annual general meeting presentation for personal …2013/11/15 · annual general meeting...
TRANSCRIPT
Annual General Meeting Presentation Perth WA 15 November 2013
Bruce Kay Technical Director
For
per
sona
l use
onl
y
Slide 2
Company Objectives
Become a cash producing, dividend paying gold producer in 2-3 years
Considerably enhance value by successful exploration
Acquire assets with strong upside potential: the NQM and Normandy experience
Early cash flow is the priority
For
per
sona
l use
onl
y
Slide 3
Four Eagles: 2013 Summary
Hayanmi Gold Prospect extended to 2.6 kms long
Three prospects now defined with high grades (Hayanmi, Discovery and Boyd’s Dam)
Large gold footprint 6 kms by 2.5 kms with potential to extend
Gold is finely divided with good assay repeatability
2014 Objective: Angled drilling to define high grade gold deposit at shallow depth
For
per
sona
l use
onl
y
Slide 4
Virgin Gold Discovery with Excellent Infrastructure
Good road and rail access, power and water
Other gold plants available in district for early cash flow
Freehold land with no native title
Local workforce, no FIFO
Potential for both shallow open pit gold and large gold discoveries F
or p
erso
nal u
se o
nly
Slide 5
Non-Gold Projects
Four Eagles Gold Project
Minnie Springs • $1m of molybdenum exploration • Low grade molybdenum resource defined • Untested tungsten prospect (0.5 – 1% WO3) • Shallow uranium mineralisation (500ppm U) Everton
• Historic Molybdenum production 21,000 tonnes @ 1.4%MoS2
• Scattered molybdenum mineralisation in quarry
• Farm-out potential
For
per
sona
l use
onl
y
Slide 6
Bendigo / Ballarat Gold Zones
DPI predicts 32 Mozs
60 MozsProduction
Whitelaw Fault
Avoc
aFa
ult
Bambra
Fault
Moun
t Willi
amFa
ult
Governor Fault System
N. S. W.
V I C T O R I AFour Eagles Gold Project
Bendigo
NORTH0
kilometres
100
Bendigo - Ballarat Gold Zone
Total Gold Production
38º
36º
143º 145º
Ballarat
Stawell
MELBOURNE
Concealed by Murray Basin Sediments
> 10 million ounces> 1 million ounces> 300,000 ounces
60 million ounces produced2 Deposits > 10 million ounces5 deposits > 1 million ounces
DPI predicts 32 million ounces of gold under cover (source: Victorian Department of Primary Industries, Gold Undercover Initiative)
Historical Gold Production Bendigo-Ballarat Region
For
per
sona
l use
onl
y
Slide 7
Bendigo: a world-class gold target
BENDIGO
URBAN
AREA
His
ato
ricl
Prdo
uctio
n Z
one
Hustlers Line1.6mt @17.6g/t Au(918,000oz)
Garden Gully Line10.8mt @15.0g/t Au(5,203,000oz)
New Chum Line7.9mt @15.1g/t Au(3,850,000oz)
Deborah Line0.46mt @14.7g/t Au(217,000oz)
Sheepshead Line2.3mt @11.6g/t Au(852,000oz)
Nell Gwynne
Line
Napoleon Line
NORTH
0
kilometres
2
Bendigo Goldfield Historical Gold Production
from Lines of Lodes
18 million ounces of reef gold
4 million ounces of alluvial gold
Includes possibly 7 million ounces in top 200 metres
Large footprint (8kms x 3kms)
For
per
sona
l use
onl
y
Slide 8
North Bendigo Gold Belt
Major gold belt emerging north of Bendigo
Totally concealed by Murray Basin sediments
Whitelaw Fault controls gold
Catalyst has 25 kms of strike length
230,000mE 250,000mE 270,000mE 290,000mE
FostervilleGoldfield
BendigoGoldfield
5,960,000mN
5,920,000mN
5,940,000mN
5,980,000mN
Fosterville
Bendigo
EL4525
EL4525Raywood
Mitiamo
Tandarra Project
Whitelaw
Fault
Tandarra F
Four EaglesGold
Project
V I C T O R I A N S W
0
kilometres
20
NORTH
EL5295
Echuca
Rochester
Lockington
Sebastian
6,000,000mN
Pyramid
Catalyst / Providence JVUnity ELs
Gold deposit/occurrenceTown / cityMain RoadRailwayLimit of base-ment outcrop
Lion Gold /Navarre
Unity MLs
Navarre
Crocodile Gold
Timpetra
Exploration Licence Holding Companies
For
per
sona
l use
onl
y
Slide 9
What lies beneath the wheat fields?
