

Much of the equipment must be accessible to electrical outlets to maintain

battery charges.

Movable Modular Casework:

They can be used to store small and large equipment and may include

Modular Shelving units

Bulk supply carts.

Space for Laboratory equipment:

Since many patients in the ICU require Arterial blood gas analysis and electrolyte

analysis space must be provided for an ABG analyzer and an electrolyte analyzer.

14 51

Page 57: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Clean and dirty utility rooms:

They must be separate rooms that are not interconnected.

Clean utility room:

It should be used for the storage of all clean and sterile supplies and also for the

storage of clean linen. It requires space for supplies, linen, procedure trays and

procedure carts.

Movable Modular Casework:

Cantilevered work surfaces with drawers

Extra- deep modular shelving units

Lockers for medical supplies and linen

Bulk supply carts

Procedure carts.

Dirty Utility room:

It must be provided with a sink. Separate covered containers must be provided

for soiled linen and waste materials. Special containers should be provided for the

disposal of needles and other sharp objects. Air supply from the dirty utility room

must be exhausted. This room typically has a sink.

Movable Modular Casework:

Cantilevered work surfaces with drawers

Cantilevered sink unit.

If a special procedures room is desired it could be located between the clean and

dirty utility rooms. A separate hatch can be provided from the clean utility room

to the special procedure room and from the special procedures room to the dirty

utility room.

Food preparation area/Pantry:

An area where food can be brought from the kitchen in food trolley and

heated/prepared before it can be distributed to the patients.

Staff change rooms and toilets:

14 52

Page 58: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Rooms must be provided for staff to change and there should be lockers to keep

their belongings. Separate toilets should be provided for the staff.

Patient and supply corridors:

The patient and supply and service corridors should be separate from each other

so as to facilitate easy movement.

Reception area/Visitors lounge/Waiting room.

The reception area should be located such that all visitors should pass this area

before entering. This area should contain information about the patients admitted

and should also be of help to the attendants of the patient.

Waiting room:

One to one and a half seats per critical bed is recommended here. Public

telephones( preferably with privacy enclosures) must be provided. Television and/

or music should be provided. Tea/coffee vending machines, public toilet facilities

and a drinking fountain should be located in the lounge area.

One bed per patient admitted must be provided for the patients’ attendants. This

room must have adequate toilet and bathing facilities.

A separate family consultation room can be provided. This will help if the treating

physician wants to talk with the family/ relatives of the patient.

Interdepartmental Relationships:

ICUs should be located close to or be easily accessible from

Emergency Department

Operation Theatre

Laboratory

Radiology

General Nursing units/ Wards

Most admissions are through OT or emergency.

Also they should be close to vertical transport cores.

An intermediate area should have twice the number of intensive care beds in an

ICU

Patient/material flow.

14 53

Page 59: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Patients will come to the unit from in-patient admitting, emergency/trauma

department, other patient care units, surgical departments or cardiac cath

departments.

From here the patients may go to other patient care units like intermediate care/

general nursing units, surgical OT, diagnostic departments like radiology,

laboratory, Endoscopy or the patient can be discharged home

Patient/Material flow in ICU:

14

ICU Discharge Home

Support ServicesDietary

Materials ManagementCSSD

Housekeeping

Admitting Services

Emergency room

TriageObservati

on

54

Page 60: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Lighting:

While considering optimal lighting, attention must be given to the reflectance

value of walls, ceilings, and floor. The reflectance value is dependent upon their

texture and colour. Some recommended reflectance values are ceilings 80 to

95%, upper walls 40 to 60%, lower walls 15 to 20%, floors 15 to 30%, furniture 25

to 40%.

General overhead illumination plus light from the surroundings should be

adequate for routine nursing tasks including charting, yet create a soft light

environment for patient comfort. The intensity of 300 lux has been

recommended. Total luminance should not exceed 30 foot candles (fc). It is

preferable to place lighting controls on variable control dimmers located just

outside the room. This approach permits changes in lighting at night outside the

room, allowing a minimum disruption of sleep during patient observation. Night

lighting should not exceed 6.5 fc for continuous use or 19 fc for short periods.

Separate lighting for emergencies and procedures should be located in the ceiling

directly above the patient and should fully illuminate the patient with at least 150

14

DiagnosticsRadiologyLaboratoryCath Lab

EndoscopyEEG/EMG

Trauma unit

Other Patient units

OT/Surgery/Recovery

55

Page 61: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

fc shadow free. A patient reading light is desirable and should be mounted so that

it will not interfere with the operation of the bed or monitoring equipment. The

luminance of the reading lamp should not exceed 30 fc.

Colour in intensive care units:

Blues and greens should be avoided in the intensive treatment rooms as about 50

% of the light reflects from the walls the green and blue colours and may appear

to make the patient cyanotic. Gray colour is preferred.

Blue or blue green shades should be used in waiting and holding areas where

they are calming.

Noise levels:

The international noise council has recommended that noise levels in hospitals

acute care areas should not exceed 45 db in daytime, 40 db in evening and 20 db

at night. Normally noise levels in most hospitals are between 50 to 70 dB with

occasional episodes above this range. For these reasons floor coverings that

absorb sound should be used. Walls and ceilings should be constructed of

materials with high sound absorption capabilities.

Temperature and humidity in ICUs:

A temperature of 22 to 23 degree centigrade and humidity at 50 to 60 percent

have been found appropriate in the intensive care and treatment units as well as

in isolation rooms.

Doors:

In the ICU handles can be omitted from doors which can be pushed open. Also the

door width should be about 145 cm. In neonatal intensive care units the door

units the door widths of 90 cm are accepted.

Utilities:

Each ICU must have electrical power, water, oxygen. Compressed air, vacuum,

lighting and environmental control systems that support the needs of patients

and critical care team under normal and emergency situations. A utility column

(free standing, ceiling mounted or floor mounted) is the preferred source of

bedside electrical power, oxygen, compressed air and vacuum and should contain

the controls for temperature and lighting. When appropriately placed, utility

14 56

Page 62: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

columns permit easy access to patients head to facilitate emergency airway

management if needed. If utility columns are not feasible utility services may be

supplied on the head wall.

Electrical Power:

Electrical service to each ICU should be provided by a separate feeder connected

to the main circuit breaker panel that serves the branch circuits in the ICU. The

main panel should also be connected to an emergency power source that will

quickly resupply power in the event of power interruption. Each outlet or outlet

cluster within an ICU should be serviced by its own circuit breaker in the main

panel. It is critical that the ICU staff have easy access to the main panel in case

power must be interrupted for an electrical emergency.

Grounded 110 volt electrical outlets with 30 amp circuit breakers should be

located within a few feet of each patients bed. Outlets at the head of the bed

should be placed approximately 36 inches above the floor to facilitate connection

and to discourage disconnection by pulling the power cord rather than the plug.

Outlets at the sides and foot of the bed should be placed close to the floor to

avoid tripping over electrical cords.

In intensive care and treatment units 10 electrical outlets per bed are required.

In neonatal intensive care units 10 to 12 outlets per bed are required.

Water Supply:

The water supply must be from a certified source, especially if haemodialysis is to

be performed. Zone stop valves must be installed on pipes entering each ICU to

allow service to be turned off should line breaks occur. Hand washing sinks deep

and wide enough to prevent splashing, preferably equipped with elbow, knee,

foot or sonar operated faucets must be available near the entrances to patient

modules or between two patients in ward type units. This is a critical component

of general infection control measures. When a toilet is included in a patient

module, it should be equipped with bedpan cleaning equipment, including hot

and cold water supplies and a spray head with foot control. In addition when

toilets are present, environmental control systems must be modified.

Oxygen, Compressed Air and Vacuum.

Centrally supplied oxygen and compressed air must be provided at 50 to 55 psi

from main and reserve tanks. At least 2 oxygen outlets per patient are required.

One compressed air outlet per bed is required two are desirable. Connections for

14 57

Page 63: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

oxygen and compressed air outlets must occur by keyed plugs to prevent the

accidental exchange of gases. Audible and visible low and high pressure alarms

must be installed both in each ICU and in hospital engineering. Manual shut off

valves must be located and identified in both areas to permit interruption of the

supplies in case of fire, excessive pressure or for repair purposes.

At least three vacuum outlets per bed are required. The vacuum system must

maintain a vacuum of at least 290 mm hg at the outlet farthest away from the

vacuum pump. Audible and visual alarms must indicate a decrease in vacuum

below 194 mm hg.

Environmental Control systems:

Suitable and safe air quality must be maintained at all times. A minimum of six

total air changes/ room/ hr are required, with two air changes/ hr composed of

outside air. For rooms having toilets, the required toilet exhaust of 75 cubic ft/min

must be composed of outside air. Central air-conditioning systems and

recirculated air must pass through appropriate filters.

Radiology Department:

Function

The term radiology now incorporates:

Radiodiagnosis—

X Ray

Sonography

CT Scan

Magnetic Resonance Imaging (MRI)

Digital Subtraction Angiography (DSA)

Radiotherapy

Nuclear Medicine

Interventional radiology

The functions of the radiology department are;

Receiving the patient.

Exposing the film using the appropriate modality

Developing and checking the quality of the film image.

Viewing and interpretation by a radiologist.

Dictation and transcription of the interpretation and forwarding the report to

the requesting physician or surgeon.

Filing both the film and the written report.

14 58

Page 64: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Location:

The department should be easily accessible to the OPD, casualty and the

inpatient wards.

The location of the department will be on the ground floor.

It should have some scope for expansion at a later date.

Layout:

Planning for a good design for the X ray department is a complex process.

