Overview

Circumstances

Analysis Process Before

Analysis Process Today

Preview

FAUN-HTC2011 2

Page 3: Analysis Process in Mobile Crane Development

Circumstances

Analysis Boundaries

FAUN-HTC2011 3

• Approx. 40 main boom telescoping states

• Approx. 20 possible configurations per state

• Over a turning range of 360°

• Additional boom extensions (~ 30-50 possible configurations)

• Different counterweights and outrigger bases

• And so on ….

More than 150.000 load cases to find a optimum that leads into a rated load value for the end customer

Page 4: Analysis Process in Mobile Crane Development

Analysis Process

Before (Design Driven)

FAUN-HTC2011 4

Design

Draft

Design

Concept Design

Structure Analysis

Drawing In Out

• FEM Analysis only as a proof of design

• Early stage design failures come to light too late

• Structural needs were “less important”

• Where analysis results were needed, long waiting times occurred

Page 5: Analysis Process in Mobile Crane Development

Analysis Process

FAUN-HTC2011 5

IGES Format Snapshot

(solid) Shell Model

Before (Design Driven)

Page 6: Analysis Process in Mobile Crane Development

Analysis Process

Today (Crane Driven)

FAUN-HTC2011 6

Structure

Draft

Structure

Concept Structure

In Out Design

Draft

Design

Concept Design

Drawing

• Structure tells design how to look like in general, from the very beginning

• Designer and structural engineer understand each others needs much better

• Weight is most important structural design is important

• More but smaller analysis steps lead to faster results

Page 7: Analysis Process in Mobile Crane Development

Analysis Process

FAUN-HTC2011 7

CATIA product opened inside HM

Page 8: Analysis Process in Mobile Crane Development

Analysis Process

FAUN-HTC2011 8

Midsurfaces creation

Page 9: Analysis Process in Mobile Crane Development

Analysis Process

FAUN-HTC2011 9

Stiching (semi-automatic)

Page 10: Analysis Process in Mobile Crane Development

Analysis Process

FAUN-HTC2011 10

FE Model

Page 11: Analysis Process in Mobile Crane Development

Analysis Process

FAUN-HTC2011 11

Designer modifies CAD models much faster than a structural engineer could modify FE models

Direct CAD model usage inside of HM speeds up calculation and ensures usage of the actual state of design

General finding

Page 12: Analysis Process in Mobile Crane Development

Preview

What we have started …

FAUN-HTC2011 12

• Catia V5 integrated pre-analysis by the designer

• Structural optimization of existing machines (new motors & exhaust systems)

• Structural optimization during concept phase