an update on structural seal development at nasa grc

18
AN UPDATE ON STRUCTURAL SEAL DEVELOPMENT AT NASA GRC Pat Dunlap, Bruce Steinetz, and Josh Finkbeiner National Aeronautics and Space Administration Glenn Research Center Cleveland, Ohio Jeff DeMange and Shawn Taylor University of Toledo Toledo, Ohio Chris Daniels University of Akron Akron, Ohio Jay Oswald J&J Technical Solutions, Inc. Cleveland, Ohio National Aeronautics and Space Administration www.nasa.gov NASA Glenn Research Center An Update on Structural Seal Development at NASA GRC Pat Dunlap, Dr. Bruce Steinetz, Josh Finkbeiner NASA Glenn Research Center, Cleveland, OH Jeff DeMange, Shawn Taylor University of Toledo, Toledo, OH Dr. Chris Daniels University of Akron, Akron, OH Jay Oswald J&J Technical Solutions, Inc., Cleveland, OH 2005 NASA Seal/Secondary Air System Workshop November 8-9, 2005 Pat Dunlap, Dr. Bruce Steinetz, Josh Finkbeiner NASA Glenn Research Center, Cleveland, OH Jeff DeMange, Shawn Taylor University of Toledo, Toledo, OH Dr. Chris Daniels University of Akron, Akron, OH Jay Oswald J&J Technical Solutions, Inc., Cleveland, OH 2005 NASA Seal/Secondary Air System Workshop November 8-9, 2005 NASA/CP—2006-214383/VOL1 411

Upload: others

Post on 29-May-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: An Update on Structural Seal Development at NASA GRC

AN UPDATE ON STRUCTURAL SEAL DEVELOPMENT AT NASA GRC

Pat Dunlap, Bruce Steinetz, and Josh Finkbeiner National Aeronautics and Space Administration

Glenn Research Center Cleveland, Ohio

Jeff DeMange and Shawn Taylor

University of Toledo Toledo, Ohio

Chris Daniels

University of Akron Akron, Ohio

Jay Oswald

J&J Technical Solutions, Inc. Cleveland, Ohio

National Aeronautics and Space Administration

www.nasa.govNASA Glenn Research Center

An Update on Structural Seal Development at NASA GRC

Pat Dunlap, Dr. Bruce Steinetz, Josh FinkbeinerNASA Glenn Research Center, Cleveland, OH

Jeff DeMange, Shawn TaylorUniversity of Toledo, Toledo, OH

Dr. Chris DanielsUniversity of Akron, Akron, OH

Jay OswaldJ&J Technical Solutions, Inc., Cleveland, OH

2005 NASA Seal/Secondary Air System WorkshopNovember 8-9, 2005

Pat Dunlap, Dr. Bruce Steinetz, Josh FinkbeinerNASA Glenn Research Center, Cleveland, OH

Jeff DeMange, Shawn TaylorUniversity of Toledo, Toledo, OH

Dr. Chris DanielsUniversity of Akron, Akron, OH

Jay OswaldJ&J Technical Solutions, Inc., Cleveland, OH

2005 NASA Seal/Secondary Air System WorkshopNovember 8-9, 2005

NASA/CP—2006-214383/VOL1 411

Page 2: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Intr

oduc

tion

& B

ackg

roun

d

•A

dvan

ced

stru

ctur

al s

eals

are

re

quire

d on

futu

re h

yper

soni

c ve

hicl

es a

nd o

n ve

hicl

es a

nd

syst

ems

for

NA

SA

’s E

xplo

ratio

n In

itiat

ive

–D

ynam

ic s

eals

:•

Con

trol

sur

face

s•

Land

ing

gear

doo

rs

•A

cces

s pa

nels

and

doo

rs

•H

yper

soni

c en

gine

ram

ps a

nd

pane

ls

–S

tatic

sea

ls:

•D

ocki

ng/b

erth

ing

syst

em s

eals

Lead

ing

edge

pan

el jo

ints

•A

crea

ge th

erm

al p

rote

ctio

n sy

stem

(T

PS

) jo

ints

•H

eats

hiel

d jo

ints

and

inte

rfac

es

Hype

rson

ic e

ngin

e se

alsSe

al

loca

tion

Heat

shie

ld s

eals

NASA/CP—2006-214383/VOL1 412

Page 3: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

GR

C S

truc

tura

l Sea

ls T

eam

Res

earc

h A

reas

•G

RC

Str

uctu

ral S

eals

Tea

m d

evel

opin

g se

als

for

NA

SA

’s

Exp

lora

tion

Initi

ativ

e:–

Adv

ance

d D

ocki

ng/B

erth

ing

Sys

tem

(A

DB

S)

for

CE

V (

JSC

)–

CE

V T

PS

Adv

ance

d D

evel

opm

ent (

LaR

C, A

mes

) –

Aer

ocap

ture

Tec

hnol

ogy

Dev

elop

men

t (M

SF

C)

–D

eplo

yabl

e S

kirt

Sys

tem

(N

orth

rop

Gru

mm

an)

Trai

ling

ballu

te fo

r ae

roca

ptur

eCr

ew E

xplo

ratio

n Ve

hicl

e (C

EV)

Adva

nced

Doc

king

/Ber

thin

g Sy

stemSe

alin

g in

terf

ace

NASA/CP—2006-214383/VOL1 413

Page 4: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Res

earc

h A

reas

& O

bjec

tive

•G

RC

Str

uctu

ral S

eals

T

eam

als

o de

velo

ping

se

als

for

hype

rson

ics

prog

ram

s:–

Fal

con

prog

ram

(Lo

ckhe

ed

Mar

tin, D

AR

PA

, JS

C)

–X

-43C

Dire

ct C

onne

ct

Com

bust

or R

ig (

AT

K G

AS

L,

LaR

C)

Obj

ectiv

e: D

evel

op s

ealin

g sy

stem

s th

at m

eet v

ehic

le/s

yste

m

requ

irem

ents

and

dem

onst

rate

per

form

ance

in r

elev

ant e

nviro

nmen

ts

Falc

on v

ehic

leCont

rol

surf

ace

seal

s

Lead

ing

edge

sea

ls

Acre

age

TPS

seal

s

NASA/CP—2006-214383/VOL1 414

Page 5: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Pre

sent

atio

n O

utlin

e

•W

afer

sea

ls•

Spr

ing

tube

sea

ls•

Hig

h te

mpe

ratu

re s

eal p

relo

ader

s: T

ZM

can

ted

coil

sprin

gs•

Arc

jet t

est r

ig

NASA/CP—2006-214383/VOL1 415

Page 6: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Waf

er S

eal G

eom

etry

/Flo

w In

vest

igat

ions

•P

revi

ous

test

s re

veal

ed th

at w

afer

sea

l ins

talla

tion

fact

ors

influ

ence

d flo

w r

ates

•O

bjec

tive:

Impr

ove

unde

rsta

ndin

g of

waf

er s

ealin

g sy

stem

•A

ppro

ach:

Par

amet

ric s

tudi

es o

f per

form

ance

(flo

w te

sts)

–D

esig

n of

exp

erim

ents

(D

OE

) st

udy

to e

valu

ate

varia

bles

that

affe

ct

seal

inst

alla

tion

–W

afer

sea

l geo

met

ry s

tudy

Bri

dg

e el

emen

t

Sea

l pre

load

ers

0.12

5 in

. gap

Tes

t se

al

Sea

l ca

rtri

dg

e

Co

ver

pla

te

Ple

nu

m

cham

ber

Met

ered

air

su

pp

ly

Line

ar fl

ow fi

xtur

e

NASA/CP—2006-214383/VOL1 416

Page 7: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Waf

er S

eal I

nsta

llatio

n D

OE

Stu

dy

•W

afer

geo

met

ry: 0

.5 in

. wid

e x

0.92

in. l

ong

x 0.

125

in. t

hick

•F

ive

fact

ors

eval

uate

d at

two

leve

ls–

Waf

er h

eigh

t tol

eran

ce: 0

.000

3 an

d 0.

0020

in.

