Annual Report 2010-11
1
Annual Report
2010-11
Centre for e-Governance
(A Society created under Karnataka Societies Registration Act 1960)
GOVERNMENT OF KARNATAKA
Centre for e-Governance
Room No-108, 1st
floor, Gate No. 2,
M.S.Building, Bangalore - 560 001
Annual Report 2010-11
2
1 Centre for e-Governance ................................................................................................. 3
2 Projects Managed by CeG ............................................................................................... 5
3 State Data Centre (SDC) .................................................................................................. 5
4 Karnataka State Wide Area Network (KSWAN) ................................................................ 8
5 Karnataka Secretariat LAN (SecLAN).............................................................................. 11
6 Setting up of Bangalore One Integrated Citizens Service Centers ................................... 12
7 Setting up of Karnataka One Integrated Services Centres .............................................. 13
8 e-Procurement ............................................................................................................. 14
9 Human Resource Management System (HRMS) ............................................................ 16
10 Karnataka Web Portal Project ....................................................................................... 17
11 UID / AADHAAR Project ................................................................................................ 19
12 Capacity Building .......................................................................................................... 19
13 State Portal and State Services Delivery Gateway (SSDG) .............................................. 22
14 Karnataka Resident Data Hub (KRDH) ........................................................................... 23
Annual Report 2010-11
3
1 Centre for e-Governance
Centre for e-Governance is a Society setup by the Department of Administrative Reforms (DPAR),
Government of Karnataka, under the Karnataka Societies Registration Act 1960. The area of operation of
the society extends to whole of Karnataka State. The Society was established in the year 2006. It
functions at 108, Ist floor, M.S.Building, Ambedkar Veedhi, Bangalore 560 001.
Objectives
Centre for e-Governance is an autonomous and independent body set up for conceptualizing,
implementing and monitoring of various e-Governance initiatives in Karnataka. The objectives of the
Society are;
a) To facilitate the rapid and effective use of Information Technology for the benefit of common
man.
b) To conceive, implement and monitor various e-Governance projects in the state in order to
achieve the goal of the State Government to take IT to the common man.
c) To provide technical support to various Government departments and entities in their IT projects.
d) To co-ordinate with the Government departments and entities as well as undertake a few critical
projects that are likely to be useful to more than one department.
e) To promote usage of Kannada in computers.
f) Any other object in furtherance of e-Governance in the State of Karnataka
Organization of the Centre for e-Governance
Centre for e-Governance (CeG) is governed by a Governing Council. Chief Secretary to Government of
Karnataka is the Chairman of the Governing Council. Principal Secretary, DPAR (e-Governance) is the
Chairman of the Society. An Executive Committee chaired by the Principal Secretary (e-Gov) and
comprising of senior officers of Government of Karnataka, representatives from academia, NIC, industry
provides strategic and operational guidance to the activities of the society. day to day functions are
performed by the Chief Executive Officer.
4
Organgram given below depicts the organizational structure of the CEG
.
The details of the officers who functioned as Chairman, Chief Executive Officer and Pr
during 2010-11 are given below:
Designation/Project
Chairman, Executive
Committee
Chief Executive Officer, CeG
Project Director, KSWAN
Project Director, Capacity
Building Scheme (NeGP)
Project Director, e
Procurement
Project Officer, HRMS
Replication of Bangalore One
in Bangalore /Assistant
Director, Bangalore One
Chairman: Chief Secretary to Government of Karnataka
