Congestion Mitigation and Air Quality Improvement Program (CMAQ)
FUNDING REQUEST SUBMITTAL
for
OLD TOWN ROUNDABOUT (FAU 1479)
WARRENVILLE, IL
SUBMITTAL DATES AND LOCATIONS
February 16, 2015
DuPage Mayors and Managers Conference
1220 Oak Brook Road
Oak Brook, IL 60523
(submitted electronically to Mike Albin at malbin@dmmc‐cog.org)
March 3, 2015
Chicago Metropolitan Agency for Planning
233 South Wacker Drive
Suite 800
Chicago, IL 60606
(submitted electronically to Doug Ferguson at [email protected])
DIRECT ALL QUESTIONS AND INQUIRIES TO
Philip M. Kuchler, P.E. CFM
Senior Civil Engineer
(630) 836‐3033
OLD TOWN ROUNDABOUT
TABLE OF CONTENTS
SUBMITTAL COVER LETTER
TABLE OF CONTENTS
CMAP FY2016‐2020 CMAQ Project Application – Traffic Flow Improvements
APPENDICES
Appendix A: Location Maps and IDS Excerpt
Appendix B: Cost Estimate and Project Milestone Schedule
Appendix C: Existing Warrenville Road / Batavia Road Intersection
CMAQ FY2016‐2020 Input Module Worksheet
Traffic Count Data
Appendix D: Existing Warrenville Road / River Road Intersection
CMAQ FY2016‐2020 Input Module Worksheet
Traffic Count Data
Appendix E: Proposed Oval Roundabout Intersection
CMAQ FY2016‐2020 Input Module Worksheet
Traffic Count Data
Appendix F: City Subarea and Bikeway Plan Excerpts
CMAP FY 2016-2020 CMAQ PROJECT APPLICATION TRAFFIC FLOW IMPROVEMENTS
I. PROJECT IDENTIFICATION Project Sponsor
City of Warrenville Contact Information – Name, Title, Agency, Address, Phone, e-mail (e-mail required)
Philip M. Kuchler, Senior Civil Engineer City of Warrenville 3s258 Manning Avenue Warrenville, IL 60555 (630) 836-3033 [email protected]
Other Agencies Participating In Project
DuPage County Division of Transportation
☐ New Project ☐ Existing CMAQ Project ☐ Add CMAQ to Existing Project
TIP ID if project already has one
08-13-0004
II. PROJECT LOCATION Projects not readily identified by location must provide a title on the last line of this section Attach a map sufficient to accurately locate this project in a GIS system
Name Of Street Or Facility To Be Improved Intersections of Batavia Rd / Warrenville Rd / River Rd
Marked Route #
Project Limits: North/West Reference Point/Cross St/Intersection Intersection of Warrenville Road and Batavia Road
Marked Route #
Municipality & County Warrenville & DuPage
Project Limits: South/East Reference Point/Cross St/Intersection Intersection of Warrenville Road and Winfield Road
Marked Route #
Municipality & County Warrenville & DuPage
Other Project Location Information Or Project Title Old Town Roundabout Project – Please note excludes section of road to be reconstructed with separate DuPage County Warrenville Road Bridge Project (bids opened 1/30/15).
III. PROJECT FINANCING & CMAQ FUNDING REQUEST Please review the instructions.
Starting Federal
Fiscal Year* Total Phase Costs (New) CMAQ
Funds Requested
Other Federal Funds Including prior CMAQ awards
Fund Type Amount
Engineering Phase 1 2013 $ 78,820 $ - $0
Engineering Phase 2 2016 $ 141,205 $ 112,964 - $0
Right-Of-Way Acquisition 2017 $2,243,900 $1,795,120 - $0
Construction (Including Construction Engineering) 2019 $1,553,255 $ 613,804 STP $550,000
Engineering (For Implementation Projects) $ $ $
Implementation $ $ $
Alternatives Analysis $ $ $
*Phase must be accomplished within 3 years $4,017,180 $2,521,888 Total Project Costs
Source Of Local Matching Funds City One-time Special Projects Fund (Old Town Roundabout qualifies) and Tax Increment Financing District #3 (Old Town Roundabout falls within TIF#3).
If Soft Matching Funds Are Intended To Be Used, Please Contact CMAP Staff. Have the Matching Funds Been Secured? (Provide Details):
Funds have not specifically been budgeted for this project, however as of last audit April 30, 2014, the Special Projects Fund had a balance of $5,188,905. Tax Increment Financing (TIF) District #3 includes this project site.
CMAP FY 2016-2020 CMAQ PROJECT APPLICATION TRAFFIC FLOW IMPROVEMENTS – PAGE 2
IV. PROJECT EMISSIONS BENEFIT DATAType of Project (Check All that Apply): Intersection Type: ☐ Roundabout ☐ Restricted Crossing U-Turn (J-Turn) ☐ Median U-Turn ☐ Diverging Diamond Interchange ☐ Conventional
Bottleneck Eliminations: ☐ Highway-Rail Grade Separation ☐ Two-Way Left Turn Lane ☐ Realignment
☐ Remove Obstruction ☐ Vertical Clearance ☐ Truck Route Improvement
Turn Lanes: ☐ Add Dual Left Turn Lanes ☐ Add Single Left Turn Lanes ☐ Add Right Turn Lanes ☐ Multiple Turn Lane Types
Reconstruction: ☐ Full Intersection Reconstruction
(existing signal) ☐ Traditional Interchange
Reconstruction
Signals: ☐ Signal Modernization ☐ New Signalization
Project Length (Miles – Bottleneck Elimination And Multiple Intersections Only): _________ Posted Speeds (Miles Per Hour For Each Street): Batavia Road (35 mph) / Warrenville Road east (35 mph) / River Road (40 mph) / Warrenville Road west (25 mph)
Bi-Directional AADTs by Approach: North Leg (North Approach): Batavia Road (8,000 in 2014 ); South Leg: River Road (3,000 in 2009); West Leg: Warrenville Road (3,058 in 2012); East Leg: Warrenville Road (12,000 in 2009);
Do queues currently clear on the major street at signalized intersections in the pm peak period? ☐ Yes ☐ No - No signalized Intersections
Are the subject roadways included as part of the Congestion Management Process Highway System? ☐ Yes ☐ NoIs the project location identified in IDOT’s 5% Safety Location report? ☐ Yes ☐ No If “Yes” is checked, indicate in the project description how the project will address the safety issues.Will bicycle facilities be added as part of this project? ☐ Yes ☐ No If “Yes” is checked, describethe bicycle facility in the project description providing details asked for on the bicycle facility application form.
V. PROGRAM MANAGEMENT INFORMATION
Is right-of-way acquisition required for this project? If so, has right-of-way been acquired?
☐ Yes ☐ No ☐ Yes ☐ No
Preliminary Design Status:
☐ N.A. ☐ Not Begun ☐ Agreement executed by Central Office ☐ Engineering Underway ☐ Submitted for review ☐ Responding to review comments ☐ Agreement sent to District 1for signatures ☐ Design approval granted Date approval is anticipated or was granted: April 30, 2015
Estimated Completion Year: 2019
VI. PROJECT DESCRIPTION
Please describe project, including any qualitative travel time reliability improvements listed on pages 8-9 of application booklet.
The Old Town Roundabout project will improve the safety, connectivity, and efficiency of public transit through this area of the City. Warrenville Road between Rockwell Street and Winfield Road is a designated bus route serviced by Pace. The implementation of this project will reduce the level of potential confusion drivers, pedestrians, and bicyclists have when they approach these intersections by reducing the number of decisions they will need to make and by providing a clear path for safe, controlled, and properly protected travel each group has through this area.
The City of Warrenville and DuPage County have a unique opportunity to implement the Old Town Roundabout project identified in the City’s adopted Old Town Civic Center Subarea Plan in conjunction with two other important projects to be constructed by DuPage County in 2015. This project is named the Old Town Roundabout as it is located in Old Town Subarea. The Warrenville Road Bridge falls within these project limits, but is excluded from the project. Bids were opened on the reconstruction of this bridge on January 30, 2015. DuPage County Stormwater is utilizing a combination of DuPage County Bond funds and IEPA 319 Grant funds to implement a flood protection project that will realign the river in conjunction with the bridge reconstruction in 2015; and has already constructed a flood control berm, increased flood storage and conveyance along River Road between Warrenville Road and Ferry Road. Included in this project was the installation of a multi-use path for the City of Warrenville that provides access from this intersection area to Bower Elementary School and Cerny Park, as well as the businesses in Cantera on Ferry, Winfield and Diehl Roads.
The roundabout will remove an offset intersection and replace it with a roundabout to improve traffic circulation, reduce vehicular emissions, and dramatically improve bicycle and pedestrian connectivity and safety. The emissions will be reduced by eliminating the stop sign control at the various legs of the intersections. The improvement is consistent with the City’s adopted Bikeway Implementation Plan and will provide links between the proposed River Road multi-use path, the County’s West Branch regional trail along the east side of the DuPage River, relocate the location this path crosses Warrenville Road to a safer location, and connect the regional trail system to the City’s sidewalk network. Additionally, this improvement will connect to the onstreet bicycle lanes on Batavia Road for connectivity between this intersection and the Illinois Prairie Path at the intersection of Batavia Road and Illinois Route 56 and the City’s Batavia Road Bike Path to Fermi National Accelerator Laboratory.
APPEN
DIX A
LOCATION M
APS AND ID
S EX
CER
PT
EXHIBIT 1-1 Location Map
Project Location
Not to Scale
Old Town Roundabout
Job # 120705.P1
EXHIBIT 2 Intersection Overview
Project Location
Not to Scale
������������ ��
Old Town Roundabout FAU 1479: Warrenville Road
Warrenville, IL
Batavia R
d
Warrenville Rd
Riv
er R
d
APPEN
DIX B
COST ESTIM
ATE
AND M
ILESTO
NE SCHED
ULE
ITEM
UN
ITTO
TAL
NO
.D
ESC
RIP
TIO
NU
NIT
QU
AN
TITY
PRIC
EC
OST
CM
AQ
STP
LOC
AL
PE
IP
RE
LIM
INA
RY
EN
GIN
EE
RIN
G I
(10%
) - L
ocal
Fun
ding
L S
UM
178
,820
.00
$
78,8
20.0
0$
-
$
-
$
78
,820
.00
$
PE
IIP
RE
LIM
INA
RY
EN
GIN
EE
RIN
G II
(10%
)L
SU
M1
141,
205.
00$
14
1,20
5.00
$
11
2,96
4.00
$
-
$
28
,241
.00
$
DuP
AG
E C
OU
NTY
RIG
HT-
OF-
WA
YS
Q F
T97
,975
-$
-
$
R
IGH
T-O
F-W
AY
EA
SE
ME
NTS
SQ
FT
9,73
510
.00
$
97
,350
.00
$
CO
MM
ER
CIA
L R
IGH
T-O
F-W
AY
SQ
FT
65,3
6020
.00
$
1,
307,
200.
00$
TE
MP
OR
AR
Y E
AS
EM
EN
TSS
Q F
T18
,700
0.50
$
9,35
0.00
$
BU
ILD
ING
AC
QU
ISIT
ION
EA
234
0,00
0.00
$
680,
000.
00$
BU
ILD
ING
DE
MO
LITI
ON
EA
275
,000
.00
$
150,
000.
00$
RIG
HT-
OF-
WA
Y SU
BTO
TAL:
2,24
3,90
0.00
$
1,79
5,12
0.00
$
-$
448,
780.
00$
1P
AV
EM
EN
T R
EM
OV
AL
SQ
YD
7,70
010
.00
$
77
,000
.00
$
2C
ON
CR
ETE
CU
RB
& G
UTT
ER
RE
MO
VA
LFO
OT
2,42
55.
