Page 1: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

An Overview of the 2016 Modified Pupil Accommodation Review for Southwest Burlington

Page 2: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

1. Starting with WHY? Background What is a Modified Pupil Accommodation Process? Declining student enrolment A window of opportunity

2. A Proposed Solution Proposed plan Why this approach? Design concept - what would this look like?

3. How Would This Affect Students and Families? 4. Next Steps Sequence of Events Timelines

5. What to Expect at the Community Consultation Meeting

What’s Inside:

2

Page 3: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Starting with WHY?

Page 4: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Background

On Tuesday, January 19, 2016, the Board of Trustees approved a motion to proceed with a Modified Pupil Accommodation Review Process for Southwest Burlington.

At this time, no decision has been made, and no decision will be made until after this consultation process is complete, and Trustees have had an opportunity to review the recommendations in light of all the feedback gathered.

4

Page 5: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

What is a Modified Pupil Accommodation Process?

The Ministry of Education document, Guidelines for Pupil Accommodation Reviews, is posted on our website: www.hcdsb.org and provides a good overview of the modified process.

The basic difference between a modified review process and the standard review process is that the establishment of an Accommodation Review Committee is not required, and there is one less formal Community Consultation Meeting.

5

Page 6: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Why Are We Reviewing This Community?

As a Board, we are regularly assessing student enrolment.

In 2013, Trustees approved its Long Term Capital Plan (LTCP) in principle (available at www.hcdsb.org)

The LTCP contains long-term student enrolment projections, and identifies future projects and/or boundary reviews to address too many, or not enough pupil places.

So this is what we know from our current LTCP…

6

Page 7: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

The Number of Students in South Burlington Schools is Declining

7

Page 8: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Why Does This Matter? Over the past 5 years (2011-2015), South Burlington has

seen declining student enrolment. This decline is forecasted to continue.

When a school has excess space because of low enrolment, it costs money to maintain and operate these empty spaces – money that could otherwise be redirected to our students in the classrooms.

As student enrolment continues to drop in South Burlington, we will not be able to sustain 5 standalone elementary schools.

8

Page 9: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

What Does this Mean for Students? The number of staff in a school is based on the

number of students. As the number of students decrease, staffing is

reduced. With fewer staff, it will get harder and harder to keep

offering programs and extra-curricular activities. At this time, we have no money available in our

budget to build or renovate schools for this purpose, so when the time comes to close schools, students would have to be moved to an existing school.

9

Page 10: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

If We Do Nothing Now The student population in our Catholic elementary

schools in South Burlington will continue to drop. We would be forced to close schools and move

students – likely to an existing school building. Given the size of our schools in South Burlington, we

would not be able to accommodate entire school communities together, and would likely need to look at boundary changes and splitting up communities.

10

Page 11: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

A Window of Opportunity

On December 16, 2015, the Ministry of Education announced available funding to school boards for consolidation projects.

By applying for this funding, HCDSB has an opportunity to renovate an existing school to incorporate 21st Century learning concepts and designs for your community.

11

Page 12: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

A Proposed Solution

Page 13: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Burlington Southwest QEW - Map

13

Page 14: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Schools Included in this Review Area:

14

St. Paul Catholic Elementary School St. John Catholic Elementary School

Page 15: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Number of Students in Southwest Burlington is Declining

563

442

15

Classroom Capacity – 732 Students

2015 2025

266

297

208

234

ST. JOHN SCHOOL

ST. PAUL SCHOOL

TOTAL FUNCTIONAL BUILDING CAPACITY (FBC)

Page 16: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

A Proposed Solution A. Construct a 6 classroom addition of 144 pupil place at the St.

John school location for the 2017- 2018 school year. B. Close St. Paul school, and re-direct the entire student population

to the newly renovated St. John (Burlington Southwest School) – all attendance boundaries consolidated into one.

C. Re-direct all existing programs at the time of consolidation offered at the two (2) affected schools to Burlington Southwest School.

D. Outreach to approved community partners of the Board for potential co-build projects.

E. Address renewal needs at the Burlington Southwest School with Board facility renewal funds, such as accessibility improvements, as part of the addition construction, where feasible; and,

F. Retain the St. Paul School facility, with the intent of reviewing options for combining the lands with Assumption Secondary School for a potential future project.

16

Page 17: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Enrolment and Capacity for this Option Option Enrolment and Utilization Analysis

10 Year Enrolment vs. Capacity Forecast

Burlington Southwest School

17

Proposed Classroom Capacity – 527 Students

Page 18: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

How We Project Enrolment?

18

SINGLE FAMILY HOMES TOWN HOUSES CONDOMINIUMS

HIGH YIELD (+ kids) MEDIUM YIELD LOW YIELD (- kids)

ENROLMENT CONSIDERATIONS FOR NEW HOUSING DEVELOPMENTS

St. John School Junior Kindergarten = 27 St. Paul School Junior Kindergarten = 23

Yearly Grade to Grade Progression Factor (%)

CALCULATION OF EXISTING COMMUNITY PROJECTIONS

JK Entrance Driven by: Census, Birth Data, Catholic Student Share

Page 19: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

What Would Occur A. Re-locate all St. John students to St. Paul School until the

construction of the Burlington Southwest School addition is completed – nine (9) portable classrooms will be required;

B. Upon completion of the addition, all students will be relocated to the new Burlington Southwest School, and St. Paul School will close, but will remain a Board property until further notice.

Burlington Southwest School Occupancy 2017-18 school year

19

Page 20: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Why this Approach?

Page 21: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Criteria Used

A. Facility Utilization between 90-125% B. 500-671 Functional Building Capacity

(brick and mortar) C. AODA Accessibility (School and Site) D. Transportation Times E. Average Distance to School F. Site Sizes between 5-6 acres G. Adjacent uses H. Other Site Limitation

21

Page 22: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

St. John School Site St. Paul School Site

School Site Comparison

22

Total site size: approximately 4.70 acres in total – yellow outline

Usable site size: approximately 2.97 acres Play space area: 1.28 acres – pink outline Regular shaped lot – shares site with

Assumption for the Track (limited use) Small frontage – limited bus/vehicle access Potential to use lands for secondary project School Built in 1968 (48 years)

Total site size: approximately 1.96 acres in total – yellow outline

Usable site size: approximately 3.96 acres Play space area: 1.65 acres – pink outline Adjacent to parish with existing shared use

agreement Access to site by three (3) municipal streets –

improves site functionality School Built in 1995 (21 years)

Page 23: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Proposed School Concept

23

SHARED PARKING AND DROP OFF AREA

GRASS PLAY AREA

EXISTING FACILITY (1995)

ASHPHALT PLAY AREA

Total site size: approximately 1.96 acres in total – yellow outline Usable site size: approximately 3.96 acres – blue outline Play space area: 1.65 acres – pink outline

Page 24: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Proposed School Concept

24

EXISTING FACILITY (1995)

ASHPHALT PLAY AREA

GRASS

PLAY AREA

SHARED PARKING AND DROP OFF AREA

Total site size: App. 1.96 acres Usable site size: App. 3.96 acres Play space area: App. 1.65 acres

BU

S LA

Y-B

Y A

REA

Page 25: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Walking and Transportation Considerations

25

Page 26: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

• Exception west of Maple Ave is currently in place for St. John students.

• Crossing Guard locations subject to change depending on usage, additional locations may be introduced if walking increases in the area (Municipal Warrants).

• Transportation times for regular track programming is averaged at 14 minutes.

HCDSB Average Distance to Stop:

Transportation Needs, Distance, and Time

26

Page 27: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Overall the Best Option for Burlington Southwest

A. Facility utilization between 90-125% over a 10 year

horizon. B. 475-521 pupil places are proposed, pending on addition

size. C. School and site meet AODA (accessibility standards). D. Transportation times are well below 60 minutes, and

maximum times are not anticipated to exceed 30 minutes. E. Average distance to school is reasonable. F. Site size is 1.96 acres, below standards, but collaboration

with adjacent parish will increase overall site size within desired benchmarks.