Equipment for Radiodiagnosis department is expensive, requires a great deal of

care and maintenance and appropriate space central to the users

WHO has recommended the standard size of the X ray room at 20 sq. mts

Approximate requirement of space for hospitals of different sizes is

750 beds --- 800 sq m

500 beds --- 650 sq m

300 beds --- 370 sq m

200 beds --- 175 sq m

100 beds --- 65 sq m.

Generally the space distribution in an X ray department is as follows:

11% control rooms and cubicles

16.5% X ray rooms.

9.0% Film processing and interpretation.

20.5% Administrative

8.5% Teaching

5.0% Waiting and Recovery

29.5% Circulation and wall area.

Patient and work flow:

According to experience 3 percent of the patients are taken directly to the X Ray

rooms. 17 percent are bed or stretcher cases. 80 percent are ambulant or use

wheel chairs or are minors. Around 5 to 10 percent of the departments patients

are children.

Patients

Receptionist

14 59

Page 65: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Waiting

Undressing/Enema

X ray Procedure

Film Processing

Wet film examination

Viewing by Radiologist

Interpretation

Report to the patient

Functional areas:

Waiting:

From the main reception area the patients are directed to sub-waiting areas.

A floor area of about 1.3 sq m should be allowed for each waiting patient.

Parking areas for beds and trolleys should be provided. The corridors must be 2.8

m wide for bed traffic.

Lavatories:

Lavatories should be easily accessible to waiting patients. Some should be larger

so that an attendant could assist. Handgrips on the wall for the patient are

recommended. Doors to lavatory compartments should open outwards.

All lavatories must have a wash basin.

Changing cubicles:

The patients who are to be X rayed require undressing or stripping to the waist.

Each X ray room requires about 2 well lit and ventilated cubicles of about 1.3 sq

mts size.

Each cubicle should have a chair, clothes hook and a mirror.

Contrast media preparation room/Barium Preparation:

In the vicinity of the undressing cubicles and X ray rooms there should be a room

where contrast media, frequently barium powder is mixed for investigations.

X ray screening room:

14 60

Page 66: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

A standard size of 40 sq mts has been recommended. The depth of the screening

room should not be less than 5.8 m. In the room a working height of about 3.3 m

is recommended.

In all X ray rooms a stainless steel unit with a sink and a washbasin is needed

because of the microbial cross-contamination and infection potential.

Door openings should be at least 1.3 m wide.

Radiodiagnostic rooms should have natural lighting and ventilation whenever

possible. All artificial lighting in the screening room should be wall mounted. The

ceiling has to be free from air ducts, pipes etc and should be weight bearing in all

directions for the installation of ceiling mounted equipment.

All rooms will have a control, tube (an X ray emitting device), tube stand or

support and cabling.

Important design considerations:

The space should be configured to allow a stretcher to be manoevered

with minimum turns by placing the axis of the X ray table perpendicular to

the wall with the door by which the patient will enter the room.

The control console will be opposite the door with direct access to the

vertical core.

Minimum size of a room should not be less than 20 sq mts/ideal is 40sq.

mts.

An overhead type tube support facilitates X raying a patient in bed or on a

stretcher.

The X ray tube should never point towards the control unit, darkroom or

window.

Control panel should be as far away as possible from X ray table.

Radiation hazard to the occupants of the X ray room is inversely

proportional to the square of the distance between the tube and the

individuals.

The passage of film cassettes from the radiography room to the darkroom

takes place through the hatch window opening into the darkroom. The

hatch must be adequately lead lined to prevent the entry of radiation

scatter into the darkrooms.

Also the doors and windows of the radiography room have to be lead lined

to prevent radiation scatter from the room.

A door on the control booth is required to protect the technician in the

booth from scattered radiation.

14 61

Page 67: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

The control panel should be wired to a signal outside each X ray room to

indicate when the machine is on, to prevent other personnel from

inadvertently entering the room. A red light bulb will be satisfactory as a

signal.

Special equipment:

Table and tube.

Wall bucky (a device that holds film in a position during exposure)

Control console

Sink and casework

Transformer and power cabinet.

Fluoroscopy room:

Fluoroscopy makes use of radio- opaque media that may be introduced into the

body to create images of tissue that would not otherwise show up well on X ray.

Because the radio- opaque material is typically barium introduced through the

mouth or the rectum, it is important to have a toilet room directly accessible from

the procedure room.

Important design considerations:

Apart from the design considerations for X ray rooms other considerations

peculiar for fluoroscopy room are:

The toilet room will be directly attached to the fluoroscopy room.

Barium will be prepared in a procedure room.

Floors should be designed keeping in mind that loads upto 2,000 kg/m will

be borne by the floor.

Special equipment;

Fluoroscopic X - Ray tube and table.

Image intensifier.

Spot film camera

Video monitor.

Wall bucky

Control Console

Sink and casework.

Transformer and Power cabinet.

X ray machines :

14 62

Page 68: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Machines which operate at a higher milliampereage are better for taking X rays of

thicker part of the body with less exposure time, but they are more expensive.

For chest X rays and X ray of the extremities better films of these parts are

obtained with 100 or 200 mA machines. However Examination of the skull,

abdomen and special investigations are best carried out with machines working

at 500 mA and above.

Image intensifiers:

Special investigations and fluoroscopy together form about 14 percent of all

investigations.

Image intensifiers greatly enhance the brightness of the normal fluoroscopic

images reducing the dose to the patient. Image intensifier systems are

distinguished by a C arm suspended from an overhead support clamped between

the floor and ceiling on an upright metal column.

Some details on X-ray machines available and prices.

Portable X ray- 60 mA ---- Rs.1,25,000

300 mA X ray -----Rs. 7,50,000

500 mA X ray ----- Rs.9,00,000

1,000 mA X ray with IITV—Rs.32,00,000

Film processor tank ---- Rs. 3,00,000

X ray viewer (8 film panel)-- Rs. 9,000.

Power requirements:

1. Mains

220 volts AC, three phase.

50-60 cycles

25 Amps

Mains impedance should not be greater than 0.5 ohms.

2. For a steady current with least impedance, a separate power line

exclusively for the radiology department is essential.

3. Frequent voltage fluctuations give unsatisfactory results. Voltage stabilizer

is necessary for each machine.

Radiation Protection:

If radiology rooms are isolated and built so that people cannot come within one

metre of its outside walls then no protection to the walls is required. However as

14 63

Page 69: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

this is not always possible the walls of the rooms where radiographic machines

are located have to be adequately reinforced.

AERB guidelines (also see annexure)

PROTECTIVE BARRER

The protective barrier for positioning between the operator/control panel and the X-ray tube/patient must be of appropriate size and design so as to shield the operator adequately against leakage and scattered radiation. The protective barrier must have a minimum lead equivalence of 1.5 mm. A viewing window having 1.5 mm lead equivalence must be provided in the barrier. The lead equivalence must be indicated on the barrier as well as on viewing window.

FLUOROSCOPY CHAIR

The fluoroscopy chair must have a minimum of 1.5 mm lead equivalence and its design must ensure adequate protection to the radiologist against stray radiation.

PROTECTIVE APRONS

The protective aprons must have a minimum lead equivalence of 0.25 mm and their size/design must ensure adequate protection to the torso and gonads of the user against stray radiation.

PROTECTIVE GLOVES

Protective gloves must have a minimum lead equivalence of 0.25 mm and the design must ensure adequate protection against stray radiation reaching the hands and the wrists and must permit easy movements of the hand/fingers.

GONAD SHELD The gonad shields must have a minimum lead equivalence of 0.5 mm.

PASS BOX The cassette pass box intended for installation in the X-ray room wall must have a shielding of 2.0 mm lead equivalence. The design must be such that the pass box can be opened from one side at a time.

FILM STORAGE The box intended for temporary storage of undeveloped films must not have less than 2.0 mm lead equivalence all around.

VEHICLE X-ray units installed in a mobile van or vehicle e.g. for

14 64

Page 70: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

MOUNTED X-RAY EQUIPMENT

medical surveys/clinics in remote areas, must be provided with an appropriate shielding enclosure so as to ensure adequate built in protection for persons likely to be present in and around the vehicle.

SHIELDING CONTINUITY

Appropriate overlap of shielding materials must be provided at the joints or discontinuities so as to ensure minimum prescribed shielding all over the surface of all radiation protection devices. Care must be taken to ensure that lead or any other shielding material does not creep or flow, resulting in reduction of shielding in any location.

MARKINGS The lead equivalence of shielding incorporated in radiation protection devices must be marked conspicuously and indelibly on them.

CONVENTIONAL SAFETY

Facilities for immobilization of patients, specially children, should be provided so as to minimize holding of patients during X-ray examinations.

CONVENTIONAL SAFETY

Appropriate equipment must be available to prevent/manage conventional hazards such as fire, flooding and electrical emergencies.

SAFETY ACCESSORIES

Additional radiation protection devices which would be necessary for specialized radiological investigations must have a minimum of 0.5 mm lead equivalence

SERIAL CHANGERS

Automatic serial changers should be used where the volume of work demands such specialized equipment.

For a 100 mA machine a wall thickness equivalent to 1 mm of lead is

required.

1 mm of lead thickness = 12 cm of poured concrete

= 10 cm of sheet glass

= 5 mm of steel.

The appropriate wall thickness using different materials can be calculated

using the following equation:

Thickness of concrete x 2.35 gm/ cu. Cm = Thickness of other material x

Density of other material.

As per the recommendations of the radiation protection division of the

BARC, Mumbai the walls of the radiography rooms have to be 9 inches

14 65

Page 71: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

thick concrete walls or 14 inches thick brick masonry walls which are

sufficient for primary as well as secondary radiation. Where they are thin,

lead shielding of walls is advisable.