00$
12
,125
.00
$
3C
OM
BIN
ATI
ON
CO
NC
RE
TE C
UR
B A
ND
GU
TTE
R, T
YP
E B
-6.1
8FO
OT
1,50
035
.00
$
52
,500
.00
$
4C
OM
BIN
ATI
ON
CO
NC
RE
TE C
UR
B A
ND
GU
TTE
R, T
YP
E M
-6.1
8FO
OT
500
35.0
0$
17,5
00.0
0$
5
HM
A S
UR
FAC
E C
OU
RS
E, M
IX "D
", N
50TO
N41
095
.00
$
38
,950
.00
$
6H
MA
BIN
DE
R C
OU
RS
E, I
L-19
.0, N
50TO
N1,
525
80.0
0$
122,
000.
00$
7A
GG
RE
GA
TE B
AS
E C
OU
RS
E, 4
"S
Q Y
D4,
000
15.0
0$
60,0
00.0
0$
8
CO
NC
RE
TE T
RU
CK
AP
RO
NS
Q Y
D40
080
.00
$
32
,000
.00
$
9S
TOR
M S
EW
ER
L S
UM
150
,000
.00
$
50,0
00.0
0$
10
SIG
NA
GE
L S
UM
15,
000.
00$
5,00
0.00
$
11P
AV
EM
EN
T M
AR
KIN
GS
L S
UM
115
,000
.00
$
15,0
00.0
0$
12
PC
C S
IDE
WA
LK, 5
"S
Q F
T3,
870
7.50
$
29,0
25.0
0$
13
CO
LOR
ED
/ S
TAM
PE
D P
CC
SID
EW
ALK
L S
UM
144
,000
.00
$
44,0
00.0
0$
14
RO
AD
WA
Y M
ED
IAN
LA
ND
SC
AP
ING
L S
UM
112
,400
.00
$
12,4
00.0
0$
15
STR
EE
T TR
EE
SL
SU
M1
42,7
50.0
0$
42
,750
.00
$
16S
OD
DIN
GS
Q Y
D4,
700
9.00
$
42,3
00.0
0$
17
TOP
SO
IL, 4
"S
Q Y
D4,
700
5.00
$
23,5
00.0
0$
18
DE
CO
RA
TIV
E P
ED
ES
TRIA
N L
IGH
TIN
GL
SU
M1
325,
000.
00$
32
5,00
0.00
$
19
MU
LTI-U
SE
AS
PH
ALT
TR
AIL
L S
UM
136
,000
.00
$
36,0
00.0
0$
20
UTI
LITY
RE
LOC
ATI
ON
S /
UN
DE
RG
RO
UN
DIN
GFO
OT
1,50
025
0.00
$
375,
000.
00$
21C
ON
STR
UC
TIO
N E
NG
INE
ER
ING
III (
10%
)L
SU
M1
141,
205.
00$
14
1,20
5.00
$
C
ON
STR
UC
TIO
N (I
NC
LUD
ING
PH
ASE
III E
NG
) SU
BTO
TAL
1,55
3,25
5.00
$
613,
804.
00$
550,
000.
00$
389,
451.
00$
TOTA
L:4,
017,
180.
00$
2,
521,
888.
00$
55
0,00
0.00
$
94
5,29
2.00
$
RIGHT-OF-WAY
CIT
Y O
F W
AR
REN
VILL
EO
LD T
OW
N R
OU
ND
AB
OU
TE
NG
INE
ER
S E
STI
MA
TE O
F P
RO
BA
BLE
CO
NS
TRU
CTI
ON
CO
ST
3/3/
2015
FUN
DIN
G S
OU
RC
E
PRO
JEC
T M
ILE
STO
NE
SC
HE
DU
LE
Mun
icip
ality
:C
ity o
f War
renv
ille
Con
tact
Info
rmat
ion
Proj
ect:
Old
Tow
n R
ound
abou
t Pro
ject
Mun
icip
ality
Phil
Kuc
hler
(630
) 836
-303
3Sc
ope
of W
ork:
Rep
lace
exi
stin
g of
fset
inte
rsec
tion
with
Rou
ndab
out
Cou
ncil/
Liai
son
DuP
age
- Mik
e A
lbin
(630
) 571
-048
0TI
P #:
08-1
3-00
04C
onsu
ltant
John
May
er, E
ng. R
es. A
ssoc
. (63
0) 3
93-3
060
TIP
Yea
rs (P
h II
/ C
onst
):ID
OT
Mar
ilin
Solo
mon
(847
) 705
-440
7Se
ctio
n #:
13-0
0034
-00-
CH
Last
Con
str &
E3
Cos
t (da
te: 6
/6/2
013)
: $1
,623
,858
Cur
rent
Con
str &
E3
Cos
t (da
te: 3
/3/2
015)
: $
$1,5
53,2
55D
ate
Prep
ared
:1/
22/2
013
Dat
e R
evis
ed:
3/3/
2015
Proj
ecte
d D
ates
Initi
al E
st.
Kic
k-O
ffR
evis
ed/A
ctua
l1.
Pr
ojec
t Sco
ping
Not
es2.
ID
OT
Phas
e I K
ick-
off M
eetin
g2/
14/2
013
2/6/
2013
Kic
k-of
f mee
ting
was
2/6
/201
3 at
IDO
T, D
istri
ct 1
.3.
1st
Sta
te/F
eder
al C
oord
inat
ion
Mee
ting
3/15
/113
3/12
/201
31s
t FH
WA
Coo
rd. M
tg -
3/12
/201
3, 2
nd -
11/1
8/20
14.
4.
Cat
egor
ical
Exc
lusi
on C
oncu
rren
ce3/
15/2
013
Per 2
nd F
HW
A C
oord
. Mtg
. thi
s cou
ld b
e do
ne v
ia e
-mai
l.5.
D
esig
n V
aria
nce
Con
curr
ence
3/15
/201
36.
Su
bmit
Dra
ft Ph
ase
I Rep
ort (
PDR
) to
IDO
T (a
)7/
1/20
136/
30/2
013
12/1
7/20
14Th
ird S
ubm
ittal
- m
aile
d 12
/8/2
014,
rec'd
by
IDO
T 12
/17/
147.
Pu
blic
Hea
ring/
Mee
ting
(or N
/A)
3/15
/201
33/
31/2
013
Hel
d Pu
blic
Info
rmat
ion
& In
put M
eetin
gs o
n 2/
27/2
013
and
3/11
/201
4.8.
R
ight
-of-
Way
Kic
k-of
f Mee
ting
(or N
/A)
10/1
/201
39.
Su
bmit
Fina
l Pha
se I
Rep
ort (
PDR
) to
IDO
T (b
)11
/1/2
013
10.
Subm
it Ph
ase
II E
ngr.
Agr
eem
't to
IDO
T (o
r N/A
)4/
1/20
142/
1/20
1611
. Ph
ase
I Des
ign
App
rova
l2/
1/20
142/
15/2
014
4/30
/201
5R
evis
ed b
ased
on
Mar
ilin
Solo
mon
inpu
t.12
. R
OW
Aqu
istio
n In
itiat
ion
(or N
/A) (
c )
3/
1/20
144/
30/2
016
13.
Phas
e II
Eng
r. A
gree
men
t App
rova
l (or
N/A
)6/
1/20
144/
30/2
016
14.
Subm
it Pr
e-Fi
nal P
lans
and
Est
imat
es (d
)5/
1/20
154/
24/2
018
15.
Subm
it Ph
ase
III E
ngr.
Agr
eem
ent t
o ID
OT
6/29
/201
56/
25/2
018
16.
Subm
it Fi
nal P
lans
, Spe
cs &
Est
imat
es (P
S&E)
(e)
6/29
/201
56/
25/2
018
17.
RO
W A
cqui
sitio
n C
ompl
ete
8/5/
2015
8/1/
2018
18.
Con
stru
ctio
n L
ettin
g9/
18/2
015
9/18
/201
59/
14/2
018
Not
es:
See
IDO
T Lo
cal R
oads
' Mec
hani
cs o
f Pro
ject
Man
agem
ent
(a
) 3 to
6 m
onth
revi
ew re
quire
d pe
r com
plex
ity a
nd su
bmitt
al q
ualit
y"F
eder
al A
id P
roje
ct In
itiat
ion
to C
ompl
etio
n" F
low
Cha
rt fo
r
(b) 1
to 3
mon
th re
view
sequ
ence
of e
vent
s and
est
imat
ed re
view
tim
es.
