annexure. c. 132kv power transformer protection panel...

36
ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings:

Upload: others

Post on 23-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings:

  • This page left intentionally blank.

  • CONSULTANT

    NATIONAL ENGINEERING SERVICE PAKISTAN

    Power Transmission and Distribution Group Electrotechnical documents

    1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    D

    C

    B

    Site As Built

    Rev.

    NESPAK COMM.

    21.04.09

    11.09.08

    20.09.07

    Saqib

    SI

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA Ref.no.:132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-U7401-D

    A

    +R4

    =E13

    Sheet 1-

    1 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    A1Siemens PAK

    NTDC/WAPDA

    GAKKHAR 500/220/132kV Substation Project

    =E13+R4

    132kV Trafo. Protection Panel

    Cover sheet

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    7.3.1 SP2

    Last used: 25.06.09

    Archive: = / A / A / 1

    V1.0.0

    13.02.2007

    Site As Built

  • LEGEND

    1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    DateRemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA 132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7403

    B

    +R4

    =E13

    Sheet 1-

    1 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    AA1

    BB - I

    BB - II

    To 11kV Switchgear

    To Metering Panel

    132kV 2000A

    To Busbar Protection Panel

    From 11KV

    SIDE CT

    SYMBOL DESCRIPTION

    Siemens PAK

    Overview diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / B / AA / 1

    Last used: 25.06.09

    V1.0.0

    14.06.2004

    1600-800-400/1A

    3P Core 2

    0.2 Core 1

    200-100/1A

    200-100/1A

    200-100/1A

    -Q1

    Dyn 11

    10/13 MVA

    132/11.5 KV

    Core1

    Core2

    Core3

    Core4

    Power Trafo

    M

    -F1

    -T01

    -F2

    -T5

    -Q9

    P1

    -T1

    P2

    -Q0

    M

    -Q2

    0.2 15VA

    3

    200VA

    (Y Phase)

    10P20 60VA

    10P20 30VA

    10P20 30VA

    (E13 CVT)

    132kV / 110-110V

    3

    M

    TCS1

    -F87

    -F50

    87T

    50/51

    50N/51N

    TCS2

    50/51

    87T

    50N/51N

    M

    M

    Circuit Breaker

    Differential relay

    Surge Arrestor

    Power Transformer

    Current Transformer

    Voltage Transformer

    Motorized Earthing Switch

    Motorized Disconnector Switch

    Over Current & Earth Fault Relay

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Rev.

    NESPAK COMM.

    REV.

    11.09.08

    20.09.07

    06.07.07

    SI

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    AC Heating and Power Circuit

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7406-C

    S

    +R4

    =E13

    Sheet 1+

    2 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    D1Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / D / 1

    wiring H07-K 1,5 black,if not other wise specifed

    File name: 000127

    Last used: 25.06.09

    V1.0.0

    14.06.2004

    =E12

    +R3

    Line Protection Panel

    2-X100

    4

    NE-031

    1X3X4mm2

    1

    2

    1-X100

    3-X100

    230V AC

    2.5mm2

    Cubicle Illumination

    1

    I >

    2

    -F100

    /ZD1.1

    3A

    -S10121

    22/ZD1.1

    -H101

    X1

    X2

    /ZD1.1

    1/N/PE ~50Hz 230V

    -B101

    /ZD1.5

    -R101

    /ZD1.4

    -S200 12/ZD1.6

    Auto

    Manual

    L2

    23

    Cubicle Heating

    34

    -F102

    /ZD1.7

    N

    Lin

    1

    I >

    2L0

    2.5 sq.mm

    ELCB& Socket

    L

    -X50

    N

    PE

    /ZD1.3

    N

    E

    7-X100

    8-X100

    1

    I >

    2

    -F101

    /ZD1.1

    6A

    /RA3.2

    L

    DC Supply Supervision

    /RA3.2

    N

    2-X100

    4

    NE-032

    1X3X4mm2

    1

    2

    =E14

    +R3

    1-X100

    3

    Line Protection Panel

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Rev.

    NESPAK COMM.

    REV.

    11.09.08

    20.09.07

    06.07.07

    SI

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Maintenance Telephone

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7406-C

    S

    +R4

    =E13

    Sheet2-

    2 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    D2Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / D / 2

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    =E12

    +R3

    Line Protection Panel

    2-X200

    4

    E12-025

    1X4X2.5mm2

    1

    2

    1-X200

    3

    -X902

    /ZD1.5

    5

    6

    Telephone Socket

    2-X200

    4

    E14-024

    1X4X2.5mm2

    1

    2

    =E14

    +R3

    Line Protection Panel

    1-X200

    3

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    B

    A

    NESPAK COMM.

    REV.

    20.09.07

    06.07.07

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    DC Power Supply

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7407-B

    S

    +R4

    =E13

    Sheet 1-

    1 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    G1Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / G / 1

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    V1.0.0

    14.06.2004

    =E12

    +R3

    Line Protection Panel

    2-X110

    4

    2-X120

    4

    2-X130

    4

    NK-073

    1X3X4mm2

    2

    NK-074

    1X3X4mm2

    2

    NK-075

    1X3X4mm2

    2

    1-X110

    3

    1-X120

    3

    1-X130

    3

    2.5mm2

    2II > >

    431

    -F110

    /ZD1.3

    6A

    A1

    A2

    -K110

    /ZRA1.1

    INCOMING SUPPLY A

    1314

    23

    24

    2

    II > >

    431

    -F120

    /ZD1.3

    6A

    51

    52

    1-X140

    /NA2.2

    1L1+

    61

    62

    4/NA2.2

    1L1-

    INCOMING SUPPLY B

    1L+

    1L-

    2L+

    2L-

    3L+

    3L-

    2/NB2.2

    2L1+

    A1

    A2

    -K120

    /ZRA1.1

    5/NB2.2

    2L1-

    110V DC

    110V DC

    110V DC

    33L1+

    63L1-

    -K110

    71

    72

    /ZRA1.1

    -H1

    X1

    X2

    /ZD1.1

    ALARMS

    -K120

    71

    72

    /ZRA1.1

    2-X110

    4

    2-X120

    4

    2-X130

    4

    NK-076

    1X3X4mm2

    1

    2

    NK-077

    1X3X4mm2

    1

    2

    NK-078

    1X3X4mm2

    1

    2

    =E14

    +R3

    1-X110

    3

    1-X120

    3

    1-X130

    3

    Line Protection Panel

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    B

    A

    NESPAK COMM.