0.4m @ 152.0g/t Au (FEDD008) 6.0m @ 82.7g/t Au (FE328) 1.0m @ 18.3g/t Au (FERC002) 3.0m @ 36.6g/t Au (FE415) 1.0m @ 17.5g/t Au (FEDD001) 3.0m @ 20.5g/t Au (FE592) 3.0m @ 9.1g/t Au (FE608)
For
per
sona
l use
onl
y
Slide 10
Four Eagles Gold Zones
Bendigo Pyramid Road
0
kilometre
1NORTH
Bendigo Pyramid Road
Whitelaw
Fault
Projected TandarraFault
242,000mE244,000mE 246,000mE
5,992,000mN
5,990,000mN
5,988,000mN
EAGLE 1 TARGET
EAGLE 2
EAGLE 4ZONE
EAGLE 3
E 5AGLETARGET
343
380
328D001
316 (3.85km north)
469
509584
623
619
D008
D007
446
326
648
626
649
Drillhole Intersections (>0.7g/t Au)FEDD001 3.7m @ 4.7g/t Au from 170m inc. 0.8m @ 17.5g/t Au from 173mFEDD007 0.4m @ 8.4g/t Au from 168m and 0.75m @ 15.3g/t Au from 170mFEDD008 0.4m @ 152g/t Au from 150mFERC002 2m @ 1.8g/t Au from 67m and 1m @ 18.3g/t Au from 127mFERC003 2m @ 6.2g/t Au from 49mFE326 1.5m @ 1.81g/t Au from 114mFE328 6m @ 82.7g/t Au from 123mFE343 3m @ 3.34g/t Au from 111mFE380 3m @ 9.71g/t Au from 120mFE399 3.0m @ 1.42g/t Au from 66mFE402 3.0m @ 0.8g/t Au from 90mFE415 6.0m @ 2.6g/t Au from 45m and 3.0m @ 36.6g/t Au from 57mFE469 3.0m @ 1.23g/t Au from 36mFE471 3.0m @ 5.96g/t Au from 75m and 3.0m @ 1.33g/t Au from 81mFE472 3.0m @ 1.2g/t Au from 45m and 3.0m @ 2.32g/t Au from 63mFE492 3.0m @ 1.2g/t Au from 75mFE509 3.0m @ 0.7g/t Au from 84mFE532 3.0m @ 2.1g/t Au from 96mFE535 3.0m @ 1.37g/t Au from 63mFE572A 3.0m @ 1.74g/t Au from 51mFE575 3.0m @ 4.9g/t Au from 66mFE578 3.0m @ 1.14g/t Au from 60mFE579 9.0m @ 2.33g/t Au from 48m and 3.0m @ 1.23g/t Au from 78mFE584 3.0m @ 0.88g/t Au from 117mFE591 3.0m @ 14.7g/t Au from 87mFE592 9.0m @ 7.9g/t Au from 87m incl. 3.0m @ 1.26g/t Au from 87m incl. 3.0m @ 20.5g/t Au from 90m and 3.0m @ 1.94g/t Au from 93mFE595 3.0m @ 2.33g/t Au from 126mFE606 3.0m @ 1.39g/t Au from 102mFE608 3.0m @ 9.1g/t Au from 108mFE619 3.0m @ 0.8g/t Au from 45mFE623 3.0m @ 0.83g/t Au from 33mFE626 1.5m @ 12.9g/t Au from 52.5mFE648 1.5m @ 1.0g/t Au from 82.5mFE649 4.5m @ 1.0g/t Au from 97.5m
