An Integrated Renewable Energy Planfor Northern New Mexico
Luis A. Reyes, Jr.CEO
Kit Carson Electric Cooperative, Inc.October 25 & 26, 2018
Kit Carson Electric Cooperative, Inc. 2018 1
Kit Carson Electric Cooperative, Inc. (KCEC) has29,500 electric members, 6,700 Broadbandmembers and 3,100 propane members serving Taos,Colfax and Rio Arriba counties, including 2 Pueblos inNorth Central New Mexico. KCEC has approximately2900 miles of electric and high speed fiber opticlines.
KCEC has recently began constructing a distributedsolar fleet with storage integration to service 100%of KCEC’s daytime peak kW by 2022.
In 2016 Kit Carson exited from it long term All-Requirements Power Contract with its G & T, Tristate,and contracted with a Power Marketer, GuzmanEnergy, for KCEC power supply for the next 10 years.
Kit Carson Electric Cooperative, Inc. 2018 2
Baseline Infrastructure is a High Speed Fiber Network
Kit Carson Internet serves over 6,700 customers including members who reside in areas where broadband was not available or service was limited. Additionally, to date the project has created 405 jobs, 90% which have been local; which were tied to physical main line construction. It has also given our local contractors and their laborers the experience and the skill sets to bid, and obtain projects outside the KCI service territory. This endeavor has greatly added to the economic viability of our surrounding communities. Broadband is the foundation for future economic development. KCEC has been deploying Fiber Services for electric operation since 2005.
Benefits of High Speed Fiber • Real Time Pricing• Enable Smart Grid• Matching and Adjusting Solar Loads with Battery
Storage• GB Commercial Service
Kit Carson Electric Cooperative, Inc. 2018 3
Benefits of Broadband
• Economic development and load growth
• High speeds – 40 Mbps to 1GB
• Affordability - High Speed Access to all members
• Data reliability
• 82% of organizations now use Cloud services
• “Symmetric speed” - uploads and downloads simultaneously
• Better quality for VoIP users – Star to Star
• Improved collaborations – video conferencing
• Business security and productivity
• Home video streaming
• 2000 - Plains/Tri-State G & T’s merge, creates a 44 member G & T.• 2002 - WESC term increases from 2020 to 2040.• 2006 - WESC term increase to 2050. KCEC refuses to extend.• 2013 -1st Rate Case for Tri-State in NM before NMPRC.• 2014 - Begin Discussion with Tri-State on Exit of WESC.• 2014 - 2016 – Due Diligence and Exit Work with Tri-State, Third Parties,
RUS & CoBank• 2016 - Solicit a New Power Supplier• July 2016 - Exit from TS complete, New PPA with Guzman Energy
Commences• December 2016 - Begin 100 % Solar Daytime Peak Project• 2018 - Release Storage RFP
Power Supply History
Kit Carson Electric Cooperative, Inc. 2018 5
The Landscape Is Changing
Kit Carson Electric Cooperative, Inc. 2018 6
Tristate Exit Facts
• Exited Tri-State July 1, 2016
• Expected to save $63m over 10 years
• 10 year contract
• KCEC will pay the buy out amount of $37M by 2022
• Signed NDAs
Kit Carson Electric Cooperative, Inc. 2018 7
Expected Financial Benefits of Solar Plan
• Over the next several years the cost of renewable energy (solar and storage) will decrease by over 40%.
• believes renewables, and solar in particular, will be the main driver of the U.S. energy growth in the next decade.
• Solar will contribute more than 1,400 GW of installed capacity nationwide, accounting for 17% of electricity generation mix and nearly 38% of all investments in the energy sector through 2030.
• We also expect solar competitiveness to continue to improve as the cost of installations decline further.
• Within 5 years we believe the cost of solar to decline by almost 25%.
• There will be addition cost savings as more advanced technology comes online and with energy efficiencies
Kit Carson Electric Cooperative, Inc. 2018 8
Solar Plan Timeline• Achieve 100% Daytime Renewables by 2023
• 2016 - 2017 – Announcement of the Solar Plan, 10 MW installed and activated.
