  • cooperative governanceDepartment:Cooperative GovernanceREPUBLIC OF SOUTH AFRICA

    ANNUAL PERFORMANCE PLAN2018/19

  • 12018/19 - Annual Performance Plan

    cooperative governanceDepartment:Cooperative GovernanceREPUBLIC OF SOUTH AFRICA

    DCOGANNUAL PERFORMANCE PLAN

    2018/19

  • 2 Department of Cooperative Governance3

    It gives me great pleasure to present the Annual Performance Plan (APP) of the Department of Cooperative Governance for 2018/19. This year marks the 100th anniversary of the birth of democratic South Africa’s first president, Nelson Rolihlahla Mandela. What better way to honour him than by ensuring that we do indeed create a better life for all South Africans. We work towards building a future where all citizens have equal access to services, and one in which all citizens have a share in our country’s wealth.

    We are relentless in our pursuit of the goals of the National Development Plan. Outcome 9 has had a number of notable successes. The Community Works (CWP) Programme has gone a long way towards ensuring social and economic inclusion. We aim to increase the effectiveness of the CWP through the development of partnerships to enhance training and skills development.

    To further ensure that we execute our mandate of radical economic transformation, we have added the pillar of Local Economic Development to the Back-to-Basics programme. During the forthcoming year the Local Economic Development (LED) focus will be on Regional Economic Development Planning to improve integrated planning in secondary cities and mining towns. The potential of cities is maximised when there is alignment and integration in investments in transportation, human settlements, resilient infrastructure networks, and

    land governance, which are the main vehicles of urban development. Investments in people, the economy and the environment can work together to transform the quality of life in communities. During this period, the Integrated Urban Development Framework (IUDF) will also be rolled out in identified secondary cities.

    I have pleasure in recommending the 2018/19 Annual Performance Plan. As we work towards the end of this term of administration, the APP sets the Department of Cooperative Governance on a higher service delivery trajectory. It keeps faith with the ethos of a new dawn that is upon us. We believe our efforts will accelerate progress towards a more prosperous, equitable and just South Africa.

    Dr Zwelini L Mkhize, MP

    Executive Authority

    Dr Zwelini L Mkhize, MP

    Minister’s Foreword

  • 32018/19 - Annual Performance Plan

    The National Development Plan (NDP) sets out the long-term vision this government has for South Africa. The Medium Term Strategic Framework (MTSF) 2014–2019 is the first full five-year programme of implementation towards the realisation of the goals of the NDP. The Department of Cooperative Governance’s role is encapsulated in Outcome 9, which calls for a ‘responsive, accountable, effective and efficient developmental local government system.’

    As we head towards the end of this term of administration, the 2018/19 Annual Performance Plan adds new impetus towards the realisation of this goal. The Department of Cooperative Governance as the custodian of local government is entrusted with the transformation and development of the local government sphere.

    The Department has overseen the successful hosting of the 2016 local government elections and its aftermath. It has taken steps to create an environment in which radical economic transformation can flourish. A key element of this is the adoption of Local Economic Development as the sixth pillar of the Back-to-Basics programme. This will ensure that each and every municipality considers LED as part and parcel of its everyday functions.

    The past year has seen the Integrated Urban Development Framework (IUDF) unit being capacitated to achieve its objectives of creating prosperous towns

    and cities by restructuring the space economy. Towards this end, the IUDF will provide support to four identified secondary cities.

    The Back-to-Basics programme forms a cornerstone of the Department’s approach to supporting local government. Municipalities will be monitored on their progress towards achieving their stated objectives.

    Support measures in furtherance of institutional development include the implementation of municipal specific revenue plans and the establishment of functional ward committees, in selected municipalities.

    It would be amiss not to mention our plans for disaster management. The past year has seen the Department deal with everything from a crippling drought to runaway fires, which have caused billions of rands in damage and destruction. Among the steps to be taken will be the assessment of municipalities on their capacity to implement the National Fire Safety and Prevention Strategy.

    We will continue to provide leadership towards the rollout of the Community Work Programme. This will include the provision of training, the formation of partnerships and an increase in the provision of work opportunities, according to available funds.

    I look forward to providing the requisite leadership to ensure the effective implementation of the 2018/19 Annual Performance Plan.

    Mr DMG Mashitisho

    DIRECTOR-GENERAL

    Mr DMG Mashitisho

    Director-General

  • 4 Department of Cooperative Governance3

    Official Sign-offIt is hereby certified that:

    The 2018/19 Annual Performance Plan was developed by the management of the Department of Cooperative Governance under the guidance of the Honorable Minister of Cooperative Governance and Traditional Affairs, Dr Zwelini L Mkhize, and prepared in line with the 2015-2020 revised Strategic Plan and 2014-2019 Medium Terms Strategic Framework (MTSF). This document accurately reflects the performance targets of the Department, given the resources made available in the budget for 2018/19.

    Ms D Snyman

    Chief Financial Officer

    Mr T Faba

    Head Official: Planning

    Mr DMG Mashitisho

    Director-General: DCoG

    Mr A Nel, MP

    Deputy Minister

    Approved by:Dr Zwelini L. Mkhize, MP

    Executive Authority

  • 52018/19 - Annual Performance Plan

    TABLE OF CONTENTSMinister’s Foreword ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 2

    Official Sign-off ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 4

    Table of Contents ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 5

    Acronyms. ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 6

    PART A: Strategic Overview1. Vision .. ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 8

    2. Mission ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 8

    3. Values.. ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 8

    4. Strategic Outcome-Orientated Goals ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 8

    5. Alignment of Strategy with National Priorities . ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 9

    6. Legislative and other Mandates ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 12

    7. Updated Situational Analysis ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 14

    7.1. External environment .. ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 14

    7.2. Internal environment ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 19

    7.3. Description of the strategic planning process.. ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 20

    Overview of the Departmental Budget and MTEF Estimates ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 22

    PART B: Programme and Sub-Programme Performance Plans

    Programme 1: Administration ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 24

    Programme 2: Regional and Urban Development and Legislative Support.. ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 27

    Programme 3: Institutional Development ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 33

    Programme 4: National Disaster Management Centre .. ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 44

    Programme 5: Local Government Support and Interventions Management ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 50

    Programme 6: Community Work Programme. ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 56

    Part C- Link to Other Plans68. Links to long-term infrastructure grants and other capital plans ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 63

    9. Conditional grants. ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 63

    Public entities reporting to the Minister .. ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 65

    PART D: Annexures: to the Annual Performance Plan8010. ANNEXURE A: Technical Indicator Descriptions per Programme.. ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 68

    11. ANNEXURE B: Changes to the 2015-2020 Strategic Plan ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... . 81

  • 6 Department of Cooperative Governance3

    Acronyms

    AG Auditor-General

    AGSA Auditor-General South Africa

    APP Annual Performance Plan

    B2B Back-to-Basics

    CoGTA Cooperative Governance and Traditional Affairs

    CWP Community Work Programme

    DBSA Development Bank of Southern Africa

    DG Director-General

    DoRA Division of Revenues Act

    DPME Department of Planning, Monitoring and Evaluation

    ENE Estimates of National Expenditure

    HOD Head of Department

    HRM Human Resource Management

    IGR Inter-governmental Relations

    IUDF Integrated Urban Development Framework

    KPA Key Performance Area

    KPI Key Performance Indicator

    LED Local Economic Development

    LGES Local Government Equitable Shares

    MDB Municipal Demarcation Board

    M&E Monitoring and Evaluation

    MEC Members of Executive Council

    MIG Municipal Infrastructure Grant

    MINEXCO Minister and Executive Committee

    MIS Management Information System

    MISA Municipal Infrastructure Support Agent

    MoU/MoA Memorandum of understanding/Memorandum of Agreement

    MPAC Municipal Public Accounts Committee

    MPAT Management Performance Assessment Tool

    MPRA Municipal Property Rates Act

    MSA Municipal Systems Act

    MSIG Municipal Systems Improvement Grant

    MTEF Medium-Term Expenditure Framework

    MTSF Medium-Term Strategic Framework

    NDMC National Disaster Management Centre

    NDP National Development Plan

    NPO Non-Profit Organisation

    NT National Treasury

    PMU Project Management Unit

    SACN South African Cities Network

    SALGA South African Local Government Association

    SAQA South African Qualifications Authority

    SCM Supply Chain Management

    SLA Service Level Agreement

    StatsSA Statistics South Africa

    TID Technical Indicator Description

    TMC Top Management Committee

  • PART A: Strategic Overview

  • 8 Department of Cooperative Governance3

    PART A: Strategic Overview1. Vision

    A functional and developmental local government system that delivers its constitutional and legislative mandates within a system of cooperative governance.

    2. Mission

    Our mission is to ensure that all municipalities perform their basic responsibilities and functions without compromise by:

    • Putting people and their concerns first

    • Supporting the delivery of municipal services to the right quality and standard

    • Promoting good governance, transparency and accountability

    • Ensuring sound financial management and accounting

    • Building institutional resilience and administrative capability.