Drillholes0.1 to 0.2 g/t Au0.2 to 0.5 g/t Au
0.5 to 1.0 g/t Au1.0 to 5.0 g/t Au> 5.0 g/t Au
Drillhole gradesAu ZoneAs Zone
Discovery
Boyd’s Dam
Hayanmi
471
402
399D005
595
608492
592591
R002472415
572A579
578
R003
575
For
per
sona
l use
onl
y
Slide 11
Hayanmi Trend
20m
30m40m50m
Cuneens Road
North Boundary Road
Yarrawalla East Road
244,000mE 245,000mE
5,991,000mN
5,990,000mN
5,992,000mN
Hayanmi Prospect
Eagle 2Zone
Eagle 2Zone
399 471592591
595492
608
326
452343
446440
623469
402
625626
648 649
HayanmiCross
Section
0
metres
500NORTH
Significant Drillhole Intersections (>0.5g/t Au)
Other IntersectionsFE326 1.5m @ 1.81g/t Au from 114mFE343 3.0m @ 3.43g/t Au from 111mFE446 3.0m @ 0.5g/t Au from 66m
Drillholes
LEGEND0.1 to 0.2 g/t Au0.2 to 0.5 g/t Au
< 20 metres20 - 30 metres30 - 40 metres40 - 50 metres> 50 metres
0.5 to 1.0 g/t Au1.0 to 5.0 g/t Au> 5.0 g/t Au
Drillhole grades Depth to Basement
Au Zone
Eagle 3Zone
Hayanmi Trend
FE399 3.0m @ 1.42g/t Au from 66mFE469 3.0m @ 1.23g/t Au from 36mFE471 3.0m @ 5.96g/t Au from 75m and 3.0m @ 1.33g/t Au from 81mFE492 3.0m @ 1.2g/t Au from 75mFE591 3.0m @ 14.7g/t Au from 87m and 3.0m @ 1.46g/t Au from 93mFE592 9.0m @ 7.9g/t Au from 87m incl. 3.0m @ 1.26g/t Au from 87m incl. 3.0m @ 20.5g/t Au from 90m and 3.0m @ 1.94g/t Au from 93mFE595 3.0m @ 2.33g/t Au from 126mFE608 3.0m @ 9.1g/t Au from 108mFE623 3.0m @ 0.83g/t Au from 33mFE626 1.5m @ 12.9g/t Au from 52.5m and 1.5m @ 0.7g/t Au from 82m and 1.5m @ 0.54g/t Au from 87mFE648 1.5m @ 0.8g/t Au from 64.5m and 1.5m @ 1.0g/t Au from 82.5mFE649 4.5m @ 1.0g/t Au from 97.5m
For
per
sona
l use
onl
y
Slide 12
Hayanmi Cross Section
Potential Ore Zone
3m @ 1.3g/t Au3m @ 20.5g/t Au3m @ 1.9g/t Au
FE593
3m @ 14.7g/t Au
3m @ 1.0g/t Au
3m @ 1.5g/t Au
FE592 D006FE591FE590
125m EOH
117m EOH
134m EOH
108m EOH
99m EOH
Proposed RC/Diamond
Drillholes
Hayanmi Cross Section5990140mN
Clay - Shepparton Fm.SandSiltCarbonaceous ClaySaprolite Zone
Potential Gold ZoneBasement Castlemaine Gp.
