Annexure -IDetails of Total Annual Procurement PlanzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA1 Target for FY 2017-18
• Nameof Project! Power Station: Baira Siul Power Station, Surangani
Period of Annual Procurement Plan 1 Target: 01/04/2017 to 31/03/2018
a) Procurement Of Goods
S.No Description of Goods Quantity UoMValue Rs.
Remarks.Iln INR I Lac~
1Purchase of Spares for Jyoti make HOrizontal Split Case
1 Lot Nos. 7.67 OEMCooling Water Pump.
2Purchase of Dew Point Sensing Probes for Baira Siul Power
1 Lot Nos. 3.08 OEMStation
3 Purchase of Stationary Items for Baira Siul Power Station 1 Lot Nos. 1.67 Non-OEM
4 Purchase of 2 X 500 KVA DG Set spares. 1 Lot Nos. 4.53 OEM
5 Purchase of Vertical Turbine Dewatering Pump (Jyoti Make) 1 Lot Nos. 9.05 Non-OEM
6 Purchase of HF Co-Axial Cable for PLCC System 1 Lot Nos. 0.91 Non-OEM
7 Purchase of Electrical Insulating Mats 1 Lot Nos. 1.68 Non-OEM
8Purchase of Stainless Steel (S. S) Items for Baira Siul Power
1 Lot Nos. 2.27 Non-OEMStation.
9Purchase of Spare Parts of Ingersoll Rand Make HP & LP
1 Lot Nos. 7.31 OEMCompressor
10 Purchase of Miscellaneous Electrical Items 1 Lot Nos. 5.22 Non-OEM
11 Purchase of Spares for 245 KV SFs Circuit Breakers 1 Lot Nos. 14.84 Non-OEM
12 Purchase of Transducers, Transmitters and Screen Cables. 1 Lot Nos. 5.35 Non-OEM
13Purchase of Induction Motor for Cooling System and
1 Lot Nos. 6.77 Non-OEMVentilation System
14 Purchase of GI and Copper Earth Strip 1 Lot Nos. 6.57 Non-OEM
15 Purchase of Spare Parts for HUSKY RTU 6049-E70 Panel 1 Lot Nos. 4.62 OEM
Supply, Installation, Testing and Commissioning of 110 KWp
16 (70KWp and 40 KWp), Roof top grid synchronized solar PV 1 Lot Nos. 97.42 Non-OEM
system along with accessories for Baira Siul Power Station.
17Purchase of Pipes and Accessories for pipeline at Tissa
1 Lot Nos. 1.76 Non-OEMColony
18 Purchase of Electric Operated Winch Machine 1 Lot Nos. 3.73 Non-OEM
19Purchase of Low Voltage (415 V) Air Circuit Breaker for Baira
1 Lot Nos. 18.52 Non-OEMSiul Power Station.
20 Purchase of Power Line Communication Carrier System 1 Lot Nos. 58.03 Non-OEM
21 Purchase of Khadder Clothe 1 Lot Nos. 3.17 Non-OEM
22 Purchase of Wire Slings 1 Lot Nos. 2.00 Non-OEM
23 Purchase of Welding & Grinding Materials 1 Lot Nos. 6.21 Non-OEM
24 Purchase of MCBs, MCCBs, Contactors and OLRs. 1 Lot Nos. 9.77 Non-OEM
25 End Suction Centifugal Pumps 1 Lot Nos. 2.00 Non-OEM
26 Gear Type mono Lube oil pumps 1 Lot Nos. 0.90 Non-OEM
27 Purchase of Turbine oil & Grease 1 Lot Nos. 17.00 OEM
28 Purchase of Electrical consumables and illumination items 1 Lot Nos. 10.00 Non-OEM
29 Purchase of Cables 1 Lot Nos. 5.00 Non-OEM
30 Purchase of DC Circuit Breaker 1 Lot Nos. 12.00 Non-OEM
31 Purchase of Bronze Bush 1 Lot Nos. 6.34 Non-OEM
~
a) Procurement Of Goods
S.No Description of Goods Quantity UoMValue Rs.
Remarks(in INRzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBAI LacslzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA
32 Purchaseof Hydrometer 1 Lot Nos. 2.00 Non-OEM
33Purchaseof Submersible Pump Set for Drainage and
1 Lot Nos. 39.38 Non-OEMDewatering
34 Purchaseof Field Discharge Resistance 1 Lot Nos. 303 OEM
35 Purchaseof Elevator under RMUworks 1 Lot Nos. 31.92 Non-OEM
36 Purchaseof Communication System under RMU works 1 Lot Nos. 82.34 Non-OEM
37 Purchaseof Security & Survillence System under RMUworks 1 Lot Nos. 77.50 Non-OEM
38 PurchaseofTATA Truck 1 Lot Nos. 25.00 Non-OEM
39 PurchaseofTATA Tipper 1 Lot Nos. 50.00 Non-OEM
40 Purchaseof Dozer 1 Lot Nos. 100.00 Non-OEM
41 Purchaseof JCB Loader 1 Lot Nos. 40.00 Non-OEM
42 Purchaseof BusBar Relay 1 Lot Nos. 22.00 Non-OEM
43 Purchaseof Computers 1 Lot Nos. 12.00 Non-OEM
[a) SubTotal Rs. (in INR I Lacs) 282.15
b) Procurement of Services
S.No. Description of Services Quantity UOMValue Rs.
Remarks(in INR I Lacs)
1 NIL --- --- ---
[b) Sub Total Rs.(in INR I Lacs) 0.00
Total (a)+(b) Rs.(in INR I Lacs)1 282.15
Note: Total Annual Procurement Value exdudes Civil Works and purchases made through Local Purchase Committee.
*In case of purchase from OEM I Non - OEM, kindly intimate the same in Remarks Column.
~Sr. Manager (Procurement)
(Signature of HOD I HOP)
Annexure· "Details of Total Annual Procurement PlanzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA1 Target for FYzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA2017·18 from MSEs
Nameof Project! Power Station: Baira Siul Power Station, Surangani
Period of Annual Procurement Plan 1 Target: 01/04/2017 to 31/03/2018
(a) Name of Goods to be PurchasedValue (In INRzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA1
SI.No. exclusively from MSEs out of 358 Qty UOMLacs)
Remarks If anyreserved Items
1Purchaseof SS & HT Fasteners for Baira
1 Lot Nos. 4.25 Non-OEMSiul Power Station.
2Purchaseof SS & HT Fasteners for Baira
1 Lot Nos. 7.01 Non-OEMSiul PowerStation.
3 Purchaseof Rubber items 1 Lot Nos. 6.22 Non-OEM
Sub-Total (a) 17.48
Annexure- III
(b) Name of Goods to be PurchasedValue (In INR I
SI.No. from MSEs for other than 358 reserved Qty UOMLacs)
Remarks If any
Items
Sub·Total (b) 0.00
Total (a+b) Rs.1 17.48
~,Sr. Manager (Procurement)