WATER ANNACIS WATER SUPPLY TUNNEL PROJECT Project Overview To meet the growing demand for drinking water in the region, Metro Vancouver is planning to construct a major water infrastructure project called the Annacis Water Supply Tunnel Project deep under the Fraser River, between the City of New Westminster and the City of Surrey. The tunnel will be one of five new water supply tunnel crossings in the region built to withstand a major earthquake. Fraser River North Arm Fraser River S FRASER PERIMETER RD (HWY 17) GRACE RD SCOTT RD / 120 ST 103 A AVE T RIVER RD ROBSON RD MILLAR RD 116 ST QUAYSIDE DR COLUMBIA ST FRONT ST COLUMBIA ST ROYAL AVE AGNES ST QUEENS AVE 3RD AVE 8TH ST 10TH ST 12TH ST 11TH ST CITY OF NEW WESTMINSTER CITY OF SURREY ANNACIS ISLAND FRASER SURREY DOCKS North Shaft Annacis Water Supply Tunnel South Shaft ANNACIS WATER SUPPLY TUNNEL ALIGNMENT

Upload: others

Post on 01-Aug-2021

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ANNACIS WATER SPPLY TNNL PROJECT Project Overvie...WATER ANNACIS WATER SPPLY TNNL PROJECT Proposed Greenspace After construction of the new Annacis Water Supply Tunnel, the north shaft

WATER

ANNACIS WATER SUPPLY TUNNEL PROJECT

Project OverviewTo meet the growing demand for drinking water in the region, Metro Vancouver is planning to construct a major water infrastructure project called the Annacis Water Supply Tunnel Project deep under the Fraser River, between the City of New Westminster and the City of Surrey.

The tunnel will be one of five new water supply tunnel crossings in the region built to withstand a major earthquake.

Fras

er R

iver

North Arm Fraser River

S FR

ASE

R PE

RIM

ETER

RD

(HW

Y 17

)

GRACE RD

SCO

TT R

D /

120

ST

103 A AVE

TANNERY RD

RIVER RD

ROBS

ON

RD

MILLAR RD 116

STQUAYSIDE DR

COLUMBIA ST

FRONT S

TCOLU

MBIA

ST

ROYAL A

VE

AGNES ST

QUEENS AVE

3RD AVE

8TH ST

10TH ST

12TH ST 11TH ST

CITY OFNEW WESTMINSTER

CITY OF SURREY

ANNACIS ISLAND

FRASER SURREY DOCKS

North Shaft

Annacis Water Supply Tunnel

South Shaft

ANNACIS WATER SUPPLY TUNNEL ALIGNMENT

Page 2: ANNACIS WATER SPPLY TNNL PROJECT Project Overvie...WATER ANNACIS WATER SPPLY TNNL PROJECT Proposed Greenspace After construction of the new Annacis Water Supply Tunnel, the north shaft

WATER

ANNACIS WATER SUPPLY TUNNEL PROJECT

Project ActivitiesThis new water supply tunnel will be excavated deep underground using a tunnel-boring machine. The tunnel-boring machine will launch from a vertical entry shaft on the Surrey side and progress north under the Fraser River to the vertical exit shaft on the New Westminster side.

Once the tunnel is drilled, a steel water main will be installed inside the new shafts and tunnel and connected to underground valve chambers at each shaft site, connecting it to the region’s drinking water system.

The new tunnel will increase the capacity of the existing system to help ensure the continued, reliable delivery of clean, safe drinking water in a growing region, and will be designed to meet current seismic standards.

Project Timeline

2016 SUMMER

2017 SUMMER

2019 JAN

2020 SUMMER

2025 SUMMER

Preliminary design

Detailed design

Start of construction

Construction completion and greenspace opening

WEAREHERE

Page 3: ANNACIS WATER SPPLY TNNL PROJECT Project Overvie...WATER ANNACIS WATER SPPLY TNNL PROJECT Proposed Greenspace After construction of the new Annacis Water Supply Tunnel, the north shaft

WATER

ANNACIS WATER SUPPLY TUNNEL PROJECT

Construction Activities

HOW BIG ARE THE WATER MAINS?There are all different sizes of water mains in our region’s distribution system. The water main being installed for this project inside the new tunnel is approximately 2.6 m (~8.5') in diameter.