244700mE 244800mE 244900mE
-50m
0m
50m
0
Metres
50
For
per
sona
l use
onl
y
Slide 13
Hayanmi Longitudinal Section
MURRAY BASIN SEDIMENTS
FE469
1.5m @ 12.9g/t Au
3m @ 0.8g/t Au
FE649FE626FE402 FE648 FE623
1.5m @ 0.8g/t Au3m @ 1.23g/t Au
4.5m @ 1.0g/t Au1.5m @ 1.0g/t Au
FE471FE608
FE599FE492 FE399 FE592
FE595 FE591
3m @ 2.3g/t Au3m @ 9.1g/t Au
3m @ 1.2g/t Au
3m @ 0.8g/t Au
9m @ 7.9g/t Au3m @ 14.7g/t Au
3m @ 1.3g/t Au3m @ 6.0g/t Au
3m @ 1.42g/t Au 3m @ 0.83g/t Au
2.6 Kilometres
Longitudinal Projection of Hayanmi Structure
5,990,000mN
5,991,000mN 5,992,000mN
50m50m
0
Metres
500
100m
150m
200m
250m
300m
ZONE OF GOLD POTENTIALFOR DRILL TESTING
200 metres
(Vertical exaggeration approx. 6:1)100m
200m
LongitudinalProjection
View lookingWEST
For
per
sona
l use
onl
y
Slide 14
Boyd’s Dam Prospect
Cuneen s Road
0
metres
200
NORTH
Bendigo Pyramid Road
245,000mE 245,500mE
5,990,000mN
5,989,500mN
5,989,000mN
EAGLE 4ZONE
Boyd’s Dam Prospect
535
549A
545540
541 R002472415
537
533 532
571572A
575576 579578
580
416R003
D003
Boyd’s DamCross Section
Drillhole Intersections (>0.5g/t Au)
Drillholes0.1 to 0.2 g/t Au0.2 to 0.5 g/t Au
0.5 to 1.0 g/t Au1.0 to 5.0 g/t Au> 5.0 g/t Au
Drillhole gradesAu ZoneAs Zone
FEDD003 3m @ 0.92g/t Au from 56mFERC002 2m @ 1.8g/t Au from 67m and 1m @ 18.3g/t Au from 127mFERC003 2m @ 6.2g/t Au from 49mFE415 6.0m @ 2.6g/t Au from 45m and 3.0m @ 36.6g/t Au from 57mFE472 3.0m @ 1.2g/t Au from 45m and 3.0m @ 1.2g/t Au from 51m and 3.0m @ 2.32g/t Au from 63mFE532 3.0m @ 0.99g/t Au from 69m and 3.0m @ 2.1g/t Au from 96mFE535 3.0m @ 1.37g/t Au from 63mFE537 6.0m @ 0.8g/t Au from 63mFE541 3.0m @ 0.93g/t Au from 54mFE572A 9.0m @ 0.76g/t Au from 48m inc 3.0m @ 1.74g/t Au from 51mFE575 3.0m @ 4.9g/t Au from 66mFE576 3.0m @ 0.65g/t Au from 78mFE578 3.0m @ 1.14g/t Au from 60mFE579 33.0m @ 0.96g/t Au from 48m inc 9.0m @ 2.33g/t Au from 48m and 3.0m @ 1.23g/t Au from 78mF
or p
erso
nal u
se o
nly
Slide 15
Boyd’s Dam Cross Section
Potential Ore Zone
FERC001FE472
FE415
3m @ 1.3g/t Au
15m @ 8.4g/t Au
FERC002
3m @ 1.0g/t Au3m @ 1.3g/t Au
2m @ 1.8g/t Au1m @ 0.55g/t Au
1m @ 18.3g/t Au
aban
done
d
1m @ 0.6g/t Au
FE542FERC003FE541FE538FERC002a
FERC004
2m @ 6.2g/t Au
Boyd’s Dam Cross Section 5989369N
245500mE
-25m
0m
0
Metres
50
100m
25m
50m
75m
245450mE245400mE
ZONE OF QUARTZ VEINS
WITH GOLD MINERALISATION
245350mE
Clay - Shepparton Fm.SandTorrumberry ClaySaprolite ZoneBasement Castlemaine GpF
or p
erso
nal u
se o
nly
Slide 16
Boyd’s Dam Longitudinal Section
MURRAY BASIN SEDIMENTS
FE580FE572
FE537 FE532FE575
3m @ 0.4g/t Au
FE471
FE545FE415
FE549AFE572A
FE578FE579RC2
RC3
33m @ 1.0g/t Au
1m @ 18.3g/t Au
3m @ 1.0g/t Au
3m @ 1.0g/t Au
2m @ 6.2g/t Au3m @ 2.3g/t Au
15m @ 8.4g/t Au
3m @ 2.1g/t Au3m @
4.9g/t Au
3m @ 1.7g/t Au
700 metres
Longitudinal Projection of Boyd’s Dam
5,989,000mN 5,989,500mN
5,990,000mN
50m
0
Metres
250
100m
150m
200m
250m
ZONE OF GOLD POTENTIAL FOR DRILL TESTING
(Vertical exaggeration approx. 3:1) 100m
200m
LongitudinalProjection
View lookingWEST
For
per
sona
l use
onl
y
Slide 17
Discovery Prospect Cross Section
Eagle 3 Trend
Eagle 2 Trend
356m
D007D008D002D001FE300 FE299
0.4m @ 8.4g/t [email protected]/tAu
FE328FE298 FE329 FE297 FE330 FE296 FE331
6m @ 82.7g/t Au3m @ 0.51g/t Au
3m @ 0.59g/t Au0.7m @ 4.83g/t Au0.8m @ 17.5g/t Au
0.4m @ 152g/t Au
Discovery Cross Section5988925mN
Clay - Shepparton Fm.SandCarbonaceous ClaySaprolite Zone
Potential Gold Zone
ShaleSandstoneQuartz Veins / Shearing
Basement Castlemaine Gp.
