analisis perkerasan jalan, pemeliharaan dan peningkatan ... fileperpustakaan.uns.ac.id...
TRANSCRIPT
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
i
Analisis Perkerasan Jalan, Pemeliharaan dan Peningkatan dengan
Metode Analisa Komponen beserta Rencana Anggaran Biaya (RAB)
Ruas Jalan Gondangmanis - Kudus KM 0+000 – 3+000
TUGAS AKHIR
Disusun Sebagai Syarat Memperoleh Gelar Ahli Madya (A.Md.)
pada Program Studi DIII Teknik Sipil
Fakultas Teknik Universitas Sebelas Maret Surakarta
Disusun Oleh :
Manas Pratama.
NIM. I 8212032
PROGRAM STUDI DIII TEKNIK SIPIL
JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS SEBELAS MARET
SURAKARTA
2015
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
ANALYSIS ON ROAD HARDENING, MAINTENANCE, AND IMPROVEMENT USING
COMPONENT ANALYSIS METHOD WITH EXPENSE BUDGET PLAN IN
GONDANGMANIS ROAD – KUDUS
KM 0+000 – 3+000
FINAL PROJECT
Written to fulfill a requirement to obtain Ahli Madya(A.Md.) degree in Civil Engineering
Undergraduate Study Program of Civil Engineering Department
of Engineering Faculty of Surakarta Sebelas Maret University
by:
Manas Pratama.
NIM. I8212032.
CIVIL ENGINEERING UNDERGRADUATE STUDY PROGRAM
CIVIL ENGINEERING DEPARTMENT OF ENGINEERING FACULTY
SEBELAS MARET UNIVERSITY
SURAKARTA
2015
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
iv
MOTTO & PERSEMBAHAN
MOTTO
Sesungguhnya bersama kesukaran itu ada keringanan. Karena itulah bila kau
sudah selesai (mengerjakan yang lain). Dan berharaplah kepada Tuhanmu.
(Q.S Al Insyiroh : 6-8)
“Tidak ada hal yang lebih indah dari menuntut ilmu”.
“Gunakanlah ilmu bermanfaat bagi diri sendiri dan orang lain”.
“Kesalahan selalu menjadi awal untuk belajar menjadi lebih baik”.
PERSEMBAHAN
Tugas akhir ini kupersembahkan untuk:
1. Allah SWT yang telah memberikan karunia-Nya
2. Ayah saya “Drs. Pramuka Supriyatmo”, Ibu “Sri Hartini”, Adik - adik saya
“Hartika Rahma Putri”, “Riz Yudha Tama” beserta seluruh anggota keluarga
besar.
3. Saudara – Saudari DIII Teknik Sipil Transportasi seluruh Angkatan.
Terimakasih atas doa dan dukungannya.
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
v
PRAKATA
Puji syukur kehadirat Tuhan YME yang telah melimpahkan rahmat dan hidayah-
Nya, sehingga penyusun dapat menyelesaikan Tugas Akhir dengan judul
Evaluasi Perkerasan Jalan, Pemeliharaan dan Peningkatan dengan Metode
Analisa Komponen beserta Rencana Anggaran Biaya (RAB) Ruas Jalan
Gondangmanis – Kudus KM 0+000 – 3+000. Laporan Tugas Akhir ini disusun
sebagai salah satu syarat kelulusan bagi mahasiswa D-III Teknik Sipil
Universitas Sebelas Maret Surakarta dalam memperoleh gelar Ahli Madya
(A.Md).
Selama penyusunan Laporan Tugas Akhir ini, penyusun banyak menerima
bimbingan, bantuan dan dorongan dari berbagai pihak. Dalam kesempatan ini
penyusun ingin menyampaikan terima kasih kepada :
1. Pimpinan Fakultas Teknik Universitas Sebelas Maret Surakarta beserta
jajarannya.
2. Pimpinan Jurusan Teknik Sipil Fakultas Teknik Universitas Sebelas Maret
Surakarta beserta jajarannya.
3. Pimpinan Program Studi DIII Jurusan Teknik Sipil Fakultas Teknik
Universitas Sebelas Maret Surakarta beserta jajarannya.
4. Ir. Ary Setyawan ,MSc,PhD. selaku Dosen Pembimbing Akademik.
5. Ir. Djumari, MT selaku Dosen Pembimbing Tugas Akhir.
6. Tim Dosen penguji Tugas Akhir.
7. Dosen-dosen Jurusan Teknik Sipil Fakultas Teknik Universitas Sebelas
Maret Surakarta.
8. Rekan-rekan D3 Teknik Sipil Transportasi 2012 atas bantuannya dalam
memberi saran untuk penyelesaian Tugas Akhir ini.
9. Semua pihak yang telah membantu terselesainya Tugas akhir ini.
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
vi
Penyusun menyadari bahwa laporan ini masih banyak terdapat kekurangan
dan kesalahan, untuk itu kritik dan saran yang bersifat membangun
senantiasa penyusun harapkan dari semua pihak. Akhirnya besar harapan
penyusun,semoga laporan ini dapat memberikan manfaat bagi penyusun
khususnya dan pembaca pada umumnya.
