an iso 9001 - 2008 company - '+domain name+' civiland steelworksforcompletemetal building...

14
Pre-Engineered CIVIL AND STEEL WORKS FOR COMPLETE METAL BUILDING SOLUTIONS PEB ENGINEERING & CONSTRUCTIONS. An ISO 9001 - 2008 Company TM GROUP SURYA Steel Building Corporate Office Jai Ganesh Vision Complex, ‘B’ Wing, 2 nd Floor, office no.: 264, 265, 266, Akurdi, Pune-411 035.Maharashtra-India. Factory Address Gat No. 175, Behind M.S.E.B. Office, Ganesh Nagar, Talawade, Pune-411 038. Mail-Id:- [email protected] , [email protected] Website:- www.groupsurya.in Contact’s No. +91 7507778565 /7507778559

Upload: phungdieu

Post on 01-Apr-2018

217 views

Category:

Documents


3 download

TRANSCRIPT

Pre-Engineered

CIVILAND STEELWORKS FOR COMPLETE METAL BUILDING SOLUTIONS

PEB ENGINEERING & CONSTRUCTIONS.

An ISO 9001 - 2008 Company

TM

GROUP SURYA

Steel Building

Corporate OfficeJai Ganesh Vision Complex, ‘B’ Wing, 2nd Floor, office no.: 264, 265, 266, Akurdi,

Pune-411 035.Maharashtra-India. Factory Address

Gat No. 175, Behind M.S.E.B. Office, Ganesh Nagar, Talawade, Pune-411 038.Mail-Id:- [email protected], [email protected]

Website:- www.groupsurya.inContact’s No. +91 7507778565 /7507778559

TM

AB

OU

T U

S

What is PEB ?TM

Pre-Engineered Buildings (PEBs) Conventional Steel Buildings

Design

Quick and efficient; since PEBs are mainly formed of

standard sections and connections, design time is

significantly reduced. Basic designs are used ove and

over.

Slow: Each conventional steel structure is

designed from scratch by the Consultant, with

fewer design aids available to the Engineer.

Delivery Average 6 to 8 weeks. Average 20 to 26 weeks.

Foundations Simple design, easy to construct and light weight. Extensive, heavy foundations required.

Erection Cost & Time

Both costs & time of erection are minimized.

Typically, they are 20% more expensive than

PEB. In most of the cases, the erection costs

and time are not estimated accurately.

The erection process is easy, fast, step by step and

with hardly any requirement for equipments.

Erection is slow and extensive field labor is

required. Heavy equipment is often needed.

ArchitectureOutstanding architectural design can be achieved at

low cost using standard architectural features and

interface details.

Special architectural design and features must

be developed for each project, which often

require research and thus resulting in much

highter costs.

Future Expansion

PEB Building are designed with future expansion in

mind. It is simple, easy and cost effective. One

supplier can co-ordinate changes.

Future expansion would be more difficult and,

more likely, costlier.

Price Overall price -30% lower Overall price - Higher Price per square meter.

GROUP SURYA PEB BUILDINGS V/S CONVENTIONAL BUILDING

Types of Typical FramesTM

TM

TM

TM

TM

TM

Success Engineers, Bhosari,Industrial Shed in PEB with

civil work (20,000 sq.ft.) (8 month)

Mahindra Logistics, Chakan, Pune Industrial

Shed in PEB with civil work (1,07,000 sq.ft.) 6

month

Mr. Desai, WaghajaiNagar Chakan Industrial

Shed in PEB (10,000 sq.ft.) 3 month

Chavan Industries, WaghjaiNagar, Chakan. Industrial shed with PEB and civil

work.( 34000 sq. ft) 4 months

TM

TM

Arofine

BridgeStone, Near Hyundai, Savardari, Chakan

Rinder India Pvt. Ltd. MIDC Chakan, Pune

Acme Industries Pvt. Ltd. Waghajai Nagar Chakan DTL Ancillaries Pvt. Ltd. MIDC, Chakan

TM

Ashok Layland

Rajyog Toyota

Hero Honda Showroom

TM

FIRST AID KIT

PERSONAL PROTECTIVE EQUIPMENT (PPE)

Corporate OfficeJai Ganesh Vision Complex, ‘B’ Wing, 2nd Floor, office no.: 264, 265, 266, Akurdi,

Pune-411 035.Maharashtra-India. Factory Address

Gat No. 175, Behind M.S.E.B. Office, Ganesh Nagar, Talawade, Pune-411 038.Mail-Id:- [email protected], [email protected]

Website:- www.groupsurya.inContact’s No. +91 7507778565 /7507778559

TM

PEB ENGINEERING & CONSTRUCTIONS.

An ISO 9001 - 2008 Company

GROUP SURYA