    REV.

    20.09.07

    06.07.07

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Lockout with Synch.

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7408-B

    S

    +R4

    =E13

    Sheet 1-

    1 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    MA1Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / MA / 1

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    =E13

    /MA4

    +S01

    Local Control Cubicle

    -F64

    13

    /ZND1.1

    -F63

    13

    /ZND1.1

    -F62

    13

    /ZND1.1

    -F61

    13

    /ZND1.1

    -F60

    13

    /ZND1.1

    1-X1

    1

    E13-026

    1X8X2.5mm2

    6-X52

    Lockout

    =E00

    /ME4

    +CP60

    -F65

    13

    /ZND1.1

    -F66

    13

    /ZND1.1

    -F67

    13

    /ZND1.1

    -F68

    13

    /ZND1.1

    -F69

    13

    /ZND1.1

    3

    1

    E13-025

    1X8X2.5mm2

    23-X2

    24

    2E13-025

    1X8X2.5mm2

    2

    2

    41 Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Site As Built

    NESPAK COMM.

    REV.

    21.04.09

    20.09.07

    06.07.07

    Saqib

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Transformer Differential Protection

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7409-C

    S

    +R4

    =E13

    Sheet 1+

    3 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    NA1

    11K

    V SWICHGEAR

    132KV CURRENT TRANSFORMER

    FROM CURRENT TRANSFORMER

    Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / NA / 1

    phase L1:Red, L2:Yellow, L3:Blue unless otherwise speifed wires are 4mm2

    Last used: 25.06.09

    =E13

    /SA1

    +S01

    =E..

    +S..

    132KV Local Control Cubicle

    200:100/1A

    -T1, core 2, 60 VA

    1-X612

    2

    3

    4

    ..-X..

    ..

    ..

    ..

    E13-917

    1X4X6mm2

    1

    2

    3

    4

    E13-918

    1X4X6mm2

    1

    2

    3

    4

    L1

    L2

    L3

    N

    L1

    L2

    L3

    N

    1-X600

    2

    3

    4

    5

    6

    7

    10-X600

    11

    12

    13

    14

    15

    16

    -X87

    /ZNA1.1

    21

    23

    25

    27

    1

    3

    5

    7

    2RMLG01

    Test block

    22

    24

    26

    28

    2

    4

    6

    8

    -F87

    /ZNA1.6

    Q1

    Q3

    Q5

    Q7

    R1

    R3

    R5

    R7

    7UT612

    Transformer Differential

    Protection Relay

    R2

    Q2

    Q4

    R4

    R6

    R8

    Q6

    Q8

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Site As Built

    NESPAK COMM.

    REV.

    21.04.09

    20.09.07

    06.07.07

    Saqib

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    DC Supply

    Transformer Differential Protection

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7409-C

    S

    +R4

    =E13

    Sheet2+

    3 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    NA2Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / NA / 2

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    /G1.41L1-

    /G1.41L1+

    -X87

    /ZNA1.1

    -F87

    /ZNA1.8

    -X87

    /ZNA1.1

    7UT612

    Transformer Differential

    Relay Power Supply

    13

    14

    F1

    F2

    1615

    /NA3.21L1-

    /NA3.21L1+

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Site As Built

    NESPAK COMM.

    REV.

    21.04.09

    20.09.07

    06.07.07

    Saqib

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Tripping Circuit

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7409-C

    S

    +R4

    =E13

    Sheet3-

    3 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    NA3Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / NA / 3

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    /NA2.41L1+

    /NA2.41L1-

    -X87

    /ZNA1.1

    -F87

    /ZNA1.8

    -X87

    /ZNA1.1

    7UT612

    Transformer Differential

    Protection Trip

    10

    9F11

    R4F10

    1211

    27

    28

    -F60

    /ZND1.1

    -F60A

    /ZND2.2

    da

    /RA1.11L1-

    /RA1.11L1+

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Site As Built

    NESPAK COMM.

    REV.

    21.04.09

    20.09.07

    06.07.07

    Saqib

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    O/C & E/F Protection

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7410-C

    S

    +R4

    =E13

    Sheet 1+

    3 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    NB1

    132KV CTs

    CORE 3

    Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / NB / 1

    phase L1:Red, L2:Yellow, L3:Blue unless otherwise speifed wires are 4mm2

    Last used: 25.06.09

    =E13

    /SA2

    +S01

    200-100/1A 60VA

    1-X613

    2

    3

    4

    E13-925

    1X4X6mm2

    1

    2

    3

    4

    L1

    L2

    L3

    N

    1-X601

    2

    3

    4

    5

    6

    7

    -X50A

    /ZNA1.1

    21

    23

    25

    27

    2RMLG01

    Test block

    22

    24

    26

    28

    -F50

    /ZNA1.1

    Q8.

    Q6.

    Q4.

    Q2.

    7SJ602

    O/C & E/F

    Protection Relay

    Q7

    Q5

    Q3

    Q1

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Site As Built

    NESPAK COMM.