Surakarta, Agustus 2015
Penyusun
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
ABSTRACT
Manas Pratama., 2015. Analysis on road hardening, maintenance, and
improvement using component analysis method with expense budget plan in
Gondangmanis Road – Kudus km 0+000 – 3+000. Final Project, Transportation
Civil Engineering Undergraduate Program, Civil Engineering Department of
Engineering Faculty of Surakarta Sebelas Maret University.
Roads Gondangmanis a collector roads III class B with the type of flexible
pavement and has a width of 6 m. This road is the main link between the Kudus
District Pati regency. Type of vehicles through the road segment consists of
motorcycles, cars and large trucks to treiler.
The observation was conducted on Gondangmanis Kudus Road in 3.00 km length
aiming to conduct an evaluation on road condition using Pavement Condition
Index (PCI) method by dividing the road into several segments with 50 m interval.
Then, every segment of road was observed (visually) and measured to identify the
types of damage existing and assessed corresponding to PCI method.
From the observation that the value of PCI 57.3 pertained "Fair" with the type of
damage in the form of Alligator Cracking, Depression, Bleeding, Longitudinal
Cracking, Polished Aggregate, Patching, Potholes and Stripping. The damage in
some segments only and do repairs based on the type of damage that exist, namely
by filling cracks, laburan local asphalt, sand stocking and filling. According to the
calculation volume of traffic density, CBR value of 90% amounting to 7.5% and
5.48 soil bearing capacity planning is repeated with a thick layer of 8 cm thick in
accordance with the design life of 10 years. Pavement materials used are Laston
Ms.744. Then of the entire job is obtained the total cost required in business
improvement and quality improvement at Jalan Gondangmanis - Holy km 0 +
000-3 + 000 2015 is Rp. 2,946,276,228, -
Keywords: Pavement Condition Index (PCI), LASTON, RAB.
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
vii
ABSTRAK
Manas Pratama., 2015. Analisa kerusakan Jalan dengan Metode Pavement
Condition Index (PCI),Peningkatan dengan Metode Analisa Komponen dan
Rencana Anggaran Biaya (RAB) Ruas Jalan Gondangmanis - Kudus km 0+000 –
3+000. Tugas Akhir, Program Diploma III Teknik Sipil Transportasi, Jurusan
Teknik Sipil Fakultas Teknik Universitas Sebelas Maret Surakarta.
Ruas Jalan Gondangmanis merupakan ruas jalan kolektor kelas III B dengan jenis
perkerasan lentur dan memiliki lebar 6 m. Ruas jalan ini menjadi jalur
penghubung antara Kabupaten Kudus ke Kabupaten Pati. Jenis kendaraan yang
melalui ruas jalan ini terdiri dari motor, mobil dan truck besar hingga treiler. Agar
berfungsi lebih baik, harus dilakukan evaluasi secara periodik dengan dukungan
data yang valid.
Pengamatan yang dilakukan pada Jalan Gondangmanis Kudus dilakukan karena
beberapa alasan. Dengan tujuan untuk melakukan penilaian kondisi jalan dengan
mengunakan metode Pavement Condition Index (PCI) dengan membagi jalan
menjadi beberapa segmen yaitu setiap 50 m. Kemudian, setiap segment jalan
dilakukan pengamatan (secara visual) dan pengukuran untuk mengidentifikasi
jenis kerusakan yang ada dan melakukan penilaian sesuai dengan metode PCI.
Dari hasil pengamatan diperoleh nilai PCI 57.3 tergolong “Fair” dengan jenis
kerusakan berupa Alligator Cracking, Depression, Bleeding, Longitudinal
Cracking, Polished Aggregat, Patching, Potholes and Stripping. Kerusakan ini
pada beberapa segmen saja dan dilakukan perbaikan berdasarkan jenis kerusakan
yang ada, yaitu dengan pengisian retak, laburan aspal setempat, penebaran pasir
dan penambalan. Sesuai perhitungan volume kepadatan lalu lintas, nilai CBR 90%
sebesar 7.5% dan daya dukung tanah 5,48 dilakukan perencanaan tebal lapisan
ulang dengan tebal 8 cm sesuai dengan umur rencana yaitu 10 tahun. Bahan
perkerasan yang digunakan adalah LASTON Ms.744. Kemudian dari seluruh
pekerjaan diperoleh total biaya yang diperlukan dalam usaha perbaikan &
peningkatan mutu pada Jalan Gondangmanis – Kudus km 0+000 – 3+000 tahun
2015 adalah Rp. 2.946.276.228,-
Kata kunci : Pavement Condition Index (PCI), LASTON, RAB.
