ANNEXURE - I
SEC No. Page No. Clause No. Subject
1 1.4 225 Kick off meeting The kick off meeting shall necessarily be held within 15 days of
issue of Fax of Intent (FOI)/ Letter of Intent (LOI) / Letter of
Acceptance (LOA)
We request BCPL to consider a lead time of 4 weeks
for deployment of team
No change on Kick off meeting date. For other
change in this clause, please refer Amendment
2 1.9 226 Profile of Consulting Resources Functional Consultants We request to consider Graduation as basic
qualification for Functional consultants
Please refer Amendment
3 1.9 226 Profile of Consulting Resources Functional Consultants Pls validate the understandig that profiles submitted
at time of bid submission will be indicative profiles
however at time of implementation profile of similar
credentials will be deployed
Under exceptional circumstance alternate resource
of similar profile can be deployed at the time of
execution subject to fulfilment of tender conditions
4 1.9 227 Profile of Consulting Resources In the capacity of column against the field "Total Experience
Post Qualification" & "Total Experience SAP ERP Implementation
Experience"
Pls explain what is expected in this field Self explanatory
5 1.11 228 Detailing of Scope of Work The scope of Implementation Partner includes, but is not limited
to, the processes / functionalities mentioned in the tender
document
We request removal of clause" but not limited to" No change
6 1.13 231 Training Training the users and the mechanisms to ensure that all the
intended users can use the system effectively.
Pls validate the understanding that Train the trainer
approach is okay for training of end users
Train the trainer approach along with assistance to
the trainer as and when required.
7 1.13.1 235 Data Migration Services Migrating the data from the other systems/manual operations
to the ERP system will include identification of Data Migration
requirements, collection and migration of user data, collection
and migration of master data, closing or migration of open
transactions, collection and migration of documentary
information and migration of data from the legacy
applications/systems.
As industry best practices only Cutover data/ open
trasactions are migrated to new system. Request
BCPL to consider the same
Explained during pre-bid. No change.
8 1.13.1 235 Data Migration Services The data migration services will include development of
templates in consultation with BCPL for data conversion if
required as well as converting the data from physical form to
digital form wherever required.
Request BCPL to elbrate scope for data digitization,
volume of data to be digitized?
Explained during pre-bid. No change.
9 1.13.1 235 Data Migration Services Implementation Partner shall ensure complete data cleaning
and validation for all data migrated from the legacy systems to
the new application.
As per industry best practices data cleansing & data
validation has to be done by BCPL, Pls validate the
understanding
Primary responsibility of data cleansing and
validation is with BCPL, however IP will assist BCPL
for the same.
10 General Sizing Pls help us with concurrency that need to be
considered while doing sizing.
Explained during pre-bid. No change.
11 General Sizing Pls validate the understanding that sizing has to be
done for user licenses provided in RFP.
Explained during pre-bid. No change.
12 The bidder should be an OEM or
authorized representative of OEMs of
offered Servers, Storage, E-mail and
Virtualization Software. Bidder shall
submit authorization letter from OEMs of
all the above items, referring this tender
number.
Network & security OEM authorisation is also to be
considered as BEC , as it’s a significantly high valued
item , and needed to be OEM supported from the
time of MAF. Request to put MAF for all the major
items in the bid.
No Change
Bidding Document No. : BCPL/DIB/C&P/SER/20140122/MKB
Reply to the queries raised by the bidder’s during pre- bid meeting held on 20/08/2014.
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
13 The bidder should have successfully
executed at least one End-to-End SAP
ECC 6.0 implementation involving FICO,
MM, SD, QM, HR and India Payroll in
India in a single or maximum two orders.
The orders as well as completion date
should be within last 7 years from the
due date of submission of bid. Bidder
must submit copies of relevant work
order and its completion certificate
issued by the end user in support of
meeting the above experience. Copy of
completion certificate must indicate
reference no. of work order, work order
date, actual date of completion and
actual executed value of the order.
In case the above order is still under
support but Go-live has happened,
certificate from clients indicating Go-live
date of respective modules to be
furnished in addition to order copy.
BCPL to clarify if Functional upgrade projects can be
submitted.As there are no major difference in New
implementation or functional upgrade projects.Most
of the upcoming projects are Upgrade ones.
No
Only end-to-end SAP ECC 6.0 implementation will
be considered.
14 71 | P a g
e
In case any additional tools/equipment,
software, licenses, services, configuration
are required to achieve the overall
desired functionality, the same has to be
incorporated in the proposed solution by
the bidder without any additional cost to
BCPL.
BCPL to clarify as Microsoft System center is already
part of the bid.
Clarified during pre-bid. No Change
15 74 Bidder shall be responsible for supplying
the total solution to meet BCPL‟s
requirement. In this regard, all the
necessary tools, tackles, cables, H/w &
S/w, accessories etc. (including any item
not specified in BOM etc.) required to
complete the Scope of Work as per
tender document shall be provided by
the bidder at no extra cost of BCPL
BCPL has already mentioned BOM and Qty , Please
clarify .
Clarified during pre-bid. No Change
16 74 All data and power cabling with socket
and termination shall be in the scope of
the bidder.
BCPL has already mentioned BOM and Qty , Please
clarify .
Apart from the data center line items, other data
and power cabling with socket and termination to
achieve the overall requirement of the project shall
be in the scope of the bidder at no extra cost to
BCPL.
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
17 75 The SUPPLIER shall provide on-site
comprehensive warranty, DLP& support
valid for a period of 3 years from the date
of acceptance of the entire solution or
date of SAP-Go-live whichever is
later.The SUPPLIER shall be responsible
for trouble free operation of the entire
solution including data centre
equipment.
request to change it to Implementation of respective
milestone
No change
18 75 Bidder shall provide support services for
the supplied solution including all
Hardware & Software on 24 Hour basis
and shall deploy manpower for round the
clock monitoring, troubleshooting &
support of the supplied setup.
this is as per the man power requirment asked in the
tender, plz clarify .
Pl. refer Pg. 78 wherein it is indicated that "Bidder
shall provide additional resources, if required to
maintain the desired SLAs".
19 76 The comprehensive warranty shall also
include the battery of the UPS for the
warranty period. If the same needs to be
changed/replaced during the warranty
period, the same needs to be done
without any cost implication.
Request to exclude the battary from warranty No change
20 76 System Support Services To provide
maximum uptime and performance
levels of supplied solution including all
the Hardware & Software items at the
respective sites detailed in the
document, support jobs would include
the following:
this is as per the SLA asked, plz clarify Yes
21 96 Non-Performance Deductions (Service
Delivery) [NPD-1]:
BCPL to relook as these are very stringint , refer GAIL
penaty clause which has been modified recently .
Request to amend the same , refer page 115 for email
upgradation tender , refer page 102 in SAP hardware
upgrade tender released recently.
No Change
22 Non-Performance Deductions (Others)
[NPD-2]:
BCPL to relook as these are very stringint , refer GAIL
penaty clause which has been modified recently .
Request to amend the same , refer page 115 for email
upgradation tender , refer page 102 in SAP hardware
upgrade tender released recently.
No Change
23 III 229 1.12.1 Bidder's Organization (Bullet Point #5); Information regarding
Bidder‘s on-going and ―in pipeline‖ projects in the area of SAP
implementation in India. The Bidder shall mention specifically if
they have entered into any contract with their client(s), which
prohibits them from quoting for ECC 6.0 implementation in BCPL
and/or any other Oil / Gas Company in India. The Bidder shall
also specify if any of their affiliates / subsidiaries / partners / sub-
contractors have entered into such conditional contracts /
agreements as mentioned as above.
please clarify Clarified during pre-bid.
24 77 8 Could you please share location wise user details. Not required at this stage.
25 Please confirm if End user support is in scope / out of
scope
Explained during pre-bid. No change.
26 66 Mock drill Please confirm if Mock to be carried out for entire site
/ for specific applications?
Mock drill shall be as per the requirement of BCPL
which can be for entire site or for specific
applications.
27 NIT SAP 78 Bidder shall provide additional resources, if required to maintain
the desired SLAs.
Need clarity on down / uptime %. What do you mean
by additional resource.?
Self explanatory
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
28 79 Virus/Malware/Spyware Control Service Who will provide licenses? Licenses will be
provided by the bidder as per Tender conditions.
29 80 Database Management Service What all applications to be maintained apart from
SAP during 2 years?
Explained during pre-bid.
30 81 Tools Do you require any IT service desk tool? Any additional software/tool required to maintain
SLA will be provided by bidder at no extra cost to
BCPL.
31 82 VM Resource Monitoring and Sharing Service Who is the OEM? Ambiguous Query. No change
32 96 NPD Requesting you to pls make it maximum 10% instead
of 50%. Is the uptime 99.99%?
No change
33 Do you want us to configure any NMS tool for server
and Network equipment monitoring.
Any additional software/tool required to maintain
SLA will be provided by bidder at no extra cost to
BCPL.
34 Do you want us to provide realtime report / manual
report ( for server, network, DB, mail, SAP, security,
non IT devices etc)
Combination of Real-time and Manual Report as
available in respective system.
35 Third party Audit Please confirm if bidder can engauge a certified
auditor from wipro who is no deployed at site
Auditor has to be from third party only.
36 2.0, C 66 Scope of Work Non-SAP Database Please list down the Non-SAP Applications for which
the database need to be configured.
Intranet and other home grown / standard
application as developed / acquired by BCPL in
future
37 2.0, C 66 Scope of Work Non-SAP Database Please mention the specification required for each of
the database, that is no. of Cores for NON-SAP
Applications
Shall be finalized at the time of deployment as per
actual load.
38 2.0, C 66 Scope of Work Non-SAP Database Please mention the featurs & properties configuration
required for each of the non-SAP database.
As per RFP.
39 2.0, C 66 Scope of Work Non-SAP Database Any type of integaration is required between the
databases or application? If yes please share the
details such what fields needs to be integarted within
which of the applications?
