an integrated measurement framework (imf) for enabling geni substrate measurement and control

4
An Integrated Measurement Framework (IMF) for Enabling GENI Substrate Measurement and Control I. Baldine, B. Bathula, K. Bergman, C. Chen, R. Dutta, C. P. Lai, G. Rouskas, A. Wang , M. S. Wang NO: 1718

Upload: oona

Post on 06-Feb-2016

27 views

Category:

Documents


0 download

DESCRIPTION

An Integrated Measurement Framework (IMF) for Enabling GENI Substrate Measurement and Control. NO: 1718. I. Baldine, B. Bathula, K. Bergman, C. Chen, R. Dutta, C. P. Lai, G. Rouskas, A. Wang , M. S. Wang. Experimenter access to measurement. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: An Integrated Measurement Framework (IMF) for Enabling GENI Substrate Measurement and Control

An Integrated Measurement Framework (IMF) for Enabling GENI Substrate Measurement and Control

I. Baldine, B. Bathula, K. Bergman, C. Chen, R. Dutta, C. P. Lai, G. Rouskas, A. Wang, M. S. Wang

NO: 1718

Page 2: An Integrated Measurement Framework (IMF) for Enabling GENI Substrate Measurement and Control

Experimenter access to measurement

HW developed: the netFPAG-controlled SOA; the script-controlled attenuator SW developed: (1) SILO runs in BEN, and services are developed; (2) Measurement published through XMPP; HW-SW interaction finished: xmlrpc, XMPP Live demo with video stream

Spiral 2 Status – successful demo of IMF cross-layer milestone

Spiral 3 Plan Use ORCA framework to set up the experiment Ontology for measurement, and explore measurement roles in

resource presentation

IMF provides architectural capability to integrate measurement framework (secondarily, shared substrate)Collaborate with ERM, BEN/ORCA, LEARN.

Page 3: An Integrated Measurement Framework (IMF) for Enabling GENI Substrate Measurement and Control

Experimenter access to measurement

Architectural Support for Integration of Measurements

port power base line

SILO-controlled port power

Page 4: An Integrated Measurement Framework (IMF) for Enabling GENI Substrate Measurement and Control

Experimenter access to measurement

Highly collaborated with ERM, LEARN, ORCA/BEN A very general approach (both SILO and Measurement

pubsub Module), so we expect that once we complete integration into ORCA, other Cluster D experiments or outside experiments will be able to port it seamlessly.

Spiral 2 Experiment Status

Spiral 3 Plan

Fully integrated with ORCA; Multiple aggregates - Integrating into other control frameworks

is also something we want to do, but probably not before Year 3 of our project.