(c
) M
inim
um 9
to 1
8 m
onth
s req
uire
d fr
om p
lats
to a
cqui
sitio
n
(d) 1
to 4
mon
th re
view
(e
) 7 to
10
days
bef
ore
Sprin
gfie
ld B
LR d
ue d
ate
APPEN
DIX C
EXISTING W
ARREN
VILLE ROAD / BATA
VIA ROAD IN
TERSECTION
CMAQ FY2016‐2020 IN
PUT MODULE W
ORKSH
EET
TRAFFIC COUNT DATA
ALL-WAY STOP CONTROL ANALYSISGeneral Information Site Information Analyst MW Agency/Co. Warrenville Date Performed 1/17/2013 Analysis Time Period AM
Intersection Batavia & Warrenville JurisdictionAnalysis Year 2013
Project ID East/West Street: Warrenville North/South Street: Batavia
Volume Adjustments and Site CharacteristicsApproach Eastbound WestboundMovement L T R L T RVolume (veh/h) 0 259 0 0 83 0 %Thrus Left Lane
Approach Northbound SouthboundMovement L T R L T RVolume (veh/h) 0 0 0 478 0 4 %Thrus Left Lane
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration T T LR PHF 0.84 0.84 0.84 Flow Rate (veh/h) 308 98 573 % Heavy Vehicles 2 2 2 No. Lanes 1 1 0 1 Geometry Group 1 1 1 Duration, T 0.25
Saturation Headway Adjustment WorksheetProp. Left-Turns 0.0 0.0 1.0 Prop. Right-Turns 0.0 0.0 0.0 Prop. Heavy Vehicle 0.0 0.0 0.0 hLT-adj 0.2 0.2 0.2 0.2 0.2 0.2 hRT-adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 0.0 0.0 0.2
Departure Headway and Service Timehd, initial value (s) 3.20 3.20 3.20 x, initial 0.27 0.09 0.51 hd, final value (s) 5.81 6.21 5.36 x, final value 0.50 0.17 0.85 Move-up time, m (s) 2.0 2.0 2.0
Service Time, ts (s) 3.8 4.2 3.4
Capacity and Level of ServiceEastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity (veh/h) 558 348 665 Delay (s/veh) 14.43 10.47 31.37 LOS B B D Approach: Delay (s/veh) 14.43 10.47 31.37 LOS B B D
Intersection Delay (s/veh) 23.95 Intersection LOS C Copyright © 2010 University of Florida, All Rights Reserved HCS+TM Version 5.6 Generated: 1/18/2013 11:56 AM
Page 1 of 1All-Way Stop Control
1/18/2013file:///C:/Users/mwhitcomb/AppData/Local/Temp/u2kB694.tmp
ALL-WAY STOP CONTROL ANALYSISGeneral Information Site Information Analyst MW Agency/Co. Warrenville Date Performed 1/17/2013 Analysis Time Period PM
Intersection Batavia & Warrenville JurisdictionAnalysis Year 2013
Project ID East/West Street: Warrenville North/South Street: Batavia
Volume Adjustments and Site CharacteristicsApproach Eastbound WestboundMovement L T R L T RVolume (veh/h) 0 123 0 0 195 0 %Thrus Left Lane
Approach Northbound SouthboundMovement L T R L T RVolume (veh/h) 0 0 0 306 0 13 %Thrus Left Lane
Eastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Configuration T T LR PHF 0.92 0.92 0.92 Flow Rate (veh/h) 133 211 346 % Heavy Vehicles 1 1 1 No. Lanes 1 1 0 1 Geometry Group 1 1 1 Duration, T 0.25
Saturation Headway Adjustment WorksheetProp. Left-Turns 0.0 0.0 1.0 Prop. Right-Turns 0.0 0.0 0.0 Prop. Heavy Vehicle 0.0 0.0 0.0 hLT-adj 0.2 0.2 0.2 0.2 0.2 0.2 hRT-adj -0.6 -0.6 -0.6 -0.6 -0.6 -0.6 hHV-adj 1.7 1.7 1.7 1.7 1.7 1.7 hadj, computed 0.0 0.0 0.2
Departure Headway and Service Timehd, initial value (s) 3.20 3.20 3.20 x, initial 0.12 0.19 0.31 hd, final value (s) 5.17 5.06 4.99 x, final value 0.19 0.30 0.48 Move-up time, m (s) 2.0 2.0 2.0
Service Time, ts (s) 3.2 3.1 3.0
Capacity and Level of ServiceEastbound Westbound Northbound Southbound
L1 L2 L1 L2 L1 L2 L1 L2
Capacity (veh/h) 383 461 596 Delay (s/veh) 9.38 10.17 12.49 LOS A B B Approach: Delay (s/veh) 9.38 10.17 12.49 LOS A B B
Intersection Delay (s/veh) 11.18 Intersection LOS B Copyright © 2010 University of Florida, All Rights Reserved HCS+TM Version 5.6 Generated: 1/18/2013 11:59 AM
Page 1 of 1All-Way Stop Control
1/18/2013file:///C:/Users/mwhitcomb/AppData/Local/Temp/u2k711C.tmp
APPEN
DIX D
EXISTING W
ARREN
VILLE ROAD / RIVER
ROAD IN
TERSECTION
CMAQ FY2016‐2020 IN
PUT MODULE W
ORKSH
EET
TRAFFIC COUNT DATA
TWO-WAY STOP CONTROL SUMMARYGeneral Information Site Information Analyst MW Agency/Co. Warrenville Date Performed 1/18/2013 Analysis Time Period AM
Intersection River & Warrenville JurisdictionAnalysis Year 2013
Project Description East/West Street: Warrenville North/South Street: River Intersection Orientation: East-West Study Period (hrs): 0.25
Vehicle Volumes and AdjustmentsMajor Street Eastbound Westbound Movement 1 2 3 4 5 6
L T R L T RVolume (veh/h) 10 697 31 77 312 1 Peak-Hour Factor, PHF 0.84 0.84 0.84 0.84 0.84 0.84 Hourly Flow Rate, HFR (veh/h) 11 829 36 91 371 1
Percent Heavy Vehicles 2 -- -- 2 -- --Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 1 1 0 Configuration LTR L TR Upstream Signal 0 0
Minor Street Northbound Southbound Movement 7 8 9 10 11 12
L T R L T RVolume (veh/h) 21 4 139 4 3 4 Peak-Hour Factor, PHF 0.84 0.84 0.84 0.84 0.84 0.84 Hourly Flow Rate, HFR (veh/h) 25 4 165 4 3 4
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 1 0 1 0 Configuration LT R LTR
Delay, Queue Length, and Level of ServiceApproach Eastbound Westbound Northbound Southbound Movement 1 4 7 8 9 10 11 12Lane Configuration LTR L LT R LTR
v (veh/h) 11 91 29 165 11
C (m) (veh/h) 1186 778 101 362 94
v/c 0.01 0.12 0.29 0.46 0.12
95% queue length 0.03 0.40 1.08 2.30 0.38
Control Delay (s/veh) 8.1 10.2 54.4 23.0 48.3
LOS A B F C E
Approach Delay (s/veh) -- -- 27.7 48.3
Approach LOS -- -- D E
Copyright © 2010 University of Florida, All Rights Reserved HCS+TM Version 5.6 Generated: 1/18/2013 11:21 AM
Page 1 of 1Two-Way Stop Control
1/18/2013file:///C:/Users/mwhitcomb/AppData/Local/Temp/u2k6AA6.tmp
TWO-WAY STOP CONTROL SUMMARYGeneral Information Site Information Analyst MW Agency/Co. Warrenville Date Performed 1/18/2013 Analysis Time Period PM
Intersection River & Warrenville JurisdictionAnalysis Year 2013
Project Description East/West Street: Warrenville North/South Street: River Intersection Orientation: East-West Study Period (hrs): 0.25
Vehicle Volumes and AdjustmentsMajor Street Eastbound Westbound Movement 1 2 3 4 5 6
L T R L T RVolume (veh/h) 10 394 27 77 691 12 Peak-Hour Factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 Hourly Flow Rate, HFR (veh/h) 10 419 28 81 735 12
Percent Heavy Vehicles 1 -- -- 1 -- --Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 1 1 0 Configuration LTR L TR Upstream Signal 0 0
Minor Street Northbound Southbound Movement 7 8 9 10 11 12
L T R L T RVolume (veh/h) 32 4 51 9 1 8 Peak-Hour Factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 Hourly Flow Rate, HFR (veh/h) 34 4 54 9 1 8
Percent Heavy Vehicles 1 1 1 1 1 1
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 1 0 1 0 Configuration LT R LTR
Delay, Queue Length, and Level of ServiceApproach Eastbound Westbound Northbound Southbound Movement 1 4 7 8 9 10 11 12Lane Configuration LTR L LT R LTR
v (veh/h) 10 81 38 54 18
C (m) (veh/h) 866 1119 117 625 156
v/c 0.01 0.07 0.32 0.09 0.12
95% queue length 0.04 0.23 1.28 0.28 0.38
Control Delay (s/veh) 9.2 8.5 49.9 11.3 31.1
LOS A A E B D
Approach Delay (s/veh) -- -- 27.3 31.1
Approach LOS -- -- D D
Copyright © 2010 University of Florida, All Rights Reserved HCS+TM Version 5.6 Generated: 1/18/2013 11:27 AM
Page 1 of 1Two-Way Stop Control
1/18/2013file:///C:/Users/mwhitcomb/AppData/Local/Temp/u2k6AA6.tmp
APPEN
DIX E
PROPOSED OVAL ROUNDABOUT INTERSECTION
CMAQ FY2016‐2020 IN
PUT MODULE W
ORKSH
EET
TRAFFIC COUNT DATA
LEVEL OF SERVICE SUMMARY Site: Warrenville Road AM PeakRoundabout with 1-lane approaches and circulating roadMUTCD (FHWA 2009) example number: 2B-22Roundabout Guide (TRB 2010) example number: A-1
Roundabout
South East North West IntersectionLOS C A B B B
Level of Service (LOS) Method: Delay (HCM 2000). Roundabout LOS Method: Same as Signalised Intersections.Lane LOS values are based on average delay per lane.Intersection and Approach LOS values are based on average delay for all lanes.SIDRA Standard Delay Model used.
Processed: Thursday, January 17, 2013 1:51:11 PM Copyright © 2000-2011 Akcelik and Associates Pty Ltd
DETAILED OUTPUT Warrenville Road AM Peak
Roundabout with 1-lane approaches and circulating roadMUTCD (FHWA 2009) example number: 2B-22Roundabout Guide (TRB 2010) example number: A-1
Roundabout
OUTPUT TABLE LINKS
RoundaboutsRoundabout Basic ParametersRoundabout Gap Acceptance Parameters
MovementsMovement Capacity ParametersMovement PerformanceFuel Consumption, Emissions and Cost (Total)Fuel Consumption, Emissions and Cost (Rate)Intersection Negotiation DataMovement Speeds and Geometric Delay
LanesLane PerformanceLane Flow and Capacity InformationLane, Approach and Intersection PerformanceDriver CharacteristicsLane DelaysLane Queues (Vehicles)Lane Queues (Distance)Lane Queue Percentiles (Vehicles)Lane Queue Percentiles (Distance)Lane Stops
Flow Rates and Demand AnalysisMovement Definitions and Flow Rates (O-D)Flow Rates (Separate Light and Heavy Vehicles)Flow Rates (Total Vehicles and Percent Heavy)
OtherModel SettingsParameters Used in Cost CalculationsDiagnostics
Roundabouts
Roundabout Basic ParametersSite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------------------------------ Circulating/Exiting Stream Cent Circ Insc Ent Ent Cir Ent Av.Ent ------------------------------------ Island Width Diam. Rad Ang Lan Lan Lane Flow %HV Adjust. %Exit Cap. O-D Diam Width Flow Incl. Constr. Factor ft ft ft ft deg ft veh/h pcu/h Effect------------------------------------------------------------------------------
South: River Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium 66 17 100 31 30 1 1 14.00 901 1.0 910 0 N 0.857------------------------------------------------------------------------------
East: Warrenville Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium 66 17 100 36 30 1 1 14.00 38 1.0 38 0 N 0.992------------------------------------------------------------------------------
North: Batavia Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium
Page 1 of 12Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
Movements
66 17 100 40 30 1 1 14.00 202 1.0 204 0 N 0.991------------------------------------------------------------------------------ West: Warrenville Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium 66 17 100 33 30 1 1 14.00 703 1.0 710 0 N 0.870------------------------------------------------------------------------------ Roundabout Capacity Model: SIDRA Standard HV Method for Gap Acceptance: Include HV Effect for all percentages
Roundabout Gap Acceptance ParametersSite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------------------------------ Turn Lane Lane ---- Circulating/Exiting Stream --- Critical Gap No. Type Flow Aver Aver In-Bnch Prop ------------ Foll-up Rate Speed Dist Headway Bunched Hdwy Dist Headway pcu/h mph ft sec sec ft sec------------------------------------------------------------------------------
South: River Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium Left 1 Dominant 910 16.0 93.0 2.00 0.692 4.84 113.9 3.02 Thru 1 Dominant 910 16.0 93.0 2.00 0.692 4.89 115.0 3.05 Right 1 Dominant 910 16.0 93.0 2.00 0.692 4.89 115.0 3.05 ------------------------------------------------------------------------------
East: Warrenville Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium Left 1 Dominant 38 18.3 2529.0 2.00 0.045 5.08 136.3 2.74 Thru 1 Dominant 38 18.3 2529.0 2.00 0.045 5.08 136.2 2.74 Right 1 Dominant 38 18.3 2529.0 2.00 0.045 5.08 136.3 2.74 ------------------------------------------------------------------------------
North: Batavia Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium Left 1 Dominant 204 17.2 444.3 2.00 0.297# 5.41 136.4 3.01 Thru 1 Dominant 204 17.2 444.3 2.00 0.297# 5.41 136.4 3.01 Right 1 Dominant 204 17.2 444.3 2.00 0.297# 5.36 135.1 2.98 ------------------------------------------------------------------------------
West: Warrenville Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium Left 1 Dominant 710 13.7 102.2 2.00 0.600# 5.06 102.1 3.07 Thru 1 Dominant 710 13.7 102.2 2.00 0.600# 5.11 103.1 3.10 Right 1 Dominant 710 13.7 102.2 2.00 0.600# 5.11 103.1 3.10 ------------------------------------------------------------------------------
Roundabout Capacity Model: SIDRA Standard P Priority sharing is implied for some movements (Follow-up Headway plus Intra-bunch Headway is larger than the Critical Gap). The O-D Factor (Roundabout Basic Parameters table) allows for priority sharing and priority emphasis. # "Extra" bunching (i.e. a percentage increase or decrease in the amount of bunching in the flow entering the roundabout) specified by the user has affected bunching in the circulating flow in front of this approach.