Non-SAP database shall have integration with SAP
application to meet the functional requirement.
40 2.0, C 66 Scope of Work Non-SAP Database Any type of data migration is there in scope or not? If
yes please share the details such as size, location &
format of data.
Not required.
41 Virtualized
Environment/Se
rver & Storage
Setup
65 2 /B Bidder shall supply, install, test and commission Microsoft
System Center as per specification given in Annexure – A.
Share more Detail -Disk/Tape Backup/Restore of
Servers/VMs/Exchange etc.
-Disaster Recovery
As per RFP.
42 Active Directory
& E-mail setup
using
DNS/DHCP
services,
Intranet and
non-SAP
database
66 2/C Migration of existing e-mail setup (running on Exchange 2013
hosted on third party premises) is to be migrated to the new
system
Please Provide More Detail., Number of user,
Database Size and Mode of user access
Approximately 500 email users with mailbox quota
of 1 GB per user.
43 Active Directory
& E-mail setup
using
DNS/DHCP
services,
Intranet and
non-SAP
database
66 2/C Migration of existing e-mail setup (running on Exchange 2013
hosted on third party premises) is to be migrated to the new
system
Proposed Per/User MailBox Quota, and Arching
Quota (If any)
Shall be finalized at the time of deployment as per
actual requirement.
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
44 Active Directory
& E-mail setup
using
DNS/DHCP
services,
Intranet and
non-SAP
database
66 2/C Authentication of Intranet has to be made through AD. Provide more Detail - Is AD will
athenticated/Integrated with Third Part Appliacne?
Integration of AD with other supplied systems
wherever required.
45 Active Directory
& E-mail setup
using
DNS/DHCP
services,
Intranet and
non-SAP
database
66 2/C Is there any exiting Active Directory- Please share
Detail
No.
46 III 76 8.0 GUARANTEES, WARRANTEES & MAINTENANCE Is SAP application functional and
technical(Development) Support for FICO,SD,MM,HR
Modules are included in Scope of system support
services (apart from SAP Basis)?
This support is only up to 'post go-live &
stabilization period' of 6 months.
47 III 75 8.0 GUARANTEES, WARRANTEES & MAINTENANCE Is SAP application functional and
technical(Development) Support for FICO,SD,MM,HR
Modules are included in Scope of system support
services (apart from SAP Basis), please specify the
engagement period. Is it 2.5 years post completion of
Post Go-live and stabilization period?
This support is only up to 'post go-live &
stabilization period' of 6 months.
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
48 III 76 8.0 GUARANTEES, WARRANTEES & MAINTENANCE If SAP functional and development of scopefor
FICO,SD,MM,HR Modules(Apart from SAP Basis),
please confirm the service window of support.
Whether the support is limited to BCPL working hours
except for Severity-1 issues?
NA
49 III 77 8.0 GUARANTEES, WARRANTEES & MAINTENANCE If SAP functional and development of scopefor
FICO,SD,MM,HR Modules, please confirm the location
from where the support services is rendered.
Whether SAP functional support can be rendered
from offshore or onsite/offshore model? Will BPCL
provide necessary approvals and requirements for
remote access?
NA
50 III 96 8.0 GUARANTEES, WARRANTEES & MAINTENANCE If SAP functional and development of scopefor
FICO,SD,MM,HR Modules, please specify the SLAs.
NA
51 III 101 10.0 Training If SAP functional and development of scopefor
FICO,SD,MM,HR Modules, please specify the training
requirements during support period
NA
52 Annexure-F 232 1.13.1 - III Change control and Estimation If SAP functional and development of scopefor
FICO,SD,MM,HR Modules, please specify the change
control mechanism for new developments /
requirements, changes due to business growth
requirements. Can we propose the same?
NA
53 To be added Deemed Acceptance Any Deliverable(s) / Work Product(s) provided to the
Customer shall be deemed to have been accepted if
the customer puts such Deliverable(s) / Work
Product(s) to use in its business or does not
communicate its disapproval of such Deliverable(s) /
Work Product(s) together with reasons for such
disapproval within 10 days from the date of receipt of
such Deliverable(s) / Work Product(s).
No.
54 92 i SLA Refer RFP The SLA deductions mentioned are too high. Also the
overall penalty payable shall not exceed 5% of the
value of the contract
No change.
55 Annexure - A 125 A.8 Should support at least 50 concurrent users in cluster. We understand the license has to be provided for 50
concurrent users.
As per Tender
Specification says that "Each VPN appliance should
have SSL VPN feature with at least 50 nos. of
concurrent user licenses"
56 10 101 10 TRAINING : Module 5 Please clarify does the travel cost will also be
responsibility of bidder
No.
57 10 101 10 TRAINING : Module 5 Please clarify will training also include certification
and bidder has to quote for one time certification
cost.
No.
58 Annexure - A 115 A.3 (a) IPSec remote-access VPN concentrator services for up to five
hundreds of simultaneous remote software- or hardware-based
VPN clients
Request you to remove this specification as dedicated
hardware for SSL VPN has been asked as part of RFP.
Please refer Amendment
59 Annexure - A 118 A.4 (a) IPSec remote-access VPN concentrator services for up to five
hundreds of simultaneous remote software- or hardware-based
VPN clients
Request you to remove this specification as dedicated
hardware for SSL VPN has been asked as part of RFP.
Please refer Amendment
60 Annexure - A 115 A.3 (b) Option to Push VPN policy dynamically to VPN Remote-enabled
solutions upon connection, eliminating the need to manage
each client separately and therefore helping ensure
enforcement of the latest corporate VPN security policies
Request you to remove this specification as dedicated
hardware for SSL VPN has been asked as part of RFP.
Please refer Amendment
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
61 Annexure - A 118 A.4 (b) Option to Push VPN policy dynamically to VPN Remote-enabled
solutions upon connection, eliminating the need to manage
each client separately and therefore helping ensure
enforcement of the latest corporate VPN security policies
Request you to remove this specification as dedicated
hardware for SSL VPN has been asked as part of RFP.
Please refer Amendment
62 Annexure - A 115 A.3 External Firewall with IPS There is no refrence of having internal harddrive in
Firewall Appliance, requiret you to please add
following specification;
Appliance should have minimum 200 GB of internal
harddrive for storing appliance logs.
No change
63 Annexure - A 118 A.4 Internal Firewall with IPS There is no refrence of having internal harddrive in
Firewall Appliance, requiret you to please add
following specification;
Appliance should have minimum 200 GB of internal
harddrive for storing appliance logs.
No change
64 8 83 Third Party Audits Bidder has to carry-out third-party audit at least once in a year
during the Warranty period for various equipment such as
servers, storage, backup solution, network and security
equipment for Primary and DR site and carry out the compliance
of the audit recommendations. During the audit, penetration
testing from within BCPL network and outside BCPL network has
also to be carried out.
Does the audt scope include only security
requirements?
If so against which standard? ISO 27001?
As per RFP.
65 8 83 The bidder has to comply with the requirements of ISO
9001:2008 or ISO 27001 or other IT standards in BCPL Data
Center (primary and DR) as and when such standards are
adopted by BCPL.
Does the present scope include design/development
of process documentation wrt ISO 9001/ISO 27001?
What other standards are in scope?ISO 22301?ISO
20000?
Is separate proposal to be made for process design as
and when BCPL decides to adopt such standards?
As per RFP.
66 8 84 Third Party Audits Bidder has to carry out third-party power and environment audit
from authorized/expert agency at least once in every year
during the contract period for all Primary and DR locations. The
bidder shall comply with all the recommendations related to
audit reports like: Sulphur content, carbon content etc.
To which standard power and environment audit
should be done?
As per RFP.
67 8 84 Third Party Audits To be able to provide quality services for the Data Center jobs, it
is mandatory that the bidder must follow well-defined set of
processes and procedures.
Problem Management
Incident Management
Change Management
Availability Management
Performance Management
Capacity Management
Service Level Management
Configuration & Certification Management
Release Management
Security Management
Detection & Eradication Management
Inventory Management
Vendor Management
Software License Management
Process/procedure definition is prerequisite for
operational compliance.
Are there any other processes in scope for process
definition?
Are these processes/procedures need to be in
compliance with ISO 20000/ITIL?
As per RFP.
68 274 2.2 UPS NA Please clarify as per UPS specification it is calls for
conventional(Non Moduler) type UPS but as per BOQ it
calls for Moduler UPS. Kindly Confirm, bidder need to
quote as per BOQ or as per specification.
Please refer amendment
69 UPS MAKE Not Mentioned Request BCPL to include these makes:- Emerson, ABB,
Schneider, Eaton, Socomec
Request for addition Please refer amendment
70 PAC Make Not Mentioned Request BCPL to include these makes:-Emerson, Blue
box, Schneider, GEA, Stulz
Request for addition Please refer amendment
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
71 B.1
Virtualization
Servers
121 1 The server should have minimum two numbers of latest
generation multi-core 64-bit x86 processors. The processor
should be fully binary compatible to 32-bit applications. The
server should have minimum SPECInt2006_Rate Base
performance of 1200 or higher. (Bidder shall submit relevant
documentary proof i.e. SPECint2006_Rate Base results
published on www.spec.org)
It is recommended that latest generation E7 X-86
CPUs , should be asked for this kind of requirement
Intel E7 CPUs are the
latest and current
generation
processors . They are
best suitable for high
performance
workload and
virtualization. These
processors has better
scalability from CPU,
Memory and I/O
Bandwidth
standpoint.
No change
72 B.1
Virtualization
Servers
121 1 The server should have minimum two numbers of latest
generation multi-core 64-bit x86 processors. The processor
should be fully binary compatible to 32-bit applications. The
server should have minimum SPECInt2006_Rate Base
performance of 1200 or higher. (Bidder shall submit relevant
documentary proof i.e. SPECint2006_Rate Base results
published on www.spec.org)
We would request you to reduce the SPECint200-Base
Rate Performance to 900 from currently asked 1200.