    REV.

    21.04.09

    20.09.07

    06.07.07

    Saqib

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    DC SUPPLY

    O/C & E/F Protection

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7410-C

    S

    +R4

    =E13

    Sheet2+

    3 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    NB2Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / NB / 2

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    /G1.52L1-

    /G1.42L1+

    -X50A

    /ZNA1.1

    -F50

    /ZNA1.3

    -X50A

    /ZNA1.1

    O/C & E/F Relay

    Power Supply

    13

    14

    F1

    F2

    1615

    /NB3.22L1-

    /NB3.22L1+

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Site As Built

    NESPAK COMM.

    REV.

    21.04.09

    20.09.07

    06.07.07

    Saqib

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Tripping Circuit

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7410-C

    S

    +R4

    =E13

    Sheet3-

    3 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    NB3Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / NB / 3

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    /NB2.42L1+

    /NB2.42L1-

    -X50A

    /ZNA1.1

    -F50

    /ZNA1.3

    -X50A

    /ZNA1.1

    7SJ602

    O/C & E/F

    Protection Trip

    43

    F8

    R3

    F9

    65

    27

    28

    -F61

    /ZND1.1

    -F61A

    /ZND2.2

    da

    /NC1.22L1+

    /NC1.22L1- S

    ite As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Rev.

    NESPAK COMM.

    REV.

    11.09.08

    20.09.07

    06.07.07

    SI

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Tripping Circuit

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7411-C

    S

    +R4

    =E13

    Sheet 1+

    2 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    NC1Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / NC / 1

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    /NB3.42L1+

    /NB3.42L1-

    =E..

    +R..

    11KV Switchgear

    11KV Side

    Tripping

    +P8

    10-X1

    1

    E13-027

    1X8X2.5mm2

    ..-X..

    ..

    2

    E13-027

    1X8X2.5mm2

    6-X1

    27

    28

    -F62

    /ZND1.1

    -F62A

    /ZND2.1

    da

    /NC2.12L1+

    /NC2.12L1-

    -F63A

    /ZND2.2

    da

    =E00

    /NB3

    +RP7

    132kV Busbar

    Protection Trip

    67-X1

    1

    E13-028

    1X4X2.5mm2

    7-X1

    27

    28

    -F63

    /ZND1.1

    83

    2

    8

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Rev.

    NESPAK COMM.

    REV.

    11.09.08

    20.09.07

    06.07.07

    SI

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Tripping Circuit

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7411-C

    S

    +R4

    =E13

    Sheet2-

    2 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    NC2Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / NC / 2

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    /NC1.42L1-

    /NC1.42L1+

    =Fan Control

    /M7

    Panel

    Transformer Fan Control Panel

    Buchholz

    Protection Trip

    11-X1

    1

    E13-029

    1X12X2.5mm2

    925-X4

    -F8

    926

    2

    E13-029

    1X12X2.5mm2

    13-X1

    27

    28

    -F64

    /ZND1.1

    -F64A

    /ZRA1.6

    21

    Pressure Relief

    Device Trip

    945

    946

    3

    14

    27

    28

    -F69

    /ZND1.1

    Oil Temperature

    Trip

    917

    -F6

    918

    4

    15

    27

    28

    -F65

    /ZND1.1

    -F65A

    /ZRA1.5

    21

    WindingTemperature

    Trip

    967

    -F7

    968

    5

    16

    27

    28

    -F66

    /ZND1.1

    -F66A

    /ZRA1.5

    21

    Tap Changer

    Protection Trip

    921

    -F9

    922

    6

    17

    27

    28

    -F67

    /ZND1.1

    -F67A

    /ZRA1.5

    21

    =Sergi

    /SH:9

    Fire Protection Panel

    Fire Fighting

    Trip

    12

    1

    E13-030

    1X18X2.5mm2

    801

    802

    2

    E13-030

    1X18X2.5mm2

    18

    27

    28

    -F68

    /ZND1.1

    723

    724

    -F68A

    /ZRA1.4

    21

    /RA2.12L1+

    /RA2.12L1-

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Rev.

    NESPAK COMM.

    REV.

    11.09.08

    20.09.07

    06.07.07

    SI

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Trip Circuit-1 Supervision

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7412-C

    S

    +R4

    =E13

    Sheet 1+

    2 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    ND1Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / ND / 1

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    =E13

    /MA2

    +S01

    3-X52

    26

    29

    30

    51

    E13-031

    1X8X2.5mm2

    1

    2

    3

    4

    5

    1-X2

    2

    3

    4

    5

    Transformer

    Differential

    Protection Trip

    -F60

    57

    /ZND1.1

    O/C & E/F

    Protection Trip

    -F61

    57

    /ZND1.1

    11KV

    Protection Trip

    -F62

    57

    /ZND1.1

    132KV Busbar

    Protection Trip

    -F63

    57

    /ZND1.1

    Buchholz

    Protection Trip

    -F64

    57

    /ZND1.1

    Pressure

    Releif Trip

    -F69

    57

    /ZND1.1

    Oil Temperature

    Protection Trip

    -F65

    57

    /ZND1.1

    Winding Temp.

    Protection Trip

    -F66

    57

    /ZND1.1

    -F67

    57

    /ZND1.1

    Tap Changer

    Protection Trip

    -F68

    57

    /ZND1.1

    Fire

    Protection Trip

    1

    1

    -R1A

    /ZND2.8

    2

    -R2A

    /ZND2.8

    2

    -F701

    /ZND2.2

    13

    14

    21

    22

    RL2

    RL3

    Trip Circuit 1

    Supervision Relay

    RL1

    27

    28

    1 -R3

    /ZND2.8

    2

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Rev.

    NESPAK COMM.