Dist (Distance): Spacing, i.e. distance between the front ends of two successive vehicles across all lanes in the circulating or exiting stream
Movement Capacity ParametersSite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------------------------- Mov Opposing Movement Total Prac. Prac. Lane Deg. ID Demand Adjust. Cap. Deg. Spare Util Satn Flow HV Flow HV Flow Satn Cap. veh/h % veh/h % pcu/h veh/h xp % % x-------------------------------------------------------------------------
South: River Road 10 L 7 1.0 901 1.0 910 13 0.85 67 100 0.510
Page 2 of 12Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
11 T 24 1.0 901 1.0 910 48 0.85 67 100 0.510 12 R 170 1.0 901 1.0 910 333 0.85 67 100 0.510 ------------------------------------------------------------------------- East: Warrenville Road 1 L 94 1.0 38 1.0 38 245 0.85 120 100 0.386 2 T 101 1.0 38 1.0 38 262 0.85 120 100 0.386 3 R 288 1.0 38 1.0 38 746 0.85 120 100 0.386 ------------------------------------------------------------------------- North: Batavia Road 4 L 584 1.0 202 1.0 204 915 0.85 33 100 0.638 5 T 24 1.0 202 1.0 204 38 0.85 33 100 0.638 6 R 4 1.0 202 1.0 204 7 0.85 33 100 0.638 ------------------------------------------------------------------------- West: Warrenville Road 7 L 7 1.0 703 1.0 710 10 0.85 26 100 0.674* 8 T 310 1.0 703 1.0 710 460 0.85 26 100 0.674* 9 R 13 1.0 703 1.0 710 20 0.85 26 100 0.674*------------------------------------------------------------------------- * Maximum degree of saturation
Movement PerformanceSite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
--------------------------------------------------------------------------------- Mov Total Total Aver. Eff. Total Perf. Tot.Trav. Tot.Trav. Aver. ID Delay Delay Delay Stop Stops Index Distance Time Speed (veh-h/h)(pers-h/h)(sec) Rate (veh-mi/h)(veh-h/h) (mph) ---------------------------------------------------------------------------------
South: River Road 10 L 0.05 0.05 24.4 1.08 7.2 0.18 2.0 0.1 20.9 11 T 0.14 0.16 20.0 1.03 25.3 0.64 7.5 0.3 22.5 12 R 0.99 1.19 21.1 1.05 177.9 4.52 51.7 2.3 22.4---------------------------------------------------------------------------------
East: Warrenville Road 1 L 0.30 0.36 11.5 0.75 70.6 1.32 14.6 0.7 21.1 2 T 0.11 0.13 3.9 0.34 34.6 0.79 9.5 0.4 22.1 3 R 0.48 0.58 6.0 0.49 142.0 2.81 31.9 1.5 21.9---------------------------------------------------------------------------------
North: Batavia Road 4 L 2.11 2.53 13.0 0.72 422.5 10.65 139.2 6.1 22.9 5 T 0.05 0.07 8.0 0.62 15.1 0.40 5.8 0.2 25.1 6 R 0.01 0.01 7.4 0.62 2.8 0.07 0.9 0.0 23.6---------------------------------------------------------------------------------
West: Warrenville Road 7 L 0.04 0.05 22.8 1.22 8.1 0.18 1.1 0.1 14.1 8 T 1.46 1.75 16.9 1.18 365.1 7.71 45.4 3.1 14.6 9 R 0.07 0.08 18.4 1.19 15.9 0.35 2.1 0.1 15.3---------------------------------------------------------------------------------
Fuel Consumption, Emissions and Cost (Total)Site:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
-------------------------------------------------------------- Mov Cost Fuel CO2 CO HC NOX ID Total Total Total Total Total Total $/h gal/h kg/h kg/h kg/h kg/h--------------------------------------------------------------
South: River Road 10 L 1.63 0.1 0.8 0.05 0.001 0.002 11 T 6.15 0.4 3.8 0.30 0.007 0.009 12 R 43.45 2.8 26.7 2.15 0.047 0.064
----------------------------------------------- 51.23 3.3 31.3 2.50 0.055 0.075--------------------------------------------------------------
East: Warrenville Road 1 L 15.51 1.2 11.6 1.37 0.022 0.033 2 T 7.20 0.4 3.8 0.29 0.007 0.008 3 R 31.41 2.4 23.0 2.62 0.043 0.065
-----------------------------------------------
Page 3 of 12Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
54.12 4.1 38.4 4.28 0.072 0.106-------------------------------------------------------------- North: Batavia Road 4 L 118.82 8.1 77.1 7.18 0.139 0.191 5 T 4.77 0.4 3.5 0.36 0.006 0.009 6 R 0.62 0.0 0.3 0.02 0.001 0.001
----------------------------------------------- 124.21 8.6 81.0 7.56 0.145 0.201-------------------------------------------------------------- West: Warrenville Road 7 L 1.46 0.1 0.8 0.08 0.002 0.002 8 T 59.13 3.9 36.7 3.69 0.068 0.093 9 R 2.88 0.2 1.9 0.21 0.004 0.005
----------------------------------------------- 63.47 4.2 39.5 3.98 0.073 0.101-------------------------------------------------------------- INTERSECTION: 293.02 20.1 190.2 18.32 0.346 0.482--------------------------------------------------------------
Fuel Consumption, Emissions and Cost (Rate)Site:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
-------------------------------------------------------------- Mov Cost Fuel CO2 CO HC NOX ID Rate Eff. Rate Rate Rate Rate $/mi mpg g/km g/km g/km g/km--------------------------------------------------------------
South: River Road 10 L 0.51 22.4 262.8 15.52 0.459 0.527 11 T 0.51 18.6 315.5 25.34 0.554 0.755 12 R 0.52 18.3 320.7 25.80 0.565 0.767
----------------------------------------------- 0.52 18.5 318.2 25.41 0.560 0.758--------------------------------------------------------------
East: Warrenville Road 1 L 0.66 11.9 494.1 58.04 0.946 1.401 2 T 0.47 23.7 248.6 18.87 0.444 0.522 3 R 0.61 13.1 448.0 51.20 0.838 1.266
----------------------------------------------- 0.60 13.8 426.4 47.53 0.800 1.176--------------------------------------------------------------
North: Batavia Road 4 L 0.53 17.1 344.3 32.03 0.618 0.852 5 T 0.51 15.7 373.5 38.40 0.677 1.002 6 R 0.45 23.3 252.9 18.02 0.439 0.540
----------------------------------------------- 0.53 17.1 344.9 32.20 0.620 0.856--------------------------------------------------------------
West: Warrenville Road 7 L 0.83 12.3 477.4 45.37 0.901 1.141 8 T 0.81 11.7 502.3 50.53 0.934 1.278 9 R 0.83 10.5 558.6 59.98 1.047 1.499
----------------------------------------------- 0.81 11.7 504.2 50.83 0.938 1.284--------------------------------------------------------------
INTERSECTION: 0.58 15.5 379.2 36.53 0.690 0.961--------------------------------------------------------------
Intersection Negotiation DataSite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
----------------------------------------------------------------------------- Negn Negn Negn Appr. Downstream Distance From To Radius Speed Dist. Dist. -------------------- Approach Approach Turn ft mph ft ft ft User Spec?-----------------------------------------------------------------------------
South: River Road East Right 77.3 17.4 38.7 1300 307 No North Thru 126.0 20.9 95.2 1300 341 No
Page 4 of 12Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
Lanes
West Left 39.8 13.5 156.3 1300 243 No ----------------------------------------------------------------------------- East: Warrenville Road South Left 39.8 13.5 156.3 330 474 No North Right 77.3 17.4 38.7 220 309 No West Thru 126.0 20.9 95.2 330 199 No ----------------------------------------------------------------------------- North: Batavia Road South Thru 126.0 20.9 95.2 850 443 No East Left 39.8 13.5 156.3 850 409 No West Right 77.3 17.4 38.7 850 189 No ----------------------------------------------------------------------------- West: Warrenville Road South Right 77.3 17.4 38.7 460 372 No East Thru 126.0 20.9 95.2 460 319 No North Left 39.8 13.5 156.3 460 364 No -----------------------------------------------------------------------------
Maximum Negotiation (Design) Speed = 30.0 mph
Downstream distance is distance travelled from the stopline until exit cruise speed is reached (includes negotiation distance). Acceleration distance is weighted for light and heavy vehicles. The same distance applies for both stopped and unstopped vehicles.
Movement Speeds and Geometric DelaySite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
---------------------------------------------------------------------------- Queue Move-up App. Speeds Exit Speeds ------------- Av. Section Spd Geom Mov ------------ ----------- 1st 2nd --------------- Delay ID Cruise Negn Negn Cruise Grn Grn Running Overall sec ----------------------------------------------------------------------------
South: River Road 10 L 40.0 13.5 13.5 25.0 10.8 26.0 20.9 9.9 11 T 40.0 20.9 20.9 35.0 10.7 26.5 22.5 5.5 12 R 40.0 17.4 17.4 35.0 10.7 26.8 22.4 6.6----------------------------------------------------------------------------
East: Warrenville Road 1 L 35.0 13.5 13.5 40.0 21.1 21.1 11.2 2 T 35.0 20.9 20.9 25.0 22.1 22.1 3.6 3 R 35.0 17.4 17.4 35.0 21.9 21.9 5.8----------------------------------------------------------------------------
North: Batavia Road 4 L 35.0 13.5 13.5 35.0 13.8 22.9 22.9 10.3 5 T 35.0 20.9 20.9 40.0 13.8 25.1 25.1 5.4 6 R 35.0 17.4 17.4 25.0 13.8 23.6 23.6 4.8----------------------------------------------------------------------------
West: Warrenville Road 7 L 25.0 13.5 13.5 35.0 11.6 18.4 14.1 8.4 8 T 25.0 20.9 20.9 35.0 11.5 17.7 14.6 2.6 9 R 25.0 17.4 17.4 40.0 11.5 18.9 15.3 4.1----------------------------------------------------------------------------
"Running Speed" is the average speed excluding stopped periods.
Lane PerformanceSite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
-------------------------------------------------------------- Q u e u e Flow Cap Deg. Aver. Eff. 95% Back Lane Lane Satn Delay Stop ------------ Length No. veh/h veh/h x sec Rate veh ft ft --------------------------------------------------------------
Page 5 of 12Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
South: River Road 1 LTR 201 394 0.510 21.0 1.05 3.7 92.5 1300.0 -------------------------------------------------------------- East: Warrenville Road 1 LTR 483 1253 0.386 6.7 0.51 2.6 66.1 330.0 -------------------------------------------------------------- North: Batavia Road 1 LTR 613 961 0.638 12.7 0.72 5.8 145.9 850.0 -------------------------------------------------------------- West: Warrenville Road 1 LTR 330 490 0.674 17.1 1.18 6.4 160.5 460.0 --------------------------------------------------------------
Lane Flow and Capacity InformationSite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
---------------------------------------------------- Lane Dem Flow (veh/h) Min Tot Deg. Lane No. ------------------- Cap Cap Satn Util Lef Thru Rig Tot veh/h veh/h x %----------------------------------------------------
South: River Road 1 LTR 7 24 170 201 150 394 0.510 100 ----------------------------------------------------
East: Warrenville Road 1 LTR 94 101 288 483 150 1253 0.386 100 ----------------------------------------------------
North: Batavia Road 1 LTR 584 24 4 613 150 961 0.638 100 ----------------------------------------------------
West: Warrenville Road 1 LTR 7 310 13 330 150 490 0.674 100 ----------------------------------------------------
The capacity value for priority and continuous movements is obtained by adjusting the basic saturation flow for heavy vehicle and turning vehicle effects. Saturation flow scale applies if specified.