This will allow for most of reputed Server vendors to
quote for equivalent products
No change
73 B.1
Virtualization
Servers
121 1 The server should have minimum two numbers of latest
generation multi-core 64-bit x86 processors. The processor
should be fully binary compatible to 32-bit applications. The
server should have minimum SPECInt2006_Rate Base
performance of 1200 or higher. (Bidder shall submit relevant
documentary proof i.e. SPECint2006_Rate Base results
published on www.spec.org)
Kindly Clarify on whether Dual Socket or Quad Socket
Servers need to be offered and accordingly, how
many CPU Slots need to be populated from dayone ?
Clarified during pre-bid. No change.
74 B.1
Virtualization
Servers
123 1 Internal DVD Drive Please allow for external DVD drive also to be offered
as an option. This will allow reputed Vendors like
Cisco to offer their Rack Servers
Query is not inline with RFP.
75 B.1
Virtualization
Servers
122 1 Integrated Hardware RAID Controller with Min. 64 MB cache
(capable of implementing RAID 0, 1).
Its is highly recommended to increase the Cache size
to minimum 1 GB for the RAID Controller
1 GB Cache is
recommended for
high perfromance
enterprise workloads
and would also
increase the
perfromance of
virtualized
environment
No change
76 B.2 Standalone
Servers
123 1 The server should have latest generation multi-core 64-bit x86
processors. The processor should be fully binary compatible to
32-bit applications. The server should have minimum
SPECInt2006_Rate Base performance of 200 or higher. (Bidder
shall submit relevant documentary proof i.e. SPECint2006_Rate
Base results published on www.spec.org)
Kindly Clarify on whether Dual Socket Servers need to
be offered with both CPU Slots populated from
dayone ?
Clarified during pre-bid. No change.
77 B.2 Standalone
Servers
125 1 Internal DVD Drive Please allow for external DVD drive also to be offered
as an option. This will allow reputed Vendors like
Cisco to offer their Rack Servers
Query is not inline with RFP.
78 B.2 Standalone
Servers
124 1 Integrated Hardware RAID Controller with Min. 64 MB cache
(capable of implementing RAID 0, 1).
Its is highly recommended to increase the Cache size
to minimum 1 GB for the RAID Controller
1 GB Cache is
recommended for
high perfromance
enterprise workloads
and would also
increase the
perfromance of
virtualized
environment
No change
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
79 B.4 SAN Switch 128 1 24 x 8 Gbps FC Ports Active Per Switch It is highly recommended that SAN Switch should be
able to support 16 Gbps FC Ports in future by just
upgrading the existing SAN Switch Hardware and not
by replacing it.
This would provide
Total Investement
Protection to BCPL
and help in create an
infrastructure that
can support any
future enhancement
in the technologies
without incurring
much cost
No change
80 B.4 SAN Switch 128 2 All Ports Should be auto-sensing 2, 4, 8 Gbit/sec Fibre Channel It ishighly recommened that SAN Switch should
support 10 Gbps FCOE Ports from day one so that in
future if required FCOE ports can be added on to the
same SAN Switch Hardware to make it part of FCOE
based Datacenter Architecture
FCOE is Fiber Channel
over Ethernet , which
is current Industry
Standard for
Converged
Architecture to run
LAN & SAN traffic on
Same cable, Port or
Card . FOCE based
deployment would
make overall
management simpler,
and help in reducing
cost by reducing
redundant devices
footprint in the
datacenter
No change
81 A 58 The External and Internal firewall has to be from two different
make.
Query is not clear.
82 VPN Appliance 119 Dual redundant power supply For smaller VPN gateway requriements dual power
supply shouldn’t be mandatory. (As you are already
looking for VPN cluster and reduduancy)
Query is not inline with RFP.
83 Email Gateway 133 & 134 At Primary site, SMTP Gateway appliances shall be configured in
Active-Active mode for load balancing. Any H/w or S/w (if
needed) to achieve this shall be provided by the bidder.
Provided SMTP-Gateway solution shall have redundant
components to ensure no single point of failure.
Using the MX record we can achieve Active/Active or
AS Failover. Why we need the same on Hardware
level ?
No change.
H/w or S/w for achieving Active-Active load
balancing of SMTP Gateway is not mandatory. It is
to be supplied if needed. If bidder choose to use
MX record for the same, they can do so.
84 Email Gateway 134 TEC / IPv6 Ready logo certified / EAL3 / NDPP1.1 certified Please consider FIPS and EAL 2 also in this List.
Furthermore "if applied for" should also be taken in
consideration as new appliances needs to get
recertified.
Query is not inline with RFP.
85
Anti-Spam
Features
134 5 The solution should support desktop plug-ins for popular email
clients and thus empower end users to take control of their
inboxes by specifying approved languages, personal lists of
allowed and blocked senders, and other settings.
Every OEM does this differnetly therefore desktop
plugin as OEM specific parameter should be removed.
Query is not inline with RFP.
86 Management 138 The Solution should support Incident & Event Management. Which type of Incidents and Event are we lloking at
here ?
It is security incident and event.
87 Capacity 141 At Primary site, Web Gateway appliances shall be configured in
Active-Active mode for load balancing. Any H/w or S/w (if
needed) to achieve this shall be provided by the bidder.
Provided Web-Gateway solution shall have redundant
components to ensure no single point of failure
AS/AA Failover can happen based on PAC file or
WCCP depedning on the way of deployment. Still do
we need to give extra loadbalancer to achieve the
same ?
No change.
H/w or S/w for achieving Active-Active load
balancing of Web Gateway is not mandatory. It is
to be supplied if needed. If bidder choose to use
any other method for the same, they can do so.
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
88 Capacity 141 TEC / IPv6 Ready logo certified / EAL3 / NDPP1.1 certified Please consider FIPS and EAL 2 also in this List.
Furthermore "if applied for" should also be taken in
consideration as new appliances needs to get
recertified.
Query is not inline with RFP.
89 Proxy Features 142 5 Proxy shall have protection from Denial- of-Service Attacks. DOS attack prevention is part of Firewall or IPS and
Web Secuity appliance wont be able to prevent the
same. Therefore this point should be ommitted.
Query is not inline with RFP.
90 Proxy Features 142 12 The solution should be capable of blocking access to malicious
websites based on comprehensive reputation scoring with no
database updates required
Without the database updates it will not block the
latest malware website based on reputation
therefore this cluase should be removed.
Query is not inline with RFP.
91 Proxy Features 143 25 Spyware cleanup by redirecting to spyware cleanup server This is a prorietary feature as Web Security appliance
can only block the spyware therefore this should be
ommitted.
Query is not inline with RFP.
92 Database
Granularity
144 4 The solution proposed should have specific categories for
bandwidth choking sites and malicious web sites.
Every OEM does that differently therefore it should
be site/Application.
Query is not inline with RFP.
93 Management
and
Administration
144 2 2. The solution proposed should support system alerts for
Notification regarding subscription status, Database activity, or
administrator lockouts, etc by Email, Popup Screen etc.
Popup Screen should be omitted as every OEM does
that using Email.
Query is not inline with RFP.
94 URL Filtering
Features
145 5 The solution should support Time based Quota policies for URL
categories, users, IP, networks, user groups etc.
It should be Time based Polcies /Time based quota as
most OEM's don’t support the same.
Query is not inline with RFP.
95 Protocol
Filtering
Features
146 1 The solution should have atleast 80+ protocols with atleast
protocol categories like Email, File Transfer, Bots, Instant
Messaging, Web 2.0, P2P, Proxy Avoidance, Multi Media
Streaming Protocols and remote access etc.
Every OEM calls protocols as Applications therefore it
should be protocols/Application.
Query is not inline with RFP.
96 Protocol
Filtering
Features
146 5 The remote filtering solution should be managed by the same
console for URL filtering solution
We don’t support remote filtering using the same GUI
interface therfore it should be omitted.
Query is not inline with RFP.
97 Logging 146 3 The solution proposed should support databases like MSDE,
SQL, Oracle, MySQL etc.
We don’t support multiple databases therefore this
clause should be ommitted.
Query is not inline with RFP.
98 A.1 103 Port Requirements Min 4 x Autosensing 10/100/1000 Gigabit Ethernet routed ports kindly specify the 4 GE ports (10/100/1000 Mbps),
should support WAN LINKS.
No change.
Already mentioned as routed ports and this should
support WAN link.
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
99 TEC / IPv6 Ready logo certified / EAL3 / NDPP1.1 certified should we read "/" that all should be available and
it’s not "or"
Query is not inline with RFP.
100 Power supply there is no mention of power supply. Kindly specify
redundant internal power supply ( as these are sap
datacenter router)
No Change
101 Should support IPSec VPN, SSH, OSPF, BGP, MPLS, routing
protocols and Licenses for these routing protocols for IPV4 &
IPV6 should be provided and protocols for IPV4 & IPV6 should be
available for use from day one.
please include open standard protocol EIGRP. No Change
102 A.5 115 L3 Switch IPv6 Ready logo certified kindly specify switch to be IPv6 ready logo to have
end to end ipv6 compliance.
Query is not inline with RFP.
103 uplinks are not mentioned suggets to have 2 *10 Gig uplinks or 4 * 1 gig uplinks. No Change
104 power supply please specify to have internal redundant power
supply.
No change
105 Min. 24,000 MAC Addresses Support kindly change to 16000 mac address. Query is not inline with RFP.
106 Routing RIP,BGP,Ospf, Igmp please include open standard protocol EIGRP. No change
107 please specify memory RAM AND FLASH both should be 64 Mb No change
108 A.6 l2 switch IPv6 Ready logo certified kindly specify switch to be IPv6 ready logo to have
end to end ipv6 compliance.
Query is not inline with RFP.
