Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Update: WIT Contract Ownership January 2015 Salt Lake City, UT

Upload: lucas-richard

Post on 21-Dec-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Update: WIT Contract Ownership January 2015 Salt Lake City, UT

Andy MeyersInterchange Scheduling and Accounting

Subcommittee Chair

Update: WIT Contract OwnershipJanuary 2015

Salt Lake City, UT

Page 2: Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Update: WIT Contract Ownership January 2015 Salt Lake City, UT

2

• Mid November 2014 ISAS held a webinar to discuss the ownership of the WIT

• October 2014 Interchange Authority (IA) was removed from applicability of INT standards

• Peak was currently holding the WIT contract but WECC was maintaining administrative functions

Tag corrections DTE correction PII accuracy checks Change order specs Inadvertent dispute tracking General troubleshooting

WIT Contract

Page 3: Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Update: WIT Contract Ownership January 2015 Salt Lake City, UT

3

• 3 Scenarios were presented for the future ownership of WIT

Peak RC WECC Group of Balancing Authorities

• Recommendation was for Peak to remain the owner of the WIT contract

WIT Contract

Page 4: Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Update: WIT Contract Ownership January 2015 Salt Lake City, UT

4

• Recommendation from webinar was for Peak to retain the WIT contract

• The following details need to be worked out between Peak and WECCo Funding for the tool (contracted service vs. normal assessment)o Funding for additional FTE labor at Peako Timing for transitioning administrative dutieso Creation of a user's groupo Ensuring that WECC will still be a user with sufficient privileges to

access the data it needs to perform delegated functions

WIT Contract