244000mE 244250mE
244500mE
-250m
0m
FOLD
AXIS
215.5m EOH
257.1m EOH
TAN
DA
RR
A F.
0
Metres
100For
per
sona
l use
onl
y
Slide 18
Four Eagles Fine and Coarse Gold
Process from Discovery (FE328), Hayanmi (FE471) and Boyd’s Dam (FE415) F
or p
erso
nal u
se o
nly
Slide 19
LeachWELL Correlation Graph
10
20
30
40
±2kg
sam
ple b
y Lea
chW
ELL
(g/t A
u)
10 20 30 40 5030 gram sample by AAS (g/t Au)
Regre
ssion
Line
Regre
ssion
Line
00
5
530 gram sample by AAS (g/t Au)See
Inset
INSET
±2kg
sam
ple b
y Lea
chW
ELL
(g/t A
u)
Hole TypeDiamond holeAircore hole
Correlation 2kg LeachWELL vs 30gm Aqua Regia/AAS
For
per
sona
l use
onl
y
Slide 20
Conceptual Mine Plan F
or p
erso
nal u
se o
nly
Slide 21
Four Eagles 2013/14 Drilling
EL5295
EL4525
Granite
Bendigo Pyramid Road
0
kilometres
2NORTH
Bendigo Pyramid Road
Whitelaw
Fault
Projected Tandarra Fault
240,000mE 244,000mE 248,000mE
5,990,000mN
5,994,000mN
5,998,000mN
EAGLE 1 TARGET
EAGLE 2ZONE
EAGLE 4ZONE
EAGLE 3ZONE
EAGLE 5TARGET
EAGLE 1
EAGLE 2
EAGLE 3
EAGLE 4
2013 Aircore Drilling
See enlargement plan
EAGLE 1
EAGLE 2
EAGLE 3
EAGLE 4
Reconnaissance Aircore in Shallow Basement Areas
Aircore/RC Infill in Shallow
Basement Areas
316
343
380
328D001
316
469
509584
623
619
D008
D007
446
326
648
626
649
471
402
399D005
595
608492
592591
R002472415
572A579
578
R003
575
Drillholes0.1 to 0.2 g/t Au0.2 to 0.5 g/t Au0.5 to 1.0 g/t Au1.0 to 5.0 g/t Au> 5.0 g/t Au
Drillhole gradesAu ZoneAs Zone
Basement 0 – 30 metres depthBasement 30 – 50 metres depthBasement > 50 metres depth
Shallow Basement target areas
For
per
sona
l use
onl
y
Slide 22
Drilling Methodology
Potential Ore Zone
125m EOH 125m EOH
Reconnisance Aircore
Infill Aircore
Diamond / RC
Four Eagles Drilling Methodology
Clay - Shepparton Fm.SandSiltCarbonaceous ClaySaprolite ZoneBasement Castlemaine Gp.