• 2018 - 4-6 MW installed and activated, RFI / RFP for a storage partner, NREL Solar Energy Innovation Network participation.
• 2019 - Integrating New Technologies: EV charging stations, additional 4-6 MW, locate optimal place for battery storage.
• 2020 - 2021 - Add 4-6 MW, analyze first financial savings.
• 2022 - Greater System Reliability, Emergency Preparedness and approximately a 40% Cost Savings energy savings.
• Partnerships – Town of Taos, Village of Red River, Village of Angel Fire, Village of Eagle Nest, Village of Questa, Picuris Pueblo, Taos Pueblo, UNM, NNMC, Chevron, RCCLA, School Districts, Private land owners, a truly community project
• Arrays are built by a local solar company, Sol Luna Solar
Kit Carson Electric Cooperative, Inc. 2018 9
Current Renewable Goals
• 35 - 40 MW Solar (1 MW Scale) and Battery Storage (100 % Daytime)
• 2018 - Release Battery Storage RFI
• 2019 – Implement Battery Storage
• NREL Solar Energy Innovation Network
• April 2018 Press Release
• Replication Symposium June 2019
• Continued Broadband Implementation for “Smart Grid” integration
• ARRA “Fiber to the Home” grant awarded 2010 and completed 2015
• Researching new technologies in the move toward 5G
National Renewable Energy Labs
12
National Renewable Energy Laboratory (NREL), the U.S. Department of Energy (DOE) Solar EnergyTechnologies Office’s Solar Energy Innovation Network (SEIN) and Kit Carson Electric Cooperative,Inc. will be working together for the next 18 months to on a project called, the Resilient RenewableEnergy Roadmap for Rural Electric Cooperatives. The focus is to pilot KCEC’s 35MW solar projectwith battery storage and model how to address the nation’s rapidly changing electricity needs.
Goals• Develop solutions for improving reliability and affordability of solar energy through options
analysis and systems design.• Focus on evaluating the grid impacts and costs anticipated for various penetration levels of solar
and other distributed energy resources (DER).• Provide available data and work in coordination with program staff to model approaches to
minimize costs for combinations of solar and other DERs.• Pilot and test approaches and document through case studies.
Kit Carson Electric Cooperative, Inc. 2018
National Renewable Energy Laboratory
13
Project Outcomes• Develop a KCEC service area energy roadmap to achieve goal of 35to 40
megawatts (MW) of renewable energy electricity supply by 2022.• Complete one case study of a pilot solar PV technology system installation with
the intent of broader replication.• Demonstrate an operations model for rural electric cooperatives (RECs) to
integrate DERs with storage into their portfolios including behind the meterapplication.
• Participate in regional resilient energy planning efforts.• Develop a business model with best practices and build the internal capacity to
make the resilient and renewable energy transition.• Advance an education program on options for integrating resilient, renewable
electricity supply for cooperatives.
Kit Carson Electric Cooperative, Inc. 2018
NATIONAL RENEWABLE ENERGY LABORATORY 14
TRI-STATE G&T service territory
KCEC operation region (New Mexico)
Solar arrays KCES owns and operates
Solar arrays under development Kit-Carson plans to install up to 35 to 40megawatts of solar generation by 2022 thissummer around Taos, with a goal of achieving100% day time solar
To achieve even higher PV penetration levels, NREL will develop a planning tool for KCEC that helps plan and achieve this goal.
NREL Modeling Project Summary
Ensure that any new PV installations complies with applicable interconnection standards
The tool should be able to :
Estimate reverse power flows at the substation level for a given load and PV forecast
Identify potential bottlenecks in the network (both current and voltage constraint elements)
NATIONAL RENEWABLE ENERGY LABORATORY 15
Energy Storage market inthe United States continues to evolve.
Both the technology mix and application mix have changed substantially over the last 5 years.
We expect the evolution of the energy storage market to continue with commercially viable solutions to be available in the next 3 to 5 years.