109 please specify memory RAM AND FLASH both should be 64 Mb No Change
Link Aggregators / Load-Balancers
110 A.2 108 1 Make/Model – F5 Networks / Citrix Systems / Radware /
Riverbed
Third party analysis agencies like Gartner ensures that
the proposed product is tested & recognized
worldwide in the respective domain area.
Hence we would request you to kindly consider the
GARTNER LEADER QUADRANT ADC OEM's only for
this critical component.
Suggested CLAUSE:
Make/Model – F5 Networks / Citrix Systems /
Radware
Please refer Amendment
111 A.2 108 1 Min. 6 No.s of 10/100/1000 Ethernet Ports Min. 8 No.s of 10/100/1000 Ethernet Ports No change
112 A.2 109 1 Min. 1 Gbps wire speed throughput Min. 1 Gbps wire speed throughput and scalable upto
4 Gbps
No change
113 A.2 108 1 New Clause request We recommended that Load Balancer vendor has TAC
suport center based out of INDIA only. This would
ensure that BCPL would be getting best of the class
support directly from the OEM's/ vendors locally also.
SUPPORT: The OEM should have DIRECT OEM TAC
Support in INDIA & should have Indian presense for
more than a Decade.
No change
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
Reverse Proxy
114 A.7 122 1 Make/Model - Cisco / Blue coat Sytems / McAfee / Websense /
Zscaler / Symantec / Barracuda Networks / F5 Networks / Citrix
Systems / Radware/Riverbed/ A10 Networks
Third party analysis agencies like Gartner ensures that
the proposed product is tested & recognized
worldwide in the respective domain area.
We would request you to kindly consider the
GARTNER LEADER QUADRANT ADC OEM's only for
this critical component.
Suggested CLAUSE:
Make/Model - Cisco / Blue coat Sytems / McAfee /
Websense / Zscaler / Symantec / Barracuda
Networks / F5 Networks / Citrix Systems / Radware
Please refer amendment
115 A.7 122 1 Should have minimum 6 x Copper Gigabit Ethernet Ports Should have minimum 8 x Copper Gigabit Ethernet
Ports
No change
116 A.7 122 1 Should provide minimum 1 Gbps throughput Should provide minimum 1 Gbps throughput and
scalable upto 5 Gbps
No change
117 A.7 122 1 New Clause request We recommended that Load Balancer vendor has TAC
suport center based out of INDIA only. This would
ensure that BCPL would be getting best of the class
support directly from the OEM's/ vendors locally also.
SUPPORT: The OEM should have DIRECT OEM TAC
Support in INDIA & should have Indian presense for
more than a Decade.
No change
Annexure F 214 1.3 Implementation Project Location Project team will function in combination of off-shore
and on-site model.
No change.
Annexure F 214 1.4 Completion Period Kick-off meeting will be held within 15days of signing
of Contract.
No change on Kick off meeting date. For other
change in this clause, please refer Amendment
NIT_SAP_20140
122
225 1.4 1.4 Completion Period Go-Live stabilization support period of 26 weeks from
the date of Go-live- whether it is part of System
Support Services & Facility Management.
No, 'Post Go-Live & stablization support' is not the
part of Facility Management Support. 'Post Go-Live
& stabilization support period' of 26 weeks shall
comence from the date of Go-live. 'Facility
Management Support period' of 3 years shall also
comence from the date of Go-live.
The implementation period is 52 weeks from the date of kick off
meeting and Post Go-Live stabilization support period of 26
weeks from the date of Go-live. The kick off meeting shall
necessarily be held within 15 days of issue of Fax of Intent (FOI)/
Letter of Intent (LOI) / Letter of Acceptance (LOA). The Key
deliverables mentioned under Annexure-01 shall also be
considered for project completion and application of PRS.
NIT_SAP_20140
122
99 9.0 PAYMENT TERMS For (Sub Total A + Sub Total B + Sub Total C + Sub Total D) of SOR
[ SP01 ]
Request to release :
HW • 70% payment will be made after delivery of all the items at
respective site(s)
• 100% payment will be made after delivery of all the
items at respective site(s)
• 20% payment will be made after successful Installation and
Commissioning of all hardware and software at primary and DR
site (other than SAP Implementation) & acceptance at site(s) by
BCPL.
• 10% payment will be made after adjustment of applicable LD,
if any, on successful operation of complete setup including SAP
production application for three months and completion of
documentation & training.
NIT_SAP_20140
122
99 9.0 PAYMENT TERMS For (Sub Total E) of SOR [ SP02 ] Can we propose to release the payment in three
equal instamment, during the Build - Acceptance
stage.
118
119 No change
120 No change
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
[ SP02 ] TOTAL FOR DATA CENTER: TOTAL
I + TOTAL II + TOTAL III + TOTAL IV +
TOTAL V + TOTAL VI + TOTAL VII + TOTAL
VIII
• 90% payment will be made after successful completion of data
centre construction, testing, commissioning & acceptance by
BCPL
• 10% payment will be made after adjustment of applicable LD,
if any, on successful operation for three months and completion
of documentation & training.
NIT_SAP_20140
122
99 9.0 PAYMENT TERMS For (Sub Total F) of SOR * PART –F of SP03+ Request to :
Implementation of SAP • 7% payment will be made after completion of ―Project
Preparation‖ Mile-Stone certified by BCPL
• 10% payment will be made after completion of
―Project Preparation‖ Mile-Stone certified by BCPL
• 30% payment will be made after completion of
―Business Blueprint‖ Mile-Stone certified by BCPL
• 18% payment will be made after completion of ―Business
Blueprint‖ Mile-Stone certified by BCPL
• 35% payment will be made after completion of
―Realization‖ Mile-Stone certified by BCPL
• 33% payment will be made after completion of ―Realization‖
Mile-Stone certified by BCPL
• 20% payment will be made after completion of
―Final Preparation and Go-live‖ Mile-Stone certified
by BCPL
• 16% payment will be made after completion of ―Final
Preparation and Go-live‖ Mile-Stone certified by BCPL
• 5% payment will be made after completion of
―Post Go-live Stabilization support‖ Mile-Stone
certified by BCPL
• 16% payment will be made after completion of ―Post Go-live
Stabilization support‖ Mile-Stone certified by BCPL
• 10% payment will be made after adjustment of applicable LD,
if any, on final sign-off and completion of documentation &
training.
NIT_SAP_20140
122
99 9.0 PAYMENT TERMS For (Sub Total G) of SOR *PART –G of SP03+ Can we propose to release the payment in Four equal
instamments, during the Instalation and
Commissioning stage - Acceptance stage.
Installation and Commissioning of HW • 90% payment will be made after successful Installation and
Commissioning of all hardware and software at primary and DR
site (other than SAP Implementation) & acceptance at site(s) by
BCPL
• 10% payment will be made after adjustment of applicable LD,
if any, on successful operation of complete setup including SAP
production application for three months and completion of
documentation & training.
NIT_SAP_20140
122
99 9.0 PAYMENT TERMS For (Sub Total H) of SOR [SP04] OEM AMC will be Yearly in Advance
System Support Services & Facility
Management
• Payment will be made on quarterly basis after completion of
each quarter and submission of invoice(s) in triplicate to BCPL‘s
Engineer-in-Charge after successful completion of services as
per scope of work considering various SLAs and terms and
conditions of the tender document and certification by BCPL
Engineer-in-Charge.
Facility Management Monthly in Arrears
• The detail of deductions towards non-compliance of the SLAs,
if any, shall be submitted accordingly by the party along with
quarterly invoice.
No change
123 No change
124 No change
122
125 No change
126 No change
127
121 No change
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
128 NIT_SAP_20140
122
92 l) SERVICE LEVEL AGREEMENT (SLAs) We submit that Penalty for SLA defaults; Aggregate of
all quarterly penalties will not exceed 5% of quarterly
managed services fees (excluding AMC charges).
No change
129 Non-SAP
Database
General
Query
Non-SAP database Please explain the role of non-SAP databases in the proposed
technology. What the applications, the non-SAP databases are
going to support? Are mission critical surround applications like
Manufacturing Execution System etc. would be supported by
the non-SAP database, like any other manufacturing
applications?
Provide detailed breakup Database shall be for Intranet and other home
grown / standard application as developed /
acquired by BCPL in future.
130 The RFP talks
about 2
database
systems, one
which underlies
the central ERP -
SAP, and the
other for the
surround
applications.
Although the
details of the
surround
applications are
not mentioned
in this ERP, from
our experience
as the prime
database
provider, for
both ERP and
non-ERP
applications in
manufacturing
sector, we have
observed that
there is a strong
requirement of
General
Query
No integration requirement between the
SAP and non-SAP databases mentioned
in the RFP
Since, from a practical viewpoint there would always be
integration between the non-ERP and ERP databases, would
BCPL provide some guidelines on this data integration, so that
the bidder r takes them in due consideration in formulating their
solution architecture and choosing the appropriate tools and
technologies
Minimal guideline on data integration between ERP
and non-ERP databases
There will be no direct database level integration
between SAP Database and Non-SAP Database.
131 Technology
Deployment
General Query6 standalone servers in DC and 6
standalone servers in DR
What is the role of 6 numbers of standalone servers proposed to
be procured both for DC and DR? What are the software
packages that BCPL intends to install in these standalone
servers. Please provide detailed breakup
Provide detailed breakup Shall be used for hosting applications in MZ and
DMZ which shall not run on virtualized
environment.
132 DR for Proposed
Setup
65 a. DR of SAP and non-SAP database has
to be configured using the native
application aware replication
methodology of the respective
applications.
b. The replication of all the Virtual
Machines are to be configured using
storage based replication. Any
software/utilities/ licenses required to
achieve the same, shall be provided by
the bidder.
The points a. and b. mentioned in the section seem to be self
contradictory. While in the point a., it is mentioned that
database need to use their native capabilities for replication
with the DR site, point b. at the same time that replication
needs to be a storage replication, which obviously cannot be
native to a database, neither can it be database aware.
Does BCPL here mean that,"the databases for SAP and non-SAP
has to be configured using the native application aware
replication methodology of the respective applications and the
non-database artifacts lying within the virtual machines are to
be replicated using storage base replication"?
Modify points a. and b. as "the databases for SAP and
non-SAP has to be configured using the native
application aware replication methodology of the
respective applications and the non-database
artifacts lying within the virtual machines are to be
replicated using storage base replication"
Both sort of replications are required as per RFP.
133 C.5 Database
for non-SAP
applications
140 Offered database is to be configured in a
virtual server having 6 cores which shall
be used as production server.
Please remove the figure "1", from the Qty column and modify it
to "in accordance with to the number of cores"
As mentioned in the left column Unit of measurement is Lumpsum (LS). Hence,
quantity is kept as 1.
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
134 Database for
non-SAP
applications
140 The offered database license shall be
server / processor / core based for
unlimited number of internal / external
named / concurrent users and for
unlimited data volume
What is expected to be the total number of application users
accessing the non-SAP database(s), in the next 3 years? From
the RFP's it seems that it would be accessed by a set of internal
users. In such limited user scenarios, it is beneficial for the
customers to go for user based licensing metric rather than
unlimited user, because it is cost effective without disturbing
the compliance
Request BCPL to evaluate, and if found suitable,
please change this clause to "The offered database
license shall be server / processor / core based or
user based ensuring that the license compliance is
maintained"
No change.
135 Virtualization
methodology
and tools
General Query Would BCPL accept any other virtualization technology except
VMWare/Hyper - V ?
Please provide clarification No.
136 Virtualization
methodology
and tools
General Query As explained in the email sent from Oracle(from
[email protected]) 13th July 2014. That email is attached
for your reference
Please allow OVM to quote also Already clarified during pre-tender meeting.
137 Section-III,
Annexure-A
108 A.2 Link Aggregators / Load-Balancers Make/model Request to include OEM “Array Networks” who is
consistently holding position among top 3 in IDC.
No change.
Section-III,
Annexure-A
109 A.2 Link Aggregators / Load-Balancers Min. 1 Gbps throughput 1) Load balancer throughput (1Gbps) is not in line
with firewall throughput (4 Gbps) and same will
impact application performance.
No change.
2) As per RFP, IPV6 is required from day one. With
reference to DOIT guidelines enabling IPv4 and IPV6
dual stack impacts device performance.
so we highly recommend minimum 4 gbps
throughput for best application performance.
139 Section-III,
Annexure-A
109 A.2 Link Aggregators / Load-Balancers IPv6 Ready logo certified by TEC (India) - Documentary proof to
be submitted.
IPv6 ready logo is certified by eight approved labs by
the forum and TEC is one of them. So we request to
read it as “IPv6 Ready logo certified by approved labs
- Documentary proof to be submitted”
Certification can be from any of the approved labs
subject to compliance of TEC Guideline.
Section-III,
Annexure-A
110 A.2 Link Aggregators / Load-Balancers DNS Support As per RFP page no 60, there is already external DNS
server in the scope. Adding DNS functionalities to
load balancer would add unnecessary cost to the
project. We request to delete the lines.
System should support operating as an authorative DNS server
in standalone as well as cluster/HA configuration.
System should support resolving External host names to internal
IP addresses, External (NAT) IP addresses.
System should support responding various DNS query types like
Host Record, A Record, MX record etc.
Should support Name to IP resolution based on load balancing
decisions (router health, load, traffic type, etc).
141 Section-III,
Annexure-A
122 A.7 Reverse Proxy Make/Model Request to include OEM “Array Networks” who is
consistently holding position among top 3 in IDC.
No change.
Section-III,
Annexure-A
122 A.7 Reverse Proxy As mentioned in RFP page no 66, Outlook Web Access
will be served using Reverse Proxy in DMZ. So only
one port is sufficient to connect Reverse proxy device
to DMZ zone. We suggest “minimum 2 Copper Gigabit
Ethernet Ports”
Should have minimum 6 x Copper Gigabit Ethernet Ports
Section-III,
Annexure-A
122 A.7 Reverse Proxy 1) Reverse Proxy throughput (1Gbps) is not in line
with firewall throughput (4 Gbps) and same will
impact application performance (OWA).
No change.
142
No change.
No change.
140
143
138
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
Should provide minimum 1 Gbps throughput 2) As per RFP, IPV6 is required from day one. With
reference to DOIT guidelines enabling IPv4 and IPV6
dual stack impacts device performance.
No change.
so we highly recommend minimum 4 Gbps
throughput for best application performance
No change.
Section-III,
Annexure-A
123 A.7 Reverse Proxy IPv6 ready logo is certified by eight approved labs by
the forum and TEC is one of them. So we request to
read it as “IPv6 Ready logo certified by approved labs
- Documentary proof to be submitted”
IPv6 Ready logo certified by TEC (India) - Documentary proof to
be submitted
145 Annexure - A 136 B5 Tape Library As per the requirement there is no redundancy
required at any level. Since it is a SAP environment
there should be redundancy at each level e.g.
Redundant power supply, Dual FC port LTO Drive &
Dual Robotics. Kindly confirm if any redundancy
required in Tape Library.
Please refer amendment.
146 Annexure - A 136 B5 Tape Library -
Offered Tape Library should provide at least 2 no. of 8 Gbps
native FC Connectivity to SAN Switches for SAN based backup.
As per the Tech specs, no. of port requirement is half
of the No. of LTO drive, which will reduce the
throughput/ Performance. It should be at least equal
to the no. of LTO drives or double the LTO drive (to
maintain the redundancy). Each LTO drive comes with
min. 1 FC ports and max. 2 FC ports for redundancy.
Kindly confirm on the no. of FC ports.
Please refer amendment.
147 Annexure-A 127 B1 Virtualization Servers The server should have minimum two numbers of latest
generation multi-core 64-bit x86 processors. The processor
should be fully binary compatible to 32-bit applications. The
server should have minimum SPECInt2006_Rate Base
performance of 1200 or higher. (Bidder shall submit relevant
documentary proof i.e. SPECint2006_Rate Base results
published on www.spec.org)
We would request you to reduce the SPECint200-Base
Rate Performance to 900 from currently asked 1200.
This will allow quoting servers from all OEMs listed in
the tender page#106.
No change.
148 Annexure-A 127 B1 Virtualization Servers The processor should be fully binary compatible to 32-bit
applications. The server should have minimum
SPECInt2006_Rate Base performance of 1200 or higher. (Bidder
shall submit relevant documentary proof i.e. SPECint2006_Rate
Base results published on www.spec.org)
The server should have minimum two numbers of latest
generation multi-core 64-bit x86 processors.
Kindly Clarify on whether Dual Socket or Quad Socket
Servers need to be offered and accordingly, how
many CPU Slots need to be populated from day one?
Clarified during pre-bid. No change.
149 Annexure-A 128 B1 Virtualization Servers Internal DVD Drive Please allow for external DVD drive also to be offered
as an option. This will allow quoting servers from all
OEMs listed in the tender page#106.
Query is not inline with RFP.
150 Annexure-A A.8 VPN Appliance Dual redundant power supply As tender is asking for VPN appliance in cluster, Dual
power supply is additional redundancy and will add to
the cost. Please remove.
Query is not inline with RFP.
151 Annexure-A 59,
114,117
A.3 & A.4 Internal and External Firewall The External and Internal firewall has to be from two different
make.
Request you to add more OEMs so that SI has more
choices. OEMs prohibit quoting competition’s product
and will charge very high rate.
No change.
152 Annexure-A 140 D1. Email Gateway At Primary site, SMTP Gateway appliances shall be configured in
Active-Active mode for load balancing. Any H/w or S/w (if
needed) to achieve this shall be provided by the bidder.
Provided SMTP-Gateway solution shall have redundant
components to ensure no single point of failure.
Using the MX record we can achieve Active/Active or
AS Failover. Why we need the same on Hardware
level?
No change.
H/w or S/w for achieving Active-Active load
balancing of SMTP Gateway is not mandatory. It is
to be supplied if needed. If bidder choose to use
MX record for the same, they can do so.
No Change.
Requirement is as per DOIT.
143
144
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
153 Annexure-A 146 D1. Email Gateway Management: The Solution should support Incident & Event
Management.
Which type of Incidents and Event are required here? It is security incident and event.
154 Annexure-A 148 D2. Web Gateway with Content-filtering At Primary site, Web Gateway appliances shall be configured in
Active-Active mode for load balancing. Any H/w or S/w (if
needed) to achieve this shall be provided by the bidder.
Provided Web-Gateway solution shall have redundant
components to ensure no single point of failure
AS/AA Failover can happen based on PAC file or
WCCP depending on the way of deployment. Still do
we need to give extra load balancer to achieve the
same?
No change.
H/w or S/w for achieving Active-Active load
balancing of Web Gateway is not mandatory. It is
to be supplied if needed. If bidder choose to use
any other method for the same, they can do so.
155 Annexure-A 153 D2. Web Gateway with Content-filtering URL Filtering Features: (5) The solution should support Time
based Quota
policies for URL categories, users, IP, networks, user groups etc.
It should be Time based Policies /Time based quota as
most OEM's don’t support the same.
Query is not inline with RFP.
156 Scope of Work 70 E. Construction of Data Centre Any additional equipment or higher configuration equipment
required to be installed for achieving desired performance shall
be in the scope of the bidder without any additional implication
to BCPL.
As construction of Data Centre is of Works type (civil,
electrical works, cabling, etc.), bidder should be
allowed to invoice on the basis of actual quantity of
works executed. It is not feasible to measure the
works quantity through few site visits.
No Change.
157 Scope of Work 70 E. Construction of Data Centre BCPL is requested to provide water supply and power
supply required to perform the task of constructing
Data Centre without any cost to the bidder.
Yes
158 Annexure-E 222 Data Centre Bill of Material Please provide preferred OEMs for each item. It is
required to benchmark quotes from bidders as
bidders can supply products from varied OEMs
(local/reputed).
PAC : Emerson / Uniflair / Stulz / blue star / Schneider
CAC : Blue Star / Carrier / Voltas / Godrej / LG
UPS : Emerson / Numeric / Eaton / Tritronics / Uniline
/ Microtec / Schneider
Battery : Amaraja / Exide / Rocket / Suntrac / Amco
BMS : Honeywell / Schneider / Siemens / Azbil /
Edwards / Maser / Jayfire / Sontay / Johnsons
Please refer amendment
159 Annexure-B 162 Location-wise Bill of Material Pl confirm that DR Centre (GAIL) has the free capacity
in the following infrastructure to host the Bill of
Material identified for DR:
- Racks
- UPS & batteries
- Power Back-up
- HVAC
- Internal LAN
- Building Management
- Workspace for support resources during DR
drill/Disaster situations.
Please confirm that bidder is not required to quote for
the above.
Data cabling has to be done by bidder at DR as per
actual site requirement.
160 Annexure-B 162 Location-wise Bill of Material Please confirm the availability of Power back-up from
DG at DC facility and isolation transformer at
incoming power line.
Not required.
161 Annexure-F 238 1.13.1 (XIII.) Support and Maintenance BCPL is requested to allow bidder to set up VPN
connectivity between DC/ DR to its premises to
provide remote and L2/L3 support.
Yes
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
162 SPO2 309 Internal Electrical Works Please share a copy of SLD mentioned. SLD to be designed by bidder and vetted by BCPL at
the time execution.
163 1.13.1 224 IX Data Migration Services Please provide the volume of Data to be migrated.
Request also indicate % of Data available in Systems
and Manual
Clarified during pre-bid.
164 1.1 214 1.3 Implementation Project Location Please confirm if the Implementation can be done in
an Onsite / offsite model
No change.
165 Ann. 04 243 Table Roles & Responsibilities Please indicate the number of End users (for Train the
Trainer) to be trained
Shall be decided at the time of execution.
166 Section-III,
Annexure-A
109 A.2 Link Aggregators / Load-Balancers Min. 1 Gbps throughput 1) Load balancer throughput (1Gbps) is not inline with
firewall throughput (4 Gbps) and same will impact
application performance.
No change.
167 176 4.2- E Redundant Operation of UPS: The units shall operate in load
sharing mode. The UPS systems will be synchronized for voltage
and frequency. Power from UPS should be fed to the racks. The
UPS systems will be on N+1 redundant mode. In case of failure
of one UPS the load will be transferred to the other one without
affecting or creating any disturbance to the load
2x60kva UPS required in N+1 redundancy i.e. TWO
UPS shall be in Parallel Load sharing mode with 50-
50% load sharing and in the event of failure of one
UPS other has to take 100% load and on rectification
of fault UPS then again both has to work in 50-50%
load sharing-
We are requesting
you Please consider
and clarify
accordingly
Both the UPS has to be configured in-parallel for
voltage and frequency synchronization, however
the outputs will be separately distributed to each
load as per electrical diagram to achieve load
sharing and no single point of failure. In case of
equipments having odd number of power supplies,
bidder has to provide rack mountable static
transfer switch for providing uninterrupted power
supply to such equipments with UPS level
redundancy. Please refer amendment.
168 174 4 Electrical: As schemetic drawing PDU-1 & PDU-2 Whether in PDU there are Isolation Transformers are
there or not. If yes what is the capacity of the
Transformer
Looking for
clarification
We have not asked for separate Isolation
Transformers.
169 174 1 & 4.1 4. Electrical: As schemetic drawing PDU-1 & PDU-2 # The UPS
system shall be in double-conversion mode ONLINE scalable UPS
configured in parallel. Each UPS unit shall have a unit rating of
(60 KVA)/ 60 KW and 6kva UPS for NON critical load
(Transformer-less non modular UPS)
If PDU do not have Isolation transformer then it is
must require to have ISOLATION TRANSFORMER at
OUT PUT of each UPS SYSTEM to protect the Neutral
Noise not to enter to the load. If Neutral noise enters
to Load then there will be trouble in proper operation
Load. Hence to Protect Neutral Noise UPS O/P should
have built-in ISOLATION TRANSFORMER.
We are requesting
you Please consider
and clarify
accordingly
Please refer amendment.
170 174 4.1 Input Frequency tolerance 35 – 70 Hz Input frequency window stated as 35HZ. to 70Hz. is
too high and never get elsewhere in Indian Electrical
Standard. So it may be a typographical error, hence
need to clarify. This may be 45Hz to 55Hz need
clarification
We are requesting
you Please consider
and clarify
accordingly
Please refer amendment.
171 Section-III,
Annexure-A
136 B.5 Tape Library Offered Tape Library should provide at least 2 no. of 8 Gbps
native FC Connectivity to SAN Switches for SAN based backup.
Do you meant to say that , out of the 4 drives in the
Tape Library , min 2 Drives should be allocated to the
SAN
Please refer amendment.
FOR Queries SL. NO. 172 - 185 REFER LAST TWO PAGES OF THE DOCUMENT
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
186 F8 35 PRESENT COMMITMENTS OF THE BIDDER PRESENT COMMITMENTS OF THE BIDDER Request BCPL to put a limit over here, like details of 5
on going projects
As per Tender Form F8
187 31.23 52 Suitable site office space may be
provided by BCPL if required and
available.
Suitable site office space may be provided by BCPL if required
and available.
Pls validate the understanding that suitable office
space & all required setup to execute the project will
be provided by BCPL
As per Tender clause 31.23 & 40 of SCC Part A.
188 Similarly, in case of Works Contract
(involving both supply of material and
services) Tax will be deducted at source
by BCPL towards W. C. Tax at the rate
applicable from time to time (presently
5%) and issue necessary certificate to this
effect.
As there is supply of product also involved, why WCT
is applicable ? Please calrify .
As per Tender
189 Taxes any change in any kind of tax to be borne by BCPL , as
it’s a long duration contract BCPL to consider the
request.
As per Tender. GCC clause no. 100
190 Entire responsibility along with custody
of the material at Primary site viz.
Lepetkata and at DR Site viz. Noida, UP
lies with the contractor.i.e. Storage,
transit insurance and safe custody of
material covered under SP01 and SP02
lies with contractor till complete handing
over of the same.
Request BCPL to take custody of material , Insurance
can be part of SI.
For SP01, The Material handed over to BCPL shall
be under custody of BCPL for Insurance purpose.
191 III 54 38.1 SUB LETTING OF WORK: No contractor shall sublet or assign any
work in part or whole to any firm, individual, partnership firm,
Pvt. Ltd., Company, Proprietorship firm etc without the prior
written permission of BCPL. In case the contractor sublets or
assigns the contract in part or whole without the prior written
permission of BCPL and any claim referred by any firm /
individual to BCPL stating that the main contractor has not paid
his or their dues/ payments, in that circumstances, BCPL shall
without assigning any reasons, withhold from the payments of
contractor, the amount equivalent to the claim amount of sub-
contractor/ individual/ vendor (s) etc. The same shall be
released to the contractor after contractor and labour/ supplier/
sub-contractor jointly submits a joint written settlement to
BCPL.
Request BCPL to state that SAP implementation sub
letting should not be allowed. The implementation
has to be carried out by the on roll core employees of
the successful bidder / SI / IP.
As per Tender. Clause 37 of GCC and 38.1 of SCC.
192 GCC 26 59 GENERAL CONDITIONS FOR CONSTRUCTION AND ERECTION
WORK
Kindly share the general shift timing. As per Tender. GCC Clause No. 59
193 To be added Limitation of Liability Notwithstanding anything to the contrary elsewhere
contained in this or any other contract between the
parties, neither party shall, in any event, be liable for
any indirect or speculative or consequential or penal
damages, including, but not limited to, any loss of
use, loss of data, business interruptions, and loss of
income or profits, irrespective of whether it had an
advance notice of the possibility of any such
damages. Neither party shall also be liable for any
third party claims, other than as expressly provided
elsewhere in this agreement.
Notwithstanding anything to the contrary elsewhere
contained, the total liability of either party under this
agreement, shall not, in any circumstances, exceed
the total value of the contract.
As per Tender. Clause No. 80.3 of GCC- Contract &
Clause No. 42 of GCC - Goods.
194 To be added Passing of Title The risk, title and ownership of the products shall be
transferred to the customer upon delivery of such
products to the customer site.
As per Tender
195 50 17 Abnormally High Rates Refer RFP Request deletion of this clause As per Tender
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
196 51 22 Termination oof Contract The Owner/ Engineer-in-Charge reserve the right to terminate
the contract on giving 30 days notice without assigning any
reason.
In the event of termination by owner, the Bidder shall
be paid for the:
1. goods delivered
2. services rendered
3. work in progress
4. unpaid AMCs
5. third party orders in pipeline which cannot be
cancelled despite Bidder's reasonable efforts
5. unrecovered investments shall be paid by customer
as per termination schedule
till the date of termination.
As per Tender
197 clause related to power , water wrt GCC to be removed As per Tender
198 24 39 Signing of Agreement 39.1 BCPL will award the Contract to the successful bidder, who,
within 15 days of receipt of the same, shall sign and return the
acceptance copy to BCPL. 39.2 The successful bidder shall be required
to execute an AGREEMENT in the proforma given in Instruction to
Bidder (ITB) F-16 of this standard bidding document on non-judicial
paper of appropriate value (the cost of stamp paper shall be borne by
the Contractor), within 15 days of the receipt by him of The
Notification of Acceptance of Tender. In the event of failure on the
part of the successful bidder to sign the AGREEMENT within the above
stipulated period, the Bid Security shall be forfeited and the
acceptance of the tender shall be considered as cancelled.
39.1 BCPL will award the Contract to the successful bidder,
who, within 15 days of receipt of the same, shall sign and
return the acceptance copy to BCPL. 39.2 The successful
bidder shall be required to execute an AGREEMENT in the
proforma given in Instruction to Bidder (ITB) F-16 of this
standard bidding document on non-judicial paper of
appropriate value (the cost of stamp paper shall be borne
by the Contractor), within 15 days of the receipt by him of
The Notification of Acceptance of Tender. In the event of
failure on the part of the successful bidder to sign the
AGREEMENT within the above stipulated period, the Bid
Security shall be forfeited and the acceptance of the
tender shall be considered as cancelled. Provided,
however, BCPL will not have the right to forfeit the Bid
Security if the failure to sign the Agreement is caused by
the failure of the Parties to mutually agree to terms and
conditions of the Agreement.
Request addition of
highlighted.
As per Tender Clause No. 39.
199 24 41 Corrupt or Fraudulent Practices As per Draft Future ineligibility cannot be for a period exceeding one
(01) year. The determination if the bidder has indulged in
any corrupt or fraudulent practices has to be done by court
of competent juridistion.
Request Addition As per Tender
200 51 22 Termination of Contract The Owner/ Engineer-in-Charge reserve the right to terminate the
contract on giving 30 days notice without assigning any reason. In the event of termination by owner, the Bidder shall
be paid for the:
1. goods delivered
2. services rendered
3. work in progress
4. unpaid AMCs
5. third party orders in pipeline which cannot be
cancelled despite Bidder's reasonable efforts
5. unrecovered investments shall be paid by customer
as per termination schedule
till the date of termination.
Request addition as a
clause
As per Tender
201 GCC for contract (for SP02_SP03_SP04)
202 13 6.1: Note Earnest Money ...The Earnest Money deposited by successful tenderer shall be
forfeited if the Contractor fails to furnish the requisite Contract
Performance Security as per clause 24 hereof and /or fails to start
work within a period of 15 days or fails to execute the AGREEMENT
within 15 days of the receipt by him of the Notification of Acceptance
of Tender.
...The Earnest Money deposited by successful tenderer
shall be forfeited if the Contractor fails to furnish the
requisite Contract Performance Security as per clause 24
hereof and /or fails to start work within a period of 15
days or fails to execute the AGREEMENT within 15 days of
the receipt by him of the Notification of Acceptance of
Tender, provided such failure to execute the Agreement is
not caused by the failure of the successful tenderer and
the Employer to agree to mutually acceptable terms and
conditions of the Agreement.
Request Addition As per Tender
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
203 14 12 Retired Government or Company Officers No Engineer of Gazetted rank or other Gazetted Officer employed in
Engineering or Administrative duties in an Engineering Department of
the States/ Central Government or of the EMPLOYER is allowed to
work as a CONTRACTOR for a period of two years after his retirement
from Government Service, or from the employment of the EMPLOYER
without the previous permission of the EMPLOYER. The CONTRACT, if
awarded, is liable to be cancelled if either the CONTRACTOR or any of
his employees is found at any time to be such a person, who has not
obtained the permission of the State/Central Government or of the
EMPLOYER as aforesaid before submission of tender, or engagement
in the CONTRACTOR'S service as the case may be.
Request to please delete this clause. There is no way we
can track and consequently comply with this requirement.
Request Deletion As per Tender
204 18 29 Failure by the Contractor to Comply with
the Provisions of the contract
As per Draft Request to substitute existing clause with:
Either Party shall have the right to terminate this
Agreement at any time in the event that the other party
commits a material breach of the Agreement and fails to
cure such default to the non-defaulting party’s reasonable
satisfaction within thirty (30) days. In the event of
termination Employer shall pay the Contractor for goods
delivered and services rendered till the effective date of
termination.
Request Modification As per GCC
205 19 30 Contractor Remains Liable to pay
Compensation If
As per Draft Request to please delete this clause. Payment upon
termination is covered under the clause proposed instead
of Clause 29.
Request Deletion As per GCC
206 20 32.3 Termination of Contract As per Draft Request to delete this as we cannot agree to be put on any
holiday list for performance breaches. Being blacklisted or
being put on any holiday llist is only permissible in the
event of the Contractor or any of its personnel indulging in
any corrupt or fraudulent practices.
Request Deletion As per GCC
207 20 33 Members of the Employer not Individually
Liable
As per Draft Request to please make this clause mutual. Request Modification As per GCC
208 21 38 Power of Entry As per Draft This clause to be deleted. If any of the grounds mentioned
under this clause arise, then the Employer in any case has
the right to terminate the contract and seek damages as
provided for under the termination clause proposed
above. This is not a civil works contract that we can grant
the Employer the right to enter any site.
Request Deletion As per GCC
209 31 76 Action and Compensation in case of Bad
Work
As per Draft Request to delete as this is too vague and we will not
agree to this.
Request Deletion As per GCC
210 31 77 Suspension of Works As per Draft We can only agree to give the Employer the right of
suspension if we continue to be paid during the period of
suspension.
Request Modification As per GCC
211 33 85 Indemnity As per Draft Request to please delete this clause as we cannot agree to
provide the remedy of indemnity for performnce related
breaches. Indemnity is a remedy which is granted only for
specific extraneous grounds such as breach of
confidentiality, gross negligence, etc.
Request Deletion As per GCC
212 40 104 Labour Laws As per Draft This clause needs discussion with the Customer as all of
these laws are not applicable to us as IT service providers.
Further, we will agree to comply with only those laws
which are applicable to us as IT service providers and no
more. Request to please modify the clause accordingly.
Request Modification As per GCC
213 42 108 Arbitration As per Draft Entire clause to be substituted by:
If any dispute between the Parties cannot be settled by
mutual discussions within the thirty (30) day period, either
party may refer the matter to a panel of three arbitrators.
Each party shall choose one arbitrator, both of whom shall
elect the third arbitrator who shall be the presiding
arbitrator. The arbitration proceedings shall be held under
the provisions of the Arbitration and Conciliation Act, 1996
or any of its subsequent amendments. The arbitration
proceedings shall be in English and the venue of
arbitration shall be Bangalore, India.
Request Modification As per GCC
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
GCC 17 24.1 The CONTRACTOR shall furnish to the EMPLOYER, within 15 days
from the date of notification of award, a security in the
We submit that that the security be submitted upon
execution of the contract. Hence we propose
modification of this clause as follows:- “The
CONTRACTOR shall furnish to the EMPLOYER, within
15 days from the date of execution of the contract, a
security in the
sum of… sum of…”
215
GCC 17 24.5 Failure of the successful bidder to comply with the requirements
of this Clause shall constitute sufficient grounds for the
annulment of the award and the forfeiture of bid security.
We submit that a notice mentioning a reasonable
opportunity for cure be provided prior to -
termination of the contract for any breach/delay in
performance of contract or invocation of security
GCC 22 39.1 - We are fine with the indemnity requirements in these
clauses.
We propose incorporation of the following additional
sentence with respect to indemnity obligations of the
Contractor:- “Upon receipt of a third party claim,
Employer will promptly inform the Contractor and
will require it to defend/settle the claim”
24 44.4
33-34 85
37-38
98.1
39
102.1.1-102.1.2
103.3
40
104.3
40
104.1
41
106
41 122.2
45
GCC 42 108 The decision of Employer on the appointment of the sole
arbitrator shall be final
We submit that the arbitrator shall be a person who
will be mutually discussed and agreed by the parties.
Hence, we propose replacement of this sentence with
the following
As per GCC
218
214
217
216 `As per GCC
As per GCC
As per GCC
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
and binding on the parties. “In the event the parties are unable to reach an
agreement on the sole arbitrator, the arbitrator will
be appointed under the provisions of the Arbitration
and Conciliation Act, 1996.”
GCC 36 92 PAYMENT OF CONTRACTOR'S BILL We submit incorporation of the following additional
sentence:- “Employment will pay an invoice within 30
days of the date of receipt of invoice”
As per GCC
GCC 18 29.1 …may take over the work remaining unfinished by the
CONTRACTOR and complete the same through a fresh
contractor or by other means, at the risk and cost of the
CONTRACTOR
We are fine with this clause. We submit that this
clause will not be invoked for minor/each delays but
for regular and material delays/non-performance. We
also submit that prior to invocation of this cause,
contractor will be provided an opportunity to remedy
the non-performance. Hence, we propose addition of
a new clause herein:-
As per GCC
“This clause will not be invoked for each or minor
delays and non-performance but material and
consistent delays. The contract will be given a written
notice and will be provided a reasonable opportunity
to cure the delay/non-performance prior to take over
of the unfinished work.”
As per GCC
…the PURCHASER shall have the option and be at liberty to take
the CONTRACT wholly or in part out of the SELLER’s hand and
make alternative arrangements to obtain the requirements and
completion of CONTRACT at the SELLER’s risk and cost and
recover from the SELLER,…
As per GCC
… PURCHASER/ shall have the option to take over the
EQUIPMENT and rectify, if possible, the EQUIPMENT to fulfill the
guarantees and/or to make necessary additions to make up the
deficiency at Seller’s risk and cost…
GCC Goods 12 14
GCC Goods
16 20.2.3
GCC Goods
25.1
223 18
218 As per GCC
As per Tender
219
220
221
222
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
224 GCC Goods 9-Oct 11.1 Patent Rights, Liability & Compliance of Regulations We are fine with this clause. We submit that for third
party branded products, the OEM
licensors/manufacturers directly provided IPR
indemnity to the customer. Hence, we propose
incorporation of the following sentence herein:- “For
third party branded products, the IPR indemnity
offered by the OEM licensor/manufacturer will be
passed on by the contractor to the Employer.”
GCC Goods 15 20 Guarantee We submit that the industry standard terminology is
“Warranty” and not Guarantee. Hence, we propose
replacement of the word ‘Guarantee’ with
‘Warranty’.
As per Tender
225 1 3 1.2.7 Last date and time for submission of bid. We feel that submission contains lot of third party
items and with holidays in between would request an
extension of submission by one month.