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
ix
DAFTAR ISI
TUGAS AKHIR ............................................................................................. i
LEMBAR PERSETUJUAN .......................................................................... ii
LEMBAR PENGESAHAN ........................................................................... iii
MOTTO & PERSEMBAHAN ...................................................................... iv
KATA PENGANTAR ................................................................................... v
ABSTRACT .................................................................................................. vii
ABSTRAK ..................................................................................................... viii
DAFTAR ISI .................................................................................................. ix
DAFTAR TABEL .......................................................................................... xvi
DAFTAR GAMBAR ..................................................................................... xxi
BAB 1 PENDAHULUAN
1.1 Latar Belakang ................................................................... 1
1.2 Cakupan Tugas Akhir ........................................................ 3
1.3 Batasan Tugas Akhir ......................................................... 3
1.4 Tujuan Tugas Akhir ........................................................... 3
1.5 Manfaat Tugas Akhir ......................................................... 4
BAB 2 LANDASAN TEORI
2.1 Dasar Teori ........................................................................ 5
2.1.1 Definisi Jalan ......................................................... 5
2.1.2 Klasifikasi Jalan ..................................................... 6
2.1.2.1 Klasifikasi Jalan menurut Fungsi Jalan ... 6
2.1.2.2 Klasifikasi Jalan menurut Peranan Jalan . 6
2.1.2.3 Klasifikasi Jalan menurut Kelas Jalan ..... 7
2.1.2.4 Klasifikasi Jalan menurut Medan Jalan ... 8
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
x
2.1.2.5 Klasifikasi Jalan menurut Wewenang
Pembinaan Jalan ......................................
8
2.1.3 Ruang Bebas Jalan ................................................. 9
2.1.3.1 Ruang Manfaat Jalan (RUMAJA) ........... 10
2.1.3.2 Ruang Milik Jalan (RUMIJA) ................. 13
2.1.3.3 Ruang Milik Jalan (RUWASJA) ............. 13
2.2 Jenis Kerusakan ................................................................. 14
2.2.1 Retak (Cracks) ....................................................... 15
2.2.1.1 Retak Rambut (Hair Cracks) .................. 15
2.2.1.2 Retak Kulit Buaya (Alligator Cracks) ..... 16
2.2.1.3 Retak Pinggir (Edge Cracks) .................. 16
2.2.2 Distorsi (Distorsion) .............................................. 17
2.2.2.1 Alur (Ruts) ............................................... 17
2.2.2.2 Amblas (Grade Depressions) .................. 18
2.2.2.3 Jembul (Upheaval) .................................. 19
2.2.3 Catat Permukaan (Disintegration) ......................... 19
2.2.3.1 Lubang (Pothole) .................................... 20
2.2.3.2 Pelepasan Butir (Raveling) ...................... 21
2.2.3.3 Pengelupasan Lapisan (Stripping)............ 21
2.2.4 Pengausan (Polished Agregat)................................ 22
2.2.5 Kegemukan (Bleeding/ Flussing) .......................... 22
2.3 Konsep Pemeliharaan Jalan ............................................... 23
2.3.1 Klasifikasi Pemeliharaan Jalan .............................. 24
2.3.2 Klasifikasi Jalan dan Tingkat Pelayanan ............... 25
2.3.3 Klasifikasi Jalan dan Tingkat Kondisi Jalan .......... 26
2.3.4 Drainase Jalan ....................................................... 26
2.4 Perencanaan Tebal Perkerasan ........................................... 27
2.4.1 Menentukan Daya Dukung Tanah Dasar (DDT) ... 28
2.4.2 Menentukan umur rencana (UR) ........................... 29
2.4.3 Menentukan Faktor Pertumbuhan Lalu Lintas (i
%) ........................................................................... 30
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xi
2.4.4 Menentukan Tingkat Lalu Lintas Harian Rara-
Rata (LHR) ............................................................ 30
2.4.5 Menentukan Angka Ekivalen masing-masing
Kendaraan .............................................................. 30
2.4.6 Menentukan Faktor Regional (FR) ........................ 32
2.4.7 Menentukan Indeks Permukaan (IP) ...................... 33
2.4.8 Mencari Nilai Indeks Tebal Perkerasan (ITP) ....... 35
2.5 Metode Pavement Conditons Index (PCI) .......................... 38
2.5.1 Deformasi ............................................................... 38
2.5.1.1 Alur (Rutting) .......................................... 38
2.5.1.2 Bergelombang (Corrugation) .................. 39
2.5.1.3 Sungkur (Shoving) ................................... 40
2.5.1.4 Amblas (Depression) .............................. 40
2.5.1.5 Mengembang (Swell) .............................. 41
2.5.1.6 Benjol dan Turun (Bump and Sags) ........ 42
2.5.2 Retak (Crack) ......................................................... 42
2.5.2.1 Retak Kulit Buaya (Alligator Crack) ...... 43
2.5.2.2 Retak Memanjang dan Melintang ............. 43
2.5.2.3 Retak Reflektif Sambungan (Joint
Reflection Crack) .................................... 44
2.5.2.4 Retak Blok (Block Crack) ....................... 46
2.5.2.5 Retak Slip (Slippage Crack) .................... 46
2.5.3 Kerusakan di Pinggir Perkerasan ........................... 47
2.5.3.1 Retak Tepi (Edge Cracking) ................... 47
2.5.3.2 Jalur/ Bahu turun (Lane/ Shoulder Drop-
off) ........................................................... 48
2.5.4 Kerusakan Tekstur Perkerasan .............................. 49
2.5.4.1 Lubang (Pothole)..................................... 49
2.5.4.2 Pelapukan dan Butiran Lepas
(Weathering and Raveling) ..................... 50
2.5.5 Kegemukan (Bleeding/ Flussing) .......................... 51
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xii
2.5.6 Agregat Licin (Polished Agregate) ....................... 51
2.5.7 Tambalan dan Tambalan Galian Utilitas
(Patching and Utility Cut Patching) .................... 52
2.5.8 Persilangan Jalan Rel (Railroad Crossing) ............ 53
2.5.9 Kadar Kerusakan (Density) .................................... 53
2.5.10 Nilai Pengurangan Deduct Value (DV) .................. 54
2.5.11 Total Deduct Value (TDV) .................................... 64
2.5.12 Corrected Deduct Value (CDV) ............................ 64
2.5.13 Nilai Kondisi Perkerasan (PCI) ............................. 65
2.5.14 Klasifikasi Kualitas Kerusakan .............................. 65
2.6 Jenis Pemeliharaan Berdasarkan Nilai PCI ....................... 66
2.7 Metode Perbaikan .............................................................. 67
2.7.1 Metode Perbaikan P1 (Penebaran Pasir) .................. 67
2.7.2 Metode Perbaikan P2 (Laburan Aspal Setempat) ... 67
2.7.3 Metode Perbaikan P3 (Melapisi Retak) .................. 68
2.7.4 Metode Perbaikan P4 (Pengisian Retak) .................. 69
2.7.5 Metode Perbaikan P5 (Penambalan Lubang) ........... 69
2.7.6 Metode Perbaikan P6 (Perataan) .............................. 71
BAB 3 METODOLOGI
3.1 Metode Survey ................................................................... 72
3.2 Lokasi Survey .................................................................... 72
3.3 Teknik Pengumpulan Data ................................................. 73
3.3.1 Data yang Diperoleh .............................................. 73
3.3.2 Peralatan yang Digunakan ..................................... 73
3.4 Analisis Hasil Survey ......................................................... 76
3.5 Tahapan Survey ................................................................. 77
3.6 Diagram Alir ...................................................................... 77
BAB 4 ALINYEMEN HORISONTAL
4.1 Kondisi Jalan ...................................................................... 81
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xiii
4.1.1 Jalan Gondang Manis Kudus ……………………… 81
4.1.2 Inventarisasi Jalan …………………………………. 81
4.2 Kerusakan Jalan ................................................................. 88
4.3 Deduct Value ...................................................................... 92
4.4 Perhitungan Nilai Izin Deduct Value (M)………………... 101
4.5 Perhitungan Corrected Deduct Value (CDV) ................... 102
4.6 Perhitungan Nilai Pavement Condition Index ( PCI ) ........ 113
4.7 Perhitungan Densitas, DV, CDV dan Nilai PCI ………… 113
4.8 Data California Bearing Ratio (CBR) ……....................... 119
4.9 Data Lalu Lintas Harian Rata-Rata (LHR) ....................... 134
4.10 Volume Rencana ………………………………………… 138
4.11 LHR 2 Lajur 2 Arah STA 1+300 – 3+000 ......................... 138
4.12 Perencanaan Tebal Perkerasan Jalan ................................. 139
4.12.1 Data Jalan Tentara Pelajar ...................................... 139
BAB 5 RENCANA ANGGARAN BIAYA
5.1 Jenis Pekerjaan ................................................................... 148
5.2 Perhitungan Volume Pekerjaan ......................................... 149
5.2.1 Pekerjaan Galian Perkerasan
Beraspal.................................................................. 149
5.2.2 Penambalan Lubang ............................................... 150
5.2.3 Bahan Pengisi (Filler) ............................................ 151
5.2.4 Pekerjaan Penebaran Pasir ..................................... 151
5.2.5 Pekerjaan Lapis Resap Pengikat Aspal Cair (tack
Coat)........................................................... 152