    3. Values

    Guided by the spirit of Batho Pele (People First), our values are:

    • Commitment to public service

    • Integrity and dedication to fighting corruption

    • Hands-on approach to dealing with local challenges

    • Public-participation and people-centred approach

    • Professionalism and goal orientation

    • Passion to serve

    • Excellence and accountability.

    4. Strategic Outcome-Orientated Goals

    The priorities of the Department are aligned with the broad policy priorities of the country, as outlined in the 2014-2019 Medium-Term Strategic Framework (MTSF). The Department drives the implementation of MTSF by coordinating Outcome 9 (through the Technical Implementation Forum and the Ministerial Implementation Forum) with the support of sector Departments and provinces to realise the MTSF vision, Back-to-Basics (B2B) programme and strategic outcome-orientated goals through the implementation of strategic outcome-orientated goals and programme-strategic objectives over the Medium-Term Expenditure Framework (MTEF). The Department aims to realise the following strategic outcome-orientated goals through the rollout of the following related programme strategic objectives:

    Table 1: Linking strategic outcome-orientated goals with Programme strategic objectives

    Strategic outcome-orientated goal (s) Related strategic objective (s)

    Effective and efficient internal corporate governance processes and systems (SOG 1)

    Improve DCoG governance process and systems by March 2020 (SO 1.1)

  • 92018/19 - Annual Performance Plan

    Strategic outcome-orientated goal (s) Related strategic objective (s)

    Lead and support the creation of prosperous cities and towns by restructuring the space economy (SOG 2)

    Facilitate the restructuring of municipal space economy through integrated development planning and spatial targeting by March 2020 (SO2.1)

    Support the creation of an enabling environment for municipalities to achieve inclusive economic development through the implementation of initiatives of the National Framework for LED by March 2020 (SO 2.2)

    Foster the creation of a functional local government system through enhanced accountability and transparency (SG 3)

    Deepen the relationship between citizens and local government through improved citizen engagement mechanisms by March 2020 (SO 3.1)

    Improve accountability in the local government system by coordinating reporting on municipal performance by March 2020. (SO 3.2)

    Build institutional resilience and initiate the next phase of institution building (SG 4)

    Strengthen the functionality of municipalities through the implementation of administrative and institutional systems by March 2020 (SO 4.1)

    Implement initiatives to improve financial sustainability and revenue management in local government by March 2020 (SO 4.2)

    Entrench a culture of good governance and instil a new morality of service and integrity in Local Government (SG 5)

    Promote good governance through strengthening anti-corruption measures in local government by March 2020 (SO 5.1)

    Coordinate effective integrated disaster management and fire services (SG 6)

    Improve the system of disaster management and fire services across government by March 2020 by (SO 6.1):

    • Developing, strengthening, and managing of regulatory frameworks and institutional arrangements

    • Promoting capacity building through awareness, education, training and research

    • Promoting Disaster Risk Reduction through a well-coordinated and integrated planning process, with specific focus on mitigation, preparedness, response and recovery

    • Guiding the development of a comprehensive information management and communication system and establish integrated communication links with relevant role players

    Ensure significant improvements in service delivery through sound infrastructure management (SG 7)

    Coordinate and facilitate sector collaboration for infrastructure development at municipal level to extend services to unserved communities by March 2020 (SO7.1)

    Local public employment programmes expanded through the Community Work Programme (SG 8)

    Provide one million work opportunities through effective and efficient programme management and strategic partnerships by March 2020 (SO 8.1)

    5. Alignment of Strategy with National Priorities

    The Department contributes to the achievement of national priorities as outlined in Government’s five-year strategy: the 2014-2019 MTSF, specifically Outcome 9: A responsive, accountable, effective and efficient developmental local government system.

  • 10 Department of Cooperative Governance3

    The Department contributes towards the following MTSF: Outcome 9 sub-outcomes:

    • Sub-outcome 1: Members of society have sustainable and reliable access to basic services.

    • Sub-outcome 2: Strengthened intergovernmental arrangements for a functional system of cooperative governance for local government.

    • Sub-outcome 3: Democratic, well-governed and effective municipal institutions capable of carrying out their developmental mandate according to the Constitution.

    • Sub-outcome 4: Sound financial management.

    • Sub-outcome 5: Local public employment programmes expanded through the Community Work Programme.

    MTSF Outcome 9:

    Sub-outcomes

    Related Strategic Outcome-Oriented

    Goal (s)

    Related Strategic Objective (s)

    Related Key Performance indicators

    Sub-outcome 1: Members of society have sustainable and reliable access to basic services.

    Ensure significant improvements in service delivery through sound infrastructure management

    (SG 7)

    Coordinate and facilitate sector collaboration for infrastructure development at municipal level to extend services to unserved communities by March 2020 (SO7.1)

    Number of targeted MIG receiving municipalities monitored for compliance with DoRA

    Sub-outcome 2: Strengthened Intergovernmental arrangements for a functional system of cooperative governance for local government;

    Foster the creation of a functional local government system through enhanced accountability and transparency (SG 3)

    Deepen the relationship between citizens and local government through improved citizen engagement mechanisms by March 2020 (SO 3.1)

    Improve accountability in the local government system by coordinating reporting on municipal performance by March 2020. (SO 3.2)

    Number of municipalities with functional ward committees

    Number of municipalities supported to institutionalise community complaints management processes

    Annual Report on municipal performance progress based on the monthly B2B questionnaire developed

    Sub-outcome 3: Democratic, well-governed and effective municipal institutions capable of carrying out their developmental mandate according to the Constitution.

    Build institutional resilience and initiate the next phase of institution building (SG 4)

    Strengthen the functionality of municipalities through the implementation of administrative and institutional systems by March 2020 (SO 4.1)

    Number of reports on the appointment of senior managers concluded in line with the MSA regulations.

    Number of reports on corrective action taken to enforce compliance by municipalities with the prescribed competency requirements

  • 112018/19 - Annual Performance Plan

    MTSF Outcome 9:

    Sub-outcomes

    Related Strategic Outcome-Oriented

    Goal (s)

    Related Strategic Objective (s)

    Related Key Performance indicators

    Sub-outcome 4: Sound financial management

    Build institutional resilience and initiate the next phase of institution building (SG 4)

    Implement initiatives to improve financial sustainability and revenue management in local government by March 2020. (SO4.2)

    A municipal-specific revenue plan implemented in selected municipalities.

    Number of municipalities assessed in terms of compliance with the rating aspects of the MPRA

    Sub-outcome 5: Local public employment programmes expanded through the Community Work Programme.

    Local public employment programmes expanded through the Community Work Programme (SG 8)

    Provide one million work opportunities through effective and efficient Programme management and strategic partnerships by March 2020. (SO8.1)

    Number of work opportunities provided

    Number of CWP participants trained

    Number of CWP partnerships established

    The B2B programme approach adopted by the Department is aligned with the priorities outlined in MTSF: Outcome 9.

    The Department also contributes to other MTSF outcomes, specifically Outcome 7 and Outcome 14, as indicated below:

    Table 2: DCoG contribution to other Government Outcomes

    Other MTSF Outcomes DCoG Role

    Outcome 7: Vibrant, equitable, sustainable rural communities contributing towards food security for all

    Sub-outcome 1: Improved land administration and spatial planning for integrated development in rural areas

    Through facilitating the rollout of the IUDF Implementation Plan

    Outcome 7: Sub-outcome 3: Improved food security The Community Work Programme administered by DCoG contributes towards this sub-outcome through the support to agriculture cooperatives in the creation of food gardens

    Outcome 14: Nation building and social cohesion. All municipalities have recorded processes that demonstrate inclusion of the poor in budgeting processes and a direct link to MTSF: Outcome 9, sub-outcome 3, outlined above

    Through the implementation of the Indigent Policy, we ensure that municipal plans focus on poor and vulnerable groups, as indicate in MTSF: Outcome 9, sub-outcome 1, above

    The Ward Committee System, Ward Councillors and Ward Committees report at ward meetings about broad budget plans and consult residents about programmes and projects that will affect them

    Outcome 14: Sub-outcome 3: Greening of public spaces and Cleaning of Cities

    Through the CWP partnerships, some projects focus on the greening of public spaces and cleaning of cities

  • 12 Department of Cooperative Governance3

    6. Legislative and other Mandates

    6.1. Constitutional Mandate

    The mandate of the Department of Cooperative Governance (DCoG) is derived primarily from Chapters 3, 5, 6, 7 and 9 of the Constitution of the Republic of South Africa, 1996, hereinafter referred to as the Constitution.

    Chapter 3 - Deals with cooperative government and intergovernmental relations. The Department observes and adheres to the principles and conduct set out in this chapter.

    Chapter 5 - Deals with national intervention in provincial administration when a province cannot or does not fulfil an executive obligation in terms of the Constitution or legislation.