Lane, Approach and Intersection PerformanceSite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
-------------------------------------------------------------------------- Lane Demand Flow (veh/h) Adj. Eff Grn Deg Aver. Longest Shrt No. -------------------- %HV Basic (sec) Sat Delay Queue Lane L T R Tot Satf. 1st 2nd x sec ft ft --------------------------------------------------------------------------
South: River Road 1 LTR 7 24 170 201 1 0.510 21.0 92 1300
------------------------------------------------------------------ 7 24 170 201 1 0.510 21.0 92 --------------------------------------------------------------------------
East: Warrenville Road 1 LTR 94 101 288 483 1 0.386 6.7 66 330
------------------------------------------------------------------ 94 101 288 483 1 0.386 6.7 66 --------------------------------------------------------------------------
North: Batavia Road 1 LTR 584 24 4 613 1 0.638 12.7 146 850
------------------------------------------------------------------ 584 24 4 613 1 0.638 12.7 146 --------------------------------------------------------------------------
West: Warrenville Road 1 LTR 7 310 13 330 1 0.674 17.1 160 460
------------------------------------------------------------------ 7 310 13 330 1 0.674 17.1 160 ========================================================================== ALL VEHICLES Total % Max Aver. Max Flow HV X Delay Queue 1628 1 0.674 12.9 160
Page 6 of 12Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
Go to Table Links (Top)
========================================================================== Peak flow period = 15 minutes.
Queue values in this table are 95% queue (feet) Note: Basic Saturation Flows are not adjusted at roundabouts or sign- controlled intersections and apply only to continuous lanes.
Driver CharacteristicsSite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
-------------------------------------------------------- Average Driver Lane Satn Satn Satn Satn Queue Response No. Speed Flow Hdwy Spacing Space Time mph veh/h sec ft ft sec--------------------------------------------------------
South: River Road 1 LTR 17.7 1182 3.04 78.83 25.20 2.07--------------------------------------------------------
East: Warrenville Road 1 LTR 17.3 1313 2.74 69.69 25.20 1.75--------------------------------------------------------
North: Batavia Road 1 LTR 13.8 1194 3.01 61.05 25.20 1.77--------------------------------------------------------
West: Warrenville Road 1 LTR 20.6 1161 3.10 93.63 25.20 2.27--------------------------------------------------------
Saturation Flow and Saturation Headway are derived from follow-up headway.
Lane DelaysSite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------------------------------------ Delay (seconds/veh) ----------------
Deg. Stop-line Delay Acc. Queuing Stopd Lane Satn 1st 2nd Total Dec. Total MvUp (Idle) Geom Control No. x d1 d2 dSL dn dq dqm di dig dic----------------------------------------------------------------------
South: River Road 1 LTR 0.510 10.6 3.8 14.5 4.7 9.8 1.7 8.1 6.6 21.0----------------------------------------------------------------------
East: Warrenville Road 1 LTR 0.386 0.3 0.0 0.3 1.0 0.0 0.0 0.0 6.4 6.7----------------------------------------------------------------------
North: Batavia Road 1 LTR 0.638 2.5 0.2 2.6 2.8 0.0 0.0 0.0 10.1 12.7----------------------------------------------------------------------
West: Warrenville Road 1 LTR 0.674 8.3 6.1 14.4 5.5 8.9 2.4 6.5 2.8 17.1----------------------------------------------------------------------
dSL: Stop-line delay (=d1+d2) dn: Average stop-start delay for all vehicles queued and unqueued dq: Queuing delay (the part of the stop-line delay that includes stopped delay and queue move-up delay) dqm: Queue move-up delay di: Stopped delay (stopped (idling) time at near-zero speed) dig: Geometric delay dic: Intersection control delay (sum of stop-line and geometric delays)
Lane Queues (Vehicles)Site:Warrenville Road AM Peak
Intersection ID: 1
Page 7 of 12Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
Roundabout
------------------------------------------------------------------------------------ Deg. Ovrfl. Back of Queue (veh) Queue Prob. P'ile Cyc-Av. Queue Lane Satn Queue --------------------------- Stor. Block Block ------------- No. x No Nb1 Nb2 Nb 95% Ratio % % Nc 95%------------------------------------------------------------------------------------ South: River Road 1 LTR 0.510 0.3 1.3 0.2 1.5 3.7 0.07 0.0 100.0 0.8 1.5------------------------------------------------------------------------------------ East: Warrenville Road 1 LTR 0.386 0.0 1.1 0.0 1.1 2.6 0.20 0.0 100.0 0.0 0.1------------------------------------------------------------------------------------ North: Batavia Road 1 LTR 0.638 0.0 2.3 0.1 2.3 5.8 0.17 0.0 100.0 0.5 0.8------------------------------------------------------------------------------------ West: Warrenville Road 1 LTR 0.674 0.6 1.9 0.7 2.6 6.4 0.35 0.0 100.0 1.3 2.4------------------------------------------------------------------------------------
SIDRA Standard models are used for Back of Queue estimation since HCM only gives Cycle-Average Queues for unsignalised intersections.
Lane Queues (Distance)Site:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------------------------------------ Deg. Ovrfl. Back of Queue (ft) Queue Prob. P'ile Cyc-Av. Queue Lane Satn Queue --------------------------- Stor. Block Block ------------- No. x No Nb1 Nb2 Nb 95% Ratio % % Nc 95%------------------------------------------------------------------------------------
South: River Road 1 LTR 0.510 6.5 31.5 5.7 37.2 92.5 0.07 0.0 100.0 20.4 37.0------------------------------------------------------------------------------------
East: Warrenville Road 1 LTR 0.386 0.0 26.6 0.0 26.6 66.1 0.20 0.0 100.0 0.9 1.7------------------------------------------------------------------------------------
North: Batavia Road 1 LTR 0.638 0.8 57.1 1.6 58.7 145.9 0.17 0.0 100.0 11.4 20.6------------------------------------------------------------------------------------
West: Warrenville Road 1 LTR 0.674 15.4 47.4 17.1 64.6 160.5 0.35 0.0 100.0 33.2 60.2------------------------------------------------------------------------------------
SIDRA Standard models are used for Back of Queue estimation since HCM only gives Cycle-Average Queues for unsignalised intersections.
Lane Queue Percentiles (Vehicles)Site:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------- Deg. Percentile Back of Queue (veh) Lane Satn ---------------------------------------- No. x 50% 70% 85% 90% 95% 98%-------------------------------------------------------
South: River Road 1 LTR 0.510 1.5 1.9 2.7 3.1 3.7 4.1 -------------------------------------------------------
East: Warrenville Road 1 LTR 0.386 1.1 1.4 1.9 2.2 2.6 2.9 -------------------------------------------------------
North: Batavia Road 1 LTR 0.638 2.3 3.0 4.3 4.9 5.8 6.4 -------------------------------------------------------
West: Warrenville Road 1 LTR 0.674 2.6 3.3 4.7 5.4 6.4 7.1 -------------------------------------------------------
SIDRA Standard models are used for Back of Queue estimation since
Page 8 of 12Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
Go to Table Links (Top)
Flow Rates and Demand Analysis
HCM only gives Cycle-Average Queues for unsignalised intersections.
Lane Queue Percentiles (Distance)Site:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------- Deg. Percentile Back of Queue (feet) Lane Satn ---------------------------------------- No. x 50% 70% 85% 90% 95% 98%-------------------------------------------------------
South: River Road 1 LTR 0.510 37.2 48.2 67.9 78.6 92.5 102.6 -------------------------------------------------------
East: Warrenville Road 1 LTR 0.386 26.6 34.4 48.5 56.2 66.1 73.3 -------------------------------------------------------
North: Batavia Road 1 LTR 0.638 58.7 76.0 107.1 124.1 145.9 161.9 -------------------------------------------------------
West: Warrenville Road 1 LTR 0.674 64.5 83.6 117.8 136.5 160.5 178.1 -------------------------------------------------------
SIDRA Standard models are used for Back of Queue estimation since HCM only gives Cycle-Average Queues for unsignalised intersections.
Lane StopsSite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
---------------------------------------------------------------------- Queue Total Deg. -- Effective Stop Rate -- Total Move-up Queue Prop. Lane Satn Geom. Overall Stops Rate Move-ups Queued No. x he1 he2 hig h H hqm Hqm pq----------------------------------------------------------------------
South: River Road 1 LTR 0.510 0.90 0.09 0.06 1.05 210.4 0.27 54.8 0.90----------------------------------------------------------------------
East: Warrenville Road 1 LTR 0.386 0.07 0.00 0.44 0.51 247.3 0.00 0.0 0.20----------------------------------------------------------------------
North: Batavia Road 1 LTR 0.638 0.47 0.00 0.24 0.72 440.4 0.01 5.9 0.66----------------------------------------------------------------------
West: Warrenville Road 1 LTR 0.674 0.94 0.22 0.02 1.18 389.1 0.42 139.8 0.94----------------------------------------------------------------------
hig is the average value for all movements in a shared lane hqm is average queue move-up rate for all vehicles queued and unqueued
Movement Definitions and Flow Rates (O-D)Site:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
----------------------------------------------------------------------- From To Mov Flow Rate Flow Scale Peak Flow Approach Approach ID Turn LV HV Fixed Var Factor-----------------------------------------------------------------------
South: River Road
Page 9 of 12Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
East 12 Right 168 2 1.00 1.00 0.90 North 11 Thru 24 0 1.00 1.00 0.90 West 10 Left 7 0 1.00 1.00 0.90 ----------------------------------------------------------------------- East: Warrenville Road South 1 Left 94 1 1.00 1.00 0.90 North 3 Right 285 3 1.00 1.00 0.90 West 2 Thru 100 1 1.00 1.00 0.90 ----------------------------------------------------------------------- North: Batavia Road South 5 Thru 24 0 1.00 1.00 0.90 East 4 Left 579 6 1.00 1.00 0.90 West 6 Right 4 0 1.00 1.00 0.90 ----------------------------------------------------------------------- West: Warrenville Road South 9 Right 13 0 1.00 1.00 0.90 East 8 Thru 307 3 1.00 1.00 0.90 North 7 Left 7 0 1.00 1.00 0.90 ----------------------------------------------------------------------- Unit Time for Volumes = 60 minutes Peak Flow Period = 15 minutes Flow Rates include effects of Flow Scale and Peak Flow Factor
Flow Rates (Separate Light and Heavy Vehicles)Site:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
----------------------------------------------- Mov Left Through Right ID --------- --------- --------- LV HV LV HV LV HV-----------------------------------------------
Demand flows in veh/h as used by the program South: River Road 10 L 7 0 0 0 0 0 11 T 0 0 24 0 0 0 12 R 0 0 0 0 168 2-----------------------------------------------
East: Warrenville Road 1 L 94 1 0 0 0 0 2 T 0 0 100 1 0 0 3 R 0 0 0 0 285 3-----------------------------------------------
North: Batavia Road 4 L 579 6 0 0 0 0 5 T 0 0 24 0 0 0 6 R 0 0 0 0 4 0-----------------------------------------------
West: Warrenville Road 7 L 7 0 0 0 0 0 8 T 0 0 307 3 0 0 9 R 0 0 0 0 13 0-----------------------------------------------
Unit Time for Volumes = 60 minutes Peak Flow Period = 15 minutes Flow Rates include effects of Flow Scale and Peak Flow Factor
Flow Rates (Total Vehicles and Percent Heavy)Site:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
-------------------------------------------------- Mov Left Through Right ID ---------- ---------- ---------- Total %HV Total %HV Total %HV--------------------------------------------------
Demand flows in veh/h as used by the program South: River Road 10 L 7 1.0 0 0.0 0 0.0
Page 10 of 12Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Other
Go to Table Links (Top)
Go to Table Links (Top)
Go to Table Links (Top)
11 T 0 0.0 24 1.0 0 0.0 12 R 0 0.0 0 0.0 170 1.0-------------------------------------------------- East: Warrenville Road 1 L 94 1.0 0 0.0 0 0.0 2 T 0 0.0 101 1.0 0 0.0 3 R 0 0.0 0 0.0 288 1.0-------------------------------------------------- North: Batavia Road 4 L 584 1.0 0 0.0 0 0.0 5 T 0 0.0 24 1.0 0 0.0 6 R 0 0.0 0 0.0 4 1.0-------------------------------------------------- West: Warrenville Road 7 L 7 1.0 0 0.0 0 0.0 8 T 0 0.0 310 1.0 0 0.0 9 R 0 0.0 0 0.0 13 1.0-------------------------------------------------- Unit Time for Volumes = 60 minutes Peak Flow Period = 15 minutes Flow Rates include effects of Flow Scale and Peak Flow Factor
Model SettingsSite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
* Basic Parameters: Intersection Type: Roundabout Driving on the right-hand side of the road Input data specified in US units Model Defaults: US HCM (Customary) Peak Flow Period (for performance): 15 minutes Unit time (for volumes): 60 minutes. SIDRA Standard Delay model used HCM Queue Model option used Level of Service based on: Delay (HCM 2000) Queue percentile: 95%
Parameters Used in Cost CalculationsSite:Warrenville Road AM Peak
Intersection ID: 1 Roundabout
Pump price of fuel ($/US gal) = 3.000 Fuel resource cost factor = 0.70 Ratio of running cost to fuel cost = 3.0 Average income ($/h) = 23.00 Time value factor = 0.40 Light vehicle mass (1000 lb) = 3.1 Heavy vehicle mass (1000 lb) = 24.0 Light vehicle idle fuel rate (US gal/h) = 0.360 Heavy vehicle idle fuel rate (US gal/h) = 0.530
DiagnosticsSite:Warrenville Road AM Peak
Processed: Thursday, January 17, 2013 1:51:11 PMSIDRA INTERSECTION 5.1.6.2039
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: C:\Users\fpannell\Desktop\New Project - 1.sip
Page 11 of 12Detailed Output
1/17/2013about:blank
LEVEL OF SERVICE SUMMARY Site: Warrenville Road PM PeakRoundabout with 1-lane approaches and circulating roadMUTCD (FHWA 2009) example number: 2B-22Roundabout Guide (TRB 2010) example number: A-1
Roundabout
South East North West IntersectionLOS B A B A A
Level of Service (LOS) Method: Delay (HCM 2000). Roundabout LOS Method: Same as Signalised Intersections.Lane LOS values are based on average delay per lane.Intersection and Approach LOS values are based on average delay for all lanes.SIDRA Standard Delay Model used.