5.2.6 Pekerjaan AC-BC Modifikasi (AC-BC Mod)
Grading Halus Atau Kasar ..................................... 155
5.2.7 Pekerjaan AC-WC untuk Overlay 157
5.2.8 Marka Jalan Thermoplastic .................................... 158
5.3 Analisa Perhitungan Harga Satuan Pekerjaan ................... 162
5.4 Analisa Perhitungan Waktu Pelaksanaan Proyek............... 163
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xiv
5.4.1 Pekerjaan Umum..................................................... 163
5.4.2 Pekerjaan Tanah...................................................... 163
5.4.3 Pekerjaan Perkerasan Aspal.................................... 164
5.4.4 Pekerjaan Pengembalian Kondisi dan Pekerjaan
Minor...................................................................... 166
5.5 Analisa Biaya Pekerjaan .................................................... 167
5.6 Rekapitulasi Biaya Pekerjaan ............................................ 168
5.7 Time Schedule Pekerjaan ................................................... 170
BAB 6 GALIAN DAN TIMBUNAN
6.1 Kesimpulan ........................................................................ 171
6.2 Saran .................................................................................. 173
PENUTUP ...................................................................................................... 174
DAFTAR PUSTAKA .................................................................................... 175
LAMPIRAN ................................................................................................... 177
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xv
DAFTAR TABEL
Tabel 2.1 Klasifikasi Menurut Kelas Jalan ................................................. 8
Tabel 2.2 Klasifikasi Menurut Medan Jalan................................................ 8
Tabel 2.3 Kualitas Drainase ….................................................................... 27
Tabel 2.4 Koefisien distribusi kendaraan (C) ............................................. 31
Tabel 2.5 Fakor regional (FR) ..................................................................... 33
Tabel 2.6 Indeks permukaan pada awal umur rencana (IPo) ...................... 34
Tabel 2.7 Indeks permukaan pada akhir umur rencana (IPt) ...................... 35
Tabel 2.8 Penentuan nomogram ITP ........................................................... 36
Tabel 2.9 Konfigurasi beban untuk MST 10 ton ......................................... 37
Tabel 2.10 Tingkat kerusakan perkerasan aspal dan identifikasi
kerusakan Alur (Rutting) ............................................................ 39
Tabel 2.11 Tingkat kerusakan perkerasan aspal dan identifikasi
kerusakan bergelombang (Corrugation) ..................................... 39
Tabel 2.12 Tingkat kerusakan perkerasan aspal dan identifikasi
kerusakan sungkur (Shoving) ...................................................... 40
Tabel 2.13 Tingkat kerusakan perkerasan aspal dan identifikasi
kerusakan amblas (Depression) .................................................. 41
Tabel 2.14 Tingkat kerusakan perkerasan aspal dan identifikasi
kerusakan mengembang (Swell) ..................................................
41
Tabel 2.15 Tingkat kerusakan perkerasan aspal dan identifikasi kerusakan
benjol dan turun (Bump and Slags) ............................................. 42
Tabel 2.16 Tingkat kerusakan perkerasan aspal dan identifikasi kerusakan
retak kulit buaya (Alligator Crack) ............................................. 43
Tabel 2.17 Tingkat kerusakan perkerasan aspal dan identifikasi kerusakan
retak memanjang dan melintang ................................................ 44
Tabel 2.18 Tingkat kerusakan perkerasan aspal dan identifikasi kerusakan
retak refleksi sambungan (Joint Reflection Crack) ..................... 45
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xvi
Tabel 2.19 Tingkat kerusakan perkerasan aspal dan identifikasi kerusakan
retak blok (Block Crack) ............................................................. 46
Tabel 2.20 Tingkat kerusakan perkerasan aspal dan identifikasi kerusakan
retak slip (Slippage Crack)/ retak bulan sabit (Crescent Shape
Crack) .......................................................................................... 47
Tabel 2.21 Tingkat kerusakan perkerasan aspal dan identifikasi kerusakan
retak pinggir (Edge Cracking) .................................................... 48
Tabel 2.22 Tingkat kerusakan perkerasan aspal dan identifikasi kerusakan
jalur/ bahu turun (Lane/ Shoulder Drop-off) ............................... 48
Tabel 2.23 Tingkat kerusakan perkerasan aspal dan identifikasi kerusakan
lubang (Pothole) .......................................................................... 49
Tabel 2.24 Tingkat kerusakan perkerasan aspal dan identifikasi
kerusakan pelapukan dan butiran lepas (Weathering and