    Chapter 6 - Deals with provincial intervention in local government, specifically when municipalities are unable to fulfil their executive obligations or when a municipality, due to a financial crisis, breaches the imperative to provide basic services to meet its financial obligations.

    Chapter 7 - Deals with, inter alia, municipalities in cooperative governance. The Department is legislated to support and strengthen the capacity of municipalities to manage their own affairs, exercise their powers and perform their functions.

    Chapter 9 - Deals with institutions whose role involves strengthening the constitutional democracy of the country. The DCoG has to conform to the rules set down by institutions such as the Auditor-General and Public Protector to comply with the legislative frameworks in this chapter.

    6.2. Legislative Mandate

    As a national department, our function is to develop national policies and legislation for local government and, inter alia, monitor the implementation of the following:

    Table 3: Legislative mandates of the Department

    Name of Legislation Mandate

    Municipal Property Rates Act, 2004 (Act No. 6 of 2004)

    • Regulate the power of a municipality to impose property rates

    • Exclude certain properties from rating in the national interest

    • Enable municipalities to implement a transparent and fair system of exemptions, reductions and rebates through their rating policies

    • Enable fair and equitable valuation methods of properties

    • Enable an objection and appeal process

    Local Government: Municipal Finance Management Act, 2003 (Act No. 56 of 2003)

    • Secure sound and sustainable management of the financial affairs of municipalities and other institutions in local government

    • Establish treasury norms and standards for local government

    • Provide for matters connected therewith

    Disaster Management Act, 2002 (Act No. 57 of 2002)

    • Develop an integrated and coordinated disaster management policy with a focus on disaster prevention/risk reduction, severity mitigation, emergency preparedness, rapid and effective response and post-disaster recovery

    • Establish national, provincial and municipal disaster management centres

    • Source disaster management volunteers

    • Provide for matters incidental thereto

  • 132018/19 - Annual Performance Plan

    Name of Legislation Mandate

    Local Government: Municipal Systems Act, 2000 (Act No. 32 of 2000)

    • Provide municipalities with the core principles, mechanisms and processes necessary to move progressively towards the social and economic upliftment of local communities

    • Ensure universal access to essential affordable services, affordable to all

    • Define the legal nature of a municipality as that of including the local community within the municipal area to work in partnership with the municipality’s political and administrative structures

    • Define the manner in which municipal powers and functions are exercised and performed

    • Enable community participation

    • Establish a simple and enabling framework for the core planning, performance management, resource mobilisation and organisational change processes that underpin the notion of developmental local government

    • Provide a framework for local public administration and human resource development

    • Empower the poor and ensure that municipalities establish service tariffs and credit control policies that take their needs into account in a framework that provides services, service delivery agreements and municipal service districts

    • Enable credit control and debt collection

    • Establish a framework that supports, monitors and sets standards for other spheres of government to progressively build local government into an efficient frontline development agency that integrates all governmental activities involved in socially and economically uplifting communities in harmony with their natural, local environment

    Local Government: Municipal Structures Act,1998 (Act No. 117 of 1998)

    • Establish municipalities according to the requirements of municipal types and categories

    • Establish criteria to determine area-specific municipal categories

    • Define types of municipality relevant within each category

    • Appropriately divide functions and powers between municipal categories

    • Regulate the internal systems, structures and office-bearers of municipalities

    • Provide appropriate electoral systems

    • Provide for matters in connection therewith

    The Intergovernmental Relations Framework Act, 2005 (Act No. 13, of 2005)

    The objective of this Act is to facilitate coordination between the three spheres of government to implement policy and legislation. As a Framework Act, it allows flexibility between governmental spheres to:

    • Meet the challenges within the conduct and practice of cooperative government

    • Provide the basic architecture of intergovernmental structures and processes to guide the settlement of intergovernmental disputes

    Local Government: Municipal Demarcation Act, 1998 (Act No. 27 of 1998)

    • Provide criteria and procedures for an independent authority to determine municipal boundaries

    • Provide for matters connected thereto

  • 14 Department of Cooperative Governance3

    Name of Legislation Mandate

    Organised Local Government Act, 1997 (Act No. 52 of 1997)

    • Recognise national and provincial organisations representing the different categories of municipalities

    • Determine procedures for local government to designate representatives to participate in the National Council of Provinces

    • Determine procedures for local government to consult national and provincial government

    • Determine procedures for local government to nominate persons to the Financial and Fiscal Commission

    • Provide for matters connected therewith

    Fire Brigade Services Act, 1987 (Act No. 99 of 1987)

    • Enable the establishment, maintenance, employment, coordination and standardisation of Fire Brigade Services

    • Provide for matters connected therewith

    Remuneration of Public Bearer’s Act, 1998 (Act No. 20 of 1998)

    • Provide a framework that determine salaries and allowances of the President, National Assembly members, permanent delegates to the National Council of Provinces, Deputy President, ministers, deputy ministers, traditional leaders and members of the provincial Houses of Traditional Leaders and Council of Traditional Leaders

    • Provide a framework that determines the upper limit of salaries and allowances of Premiers, Executive Council members and members of provincial legislatures and municipal councils

    • Provide a framework that determines the pension and medical aid benefits of office bearers

    • Enable the repeal of certain laws

    • Provide for matters connected therewith

    Local Government: Cross-Boundary Municipal Act, 2000 (Act No. 29 of 2000)

    • Give effect to Section 155(6A) of the Constitution by authorising the provincial executives affected to establish cross-boundary municipalities

    • Enable the re-determination of the boundaries of such municipalities under certain circumstances

    • Provide for matters connected therewith

    7. Updated Situational Analysis

    7.1. External environment

    The Department of Cooperative Governance, in fulfilling its mandate as the custodian of the local government sphere, has been facilitating and coordinating a process of transformation and development within the municipal space since the municipal system was established in 2000 in terms of Chapter 7 of the Constitution, and through the Local Government: Municipal Systems and Structure Acts.

    Post 2016 Local Government Elections

    The outcome of the 2016 local government elections presented a “new era of coalitions” in the history of local government elections in South Africa. Though the process of forming coalitions is engaged in the spirit of democracy, it is vital that the Department monitors the situation as this may bring with it a number of implications that has a direct effect on service delivery due to political ideologies that may lead to conflict between parties in a coalition government. The local government elections have produced 27 municipalities without an outright majority. This list

  • 152018/19 - Annual Performance Plan

    includes some of the largest municipalities in the country, such as Johannesburg, Tshwane, Ekurhuleni, Nelson Mandela Bay and Rustenburg. There are also some of the smaller municipalities such as Modimolle, Laingsburg, Mtubatuba and Thabazimbi where no party won outright. As is already noticed, coalitions of all kinds, but particularly those combining various smaller parties, are prone to inherent instability as a desertion by any one of them results in a vote of no confidence.

    To ensure a process of smooth governance in the 2018/19 financial year and beyond, the Department of Cooperative Governance must play a prominent role in the establishment and working of councils, especially the “hung councils.”

    Socio-economic challenges

    The National Development Plan indicates that the country’s economy needs to grow at a much faster rate, 6% at least, to begin to address its socioeconomic challenges, high unemployment, inequality and poverty. The current growth trajectory, measuring 2-3% over the past 20 years is inadequate and will not deliver inclusive growth to address the challenges. Unfortunately, SA’s economy officially entered a technical recession – with gross domestic product (GDP) contracting by 0.7% in the first quarter of 2017 from a 0.3% contraction in the previous quarter. Underscoring this is that consumer and business confidence fell in the second quarter of 2017, with business confidence falling to the worst level since the 2009 recession, according to a Rand Merchant Bank (RMB)/Bureau for Economic Research survey.

    Unemployment has been rising consistently, and income inequality has worsened despite a plethora of policy documents, the most recent being the National Development Plan. Historical evidence clearly show that as long as economic growth remains below 3%, South Africa runs the risk of unemployment persisting. Sadly, South Africa’s unemployment rate rose to 27.7% for the first quarter of 2017, according to Statistics South Africa figures. This state of affairs has a direct impact on the poor and vulnerable who rely on the provision of free basic services and the well-functioning municipalities. DCoG has a major role to play in ensuring that there is uninterrupted provision of services to the South African community.

    Radical economic transformation

    The main pillars for achieving radical economic transformation through rapid and inclusive growth in the 2014-2019 Medium-Term include the following:

    • Productive investment crowded in through the infrastructure built programme

    • Competitiveness enhancement in productive sectors of the economy

    • Addressing spatial imbalances in economic opportunities

    • Elimination of unnecessary regulatory burdens

    • Workers’ education and skills development to meet economic needs

    • A macroeconomic and financial framework to support employment-creating growth

    • Workplace conflict reduction and improved cooperation between government, organised business and organised labour

    • Expanded opportunities for historically excluded and vulnerable groups, small businesses and cooperatives

    • Public employment schemes to provide relief for the unemployed and build community solidarity.