Processed: Thursday, January 17, 2013 1:52:12 PM Copyright © 2000-2011 Akcelik and Associates Pty Ltd
DETAILED OUTPUT Warrenville Road PM Peak
Roundabout with 1-lane approaches and circulating roadMUTCD (FHWA 2009) example number: 2B-22Roundabout Guide (TRB 2010) example number: A-1
Roundabout
OUTPUT TABLE LINKS
RoundaboutsRoundabout Basic ParametersRoundabout Gap Acceptance Parameters
MovementsMovement Capacity ParametersMovement PerformanceFuel Consumption, Emissions and Cost (Total)Fuel Consumption, Emissions and Cost (Rate)Intersection Negotiation DataMovement Speeds and Geometric Delay
LanesLane PerformanceLane Flow and Capacity InformationLane, Approach and Intersection PerformanceDriver CharacteristicsLane DelaysLane Queues (Vehicles)Lane Queues (Distance)Lane Queue Percentiles (Vehicles)Lane Queue Percentiles (Distance)Lane Stops
Flow Rates and Demand AnalysisMovement Definitions and Flow Rates (O-D)Flow Rates (Separate Light and Heavy Vehicles)Flow Rates (Total Vehicles and Percent Heavy)
OtherModel SettingsParameters Used in Cost CalculationsDiagnostics
Roundabouts
Roundabout Basic ParametersSite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------------------------------ Circulating/Exiting Stream Cent Circ Insc Ent Ent Cir Ent Av.Ent ------------------------------------ Island Width Diam. Rad Ang Lan Lan Lane Flow %HV Adjust. %Exit Cap. O-D Diam Width Flow Incl. Constr. Factor ft ft ft ft deg ft veh/h pcu/h Effect------------------------------------------------------------------------------
South: River Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium 66 17 100 31 30 1 1 14.00 526 1.0 531 0 N 0.926------------------------------------------------------------------------------
East: Warrenville Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium 66 17 100 36 30 1 1 14.00 51 1.0 52 0 N 0.992------------------------------------------------------------------------------
North: Batavia Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium
Page 1 of 11Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
Movements
66 17 100 40 30 1 1 14.00 341 1.0 345 0 N 0.966------------------------------------------------------------------------------ West: Warrenville Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium 66 17 100 33 30 1 1 14.00 493 1.0 498 0 N 0.924------------------------------------------------------------------------------ Roundabout Capacity Model: SIDRA Standard HV Method for Gap Acceptance: Include HV Effect for all percentages
Roundabout Gap Acceptance ParametersSite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------------------------------ Turn Lane Lane ---- Circulating/Exiting Stream --- Critical Gap No. Type Flow Aver Aver In-Bnch Prop ------------ Foll-up Rate Speed Dist Headway Bunched Hdwy Dist Headway pcu/h mph ft sec sec ft sec------------------------------------------------------------------------------
South: River Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium Left 1 Dominant 531 15.5 154.4 2.00 0.479 5.35 121.9 3.16 Thru 1 Dominant 531 15.5 154.4 2.00 0.479 5.41 123.1 3.19 Right 1 Dominant 531 15.5 154.4 2.00 0.479 5.41 123.1 3.19 ------------------------------------------------------------------------------
East: Warrenville Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium Left 1 Dominant 52 18.8 1922.5 2.00 0.061 4.91 135.4 2.66 Thru 1 Dominant 52 18.8 1922.5 2.00 0.061 4.91 135.3 2.65 Right 1 Dominant 52 18.8 1922.5 2.00 0.061 4.91 135.4 2.66 ------------------------------------------------------------------------------
North: Batavia Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium Left 1 Dominant 345 18.7 286.1 2.00 0.398# 5.55 151.9 3.17 Thru 1 Dominant 345 18.7 286.1 2.00 0.398# 5.55 151.9 3.17 Right 1 Dominant 345 18.7 286.1 2.00 0.398# 5.55 151.9 3.17 ------------------------------------------------------------------------------
West: Warrenville Road Environment Factor: 1.20 Entry/Circulating Flow Adjustment: Medium Left 1 Dominant 498 13.9 146.8 2.00 0.468# 5.37 109.1 3.15 Thru 1 Dominant 498 13.9 146.8 2.00 0.468# 5.42 110.2 3.18 Right 1 Dominant 498 13.9 146.8 2.00 0.468# 5.37 109.1 3.15 ------------------------------------------------------------------------------
Roundabout Capacity Model: SIDRA Standard # "Extra" bunching (i.e. a percentage increase or decrease in the amount of bunching in the flow entering the roundabout) specified by the user has affected bunching in the circulating flow in front of this approach.
Dist (Distance): Spacing, i.e. distance between the front ends of two successive vehicles across all lanes in the circulating or exiting stream
Movement Capacity ParametersSite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------------------------- Mov Opposing Movement Total Prac. Prac. Lane Deg. ID Demand Adjust. Cap. Deg. Spare Util Satn Flow HV Flow HV Flow Satn Cap. veh/h % veh/h % pcu/h veh/h xp % % x-------------------------------------------------------------------------
South: River Road 10 L 8 1.0 526 1.0 531 44 0.85 376 100 0.178 11 T 37 1.0 526 1.0 531 205 0.85 376 100 0.178 12 R 62 1.0 526 1.0 531 349 0.85 376 100 0.178 -------------------------------------------------------------------------
Page 2 of 11Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
East: Warrenville Road 1 L 94 1.0 51 1.0 52 126 0.85 14 100 0.747* 2 T 239 1.0 51 1.0 52 320 0.85 14 100 0.747* 3 R 621 1.0 51 1.0 52 831 0.85 14 100 0.747*------------------------------------------------------------------------- North: Batavia Road 4 L 374 1.0 341 1.0 345 693 0.85 57 100 0.541 5 T 24 1.0 341 1.0 345 45 0.85 57 100 0.541 6 R 16 1.0 341 1.0 345 29 0.85 57 100 0.541 ------------------------------------------------------------------------- West: Warrenville Road 7 L 7 1.0 493 1.0 498 26 0.85 230 100 0.258 8 T 144 1.0 493 1.0 498 561 0.85 230 100 0.258 9 R 9 1.0 493 1.0 498 35 0.85 230 100 0.258 ------------------------------------------------------------------------- * Maximum degree of saturation
Movement PerformanceSite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
--------------------------------------------------------------------------------- Mov Total Total Aver. Eff. Total Perf. Tot.Trav. Tot.Trav. Aver. ID Delay Delay Delay Stop Stops Index Distance Time Speed (veh-h/h)(pers-h/h)(sec) Rate (veh-mi/h)(veh-h/h) (mph) ---------------------------------------------------------------------------------
South: River Road 10 L 0.03 0.04 14.2 0.89 6.9 0.15 2.3 0.1 25.9 11 T 0.10 0.12 9.8 0.74 27.0 0.66 11.2 0.4 28.6 12 R 0.19 0.23 10.9 0.78 48.4 1.15 18.9 0.7 28.3---------------------------------------------------------------------------------
East: Warrenville Road 1 L 0.31 0.38 12.0 0.68 64.3 1.49 14.6 0.7 20.8 2 T 0.29 0.35 4.4 0.38 91.7 2.45 22.3 1.1 20.0 3 R 1.13 1.36 6.5 0.49 306.2 7.42 68.8 3.3 20.6---------------------------------------------------------------------------------
North: Batavia Road 4 L 1.53 1.84 14.7 0.84 316.0 7.39 89.2 4.1 22.0 5 T 0.07 0.08 9.7 0.75 18.4 0.44 5.8 0.2 24.7 6 R 0.04 0.05 9.2 0.76 11.9 0.26 3.0 0.1 22.9---------------------------------------------------------------------------------
West: Warrenville Road 7 L 0.02 0.03 12.6 0.91 6.1 0.12 1.1 0.1 18.3 8 T 0.27 0.33 6.8 0.70 101.5 2.20 21.2 1.0 20.3 9 R 0.02 0.02 8.2 0.76 6.8 0.15 1.4 0.1 20.8---------------------------------------------------------------------------------
Fuel Consumption, Emissions and Cost (Total)Site:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
-------------------------------------------------------------- Mov Cost Fuel CO2 CO HC NOX ID Total Total Total Total Total Total $/h gal/h kg/h kg/h kg/h kg/h--------------------------------------------------------------
South: River Road 10 L 1.59 0.1 0.9 0.05 0.001 0.002 11 T 7.68 0.5 5.1 0.41 0.009 0.013 12 R 13.34 0.9 8.9 0.72 0.015 0.022
----------------------------------------------- 22.61 1.6 14.9 1.18 0.025 0.036--------------------------------------------------------------
East: Warrenville Road 1 L 15.83 1.2 11.8 1.38 0.023 0.034 2 T 18.95 1.1 10.3 0.87 0.019 0.023 3 R 71.73 5.5 52.1 6.01 0.098 0.148
----------------------------------------------- 106.50 7.8 74.2 8.26 0.140 0.205--------------------------------------------------------------
North: Batavia Road
Page 3 of 11Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
4 L 78.69 5.3 50.3 4.67 0.091 0.124 5 T 4.83 0.4 3.5 0.36 0.006 0.009 6 R 2.27 0.1 1.3 0.09 0.002 0.003
----------------------------------------------- 85.79 5.8 55.1 5.12 0.099 0.136-------------------------------------------------------------- West: Warrenville Road 7 L 1.19 0.1 0.8 0.07 0.001 0.002 8 T 21.26 1.5 14.6 1.50 0.026 0.038 9 R 1.51 0.1 1.1 0.12 0.002 0.003
----------------------------------------------- 23.96 1.7 16.5 1.70 0.030 0.043-------------------------------------------------------------- INTERSECTION: 238.86 17.0 160.7 16.26 0.294 0.420--------------------------------------------------------------
Fuel Consumption, Emissions and Cost (Rate)Site:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
-------------------------------------------------------------- Mov Cost Fuel CO2 CO HC NOX ID Rate Eff. Rate Rate Rate Rate $/mi mpg g/km g/km g/km g/km--------------------------------------------------------------
South: River Road 10 L 0.43 24.9 236.5 14.05 0.398 0.491 11 T 0.43 20.8 283.2 22.59 0.478 0.694 12 R 0.44 20.2 291.6 23.72 0.497 0.719
----------------------------------------------- 0.43 20.7 284.8 22.64 0.484 0.694--------------------------------------------------------------
East: Warrenville Road 1 L 0.67 11.7 501.8 58.75 0.959 1.425 2 T 0.53 20.6 286.0 24.27 0.528 0.643 3 R 0.65 12.5 470.7 54.28 0.889 1.336
----------------------------------------------- 0.63 13.5 436.0 48.56 0.822 1.202--------------------------------------------------------------
North: Batavia Road 4 L 0.55 16.8 350.7 32.50 0.633 0.863 5 T 0.52 15.6 378.2 39.10 0.688 1.016 6 R 0.47 22.1 266.7 19.43 0.462 0.577
----------------------------------------------- 0.54 16.8 349.7 32.49 0.631 0.863--------------------------------------------------------------
West: Warrenville Road 7 L 0.67 13.8 425.9 42.43 0.786 1.061 8 T 0.62 13.7 428.6 43.96 0.765 1.125 9 R 0.66 12.2 480.9 53.54 0.893 1.322
----------------------------------------------- 0.63 13.6 431.6 44.47 0.774 1.134--------------------------------------------------------------
INTERSECTION: 0.57 15.3 384.2 38.89 0.703 1.005--------------------------------------------------------------
Intersection Negotiation DataSite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
----------------------------------------------------------------------------- Negn Negn Negn Appr. Downstream Distance From To Radius Speed Dist. Dist. -------------------- Approach Approach Turn ft mph ft ft ft User Spec?-----------------------------------------------------------------------------
South: River Road East Right 77.3 17.4 38.7 1300 303 No North Thru 126.0 20.9 95.2 1300 336 No West Left 39.8 13.5 156.3 1300 237 No -----------------------------------------------------------------------------
East: Warrenville Road
Page 4 of 11Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
Lanes
South Left 39.8 13.5 156.3 330 471 No North Right 77.3 17.4 38.7 220 306 No West Thru 126.0 20.9 95.2 330 195 No ----------------------------------------------------------------------------- North: Batavia Road South Thru 126.0 20.9 95.2 850 442 No East Left 39.8 13.5 156.3 850 407 No West Right 77.3 17.4 38.7 850 188 No ----------------------------------------------------------------------------- West: Warrenville Road South Right 77.3 17.4 38.7 460 370 No East Thru 126.0 20.9 95.2 460 321 No North Left 39.8 13.5 156.3 460 366 No -----------------------------------------------------------------------------
Maximum Negotiation (Design) Speed = 30.0 mph
Downstream distance is distance travelled from the stopline until exit cruise speed is reached (includes negotiation distance). Acceleration distance is weighted for light and heavy vehicles. The same distance applies for both stopped and unstopped vehicles.