Raveling) ..................................................................................... 50
Tabel 2.25 Tingkat kerusakan perkerasan aspal dan identifikasi
kerusakan kegemukan (Bleeding/ Flussing) ............................... 51
Tabel 2.26 Tingkat kerusakan perkerasan aspal dan identifikasi
kerusakan agregat licin (Polished Agregate) .............................. 52
Tabel 2.27 Tingkat kerusakan perkerasan aspal dan identifikasi
Tambalan dan Tambalan Galian Utilitas (Patching and Utility
Cut Patching) .............................................................................. 52
Tabel 2.28 Tingkat kerusakan perkerasan aspal dan identifikasi
kerusakan Persilangan Jalan Rel (Railroad Crossing) ................ 53
Tabel 2.29 Nilai Kondisi Jalan ...................................................................... 66
Tabel 4.1 Inventarisasi Kelengkapan Jalan Gondang Manis (STA 0+000
– STA 0+050) s/d (STA 0+500 – STA 0+550)............................ 82
Tabel 4.2 Inventarisasi Kelengkapan Jalan Gondang Manis (STA 0 + 550
– STA 0 + 600) s/d (STA 1 + 050 – STA 1 + 100) ..................... 83
Tabel 4.3 Inventarisasi Kelengkapan Jalan Gondang Manis (STA 1 + 100
– STA 1 + 150) s/d (STA 1 + 600 – STA 1 + 650)...................... 84
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xvii
Tabel 4.4 Inventarisasi Kelengkapan Jalan Gondang Manis (STA 1 + 650
– STA 1 + 700) s/d (STA 2 + 150 – STA 2 + 200) ……………. 85
Tabel 4.5 Inventarisasi Kelengkapan Jalan Gondang Manis (STA 2 + 200
– STA 2 + 250) s/d (STA 2 + 700 – STA 2 + 750) ……………. 86
Tabel 4.6 Inventarisasi Kelengkapan Jalan Gondang Manis (STA 2 + 750
– STA 2 + 800) s/d (STA 2 + 950 – STA 3 + 000) ……………. 87
Tabel 4.7 Kerusakan Jalan Gondangmanis Kudus STA 0+000 – STA
0+500 ………………………………………………………….. 88
Tabel 4.8 Kerusakan Jalan Gondangmanis Kudus STA 0+500 – STA
1+400 …………………………………………………………. 89
Tabel 4.9 Kerusakan Jalan Gondangmanis Kudus STA 1+400 – STA
2+000 …………………………………………………………. 90
Tabel 4.10 Kerusakan Jalan Gondangmanis Kudus STA 2+000 – STA
2+650 ………………………………………………………….. 91
Tabel 4.11 Kerusakan Jalan Gondangmanis Kudus STA 2+650 – STA
3+000 ………………………………………………………….. 92
Tabel 4.12 Contoh Perhitungan Densitas & Deduct Value
Kerusakan Dengan metode PCI STA 0+050 s/d 0+100 … 92
Tabel 4.13 Perhitungan Densitas & Deduct Value Kerusakan Dengan
metode PCI STA 0+000 – 0+050 s/d STA 0+400 – 0+450 ….. 94
Tabel 4.14 Perhitungan Densitas & Deduct Value Kerusakan Dengan
metode PCI STA 0+450 – 0+500 s/d STA 0+850 – 0+900 …..
95
Tabel 4.15 Perhitungan Densitas & Deduct Value Kerusakan Dengan
metode PCI STA 0+900 – 0+950 s/d STA 1+300 – 1+350 …… 96
Tabel 4.16 Perhitungan Densitas & Deduct Value Kerusakan Dengan
metode PCI STA 1+350 – 1+400 s/d STA 1+750 – 1+800 …… 97
Tabel 4.17 Perhitungan Densitas & Deduct Value Kerusakan Dengan
metode PCI STA 1+800 – 1+850 s/d STA 2+200 – 2+250 …… 98
Tabel 4.18 Perhitungan Densitas & Deduct Value Kerusakan Dengan
metode PCI STA 2+250 – 2+300 s/d STA 2+650 – 2+700 …… 99
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xviii
Tabel 4.19 Perhitungan Densitas & Deduct Value Kerusakan Dengan
metode PCI STA 2+700 – 2+750 s/d STA 2+950 – 3+000 ….. 100
Tabel 4.20 Contoh Perhitungan Nilai Corrected deduct Value & Nilai PCI 101
Tabel 4.21 Perhitungan Nilai CDV sta 0+000 - 0+050 ……………………. 101
Tabel 4.22 Perhitungan Nilai CDV sta 0+000 - 0+050 s/d 0+250 – 0+300 . 102
Tabel 4.23 Perhitungan Nilai CDV sta 0+300 - 0+350 s/d 0+550 – 0+600 103
Tabel 4.24 Perhitungan Nilai CDV sta 0+600 - 0+650 s/d 0+850 – 0+900 .. 104
Tabel 4.25 Perhitungan Nilai CDV sta 0+900 - 0+950 s/d 1+150 – 1+200 . 105
Tabel 4.26 Perhitungan Nilai CDV sta 1+200 - 1+250 s/d 1+450 – 1+500.. 106
Tabel 4.27 Perhitungan Nilai CDV sta 1+500 - 1+550 s/d 1+750 – 1+800.. 107
Tabel 4.28 Perhitungan Nilai CDV sta 1+800 - 1+850 s/d 2+050 – 2+100. 108
Tabel 4.29 Perhitungan Nilai CDV sta 2+100 - 2+150 s/d 2+350 – 2+400. 109
Tabel 4.30 Perhitungan Nilai CDV sta 2+400 - 2+450 s/d 2+650 – 2+700.. 110
Tabel 4.31 Perhitungan Nilai CDV sta 2+700 - 2+750 s/d 2+650 – 2+700.. 111
Tabel 4.32 Perhitungan Densitas & Deduct Value Kerusakan STA 0+150
– 0+200 ……………………………………………………….. 113
Tabel 4.33 Perhitungan Nilai CDV STA 0+150 – 0+200 ……………… 113
Tabel 4.34 Perhitungan Densitas & Deduct Value Kerusakan STA 0+000
- 0+050 ………………………………………………………. 113
Tabel 4.35 Perhitungan Nilai CDV STA 0+000 - 0+050 ………………… 114
Tabel 4.36 Perhitungan Densitas & Deduct Value Kerusakan STA 1+850
- 1+900 ………………………………………………………… 114
Tabel 4.37 Perhitungan Nilai CDV STA 6+000 - 6+250 …………………. 114
Tabel 4.38 Perhitungan nilai PCI Tiap Segmen ………………………… 115
Tabel 4.39 Pengujian DCP di Titik 1............................................................. 119
Tabel 4.40 Pengujian DCP di Titik 2............................................................. 120
Tabel 4.41 Pengujian DCP di Titik 3............................................................. 121