The places which need special protection are

i. The wall behind the chest stand in the radiology room.

ii. Wall between radiology room and the adjoining room.

Personal protective measures like wearing the lead-rubber apron while

working and lead rubber gloves while doing fluoroscopy work provide

adequate protection.

Use of dosimeters to measure the level of radiation.

Dark room/ Film processing room:

The darkroom should preferably be air-conditioned. Where the volume of work is

high, automatic film developing and fixing can be done wherein the exposed film

is fed at one end and comes out automatically developed, fixed and dried at the

other end. If the daily workload in the department exceeds 50 films, a small

automatic film processor should be installed.

The darkroom is conveniently located between two X ray rooms to facilitate

handling of films, a film transfer cabinet between the two X ray rooms to facilitate

handling of the films.

A utility sink is provided in the darkroom for handwashing.

The passage into the darkroom should be zigzag to serve as a lightlock between

the darkroom and outside.

The size of the darkroom depends on the number of staff working in it. For the

first person about 8 sq m. is required and for every additional person 2 sq m is

required.

Dark colours, especially black should be avoided. Citrus fruit colour and pastel

shades are suitable for the walls and the ceiling of the darkroom.

Ten air changes per hour are recommended.

Radiologists office:

The office has a series of viewing boxes where the radiologists examine

radiologists examine radiographic plates and dictates reports.

A single radiologist can report upto 50 to 60 cases in a month.

Manpower required:

Radiologists

14 66

Page 72: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

X ray technicians

Darkroom assistants

Staff Nurse

Attendants

Record clerk

Receptionists.

Temperature in Radiodiagnostic department:

Some heating design temperatures for Radiodiagnostic departments.

Room Temperature in degrees centigrade

Waiting area 19

Patients changing room 22

Lavage room 21

Diagnostic X ray room 22

Processing area 19

Viewing area 19

Records 19

Office 19

Chemical and film stores 16

Flooring in Radiology Department:

In radiology units loads of 2,000 kg/sq m are installed which must be kept in mind

while designing the flooring of the radiology department.

Walls:

Permanent wall radiation screening in the X ray department rooms where the

working capacity does not exceed 150 kV and radiation is undirected should

comprise of a 2 mm thick sheet of lead and equivalent material.

In the X ray department shielded floors will be necessary if there are rooms below

the X ray rooms, particularly if tubes pointing downwards are used.

When under couch tubes are used ceiling shielding will be necessary for the

rooms above.

Windows:

Unshielded openings, if provided in am X-ray room for ventilation or natural light

etc., must be located above a height of 2 meters from the ground/floor level

outside the X-ray room.

14 67

Page 73: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Ultrasound room:

Ultrasound or sonography operates on the principles of sonar and records size

and shape by tracking reflected sound waves. A hand held transducer emits

regular pulses of high frequency sound and translates received echoes into

images.

Space requirements:

Space requirement for a sonography room is about 25 sq mts.

Space for staff, for storage of material and patient reception, waiting and

toilets which admit a wheelchair also are needed.

A changing cubicle of about 2 sq mts in size should be made available for

the ultrasound room. It should be equipped with hooks, mirrors and means

for locking up the patients valuables.

A toilet attached to the room is desirable.

Special equipment:

An ultrasound unit with the console placed on the right side of the patient.

Examination bed

Film illuminators.

MRI room:

MRI is performed by placing the patient in a powerful magnetic filed that aligns

the magnetic spin of the atomic nuclei. Radio frequency energy is introduced

which disturbs the alignment of the nuclei. Different atoms respond at different

radio frequencies thus providing a distinction between tissue types. MRI does not

utilize ionizing rays and can create detailed two and three dimensional images of

both hard and soft tissue.

Important design considerations:

Since MRIs use radio frequencies to generate imaging they are susceptible to

electro magnetic interference from outside sources. The room is wrapped with a

copper fabric to shield it.

Special equipment:

MRI unit

Patient couch

Operators console and video monitor in the control room.

Clinical laboratories:

Function:

14 68

Page 74: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Basic lab services provide information regarding the bodies chemical make up

and balance, the presence, numbers, performance and general activity of cells,

inherent genetic characteristics and the presence and level of bacteria and viral

organisms. In addition analyses of body tissue and cellular condition are assessed

through anatomical pathology studies. Clinicians use laboratory tests to make

decisions about patient care.

Location:

Generally laboratories are centralized for optimum efficiency in staffing,

management, quality control and equipment utilization. There may be a collection

center located in the outpatient department and a frozen section component

located in the surgical suite for immediate access during procedures. Blood gas

analyzers may be located either in the ICUs or in the laboratory depending on the

necessity. Stat labs may be located in those departments where necessary.

The laboratories will be located on the ground floor.

Interdepartmental relationships:

The labs should be easily accessible from the emergency department, the ICUs,

the OT’s, the OPD’s and the inpatient wards.

Key Determinants:

The majority of tests performed in labs today are automated, requiring relatively

little handling by technologists (except to initiate the testing process or to

calibrate and verify properly functioning equipment). Therefore the types and

numbers of testing machines within each lab section determine the capacity of

the lab and amount of space needed.

Flow of test orders and specimens:

Outpatient Inpatient

14 69

Page 75: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Patient visits Physician records

physician request for testing

on patient chart

Fills out

request for testing Specimen is collected

From patient

Outpatient comes

to lab for testing

Specimen is sent to Specimen is logged and

Specimen receiving decision is made on which dept

To send the specimen based on

Tests required

Specimen may be split into

Several containers

Departments receive sample

Departments test sample

Departments log results

Results are sent to the Results are received

Outpatient department at nurses station and

Attached to patients chart

14

Outside lab

70

Page 76: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Patient collects the

Results Physician reviews chart

And makes decision

Inpatient

Key design considerations:

Biochemistry and haematology are most frequently located closest to the

specimen reception area due to the high volume of work. Microbiology

may be located farthest from the reception area because of the lower

volume of testing to be performed and to isolate these biohazardous

activities from other procedures.

Chemical resistant and stain resistant materials should be used for

laboratory worktops and casework finishes. Bacteria resistant, cleanable

building finishes should be used in all areas. In areas of gross tissue

handling, such as gross tissue stations and the frozen section lab, stainless

steel is often used to enhance cleanability and durability.

Casework used today is modular and easily movable to facilitate quick,

economical rearrangement. Casework 36 inch high is standard.

Functional areas:

Rooms

Specimen Control/ receiving – 75 sq. ft

Phlebotomy/ Blood drawing area – 150 sq. ft

Biochemistry – 300 sq ft.

Haematology –200 sq ft.

Blood Bank – 1840 sq ft

Microbiology –200 sq ft.

14 71

Page 77: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Histology –200 sq ft.

Administrative areas-

Pathologists office – 100 sq ft

Secretarial/ Transcription area/Reception – 100 sq ft.

Specimen receiving: All orders by physicians for tests and specimens to be

examined are received and logged in here. Specimens are then distributed to the

appropriate areas within the lab. Record keeping, generating computer reports

takes place here. Specimen receiving is usually located near the entrance of the

laboratory for easy access to traffic coming into the lab. Specimen receiving

should be located in close proximity to chemistry, haematology, urinalysis and

blood bank as most of the specimens go to these areas.

Casework and furniture:

Stand up work surfaces to receive and hold specimens.

Process tables for centrifuges

Administrative work surfaces for seated work and computer use.

Work surfaces at stand up height for specimen preparation.

Locker with tray/ shelves to store blood drawing supplies used by

phlebotomists.

Phlebotomy area:

Area designated for drawing of blood samples from outpatients. Space is provided

for phlebotomists trays containing supplies necessary for drawing blood samples

from inpatients.

Casework :

Modular shelving or lockers used for storage of phlebotomists trays and

supplies.

Biochemistry:

Blood, urine and other body fluids and tissues are analyzed in the biochemistry

lab for their chemical constituents. It will have the largest workload and the

number of technicians. It contains a large number of expensive highly specialized

testing equipment. It requires workstations with running tap water, distilled water

14 72

Page 78: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

and many electrical outlets, some with dedicated lines for specific equipment.

Space must be provided for disposable supplies, reagents and instrumentation.

Workstations with modules and access panels for air and vacuum outlets,

running tap water, distilled water, drainage.

Casework cabinets may be used for storage below work surfaces.

Overhead flipper and shelf storage or below work surface drawers and shelves

for disposable supplies.

Shelves below work surfaces towards the bottom of lockers as storage for

reagent containers.

Chem- surf or resin work surfaces for staining areas.

Cantilevered work surfaces, file drawers for administrative work space for

supervisors.

Process tables for vibrating equipment, microscopes or large instrumentation

that may need easy access from all sides for use or repair.

Haematology:

It is the area of the lab in which blood samples are analyzed to determine the no.

and type of RBC’s, WBC’s and platelets. Complete blood counts (CBC) are

performed using large automated counters. Haematology performs approximately

50% of the procedures of the lab. Hence it should be in close proximity to

specimen control, have a specimen preparation area, room for several large

automated instruments, storage for reagents and many supplies and areas for

microscopes.

Casework and furniture:

Stand-up and sit down workstations with chem-surf or resin work surfaces for

receiving and preparing specimens and for staining.

A large number of workstations using modules and support panels.

Casework cabinets for storage below work surfaces.

Process tables for vibrating equipment such as a centrifuge.

Lockers on terminal panels

Microbiology:

It is a study of specimens to isolate and identify disease causing organisms e.g.

Bacteria, fungi, viruses and parasites.

Ideal location of microbiology is away from the main entrance of the lab.

Separate area for media preparation and media inoculation requiring long

work surfaces.

14 73

Page 79: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Ventilation and exhaust systems are key requirements.