Movement Speeds and Geometric DelaySite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
---------------------------------------------------------------------------- Queue Move-up App. Speeds Exit Speeds ------------- Av. Section Spd Geom Mov ------------ ----------- 1st 2nd --------------- Delay ID Cruise Negn Negn Cruise Grn Grn Running Overall sec ----------------------------------------------------------------------------
South: River Road 10 L 40.0 13.5 13.5 25.0 27.5 25.9 9.9 11 T 40.0 20.9 20.9 35.0 29.0 28.6 5.5 12 R 40.0 17.4 17.4 35.0 29.0 28.3 6.6----------------------------------------------------------------------------
East: Warrenville Road 1 L 35.0 13.5 13.5 40.0 20.8 20.8 11.2 2 T 35.0 20.9 20.9 25.0 20.0 20.0 3.6 3 R 35.0 17.4 17.4 35.0 20.6 20.6 5.8----------------------------------------------------------------------------
North: Batavia Road 4 L 35.0 13.5 13.5 35.0 14.1 22.6 22.0 10.3 5 T 35.0 20.9 20.9 40.0 14.1 24.7 24.7 5.4 6 R 35.0 17.4 17.4 25.0 14.1 23.1 22.9 4.8----------------------------------------------------------------------------
West: Warrenville Road 7 L 25.0 13.5 13.5 35.0 19.9 18.3 8.4 8 T 25.0 20.9 20.9 35.0 20.4 20.3 2.6 9 R 25.0 17.4 17.4 40.0 21.3 20.8 4.0----------------------------------------------------------------------------
"Running Speed" is the average speed excluding stopped periods.
Lane PerformanceSite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
-------------------------------------------------------------- Q u e u e Flow Cap Deg. Aver. Eff. 95% Back Lane Lane Satn Delay Stop ------------ Length No. veh/h veh/h x sec Rate veh ft ft --------------------------------------------------------------
South: River Road 1 LTR 107 598 0.178 10.8 0.77 0.9 23.4 1300.0 --------------------------------------------------------------
Page 5 of 11Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
East: Warrenville Road 1 LTR 954 1278 0.747 6.6 0.48 10.0 252.4 330.0 -------------------------------------------------------------- North: Batavia Road 1 LTR 414 767 0.541 14.2 0.84 4.3 107.7 850.0 -------------------------------------------------------------- West: Warrenville Road 1 LTR 160 621 0.258 7.1 0.71 1.4 36.1 460.0 --------------------------------------------------------------
Lane Flow and Capacity InformationSite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
---------------------------------------------------- Lane Dem Flow (veh/h) Min Tot Deg. Lane No. ------------------- Cap Cap Satn Util Lef Thru Rig Tot veh/h veh/h x %----------------------------------------------------
South: River Road 1 LTR 8 37 62 107 107 598 0.178 100 ----------------------------------------------------
East: Warrenville Road 1 LTR 94 239 621 954 150 1278 0.747 100 ----------------------------------------------------
North: Batavia Road 1 LTR 374 24 16 414 150 767 0.541 100 ----------------------------------------------------
West: Warrenville Road 1 LTR 7 144 9 160 150 621 0.258 100 ----------------------------------------------------
The capacity value for priority and continuous movements is obtained by adjusting the basic saturation flow for heavy vehicle and turning vehicle effects. Saturation flow scale applies if specified.
Lane, Approach and Intersection PerformanceSite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
-------------------------------------------------------------------------- Lane Demand Flow (veh/h) Adj. Eff Grn Deg Aver. Longest Shrt No. -------------------- %HV Basic (sec) Sat Delay Queue Lane L T R Tot Satf. 1st 2nd x sec ft ft --------------------------------------------------------------------------
South: River Road 1 LTR 8 37 62 107 1 0.178 10.8 23 1300
------------------------------------------------------------------ 8 37 62 107 1 0.178 10.8 23 --------------------------------------------------------------------------
East: Warrenville Road 1 LTR 94 239 621 954 1 0.747 6.6 252 330
------------------------------------------------------------------ 94 239 621 954 1 0.747 6.6 252 --------------------------------------------------------------------------
North: Batavia Road 1 LTR 374 24 16 414 1 0.541 14.2 108 850
------------------------------------------------------------------ 374 24 16 414 1 0.541 14.2 108 --------------------------------------------------------------------------
West: Warrenville Road 1 LTR 7 144 9 160 1 0.258 7.1 36 460
------------------------------------------------------------------ 7 144 9 160 1 0.258 7.1 36 ========================================================================== ALL VEHICLES Total % Max Aver. Max Flow HV X Delay Queue 1636 1 0.747 8.8 252 ========================================================================== Peak flow period = 15 minutes.
Page 6 of 11Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
Go to Table Links (Top)
Queue values in this table are 95% queue (feet) Note: Basic Saturation Flows are not adjusted at roundabouts or sign- controlled intersections and apply only to continuous lanes.
Driver CharacteristicsSite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
-------------------------------------------------------- Average Driver Lane Satn Satn Satn Satn Queue Response No. Speed Flow Hdwy Spacing Space Time mph veh/h sec ft ft sec--------------------------------------------------------
South: River Road 1 LTR 18.3 1130 3.19 85.46 25.20 2.25--------------------------------------------------------
East: Warrenville Road 1 LTR 17.9 1356 2.66 69.54 25.20 1.69--------------------------------------------------------
North: Batavia Road 1 LTR 14.1 1136 3.17 65.42 25.20 1.95--------------------------------------------------------
West: Warrenville Road 1 LTR 20.4 1133 3.18 94.99 25.20 2.33--------------------------------------------------------
Saturation Flow and Saturation Headway are derived from follow-up headway.
Lane DelaysSite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------------------------------------ Delay (seconds/veh) ----------------
Deg. Stop-line Delay Acc. Queuing Stopd Lane Satn 1st 2nd Total Dec. Total MvUp (Idle) Geom Control No. x d1 d2 dSL dn dq dqm di dig dic----------------------------------------------------------------------
South: River Road 1 LTR 0.178 4.3 0.0 4.3 3.5 0.8 0.0 0.8 6.5 10.8----------------------------------------------------------------------
East: Warrenville Road 1 LTR 0.747 0.8 0.0 0.8 2.2 0.0 0.0 0.0 5.8 6.6----------------------------------------------------------------------
North: Batavia Road 1 LTR 0.541 3.7 0.7 4.4 3.0 1.3 0.4 1.0 9.8 14.2----------------------------------------------------------------------
West: Warrenville Road 1 LTR 0.258 4.2 0.0 4.2 3.9 0.3 0.0 0.3 2.9 7.1----------------------------------------------------------------------
dSL: Stop-line delay (=d1+d2) dn: Average stop-start delay for all vehicles queued and unqueued dq: Queuing delay (the part of the stop-line delay that includes stopped delay and queue move-up delay) dqm: Queue move-up delay di: Stopped delay (stopped (idling) time at near-zero speed) dig: Geometric delay dic: Intersection control delay (sum of stop-line and geometric delays)
Lane Queues (Vehicles)Site:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------------------------------------
Page 7 of 11Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
Go to Table Links (Top)
Deg. Ovrfl. Back of Queue (veh) Queue Prob. P'ile Cyc-Av. Queue Lane Satn Queue --------------------------- Stor. Block Block ------------- No. x No Nb1 Nb2 Nb 95% Ratio % % Nc 95%------------------------------------------------------------------------------------ South: River Road 1 LTR 0.178 0.0 0.4 0.0 0.4 0.9 0.02 0.0 100.0 0.1 0.2------------------------------------------------------------------------------------ East: Warrenville Road 1 LTR 0.747 0.0 4.0 0.0 4.0 10.0 0.76 0.0 100.0 0.2 0.4------------------------------------------------------------------------------------ North: Batavia Road 1 LTR 0.541 0.1 1.6 0.1 1.7 4.3 0.13 0.0 100.0 0.5 0.9------------------------------------------------------------------------------------ West: Warrenville Road 1 LTR 0.258 0.0 0.6 0.0 0.6 1.4 0.08 0.0 100.0 0.2 0.3------------------------------------------------------------------------------------
SIDRA Standard models are used for Back of Queue estimation since HCM only gives Cycle-Average Queues for unsignalised intersections.
Lane Queues (Distance)Site:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------------------------------------ Deg. Ovrfl. Back of Queue (ft) Queue Prob. P'ile Cyc-Av. Queue Lane Satn Queue --------------------------- Stor. Block Block ------------- No. x No Nb1 Nb2 Nb 95% Ratio % % Nc 95%------------------------------------------------------------------------------------
South: River Road 1 LTR 0.178 0.0 9.4 0.0 9.4 23.4 0.02 0.0 100.0 3.2 5.8------------------------------------------------------------------------------------
East: Warrenville Road 1 LTR 0.747 0.0 101.6 0.0 101.6 252.4 0.76 0.0 100.0 5.2 9.4------------------------------------------------------------------------------------
North: Batavia Road 1 LTR 0.541 2.6 39.6 3.7 43.3 107.7 0.13 0.0 100.0 12.7 23.0------------------------------------------------------------------------------------
West: Warrenville Road 1 LTR 0.258 0.0 14.5 0.0 14.5 36.1 0.08 0.0 100.0 4.7 8.5------------------------------------------------------------------------------------
SIDRA Standard models are used for Back of Queue estimation since HCM only gives Cycle-Average Queues for unsignalised intersections.