    REV.

    11.09.08

    20.09.07

    06.07.07

    SI

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Trip Circuit-2 Supervision

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7412-C

    S

    +R4

    =E13

    Sheet2-

    2 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    ND2Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / ND / 2

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    =E13

    /MA3

    +S01

    34-X52

    37

    40

    48

    58

    E13-032

    1X8X2.5mm2

    1

    2

    3

    4

    5

    8-X2

    9

    10

    11

    12

    Transformer

    Differential

    Protection Trip

    -F60

    68

    /ZND1.1

    O/C & E/F

    Protection Trip

    -F61

    68

    /ZND1.1

    11kV

    Protection Trip

    -F62

    68

    /ZND1.1

    132KV Busbar

    Protection Trip

    -F63

    68

    /ZND1.1

    Buchholz

    Protection Trip

    -F64

    68

    /ZND1.1

    Pressure

    Releif Trip

    -F69

    68

    /ZND1.1

    Oil Temperature

    Protection Trip

    -F65

    68

    /ZND1.1

    Winding Temp.

    Protection Trip

    -F66

    68

    /ZND1.1

    -F67

    68

    /ZND1.1

    Tap Changer

    Protection Trip

    -F68

    68

    /ZND1.1

    Fire

    Protection Trip

    1

    1

    -R4A

    /ZND2.8

    2

    -R5A

    /ZND2.8

    2

    -F702

    /ZND2.1

    13

    14

    21

    22

    RL2

    RL3

    Trip Circuit 2

    Supervision Relay

    RL1

    27

    28

    1 -R6

    /ZND2.8

    2

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    A REV. 06.07.07 ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    11KV Side Tripping

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7413-A

    S

    +R4

    =E13

    Sheet 1-

    1 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    NF1Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / NF / 1

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    =E..

    +S..

    11KV Switchgear

    17-X2

    3

    E13-027

    1X8X2.5mm2

    ..-X..

    Transformer

    Differential Trip

    -F60

    911/ZND1.1

    18-X2

    4

    ..

    O/C & E/F

    Trip

    -F61

    911/ZND1.1

    132kV Busbar

    Trip

    -F63

    911/ZND1.1

    Buchholz

    Trip

    -F64

    911/ZND1.1

    Pressure Releif

    Device Trip

    -F69

    911/ZND1.1

    Oil Temperature

    Trip

    -F65

    911/ZND1.1

    Winding Temperature

    Trip

    -F66

    911/ZND1.1

    -F67

    911/ZND1.1

    Tap Changer

    Trip

    Fire Protection

    Trip

    -F68

    911/ZND1.1

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    B

    A

    NESPAK COMM.

    REV.

    20.09.07

    06.07.07

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Tripping Annunciation

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7414-B

    S

    +R4

    =E13

    Sheet 1+

    3 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    RA1Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / RA / 1

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    /NA3.41L1+

    /NA3.41L1-

    110 VDC

    -F50

    /ZNA1.3

    -F81

    /ZRA1.7

    7SJ602

    F3

    R5F4

    21

    Protection

    Unhealthy

    -F87

    /ZNA1.8

    7UT612

    F3

    R5

    F4

    -F701

    /ZND2.3

    -F701A

    /ZND2.3

    Trip Circuit 1

    Faulty

    13

    da

    -F702

    /ZND2.4

    -F702A

    /ZND2.3

    Trip Circuit 2

    Faulty

    13

    da

    =E13

    /NA1

    +S01

    -F20

    /ZND2.1

    CB

    Tripped

    -F60

    10

    12

    /ZND1.1

    19-X2

    3

    E13-026

    1X8X2.5mm2

    1-X11

    2-X11

    4

    E13-026

    1X8X2.5mm2

    22-X2

    da

    -F61

    10

    12

    /ZND1.1

    -F62

    10

    12

    /ZND1.1

    -F63

    10

    12

    /ZND1.1

    -F64

    10

    12

    /ZND1.1

    -F65

    10

    12

    /ZND1.1

    -F66

    10

    12

    /ZND1.1

    -F67

    10

    12

    /ZND1.1

    -F68

    10

    12

    /ZND1.1

    -F69

    10

    12

    /ZND1.1

    DC Supply Supervision

    A1

    A2

    -K130

    /ZRA1.1

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    B

    A

    NESPAK COMM.

    REV.

    20.09.07

    06.07.07

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Annunciation Function

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7414-B

    S

    +R4

    =E13

    Sheet2+

    3 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    RA2Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / RA / 2

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    /NC2.72L1+

    /NC2.72L1-

    =Trafo. Aux.

    /M8

    Control Panel

    Transformer Auxiliary Control Panel

    -F82

    /ZRA1.7

    Buchholz

    Alarm

    20-X2

    1

    E13-033

    1X12X2.5mm2

    725-X7

    -K11

    726-X7

    2

    E13-033

    1X12X2.5mm2

    23-X2

    21

    -F83

    /ZRA1.6

    Oil Temperature

    Alarm

    717

    -K9

    718

    3

    24

    21

    -F84

    /ZRA1.6

    WindingTemperature

    Alarm

    721

    -K10

    722

    4

    25

    21

    -F85

    /ZRA1.6

    729

    -K12

    730

    5

    26

    21

    Oil Level Low

    Alarm

    21

    DC Supply Supervision

    A1

    A2

    -K140

    /ZRA1.1

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    B

    A

    NESPAK COMM.

    REV.

    20.09.07

    06.07.07

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    DC Supply Failure

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7414-B

    S

    +R4

    =E13

    Sheet3-

    3 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    RA3Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / RA / 3

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    /D1.6L

    /D1.6N

    230V AC, 50Hz

    DC Supply Failure

    -K110

    81

    82

    /ZRA1.1

    A1

    A2

    -K270.