Subspecialties- Bacteriology (bacteria)

Mycology (Fungi)

Virology (viruses)

Parasitology (parasites)

They should be isolated from general lab and have negative air pressure to

guard against contamination of other lab areas from the substance under

examination.

Movable Modular Casework:

Heavy- duty work surface with drawers.

Drawers under work surfaces to hold inoculation loops, slides, cover slips,

petri dishes, test tubes, pipettes etc.

Casework cabinets for storage below work surfaces.

Modular shelving units, C frame storage units with different sized drawers

or lockers to store stains and reagents for immediate accessibility.

Resin work surfaces which are stain and heat-resistant for working with

stains, reagents and flames.

Modules with water, electrical outlets and vacuum.

Cantilevered sink unit.

Histology:

Function:

Histology prepares microscopic slides of tissues removed from patients during

surgery or autopsy.

After examination of the specimen by the naked eye in gross pathology,

pathologists examine prepared slides under the microscope to determine or

confirm the diagnosis.

The important thing to be kept in mind is the considerable cleaning problem

caused by the large amount of paraffin used – often in the melted state.

Pathologists office:

The chief pathologist will be provided with an office with room for meeting people.

He will have a microscope in the office.

Movable Modular Casework and Furnitures:

14 74

Page 80: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Chair for chief pathologist

Chairs for visitors.

Work Surface

Overhead storage

Secretarial/ Waiting:

There will be an administrative area for secretaries and receptionists. Waiting

areas are provided for patients waiting to have testing done. These areas will be

located towards the front of the laboratory to discourage traffic in the clinical

areas.

Movable Modular Casework and Furniture systems:

Work surfaces with keyboard trays or drawers to accommodate computers

and printers.

Flipper storage, display shelves and open shelves for storage of manuals and

books.

Task lights and personal lights.

Lighting in laboratories:

When precision instruments are involved or colours have to be judged the

illumination level should be about 1,000 lux and when regular instruments 500 to

600 lux. The reasonable level of illumination at work with microscopes is about

3,000 lux.

Lighting in laboratories must not cause reflectance, glare and shadows.

Temperature and humidity:

In laboratories a fairly stable temperature of between 21 to 22 degrees

centigrade and a relative humidity between 40 and 60 percent should be

maintained.

Flooring in laboratories:

For laboratories special building adaptions, such as deep inserts in the floor, must

be taken in planning considerations early on.

All materials used should be tested with strong acids, alkalis, water, solvents, and

histological stains. The floors should be of non- slip quality also when wet, easy to

14 75

Page 81: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

clean, hard wearing and fire resistant. Linoleum and tiles are widely used in

laboratories.

Asbestos vinyl tiles are hard wearing and not so slippery when wet. They are

however attacked by some alkalis and acids. Flexible vinyl is preferred for

laboratory floor covering because it is more impervious and therefore a little more

resistant to chemical attack. Flexible vinyl is resistant to acids but not to all

solvents. Vinyl sheets should not be laid where it would be subjected to abrasive

materials or to heavy point loads.

Doors in laboratories:

In laboratories 120 cm is considered to be the minimum acceptable door width.

For easy exit door widths should swing out from the laboratory.

Central Sterile Processing Department (CSSD/CSPD):

Functioning:

Central Sterile Processing is a service whereby medical/surgical supplies and

equipment-both sterile and non-sterile are cleaned, prepared, processed, stored

and issued for patient care. Its primary function is the sterilization of instruments

for surgery, labour and delivery and other departments. It is also responsible for

the distribution of sterile and clean disposable items.

Objective:

The objective of the CSSD is to provide a centralized and standardized

sterilization facility with a view to reducing the incidence of infection in a

healthcare setting.

Location:

Since around 40% of the load on CSPD is from the surgical department the ideal

location of the CSPD would be next to the surgery or either above or below

surgery. Vertical transport is important if the location is either above or below the

14 76

Page 82: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

surgical department. This is usually through dumbwaiters that provide direct

access for both clean as well as soiled materials.

Interdepartmental relationships:

The CSSD is located such that it is easily accessible from the surgical department,

the wards and the ICUs.

Key factors to be kept in mind while planning CSSD:

While designing the CSSD care should be taken that the flow of traffic is

continuous from receiving where the soiled items commence their journey

to issuing where sterilized items are issued, without retracting steps.

The CSSD is located on a lower floor then 2 dedicated dumbwaiters should

be provided-one sterile and the other soiled-which connect the CSSD floor

with the surgical suite. Dumbwaiters are small elevators that are used to

deliver supplies. The sterile dumbwaiter opens into the sterile area of the

surgical suite and transports all sterile items without being contaminated

in transit. The second dumbwaiter which opens from the disposal zone of

the surgical suite, brings down the soiled items to the soiled area of the

CSSD for reprocessing.

Work Flow:

14

IN

Soiled returns from theatres

Soiled returns from wards and departments

SORT/WASH/DISINFECT/DRY

SET Trays

Make up packs

Sterilize

Sterilize

Despatch to theatres Hold in processed goods store Despatch to wards/departments

OUT

77

Page 83: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

The department is divided into three zones to accomplish the functions of

decontamination, assembly and sterile processing and sterile storage and

distribution. These zones are a follows

1. Decontamination zone.

2. Sterilization zone

3. Storage and distribution zone.

A distinct separation must be maintained between the soiled and sterile areas.

The staff works on either side and cannot cross from one side to the other.

1. Decontamination zone:

The reusable equipment and soiled instruments and supplies are received from

departments for initial or gross cleaning. These items are cleaned and

decontaminated by means of manual or mechanical processes and chemical

disinfection.

Equipments used are:

Washer Decontaminator: Used to clean heat intolerant items.

Ultrasonic washer: Used to remove fine soil from surgical instruments after

manual cleaning and before sterilization

2. Sterilization zone:

After the instruments have been cleaned and inspected, they are assembled

into sets and trays. Each set or tray is wrapped or packaged for terminal or final

sterilization. Then the sets are prepared for issue, storage or further processing.

14 78

Page 84: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Equipment most commonly used are:

High/Low pressure sterile processing systems.

Ethylene oxide gas sterilizers.

Chemical sterilization systems.

Microwave sterilization systems.

3.Storage and distribution zone:

Following sterilization instruments are stored in sterile storage or sent to the

appropriate department.

Space requirements:

The space requirements for CSSD are around 10 –15 sq. ft per bed.

Primary areas:

1. Entrance area.

2. Soiled returns hold.

3. Washing area.

4. Gowning area.

5. Packing room.

6. Linen preparation room.

7. Sterilizer loading area.

8. Sterilizer plant room.

9. Cooling area.

10. Processed goods store.

11. Dispatch area.

Offices and staff facilities:

12. Staff changing room.

13.Staff toilets.

14. Office of the manager/in charge of dept/CSSD supervisor room.

Functions of each area:

1. Entrance area: There may be one or more entrance areas to the CSPD. One

may be for the staff and visitors and the return of soiled goods whereas the other

may be for the delivery of sterile supplies.

14 79

Page 85: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

2. Soiled returns hold: The primary function is receiving collection trolleys

containing soiled returns from users in the hospital. Adequate parking space is

required for the no. of trolleys expected to be held at any time.

3.Washing area: Its function is to offload soiled returns from trolleys, to sort, clean

and dry all reprocessable items returned. Most items including trays and

containers will be cleaned and dried using an automated process. Items not

suitable for the automatic process will be cleaned at a hand-washing and drying

systems facility.

4.Gowning area: Before entering the packing room all staff and visitors must

conform to the changing procedure policy.

5.Packing room: Here all items are inspected and assembled in preset trays and

procedure packs and then transferred as packaged goods to the sterilizer loading

area.

6.Linen preparation room: The function is to receive clean linen from the

materials store and to transfer prepared linen into the packing room.

7.Sterilizer loading area: This is located next to the packing room. Trays and

packs will be received from the packing room and loaded onto carriers and

pallets. The carrier or pallet will be loaded onto the appropriate sterilizer chamber

using a sterilizer loading trolley.

8.Sterilizer plant room: Its primary function is accommodating steam and hot air

sterilization machines if required.

9.Cooling area: The function is cooling trays and packs. To achieve a good and

safe practice, loads should remain on the carrier or pallet until cooled.

10.Processed goods store: Here goods that have been processed by the

department are stored.

11.Despatch area: Its function is to receive trays and packs from the processed

goods store and to load distribution trolleys with goods for dispatch.

14 80

Page 86: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

12.Staff changing room: Full changing facilities for male and female staff are

required if suitable central staff change is not available nearby. An individual

locker may be allocated to each full-time and part-time, member of staff.

13.Staff toilets: Toilets should be provided for the staff with WCs and washbasins.

14.Office of the manager/incharge of the dept : The requisites for this room are

computer facilities, a desk with telephone and a document storage cabinet. There

should be enough space for the manager and visitors.

Equipment and accessories:

1. SS work table with wastage bin.

2. Worktable with undershelf.

3. Vertical sliding door

4. Two door instrument washer-disinfector.

5. Single free standing basket rack.

6. Storage shelf.

7. Storage shelf

8. Work table with single sink

9. Work table with 2 sinks

10. Ultrasonic cleaner.

11. Glove washer

12. Glove dryer

13. Glove powderer.

14. Glove storing bin.

15. E.T.O. sterilizer.

16. Preparation & packing table.

17. Rectangular sterilizer.

18. Trolley with carriage.

19. Storage tank

20. Water still

21. Double free standing basket rack.

Finishes:

In the processing areas finishes should be suitable for frequent washing down

and tolerant to disinfectants. Joints should be avoided as they can hold moisture,

encouraging the growth of organisms. Worktops, sinks, etc should be built up to

14 81

Page 87: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

walls and any gaps sealed. Where gaps are unavoidable they should be wide

enough for easy cleaning. Movable worktops adjacent to machines permit easy

cleaning and maintenance.