–P

relo

ad: 1

.8 a

nd 4

.3 lb

f per

inch

of

seal

–B

ridge

ele

men

t thi

ckne

ss: 0

.015

an

d 0.

060

in.

–G

roov

e w

idth

cle

aran

ce: 0

.001

an

d 0.

007

in.

–G

roov

e le

ngth

cle

aran

ce: 0

.001

an

d 0.

005

in.

•T

est m

atrix

:–

16 tr

ials

–F

ract

iona

l fac

toria

l des

ign

(Res

olut

ion

V)

–T

ests

per

form

ed in

ran

dom

ord

er

to m

inim

ize

bias

es

Stac

k Le

ngth

Heig

ht

Wid

th

Thic

knes

s

Bri

dg

e el

emen

t

NASA/CP—2006-214383/VOL1 417

Page 8: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Res

ults

of W

afer

Sea

l Ins

talla

tion

DO

E S

tudy

Mean of 0-100 psi leakage metric, SCFM-psi/in

0.00

200.

0003

108 96 84 72 60

4.3

1.8

0.06

00.

015

0.00

70.

001

108 96 84 72 60

0.00

50.

001

WH

TP

relo

adB

ET

GW

CG

LC

WH

T =

Waf

er h

eigh

t tol

eran

ce, i

n.

Pre

load

= P

relo

ad p

er in

ch o

f sea

l, lb

f/in.

BE

T =

Brid

ge e

lem

ent t

hick

ness

, in.

GW

C =

Gro

ove

wid

th c

lear

ance

, in.

GLC

= G

roov

e le

ngth

cle

aran

ce, i

n.

Leak

age

met

ric =

Are

a un

der

flow

vs.

pr

essu

re c

urve

from

0 to

100

psi

g

Key

Loos

er

groo

ve le

ngth

cl

eara

nce

Thic

ker b

ridge

el

emen

tHi

gher

sea

l pr

eloa

d

Tigh

ter w

afer

he

ight

tole

ranc

e

Tigh

ter g

roov

e w

idth

cle

aran

ce

NASA/CP—2006-214383/VOL1 418

Page 9: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Waf

er G

eom

etry

Stu

dy: T

hick

ness

Var

iatio

ns

•M

otiv

atio

n: T

hick

er w

afer

s ha

ve lo

wer

par

t cou

nt, l

ower

leak

age

rate

s?•

Com

para

ble

leak

age

rate

s fo

r 1/

8-in

. and

1/4

-in. t

hick

waf

ers:

can

re

duce

par

t cou

nt 2

X b

y us

ing

1/4-

in. t

hick

waf

ers

•H

ighe

r flo

w r

ates

for

1-in

. and

2-in

. thi

ck w

afer

s, le

ss a

ble

to c

onfo

rm to

w

afer

mis

alig

nmen

ts a

nd s

ealin

g su

rfac

e di

stor

tions

0.0

0.2

0.4

0.6

0.8

1.0

1.2

020

4060

8010

0

Pre

ssu

re d

iffe

ren

tial

acr

oss

sea

l, p

sig

Flow per inch of seal, SCFM/in

1/8-

in.

thic

k

1/4-

in.

thic

k

1-in

. th

ick

2-in

. th

ick

1/8

in.

1/4

in.

1 in

.

2 in

.

NASA/CP—2006-214383/VOL1 419

Page 10: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Waf

er G

eom

etry

Stu

dy:

Ful

l-Siz

e vs

. Hal

f-S

ize

Waf

ers

•M

otiv

atio

n: S

mal

ler

waf

ers

occu

py le

ss s

pace

, wei

gh le

ss, f

it in

tight

er

loca

tions

•F

low

rat

es fo

r ha

lf-si

ze w

afer

s ~

3X th

ose

for

full-

size

waf

ers

(1/8

-in. t

hick

)•

Can

red

uce

part

cou

nt 4

X fo

r ha

lf-si

ze w

afer

s by

usi

ng 1

/2-in

. thi

ck

waf

ers

vs. 1

/8-in

. thi

ck (

sim

ilar

flow

rat

es)

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

020

4060

8010

0

Pre

ssu

re d

iffe

ren

tial

acr

oss

sea

l, p

sig

Flow per inch of seal, SCFM/in

1/8-

in. t

hic

k, f

ull-

size

1/8-

in. t

hic

k, h

alf-

size

1/4-

in. t

hic

k, h

alf-

size

1/2-

in. t

hic

k, h

alf-

size

0.25

in.

0.5

in.

0.92

in.

0.5

in.

Full-

size

w

afer

Half-

size

w

afer

NASA/CP—2006-214383/VOL1 420

Page 11: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Spr

ing

Tub

e S

eal D

evel

opm

ent

•O

bjec

tive:

Impr

ove

resi

lienc

y of

spr

ing

tube

se

als

at h

igh

tem

pera

ture

s•

App

roac

h:S

ubst

itute

R

ene

41 a

s m

ater

ial f

or

knitt

ed s

prin

g tu

be v

s.

Inco

nel X

-750

in b

asel

ine

desi

gn

Saf

fil

core

Sp

rin

g

tub

e

Nex

tel 3

12 s

hea

th Per

man

ent s

et

Loss

of r

esili

ency

in

bas

elin

e se

al

NASA/CP—2006-214383/VOL1 421

Page 12: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Res

ilien

cy Im

prov

emen

t for

Ren

e 41

Spr

ing

Tub

e

Pre-

test

2000

°F17

50°F

1500

°F12

00°F

20%

Com

pres

sion

Tes

ts o

n IN

X-7

50 S

prin

g Tu

be

Perm

anen

t set

20%

Com

pres

sion

Tes

ts o

n Re

ne 4

1 Sp

ring

Tube

Pre-

test

1200

°F15

00°F

1750

°F20

00°F

Sign

ifica

nt p

erm

anen

t set

for I

ncon

el a

t 150

0°F

No

visi

ble

perm

anen

t set

for R

ene

until

175

0°F

NASA/CP—2006-214383/VOL1 422

Page 13: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Spr

ing

Tub

e S

eals

: Go-

For

war

d P

lan

•T

estin

g to

-dat

e ha

s be

en o

n sp

ring

tube

s by

th

emse

lves

•W

ork

in p

rogr

ess:

–F

abric

atin

g se

als

with

Ren

e 41

spr

ing

tube

s fo

r ev

alua

tion

(Jac

kson

Bon

d E

nter

pris

es, L

LC)

•F

utur

e w

ork

–P

erfo

rm h

ot c

ompr

essi

on te

sts

on n

ew s

eals

to e

valu

ate

if re

silie

ncy

impr

ovem

ents

tran

slat

e to

full

seal

s–

Fab

ricat

e an

d ev

alua

te s

eals

with

Kan

thal

A1

wire

ove

rbra

id

inst

ead

of N

exte

l fab

ric (

impr

oved

dur

abili

ty)

–F

abric

ate

and

eval

uate

sea

ls w

ith e

ngin

eere

d co

res

inst

ead

of S

affil

(im

prov

ed r

esili

ency

and

low

er fl

ow r

ates

)

NASA/CP—2006-214383/VOL1 423

Page 14: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Hig

h T

empe

ratu

re S

eal P

relo

ader

Dev

elop

men

t: T

ZM

Can

ted

Coi

l Spr

ing

•O

bjec

tive:

Dev

elop

pr

eloa

d de

vice

s th

at

prov

ide/

augm

ent s

eal

resi

lienc

y at

hig

h te

mpe

ratu

res

•A

ppro

ach:

Pur

suin

g hi

gh

tem

pera

ture

TZ

M c

ante

d co

il sp

rings

–U

niqu

e lo

ad v

s.

disp

lace

men

t cur

ve

prov

ides

nea

rly c

onst

ant

forc

e ov

er la

rge

rang

e

–La

rge

wor

king

def

lect

ion

Larg

e w

orki

ng d

efle

ctio

n of

can

ted

coil

sprin

g

5%35

%

Can

ted

Coi

l S

prin

g

NASA/CP—2006-214383/VOL1 424

Page 15: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

TZ

M C

ante

d C

oil S

prin

g D

evel

opm

ent

•R

ecen

t acc

ompl

ishm

ents

–S

ucce

ssfu

lly fa

bric

ated

spl

it-fr

ee

0.02

5-in

. dia

met

er T

ZM

wire

with

be

tter

than

exp

ecte

d st

reng

th a

nd

duct

ility

(R

heni

um A

lloys

, Inc

.)–

Suc

cess

fully

col

d-co

iled

TZ

M w

ire

into

rep

rese

ntat

ive

sprin

g ge

omet

ries

•W

ork

in p

rogr

ess

–W

ire c

oatin

g tr

ails

usi

ng p

latin

um–

Wire

tens

ile te

sts

at r

oom

te

mpe

ratu

re a

nd 2

300°

F

•F

utur

e w

ork

–A

sses

s pl

atin

um c

oatin

g du

rabi

lity

via

bend

test

s at

230

0°F

in a

ir –

Coi

l TZ

M w

ire in

to c

ante

d co

il co

nfig

urat

ion

and

perf

orm

co

mpr

essi

on te

sts

to e

valu

ate

resi

lienc

y

Succ

essf

ul c

oilin

g tri

als

of T

ZM w

ire

Split

-free

TZM

wire

NASA/CP—2006-214383/VOL1 425

Page 16: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Arc

Jet

Tes

t Rig

Dev

elop

men

t

•O

bjec

tive

–E

valu

ate

seal

s un

der

sim

ulat

ed

reen

try

heat

ing

cond

ition

s in

JS

C

arc

jet u

sing

GR

C-d

evel

oped

test

fix

ture

•F

eatu

res

–U

niqu

e G

RC

des

ign

perm

its

test

ing

of d

iffer

ent s

eal a

nd fl

ap

desi

gns/

mat

eria

ls–

Mod

ular

sea

l car

trid

ges

enab

le

rapi

d ex

chan

ge o

f sea

l spe

cim

ens

–M

otor

-driv

en fl

ap m

oves

dur

ing

test

ing

to s

imul

ate

fligh

t–

Adj

usta

ble

angl

e-of

-atta

ck a

nd

yaw

ang

le p

erm

it in

vest

igat

ion

of

diffe

rent

flow

con

ditio

ns–

Inst

rum

enta

tion

reco

rds

tem

pera

ture

s an

d pr

essu

res

arou

nd s

eal a

nd fl

ap–

Coo

led

suba

ssem

bly

perm

its ti

me-

at-t

empe

ratu

re te

sts

Insu

latin

g til

e

Mov

able

C/

SiC

flap

(MR&

D/G

E)

Seal

loca

tion

Cool

ed

inst

rum

enta

tion

tray

and

tube Ty

pica

l arc

jet t

est a

t JSC

NASA/CP—2006-214383/VOL1 426

Page 17: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Arc

Jet

Tes

t Rig

–S

tatu

s

Cool

ed c

oppe

r mot

or

and

brak

e ho

usin

gs

•F

abric

atio

n is

und

erw

ay (

Coo

k M

anuf

actu

ring

Co.

)•

Sch

edul

e:–

Com

plet

e te

st fi

xtur

e fa

bric

atio

n an

d as

sem

bly:

1Q

FY

06–

Per

form

test

s at

JS

C: F

Y06

-07

Alum

inum

moc

kup

of le

adin

g ed

ge

Wax

mod

el o

f sid

ewal

l sho

win

g co

olin

g ch

anne

ls

NASA/CP—2006-214383/VOL1 427

Page 18: An Update on Structural Seal Development at NASA GRC

Nat

iona

l Aer

onau

tics

and

Spa

ce A

dmin

istr

atio

n

ww

w.n

asa.

gov

Sum

mar

y

•G

RC

Str

uctu

ral S

eals

Tea

m d

evel

opin

g ke

y se

al

tech

nolo

gies

for

NA

SA

’s E

xplo

ratio

n In

itiat

ive

and

hype

rson

ics

prog

ram

s•

Mor

e de

tails

in p

rese

ntat

ions

to fo

llow

NASA/CP—2006-214383/VOL1 428