    /ZRA1.1

    -K120

    81

    82

    /ZRA1.1

    -K130

    81

    82

    /ZRA1.1

    -K140

    81

    82

    /ZRA1.1

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    D

    C

    B

    Site As Built

    Rev.

    NESPAK COMM.

    21.04.09

    11.09.08

    20.09.07

    Saqib

    SI

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Annunciation Function

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7415-D

    S

    +R4

    =E13

    Sheet 1+

    7 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    RB1Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / RB / 1

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    =E13

    /RA3

    +CP51

    Remote Control Panel

    1-X9

    1

    E13-012

    1X18X2.5mm2

    17-X9

    Transformer

    Differential

    Protection Trip

    -F60

    13

    15

    /ZND1.1

    2

    2

    49

    O/C & E/F

    Protection Trip

    -F61

    13

    15

    /ZND1.1

    3

    3

    50

    Buchholz

    Trip

    -F64

    13

    15

    /ZND1.1

    4

    4

    51

    Oil Temperature

    Trip

    -F65

    13

    15

    /ZND1.1

    5

    5

    52

    Winding

    Temperature

    Trip

    -F66

    13

    15

    /ZND1.1

    6

    6

    53

    Tap Changer

    Trip

    -F67

    13

    15

    /ZND1.1

    7

    7

    54

    Fire Protection

    Trip

    -F68

    13

    15

    /ZND1.1

    8

    8

    55

    -F63A

    /ZND2.2

    10

    Busbar

    Protection

    11

    1

    9

    10

    57

    11KV Side

    Trip

    -F62

    13

    15

    /ZND1.1

    10

    9

    56

    -F20

    /ZND2.1

    10

    CB

    Tripped

    11

    1

    11

    12

    59

    Pressure relief

    Device Trip

    -F69

    13

    15

    /ZND1.1

    12

    11

    58

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    D

    C

    B

    Site As Built

    Rev.

    NESPAK COMM.

    21.04.09

    11.09.08

    20.09.07

    Saqib

    SI

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Annunciation Function

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7415-D

    S

    +R4

    =E13

    Sheet2+

    7 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    RB2Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / RB / 2

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    =E13

    /RA2

    +CP51

    Remote Control Panel

    13-X9

    1

    E13-011

    1X12X2.5mm2

    9-X9

    -F81

    /ZRA1.7

    11

    Device

    Unhealthy

    73

    14

    2

    37

    AC Supply

    Failure

    -F100

    11

    12

    /ZD1.1

    15

    5

    40

    -F101

    11

    12

    /ZD1.1

    -F102

    /ZD1.8

    11

    14

    12

    -F701A

    /ZND2.3

    10

    Trip Circuit Ckt. 1

    Faulty

    11

    116

    3

    38

    -F702A

    /ZND2.3

    10 11

    1

    17

    4

    39

    Trip Circuit Ckt. 2

    Faulty

    18

    1

    E13-017

    1X4X2.5mm2

    1-X10

    DC Supply

    Failure

    /RA4

    -K270.

    13

    14

    /ZRA1.1

    19

    2

    10

    20-X9

    3

    E13-017

    1X4X2.5mm2

    5-X10

    Sergi Box

    DC Supply

    Failure

    =Sergi

    11

    E13-030

    1X18X2.5mm2

    803

    11

    12

    804

    12

    E13-030

    1X18X2.5mm2

    21

    4

    16

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    D

    C

    B

    Site As Built

    Rev.

    NESPAK COMM.

    21.04.09

    11.09.08

    20.09.07

    Saqib

    SI

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Events Recorder

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7415-D

    S

    +R4

    =E13

    Sheet3+

    7 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    RB3Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / RB / 3

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    =Event

    +Recorder

    Events Recorder

    1-X10

    1

    E13-034

    1X27X2.5mm2

    2-X4

    2 3

    -F60A

    /ZND2.2

    10

    Transformer

    Differential

    Protection Trip

    11

    1

    4

    2

    47-X3

    -F61A

    /ZND2.2

    10

    O/C & E/F

    Protection Trip

    11

    1

    5

    3

    48

    -F63A

    /ZND2.2

    20

    Busbar

    Protection

    21

    2

    6

    4

    49

    -F20

    /ZND2.1

    20

    CB

    Tripped

    21

    2

    7

    5

    50

    -F81

    /ZRA1.7

    12

    Device

    Unhealthy

    84

    8

    6

    51

    -F62A

    /ZND2.1

    10

    11KV Side

    Trip

    11

    1

    9

    752

    -F701A

    /ZND2.3

    20

    21

    2

    11

    9

    53

    Trip Circuit-1

    Faulty

    -F702A

    /ZND2.3

    20

    21

    2

    12

    10

    54

    Trip Circuit-2

    Faulty

    27

    22

    3-X21

    DC Supply

    Failure

    -K270.

    43

    44

    /ZRA1.1

    10

    8

    403-X3

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    D

    C

    B

    Site As Built

    Rev.

    NESPAK COMM.

