Regulatory Changes Revisions to 314 CMR – Operation & Maintenance Regulations ◦ Allow a POTW to accept SSO at sludge-only anaerobic digesters with Department approval ◦ Clarify requirement for Department approval of the O&M Manual ◦ New reporting requirements for SSOTRANSCRIPT
![Page 1: Anaerobic Digestion at Wastewater Treatment Plants Regulatory Issues Bureau of Resource Protection April 2011](https://reader035.vdocument.in/reader035/viewer/2022062523/5a4d1b147f8b9ab059990d1d/html5/thumbnails/1.jpg)
Anaerobic Digestion Anaerobic Digestion at Wastewater at Wastewater Treatment PlantsTreatment Plants
Regulatory IssuesRegulatory IssuesBureau of Resource Bureau of Resource ProtectionProtection
April 2011
![Page 2: Anaerobic Digestion at Wastewater Treatment Plants Regulatory Issues Bureau of Resource Protection April 2011](https://reader035.vdocument.in/reader035/viewer/2022062523/5a4d1b147f8b9ab059990d1d/html5/thumbnails/2.jpg)
GoalsGoalsPRIMARY
◦ Effluent that meets permit limits
◦ Proper operation of treatment (AD) unit
◦ Minimize nuisance potential
◦ Promote beneficial reuse of wastewater residuals
SECONDARY ◦ Optimize energy
production ◦ Secure consistent
municipal revenue stream
![Page 3: Anaerobic Digestion at Wastewater Treatment Plants Regulatory Issues Bureau of Resource Protection April 2011](https://reader035.vdocument.in/reader035/viewer/2022062523/5a4d1b147f8b9ab059990d1d/html5/thumbnails/3.jpg)
Regulatory ChangesRegulatory ChangesRevisions to 314 CMR 12.00 –
Operation & Maintenance Regulations◦Allow a POTW to accept SSO at
sludge-only anaerobic digesters with Department approval
◦Clarify requirement for Department approval of the O&M Manual
◦New reporting requirements for SSO
![Page 4: Anaerobic Digestion at Wastewater Treatment Plants Regulatory Issues Bureau of Resource Protection April 2011](https://reader035.vdocument.in/reader035/viewer/2022062523/5a4d1b147f8b9ab059990d1d/html5/thumbnails/4.jpg)
Approval ProcessApproval ProcessSubmission of
Engineering Report◦Design criteria, disposition
of residuals, certificationOperational &
Maintenance Manual Revisions◦Add facilities, changes to
existing facilities, schedules, staffing changes
Reporting Requirements◦Maintain adequate records
of source & volume of approved SSO