A Tunnel Boring Machine will be used to excavate the new water supply tunnel

Water main installation through the shaft Pipe installation inside underground valve chamber

Water Main inside Water

Supply Tunnel 2.6 m

(approximately 8.5')

Person Height 1.8 m(approximately 6')

Page 4: ANNACIS WATER SPPLY TNNL PROJECT Project Overvie...WATER ANNACIS WATER SPPLY TNNL PROJECT Proposed Greenspace After construction of the new Annacis Water Supply Tunnel, the north shaft

WATER

ANNACIS WATER SUPPLY TUNNEL PROJECT

CROSS-SECTION OF THE ANNACIS WATER SUPPLY TUNNEL

Steel water main within tunnel (2.3 km long)

South (entry) shaft and valve chamber

North (exit) shaft and valve chamber

NEW WESTMINSTER SURREY

Fraser River

50 m deep

50-60 m deep

45-50 m deep

Page 5: ANNACIS WATER SPPLY TNNL PROJECT Project Overvie...WATER ANNACIS WATER SPPLY TNNL PROJECT Proposed Greenspace After construction of the new Annacis Water Supply Tunnel, the north shaft

WATER

ANNACIS WATER SUPPLY TUNNEL PROJECT

Fraser River

T

SKYTRAINCCCCCCaCaCCaCCCaaCarrrrrnnnr

ara vovn SSS

aaCarnrnrnrrarv

onnnnn SSSS

rvrrvvvovotttt

CCCoCoooCoCoCoCoClll

CCoCCoCoCoCo uuummmmmlulummbmmmbbbbbbbbbbbbbiiiiiaaaaa

SSSSiaiaiaiaa

SSSStttttttSSttttttt

FrFrFrFrFrFrFF oooFrFr nontttFrFrFr nnooo tttt Stttt SSSSSStttttttt

QuuQuQuQuQQQQQQuuQQ ayaayayayayayayyyyQQQQ yyyyyyyyssidedededededee DDDDDDDDDDrrrrrry edee DDDDDrryyssssyyQQQQQQQQ yyyyyQuayyaysis ddiiidddiiiddd DDDDDDDDDr

tttttttthh

SShhhhh

SSSSh

TeTeenntntntntntTeTeTT

ttttttthhh

SShthhh

SSSS

levevevvvvvvvvvvenenenenenenenneenenennntttt

llevevevvvvenenenennene ttt

QQQQQQQQQuQueeenn

AAAAAss

QQuQueeensnsnsns

AAAAAee

AAAAAAAAveveveveveveveAveeAveveee

OOnOOnOnnttatatataaririiritatataririririooooiiooooooo

SSSSiiioo oo SSSSSttttttt

QQQQQQQQQQQuQuQuuQuuQQuuQuuuuebebbeeebeeuubebebbebbbbbbbbbbeeeccccccc SSSSSbbbbbbecececcc SSSSStttttttStttttAAAAAAAAAAAAAAAAAAAAAAAuAuAuAuAuAuAA

kccckcckckkAAAA

ckckkkkkkkkkllllllalalalan

dndndndndndnddndnddddlan

dndnddndddd SSSSSSSddddddd SSSSSStttSStttttt

TTTTThThTTTTTTThThThThhhhhhhhhhhhiiiirrdrrddrrrrrddddddddddirrirddddddddd

AAAAAAAAAAAAAAAdddddd AAAAAAAAAAAAAvvveeAvAvAAvAvvAvAeeeeeee

AvAvAvAvAvAveeeeeFoFoooFoFooouuuuuFoFouuurrrttrrttrrthhhhhhhhhhh

AAAAAAhhh AAveveAAAAAAAAAAAvvvevveeeevAAAvvve

yyyyyyyyyyyy

SStS ewewewwewewwwwwararaaaa dsdsdssonononononononon WWWWWWWWWWWWWWWaaaa

Sttewewarardsdssonononon WWWWWWS yyayaaaayayaaaWWo WWWWW

dStStStewwwewewewe aa ddStStStewewewewaa ddSS

TR

tttttttthh

SSSSthhhh

SSSS2tttt

1211111211

tttttttthh

SSSthhhh

SSSttttt8t88t

tttttttttthhhhhhhh

SSSSSShhh

SSSxtiiixtxtxxtxxxxxxtxttxxxtxx

SSiS

oooooooyyyyyyoooyyyRRRoRoRooyyyyyayayayayaaa

lll l l AvAvAvAvAvAvv

yaallll AA

vAvAvevvveeee

RoooooRoRoRoyayayayayayayayalllll

yayl A

vAvAvAvAAvAAAvAvee

tttttthhhhh

SShhhhh

SSSSS

eeeeeeevvvetntt

eeeennSeSeSeevevevevev ntnt

SSSSS

ttttttttttthhhhhhhhhhhh

SSSSSSSrrrrrrthththththt

SSSSuururururtttttttttuurururttt

FoFoooooooFFoFFoFoFo

AAAgAAAAgAgAAAAAAAAAggAgAgggAggAgAgAgAgAAnenenenenenenenenenenennennn

sss s s tStSSStStStStttS

AggAgAgAgAgneneneenenssssss SStStSSStttt

ttttttttttthhhhhhhh

SSSSSh

SS9t9t9tttttt99999

ttttt

LoLoLoLooooornneeeeeeSSS

LoLoLLorne ee ee SS

tttttteeeeee

SSSSieieieieiie

SSSSSiii

Knznzzzz

eeeenKeKeKeKeenznznznzi

KKKKKccKKccccM

cM

cM

cMMMMMM

gbbgbbbeieieieieeeieeeeeeeee

SSSSSSSttb

eeeieieieSSSSSSttt

bbbbbbbbbbbbbbbbii

BBegbgBeBegbgbBeBeBeeegggegg

QQuQuQuQuQQayaayayayaa

QQQQQQayyaya ssisisisisis

QuQuQuayyaya sisyyyssss dedededeeedededededeeedddedDDDDDDDrrrrr

yyydededeededde DDDDDrrr

yyddiiiidddddddddddiiiiiddddd

DDDDDDDDDDDDrrr

Carnarv

on StColum

bia St

Front St

Quayside Dr

Tenth St

Eleventh St

Queen

s Ave

Ontario St

Quebec StAuck

land St

Third

AveFourth

Ave

Stewardson Way12th St

8th St

Sixth St

Royal A

ve

Seventh St

Fourth St

Agnes St

9th St

Lorne St

McKenzie St

Begbie St

Quayside Dr

CITY OF NEW WESTMINSTER

EXIT SHAFT LOCATION

1031 Quebec Street

Tunnel Exit Shaft Site Location

ANNACIS WATER SUPPLY TUNNEL

Page 6: ANNACIS WATER SPPLY TNNL PROJECT Project Overvie...WATER ANNACIS WATER SPPLY TNNL PROJECT Proposed Greenspace After construction of the new Annacis Water Supply Tunnel, the north shaft

WATER

ANNACIS WATER SUPPLY TUNNEL PROJECT

Proposed GreenspaceAfter construction of the new Annacis Water Supply Tunnel, the north shaft site in New Westminster, located at 1031 Quebec Street, will become a greenspace area that residents can utilize. The intention of the space is to maximize greenspace in what will become a densely populated area in the New Westminster core and to add usable, functional space for residents.

Park edges include lush vegetation and seating.

On-site stormwater catchment and treatment.

Perspective view in the park.

Page 7: ANNACIS WATER SPPLY TNNL PROJECT Project Overvie...WATER ANNACIS WATER SPPLY TNNL PROJECT Proposed Greenspace After construction of the new Annacis Water Supply Tunnel, the north shaft

WATER

ANNACIS WATER SUPPLY TUNNEL PROJECT

Proposed Greenspace Plan

Future streetscaping on Auckland- Planting, Sidewalk & Parallel Parking

Tiered Seat Walls

Screen Planting

Access Hatch

Central Lawn

Long Bench

Bio-Swale & Trees

Primary Service Access

Secondary Service Access

Access Hatches (x4)

Stone Pavers

Stone Paver Channel

Page 8: ANNACIS WATER SPPLY TNNL PROJECT Project Overvie...WATER ANNACIS WATER SPPLY TNNL PROJECT Proposed Greenspace After construction of the new Annacis Water Supply Tunnel, the north shaft

Street angle view of the park (view from the north at Auckland and 11th Street, looking toward Quebec Street)

OVERVIEW OF THE PROPOSED GREENSPACE IN NEW WESTMINSTER

WATER

ANNACIS WATER SUPPLY TUNNEL PROJECT

Page 9: ANNACIS WATER SPPLY TNNL PROJECT Project Overvie...WATER ANNACIS WATER SPPLY TNNL PROJECT Proposed Greenspace After construction of the new Annacis Water Supply Tunnel, the north shaft

WATER

ANNACIS WATER SUPPLY TUNNEL PROJECT

Greenspace Design Principles

Beneficial SpeciesBirds, insects and pollinators will be supported and encouraged throughout the greenspace with the introduction of native plant species that provide food, forage and habitat.