    LED is intended to maximise the economic potential of municipal localities and enhance the resilience of macro-economic growth through increased local economic growth, employment creation and development initiatives within the context of sustainable development.

  • 16 Department of Cooperative Governance3

    It is found however, that municipalities experience challenges in defining their role in local economic development which has resulted in the lack of clear LED policy direction at municipal level, worsened by a chronic shortage of skills, understaffing, political administration dichotomies, poor planning, inadequate support to small, medium and micro enterprises (SMMEs) or informal business, failure to understand LED processes, lack of project management and poor community involvement in planning and implementation.

    The following principles could guide Local Economic Development going forward:

    • Collaborative Partnerships

    • Integrated Place development

    • Pro-poor development

    • Youth and Women development

    • Sustainable development

    • Leadership and governance

    • State-led, private sector driven, community-based development.

    Implementing the IUDF

    South Africa is experiencing continuing urbanisation. The urban centres continue to dominate the country’s economy. Four city-regions dominate the economy, accounting for more than half the national gross value added (GVA). When other cities and large towns are included, the share rises to 81.4% of the country’s GVA, up from 79.4% in 19961, whereas the GVA (and population) of other urban centres are growing at below South Africa’s average growth rates. Nationally, a growing alignment is appearing between economic opportunity and population concentration, and thus of improved access to services

    The government’s Integrated Urban Development Framework makes a cogent argument for paying attention to cities. It offers a vision of livable, safe, resource efficient cities in the future, and it includes a package of strategies and actions for urban planning, transport, infrastructure, land development, active communities, urban governance and city finances.

    South Africa will need to adopt a much more progressive migration policy in relation to skilled as well as unskilled migrants, and should better plan for rapid urbanisation.

    A key feature of a developmental state, like South Africa, lies on the level at which its citizens have access to basic services such as housing, water, lights and sanitation. The latest General Household Survey released by the Statistics South Africa in 2016 show that of the 56 million people living in the country, over 85% are connected to the national electricity supply, about 90% have access to clean water, over 80% have access to sanitation services, while about 64% have access to refuse removal.

    Notwithstanding the fact that high percentages of our citizens have access to electricity, water, sanitation and refuse removal, there is clear evidence that the system of local government is indeed in distress, and that this state of affairs has become deeply-rooted within our system of governance. With regard to the levels of service delivery, systemic failures ranging from gaps in critical technical and management skills, neglect of operation and maintenance, poor revenue management and under-spending on capital budgets at municipal government level have been identified as major challenges in the local government sector.

    Inadequate care of infrastructure can undermine service delivery and increase backlogs. It is estimated that about 35% of water supplied is non-revenue water (or volume of water which is lost and for which no income is received by the water services provider). Poor maintenance, inaccurate or incomplete billing and water theft are seen as the main

    1 NPC (National Planning Commission). 2012. National Development Plan 2030: Our future – make it work. Pretoria.

  • 172018/19 - Annual Performance Plan

    causes of water losses which lead to non-revenue water.

    Therefore, underpinning the Department of Cooperative Governance’s performance plan are some key questions, such as how deep-rooted is the state of distress in our local municipalities, what are the causes, and through what measures do we address these fault-lines in our governance arrangements.

    Disaster Coordination and Response

    Sustainability is a key aspect of development, as this ensures that development today does not hinder future development. With regard to planning for disasters such as the recent drought, some of the challenges that have been identified include:

    • The lack of integrated and well-coordinated planning

    • The lack of institutional capacity and capability i.e. non-functional disaster management centres without relevant personnel and focal points within sectors

    • Failure to properly expend and account for funds

    • Lack of municipal risk profiles to know our areas and their exposure and vulnerability to hazards.

    Going forward, continued coordination of drought interventions in collaboration with relevant role players through the national Joint Drought Coordination Committee will remain key to consolidate intervention measures and ensure speedy drought response within the affected communities.

    The Municipal Demarcation Board (MDB), Department of Planning, Monitoring and Evaluation (DPME) and the Auditor-General South Africa (AGSA) have raised concerns in their recent local government reports regarding the performance of national and provincial departments with regard to their supervisory and regulatory responsibilities over municipalities. Gaps that have been identified include: lack of regulatory norms and standards, processes for monitoring and supervision, the collection of regular performance information and either recognising good performance or supporting and intervening with regard to inadequate performance.

    Despite some successes, there are still areas that require attention to improve the functionality of the intergovernmental system and clarify the roles and functions of the different spheres of government. South Africa’s Intergovernmental Relations (IGR) System is still fraught with institutional and design issues hampering the effectiveness of the three sphere system. There is for example a proliferation of IGR coordination structures and a plethora of plans that can create a state of paralysis, in spite of all the efforts aimed at coordination and collaboration within and across spheres of government.

    Some of the challenges are related to how the system has evolved over time and others are related to the economic constraints under which the system operates. Importantly, many of the issues relate to the shortcomings in the ‘human agency’ to drive coordination, lack of senior level capacity and skills in IGR units and secretariats, and uneven leadership and reporting through the IGR system. These pressures and weaknesses have hampered the effective discharge of core mandates and must be addressed. The lack of a centrally co-ordinated capability for municipal information gathering and analysing, support and monitoring and evaluation has been identified as undermining the capacity of the state to support and build strong municipalities.

    During the 2016/17 financial year, the Department undertook a study on “An Improved Governance Framework for Powers and Functions.” The study was informed by fieldwork and interviews in approximately 25 urban municipalities, on the local levels of challenges experienced, which resulted in an emerging consensus on key interventions/reforms required for improved urban governance. The recommendations of the study will inform aspects of the IUDF and Back-to-Basics implementation in the next MTEF period leading up to 2019. These include possible legislative reform, sectoral grant consolidation to improve coordination of infrastructure investments, a revised intergovernmental planning framework to better manage integrated spatial planning for coordinated investments in a municipal space,

  • 18 Department of Cooperative Governance3

    and more focus on how decentralisation should enable local government to meet a general mandate to provide for the welfare and development needs of their constituencies. In this regard, the Ministry has proposed a CoGTA wide Bosberaad to be held early in 2018 as part of having a broad discussion on the Constitutional and Legislative Mandate.

    Audit outcomes

    The 2014/15 general report on the audit opinions by the AGSA highlighted the significant progress made since 2010/11 in improving the audit outcomes in local government, but the rate of improvement was very marginal and limited in 2015/16.

    The audit outcomes of municipalities in the Eastern Cape, Limpopo and Mpumalanga showed momentum in the right direction, with the Eastern Cape showing the greatest improvement. The improvements in the Eastern Cape can be attributed to: improved record keeping; the support provided by the provincial treasury and the provincial department responsible for cooperative governance (provincial CoGTA); the leadership attending to audit recommendations; the implementation of the minimum competency levels; and the use of consultants. The outcomes in three of the main areas that AGSA audited are as follows:

    • The audit opinions on the financial statements only slightly improved from 60% to 62% unqualified opinions, while disclaimed and adverse opinions decreased from 13% to 10%. The revised Medium-Term Strategic Framework (MTSF) targets of 65% unqualified opinions, 20% qualified opinions and a maximum of 15% disclaimed or adverse opinions by 2018/19 can therefore be achieved.

    • The audit area that showed the greatest improvement was the quality of performance reports, with the number of municipalities with no material findings in this regard increasing from 38% to 47%. Only 31% of municipalities would have had this positive outcome had the AGSA not identified the material misstatements and allowed them to make corrections.

    • There was a slight regression in the compliance with key legislation, with the number of municipalities with no material findings decreasing from 20% to 18%. The lapse in oversight and controls in the area of compliance was evident in a number of areas, including Supply Chain Management (SCM) and consequence management, leading to increased irregular expenditure. Irregular expenditure had increased by just over 50% since the previous year to R16.81 billion – the highest since the AGSA started tracking the values.

    • The main root causes of municipalities’ continuing inability to improve internal controls e.g. management (accounting officers and senior management), the political leadership (mayors and councils) and oversight structures (MPACs and portfolio committees) did not respond with the required urgency to the AGSA’s messages about addressing risks and improving internal controls. The Department will, as part of the strategic objectives of Programme 3 (implement initiatives to improve financial sustainability and financial viability in local government and strengthening the functionality of municipalities through implementing administrative functions), linked to the Back-to-Basics programme, address the AGSA’s urging of local government leadership. The focus will be on municipalities that did not achieve the desired audit results, to address the root causes of the aforementioned weaknesses in financial and performance management.