Chairman, Princiapl Secretary, DPAR(e
KSWAN
SDC
HRMS
Annual Report 2010-11
rgangram given below depicts the organizational structure of the CEG
The details of the officers who functioned as Chairman, Chief Executive Officer and Pr
are given below:
Officer Period
Sri M.N. Vidhyashankar IAS
Principal Secretary (e-Gov)
01.04.2010 to
31.03.2011
Dr. D.S. Ravindran IFS 01.04.2010 to
31.03.2011
(except the
period shown
below)
Dr. D.S. Ravindran IFS 01.04.2010
02.08.2010
Sr. Vipin Singh, IFS 03.08.2010 to
31.03.2011
Dr. D.S. Ravindran IFS 01.04.2010
31.03.2011
Dr. Masood Sharif, KES
01.04.2010 to
31.03.2011
Sri. H. S.Shankar 01.04.2010
31.03.2011
Smt.Kumudavally 01.04.2010
31.03.2011
Governing Council
Chairman: Chief Secretary to Government of Karnataka
Executive Committee
Chairman, Princiapl Secretary, DPAR(e-Governance)
Chief Executive Officer (CEO)
HRMS
e-Procurement
SecLAN & FMS
SDSDG
UID Enrollment,
IEC & ICT
Setting up of B1 & K1
Telecentres
Capacity Building
(GoK)
rgangram given below depicts the organizational structure of the CEG
The details of the officers who functioned as Chairman, Chief Executive Officer and Project Directors
Remarks
01.04.2010 to
01.04.2010 to
(except the
period shown
to Additional Charge
03.08.2010 to
to Additional Charge
01.04.2010 to
to PO to HRMS
to Bangalore One
Chairman: Chief Secretary to Government of Karnataka
Governance)
Capacity Building
(GoK)
Capacity Building (NeGP)
Karnataka State Web
Portal
Annual Report 2010-11
5
Replication of Bangalore one
in other cities/
Project Manager KOne
Sri Shashidhar Sarangmat 01.04.2010 to
31.03.2011
Replication of
BangaloreOne in
other cities
State Data Centre/project
Manager
Sri. Raghavendra 01.04.2010 to
31.03.2011
Project Consultant
SDC
Project Officer, SecLAN Sri. Pulakeshi Bhagyavan 01.04.2010 to
10.08.2010
Project Officer,
Sec-LAN
Smt. Champa 11.08.2010 to
31.03.2011
Project Officer,
Sec-LAN
Project Director, Capacity
Building GOK
Sri. Prabhakar T 1.10.2010 to
31.03.2011
Project Director,
Capacity Building
GOK
2 Projects Managed by CeG
A. Core Infrastructure Project
a. State Data Centre (SDC)
b. Karnataka State Wide Area Network (KSWAN)
c. Secretariat LAN (SecLAN)
d. Setting up of Bangalore One and Karnataka One Centres
B. Core Enterprise Applications
a. e-Procurement
b. Human Resource Management System(HRMS)
c. State Portal and State Service Deliver Gateway
d. Karnataka Resident Data Hub(KRDH)
C. Citizen Delivery Services
a. UID Enrolment
D. Capacity Building
a. Capacity building scheme (NeGP)
b. Capacity Building Scheme (GOK)
3 State Data Centre (SDC)
The State Data Centre of Government of Karnataka was set up during 2004-05 as a core common
technology infrastructure. The State Data Centre (SDC) provides the infrastructure required for
consolidating state level applications at a central facility.
GOI has selected Centre for e-Governance as the nodal agency for setting up of Karnataka State
Data Centre (KSDC) under NeGP. M/S PwC (empanelled agency by DIT) was appointed as
State Consultant. Detailed Project Report for setting up of KSDC was submitted to DIT for
approval and the same was sanctioned by DIT.RFP was prepared for selection of an agency for
Annual Report 2010-11
6
setting up of KSDC under BOOT model. This RFP was approved by the DIT and L1 bidder M/S
TCS was selected through a competitive bidding process.
SDC provides shared infrastructure for various e-Governance projects and facilitates
provisioning of government services online & helps in providing better and efficient services to
citizens.
Objectives
• Centralizing & consolidating various government databases
• Providing shared infrastructure for various e-Governance projects
• Facilitating provisioning of government services online
• Facilitating provisioning of better and efficient services to citizens
• Facilitating providing services for backend Departments
SDC provides the following benefits for the Departments –
• Physical Security and 24x7 monitoring of servers,
• Data Security through implementation of Firewall, IPS, Antivirus,
• No procurement & maintenance cost of hardware and software for the Departments,
• Vendor support, which ensures faster resolution of issues,
• High Availability of Servers, Storage, Network, Data convergence, Centralization of
Departmental data.
• SDC can also be used as Disaster Recovery (DR) site & as Business Continuity (BC) site.