Extended to 23.09.2014
8.0 SERVICE TAX:
The Quoted rates should be inclusive of all taxes & duties
applicable during the contract period except Service Tax
and Education Cess thereon. Service Tax and Cess thereon shall
be paid extra if applicable on submission of documentary
evidence/invoice(s).
227 NIT_SAP_20140
122
47 9 SECURITY DEPOSIT: Security Deposit may be invoked in the event
successful bidder commits a material breach of the
contract and fails to cure the same within 30 days of
receipt of a written notice for cure.
As per Tender
228 NIT_SAP_20140
122
49 20 of RFP 20.0 SCHEDULE OF RATES: Since Tax and Tax rate being decided by the
Government of India or State Government, its not
HP's control; hence we will request you to modify the
language to "The prices quoted by the Vendor are
inclusive of currently applicable taxes , levies and
duties. In case of any variation (upward or downward)
in applicable taxes or government levies which are
deemed to have been included as part of the price, or
a new type of tax, duty or levy is introduced during
the term of the contract, the Vendor’s quoted price
will be increased or decreased by an amount
reflecting the changes".
As per Tender
23 Clause 43.2 of GCC 20.1 The rates quoted by the bidder shall remain firm for any
variation and will assume to be inclusive of all taxes & duties
excluding Service Tax &Cess thereon.
GCC for contract
(for
SP02_SP03_SP0
4)
229 As per Tender
Invoices / Bills in accordance with rule 4A of Service
Tax rules, 1994
Can we understood that invoice disclosure is
sufficient for documentary evidence.
847NIT_SAP_20140
122
226
As per Tender
SEC No. Page No. Clause No. Subject
Remarks BCPL's ReplyBidder's QuerySr. No. Reference of Bidding document
20.2 No escalation of whatsoever nature shall be paid to the
contractor for the entire Contract Period.
43.2 All charges on account of royalty. toilage, rent, octroi
terminal or sales tax and/or other duties or any other levy on
materials obtained for the work or temporary work or part
thereof (excluding materials provided by the EMPLOYER) shall
be borne by the CONTRACTOR.
GCC for contract
(for
SP02_SP03_SP0
4)
92.3 In general payment of final bill shall be made to
CONTRACTOR within 60 days of the submission of bill on joint
Can we request, within 30 days From Invoice date
36 GCC Clause 92.3 measurements, after completion of all the obligations under the
CONTRACT.
GCC SP01 19 26.1.1 26.1.1 Deductions shall apply as per following formula: In case of delay in delivery of equipment/materials or
delay in completion, total contract price shall be
reduced by 1/2% (Half percent) of the effected
equipment/materials price per complete week of
delay or part thereof subject to a maximum of 5%
(Five percent) of the total effected
equipment/materials price.
In case of delay in delivery of equipment/materials or delay in
completion, total contract price shall be reduced by 1/2% (Half
percent) of the total contract price per complete week of delay
or part thereof subject to a maximum of 5% (Five percent) of the
total contract price.
GCC for contract
(for
SP02_SP03_SP0
4)
17 27.1 Time is the essence of the CONTRACT. In case the
CONTRACTOR fails to complete the WORK within the stipulated
period,
Total Contract price shall be reduced by ½ % of the
total effected Price per complete week of delay or
part thereof subject
GCC Clause 27.1 then, unless such failure is due to Force Majeure as defined in
Clause 26 here above or due to EMPLOYER's defaults, the
to a maximum of 5 % of the effected Price, by way of
reduction in price for delay and not as penalty
Total Contract price shall be reduced by ½ % of the total
Contract Price per complete week of delay or part thereof
subject
to a maximum of 5 % of the Total Contract Price, by way of
reduction in price for delay and not as penalty. The said
amount will be recovered from amount due to the Contractor/
Contractor’s Contract Performance Security payable on
demand. The decision of the ENGINEER-IN-CHARGE in regard to
applicability of Price Reduction Schedule shall be final and
binding on the CONTRACTOR.
NIT_SAP_20140
122
8 12 12) OWNER‟S RIGHT TO VARY QUANTITIES AT THE TIME OF
AWARD:
Since we can quote the best Price, we need to have
Fixed Price wit Fixed Scope
As per Tender clause No. 12. Pg/08.
The OWNER reserves the right at the time of award of contract
to increase or decrease the quantity specified in the scope (in
respect of each item of scope), without any change in unit price
and other terms & conditions.
235 GCC for contract
(for
SP02_SP03_SP0
4)
19 30 CONTRACTOR REMAINS LIABLE TO PAY COMPENSATION IF We request you to have resonable Cure period for
this, before imposition of this clause
As per Tender.
234
229 As per Tender
230 As per Tender
231
As per Tender
232
As per Tender. Refer Pg. 74 clause no. 5 of SCC -
Part B for applicability of PRS.
As per Tender. Refer Pg. 74 clause no. 5 of SCC -
Part B for applicability of PRS.
233
Sl. N. Page No Clause Concern Points BCPL Response
172 Page 225 Lead time of 15 days only for deployment of team We would need a lead time of atleast 4 to 6 weeks No change
173 page 227
In the event of unsatisfactory performance of the resource deployed,
BCPL shall have the right to ask Implementation Partner to change
the resource at the earliest within a week‘s time.
We would need a lead time of atleast 4 to 6 weeks No change
174 page 228The scope of Implementation Partner includes, but is not limited to,
the processes / functionalities mentioned in the tender document;
Requested to remove word "not limited to" so that we have
clarity of scope
It is clarfiied that "but is not limited to"
means processes/functionalities to be
implemented for the modules/processes
as specified in scope fo work as per
requirement of BCPL..
175 page 231
The consultant shall take up all the issues including that of
implementation scope given by BCPL during this period.
Implementation partner shall facilitate BCPL in carrying out smooth
first financial year closing and two nos. of financial quarter closing
after go live. The implementation partner shall deploy / depute
sufficient manpower for the same at site for closing all the issues.
Need clarity on "All the issues", this should only cover issues
coming from scope of work only
It is clarified that "All the issues"
mentioned in the tender are related to the
issues pertaining to the scope of work.
176 page 232
Any need for activating any different modules of the SAP ERP over
the ones proposed by the Implementation Partner, required to meet
the functional requirements of BCPL listed in this Annexure, also is
not considered as a change as long as they are required for
implementing the processes detailed in this Annexure of the tender.
No clarity of scope
In case, any functionality / module needs
to be activated to meet the overall
functional scope of the tender, the same
has to be carried out by the bidder during
implementation.
177 Page 243 Interface with legacy applications/systems
Details of legacy applications not given-only 2 mentioned
however it is written in RFP that there will be more &
details of those will be provided during BBP phase.
During the implementation, if BCPL
requires any legacy system to be
interfaced, the same shall be carried out
by the bidder. Details of those will be
provided during BBP phase.
178 Page 242 Geographical Project Scope
Interface with GAIL's SAP environment, when BCPL doesn't
have PI/PO firstly not possible and secondly is too
cumbersome besides cannot be ascertained as GAIL's sales
is through TSW while BCPL hasn't factored IS-Oil at all; thus
this posses a serious delivery concern
The detail of places from where BCPL's
SAP system shall be accessed is listed at
"Geographical Project Scope". It is nothing
to do with TSW or IS - Oil and these
modules are not part of scope.
179 Page 244The scope of Biddr/IP includes, but is not limited to, detailing of
functional modules listed
Requested to remove word "not limited to" so that we have
clarity of scopealready clarifed
BCPL Deviations
180 page 246
Silo Management: Provides functionality for managing physical
inventories in tanks by creating tank dips in the R/3 System, and
comparing those inventories at any time with the book stocks. In
that way, gains and losses can always be determined, and goods
movements can be monitored.
Tank/Silo Management is part of IS-Oil and same is not part
of BCPL's licenses shared under Annexure 02, pg. 252 of RFP
Tank / Silo management functionality
from the available modules to be
configured or else to be developed
through customization to meet the
requirement.IS-OIL is not licensed by
BCPL.
181 Page 247
There are going to be legacy Applications/ Automation Systems
either to be fully or partially mapped with SAP. Interfaces (File/RFC)
will have to be developed in ECC itself without considering PI/XI, for
an application /functionality required but not mapped. Interfaces for
following legacy applications/systems are intended to be
developed:
o Material Codification
o Terminal Automation System (Liquid Hydrocarbons)
Details of legacy applications not given-only 2 mentioned
however it is written in RFP that there will be more &
details of those will be provided during BBP phase.
During the implementation, if BCPL
requires any legacy system to be
interfaced, the same shall be carried out
by the bidder. Details of those will be
provided during BBP phase.
182 Page 247
The above list of legacy applications/systems is not exhaustive and
the actual list of legacy applications/systems will be finalize at the
time of Business Blue Printing. ALL interfaces required,
intermediately/finally for the functionalities mentioned in the Bid
Document are in the IP scope of work. Any development effort,
other than in legacy system, required for achieving the interface shall
also be in the scope of Implementation partner.
Details of legacy applications not given-only 2 mentioned
however it is written in RFP that there will be more &
details of those will be provided during BBP phase.
During the implementation, if BCPL
requires any legacy system to be
interfaced, the same shall be carried out
by the bidder. Details of those will be
provided during BBP phase.
183 page 235
Implementation Partner shall ensure complete data cleaning and
validation for all data migrated from the legacy systems to the new
application.
Data cleansing & validation shuld be resposibility of BCPL
Primary responsibility of data cleansing
and validation is with BCPL, however IP
will assist BCPL for the same. Refer Pg.
255 of Tender
184 page 235
BCPL will not deploy any resources for data migration; the
Implementation Partner is expected to provide data migration
services during the implementation.
Would need BCPL to provide data in given templatesYes. BCPL will provide data in given
templates.
185 Page 81OS/Database upgrade / patch application as and when required by
BCPL.Can't be agreed on this. No change