    The B2B programme was launched towards the end of the 3rd term of Local Government, and only the 1st cycle of B2B’s implementation could be completed. Although a marked improvement in the five performance pillars across categories can be shown, the performances are uneven. Likewise, the capacity and performances of provincial CoGTAs is uneven. The 3rd Presidential Local Government Summit held in 2017, outlined a municipal developmental trajectory that is aligned to the NDP 2030 vision:

    • Confirming the focus of Back-to-Basics priorities

    • Articulating a need for an intergovernmental paradigm shift in planning within and across spheres

    • Encouraging forward planning and sticking to the plan (remove short-termism in planning)

  • 192018/19 - Annual Performance Plan

    • Improved alignment of spatial plans and budgets based on medium- and long-term developmental plans at municipal level

    • Mobilising Intergovernmental efforts towards alignment of spatial plans of National and Provincial Spheres with Integrated Development Plans (IDP’s) of municipalities

    • Implementing of the IUDF (spatial transformation of spaces).

    7.2. Internal environment

    With the current Medium-Term Strategic Framework (MTSF) coming to an end, the Department is in a process of assessing the progress made in achieving the current strategy and finding mechanisms to maximise the limited resources for the coming financial year in addressing critical issues that need to be addressed in the upcoming 2018/19 financial year.

    The Department has undergone an “as is” analysis of its current business processes by undertaking an Enterprise Architecture (EA) review. This will be beneficial in ensuring that the organisation identifies and addresses gaps in its business operations, and gears itself up to support the five-year strategy of government.

    Over the next MTEF, the operations of the Department will be enhanced through various administration support mechanisms that will seek to improve governance processes and systems. These will be geared towards capacitating the Department to realise its Mandate and are the following:

    • Providing support to the Community Work Programme through the Management Information System (MIS) system, integration of Information, Communication and Technology (ICT) services and automation of contract management

    • Providing strategic government communications and media engagement support to executive management and political principals

    • Enhancing knowledge sharing on international relations and improved monitoring of international Memoranda of Understanding (MoUs)

    • Addressing recurring audit findings and findings impacting on the audit report of the AGSA and Internal Audit

    • Empowering staff on SCM and financial legislation and delegations to curb irregular and unauthorised expenditure

    • Fast tracking the filling of critical posts, enhance management of staff in line with the Departmental performance management policy and institutionalising the MTEF aligned skills audit

    • Provide support through improved risk management processes at the planning stage and throughout project lifecycle

    • Providing consulting and proactive assurance through the Internal Audit function.

    Internally, the Department is organised into six budget programmes to execute its mandate and support the achievement of the strategic outcome-orientated goals. Additionally, the Department implements key policy priorities such as the Back-to-Basics programme and the Integrated Urban Development Framework. The Department executes its legislative and policy mandates through the following budget programme structure:

    Programme 1: Administration

    Purpose: Provide strategic leadership, management and support services to the Department. The programme includes the Office of the Director-General (DG) and Financial and Corporate Management Services.

    Programme 2: Regional and Urban Development and Legislative Support

  • 20 Department of Cooperative Governance3

    Purpose: Provide policy analyses and development to transform local government and improve corporative governance.

    Programme 3: Institutional Development

    Purpose: Build institutional resilience in the local government system by supporting system development, governance, capacity building and revenue management.

    Programme 4: National Disaster Management Centre

    Purpose: Promote an integrated and coordinated system of disaster prevention, mitigation and risk management.

    Programme 5: Local Government Support and Interventions Management

    Purpose: Conduct performance monitoring, support and interventions in municipalities and provincial CoGTA to drive B2B activities.

    Programme 6: Community Work Programme

    Purpose: Create income security and work experience for participants in areas and promote social and economic inclusion by targeting areas of high unemployment.

    • In addition to the internal budget programme structure, the Department has four public institutions that report to the Minister and support the implementation of policy priorities. These are the: South African Local Government Association (SALGA)

    • South African Cities Network (SACN)

    • Municipal Demarcation Board (MDB)

    • Municipal Infrastructure Support Agent (MISA).

    7.3. Description of the strategic planning process

    This 2018/19 Annual Performance Plan of the Department of Cooperative Governance was developed through the guidance of the Top Management of the Department, in consultation with members of the Senior Management Service representing the various Branches and project managers that will be responsible for the implementation of the 2018/19 APP of the Department.

    The Department submitted the first and second drafts of the 2018/19 APP to the Department of Planning, Monitoring and Evaluation on 31 August 2018 and 30 November 2018 respectively. In the development of these drafts, the 2018/19 APP of the Department was consulted with all Branches through focused engagements and a Departmental Strategic Planning Meeting with all members of the Senior Management Service. The Department adopted the following six strategic priorities that were consulted and agreed with the National Treasury during the 2017 MTEF period, to inform the budget priorities of the Department over the next MTEF, leading up to the end of the current MTSF period:

    • Priority 1: Implement initiatives to improve financial stability and revenue management of municipalities.

    • Priority 2: 2016 Local Government post-election Programme.

    • Priority 3: Implement the Integrated Urban Development Framework.

    • Priority 4: Eradication of municipal infrastructure backlogs.

    • Priority 5: Implement an integrated and coordinated system for the management of all common disasters, such as drought, floods and fires across all spheres of government.

    • Priority 6: Implement the Community Work Programme.

  • 212018/19 - Annual Performance Plan

    An exercise was also undertaken to align the first draft 2018 Estimates of National Expenditure (ENE) with the second draft 2018/19 APP to ensure that the performance information aspect of the ENE is aligned to that of the second draft APP. Externally, the Department engaged on a process to finalise the customisation of the CoGTA sector performance indicators that support the implementation of the 2014-2019 MTSF (Outcome 9) in collaboration with provincial CoGTA Departments. Provinces were also supported through their strategic planning processes by the national CoGTA to synergise sector planning within the national department and provincial counterparts.

    The Department developed and submitted the third draft 2018/19 APP, which was submitted to the AGSA for interim audit on 31 January 2018. The outcome/findings of the AGSA review together with the DPME analysis feedback on the second draft APP were considered and incorporated into the final draft 2018/19 APP. The Department convened a final Strategic Planning Meeting on 15 February 2018, to finalise the 2018/19 APP prior to approval by the Minister of Cooperative Governance and Traditional Affairs, whose approval was granted in March 2018 for tabling in Parliament.

  • 22 Department of Cooperative Governance3

    Ove

    rvie

    w o

    f the

    Dep

    artm

    enta

    l Bud

    get

    and

    MT

    EF E

    stim

    ates

    Tabl

    e 4:

    Ove

    rvie

    w o

    f the

    Dep

    artm

    enta

    l bud

    get

    and

    MT

    EF e

    stim

    ates

    Coo

    pera

    tive

    Gov

    erna

    nce

    2

    014/

    15

    201

    5/16

    2

    016/

    17

    201

    7/18

    2

    018/

    19

    201

    9/20

    2

    020/

    21

    Ran

    d th

    ousa

    ndA

    udit

    ed o

    utco

    me

    Bud

    get

    Med

    ium

    -ter

    m e

    stim

    ates

    Adm

    inis

    trat

    ion

    236

    429

    236

    494

    267

    266

    244

    296

    258

    556

    275

    708

    293

    969

    Reg

    iona

    l and

    Urb

    an D

    evel

    opm

    ent

    and

    Legi

    slat

    ive

    Supp

    ort

    80

    338

    92

    995

    389

    308

    2

    48 5

    5310

    3 47

    5 10

    9 70

    4 11

    6 25

    9

    Inst

    itutio

    nal D

    evel

    opm

    ent

    42

    040

    196

    49

    818

    592

    50

    931

    034

    57

    373

    121

    63

    111

    536

    69

    376

    402

    76

    110

    838

    Nat

    iona

    l Dis

    aste

    r M

    anag

    emen

    t C

    entr

    e 3

    85 9

    05

    258

    158

    2

    95 2

    82

    548

    051

    5

    92 2

    45

    570

    278

    6

    02 6

    27

    Loca

    l Gov

    ernm

    ent

    Supp

    ort

    and

    Inte

    rven

    tion

    Man

    agem

    ent

    15

    084

    951

    15

    317

    068

    15

    598

    244

    16

    409

    803

    15

    716

    173

    16

    181

    048

    17

    072

    302

    Com

    mun

    ity W

    ork

    Prog

    ram

    me

    1 5

    58 7

    29

    2 3

    74 2

    30

    2 3

    71 0

    96

    3 6

    40 0

    66 3

    869

    903

    4

    084

    119

    4

    311

    600

    TO

    TAL

    59

    386

    548

    68

    097

    537

    69

    852

    230

    78

    463

    890

    83

    651

    888

    90

    597

    259

    98 5

    07 5

    95

    Cur

    rent

    pay

    men

    ts 1

    975

    327

    2

    759

    622

    2

    815

    713

    4

    275

    554

    3 5

    38 1

    34

    3 5

    95 5

    23

    3 6

    62 0

    03

    Com

    pens

    atio

    n of

    em

    ploy

    ees

    234

    442

    2

    58 3

    35

    272

    404

    3

    07 6

    22

    339

    475

    3

    65 3

    54

    392

    754

    Goo

    ds a

    nd s

    ervi

    ces

    1 7

    40 8

    85

    2 5

    01 2

    87

    2 5

    43 3

    09

    3 9

    67 9

    32

    3 1

    92 8

    78 3

    224

    035

    3 2

    69 2

    49

    Tran

    sfer

    s an

    d su

    bsid

    ies

    57

    393

    046

    65

    290

    923

    67

    027

    032

    74

    180

    734

    80

    111

    778

    86

    999

    693

    94

    836

    965

    Paym

    ents

    for

    capi

    tal a

    sset

    s 1

    7 91

    2 4

    6 07

    8 9

    312

    7

    502

    7 7

    57

    8 1

    77

    8 6

    27

    Paym

    ents

    for

    finan

    cial

    ass

    ets

    263

    9

    14

    173

    10

    0 -

    -

    -

    Tota

    l eco

    nom

    ic c

    lass

    ifica

    tion

    59

    386

    548

    68

    097

    537

    69

    852

    230

    78

    463

    890

    83

    651

    888

    90

    597

    259

    98 5

    07 5

    95

  • PART B: Programme andSub-Programme Performance Plans

  • 24 Department of Cooperative Governance3

    PAR

    T B

    : Pro

    gram

    me

    and

    Sub-

    Pro

    gram

    me

    Perf

    orm

    ance

    Pla

    ns

    Prog

    ram

    me

    1: A

    dmin

    istr

    atio

    n

    Purp

    ose:

    Pro

    vide

    str

    ateg

    ic le

    ader

    ship

    , man

    agem

    ent

    and

    supp

    ort

    serv

    ices

    to

    the

    Dep

    artm

    ent.

    Stra

    tegi

    c G

    oal 1

    : Effe

    ctiv

    e an

    d ef

    ficie

    nt in

    tern

    al c

    orpo

    rate

    gov

    erna

    nce

    proc

    esse

    s an

    d sy

    stem

    s

    Stra

    tegi

    c O

    bjec

    tive

    1.1

    : Im

    prov

    e D

    CoG

    gov

    erna

    nce

    proc

    esse

    s an

    d sy

    stem

    s by

    Mar

    ch 2

    020

    Tabl

    e 5:

    Pro

    gram

    me

    1 St

    rate

    gic

    obje

    ctiv

    e an

    nual

    tar

    gets

    for

    2018

    /19-

    2020

    /21

    Obj

    ecti

    veSt

    rate

    gic

    targ

    et

    Aud

    ited

    /Act

    ual P

    erfo

    rman

    ceEs

    tim

    ated

    Pe

    rfor

    man

    ceM

    ediu

    m-T

    erm

    Tar

    gets

    2014

    /15

    2015

    /16

    2016

    /17

    2017

    /18

    2018

    /19

    2019

    /20

    2020

    /21

    SO1.

    1: Im

    prov

    e D

    CoG

    go

    vern

    ance

    pr

    oces

    ses

    and

    syst

    ems

    by

    Mar

    ch 2

    020

    Fina

    l MPA

    T s

    core

    m

    aint

    aine

    d at

    3

    in M

    arch

    202

    1

    --

    New

    indi

    cato

    r Fi

    nal a

    vera

    ge

    MPA

    T s

    core

    im

    prov

    ed fr

    om

    2.7

    in 2

    015

    to 3

    in

    201

    8

    Fina

    l ave

    rage

    M

    PAT

    sco

    re

    mai

    ntai

    ned

    at 3

    in

    201

    9

    Fina

    l ave

    rage

    M

    PAT

    sco

    re

    mai

    ntai

    ned

    at 3

    in

    202

    0

    Fina

    l ave

    rage

    M

    PAT

    sco

    re

    mai

    ntai

    ned

    at 3

    in

    202

    1

    Tabl

    e 5.

    1: P

    rogr

    amm

    e 1

    Prog

    ram

    me

    perf

    orm

    ance

    indi

    cato

    rs a

    nd a

    nnua

    l tar

    gets

    for

    2018

    /19

    finan

    cial

    yea

    r

    Out

    put

    Perf

    orm

    ance

    In

    dica

    tor

    Aud

    ited

    Per

    form

    ance

    Es

    tim

    ated

    Pe

    rfor

    man

    ceM

    TEF

    Tar

    gets

    2014

    /15

    2015

    /16

    2016

    /17

    2017

    /18

    2018

    /19

    2019

    /20

    2020

    /21

    Stra

    tegi

    c O

    bjec

    tive

    1.1

    : Im

    prov

    e D

    CoG

    gov

    erna

    nce

    proc

    esse

    s an

    d sy

    stem

    s by

    Mar

    ch 2

    020

    Dep

    artm

    enta

    l M

    anag

    emen

    t Pe

    rfor

    man

    ce

    Ass

    essm

    ent T

    ool

    (MPA

    T)

    scor

    e

    Impr

    ovem

    ent

    in

    Dep

    artm

    enta

    l M

    PAT

    ave

    rage

    sc

    ore

    --

    New

    indi

    cato

    rFi

    nal a

    vera

    ge

    MPA

    T s

    core

    im

    prov

    ed fr

    om

    2.7

    in 2

    015

    to 3

    in

    201

    8

    Fina

    l ave

    rage

    M

    PAT

    sco

    re

    mai

    ntai

    ned

    at

    3 by

    31

    Mar

    ch

    2019

    Fina

    l ave

    rage

    M

    PAT

    sco

    re

    mai

    ntai

    ned

    at

    3 by

    31

    Mar

    ch

    2020

    Fina

    l ave

    rage

    M

    PAT

    sco

    re

    mai

    ntai

    ned

    at

    3 by

    31

    Mar

    ch

    2021

  • 252018/19 - Annual Performance Plan

    Tabl

    e 5.

    2: P

    rogr

    amm

    e 1

    Qua

    rter

    ly t

    arge

    ts 2

    018/

    19

    Perf

    orm

    ance

    In

    dica

    tor

    Rep

    orti

    ng

    Freq

    uenc

    y A

    nnua

    l Tar

    get

    2018

    /19

    Qua

    rter

    ly T

    arge

    ts

    Qua

    rter

    1Q

    uart

    er 2

    Qua

    rter

    3Q

    uart

    er 4

    Impr

    ovem

    ent

    in

    Dep

    artm

    enta

    l M

    PAT

    ave

    rage

    sc

    ore

    Qua

    rter

    lyFi

    nal a

    vera

    ge M

    PAT

    sc

    ore

    mai

    ntai

    ned

    at

    3 in

    201

    9

    No

    targ

    et

    Dep

    artm

    enta

    l MPA

    T K

    PS

    self-

    asse

    ssm

    ent

    scor

    es

    for

    2017

    sub

    mitt

    ed t

    o D

    PME

    by 3

    0 Se

    ptem

    ber

    2018

    Inte

    grat

    ed M

    anag

    emen

    t To

    ol t

    o ad

    dres

    s M

    PAT,

    A

    GSA

    and

    Inte

    rnal

    A

    udit

    findi

    ngs

    deve

    lope

    d an

    d ap

    prov

    ed b

    y To

    p M

    anag

    emen

    t C

    omm

    ittee

    by

    30

    Nov

    embe

    r 20

    18

    (Bas

    ed o

    n 20

    17 fi

    ndin

    gs)

    Fina

    l 201

    6 M

    PAT

    ave

    rage

    sc

    ores

    impr

    oved

    and

    m

    aint

    aine

    d at

    3 fr

    om

    2017

    /18

    finan

    cial

    yea

    r by

    31

    Mar

    ch 2

    019

    Tabl

    e 5.

    3: S

    trat

    egic

    Ris

    ks fo

    r 20

    18/1

    8 fin

    anci

    al y

    ear:

    Adm

    inis

    trat

    ion

    Stra

    tegi

    c ob

    ject

    ive

    Rel

    ated

    ris

    k M

    itig

    atin

    g m

    easu

    res

    Impr

    ove

    DC

    oG g

    over

    nanc

    e pr

    oces

    ses

    and

    syst

    ems

    by M

    arch

    202

    0N

    on-c

    ompl

    ianc

    e w

    ith p

    olic

    ies,

    proc

    edur

    es, d

    eleg

    atio

    ns o

    f aut

    hori

    ty

    Inef

    fect

    ive

    inte

    rnal

    con

    trol

    env

    iron

    men

    t

    Reg

    ular

    ove

    rsig

    ht b

    y th

    e In

    tern

    al C

    ontr

    ol C

    omm

    ittee

    and

    the

    DG

    on

    the

    impl

    emen

    tatio

    n of

    pol

    icie

    s, pr

    oced

    ures

    and

    impl

    emen

    tatio

    n of

    con

    sequ

    ence

    m

    anag

    emen

    t w

    here

    the

    re a

    re t

    rans

    gres

    sion

    s/no

    n-co

    mpl

    ianc

    es

    Dev

    elop

    and

    impl

    emen

    t th

    e M

    PAT

    impr

    ovem

    ent

    plan

    Rev

    iew

    and

    str

    engt

    hen

    man

    agem

    ent

    actio

    ns id

    entifi

    ed t

    o ad

    dres

    s ro

    ot c

    ause

    s of

    au

    dit

    findi

    ngs

    Impr

    ove

    the

    over

    all M

    PAT

    sco

    re t

    o 3

    Con

    duct

    aw

    aren

    ess/

    trai

    ning

    ses

    sion

    s on

    pol

    icie

    s an

    d de

    lega

    tions

    of a

    utho

    rity

  • 26 Department of Cooperative Governance3

    Tabl

    e 5.