Status of the Project
Status of applications hosted /Departments using SDC as on 31st March 2011 are as shown below
2010-11
No. of Departments using SDC 21
No. of Applications hosted at SDC 43
New applications hosted – 14 new applications of 10 departments were hosted at SDC
• UID of e-Governance department
• GIM of IT&BT department
• UPOR of revenue department
• Vatsoft of Commercial Tax department
• Pelsoft of Commercial Tax department
• Anthya Samskara neravu yojane of DSSP department
• Adarsha Vivaha yojane of DSSP department
• Financial Inclusion of DSSP department
• Borewell management System of Tumkur ZP
Annual Report 2010-11
7
• FORDIS of Forest department
• Women & Child Departmental portal
• Juvenile Justice Automation of Women & Child department
• e-Beat application of CID
• Sujala application of Watershed department
Key Activities
• Upgraded virtualization software from Vmware ESX server to Vsphere
• Augmented Vsphere servers from 2 node cluster to 4 node cluster for high availability
• Implementation of SQL 2008 R2 on clustered mode for UID project
• Up gradation from L2 to L3 switch for segregation of SECLAN & KSWAN traffic
• Implementation of LTO4 tape drive for UID project
• Upgraded Trend IMSS & Scanmail softwares
• Procurement of new SAN
• Procurement of LTO5 tape library
• Augmentation of Windows 2008 licenses
• Through tender process, TCS was selected as the Data Centre Operator for KSDC
• Contract was signed between TCS and CEG for setting up of KSDC.
• Integration of SRO with B1
• Integration of K1 with KSRTC through B1
• Virtualized 52 servers
• Setting up of Remote Management Centre (RMC) for accessing the departmental servers
remotely from MS building
• Migration of commercial Tax department’s servers to SDC
• All new applications to be hosted at SDC, must undergo mandatory security audit, before
it is hosted
• Setting up of common Antivirus servers for the departments at SDC
Statement showing the details of Grants Received, Expenditure, Balance as on 31.03.2011
Rs. In lakhs
Source of
Fund
Opening
Balance as on
01-04-2010
Grants
Received
Interest
Earned
Expenditure
incurred
Balance as
on 31-03-
2011
State Data
Centre - TFC 296.52 - 1.91 228.66 69.77
Annual Report 2010-11
8
e-
Governance
Plan
16.87 500.00 1.39 208.33 309.93
State Data
Centre -DIT 712.65 - 47.95 22.87 737.73
Total 1026.04 500 51.25 459.86 1117.43
4 Karnataka State Wide Area Network (KSWAN)
Objectives
To establish a State Information Highway by setting up a single unified cost-effective, secure
and reliable State Wide Area Network through Public Private Partnership so as to bring the
advantages of a connected Government to its citizens regardless of their location in the state and
to make the working of the Government more efficient and transparent.
The broad objectives of the Project are:
• To create a plug and connect environment for all Government Departments/ PSUs so as
to provide bandwidth on demand.
• To establish a highly reliable, robust and secure communication corridor.
• To provide reliable and secure backbone for network.
• To facilitate storage of data at site meant for Disaster recovery.
• To facilitate Governments to go for centralised architecture for their e-Government
applications so as to decrease total cost of ownership.
KSWAN Services
A number of applications are making use of the KSWAN providing Data Services to the
department users. Government Offices would be provided with connectivity, which enables each
office to send/receive files, have e-transactions ONLINE. This will enable Departments to:
a. Connect to their department applications
b. Connect to core applications
Data Services
Major Applications Rolled Out:
• Department wide Enterprise applications provided
o Bhoomi (Revenue Department)
o Khajane (Treasury Department)
o Kaveri (Stamps and Registration Department)
o Nemmadi (E Governance/Revenue Department)
Annual Report 2010-11
9
• Applications cutting across departments
o eProcurement
o HRMS (e_Governance Department)
o Paperless office(File and Letter Monitoring system)
• Department specific applications
o Raitha Mitra & AgrisNet (Agriculture department)
o STEERS(Election Office)
o Case Data Transfer (High Court)
o Vaahan/Sarathi (Transport Department)
o Department of Municipal Administration
o Akshaya (Food & Civil Supplies Department)
Video Services
Video Conferencing Service is a shared service across all departments. Dedicated VC facility has
been established to five departments in Bangalore viz.
• Forest Department,
• High Court,
• Prison Department,
• Department of Municipal Administration
• Karnataka Information Commission
• Office of Hon’ble Governor and Chief Minister and the District administration.
• Mobile video conferencing facilities.
Voice Services
• VoIP (IP Phone) have been provided to 2280 remote offices for dedicated voice services.
• Infrastructure Management Services
• Managed Security Services
• Help Desk Services
• Computing facilities at all Districts and Taluka locations through Government business
centres in 126
Key Activities and achievements
• 3 Mini POPs created during the year
• 310 remote offices connected
• Video Conferencing Facility extended to Karnataka Information Commission, High
Courts and Prison Department
• 2 Integrated Video Conferencing Facility provided to Agriculture and Education
Department
• 21 Trolley based VCs are made operational
• IP Phones provided to 310 remote offices
Annual Report 2010-11
10
• Revenue, Stamps and Registration, Food and Civil Supplies, Municipal Administration,
Treasury, Transport, High Court, District Courts, Prisons, Agriculture, Mines and
Geology and Education Departments are given the facility of using SWAN
Status of the Project
TYPE 2010-11
1. POPs 178
2. Remote Offices 2280
3. Govt. Business Centres 126
4. Video Conference Facility
a. State
b. Districts
c. Integrated
9
30 (Co-located with DCRs)
2
5. Mobile Video Conferencing facility 2 Mobile Vans in the state.
6. No of applications riding on KSWAN 14
Statement showing the details of Grants Received, Expenditure, Balance as on 31.03.2011
Rs. In lakhs
Source of
Fund
Opening
Balance as on
01-04-2010
Grants
Received
Interest
Earned
Expenditure
incurred
Balance as
on 31-03-
2011
KSWAN DIT 2,484.28 -
126.67 1,023.58 1587.37
KSWAN TFC 3,102.75 - 34.14 863.92 2,272.97
e-Gov Plan 5.05 535.00 3.03 - 543.08
Bandwidth
ACA 219.90 - 7.46 687.30 -459.94
Site
Preparation
ACA
748.95 0 40.67 0 789.62
Total 6,560.93 535.00 211.96 2,574.80 4733.09
Annual Report 2010-11
11
5 Karnataka Secretariat LAN (SecLAN)
Vidhana Soudha, MS Building and Annex 5 host the senior administration & management staff
of various departments of Government of Karnataka (GoK). The secretariat Local Area Network
(SecLAN) was set up to interconnect all the administrative departments housed in these three
buildings. This Secretariat Local Area Network (SECLAN) is extensively used by the Karnataka
Government Secretariat to run various e-Governance applications such as File Monitoring
System, Letter Monitoring System and Attendance Monitoring System apart from Intranet and
Internet.
Objectives
• To establish a reliable and available Local Area Network to address the current needs of
the Departments and users in these facilities.
• To establish a network to provide triple play services including data, voice and video
traffic.
• To provide for scalability for growth in future in terms of addition of more users to the
network.
• To enable controlled access to the network and IT resources in these facilities.
• To establish effective monitoring and management systems for the SECLAN.
• To enable seamless integration with Karnataka State Data Centre (KSDC), ISP and
Karnataka State wide area network (KSWAN) projects.
• Implementation of processes and procedures for effective management and monitoring of
SECLAN.
Key Activities
• Upgradation of LAN cabling from CAT 5 to CAT 6 is completed in M S Building,
Vidhana Soudha, Lokayukta and Annexe Building.
• Wireless Access Points have been installed at MS Building, Vidhana Soudha,Annexe,
and Lokayukta.
• UPS facility is made available for the Hub Rooms and Core Switch rooms :
• Network Management System has been installed with features to monitor the uptime of
the devises connected to the network
• FAT was declared successful on 14th February, 2011.
• Automated SLA reports being generated by the NMS Tool.
• RFP for Facility Management Services was floated on 06/09/2010
Annual Report 2010-11
12
Statement showing the details of Grants Received, Expenditure, Balance as on 31.03.2011.
Rs. In lakhs
Source of
Fund
Opening
Balance as on
01-04-2010
Grants
Received
Interest
Earned
Expenditure
incurred
Balance as
on 31-03-
2011
e-
Governance
Plan
- 93.75 0.05 80.43 13.37
6 Setting up of Bangalore One Integrated Citizens Service Centers
Government of Karnataka (GoK) in order to provide integrated services to the citizens deployed
the tools of ICT, so as to enhance Speed, Convenience, Certainty and Accountability in
providing such services through the concept of a 'One-Stop-Shop’ facility established
BangaloreOne Centers across the city and the project was launched on 2nd April 2005 and runs
on Public Private Partnership (PPP) model.
Centre for e Governance was entrusted the task of replication of Bangalore One in Bangalore and other
cities of Karnataka in the year 2009. While the sites for setting up of the centres are provided by the
BBMP/BDA or by the District administration, the work of setting up centres through civil and electrical
work is carried out by the CeG. After the centres are set up, they are handed over to the Directorate of
Electronic Delivery of Citizen Services for operations and maintenance.
6.1 Key Activities
Status of the Project
No. of Centres 68
No. of Services 33
No. of Transactions (Crores) 1.09
Annual Report 2010-11
13
Turnover (Rs./Crores) 858.40
Key Activities
• 13 Centres opened during the year
• Interior work taken in 10 centres and completed the same during the year
Statement showing the details of Grants Received, Expenditure, Balance as on 31.03.2011.
Rs. In lakhs
Source of
Fund
Opening
Balance as on
01-04-2010
Grants
Received
Interest
Earned
Expenditure
incurred
Balance as
on 31-03-
2011
Bangalore
One – TFC 330.65 - 1.83 89.53 242.95
e-
Governance
Plan
5.23 150.00 1.18 0.18 156.23
Total 335.88 150 3.01 89.71 399.18
7 Setting up of Karnataka One Integrated Services Centres
On successful implementation of Bangalore One project, Government of Karnataka has decided to
replicate it to tier two cities of Karnataka. Accordingly Vide GO DPAR 32 EGM 2006, Dated 17th January
2007, the Govt. has approved the replication of the Bangalore One Project to other cities of Karnataka.
Vide Government Order NO DPAR 96 EGV 2008 Dated 2nd
September 2008 decided to entrust the work
of creating interiors, furniture’s etc to Center for e-Governance. Director, EDCS to suggest Center for e-
Governance, the sites to be developed and Center for e-Governance to complete the work in all respects
and hand over to EDCS Directorate for operations.
7.1 Progress made during 2010-11
Interiors for 6 Citizen Service Centres has been completed in the following Cities
Annual Report 2010-11
14
o Bellary – 1 Center
o Mysore – 1 Center
o Tumkur – 1 Center
o Hubli-Dharwad - 3 Centres
• Total 33 Centres are operational in 9 cities
Statement showing the details of Grants Received, Expenditure,Balance as on 31.03.2011.
Rs. In lakhs
Source of
Fund
Opening
Balance as on
01-04-2010
Grants
Received
Interest
Earned
Expenditure
incurred
Balance as
on 31-03-
2011
e-
Governance
Plan
57.20 202.50 1.33 2.68 258.35
8 e-Procurement
In 2003, the State Cabinet had approved implementation of a unified e-Procurement platform. A
Steering Committee was constituted, under the Chairmanship of Additional Chief Secretary,
Government of Karnataka to provide overall guidance and direction to e-Procurement project. A
Project Monitoring Committee, under the Chairmanship of Principal Secretary, e-Governance
and Chairman, Centre for e-Governance, was constituted to provide policy level support and
guidance. A Functional Requirement Specification Committee, under the Chairmanship of Chief
Executive Officer, Centre for e-Governance, was constituted to discuss the customization
requests and other requirements related to e-Procurement application software. The e-
Procurement Cell, headed by a senior government official, provides operational support for
successful implementation and maintenance of e-Procurement project.
Objectives
• To enhance transparency and accountability of government procurement processes
• To promote competitive market-driven bidding
• To enable ease of access to contractor community on various procurement tenders
• To provide a common environment for all types of tenders
• To create infrastructure for effective implementation of procurement policies
• To involve less paper, thereby, adopting green working
Key Activities
Annual Report 2010-11
15
The following major additional features have been incorporated in the e-Procurement system
during the year 2010-11
• Enabling of provision for H1 Tenders
• Uploading of inventory data through pre-designed spreadsheet
• Auto-Instruction for refund of EMD
• Implementation of Simplified e-Auctions in Urban Development Authority(Mysore)
• Integration of Bangalore One / Karnataka One for auction payments
• Enabling of DSC-based login for all users
• A series of contractor workshops and department training were conducted at Training
Centres in Bangalore / Dharwad and various onsite locations.
• PWD allotted a building for setting up of training centre at Dharwad and the building was
taken over by the CEG on 10.03.2011
Growth in e-Procurement over the last four years
Parameter 2007-08 2008-09 2009-10 2010-11 Total
New Departments
7
19
31
58
115
No. of Govt. Users
74
972
1,072
2,455
4,573
No. of Suppliers Registered
130
1,775
4,420
7,700
14,025
No. of Tenders Published
15
1,262
4,883
14,166
20,326
Value of Tenders Published (Rs. Crore)
57
10,226
25,630
33,554
69,468
Government Officials & Suppliers Trained
865
1,034
2,936
3,803
8,638
Digital Signatures Issued
205
1,003
1,874
3,966
7,048
Awards
FutureGov Award 2010 – This international award is constituted by FutureGov Magazine,
Malaysia. The award was conferred to e-Procurement project as the best business process in
Public Sector.
Project Expenditure
The e-Procurement project is being managed entirely from the interest earned on Fixed Deposits
and the transactional revenue collected from bidders. The e-Procurement project met all its
Annual Report 2010-11
16
expenditure for the year 2010-11 from its operational revenue as mentioned above. The details
are as follows.
Statement showing the details of Grants Received, Expenditure, Balance as on 31.03.2011.
Rs. In lakhs
Source of
Fund
Opening
Balance as on
01-04-2010
Grants
Received
Interest
Earned
Expenditure
incurred
Balance as
on 31-03-
2011
e-
Procurement
TFC
819.90 - 4.75 644.11 180.54
NISG 3.17 - 0.10 - 3.27
e-Tendering 254.94
44.03*
447.61** 102.46 644.12
Total 1078.01 44.03 452.46 746.57 827.93
* Pertains to the income from transaction fee collected from the bidders
** pertains to the interest earned on the EMDs collected and on the transaction fees.
9 Human Resource Management System (HRMS)
The Government of Karnataka started implementing Human Resource Management System
since January 2007 with the World Bank Assistance. Contract agreement was signed with CMC
Ltd. as consultant to study, design, develop, implement and maintain for two years for a total
cost of 4.35 crores.
Objectives
• To create and maintain a database of all Government employees
• To get a consistent and unified picture of the employee data
• To maintain Service Registers of all employees in electronic form
• To derive cadre management information for planning by the heads of
departments/Ministries
• Data processing and projection/ budgeting of employee related salary expenses
Status of the Project
Annual Report 2010-11
17
• Fully aided educational institutions covering nearly 70,000 employees were brought
under HRMS.
• Many Boards Corporations and other Govt. bodies were requesting us to implement
HRMS in their organizations. Therefore in order to accommodate, a separate
infrastructure was set up in SDC, which is very much similar to the exisiting
infrastructure (i.e Two servers with 2 CPU each, quad core and 40 GB RAM each, O.S
2003 64 bit, Oracle 11G)
• One Computer, One Dot Matrix Printer and One UPS with ½ hr back up is distributed to
2854 DDOs throughout the State.
Key Activities
• 1000 employees of Karnataka Soaps and Detergent Limited were brought under HRMS.
• 2000 DDOs pertaining to four districts were given refresher training in HRMS
• User manual was printed and distributed to all DDO’s to help them in using HRMS application
more effectively.
• Provision for Calculation and generation of reports for arrears salary like Increment, Promotion ,
Leave and DA were developed
Project Expenditure
HRMS project received grants from Government under plan scheme, and from 12th
Finance Commission
(TFC). The details are as follows.
Statement showing the details of Grants Received, Expenditure, Balance as on 31.03.2011.
Rs. In lakhs
Source of
Fund
Opening
Balance as on
01-04-2010
Grants
Received
Interest
Earned
Expenditure
incurred
Balance as
on 31-03-
2011
e-
Governance
Plan
22.14 25.00 0.70 45.95 1.89
10 Karnataka Web Portal Project
Karnataka State Web portal project is aiming at one stop information hub of all Govt.
departments. It facilitates departments to host their web site in this common platform with an
access to update them periodically.
The e-Form project is a Government initiative to facilitate the public to make electronic
submissions of forms for various services provided by different Govt. department. "Electronic
Annual Report 2010-11
18
Submission of Forms" enables citizens to fill-in and submits forms to Government electronically
anytime and anywhere for obtaining Government services. In the first phase all forms are
provided in the web for citizen to just down load the forms.
Key Activities
A total of 47 departmental portals were created and hosted in State Data Centre so far.
Following Departmental portals were created during the year:
SI.
No.
Portal Title Department
1 Watershed Department Department of Water Resources
2 Karnataka state Child Labour Department of Labour
3 Directorate of Medical Education Department of Medical Education
4 Belgaum Institute of Medical Science Department of Medical Education
5 Tumkur ZillaPanchayat Zilla Panchayat
6 Transport Secretariat Transport Department
7 State Planning Board Planning Department
8 Shimoga Institute of Medical Science Department of Medical Education
9 Mandya Institute of Medical Science Department of Medical Education
10 Medicinal Plants Authority Forest Department
11 Fire & Emergency Services Home Department
12 Directorate of Welfare of Disabled and Senior
Citizens
Department of Social Welfare
13 Bio Energy India Department of Commerce &
Industries
14 Lake Development Authority Department of Water Resources
15 Karnataka State Pollution Control Board Department of Commerce &
Industries
Statement showing the details of Grants Received, Expenditure, Balance as on 31.03.2011.
Rs. In lakhs
Source of
Fund
Opening
Balance as on
01-04-2010
Grants
Received
Interest
Earned
Expenditure
incurred
Balance as
on 31-03-
2011
e-
Governance
Plan
59.69 - 2.56 11.76 50.49
Annual Report 2010-11
19
11 UID / AADHAAR Project
UIDAI has signed Memorandum of Understanding (MoU) with State Governments and other partner
agencies and engaged them as “Registrar”. The Centre for e-Governance (CEG), designated as the nodal
agency for implementation of UID in the State vide Government Order No. DPAR 159 EGM 209(P-1)
dated 17th December 2009, has executed the agreement on behalf of the State Government of Karnataka.
The MoU was executed with UIDAI on 18th of March 2010. As per the MoU, CEG shall, inter alia,
gather demography and bio-metric information from residents as per the standards prescribed by the
UIDAI and upload the same to UIDAI for further processing and generation of AADHAAR.
Key Activities
The key project related developments during the last financial year are as follows:
• Proof of Concept of the project was conducted in Tumkur District from 13-04-2010 to 10-5-2010.
• Request for Proposal was published to select Enrolment Agency (EA) to pilot UID enrolment in
two Districts namely: Mysore and Tumkur. Comat Technologies & Wipro Limited were selected
as EA for Mysore and Tumkur Districts respectively
• Inauguration of UID enrolment of residents happened simultaneously at Mysore and Tumkur on
8th Oct 2010
• Total number of UID enrolments reported as on the 31st of March 2011 is as follows:
o Tumkur: 12,93,104
o Mysore: 13,52,403
Statement showing the details of Grants Received, Expenditure,Balance as on 31.03.2011.
Rs. In lakhs
Source of
Fund
Opening
Balance as on
01-04-2010
Grants
Received
Interest
Earned
Expenditure
incurred
Balance as
on 31-03-
2011
UID
Enrollment - 650.41 0.23 45.64 605.01
UID IEC - 80.00 - 1.68 78.32
Total 0 730.41 0.23 47.32 683.33
12 Capacity Building
11.1 Capacity Building Scheme under NeGP
Government of India under NeGP formulated the Capacity Building programme in 2005-06 in order to
facilitate Capacity Building in the Government for implementation of NeGP. Subsequently, a Capacity
Building Scheme (2008 to 2011) was sanctioned by Government of India with an outlay of Rs. 10.57
Annual Report 2010-11
20
Crores, to be funded both through Grant-in-Aid and also as Additional Central Assistance. The key
components of this programme involve:
a. Setting up of State e-Mission Team to facilitate Government Departments to plan and implement
e-Governance initiatives.
b. Strengthening of State Training Institute
c. Specialised training programmes for political as well as officials to plan and implement e-
Governance initiatives.
11.1.2 Key Activities
Details of support given in 2010-11 to CEG and other Government Departments through PWC that
provided manpower for SeMT.
Service/Deliverable Department
Core Infrastruture • Secretariat LAN RFP
• SDC Project
Management
• Strategy Document
for SDC Disaster Recovery
• Virtualization case
study
• Costing model for
SDC
• DR plan for KSWAN
• Facility Management
Service RFP for Secretariat
• Acceptable Usage
Policy for SDC
• Nemmadi Project
Management
CEG
Strategic Imitative • RTI RFP
• RFP for Computer
Literacy Test
• UID Pilot RFP
• RFP for setting up of
mailing solution
• RFP for setting up of
SMS platform
• Crisis Management
Plan
CeG
Departmental Initiatives • MIS planning RFP
• RFP for MIS for ICDS-
Women & Child
Development Department
• RFP for IT solution of
Suvarna Arogya Suraksha
• Women & Child
Development
Department
• Suvarna Arogya
Suraksha Trust
• Labour department
Annual Report 2010-11
21
Trust
• Labour department
automation RFP
MMP • MMP Synopsis- 10
departments
• Process assessment -
Agriculture dept
• Integration of IGR
services with B1
• CEG
• Agriculture Department
• Stamps and Registration
During the year 2010-11, NeGP started hiring consultants from open market through National
Institute for Smart Government(NISG). 4 Consultants including one Principal Consultant from
Indian Administrative Service were hired and deputed to Centre for e-Governance.
Following were the services/deliverables provided by the consultants during 2010-11:
• Review of K-KISAN RFP for Agriculture Department
• Project Management Support for UID project
• Analysis of B1,K1 and Nemmadi Services 11.2 Capacity Building Scheme – Government of Karnataka
Developing the requisite capacities within the Government departments, to conceptualize implement
and maintain e-Governance initiatives is one of the key concerns of the state. In this endeavor the CEG
has undertaken to impart the knowledge by organizing workshops on the following topics:-
11.2.1 Key Activities
• HRMS: Workshops for the governments employees on arrears preparation bill for
Bangalore rural, Kolar, Chickballapur and Ramanagara Districts was conducted in the
month of November 2010. As many as 1400 officials and Officers participated in the
programme.
• E-Procurement: Because of the introduction of new modules viz., Contract
Management, & Catalogue Management, in the e-procurement software a workshop for
Principal Secretaries, Secretaries and heads of departments was conducted on 01.02.2011.
150 senior officers participated in the programme.
• AADHAR: UID Project was launched at Mysore & Tumkur on 08.10.2010. As a part of
the project Verifiers, Operators, and Political Leaders are to be trained to propagate the
procedure of enumeration of residents. In this venture 2 training programmes for
verifiers were held at Tumkur & Mysore in the month of January 2011. 1000 officials
participated in the programme.
Statement showing the details of Grants Received, Expenditure, Balance as on 31.03.2011.
Rs. In lakhs
Annual Report 2010-11
22
Source of
Fund
Opening
Balance as on
01-04-2010
Grants
Received
Interest
Earned
Expenditure
incurred
Balance as
on 31-03-
2011
Capacity
Building -
DIT
248.17 - 12.01 84.56 175.62
e-
Governance
Plan
70.00 - 3.45 5.65 67.80
NeGP-ACA 177.48 - 9.53 11.12 175.89
Total 495.65 0 24.99 101.33 419.31
13 State Portal and State Services Delivery Gateway (SSDG)
Introduction
State Portal and SSDG Project has been formulated under the National e- Governance Plan (NeGP).
NeGP aims to make all Government services accessible to common man, in his locality, over internet and
through Common Services Centres (CSCs).
To create an infrastructure that will Expand, Integrate and Enhance the reach of the services provided by
the Government to citizens and possibly business customers as well.
Objectives
• Design and development of State Portal as per DIT, GoI prescribed State Portal
Framework which includes Government office directory, service locator etc.
• Services registered in National Service Directory.
• Design and development of e-form application in a secure and usable format.
• Gateway achieves integration amongst diverse set of applications built on varying
platforms through a set of e-government standards.
• Integration of State Portal with National Portal of India for seamless exchange of services
Key Activities
• Selection of Consultant for studying & documenting the requirements of SSDG project
and also to prepare the RFP.
• Government notified CeG as the implementing agency for the SSDG Project
• RFP was prepared after consultations with the Departments
Annual Report 2010-11
23
Statement showing the details of Grants Received, Expenditure, Balance as on 31.03.2011.
Rs. Lakhs
Source of
Fund
Opening
Balance as on
01-04-2009
Grants
Received
Total Expenditure
incurred
Balance as
on 31-03-
2010
SSDG-DIT 530.79 -
33.97 4.12
560.64
14 Karnataka Resident Data Hub (KRDH)
Introduction
The Centre for e-Governance, Government of Karnataka (called CeG hereafter) intends to leverage the
uniqueness of the Aadhaar and enable various departments to ensure that the benefits reach the right
citizen by enabling Aadhaar based citizen service delivery system.
As the nodal agency for implementation of UID including Aadhaar enrolments, seeding of Aadhaar into
the department’s databases and applications and Aadhaar authentication infrastructure in the State of
Karnataka, the Centre for e-Governance (CeG) has taken a holistic view for Aadhaar enablement in the
State.
Objectives
• To develop a State level framework for seeding of resident databases of the departments with
the correct Aadhaar information
• To develop a single consolidated view of the services and benefits availed by a citizen across
departments
Key Activities
Some of the key activities performed as a part of the KRDH project:
• Selection of the Principal Consultant for the Design and Development of UID ICT Infrastructure
• Development of the Detailed Project Report for enabling Department Database and Application
with Aadhaar
• Approval of the DPR by UIDAI, Government of India