G. Adjacent uses are residential, a parish, and a commercial car dealership.

H. Parking is shared with parish.

27

Page 28: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Proposed Design for Burlington Southwest

School Site

Page 29: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Aerial View of Site

29

Page 30: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Proposed Addition to St. John (B) School

• 6 classroom addition to the rear of the existing St. John School. • Incorporates 21st Century learning concepts in various open and

flexible educational spaces. • Compact and efficient design, allows for continued use of

playspace, parking, and busloops.

30

Proposed Burlington Southwest Catholic Elementary School

Page 31: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Conceptual Rendering

31

Page 32: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Conceptual Site Plan

32

Page 33: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Conceptual Floor Plans

Ground Floor Plan 33

Page 34: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Conceptual Floor Plans

Second Floor Plan 34

Page 35: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Exterior Example

35

Page 36: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Lobby Example

36

Page 37: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Lobby Example

37

Page 38: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Lobby Example

38

Page 39: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Library Example

39

Page 40: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

2 Storey Window Glazing

40

Page 41: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Classroom Examples

41

Page 42: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Energy Efficient Building

42

Page 43: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Outdoor Play Area Concept

43

Page 44: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Outdoor Play Area Concept

44

Page 45: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Outdoor Play Area Concept

45

Page 46: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

What Would This Mean for Students

and Families?

Page 47: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Changes to Expect

New 21st Century School design Potential change in transportation status

(walker/bussed) Reduction in double-split classrooms Larger school building and community Potential for new teaching staff for your child Short-term portable needs

Page 48: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Benefits to the Proposed Solution

Classroom ratios will remain the same, but with fewer combined classes.

Larger school staff complement and resources are available for student needs.

Increase in co-curricular activities for students.

Would meet current AODA accessibility standards.

48

Current school community would move and stay together.

A school building that is in better condition.

An enhanced 21st Century learning environment:

• Larger classrooms • Music room • Art room • Science lab • Updated library learning commons • Updated FDK outdoor play area

Page 49: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Next Steps

Page 50: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Sequence of Events

Review and Consultation

Board Approval

Ministry Approval

Transition Committee Established

50

Page 51: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Timelines

51

Page 52: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Transition Committee

• Moving logistics for transition period • Home/School/Parish Connections • School Name • School Logo • School Uniforms • School Finances and Purchases • School Closing Events • School Community Introductions and Transition Activities • Memorabilia, Art, Photographs and Other School History • Input on the logistics of relocation to new site • Transition of Technology from site to site (iPads, laptops,

Smartboards)

52

Page 53: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

What to Expect at the Community Consultation

Page 54: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Format of the Community Consultation Meeting on Tuesday, March 8, 2016

54

6:30 p.m. School Opens for Arrival and Registrations 7:00 p.m. Welcome and Introductions 7:05 p.m. Background Presentation 7:30 p.m. Breakout into Small Groups (8-10) to discuss* the following questions:

1. What do you like best about the proposed plan? 2. What are the challenges you see with this plan? 3. Do you have any suggestions to improve this plan?

*A scribe will be assigned to each table. All feedback will be recorded and shared with Trustees in the final report to the Board. NOTE: Questions or comments will be collected in writing, and passed along to Trustees for response at a later time. To register to attend: survey.hcdsb.org/2016MPAR.aspx

Page 55: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

4 Ways to Tell Us What You Think

Page 56: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

4 Ways to Tell Us What You Think…

56

Page 57: An Overview of the 2016 Modified Pupil Accommodation ... Pupil Accommodation Review for Southwest Burlington . 1. ... process and the standard review process is that the ... Burlington,

Delegation to the Board of Trustees

57