Ledges trap dust particles and should be avoided. This is particularly

important in the packing room and linen preparation room which as clean rooms

require finishes which are easily cleaned and low in maintenance.

Finishes must be suitable to cope with heavily loaded trolleys which are used

in many spaces. Buffering on trolleys and mobile equipment is one of the most

effective ways of reducing damage.

Flooring in the CSPD:

Throughout the processing areas, stores and circulation spaces a uniform floor

level must be maintained. The finish must be suitable for heavy trolley traffic. The

flooring should be turned up at walls in an integral covered skirting which should

be continuous with the floor and be finished flush with the wall so that the

junction between the skirting and the wall does not provide a ledge for the

collection of dust.

The finish must be hardwearing and easy to clean. Appropriate finishes would

be PVC sheet with welded joints or resin based flooring. A non slip surface should

be considered for wet areas.

Walls in the CSPD:

In the storage and processing areas hollow wall construction should not be

used because of possible infestation risk and liability to trolley damage. Walls

should be of solid construction, rendered to a hard smooth finish to withstand

heavy treatment. Epoxy coating would be appropriate in processing areas.

Emulsion paint is appropriate in stores, circulation areas and staff areas.

Ceilings:

The minimum height from floor level to ceiling is 2.8 metres.

Doors:

Doors should be adequately sized to allow clear passage of trolleys and wheeled

medical equipment.

14 82

Page 88: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Patient room:

The patient room should be planned to provide the maximum amount of patient

comfort while allowing for the greatest quality of patient care. The room should

be designed to provide enough space for the patient and family or visitors as well

as equipment.

Spatial Requirements:

It is recommended that the area for one bed room should be less than 120 sq

feet in the general ward. The two bed rooms should be of 350 sq feet in size with

a minimum of 175 sq ft allotted to each bed and provided with curtains for visual

privacy. The private and deluxe rooms should have a area of 350 sq. ft. There

should not be less than four feet of space between the beds, and sufficient space

to allow the nurse to pass between the bed and the wall.

Important design considerations:

The patients beds should be placed parallel to the exterior wall so that

patients can avoid facing the window and the outside glare.

The doors of the patient rooms should not open outward into the corridor.

The toilet in the patient room should be provided with a grab bar and an

emergency call button within easy reach. 30 to 35 mm diameter of the grab bar

will provide most people with a safe grip.

The door of the toilet should open outwards towards the patient room.

Electrical outlets for a reading light, nurses call and television should be at

the head of the bed and so also the telephone.

An additional electrical outlet for cleaning equipment like vacuum cleaner

and portable X ray is needed on the opposite wall.

The television may be ceiling hung or wall hung and should be in direct

sight from the bed.

Windows should be provided for orientation of the patient to the outside

world. The height of the window sill should not exceed three feet to allow the

patient the outside view.

The door width of all patient rooms should not be less than 1.2 m so that a

standard hospital bed can be wheeled in without obstruction. A standard hospital

bed measures 1.0 m in breadth and 2.15 m in length.

Suitable width of corridors is 2.4 m to facilitate movement of stretcher

trolleys.

14 83

Page 89: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

The floor of ceiling height of the ward unit should not be less than 3.00 m.

A comfortable working height while standing is usually 91.5 cm at the

wash basin rim. Wash basins used by wheelchair patients should have a

maximum height of 80 cm.

Movable Modular Casework and furniture:

L carts or supply carts for general medical supplies.

C frame storage units with drawers for general patient supplies.

Cantilevered work surfaces for nurse charting.

Patient bed

Chair for the patient

Visitors chair.

Lighting requirements:

In the patient room the level of illumination of 100 lux is quite satisfactory for

general lighting of the patient areas which will also meet the needs of the nursing

staff.

For examination purposes an examination light capable of providing 500 to 1000

lux will be required.

Noise in ward units:

Acceptable noise levels in wards range between 30 to 40 decibels.

BIBLIOGRAPHY:

1. Hospitals: The Planning and Design Process – Owen Hardy and Lawrence

Lammers.

2. Designing for total Quality in Healthcare- Kunders G. D.

14 84

Page 90: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

3. Principles of Hospital Planning and Administration – B.M. Sakharkar.

4. Hospital Planning and Administration –MacCaulay and Llewelyn-Davies.

5. The Frontline Hospital- by Philip Mein. An article in a WHO offset

publication.

6. Planning, building and operation of healthcare facilities – B. M.

Kleczkowski. Also an article in a WHO offset publication.

7. Modern Hospital – International Planning Practices – Ervin Putsep.

8. Hospital Planning Module – Dr. Vivek Desai.

9. Herman Miller – Graphic Standards Programming and Schematic Design.

10. Building Type Basics For Healthcare Facilities – Stephen A. Kliment.

11. Sterile Services Department – Scottish Hospital Planning Note.

12. Hospital Planning Design & Management – G.D. Kunders.

13. Hospital Architecture – Guidelines for design & renovation – David R.

Porter.

14. www.aerb.gov.in - Safety code on medical, diagnostic X- ray equipment

and installations.

ANNEXURE 1List of Licenses, Registrations and Approvals required.

License AgencyFood inspector license (storage of

kitchen items)

Municipal Authority

14 85

Page 91: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

Storage of spirit Municipal Authority

Storage of acids, alcohols, acetone, X

ray films, oxygen cylinders

Municipal Authority

LPG cylinders Central Govt.

Drug license form 12(permission to

import)

Prohibition and excise dept.

License for spirit Prohibition and excise dept.

License for alcohol Prohibition and excise dept.

Registration AgencyReg. Under Shops and establishment

Act

Municipal Authority

FDA for blood bank Central Govt.

FDA for Pharmacy Central Govt.

Reg of vehicles(ambulances) RTO

Approval list of items AgencyImaging dept (X ray, MRI, CT scan,

Gamma camera, RIA, Mammography)

BARC, Central govt.

Chimney for incinerator Pollution board

Electrical installations PWD, municipal authority

Lifts Municipal Authority

Fire Fighting Chief fire Officer

Incinerator Pollution Board

Sewage treatment plant Pollution board

Annexure 2

AERB SPECIFICATIONS FOR MEDICAL DIAGNOSTIC X-RAY

EQUIPMENT

PURPOSE This Code is intended to govern radiation safety in the design,

14 86

Page 92: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

installation and operation of medical diagnostic X- ray equipment in order to:-

(a) ensure that workers occupationally exposed to radiation/members of the public are not exposed  to radiation in excess of the operational limits specified under the Radiation Protection Rules, 1971;

(b) do whatever is reasonably  achievable to reduce radiation exposures below these limits;

(c) ensure availability of appropriate equipment, personnel and expertise for patient protection; and

(d) ensure timely detection and prompt rectification of radiation safety related defects or malfunctioning of the equipment.

SCOPE Radiation safety in the use of radiation generating plants is governed by section 17 of the Atomic Energy Act, 1962. Pursuant to the provisions of  the Act, the Central Government had promulgated the Radiation Protection Rules, 1971 Which stipulate basic safety standards for  all types of radiation applications in medicine, industry, research etc. Appropriate radiation surveillance procedures have been issued under rule 15 for ensuring radiation protection in various types of applications. Radiation Surveillance Procedures for Medical Applications of Radiation  are applicable to medical X- ray equipment and installations. This Code elaborates the safety requirements contained in the Atomic Energy Act, 1962 and the Radiation Surveillance Procedures, relevant to medical diagnostic X-ray equipment and installations and their use. Practical aspects of implementing these requirements will be further elaborated in the various guides to be issued under this Code.

In this Code, unless the context otherwise requires:-

(i) "adequate protection" means protection against radiation so provided that the levels of radiation are kept as low as reasonably achievable and in no case exceed the prescribed operational limits;

(ii) "appropriate" means appropriate in the opinion of the competent authority to ensure adequate protection;

(iii) "collimator" or "field limiting diaphragm" means the mechanism for defining the useful beam;

14 87

Page 93: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

(iv) "commissioning" means starting the use of a diagnostic X-ray equipment subsequent to performing such tests and measurement as are necessary to confirm the safety and performance of the equipment  as per the design intent;

(v) "competent authority" means any officer or authority appointed by the Central Government by notification. At present atomic Energy Regulatory Board is the competent authority;

(vi) "cone" means a device by which the X- ray beam is confined to a specified area;

(vii) "decommissioning" means discontinuation of the use of a diagnostic  X-ray equipment on a permanent basis, with or without dismantling the equipment;

(viii) "dose" means energy absorbed in matter from ionising radiation per unit mass of the matter. The S.I. Unit of dose is gray (Gy). The special unit of dose is the rad and 1 rad = 1 centigray (cGy);

(ix) "dose equivalent" means the quantity obtained on multiplying the absorbed dose in tissue  by appropriate weighting  factors to correct and normalize for variation in the degree of biological  effect produced by the same dose of different ionising radiations or under different irradiation conditions. The dose equivalent is used for radiation protection purposes only. The unit of dose equivalent is sievert (Sv) when the absorbed dose is expressed in gray. 1 sievert = 100 rem (Appendix-IV) ;

(x) "dosimetry" means operations and measurements performed in connection with (a) the determination of rediation dose;(b) dose distributions in the irradiated volume; and (c) measurements related to operational limits;

(xi) "employer" means any person who employs radiation workers or who is self-employed as the only radiation worker in a radiation installation;

(xii) "filter" means a layer of radiation attenuating material incorporated in the tube housing to preferentially absorb the less penetrating components of the useful beam; "permanent filter" means the filter which is an integral part of the tube housing and which cannot be removed by the user, unlike the "added filter";

14 88

Page 94: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

(xiii) "fluoroscopic screen" means a card-board or plastic base upon which a layer of fluorescent salt is evenly spread which emits visible radiation on being subjected to X- rays;

(xiv) "focus" means that area of the anode in an X-ray tube on which X- ray producing electrons are incident. The area from which the useful beam appears to originate, relative to the film is called "apparent focus".