244700mE 244800mE 244900mE
-150m
-200m
-100m
-50m
0
Metres
50
For
per
sona
l use
onl
y
Slide 23
2-3 Year Exploration Programme
Recon Aircore Drilling 15,000m/$0.5M
Grid Follow up Aircore drilling 30,000m/$1.0M
Angled RC Drilling 15,000m/$1.0M
Angled Diamond Drilling 5,000m/$1.5M
This would give about 50 Ore Cross Sections
Estimated Total Cost to JORC Resource: $5M For
per
sona
l use
onl
y
Slide 24
Heads of Agreement Initial Phase $2,100,000 exploration spend by January 2014 to earn
50% interest in project. Completed June 2013
Future Farm-in $2,100,000 exploration spend to earn up to 75% interest in
project (assumes non-contribution by Providence at 60%) Catalyst gives Providence staged conditional shares and cash
at 60%, 70%, 75% and Feasibility (1.5 m CYL shares: $230,000) Providence Gold & Minerals 25% free carried until decision
to mine Providence can elect to take 2.5% royalty on mine project
Four Eagles Farm-in Agreement F
or p
erso
nal u
se o
nly
Slide 25
Catalyst Capital Structure
Capital Structure (ASX: CYL) 47,303,033 fully paid ordinary shares
– 1,000,000 unlisted 20 cent options expiring 30/06/2014 – 750,000 unlisted 30 cent options expiring 30/06/2015 – 350,000 unlisted Performance Rights
Top 20 control approximately 70% of issued capital
Cash in hand A$0.9 million (at 30 Sept 2013)
Market Capitalisation A$14 million (at 30 cents per share) F
or p
erso
nal u
se o
nly
Slide 26
Directors Bruce Kay – Technical Director Stephen Boston – Chairman Robin Scrimgeour – Non-executive Gary Schwab – Non-executive Officers Frank Campagna – Company Secretary John Arbuckle – Consultant
Corporate Structure F
or p
erso
nal u
se o
nly
Slide 27
Competent Person’s Statement The information in this report that relates to Exploration Results is based on information compiled by Mr Bruce Kay, who is a Fellow of the Australasian Institute of Mining and Metallurgy and is a non-executive director of Catalyst Metals Limited. Mr Kay has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves’. Mr Kay consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
Competent Persons Statement F
or p
erso
nal u
se o
nly
Slide 28
This presentation has been prepared by Catalyst Metals Limited (“Catalyst”). This document contains background information about Catalyst current at the date of this presentation. The presentation is in summary form and does not purport to be all inclusive or complete. Recipients should conduct their own investigations and perform their own analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and opinions contained in this presentation.
This presentation is for information purposes only. Neither this presentation nor the information in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction.
This presentation may not be distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdictions. Recipients should inform themselves of the restrictions that apply in their own jurisdiction. A failure to do so may result in a violation of securities laws in such a jurisdiction.
This presentation does not constitute investment advice and has been prepared without taking into account the recipient’s investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentation are not intended to represent recommendations of particular investments to particular persons. Recipients should seek professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include (among others) the risk of adverse or unanticipated market, financial or political developments.
To the fullest extent permitted by law, Catalyst and its officers, employees, agents and advisers do not make any representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of any information, statements, opinions, estimates, forecasts or other representations contained in this presentation. No responsibility for any errors or omissions from this presentation arising out of negligence or otherwise is accepted.
This presentation may include forward looking statements. Forward looking statements are only predictions and are subject to risks, uncertainties and assumptions which are outside the control of Catalyst. Actual values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on forward looking statements. Any forward looking statements in this presentation speak only at the date of issue of this presentation. Subject to any continuing obligations under any applicable law and the ASX Listing Rules, Catalyst does not undertake any obligation to update or revise any information or any of the forward looking statements in this presentation of any changes in events, conditions or circumstances on which any such forward looking statement is based.
Disclaimer and Forward Looking Statements F
or p
erso
nal u
se o
nly
Annual General Meeting Presentation Perth WA 15 November 2013
Bruce Kay Technical Director
For
per
sona
l use
onl
y