Storage solutions in the current market environment make most sense where a combination of the following 3 factors are available:
• High electricity rates (CA, MA, NJ)
• High renewables penetration (TX, CA)
• Availability of storage subsidies (CA, NY)
AK
30.5
AZ-
AR
580.5
CA
2.8
CO
2.9
FL
58.7
HI
0.1
ID
IL
157.0IN
-
IA
0.5
LA
9.0 DE
10.5 MD
- DC
1.7
MI
2.4
MN
- 0.2
MS AL
4.1
MO
0.1
MT
-
NE
0.1
KS
50.0
NV
0.6
3.6
NM
1.6
NC
26.1 76.3
0.4
OK
10.2
OR 70.5
NY
145.8
PA
- RI1.7 CT
-
1.0 SC
GA
-
ND
-
SD
KY
0.0 TN
70.4
TX
5.2
UT
5.4 1.3NHVT
19.2
WA
OH67.0 0.2
1.0 WV VA
-
WI-
WY
1,501.1
US
< 5MW
5-55MW
> 55MW
No storage
CA: 1.3GWstorage
mandateby
2020
HI: KIUC SolarCity
20-year PPA17MW
solar + storage
HECO plansat
least 90MW
PJM: 265MW+operational for
frequency regulation
NY: Storage subsidy in New York
City; Con Edison announces
1.8MW ‘virtual power plant’
demonstrationproject
IN: 20MWAESIndiana project first
project in MISO
TX: Austin targeting 200MW by
2024; Duke Energy repowered
36MW, added 2.2MW for
renewables integration;
1.7MW storage in microgrids
VT:4.3MWinstalled in
microgridprojects
ME MA: $10m Energy
Storage Initiative
7.0 MA
for PGE and
PacificCorp
Ontario, Canada: Grid operator
contracted 50MW of storage
WA: $14.3m grant for
storageprojects
OR:5MWh
procurement59.6 target by 2020
AZ: Tucson Electric
Power awards two 10MW
projects
16.1 NJ NJ:$300/kWhincentivefor
projects
Recently Announced Energy Storage Projects (MW)
0%
25%
50%
75%
100%
2011 2012 2013
Technology mix of commissioned energy storage projects (MW)
Compressed air energy storage
Lithium-ion batteriesFlow batteries
Supercapacitors
2014 2015 H12016
Sodium sulphur batteries
Lead-based batteries Flywheels
Sodium nickel chloride batteries
Energy Storage Market Environment
Battery StorageCurrently Underway - Power storage and diversification of power sources are a key to future price stability. Solar is our members’ supply of source but intermittent, thus storage is key.
• RFI
• RFP
• Estimating 3-4 MW of Storage in 2019
• 4-6 MW in 2020
Potential Benefits
• Intelligent energy storage and frequency regulation
• Increased grid resilience and Stability
• Enhanced efficiency of renewables
• Cost Savings• Reduce KCEC peak energy demand by
at least 3MWs as metered for transmission purposes
• Self-supply Spinning Reserves Schedule 5 as defined in PNM OATT
• Peak Shaving• Rate Design Enhancements• Rates around an asset• Dynamic pricing
Kit Carson Electric Cooperative, Inc. 2018 16
Electrify Everything
Solar Panels
Electric Water Heater
Electric Vehicle
Electric Heater
Battery Storage
Kit Carson Electric Cooperative, Inc. 2018 17
Electric Vehicles are the Future
NationallyThe Fourth Industrial Revolution in energy and transportation systems is upon us and New Mexico must deploy critical charging infrastructure today while anticipating the mobility transformation.
LocallyDeploying the first charging stations in the KCEC Service Area in anticipation of the transportation transformation and as a tool to encourage tourism.
Kit Carson Electric Cooperative, Inc. 2018 18
A New Business Model Is Emerging
Rate Design
Tariffs
Governance
Forecasting
DecouplingBroadband
Solar Energy and
Battery Storage
Electric Vehicles
Resilient Two
Electric Grid
Kit Carson Electric Cooperative, Inc. 2018 19
The New Energy Future
Kit Carson Electric Cooperative, Inc. 2018 20
Thank you
Kit Carson Electric Cooperative, Inc. 2018 21