(xv) "grid" means a device composed of alternate strips of lead and radiolucent material encased suitably to be placed between the patient and X- ray film to absorb scatter. "potter bucky grid" or "bucky" means a device containing a grid and a mechanism to impart motion to the grid during radiography exposure;

(xvi) "handle" means manufacture, possess,store,use, transfer by sale or otherwise, import, transport or dispose of;

(xvii)         "kerma" means the energy transferred (per unit mass) by gamma rays, X-rays, or neutrons in the form of kinetic energy of  secondary charged particles  at the point of interest in an irradiated medium. If the irradiated medium is air,the corresponding kerma is called air  kerma. The SI unit of kerma is gray( Appendix-IV);

(xviii) "lead equivalence" means the thickness  of lead, which, under specified conditions of irradiation, affords the same attenuation as the material under consideration;

(xix) "leakage radiation" means radiation coming out of the tube housing  out side the useful beam area.

(xx) "light beam collimator" or "light beam diaphragm" means the mechanism to collimate and indicate the radiation field by an optical equipment;

(xxi) "mobile equipment" or "portable equipment" means equipment intended to be moved or carried from carried from one location to another between periods of use;

(xxii) "operational limits" means limits on levels of radiation as the competent authority may by notification specify from time to time;

(xxiii) "person" includes-

14 89

Page 95: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

(I) any individual, corporation, association of persons whether incorporated or not, partnership, estate, trust, private or public institution, group, government agency, or any state or any political sub-division thereof or any political entity;(ii) any legal successor, representative or agent of each of the foregoing;

(xxiv) "protective barrier" or "shielding" means a barrier of radiation attenuating material used to reduce radiation levels;

(xxv) "quality assurance tests" means tests performed to ensure the performance and reliability of the X-ray equipment as per the design specifications;

(xxvi) "radiation" in the context of diagnostic X- ray equipment means X- rays originating from the X-ray tube or its high voltage components/accessories, It also includes the scattered radiation;

(xxvii) "radiation protection survey" means an evaluation of radiation safety in and around a radiation installation using appropriate radiation measuring instruments;

(xxviii)    "radiation surveillance" means measure that may be specified by the competent authority to provide adequate protection either generally or in any individual case;

(xxix) "radiation worker" means any person who is occupationally exposed to radiation and who in the opinion of the competent authority should be subject to radiation surveillance;

(xxx) "radiograph" means a permanent record of a transmission image, produced by a beam of X-rays after passing through the subject;

(xxxi) "radiological safety officer" means any person who is so designated by the employer and who in the opinion of the competent authority is qualified to discharge the functions outlined in the Radiation Protection Rules, 1971;

(xxxii) "safety" means radiation safety and does not include electrical/mechanical and other safety considerations;

(xxxiii) "scatter" or "scattered radiation" means radiation scattered by the medium on which the primary beams is incident;

(xxxiv) "stationary equipment" means either fixed equipment or equipment which is not intended to be moved from one place

14 90

Page 96: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

to another,

(xxxv) "tube housing" means a shielding enclosure provided around an X- ray tube, in order to-(I) define the useful beam; and(ii) limit the radiation levels outside of the useful beam such as not to exceed the radiation leakage levels as specified in section 3 of this Code;

(xxxvi) "useful beam" or "primary beam" means that part of the emergent radiation from an X-ray tube housing which is capable of being used for the purpose for which the X-ray equipment is intended; and

(xxxvii) "X-ray equipment" or "x-ray unit" means the integrated assembly consisting of X-ray tube along with its housing, support structure, associated accessories necessary for proper operation and inclusive of built-in-radiation safety devices as provided in section 3 of this Code.

  In this Code-

(i) "shall" indicates a mandatory requirement as per provisions in the Radiation Protection Rules, 1971;

(ii) "must" indicates a recommendation that is essential to meet the currently accepted standards of radiation protection; and

(iii) "should" indicates an advisory recommendation that is highly desirable and that is to be implemented where feasible.

BUILT- IN SAFETY SPECIFICATIONS FOR MEDICAL DIAGNOSTIC X-RAY

EQUIPMENT

Specifications for Radiography Equipment

TUBE HOUSING Every tube housing for medical diagnostic X-ray equipment shall be so constructed that the leakage radiation through the protective tube housing in any direction, averaged over an area not larger than 100 cm2 shall not exceed an air kerma of 1 mGy in one hour approximately 115 mR in one hour) at a distance of 1.0 meter from the X-ray source when the tube is operating at each of the ratings specified

14 91

Page 97: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

by the manufacturer. There must be a distinctly visible mark on the tube housing to indicate the plane of the focus.

CONES &/ DIAPHRAGMS

The X-ray tube housing must be provided with light beam collimators for all general purpose stationary diagnostic X-ray machines. For mobile units, a light beam collimator should be preferred over cones wherever possible. Field limiting diaphragms or cones shall comply with the leakage radiation level requirements prescribed for the tube housing. Each cone should be indelibly marked with field size at the specified focus to film distance.

BEAM FILTER The useful beam portal of an X-ray tube housing with maximum rated operating potential above 100 kV must have a total filter equivalent to at least 2.5 mm aluminum of which 1.5 mm should be permanent. The X-ray tube housing must have a total filter equivalent to at least 2.0 mm aluminum ( of which 1.5 mm should be permanent) for units operating  upto 100 kV except  mammography and dental units. Mammography units must have a permanent filter equivalent to at least 0.5 mm aluminum in the useful beam. The total permanent filtration in the useful beam for conventional dental radiography equipment with a maximum tube voltage not exceeding 70 kV must be equivalent to not less than 1.5 mm aluminum.            The inherent\permanent filter incorporated must be indicated in the housing. The added filters must have their equivalent filtration clearly marked on them.

TUBE POSITIONING           

The X-ray unit must have  appropriate features and display aids for tube positioning, target to film distance selection, useful beam centering and angulation, positioning of the patient and  for the X-ray film exposure in the desired manner.

LOCKING DEVICES The tube housing and the tube stand must have appropriate locking devices to immobilize` the tube in the desired location and orientation.

BUCKY ALIGNMENT The X-ray table must have provisions for correct positioning of the grid, the bucky tray and the film cassette in proper alignment with the useful beam and for their locking in the desired position.

14 92

Page 98: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

CABLE LENGTH The X-ray unit must have electrical cables of sufficient length so that the control panel/operation switch can  be located and operated from a  minimum distance of 3 metres from the nearest position of the X-ray tube. For dental radiography units and mobile/portable X-ray equipment the cable must not be less than 2 metres.

CONTROL PANEL The control panel must be provided with means to indicate the exposure parameters and conditions including the tube potential, tube current, time of exposure, integral exposure in milliampere seconds (mAs), technique selection and the engagement of the buck mechanism. A Clearly marked and identifiable indicator must be provided at the control panel to show whether the X-ray beam is 'ON' or 'OFF' for portable/mobile/dental units appropriate exposure parameters should be provided.

COMMON STATION  When more than one tube can be operated from a single control panel, there must be indication at or near the tube housing and on the control panel showing which of the tubes is being operated.

EXPOSURE SWITCH The control panel must have provision to terminate the X-ray exposure automatically after a preset time or manually at any moment before this time by removing pressure from it , When mechanical timers are provided, repeated exposures must not be possible without resetting the timer. The timer must be so arranged that inadvertent exposure is not possible.

RADIATION LEAKAGE FROM TRANSFORMER

The radiation level at 5 cm from the transformer surface of the X-ray unit shall not exceed 5 mGy in one hour (approximately 0.6 mR in one hour).

SPECIAL CONES The field defining cone-cum-spacer of dental radiography and mammography units must be such that they will ensure a focus to skin distance of at least 20 cm for equipment operating at more than  60 kV and at least 10 cm for dental radiography must limit the field diameter at these distance to less than 7.5 cm at the cone end.

Specifications for Fluroscopy Equipment

FLUOROSCOPY TUBE HOUSING

The tube housing shall conform to the leakage radiation levels prescribed for radiography equipment in 3.1.1 The

14 93

Page 99: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

AND FILTRATION

useful beam must aluminum for general fluoroscopy and not less than 2.5 mm for cardiovascular studies.

PROTECTIVE LEAD GLASS

The protective lead glass covering of the fluorescent screen must have a lead equivalent thickness of 2.0 mm for units operating  upto 100 kV. For units operating at higher kilovoltages the lead equivalence must be increased at the rate of 0.01 mm per kV.

LEAD RUBBER FLAPS

The X-ray table and the fluoroscopy stand must be provided with means of adequate protection for the radiologist and other staff against the scattered X-rays. Lead rubber flaps having lead equivalence of not less than 0.5 mm and sufficient dimensions to protect the radiologist must be so provided that they are suspended (a) from the bottom of the screen such that the flaps overlap the fluoroscopic chair in vertical fluoroscopy and (b) from the edge of the screen, nearest to the radiologist, such that the flaps extend down to the table top in case of horizontal fluoroscopy. The 'bucky-slot' must be provided with a cover of 0.5 mm lead equivalence on the radiologist's side.

TUBE SCREEN ALIGNMENT

The X-ray tube and the fluoroscopic screen must be rigidly coupled and aligned so that both move together synchronously and the axis of the X-ray beam passes through the centre of the screen in all positions of the tube and screen.