    4: A

    dmin

    istr

    atio

    n -

    Rec

    onci

    ling

    Perf

    orm

    ance

    Tar

    gets

    wit

    h th

    e B

    udge

    t an

    d M

    TEF

    Adm

    inis

    trat

    ion

    201

    4/15

    2

    015/

    16

    201

    6/17

    2

    017/

    18

    201

    8/19

    2

    019/

    20

    202

    0/21

    Aud

    ited

    out

    com

    eB

    udge

    tM

    ediu

    m-t

    erm

    est

    imat

    es

    Min

    istr

    y 3

    2 91

    3 2

    7 75

    2 3

    2 08

    6 2

    6 71

    0 2

    9 44

    0 3

    1 50

    5 3

    3 68

    5

    Man

    agem

    ent

    16

    532

    20

    062

    14

    399

    18

    270

    18

    447

    19

    775

    21

    186

    Cor

    pora

    te S

    ervi

    ces

    109

    801

    1

    11 2

    42

    139

    846

    1

    04 8

    84

    113

    456

    1

    21 0

    95

    129

    334

    Fin

    anci

    al S

    ervi

    ces

    25

    276

    29

    983

    27

    159

    36

    374

    40

    569

    43

    347

    46

    294

    Inte

    rnal

    Aud

    it an

    d R

    isk

    Man

    agem

    ent

    8 6

    00

    11

    857

    7 4

    35

    16

    477

    13

    622

    14

    555

    15

    540

    Offi

    ce A

    ccom

    mod

    atio

    n 4

    3 30

    7 3

    5 59

    8 4

    6 34

    1 4

    1 58

    1 4

    3 02

    2 4

    5 43

    1 4

    7 93

    0

    Tota

    l 2

    36 4

    29

    236

    494

    2

    67 2

    66

    244

    296

    2

    58 5

    56

    275

    708

    2

    93 9

    69

    Cur

    rent

    pay

    men

    ts 2

    24 2

    35

    225

    637

    2

    60 2

    94

    238

    972

    2

    53 1

    92

    270

    058

    2

    88 0

    08

    Com

    pens

    atio

    n of

    em

    ploy

    ees

    110

    287

    1

    09 1

    13

    121

    844

    1

    25 1

    63

    141

    475

    1

    52 2

    00

    163

    610

    Goo

    ds a

    nd s

    ervi

    ces

    113

    948

    1

    16 5

    24

    138

    450

    1

    13 8

    09

    111

    717

    1

    17 8

    58

    124

    398

    Tran

    sfer

    s an

    d su

    bsid

    ies

    999

    4

    48

    185

    1

    50

    106

    1

    12

    118

    Paym

    ents

    for

    capi

    tal a

    sset

    s 1

    0 93

    2 9

    495

    6

    614

    5

    074

    5

    258

    5

    538

    5

    843

    Paym

    ents

    for

    finan

    cial

    ass

    ets

    263

    9

    14

    173

    1

    00

    -

    -

    -

    Tota

    l eco

    nom

    ic c

    lass

    ifica

    tion

    236

    429

    2

    36 4

    94

    267

    266

    2

    44 2

    96

    258

    556

    2

    75 7

    08

    293

    969

  • 272018/19 - Annual Performance Plan

    Programme 2: Regional and Urban Development and Legislative Support

    Purpose: Provide policy analysis and development to transform local government and improve corporate governance.

    The Programme’s strategic objectives are linked to the B2B programme.

    Strategic Goal 2: Lead and support the creation of prosperous cities and towns by restructuring the space economy

    Strategic objective 2.1: Facilitate the restructuring of municipal space economy through integrated development planning and spatial targeting by 31 March 2020

    Strategic objective 2.2: Support the creation of an enabling environment for municipalities to achieve inclusive economic development through the implementation of initiatives of the National Framework for LED by March 2020

    The Programme is structured into the following five sub-programmes to support the Department in achieving the objectives of its strategic outcome-orientated goals:

    Management: Regional, Urban Development and Legislative Support provides strategic leadership to the Programme to comply with and achieve Departmental targets aligned with the B2B approach.

    Local Government Legislative Support and Institutional Establishment drafts and amends primary and secondary legislation administered by the Department and provides our stakeholders with legal opinions on the interpretation of legislation and matters that impact our mandate. The sub-programme also provides technical support and advice on the determination and redetermination of municipal boundaries, provincial boundary issues and local government election.

    Urban Development Planning facilitates and monitors the implementation of the IUDF policy and local economic development plans. The sub-programme also supports municipalities to implement various tools that facilitate integrated urban development and spatial contracts in key restructuring zones.

    Spatial Planning Districts and Regions facilitates the implementation of planning frameworks to promote integrated development across Government and builds Geographic Information System (GIS) capacity in district and local municipalities to enhance evidence-based decision-making. The sub-programme also facilitates sustainable economic activities in the districts and lagging regions.

    Intergovernmental Policy and Practice reviews, clarifies and strengthens the policy and institutional environment for the assignment of powers and functions, as well as management of their powers and functions. The sub-programme is also responsible for strengthening collaborative intergovernmental management and practice between sectors, provinces and local government.

  • 28 Department of Cooperative Governance3

    Tabl

    e 6:

    Pro

    gram

    me

    2 St

    rate

    gic

    obje

    ctiv

    e an

    nual

    tar

    gets

    for

    2018

    /19-

    2020

    /21

    Stra

    tegi

    c ta

    rget

    St

    rate

    gic

    targ

    et

    Aud

    ited

    /Act

    ual P

    erfo

    rman

    ceEs

    tim

    ated

    Pe

    rfor

    man

    ceM

    ediu

    m-T

    erm

    Tar

    gets

    2014

    /15

    2015

    /16

    2016

    /17

    2017

    /18

    2018

    /19

    2019

    /20

    2020

    /21

    SO 2

    .1: F

    acili

    tate

    th

    e re

    stru

    ctur

    ing

    of m

    unic

    ipal

    sp

    ace

    econ

    omy

    thro

    ugh

    inte

    grat

    ed

    deve

    lopm

    ent

    plan

    ning

    and

    sp

    atia

    l tar

    getin

    g by

    31

    Mar

    ch

    2020

    Supp

    ort

    prog

    ram

    mes

    im

    plem

    ente

    d in

    12

    iden

    tified

    in

    term

    edia

    te

    citie

    s by

    Mar

    ch

    2021

    IUD

    F im

    plem

    enta

    tion

    plan

    fina

    lised

    Com

    preh

    ensi

    ve

    supp

    ort

    prog

    ram

    me

    for

    inte

    rmed

    iate

    ci

    ties

    final

    ised

    1 su

    ppor

    t pr

    ogra

    mm

    e de

    velo

    ped

    in a

    ta

    rget

    ed p

    ilot

    mun

    icip

    ality

    -

    Polo

    kwan

    e LM

    -

    to im

    prov

    e sp

    atia

    l, ec

    onom

    ic

    plan

    ning

    and

    im

    plem

    enta

    tion

    in li

    ne w

    ith

    IUD

    F-id

    entifi

    ed

    prio

    ritie

    s by

    31

    Mar

    ch 2

    018

    Supp

    ort

    prog

    ram

    me

    impl

    emen

    ted

    in 4

    iden

    tified

    in

    term

    edia

    te

    citie

    s by

    31

    Mar

    ch 2

    019

    Supp

    ort

    prog

    ram

    me

    impl

    emen

    ted

    in 4

    iden

    tified

    in

    term

    edia

    te

    citie

    s by

    31

    Mar

    ch

    2020

    Supp

    ort

    prog

    ram

    me

    impl

    emen

    ted

    in 4

    iden

    tified

    se

    cond

    ary

    citie

    s by

    31

    Mar

    ch 2

    020

    Supp

    ort

    prog

    ram

    me

    impl

    emen

    ted

    in 4

    iden

    tified

    in

    term

    edia

    te

    citie

    s by

    31

    Mar

    ch 2

    021

  • 292018/19 - Annual Performance Plan

    Tabl

    e 6.