    21.04.09

    11.09.08

    20.09.07

    Saqib

    SI

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Events Recorder

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7415-D

    S

    +R4

    =E13

    Sheet4+

    7 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    RB4Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / RB / 4

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    =Event

    +Recorder

    Events Recorder

    14-X10

    11

    E13-034

    1X27X2.5mm2

    3-X4

    -F82

    /ZRA1.7

    11

    Buchholz

    Alarm

    73

    15

    12

    86-X3

    -F85

    /ZRA1.6

    11

    Oil Level

    Low Alarm

    73

    16

    13

    87

    -F83

    /ZRA1.6

    11

    Oil Temp. hi

    Alarm

    73

    17

    14

    88

    -F84

    /ZRA1.6

    11 7

    3

    18

    15

    89

    Winding

    Temperature

    High Alarm

    21

    164-X4

    -F64A

    /ZRA1.6

    11

    Buchholz

    Trip

    73

    22

    17

    90-X3

    -F65A

    /ZRA1.5

    11

    Oil Temperature

    Trip

    73

    23

    18

    91

    -F66A

    /ZRA1.5

    11

    Winding

    Temperature

    Trip

    73

    24

    19

    92

    -F67A

    /ZRA1.5

    11

    Tap Changer

    Protection Trip

    73

    25

    20

    93

    -F68A

    /ZRA1.4

    11

    Fire Protection

    System Trip

    73

    26

    21

    94

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    D

    C

    B

    Site As Built

    Rev.

    NESPAK COMM.

    21.04.09

    11.09.08

    20.09.07

    Saqib

    SI

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Fault Recorder Function

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7415-D

    S

    +R4

    =E13

    Sheet5+

    7 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    RB5Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / RB / 5

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    =E00

    +XE01

    Fault Recorder

    1-X11

    1

    E13-035

    1X18X2.5mm2

    18-X151

    2

    -F60A

    /ZND2.2

    20

    Transformer

    Differential

    Protection Trip

    21

    2

    3

    2

    4-X209

    -F61A

    /ZND2.2

    20

    O/C & E/F

    Protection Trip

    21

    2

    4

    3

    5

    -F20

    /ZND2.1

    30

    CB

    Tripped

    31

    3

    5

    4

    6

    Buchholz

    Trip

    -F64

    17

    19

    /ZND1.1

    6

    5

    7

    Oil Temperature

    Trip

    -F65

    17

    19

    /ZND1.1

    7

    6

    8

    Winding

    Temperature

    Trip

    -F66

    17

    19

    /ZND1.1

    8

    7

    9

    Tap Changer

    Protection Trip

    -F67

    17

    19

    /ZND1.1

    9

    8

    10

    Fire Protection

    System Trip

    -F68

    17

    19

    /ZND1.1

    10

    9

    11

    -F62A

    /ZND2.1

    20

    11KV Side

    Trip

    21

    2

    11

    10

    12

    -F63A

    /ZND2.2

    30

    Busbar Protection

    Trip

    31

    3

    12

    11

    13

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    D

    C

    B

    Site As Built

    Rev.

    NESPAK COMM.

    21.04.09

    11.09.08

    20.09.07

    Saqib

    SI

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Scada Function

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7415-D

    S

    +R4

    =E13

    Sheet6+

    7 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    RB6Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / RB / 6

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    =SCADA

    +PANEL

    1-X12

    1

    E13-036

    1X4X2.5mm2

    ..-X..

    Scada Interface Cubicle

    Transformer

    Differential

    Protection Trip

    -F60

    14

    16

    /ZND1.1

    2

    2

    ..

    O/C & E/F

    Protection Trip

    -F61

    14

    16

    /ZND1.1

    3

    Buchholz

    Trip

    -F64

    14

    16

    /ZND1.1

    4

    Oil Temp.

    High Trip

    -F65

    14

    16

    /ZND1.1

    5

    Winding

    Temperature

    High Trip

    -F66

    14

    16

    /ZND1.1

    6

    Tap Changer

    Trip

    -F67

    14

    16

    /ZND1.1

    7

    Fire Protection

    Trip

    -F68

    14

    16

    /ZND1.1

    8

    -F20

    /ZND2.1

    40

    CB

    Tripped

    41

    4

    9

    -F701A

    /ZND2.3

    30

    Trip Ckt. 1

    Faulty

    31

    3

    10

    -F702A

    /ZND2.3

    30

    Trip Ckt. 2

    Faulty

    31

    3

    11

    -F62A

    /ZND2.1

    30

    11KV Side

    Trip

    31

    3

    12

    -F63A

    /ZND2.2

    40

    Busbar

    Protection

    41

    4

    13

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    D

    C

    B

    Site As Built

    Rev.

    NESPAK COMM.

    21.04.09

    11.09.08

    20.09.07

    Saqib

    SI

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA

    Fire Protection Circuit

    132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7415-D

    S

    +R4

    =E13

    Sheet7-

    7 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    RB7Siemens PAK

    Circuit diagram

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / RB / 7

    wiring H07-K 1,5 black,if not other wise specifed

    Last used: 25.06.09

    =Sergi

    /SH:4

    1-X13

    3

    E13-030

    1X18X2.5mm2

    201-X

    Fire Protection Panel

    2

    Differential

    Trip

    -F60A

    /ZND2.230

    31

    3

    3

    4

    202

    4

    5

    203

    O/C & E/F

    Trip

    -F61A

    /ZND2.2

    30

    31

    3

    5

    6

    204

    6

    7

    205

    Tap Changer Protection

    Trip

    -F67A

    /ZRA1.5

    12 8

    4

    7

    8

    206

    8

    9

    207

    Buchholz

    Trip

    -F64A

    /ZRA1.6

    12 8

    4

    9

    10

    208

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    B

    A

    Rev.

    NESPAK COMM.

    11.09.08

    20.09.07

    SI

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA 132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7416-B

    S

    +R4

    =E13

    Sheet 1-

    1 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    ZD1Siemens PAK

    List of Device

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / ZD / 1

    Last used: 25.06.09

    V1.0.0

    14.06.2004

    -F100/D1.3

    /RB2.3

    -F101

    /D1.6

    /RB2.3

    -S101

    /D1.3

    -H101

    /D1.3

    -H1

    /G1.6

    X1

    X2

    1

    I >

    2

    1314

    23

    24

    21

    22

    11

    12

    -F110

    /G1.3

    -F120

    /G1.4

    -X50

    /D1.6

    1

    II > >

    342

    -R101

    23

    24

    23

    L N PE

    /D1.4

    11

    12 L.

    2

    -X

    .

    .

    -X902

    -B101

    /D2.5

    /D1.4

    -S200

    /D1.5

    /D1.4

    -F102

    N

    /D1.5

    Lin

    I >

    -S200

    34

    L0

    12

    N

    E

    11 1412

    /RB2.4

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    DateRemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA 132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7417

    S

    +R4

    =E13

    Sheet 1-

    1 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    ZNA1Siemens PAK

    List of Device

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / ZNA / 1

    File name: 000162

    Last used: 25.06.09

    -X87

    -X50A

    -F50

    2RMLG01

    /NB1.5

    /NB1.5

    /NB1.5

    /NB1.5

    Q8

    Q7

    7SJ602

    F14

    F15

    F17

    F18

    Binary inputs:

    BE1

    F9

    F8

    F11

    F10

    IL1

    BE2

    BE3

    R3

    R4

    F16

    Serial

    Interf. BOption

    Q6

    Q5IL2

    Q4

    Q3IL3

    Q2

    3I0Q1

    F1

    F2Power

    Supply

    L+

    L-

    Command/alarm 3

    Command/alarm 4

    F5

    Command/alarm 1

    F6

    F7

    R1

    R2Command/alarm 2

    Live contact

    F4

    F3R5

    12

    /NA1.4

    34

    /NA1.4

    /NB3.3

    56

    /NA1.4

    /NB3.3

    78

    /NA1.4

    910

    /NA3.3

    1112

    /NA3.3

    -F50

    1314

    /NA2.3

    /NB2.3

    /NB3.3

    /RA1.2

    /RA1.2

    /NB2.3

    1516

    /NA2.3

    /NB2.3

    1718

    1920

    21

    22

    /NA1.4

    /NB1.4

    23

    24

    /NA1.4

    /NB1.4

    25

    26

    /NA1.4

    /NB1.4

    -F87

    27

    28

    /NA1.4

    /NB1.4

    /NA1.5

    /NA1.5

    /NA1.5

    /NA1.5

    /NA1.5

    /NA1.5

    /NA1.5

    /NA1.5

    Q1

    Q2

    F14

    F15

    F16

    Binary inputs:

    BI1

    I1L1

    BI2

    Q3

    Q4I1L2

    Q5

    Q6I1L3

    Q7

    I7

    F17

    BI3

    F11

    F10

    F13

    F12

    R3

    R4

    Command/alarm 3

    Command/alarm 4

    7UT612

    C Option

    F18

    B Option

    A Option

    Serial Interfaces

    F1

    F2Power

    Supply

    L+

    L-

    Q8

    R1

    R2I2L1

    R3

    R4I2L2

    R5

    R6I2L3

    R7

    I8R8

    F5Live contact

    F3

    F4M1

    Command/alarm 1 F7

    F6R1

    Command/alarm 2 F9

    F8R2

    -F87

    /NA2.3

    /NA3.3

    /RA1.3

    /RA1.3

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Rev.

    NESPAK COMM.

    REV.

    11.09.08

    20.09.07

    06.07.07

    SI

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA 132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7418-C

    S

    +R4

    =E13

    Sheet 1+

    2 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    ZND1Siemens PAK

    List of Device

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / ZND / 1

    Last used: 25.06.09

    -F60/NA3.3

    /ND2.3

    /MA1.3

    /ND1.3

    /NF1.2

    /RA1.4

    /RB1.2

    /RB6.2

    -F61

    /NB3.3

    /ND2.3

    /MA1.3

    /ND1.3

    /NF1.3

    /RA1.5

    /RB1.3

    /RB6.3

    -F62

    /NC1.3

    /ND2.4

    /MA1.3

    /ND1.4

    /RA1.5

    /RB1.7

    -F63

    /NC1.5

    /ND2.4

    /MA1.3

    /ND1.4

    /NF1.3

    /RA1.5

    -F64

    /NC2.2

    /ND2.5

    /MA1.3

    /ND1.4

    /NF1.4

    /RA1.6

    /RB1.3

    /RB6.3

    /RB5.4

    -F65

    /NC2.3

    /ND2.5

    /MA1.5

    /ND1.5

    /NF1.5

    /RA1.6

    /RB1.4

    /RB6.4

    /RB5.5

    -F66

    /NC2.4

    /ND2.6

    /MA1.5

    /ND1.6

    /NF1.5

    /RA1.6

    /RB1.5

    /RB6.4

    /RB5.5

    -F67

    /NC2.5

    /ND2.6

    /MA1.5

    /ND1.6

    /NF1.6

    /RA1.7

    /RB1.5

    /RB6.5

    /RB5.6

    -F68

    /NC2.6

    /ND2.7

    /MA1.5

    /ND1.7

    /NF1.6

    /RA1.7

    /RB1.6

    /RB6.5

    /RB5.6

    -F69

    /NC2.3

    /ND2.5

    /MA1.5

    /ND1.5

    /NF1.4

    /RA1.7

    /RB1.8

    27

    28

    MVAJ25

    13

    24

    57

    68

    911

    10

    12

    13

    15

    14

    16

    17

    19

    21

    23

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    C

    B

    A

    Rev.

    NESPAK COMM.

    REV.