Tabel 4.42 Pengujian DCP di Titik 4............................................................. 122
Tabel 4.43 Pengujian DCP di Titik 5........................................................... 123
Tabel 4.44 Pengujian DCP di Titik 6........................................................... 125
Tabel 4.45 Pengujian DCP di Titik 7........................................................... 126
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xix
Tabel 4.46 Pengujian DCP di Titik 8........................................................... 127
Tabel 4.47 Pengujian DCP di Titik 9........................................................... 129
Tabel 4.48 Pengujian DCP di Titik 10........................................................... 130
Tabel 4.49 Nilai CBR pada tiap titik ............................................................. 131
Tabel 4.50 CBR Rata-rata 90% ……………………..................................... 131
Tabel 4.51 Komulatif LHR dari Arah Utara – Selatan Jalan Gondangmanis
STA 1+300 …………………………………………………….. 133
Tabel 4.52 Komulatif LHR dari Arah Selatan – Utara Jalan Gondangmanis
STA 1+300 …………………………………………………… 134
Tabel 4.53 Nilai emp untuk tipe jalan perkotaan tak terbagi …………….. 134
Tabel 4.54 Komulatif LHR 2 Lajur 2 Arah ………………………………. 136
Tabel 4.55 Jumlah Kendaraan Ringan (LV) perhari (kend/hari) 2 Lajur 2
Arah ………………………………………………………….. 138
Tabel 4.56 Jumlah Kendaraan Berat (HV) perhari (kend/hari) 2 Lajur 2
Arah …………………………………………………………... 138
Tabel 4.57 Nilai LHR Jalan Gondang Manis …………………………….. 140
Tabel 4.58 Perhitungan Nilai LHR Jalan Gondang Manis ………………… 141
Tabel 4.59 Konfigurasi Beban Sumbu Kendaraan ………………………… 141
Tabel 4.60 Perhitungan Angka Ekivalen ( E ) Untuk masing-masing
kendaraan………………………………………………………. 142
Tabel 4.61 Perhitungan Lintas Ekivalen Kendaraan ………………………. 143
Tabel 5.1 Pekerjaan Galian Beraspal ……………...................................... 148
Tabel 5.2 Pekerjaan Penambalan Kerusakan .............................................. 149
Tabel 5.3 Pekerjaan Bahan Pengisi( Filler ) ............................................... 150
Tabel 5.4 Pekerjaan Penebaran Pasir .......................................................... 150
Tabel 5.5 Pekerjaan Resap Lapis Perekat Tack Coat pada Kerusakan …... 152
Tabel 5.6 Perhitungan Volume Pekerjaan AC-BC Modified pada
Kerusakan ……………………………………………………… 154
Tabel 5.7 PerhitunganVolume Pekerjaan AC-WC ..................................... 156
Tabel 5.8 Contoh perhitungan harga satuan pekerjaan untuk pekerjaan
Laston Lapis Antara (AC-BC) ………………………………… 161
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xx
Tabel 5.9 Analisa Biaya Pekerjaan ............................................................. 166
Tabel 5.10 Rekapitulasi Biaya Pekerjaan ...................................................... 167
Tabel 5.11 Time Schedule Pekerjaan ............................................................ 169
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xxi
DAFTAR GAMBAR
Gambar 2.1 Penampang Melintang Jalan …………………………………….. 10
Gambar 2.2 Penampang Melintang Jalan dengan Drainase Terbuka ................ 14
Gambar 2.3 Penampang Melintang Jalan dengan Drainase Tertutup ............... 14
Gambar 2.4 Retak Rambut (Hair Cracks) ........................................................ 15
Gambar 2.5 Retak kulit buaya (Alligator Cracks) ............................................ 16
Gambar 2.6 Alur (Ruts) ..................................................................................... 18
Gambar 2.7 Amblas (Grade Depressions) ........................................................ 18
Gambar 2.8 Jembul (Upheaval) ........................................................................ 19
Gambar 2.9 Lubang (Pothole) ........................................................................... 20
Gambar 2.10 Pelepasan Butir (Raveling) ............................................................ 21
Gambar 2.11 Pengelupasan Lapisan (Stripping) ................................................. 22
Gambar 2.12 Pengausan (Polished Agregat) ...................................................... 22
Gambar 2.13 Kegemukan (Bleeding of Flussing)………………………………….. 23
Gambar 2.14 Hubungan antara kondisi, umur, dan penanganan jalan ................ 24
Gambar 2.15 Susunan lapis perkersan jalan ........................................................ 28
Gambar 2.16 Grafik Korelasi DDT dan CBR ..................................................... 29
Gambar 2.17 Contoh Grafik Nomogram 4……................................................... 36
Gambar 2.18 Grafik Deduct Value untuk Alur ................................................... 54
Gambar 2.19 Grafik Deduct Value untuk Gelombang ........................................ 55
Gambar 2.20 Grafik Deduct Value untuk Sungkur ............................................. 55