Lane Queue Percentiles (Vehicles)Site:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------- Deg. Percentile Back of Queue (veh) Lane Satn ---------------------------------------- No. x 50% 70% 85% 90% 95% 98%-------------------------------------------------------
South: River Road 1 LTR 0.178 0.4 0.5 0.7 0.8 0.9 1.0 -------------------------------------------------------
East: Warrenville Road 1 LTR 0.747 4.0 5.2 7.4 8.5 10.0 11.1 -------------------------------------------------------
North: Batavia Road 1 LTR 0.541 1.7 2.2 3.1 3.6 4.3 4.7 -------------------------------------------------------
West: Warrenville Road 1 LTR 0.258 0.6 0.7 1.1 1.2 1.4 1.6 -------------------------------------------------------
SIDRA Standard models are used for Back of Queue estimation since HCM only gives Cycle-Average Queues for unsignalised intersections.
Page 8 of 11Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
Flow Rates and Demand Analysis
Lane Queue Percentiles (Distance)Site:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
------------------------------------------------------- Deg. Percentile Back of Queue (feet) Lane Satn ---------------------------------------- No. x 50% 70% 85% 90% 95% 98%-------------------------------------------------------
South: River Road 1 LTR 0.178 9.4 12.2 17.2 19.9 23.4 25.9 -------------------------------------------------------
East: Warrenville Road 1 LTR 0.747 101.5 131.5 185.4 214.6 252.4 280.1 -------------------------------------------------------
North: Batavia Road 1 LTR 0.541 43.3 56.1 79.1 91.6 107.7 119.5 -------------------------------------------------------
West: Warrenville Road 1 LTR 0.258 14.5 18.8 26.5 30.7 36.1 40.0 -------------------------------------------------------
SIDRA Standard models are used for Back of Queue estimation since HCM only gives Cycle-Average Queues for unsignalised intersections.
Lane StopsSite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
---------------------------------------------------------------------- Queue Total Deg. -- Effective Stop Rate -- Total Move-up Queue Prop. Lane Satn Geom. Overall Stops Rate Move-ups Queued No. x he1 he2 hig h H hqm Hqm pq----------------------------------------------------------------------
South: River Road 1 LTR 0.178 0.58 0.00 0.19 0.77 82.3 0.00 0.0 0.65----------------------------------------------------------------------
East: Warrenville Road 1 LTR 0.747 0.19 0.00 0.29 0.48 462.3 0.00 0.0 0.43----------------------------------------------------------------------
North: Batavia Road 1 LTR 0.541 0.61 0.03 0.20 0.84 346.3 0.06 23.2 0.72----------------------------------------------------------------------
West: Warrenville Road 1 LTR 0.258 0.61 0.00 0.11 0.71 114.3 0.00 0.0 0.67----------------------------------------------------------------------
hig is the average value for all movements in a shared lane hqm is average queue move-up rate for all vehicles queued and unqueued
Movement Definitions and Flow Rates (O-D)Site:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
----------------------------------------------------------------------- From To Mov Flow Rate Flow Scale Peak Flow Approach Approach ID Turn LV HV Fixed Var Factor-----------------------------------------------------------------------
South: River Road East 12 Right 62 1 1.00 1.00 0.90 North 11 Thru 36 0 1.00 1.00 0.90 West 10 Left 8 0 1.00 1.00 0.90 -----------------------------------------------------------------------
Page 9 of 11Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Go to Table Links (Top)
East: Warrenville Road South 1 Left 94 1 1.00 1.00 0.90 North 3 Right 615 6 1.00 1.00 0.90 West 2 Thru 237 2 1.00 1.00 0.90 ----------------------------------------------------------------------- North: Batavia Road South 5 Thru 24 0 1.00 1.00 0.90 East 4 Left 371 4 1.00 1.00 0.90 West 6 Right 15 0 1.00 1.00 0.90 ----------------------------------------------------------------------- West: Warrenville Road South 9 Right 9 0 1.00 1.00 0.90 East 8 Thru 143 1 1.00 1.00 0.90 North 7 Left 7 0 1.00 1.00 0.90 ----------------------------------------------------------------------- Unit Time for Volumes = 60 minutes Peak Flow Period = 15 minutes Flow Rates include effects of Flow Scale and Peak Flow Factor
Flow Rates (Separate Light and Heavy Vehicles)Site:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
----------------------------------------------- Mov Left Through Right ID --------- --------- --------- LV HV LV HV LV HV-----------------------------------------------
Demand flows in veh/h as used by the program South: River Road 10 L 8 0 0 0 0 0 11 T 0 0 36 0 0 0 12 R 0 0 0 0 62 1-----------------------------------------------
East: Warrenville Road 1 L 94 1 0 0 0 0 2 T 0 0 237 2 0 0 3 R 0 0 0 0 615 6-----------------------------------------------
North: Batavia Road 4 L 371 4 0 0 0 0 5 T 0 0 24 0 0 0 6 R 0 0 0 0 15 0-----------------------------------------------
West: Warrenville Road 7 L 7 0 0 0 0 0 8 T 0 0 143 1 0 0 9 R 0 0 0 0 9 0-----------------------------------------------
Unit Time for Volumes = 60 minutes Peak Flow Period = 15 minutes Flow Rates include effects of Flow Scale and Peak Flow Factor
Flow Rates (Total Vehicles and Percent Heavy)Site:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
-------------------------------------------------- Mov Left Through Right ID ---------- ---------- ---------- Total %HV Total %HV Total %HV--------------------------------------------------
Demand flows in veh/h as used by the program South: River Road 10 L 8 1.0 0 0.0 0 0.0 11 T 0 0.0 37 1.0 0 0.0 12 R 0 0.0 0 0.0 62 1.0--------------------------------------------------
East: Warrenville Road
Page 10 of 11Detailed Output
1/17/2013about:blank
Go to Table Links (Top)
Other
Go to Table Links (Top)
Go to Table Links (Top)
Go to Table Links (Top)
1 L 94 1.0 0 0.0 0 0.0 2 T 0 0.0 239 1.0 0 0.0 3 R 0 0.0 0 0.0 621 1.0-------------------------------------------------- North: Batavia Road 4 L 374 1.0 0 0.0 0 0.0 5 T 0 0.0 24 1.0 0 0.0 6 R 0 0.0 0 0.0 16 1.0-------------------------------------------------- West: Warrenville Road 7 L 7 1.0 0 0.0 0 0.0 8 T 0 0.0 144 1.0 0 0.0 9 R 0 0.0 0 0.0 9 1.0-------------------------------------------------- Unit Time for Volumes = 60 minutes Peak Flow Period = 15 minutes Flow Rates include effects of Flow Scale and Peak Flow Factor
Model SettingsSite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
* Basic Parameters: Intersection Type: Roundabout Driving on the right-hand side of the road Input data specified in US units Model Defaults: US HCM (Customary) Peak Flow Period (for performance): 15 minutes Unit time (for volumes): 60 minutes. SIDRA Standard Delay model used HCM Queue Model option used Level of Service based on: Delay (HCM 2000) Queue percentile: 95%
Parameters Used in Cost CalculationsSite:Warrenville Road PM Peak
Intersection ID: 1 Roundabout
Pump price of fuel ($/US gal) = 3.000 Fuel resource cost factor = 0.70 Ratio of running cost to fuel cost = 3.0 Average income ($/h) = 23.00 Time value factor = 0.40 Light vehicle mass (1000 lb) = 3.1 Heavy vehicle mass (1000 lb) = 24.0 Light vehicle idle fuel rate (US gal/h) = 0.360 Heavy vehicle idle fuel rate (US gal/h) = 0.530
DiagnosticsSite:Warrenville Road PM Peak
Processed: Thursday, January 17, 2013 1:52:12 PMSIDRA INTERSECTION 5.1.6.2039
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: C:\Users\fpannell\Desktop\New Project - 1.sip8001008, SAM SCHWARTZ ENGINEERING, SINGLE
Page 11 of 11Detailed Output
1/17/2013about:blank
APPEN
DIX F
CITY SUBAREA
AND BIKEW
AY PLA
N EXCER
PTS
©
BIK
EW
AY
IM
PL
EM
EN
TA
TIO
N P
LA
N
THIRDSTREET
WA
RR
EN
VIL
LE
RO
AD
WINFIELDROAD
RIVERROAD
NE
W 1
0'
CO
NC
RE
TE
SID
EP
AT
H
WID
EN
SID
EW
AL
K
TO
8' S
IDE
PA
TH
WA
RR
EN
VIL
LE
RO
AD
SID
EP
AT
H
(OL
D T
OW
N)
WID
EN
SID
EW
AL
K T
O 8
'
SID
EP
AT
H (
FU
TU
RE
DU
RIN
G
IMP
LE
ME
NT
AT
ION
OF
SU
B-A
RE
A P
LA
N)
©
BIK
EW
AY
IM
PL
EM
EN
TA
TIO
N P
LA
N
THIRD STREET
WA
RR
EN
VIL
LE
RO
AD
CURTISAVENUE
BA
TA
VIA
RO
AD
WID
EN
RO
AD
(S
IX
INC
HE
S E
AC
H
SID
E)
AN
D A
DD
WID
E S
TR
IPE
D
SH
OU
LD
ER
S
NE
W 5
' S
IDE
WA
LK
ON
EA
ST
SID
E F
RO
M
4T
H S
TR
EE
T T
O
MA
IN S
TR
EE
T
BA
TA
VIA
RO
AD
BIK
E L
AN
ES
BU
TT
ER
FIE
LD
RO
AD
TO
WA
RR
EN
VIL
LE
RO
AD
Adopted December 1, 2008
Page 38 of 68
Several potential grant sources are available to fund infrastructure improvements of the
type recommended in the Sub-Area Plan. Grant sources are described in section 6 of this
Plan.
4.3.3 Warrenville Road
There are several recommendations depending on the section of road:
• Butterfield Road, the Illinois Prairie Path, to Batavia Road. This section has
recently been rebuilt, but there is an inadequate right-of-way for a sidepath or
designated on-road bike lanes. Batavia Road to Winfield Road
• The Old Town Sub-area Plan recommends a traffic circle for the intersection with
Batavia Road. The addition of a bike lane around the outside of the circle with a
widened sidepath on the north and south side of Warrenville Road from Batavia
Road to Winfield Road would provide a proper connection between Batavia
Road, Warrenville Road, the Galusha Road area, the Cantera sidepaths, and the
West Branch Regional Trail
4.3.4 Batavia Road
Many road cyclists use Batavia Road between Butterfield and Warrenville roads. Adding
a 4-foot bike lane without parking along both sides of the road would raise the BLOS
rating from ‘C’ to ‘B’. Lane markings should follow the AASHTO Guide for the
Development of Bicycle Facilities, and the striping should connect to the bikeway system
at Batavia Road’s eastern end, where it intersects with Warrenville Road to provide
access to Cantera, eastern routes on Warrenville Road, and the West Branch Regional
Trail. In order to complete this link from Batavia Road, additional striping and sidepath
improvements will be needed along Warrenville Road from Batavia to Winfield roads.
A crosswalk is also needed at the Warrenville Grove Forest Preserve parking lot so that
bicyclists, as well as pedestrians, using the sidewalk along Batavia Road can easily
access the Forest Preserve trails. However, given that the entrance is located on a curve,
careful consideration as to the feasibility, exact location and best design of such a
crossing will be required.