ancillary detectors working group agata week/gsi, 23 feb. 2005 integration of ancillaries with daq...

20
Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ • Goal • Context • Specifications, modes • Design • Schedule & cost Ch. Theisen for the ADWG [email protected]

Upload: kristian-victor-cook

Post on 13-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Integration of ancillaries with DAQ

• Goal• Context• Specifications, modes• Design• Schedule & cost

Ch. Theisen for the [email protected]

Page 2: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Goal

Integration of ancillary detectors electronics with Agata

Provide an interface

As many ancillary detectors as possible !

Page 3: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

ContextWhen: for the demonstrator phase (2007)

Where: Ganil, GSI, JYFL, Köln, LNL

Who: Existing and/or identified ancillariesADWG meeting 22/06/2004LUSIA, FRS, RFD, Neutron Wall, CUP,

VAMOS, PRISMA, GREAT,…, γ arrays

List to finalize a.s.a.p…

Page 4: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Ge-Cluster

CATE

Primary Beam

~500 A MeV

Production target

Dipole

SCISCI

MW

DegraderMusic

HECTOR Reaction Target

ToFToF

A/q=(B).e/c.u

S4 AREA

Ge-Cluster

CATE

Primary Beam

~500 A MeV

Production target

Dipole

SCISCI

MW

DegraderMusic

HECTOR Reaction Target

ToFToF

A/q=(B).e/c.u

Production target

Dipole

SCISCI

MW

DegraderMusic

HECTOR Reaction Target

ToFToF

A/q=(B).e/c.u

S4 AREA

LUSIA

FRS

RFD Neutron Wall

Page 5: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

CUP

VAMOS

PRISMA RITU/GREAT

Page 6: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Specifications

Correlate ancillaries with Agata(event number and/or clock counter)

Event filteringKeep relevant Agata and ancillary det. events• “Slow-down” Agata• Reduce ancillary det. dead-time

Interaction with AGATA GTS

Page 7: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

How– LUSIA VME– FRS VME– RFD VME– Neutron Wall VME– CUP VME– VAMOS VME– PRISMA VME– GREAT VME – γ arrays VME

VME INTERFACE

Page 8: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Interface with GTS

GTSAncillary

Trigger Request

Val/Rej, Clock

Val/Rej : combination of ancillary/Agata :“master”, “slave”, “mixed” modes

Latency times NOT A TRIGGER MODULE !

Page 9: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Latency times

Val/Rej : latency > 7μs

Too late for most converters Dead time ! Need prompt pre-trigger Request to ADP : Agata prompt signal

Page 10: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Global scheme

Ancillary Front-end

Ancillary Readout

VME interface

TriggerRequest

Val/RejClock counterEvent Number

GTS supervisor

Agata Merge/Ancillary post-merge

Agataflow

Agata promptsignal

Page 11: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Three modes

• “Slow” conversion mode (common dead time)

• “Fast” conversion mode (parallel-like)• Trigger-less (TDR)

Page 12: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Slow conversion modeTrigger_Request

Local_Trigger

Local_Trigger_Tag

Busy

ADC conversion

Validation_Rejection_Tag

Interface VME Cycle

Event_Number

TR

LT

TAG

Busy

Val/Rej

Val/Rej TAG

Trigger_Validation orTrigger_Reject

Only if trigger validated

Page 13: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Busy2

“Fast” conversion mode”: parallel like

Trigger_Request

Local_Trigger

Local_Trigger_Tag

Busy

ADC conversion

Validation_Rejection_Tag

Interface VME Cycle

Event_Number

TR1

LT1

TAG1

Busy1

Val/Rej1

Val/Rej TAG1

TAG2

LT2

TR2

Val/Rej2

Val/Rej TAG2

Trigger_Validation orTrigger_Reject

Page 14: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

TDR (JYFL) mode

• Correlated data (DSSD, Gas) : Trigger request• Uncorrelated data (Tunnel, Focal plane Ge…)

No events: only data Time Stamping

Clock countercorrelation !

TDRclock

counter

GTSclock

counter

Embedded TDR data source

Page 15: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Design: layout

Mezzanine

FPGA

Optical fiber

Ethernet

I/OJtag Bus

Backplane

memory

Ethernet

Shark

Page 16: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

VIRTEX - II

PROXC2V7 FF672

(396 I/O)

VIRTEX - II

PROXC2V7 FF672

(396 I/O)

BANK_4

BANK_1 BANK_0

BA

NK

_6B

AN

K_7

BANK_5

BA

NK

_3B

AN

K_2 .

CR_CON1CR_CON1

CR_CON2CR_CON2 GTS_JTAG

LSA_Trace_GTS CPU_TraceGTS

LSA_Trace_VME CPU_TraceVME

P1_VMEP2_VME

Data Bus – [32]

Address Bus - [31]

Address Modifier – [6]

Adr_, Data_Str – [3]

LWORD, WRITE – [2]

DTACK, BERR – [2]

IRQ – [4]

IACK,IN,OUT –[3]

SYSRESET – [1]

VXI -- [36] ? [3]

TOTAL: [120]

Front Panel

Drive/Conv

FRONTTrigger RequestLocal TriggerVetoRejectValidateBackpreasureLEDsCCLK [2]Inspection [4]ESTIMATE [20]

SDRAM

Ethernet

POWER

[email protected]

Shark-link [7]

Metronome [4]

Trigger_Req [1]

Local_Trigger – [1]

Trigger_Val/_Rej – [2]

Local_Trig_Tag – [8]

Clock_deskew – [6]

GTS_Clock – [2]

Val/Rej_Tag – [8]

LLP_Status – [8]

GTS_Status – [8]

MSG_Out(Str) – [8(+1)]

FPGA_Progr – [6]

TOTAL: [75]

LSA_Trace - [36]

CPU_Trace – [16]

Clock_IN – [2]

Bcast_in(Str) – [8(+1)]

TOTAL: [73]

Page 17: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Schedule

Main task: Krakow+ Ganil (tests, real time soft.), Padova (GTS), Daresbury (TDR)

Page 18: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Cost

• 2 prototypes : 6 k€• Production : 2.5 k€ /cards *6 = 15 k€• Prototypes + Production = 21 k€• + GTS Mezzanines 2.3 k€/board

Total = 34.8 k€ with 6 mezzanines = 29.4 k€ with 4 mezzanines

Page 19: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Common dead-time vs. Agata

Losses !Ancillary:Common dead-time

Agata:Full

parallel

Future (post-demonstrator): switch to parallel read-out

Page 20: Ancillary Detectors Working Group Agata Week/GSI, 23 Feb. 2005 Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &

Ancillary Detectors Working GroupAgata Week/GSI, 23 Feb. 2005

Conclusions

• Preliminary specifications ready

• We need feedback; contact us !

• Mailing list: please register !

• Web site ( GSI official site)