FIELD LIMITING DIAPHRAGM

The field limiting diaphragm control mechanism must be so mechanically restricted that even when the diaphragm is fully opened and the screen is at the maximum distance from the table there is still an unilluminated margin of at least 1 cm all along the edges of the screen.

FOCUS TO TABLETTOP DISTANCE

The focus to table top distance must be so adjusted mechanically that it shall not in any case be less than 30cm for fluoroscopy units and should preferably be (a) 45 cm for general fluoroscopy units. And (b) 60 cm for units used exclusively for chest screening.

DIAPHRAGM CONTROL 

The diaphragm control knobs must be located on the frame of fluorescent screen and provided with local shielding, if necessary, so as to offer adequate protection for the hands of the radiologist.

FOOT-SWITCH & VISUAL INDICATOR

foot operated pressure switch must be provided for conduction fluoroscopy examinations. There must be a visual indication on the control panel when the beam is

14 94

Page 100: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

'ON'.

FLUOROSCORY TIMER

The unit must have a cumulative timer and its maximum range shall not exceed 5 minutes. There should also be provision for an audible signal at the end of the preset time.

TABLE-TOP DOSE

The air kerma rate measured at the table top for the minimum focus to table top distance should be as low as possible and in any case must not exceed 5 cGy per minute (approximately 5.75 R per minute).

AUTOMATIC BRIGHTNESS

When automatic brightness control is used to adjust kV or mA of the X-ray tube to maintain constant luminescence at the viewing screen, appropriated monitoring equipment must be incorporated to check the Tube potential and tube current

SPECIFICATIONS FOR RADIATION PROTECTION DEVICES

PROTECTIVE BARRER

The protective barrier for positioning between the operator/control panel and the X-ray tube/patient must be of  appropriate size and design so as to shield the operator adequately against leakage and scattered radiation. The protective barrier must have a minimum lead equivalence of 1.5 mm. A viewing window having 1.5 mm lead equivalence must be provided in the barrier. The lead equivalence must be indicated on the barrier as well as on viewing window.

FLUOROSCOPY CHAIR

The fluoroscopy chair must have a minimum of 1.5 mm lead equivalence and its design must ensure adequate protection to the radiologist against stray radiation.

PROTECTIVE APRONS

The protective aprons must have a minimum lead equivalence of 0.25 mm and their size/design must ensure adequate protection to the torso and gonads of the user against stray radiation.

PROTECTIVE GLOVES

Protective gloves must have a minimum lead equivalence of 0.25 mm and the design must ensure adequate protection against stray radiation reaching the hands and the wrists and must permit easy movements of the hand/fingers.

14 95

Page 101: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

GONAD SHELD The gonad shields must have a minimum lead equivalence of 0.5 mm.

PASS BOX The cassette pass box intended for installation in the X-ray room wall must have a shielding of 2.0 mm lead equivalence. The design must be such that the pass box can be opened from one side at a time.

FILM STORAGE The box intended for temporary storage of undeveloped films must not have less than 2.0 mm lead equivalence all around.

VEHICLE MOUNTED X-RAY EQUIPMENT

X-ray units installed in a mobile van or vehicle e.g. for medical surveys/clinics in remote areas, must be provided with an appropriate shielding enclosure so as to ensure adequate built in protection for persons likely to be present in and around the vehicle.

SHIELDING CONTINUITY

Appropriate overlap of  shielding materials must be provided at the joints or discontinuities so as to ensure minimum prescribed shielding all over the surface of all radiation protection devices. Care must be taken to ensure that lead or any other shielding material does not creep or flow, resulting in reduction of shielding in any location.

MARKINGS The lead equivalence of shielding incorporated in radiation protection devices must be marked conspicuously and indelibly on them.

CONVENTIONAL SAFETY

Facilities for immobilization of patients, specially children, should be provided so as to minimize holding of patients during X-ray examinations.

CONVENTIONAL SAFETY

Appropriate equipment must be available to prevent/manage conventional hazards such as fire, flooding and electrical emergencies.

SAFETY ACCESSORIES

Additional radiation protection devices which would be necessary for specialized radiological investigations must have a minimum of 0.5 mm lead equivalence

SERIAL CHANGERS

Automatic serial changers should be used where the volume of work demands such specialized equipment.

14 96

Page 102: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

LOCATION OF X-RAY INSTALLATION

The rooms housing diagnostic X-ray units and related equipment should be located as far away as feasible from areas of high occupancy and general traffic, such as maternity and paediatric wards and other departments of the hospital that are not directly related to radiation and its use.

LAYOUT The layout of rooms in an X-ray department should aim at providing  integrated facilities so that handling of X-ray equipment and related operations can be conveniently performed with adequate protection. The number of doors for entry to the X-ray room should be kept to the minimum. The doors and passages leading to the X-ray installation should permit safe and easy transport of equipment and non-ambulatory patients. The dark room should be so located that the primary X-ray beam cannot be directed on it.

ROOM SIZE The room housing an X-ray equipment must be spacious enough to permit installation, use and servicing of the equipment with safety and convenience for the operating personnel, the servicing personnel and the patient. The room size must not be less than 25 sq.m. for a general purpose X-ray machine.

SHIELDING Appropriate structural shielding shall be provided for the walls, the ceiling and the floor of the X-ray room so that the doses received by workers occupationally exposed to radiation and the members of the public are kept to a minimum and shall not exceed the annual effective dose equivalent limits of 50 mSv and 1 mSv respectively. The doors of an X-ray room shall provide the same shielding as that of the adjacent walls, in case persons are likely to be present in front of them when the X-ray unit is energized. Appropriate shielding must be provided for the dark room to ensure that undeveloped X-ray films stored in it will not be exposed to more than an air kerma rate of 10mGy per week (approximately 1.13 m R per week).

OPENING & VENTILATION

Unshielded openings, if provided in am X-ray room for ventilation or natural light etc., must be located above a height of 2 meters from the ground/floor level outside the X-ray room.

ILLUMINATION Rooms housing fluoroscopy equipment must be so

14 97

Page 103: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

CONTROL designed that adequate darkness can be achieved conveniently when desired in the room. For the use of radiologist after dark adaptation.

EQUIPMENT LAYOUT

The X-ray equipment must be installed in such a way that in normal use the useful beam is not directed towards control panel, doors, windows or areas of high occupancy. The useful beam should preferably be directed towards unoccupied area should be left all around the X-ray table for safe and free movements of equipment-trolley, radiology staff and service personnel.

CONTROL PANEL

In the case of diagnostic X-ray equipment operating at 125 kV or above the control panel must be installed in a separate control room located outside but contiguous to the X-ray room and provided with appropriate shielding, direct viewing and oral communication facilities between the operator and the patient.

WAITING AREAS

Patient waiting areas must be provided outside the X-ray room.

WARNING LIGHT & PLACARD

A suitable warning signal such as a red light must be provided at a conspicuous place outside the X-ray room and kept 'ON' when the X-ray unit is in use, to prevent inadvertent entry of persons not connected with the examination. An appropriate warning placard, as indicated in Appendix-III, must also be outside the X-ray room.

 

 

OPERATIONAL SAFETY

COMMISSIONING When a diagnostic X-ray equipment is newly installed/reinstalled in a new location/the equipment is subjected to major repairs or structural modifications are carried out in the existing installation, the installation shall not be commissioned unless a radiological protection survey conducted by the R.S.O. or any other person duly authorized by the competent authority has confirmed adequate protection and operational safety in the X-ray installation. Records of all such surveys shall be maintained for inspection of the competent authority.

PERIODIC INSPECTION

Periodic inspection of the X-ray equipment, the lead rubber protective clothing and the safety/shielding features of the X-ray room must be conducted to assure

14 98

Page 104: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

replacement of defective components/items affecting radiation safety. Records of all such inspections must be maintained.

OPERATION OF X-RAY EQUIPMENT

The X-ray equipment should be so operated that the primary beam is directed towards the areas of the primary beam is directed towards the areas of minimum occupancy. Installation of more than one X-ray unit in the same room should therefore be discouraged. Only the patient whose radiological examination is to be carried out shall be allowed in the room except under conditions specified under

CONTROL PANEL When the control panel is in the X-ray room itself, the panel must be located as far away from the X-ray unit/chest stand as possible and duly shielded by a protective barrier.

FURNISHING & FIXTURES 

When the control panel is in the X-ray room itself,  the panel must be located as far away form the X-ray unit/chest stand as possible and duly shielded by a protective barrier.

BEAM RESTRICTION

Under no circumstances must the X-ray beam be directed towards the control panel and other similar areas where the shielding is adequate for secondary radiation only.

ASSISTANCE TO PATIENTS

Holding of children or infirm patients for X-ray examinations must be done only by an adult relative or escort of the patient and not by a staff member. Protective aprons and gloves must be provided to persons rendering such help. Innobiliasation devices should be used to prevent movement of children during exposure. In no case shall the film or the X-ray tube be held by hand.

SAFETY OF STAFF All efforts must be made to conduct the X-ray examination in such a way as to achieve the desired result with minimum of exposure to the patient/staff. Measures such as use of protective clothing, optimum exposure setting, minimization of retakes and optimum film processing techniques must be employed for this purpose.

OPERATIONAL STAFF

No persons other than those specifically concerned with a particular X-ray examination shall stay in the X-ray room during radiological examination. The X-ray unit

14 99

Page 105: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

must not be operated by any unauthorized person.

MOBILE EQUIPMENT

A mobile X-ray unit shall be used with appropriate safety measures to protect the public in the vicinity. Minimum occupancy, maximum distance from occupied areas and temporary shields shall be employed for the purpose.