    1: P

    rogr

    amm

    e 2

    Prog

    ram

    me

    perf

    orm

    ance

    indi

    cato

    rs a

    nd a

    nnua

    l tar

    gets

    for

    the

    2018

    /19

    finan

    cial

    yea

    r

    Out

    put

    Perf

    orm

    ance

    In

    dica

    tor

    Aud

    ited

    /Act

    ual P

    erfo

    rman

    ceEs

    tim

    ated

    Pe

    rfor

    man

    ceM

    ediu

    m-T

    erm

    Tar

    gets

    2014

    /15

    2015

    /16

    2016

    /17

    2017

    /18

    2018

    /19

    2019

    /20

    2020

    /21

    Stra

    tegi

    c O

    bjec

    tive

    2.1

    : Fac

    ilita

    te t

    he r

    estr

    uctu

    ring

    of m

    unic

    ipal

    spa

    ce e

    cono

    my

    thro

    ugh

    inte

    grat

    ed d

    evel

    opm

    ent

    plan

    ning

    and

    spa

    tial

    tar

    geti

    ng b

    y 31

    Mar

    ch

    2020

    Spat

    ial a

    nd

    econ

    omic

    pl

    anni

    ng

    impl

    emen

    ted

    Supp

    ort

    prog

    ram

    mes

    im

    plem

    ente

    d in

    sel

    ecte

    d in

    term

    edia

    te

    citie

    s

    IUD

    F im

    plem

    enta

    tion

    plan

    fina

    lised

    Com

    preh

    ensi

    ve

    supp

    ort

    prog

    ram

    me

    for

    inte

    rmed

    iate

    ci

    ties

    final

    ised

    1 su

    ppor

    t pr

    ogra

    mm

    e de

    velo

    ped

    in a

    ta

    rget

    ed p

    ilot

    mun

    icip

    ality

    -

    Polo

    kwan

    e LM

    - t

    o im

    prov

    e sp

    atia

    l, ec

    onom

    ic p

    lann

    ing

    and

    impl

    emen

    tatio

    n in

    line

    with

    IUD

    F-id

    entifi

    ed p

    rior

    ities

    by

    31

    Mar

    ch 2

    018

    Supp

    ort

    prog

    ram

    me

    impl

    emen

    ted

    in 4

    iden

    tified

    in

    term

    edia

    te

    citie

    s by

    31

    Mar

    ch 2

    019

    Supp

    ort

    prog

    ram

    me

    impl

    emen

    ted

    in 4

    iden

    tified

    in

    term

    edia

    te

    citie

    s by

    31

    Mar

    ch 2

    020

    Supp

    ort

    prog

    ram

    me

    impl

    emen

    ted

    in 4

    iden

    tified

    in

    term

    edia

    te

    citie

    s by

    31

    Mar

    ch 2

    021

    Stra

    tegi

    c ob

    ject

    ive

    2.2:

    Sup

    port

    the

    cre

    atio

    n of

    an

    enab

    ling

    envi

    ronm

    ent

    for

    mun

    icip

    alit

    ies

    to a

    chie

    ve in

    clus

    ive

    econ

    omic

    dev

    elop

    men

    t th

    roug

    h th

    e im

    plem

    enta

    tion

    of i

    niti

    ativ

    es o

    f the

    Nat

    iona

    l Fra

    mew

    ork

    for

    LED

    by

    Mar

    ch 2

    020

    Reg

    iona

    l Ec

    onom

    ic

    Dev

    elop

    men

    t Pl

    anni

    ng

    Fram

    ewor

    k on

    reg

    iona

    l ec

    onom

    ic

    deve

    lopm

    ent

    plan

    ning

    ado

    pted

    by

    the

    Min

    iste

    r

    New

    indi

    cato

    r Fr

    amew

    ork

    on r

    egio

    nal

    econ

    omic

    de

    velo

    pmen

    t pl

    anni

    ng

    appr

    oved

    by

    the

    Min

    iste

    r by

    31

    Mar

    ch 2

    019

    Reg

    iona

    l ec

    onom

    ic

    deve

    lopm

    ent

    plan

    s fo

    r pi

    lot

    regi

    ons

    deve

    lope

    d by

    31

    Mar

    ch 2

    020

    Reg

    iona

    l ec

    onom

    ic

    deve

    lopm

    ent

    plan

    s im

    plem

    ente

    d in

    se

    lect

    ed r

    egio

    ns

    by 3

    1 M

    arch

    20

    21

  • 30 Department of Cooperative Governance3

    Tabl

    e 6.

    2: P

    rogr

    amm

    e 2

    Qua

    rter

    ly t

    arge

    ts fo

    r 20

    18/1

    9

    Perf

    orm

    ance

    Indi

    cato

    rR

    epor

    ting

    Fr

    eque

    ncy

    Ann

    ual T

    arge

    t 20

    18/1

    9Q

    uart

    erly

    Tar

    gets

    Qua

    rter

    1Q

    uart

    er 2

    Qua

    rter

    3Q

    uart

    er 4

    Supp

    ort

    prog

    ram

    mes

    im

    plem

    ente

    d in

    sel

    ecte

    d in

    term

    edia

    te c

    ities

    Qua

    rter

    lySu

    ppor

    t pr

    ogra

    mm

    e im

    plem

    ente

    d in

    4

    iden

    tified

    inte

    rmed

    iate

    ci

    ties

    by 3

    1 M

    arch

    201

    9

    Supp

    ort

    prog

    ram

    me

    impl

    emen

    ted

    in 1

    id

    entifi

    ed in

    term

    edia

    te

    city

    by

    30 Ju

    ne 2

    018

    Supp

    ort

    prog

    ram

    me

    impl

    emen

    ted

    in 1

    id

    entifi

    ed in

    term

    edia

    te

    city

    by

    30 S

    epte

    mbe

    r 20

    18

    Supp

    ort

    prog

    ram

    me

    impl

    emen

    ted

    in 1

    id

    entifi

    ed in

    term

    edia

    te

    city

    by

    31 D

    ecem

    ber

    2018

    Supp

    ort

    prog

    ram

    me

    impl

    emen

    ted

    in 1

    id

    entifi

    ed in

    term

    edia

    te

    city

    by

    31 M

    arch

    201

    9

    Fram

    ewor

    k on

    reg

    iona

    l ec

    onom

    ic d

    evel

    opm

    ent

    adop

    ted

    by t

    he M

    inis

    ter

    Qua

    rterly

    Fram

    ewor

    k on

    reg

    iona

    l ec

    onom

    ic d

    evel

    opm

    ent

    adop

    ted

    by t

    he

    Min

    iste

    r by

    31

    Mar

    ch

    2019

    No

    targ

    et

    Res

    earc

    h R

    epor

    t on

    re

    gion

    s an

    d re

    gion

    al

    econ

    omic

    dev

    elop

    men

    t by

    30

    Sept

    embe

    r 20

    18

    Dis

    cuss

    ion

    docu

    men

    t on

    con

    sulta

    tions

    on

    fram

    ewor

    k on

    reg

    iona

    l ec

    onom

    ic d

    evel

    opm

    ent

    plan

    ning

    dev

    elop

    ed b

    y 31

    Dec

    embe

    r 20

    18

    Fram

    ewor

    k on

    reg

    iona

    l ec

    onom

    ic d

    evel

    opm

    ent

    adop

    ted

    by t

    he

    Min

    iste

    r by

    31

    Mar

    ch

    2019

    Tabl

    e 6.

    3: S

    trat

    egic

    Ris

    ks fo

    r 20

    18/1

    8 fin

    anci

    al y

    ear:

    Reg

    iona

    l and

    Urb

    an D

    evel

    opm

    ent

    and

    Legi

    slat

    ive

    Supp

    ort

    Stra

    tegi

    c ob

    ject

    ive

    Rel

    ated

    ris

    k M

    itig

    atin

    g m

    easu

    res

    Faci

    litat

    e th

    e re

    stru

    ctur

    ing

    of m

    unic

    ipal

    spa

    ce e

    cono

    my

    thro

    ugh

    inte

    grat

    ed d

    evel

    opm

    ent

    plan

    ning

    and

    spa

    tial

    targ

    etin

    g by

    Mar

    ch 2

    020

    Gov

    ernm

    ent

    infr

    astr

    uctu

    re p

    rogr

    amm

    es im

    plem

    ente

    d in

    an

    unco

    ordi

    nate

    d m

    anne

    r th

    ereb

    y lim

    iting

    impa

    ct

    Del

    ays

    in t

    he im

    plem

    enta

    tion

    of t

    he IU

    DF

    Dev

    elop

    , im

    plem

    ent

    and

    mon

    itor

    the

    inte

    grat

    ed

    stra

    tegy

    Esta

    blis

    h a

    Foru

    m t

    o en

    gage

    the

    diff

    eren

    t ro

    le p

    laye

    rs

    Supp

    ort

    4 In

    term

    edia

    te C

    ities

    to

    impl

    emen

    t th

    e IU

    DF

    Soug

    ht C

    ounc

    il re

    solu

    tions

    to

    prov

    ide

    supp

    ort

    on t

    he

    iden

    tified

    Mun

    icip

    aliti

    es

  • 312018/19 - Annual Performance Plan

    Stra

    tegi

    c ob

    ject

    ive

    Rel

    ated

    ris

    k M