Gambar 2.21 Grafik Deduct Value untuk Amblas .............................................. 56
Gambar 2.22 Grafik Deduct Value untuk Mengembang ..................................... 56
Gambar 2.23 Grafik Deduct Value untuk Benjol dan Turun ............................... 57
Gambar 2.24 Grafik Deduct Value untuk Retak Buaya ...................................... 57
Gambar 2.25 Grafik Deduct Value untuk Retak Memanjang/ Melintang ........... 58
Gambar 2.26 Grafik Grafik Deduct Value untuk Retak Reflektif Sambungan ... 58
Gambar 2.27 Grafik Deduct Value untuk Retak Blok ......................................... 59
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xxii
Gambar 2.28 Grafik Deduct Value untuk Retak Slip .......................................... 59
Gambar 2.29 Grafik Deduct Value untuk Retak Tepi ......................................... 60
Gambar 2.30 Grafik Deduct Value untuk Jalur/ Bahu Turun ............................. 60
Gambar 2.31 Grafik Deduct Value untuk Lubang .............................................. 61
Gambar 2.32 Grafik Deduct Value untuk Pelapukan dan Butiran Lepas ............ 61
Gambar 2.33 Grafik Deduct Value untuk Agregat Licin ..................................... 62
Gambar 2.34 Grafik Deduct Value untuk Kegemukan ........................................ 62
Gambar 2.35 Grafik Deduct Value untuk Tambalan dan Tambalan Galian ... 63
Gambar 2.36 Grafik Deduct Value untuk Persilangan Jalan Rel ..................... 63
Gambar 2.37 Grafik Corrected Deduct Value (CDV) ........................................ 64
Gambar 2.38 Nilai Kondisi Perkerasan (PCI) dan Tingkat Kerusakan ............... 66
Gambar 3.1 Lokasi Jalan Gondang Manis Kudus ............................................. 72
Gambar 3.2 Mendimensi Kerusakan Jalan ........................................................ 74
Gambar 3.3 Formulir Survey kerusakan Jalan .................................................. 75
Gambar 3.4 Formulir Survey LHR ................................................................... 75
Gambar 3.5 Formulir Survey DCP .................................................................... 76
Gambar 3.6 Diagram Alir Evaluasi.................................................................... 77
Gambar 3.7 Diagram Alir Survey Kerusakan Jalan .......................................... 78
Gambar 3.8 Diagram Alir Suvey LHR .............................................................. 79
Gambar 3.9 Diagram Alir Survey DCP ............................................................ 80
Gambar 4.1 Nilai kondisi perkerasan (PCI) dan tingkat kerusakan .................. 112
Gambar 4.2 Grafik Korelasi Nilai DCP dan CBR ............................................ 118
Gambar 4.3 Grafik Hubungan Komulatif Tumbukan dan Kumulatif Penetrasi
di Titik 1.........................................................................................
119
Gambar 4.4 Grafik Hubungan Komulatif Tumbukan dan Kumulatif Penetrasi
di Titik 2......................................................................................... 120
Gambar 4.5 Grafik Hubungan Komulatif Tumbukan dan Kumulatif Penetrasi
di Titik 3......................................................................................... 121
Gambar 4.6 Grafik Hubungan Komulatif Tumbukan dan Kumulatif Penetrasi
di Titik 4......................................................................................... 122
Gambar 4.7 Grafik Hubungan Komulatif Tumbukan dan Kumulatif Penetrasi
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
xxiii
di Titik 5......................................................................................... 124
Gambar 4.8 Grafik Hubungan Komulatif Tumbukan dan Kumulatif Penetrasi
di Titik 6......................................................................................... 125
Gambar 4.9 Grafik Hubungan Komulatif Tumbukan dan Kumulatif Penetrasi
di Titik 7......................................................................................... 126
Gambar 4.10 Grafik Hubungan Komulatif Tumbukan dan Kumulatif Penetrasi
di Titik 8......................................................................................... 128
Gambar 4.11 Grafik Hubungan Komulatif Tumbukan dan Kumulatif Penetrasi
di Titik 9......................................................................................... 129
Gambar 4.12 Grafik Hubungan Komulatif Tumbukan dan Kumulatif Penetrasi
di Titik 10....................................................................................... 130
Gambar 4.13 Grafik Nilai CBR 90% Berdasarkan Metode Bina Marga ............ 132
Gambar 4.14 Grafik Korelasi DDT dan CBR ..................................................... 139
Gambar 4.15 Grafik Indeks Tebal Perkerasan (ITP) untuk jalan Gondang
Manis – Kudus ............................................................................... 145
Gambar 4.16 Susunan Perkerasan Jalan Gondang Manis – Kudus …................. 146