SERVICING OF UNIT

Servicing X-ray equipment must be undertaken only by such technologists who have been authorized by the competent authority on the basis of their expertise and radiation protection background to undertake this job safety. In addition to the personnel monitoring devices, the service personnel must use appropriate radiation survey meters and direct reading dosimeters for on the spot verification of their working conditions.

PATIENT PROTECTION

EXAMINATIONREQUIRMENT

Any X-ray examination should be prescribed only after a critical evaluation of the patient’s condition in order to avoid unnecessary exposures. In the event of doubt on the advisability of an X-ray examination the matter should be resolved by the radiologist in consultation with the referring physician. Clinical indications, provisional diagnosis and information required form X-ray examination should be stated by the referring physician. The practice of conducting mass radiological surveys for the detection of tuberculosis, mass mammography for occult carcinoma and chest examinations should be undertaken with caution.

TRANSFER OF RECORDS

Transfer of radiographs from one institution to another should be encouraged to avoid repeat examinations.

QUALITY ASSURANCE

A new diagnosis X-ray equipment must not be used unless all the appropriate quality assurance tests have been performed satisfactorily. Quality assurance tests must be repeated periodically to ensure continued good performance. Any defects noticed must be corrected before recommisioning the unit.

FLUOROSCOPY REQUIREMENT

No fluoroscopic examination should be conducted if the required information can be obtained form radiography. Wherever possible image intensifiers of high gain, coupled with a TV monitor should be used for fluoroscopy. No fluoroscopic work shall be done on

14 100

Page 106: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

equipment not designed for fluoroscopy.

PATIENT DOSE REDUCTION

All efforts shall be made to keep the patient dose as low as technically achievable. Appropriate techniques such as use of high efficiency filmscreen combinations, minimum field size, minimum fluoroscopic time and tube current, good dark adaptation and room darkening must be employed for this purpose in day–to-day practice of radiology.

ELECTIVE RADIOLOGICAL EXAMINATIONS OF FEMALES

Elective radiological examinations of the lower abdomen and pelvis of women in the reproductive age should be carried out. Preferably within the first 10 days from the onset of menstruation. However the examination may be performed if the clinical condition of the patient needs immediate X-ray examination.

FOETAL PROTECTION

Radiological examination of the lower abdomen and pelvis of a pregnant woman must be conducted that the foetus receives minimum possible radiation dose. In all other X-ray examinations of the pregnant women the lower abdomen and the pelvis must be covered with a  protective shield.

ORGAN SHIELD Gonad shields must be employed to shield the reproductive organs of the patient unless it would interfere with the information desired. Eye shields should be provided to protect the eyes of the patients undergoing some special examinations like carotid angiography. Thyroid shields should be used where necessary.

EXAMINATIONS OF CHEST

Photoflurography and radiography of the chest should be performed with a focus to receptor distance of at least 120 cm.

RECORDS Records of all radiological examinations should be maintained by the radiologist for follow-up and future reference. Reports, and if possible radiographs, should be given to the patient for future reference.

RADIATION PROTECTION PROGRAMME

FUNCTIONS OF R.S.O. The radiological safety officer (RSO) shall implement all radiation surveillance measures, conduct periodical radiation protection

14 101

Page 107: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

surveys, maintain proper records of personnel doses, instruct all radiation workers on relevant safety measures, educate and train new entrants and take appropriate local measures including the issuance of clear administrative instructions in writing to deal with radiation emergencies. The RSO shall ensure that all radiation measuring and monitoring instruments in his custody are properly calibrated and maintained in good condition. Suitable records of such surveys, including the layout drawing, dose mappings, deficiencies noticed and the remedial actions taken shall be maintained for future follow-up.

PERSONNEL MONITORING Appropriate personnel monitoring devices shall be used by all radiation workers.

PREGNANT WORKERS Once pregnancy of a radiation worker is established, she shall not receive more than 10 mSv (1 rem) at a uniform rate during the remaining period of her pregnancy .

TRAINNES Medical students/trainees must not operate an X-ray equipment except under the direct supervision of authorized operating personnel.

STORAGE OF RADIATION SENSITIVE MATERIALS

Storage of undeveloped X-ray films and personnel monitoring devices must be done appropriately in areas protected form X-rays and other radiation sources in the installation.

PERSONNEL REQUIREMENTS AND RESPONSIBILITIES

SAFETY PERSONNEL

Every X-ray installation shall have a radiological safety officer. The radiological safety officer may be employer himself or a consultant or a full/part time employee to whom the employer will delegate the responsibility of ensuring compliance with the appropriate radiation safety/regulatory requirements applicable to his X-ray installation. The minimum qualification and experience currently prescribed for an R.S.O. are indicated in Appendix-I

14 102

Page 108: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

RADIOLOGIST All diagnostic radiology installations should be manned as far as possible by qualified radiologists. However, the services of a qualified radiologist must be made available in (i) all installations having more than two X-ray units or even single X-ray unit having fluoroscopy facility and (ii) all establishments performing special procedures such as cardiac catheterization, angiography procedures, genito-uro-radiological procedures such as cardiac catheterization, angiography procedures, C.T. scans and all other sophisticated imaging devices and procedures. The minimum qualifications and experience currently prescribed for a  radiologist are given in Appendix-I. Other installations having a single X-ray unit without fluoroscopy may be manned by a physician without radiology qualifications but having a degree recognized by the Medical Council of India, provided a qualified/ certified X-ray technologist is available. A dental X-ray equipment may be manned by a dentist damentals of radiographic techniques and radiation protection.

  Only qualified X-ray technologists will be allowed handle X-ray equipment. The minimum qualifications and experience for X-ray technologists in Appendix-I. However, the competent authority may consider relaxation of qualifications for certification of radiography technologists in case of experienced personnel where only the X-ray unit without fluoroscopy facility installed.

RESPONSIBILITES OF THE EMPLOYER

In any diagnostic X-ray installation, the ultimate responsibility of ensuring radiation safety, availability of RSO and qualified personnel for handling of X-ray equipment and providing them requisite equipment and facilities to discharge their duties and functions shall rest with the employer. He shall inform the competent authority of any change in equipment or staff including the RSO.

RESPONSIBILITES OF THE RADIOLOGIST

The radiologist shall undertake an X-ray examination on the basis of a medical requirement. He shall so conduct the examination as to achieve maximum reduction in radiation dose to the patient while retaining all clinically important information.

RESPONSIBILITES OF X-RAY TECHNOLOGIST

The X-ray technologist and other attending staff shall ensure appropriate patient protection, public protection and operational safety in handling the X-ray equipment and other associated facilities.

14 103

Page 109: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

RESPONSIBILITES OF THE R.S.O.

The RSO shall assist the employer in meeting the relevant regulatory requirements applicable to his X-ray installation.

RESPONSIBILITES OF THE MANUFACTURER

The manufacturer of X-ray equipment must make available to the actual user detailed procedures for routine quality assurance tests, exposure charts, operating manuals and a copy of safety/regulatory documents as may be issued by the competent authority from time to time. The manufacturer must provide appropriate servicing and maintenance facilities during the useful  life time of the X-ray equipment.

REGULATORY CONTROLS

DESIGN CERTIFICATION

Every medical X-ray diagnostic equipment shall meet the design safety specifications stipulated in this code. The manufacturer/vendor shall obtain design certification from the competent authority prior to marketing the X-ray equipment.

REGISTRATION OF X-RAY EQUIPMENT

The sale, transfer, gift, leasing or loan of X-ray equipment must be registered with the competent authority by the seller or the person transferring such equipment.

REPORT ON UNSAFE EQUIPMENT

Persons undertaking servicing of X-ray equipment must immediately report to the competent authority any equipment no longer safe for use according to this equipment, its locations/address, the name and address of the employer/owner and nature of defects that equipment hazardous.

INSPECTION The diagnostic X-ray installation shall be made available by the employer for inspection, at all reasonable times, by the competent authority or his representative, to assure compliance of this code.

DECOMMISIONING Decommissioning of an X-ray equipment shall be registered with the competent authority by the employer immediately.

GUIDE & ORDERS The employer shall ensure that persons handling medical x-ray diagnosis equipment duly addible by the previsions of this Code and their further elaboration in the various Guides issued by the competent authority. He shall also ensure that these documents are made

14 104

Page 110: An Architectural Brief for a Proposed 100-Bedded Hospital

AN ARCHITECTURAL BRIEF FOR A PROPOSED 100 BEDDED HOSPITAL

available to them and further that any other measures of safety as the competent authority may stipulate at any time in each individual case are duly implemented without delay.

CERTIFICATION OF RSO

Any consultant undertaking contract(s) to discharge the duties and functions of RSO in diagnostic X-ray installations shall do only after obtaining certification from the competent authority for the purpose. Such certification shall be granted on the basis of his qualification, experience and the testing/survey/dosimetry equipment available with him.

CERTIFICATION OF SERVICE ENGINEERS

Servicing of X-ray equipment shall be undertaken only by persons holding a valid servicing safety certification from the competent authority. The certification shall be granted on the basis of his qualification ,training, experience, safety record and the  servicing facilities of such person.

REVOCATION OF CERTIFICATION

The competent authority may revoke the license/certification of an RSO/Service Engineer in the event of persistent negligence in the discharge of his duties. 

PENALTIES Any person who contravenes the provisions of the Radiation Protection Rules, 1971 elaborated in this code or any other terms or conditions of certification granted to him by the competent authority, is punishable under section 24, section 25 and section 26 of the Atomic Energy Act, 1962. The punishment may include imprisonment or fine or both.

Source:www.areb.gov.in -Safety code on medical, diagnostic X- ray equipment and

installations.

14 105