Functional LandscapeThe greenspace will function as both a utility for the water network beneath its surface and an attractive magnet for the neighbourhood, drawing residents of all ages to the site to sit, stay and play.

Water & HydrologySituated upon the proposed water supply tunnel, water will form a foundation for the design of the greenspace, from its drainage and filtration in planted areas to the bio-swale that collects and temporarily stores it.

Page 10: ANNACIS WATER SPPLY TNNL PROJECT Project Overvie...WATER ANNACIS WATER SPPLY TNNL PROJECT Proposed Greenspace After construction of the new Annacis Water Supply Tunnel, the north shaft

WATER

ANNACIS WATER SUPPLY TUNNEL PROJECT

Potential Greenspace ElementsWould you like to see any of the following elements incorporated into the greenspace?Please place a sticky note on the element you would like to see in the greenspace.

LandscapingAdding shrub and perennial planting

and trees to the greenspace

Seating OptionsAdditional seating opportunities

for greenspace users

Historical EducationUsing images and facts to educate greenspace users

about the history of the water supply system and the City of New Westminster

Water Infrastructure Education

Detailing the extensive and intricate water supply system that provides our growing region with

clean, safe drinking water

Page 11: ANNACIS WATER SPPLY TNNL PROJECT Project Overvie...WATER ANNACIS WATER SPPLY TNNL PROJECT Proposed Greenspace After construction of the new Annacis Water Supply Tunnel, the north shaft

WATER

ANNACIS WATER SUPPLY TUNNEL PROJECT

Additional CommentsPlease provide us with any additional ideas or comments about what you would like to see in the greenspace.

Page 12: ANNACIS WATER SPPLY TNNL PROJECT Project Overvie...WATER ANNACIS WATER SPPLY TNNL PROJECT Proposed Greenspace After construction of the new Annacis Water Supply Tunnel, the north shaft

WATER

ANNACIS WATER SUPPLY TUNNEL PROJECT

Working with Our Partners and the CommunityMetro Vancouver is committed to working closely with its government partners, First Nations and local communities throughout the project. We will:

Send regular project updates to local residents and businesses notifying of any disruptions and be responsive to any concerns raised about project activities

Maintain a project website with up-to-date information

Provide a Community Liaison Officer to respond to queries and concerns during construction

To receive project updates and get information on upcoming opportunities to learn more about this project, please join our email database by signing up at the registration desk

Contacting Metro Vancouver

Community Liaison Officer: 604-432-6200 (Monday to Friday from 8 AM to 4:30 PM)

Email: [email protected] (Please include “Annacis Water Supply Tunnel” in the subject line)

Page 13: ANNACIS WATER SPPLY TNNL PROJECT Project Overvie...WATER ANNACIS WATER SPPLY TNNL PROJECT Proposed Greenspace After construction of the new Annacis Water Supply Tunnel, the north shaft

WATER

ANNACIS WATER SUPPLY TUNNEL PROJECT

Minimizing Construction ImpactsMetro Vancouver is committed to minimizing traffic and access impacts during construction of this essential water infrastructure project.

Noise: There will be some noise associated with the construction at the north shaft site. Crews will attempt, wherever practical, to reduce noise impacts to nearby residents and businesses. All work will comply with City of New Westminster bylaws or granted bylaw variances.

Parking: On-street parking will be maintained as much as possible; however there may be restrictions to street parking in the vicinity of the work zone during construction.

Pedestrians & Cyclists: Sidewalk access will generally be maintained during construction. Crosswalks, and occasionally one side of the sidewalk, may be closed intermittently during construction. Detour routes will be in place; please follow the direction of signage and traffic control personnel.

Trucks: Trucks will access the site using the designated truck routes to reduce traffic in the construction area.

Business Access: Access to businesses will be maintained during construction.