angleblaster qick start user manual

Upload: fabianandresgonzalezvalenzuela

Post on 10-Jan-2016

5 views

Category:

Documents


0 download

DESCRIPTION

manual para utilizar el inclino metro.

TRANSCRIPT

  • QUICK START

    Suitable for:

    OEM Integration OEM Installation Retro Fit Installation

    DTI AngleBlaster release 1.1DTI 2010

    Reference Guide

  • QUICK START Reference Guide

    Contents:

    Introduction ................................................................................................................... 2

    Saving Template Hole Angle Values ........................................................................... 2

    Drilling Consecutive Holes .......................................................................................... 3

    Screen Navigational Guide

    Drill Screen & Gauge View .............................................................................. 4

    Entering or Selecting a Project File ................................................................. 4

    System Setup, Zero Offset & Screen Prefences ............................................ 5

    Ring And Dump View Only (Default) ............................................................... 5

    Contact Us ................................................................................................................... 6

  • Quick Start Guide is a simplfied version of the full Operators Manual designed for fast reference on the fly.

    Read and familiarize yourself with the full Operators Manuals instructions and information for the proper operation of the DTI Angleblaster system.

    NOTE: Screen Buttons are pressure sensitive.

    QUICK START - Saving First Hole Angle Values page 2

    fig. 2

    fig. 3

    PRESS

    fig. 1

    PRESS

    1. POSITION the drill over your first surveyed or marked hole position.

    The first hole (combined) angle values, are the template for any repeating holes.

    ACTUAL RING and DUMPANGLE VALUES

    Locked in RING and DUMPAngle Values in SET column

    2. PRESS the DRILL SCREEN button, MAIN MENU (fig. 1).

    3. When you are satisfied with the the DUMP & RING values as shown in the ACTUAL Column ... PRESS the SET button (fig. 2). Note: Actual Values for Heading, Ring

    and Dump are copied to SET and the SET button turns inactive (fig. 3). Inactive SET button is a fail safe feature to prevent accidental deletion of saved values.See *Activate Set Point

    Inactive SET

    To *Activate Set Point, refer to full Operators manual.

    SAVING TEMPLATE HOLE ANGLE VALUES

  • fig. 5

    QUICK START - DRILLING CONSECUTIVE HOLES page 3

    fig. 4

    PRESS

    4. Move to your next hole. Note: Drill can approach the next hole marker from any direction, or even leave the worksite, return and resume the same drill pattern at a later date with the same angle values as the first hole.

    5. Once the mast is in position, PRESS TARGET (fig. 4)

    Pressing the Target button retrieves the SET angle values and adjusts the values for the next hole.

    Note: The green indicator arrows appear (fig. 4) The green arrows represent the TARGET values and are stationary.

    6. Align the Red Indicator Arrows (ACTUAL) over the Green (TARGET) by moving the Ring and Dump of the mast (fig. 5).

    If AZIMUTH of the mast has changed while aligning the ACTUAL with the TARGET - PRESS TARGET again (fig. 5). Everytime the TARGET button is pressed, the TARGET is refreshed.

    DTI AngleBlasters system checks and adjusts value changes due to movement.

    Re-adjust the Masts Ring & Dump to align with TARGET.

    NOTE: For a more hands-free feature, activate AUTO TRACK which tracks the TARGET every second, allowing you to more closely monitor the progress of aligning the ACTUAL and TARGET together. Refer to the full version of Operators Manual AUTO TRACK for further details.

    7. Once the ACTUAL and TARGET line up you can drill your second hole. Repeat Steps 4, 5, and 6 for any consecutive holes.

    AUTO TRACKPress for Hands Freetracking of TARGET.

    Green Arrows indicateTARGET values

    PRESS

    Align Red Arrows (ACTUAL)Over Green Arrows (TARGET)

    DRILLING CONSECUTIVE HOLES

  • MAIN MENU

    QUICK START - SCREEN NAVIGATIONAL GUIDE page 4

    fig. 2

    GAUGE VIEW

    DRILL SCREENMAIN MENU

    PROJECT SETUP

    SELECT APROJECT FILE

    NEW PROJECT SETUP

    SELECT AN EXISTINGPROJECT SETUP

    DRILL SCREEN & GAUGE VIEW

    ENTERING OR SELECTING A PROJECT FILE

  • QUICK START - SCREEN NAVIGATIONAL GUIDE page 5

    SYSTEM SETUP & SCREEN PREFENCES

    RING AND DUMP VIEW ONLY (DEFAULT)

    SYSTEM SETUPMAIN MENU

    RING & DUMP (DEFAULT)

    MAIN MENU

    OFFSET

    SCREENPREFERENCES

    SCREEN OPTIONS

    Use Up and DownScroll Arrows to Selecta Screen Preference

  • QUICK START - CONTACT page 6

    1477 Wellington Ave.Winnipeg, Manitoba, Canada, R3E 0K4

    p: (204) 775-2445e: [email protected] : www.dticanada.com www.dragantechnologies.com

    DRAGAN TECHNOLOGIES INC.

    For a updated list of our distributors, please visit;www.dragantechnologies.comand follow the Dealers page

    Contact UsAt Dragan Technologies Inc. (DTI), we believe in a strong commitment to our customers by providing them with the technical support from our team of engineers and technicians.

    Feel free to contact us with your inquires at: