an energy conservation presentation - valhalla union free school
TRANSCRIPT
An Energy Conservation PresentationValhalla Union Free School District
Date: October 9, 2012
Agenda
� Johnson Controls, Inc.
� Project Overview & Unique Benefits
� Energy Conservation Measures
� Questions and Answers
2
Who is Johnson Controls, Inc.?
3
Unique Benefits
Customized
� Unique & Co-developed partnership.
Self-Funding
� Pay for themselves 100% Guaranteed.� Pay for themselves 100% Guaranteed.
� Cost of the Project is fixed. No change orders.
� Savings from a Financial Perspective.
4
Project Breakdown
FIM 1 Lighting - Fixture Retrofit 1,090,663$ 102,408$ 11
FIM 2 Lighting - Fixture Control 132,480$ 3,010$ 44
FIM 3 Building Envelope Improvements - Weatherization 112,348$ 10,809$ 10
FIM 4.1 Energy Management System - Temperature Setback 160,820$ 8,773$ 18
FIM 4.2 Energy Management System - Exhaust Fan/Relief Damper Control 259,094$ 15,168$ 17
FIM 4.3 Energy Management System - Optimal Start 158,305$ 9,095$ 17
FIM 5 Heating Distribution System - Pipe and Valve Insulation 54,026$ 5,767$ 9
FIM 6 Boiler/Burner - Replacements 882,247$ 5,249$ 168
FIM 7 Boilers/DHW Heaters - Burner Controllers 35,791$ 2,758$ 13
FIM 8 Domestic Hot Water System - Energy Efficient DHW Installation 96,827$ 717$ 135
FIM 9 Windows - Replacements 157,324$ 461$ 342
FIM 10 Windows - Window Film 192,883$ 12,178$ 16
FIM # PROPOSED MEASURES Sell PaybackSavings
5
FIM 10 Windows - Window Film 192,883$ 12,178$ 16
FIM 11 Building Envelope Improvements - Attic Insulation 944$ 287$ 3
FIM 12 Water Conservation 45,693$ 6,849$ 7
FIM 13 Air Conditioning Unit Replacement 39,274$ 483$ 81
FIM 14 Motors - Check Valve Installation 3,588$ 939$ 4
FIM 15 Unit Ventilator Refurbishments 313,171$ 2,963$ 106
FIM 16 Transformers - Replacements
FIM 17 Vending Machine Controllers
FIM 18 Renewable Energy- Photovoltaic Electric Generation
Total Cost 3,735,478$
Annual Maintenance Savings 15,157$
Annual Energy Savings 187,913$
Rebates 112,349$
Measurement and Verification (3-years) 21,000$
Simple Payback (Years) 17.95
FIM # PROPOSED MEASURES HS/MS Kenisco Virginia DO
FIM 1 Lighting - Fixture Retrofit x x x x
FIM 2 Lighting - Fixture Control x x x
FIM 3 Building Envelope Improvements - Weatherization x x x x
FIM 4.1 Energy Management System - Temperature Setback x x x x
FIM 4.2 Energy Management System - Exhaust Fan/Relief Damper Control x x x
FIM 4.3 Energy Management System - Optimal Start x x x
FIM 5 Heating Distribution System - Pipe and Valve Insulation x x
FIM 6 Boiler/Burner - Replacements x x
FIM 7 Boilers/DHW Heaters - Burner Controllers x xFIM 7 Boilers/DHW Heaters - Burner Controllers x x
FIM 8 Domestic Hot Water System - Energy Efficient DHW Installation x
FIM 9 Windows - Replacements x
FIM 10 Windows - Window Film x x x x
FIM 11 Building Envelope Improvements - Attic Insulation x
FIM 12 Water Conservation x x x x
FIM 13 Air Conditioning Unit Repalcement x
FIM 14 Motors-Check Valve Installation x
FIM 15 Unit Ventilator Refurbishments x
Total14 10 9 8
41
6
Example of Yonkers MS/HS Gymnasium
Before Lighting Retrofit After Lighting Retrofit
Energy Conservation Measures – Lighting Replacement
� Upgrade lighting District wide
� 1,022 New fixtures to be installed
� Relamp & Reballast 1,575 fixtures
7 Annual Energy Savings: $102,408
Energy Conservation Measures –
Energy Management System: Temperature Setback
� Total System Control Points: 199 hardware points, 70 software points
and 200 Kensico integration points.
� Optimal Start, Exhaust Fan Control & Demand Controlled Ventillation.
District wide Energy Management System
8 Annual Energy Savings: $33,036
Valhalla High School Fulton High Efficiency
Energy Conservation Measures –
Boiler Replacement at High School
� Remove existing boiler #2 at High School
• Replace with (2) Fulton High efficiency dual fuel condensing boilers
9 Annual Savings: $5,249
Valhalla UFSD Energy Performance Contract
Next Steps:
Completion of Detailed Energy Audit and Final ESCO Proposal Presentation
October 9, 2012
Board of Education resolution to accept the ESCO proposal and execute a contract agreement
October 23, 2012
Board of Education SEQRA Resolution (Type II Listed Action - Negative Declaration)
October 23,2012
10
Construction Documents Development and Submission
October – December 2012 (8 Weeks)
Review and Approval by NYSED Facilities Planning
December 2012 – March 2013 (12 Weeks – Assumed)
Construction Spring 2013 – Fall 2013
Substantial Completion Fall 2013
Questions