    11.09.08

    20.09.07

    06.07.07

    SI

    ASIF

    ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA 132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7418-C

    S

    +R4

    =E13

    Sheet2-

    2 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    ZND2Siemens PAK

    List of Device

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / ZND / 2

    Last used: 25.06.09

    -F702

    -F62A

    /ND2.8

    /ND2.8

    /ND2.8

    /ND2.8

    /ND2.8

    /ND2.8

    /NC1.3

    /RB3.5

    /RB5.7

    /RB6.7

    -F20

    -F701

    /RA1.4

    /RB1.7

    /RB3.4

    /RB5.3

    /RB6.6

    -F60A

    /ND1.8

    /ND1.8

    /ND1.8

    /ND1.8

    /ND1.8

    /ND1.8

    /NA3.3

    /RB3.2

    /RB5.2

    /RB7.2

    -F61A

    /NB3.3

    /RB3.3

    /RB5.3

    /RB7.3

    27

    28

    -F63A

    13

    14

    21

    22

    RL2

    RL3

    /NC1.4

    /RB1.6

    /RB3.3

    /RB5.8

    /RB6.8

    -F702A

    RL1

    /RA1.4

    /RB2.5

    /RB3.6

    /RB6.7

    -F701A

    /RA1.3

    /RB2.4

    /RB3.5

    /RB6.6

    1

    3

    2

    4

    5

    7

    -F701

    7PA26

    30

    331

    40

    441

    50

    551

    60

    661

    70

    771

    80

    881

    K1

    K1

    K1

    K1

    K1

    K1

    10

    111

    20

    221

    K1

    K1

    ad TripK1

    /RA1.3

    -F702

    /RA1.4

    -R1A

    -R2A

    -R3

    -R4A

    -R5A

    -R6

    23

    /ND1.7

    /ND1.7

    /ND1.8

    /ND2.7

    /ND2.7

    /ND2.8

    Site As Built

  • 1 2 3 4 5 6 7 8

    F

    E

    D

    C

    B

    A

    F

    E

    D

    C

    B

    A

    1 2 3 4 5 6 7 8

    Date

    Drawn

    Appr.

    Date

    A NESPAK COMM.20.09.07 ASIF

    RemarksRev.

    Yousuf

    Shaikh/Asif

    07.05.07

    Name Norm

    GAKKHAR 500/220/132kV Substation Project

    NTDC/WAPDA 132kV Trafo. Protection Panel

    A5071 (3)G76001-A5071-S7419-A

    S

    +R4

    =E13

    Sheet 1-

    1 Sh.

    CopyRight (C) Siemens AG 2007 All Rights Reserved

    Orig./Repl.f./Repl.by

    Ref.no.:

    ZRA1Siemens PAK

    List of Device

    7.3.1 SP2

    Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

    E13+R4(Rev_D)/

    E13+R4.pro

    Symbol library

    Symbol library

    Symbol library

    Symbol library

    1: 2:

    3:

    4:

    PTD60617

    H2_60617

    Translate file

    Translate file

    Translate file

    Translate file

    A:

    B:

    C:

    D:

    b-Feld_e.etr

    C_FB_E.etr

    ELCAD-Version

    Archive: = / S / ZRA / 1

    Last used: 25.06.09

    -K110

    /G1.3

    /G1.4

    /G1.4

    /G1.4

    /G1.4

    /G1.6

    /RA3.4

    -K120

    /G1.5

    /G1.6

    /RA3.5

    -K130

    /RA1.8

    /RA3.5

    -K140

    /RA2.5

    /RA3.6

    -K270.

    /RA3.4

    /RB3.7

    /RB2.6

    A1

    A2

    13

    14

    23

    24

    A1

    A2

    13

    14

    33

    34

    21

    22

    43

    44

    31

    32

    51

    52

    43

    44

    61

    62

    71

    72

    81

    82

    -F68A

    /NC2.7

    /RB4.8

    -F67A

    /NC2.6

    /RB4.7

    /RB7.4

    -F66A

    /NC2.5

    /RB4.7

    -F65A

    /NC2.4

    /RB4.6

    -F64A

    /NC2.2

    /RB4.6

    /RB7.6

    -F85

    /RA2.4

    /RB4.2

    -F84

    /RA2.3

    /RB4.3

    -F83

    /RA2.2

    /RB4.3

    -F82

    /RA2.2

    /RB4.2

    -F81

    /RA1.2

    /RB2.2

    /RB3.4

    7PA27

    13

    59

    14

    610

    K1

    K1

    11

    37

    12

    48

    K1

    K1

    12 TripK1

    Site As Built

  • This Page intentionally left blank.

    Sheet Management=AA1

    BAA1

    SD1 (AC Heating and Power Circuit)2 (Maintenance Telephone)

    G1 (DC Power Supply)

    MA1 (Lockout with Synch.)

    NA1 (Transformer Differential Protection)2 (Transformer Differential Protection)3 (Tripping Circuit)

    NB1 (O/C & E/F Protection)2 (O/C & E/F Protection)3 (Tripping Circuit)

    NC1 (Tripping Circuit)2 (Tripping Circuit)

    ND1 (Trip Circuit-1 Supervision)2 (Trip Circuit-2 Supervision)

    NF1 (11KV Side Tripping)

    RA1 (Tripping Annunciation)2 (Annunciation Function)3 (DC Supply Failure)

    RB1 (Annunciation Function)2 (Annunciation Function)3 (Events Recorder)4 (Events Recorder)5 (Fault Recorder Function)6 (Scada Function)7 (Fire Protection Circuit)

    ZD1

    ZNA1

    ZND12

    ZRA1

    155: 156: 225: 226: 300: 301: 311: 312: 323: 324: 335: 336: 347: 348: 358: 359: 369: 370: 381: 382: 392: 393: 403: 404: 415: 416: 426: 427: 438: 439: 449: 450: 461: 462: 473: 474: 484: 485: 495: 496: 507: 508: 518: 519: 529: 530: 540: 541: 551: 552: 562: 563: 573: 574: 585: 586: 597: 598: 609: 610: 620: 621: 632: 633: