annual report 2012/13 · 2 - sutherland shire council annual report 2012/13 vision and values the...
TRANSCRIPT
Sutherland Shire COUNCIL
ANNUAL REPORT 2012/13
HIGHLIGHTS
SOME OF OUR MAjOR PROjEcTS cOMPLETEd OR cOMMENcEd IN 2012/13
The $6.8 million captain cook drive expansion commenced with Stage One, worth $2.9 million; it included building two new lanes and a bicycle/breakdown lane. The new road has been raised to reduce flooding. P.43
The $3.78 million makeover of cronulla Esplanade includes timber decking and seating along the shorefront, as well as a bleacher seawall with built-in seats over the existing seawall, new seating and six sunlounges. P.50
The $1m North cronulla to Wanda shared concrete walkway for cyclists and pedestrians - the widened pathway includes beach rest stops and beach accessways with timber benches, bicycle racks, a beach shower and water bubbler. P.54
The $770,000 environmentally-friendly upgrade of Prince Edward Park ensures protection of the Woronora foreshore and includes picnic furniture, a river edge pathway, ramp and stairs for safe access to the waterway. P.6
The $250,000 upgrade of Gymea Bay Baths includes the replaced southern deck and walkway as well as piles, decking and handrail. It has a new northern perimeter beam and the baths netting was reinstalled. P.52
Our new Energy and Sustainability Unit is leading the drive for increased energy and water efficiency. Council made savings of $500,000 in 2012/13 in our street lighting and electricity accounts, boosting previous savings. P.59
SUTHERLANd SHIRE cOUNcIL ANNUAL REPORT 2012/13- 1
ABOUT COUNCIL AND THE SHIRE ...... 2
Vision - values and objectives ...................... 2How we plan and report ............................. 4Mayor’s report ........................................... 6General Manager’s report ............................ 8Financial summary highlights ...................... 8Award-winning council ............................. 10Awarding our community .......................... 11About the Shire ........................................ 12calendar of events.................................... 14
CORPORATE GOVERNANCE .................... 16
councillors and Ward map ........................ 18Supporting our councillors ......................... 24Senior staff and organisation chart ............. 26Staff ....................................................... 30Internal Audit .......................................... 38
STRATEGIES AND DELIVERY ............. 40
1: Provide effective and integrated infrastructure ................. 42 2: deliver integrated transport options .......................... 56 3: conserve natural resources ............ 58 4: Protect our environment ................ 61 5: Strengthen our community ............. 68 6: Respect and value all culture and heritage ...................... 79 7 civic life ...................................... 81
OTHER STATUTORY INFORMATION ... 86
FINANCIAL SECTION ...................... 104
Understanding the annual financial reports ...................... 106
Financial statements .............................. 108
APPENDICES.................................. 204
Global Reporting Index ........................... 216General index ........................................ 218Statutory index ...................................... 219Glossary ................................................ 220Expanded contacts ................................. 222
© Sutherland Shire council 2013 ISSN 1445-1921
(Front cover: Forby Sutherland Memorial Gardens, Sutherland)
HIGHLIGHTS cONTENTS
ScOREcARd - from our performance reporting Full list and legend: Strategies and Civic Life: page 40
Some achievements this year
Upgrade works at Hazelhurst Regional Gallery & Arts centre completed
Replacement of nets - works at Kurnell, Gunnamatta and Gymea baths
Sutherland Shire Housing Strategy finalised and adopted
New framework completed to monitor energy and water usage across council sites
10 new recycling waste vehicles, 4 new operational trucks reducing cO2 by 25%
632 regular Bushcare volunteers dedicated 11,213 hours this year
604 properties participated in the Greenweb program: an increase of 38 properties
84% of reported graffiti incidents cleaned and removed within seven days
New library management system live and operational
Increased schools’ and seniors’ participation at council’s leisure centres
Hazelhurst visitor numbers increased to 182,148 (up from 153,679 in 2011/12)
Sutherland Entertainment centre visits up to 152,141 (142,266 in 2011/12)
Increase in visitors to website to 980,942 up from 720,928 in 2011/12
Some challenges ahead
! Surfacing/resurfacing, lighting and fencing upgrades of tennis courts
! Wanda Skate Park construction
! Improving quality of energy and water data, integrate with asset management system
! developing plans for improved conservation of recycled water at council sites
! Finalising and implementing the Youth Strategy
Implement Kareela Golf course Stormwater Reuse Scheme
Woronora Heights Recreation Facility Upgrade
2 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
VISION AND VALUES
The Shire viSionSutherland Shire, in Sydney’s south, shaped by bays, rivers, beaches and national parks:
A connected and safe community that respects people and nature, enjoying active lives in a strong local economy.
CounCil’S viSionTo provide community leadership translating the Shire vision to improve lifestyles and community wellbeing, and the natural environment.
CounCil’S valueSUnderstanding council’s values helps councillors and staff to know what is expected of them as council representatives working on behalf of the community. As individuals and as an organisation, council will:
• actwithhonesty,integrity,responsibilityandtransparency• prioritisecustomerserviceandcommunitysatisfaction• demonstrateleadershipandingenuity• makedecisionsbasedonreliableresearchandinformation• valuestaffandencourageteamworkandfosterprideinourworkplace• haverespectforculture,communityandtheenvironment.
CounCil’S CoMMiTMenTTo The CoMMuniTy
Community satisfaction
The highest priority is given to satisfying the needs and expectations of our community.
Management by fact
Our analysis of problems, decisions, performance measurements and other actions is based on fact and sound judgment.
Continuous improvement
Individually, in teams and as an organisation, council is committed to ongoing improvement.
ethics
We will promote sound, legal and honourable practice in the conduct of council business.
To CounCil STaff
Council staff will respect each other as individuals, encourage teamwork, and provide a safe and caring workplace, with equal opportunities for promotion and development to foster a sense of pride in the workplace.
The steps taken to implement council’s commitments to the community and council staff, and to measure its performance, are detailed in the ‘Civic Leadership’ section of our Delivery Program.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 3
VISION AND VALUES
Council Administration Centre, Sutherland
4 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
HOW WE PLAN AND REPORT
Who ThiS reporT iS forOur annual report must be submitted to the NSW Minister for Local Government by 30 November, to meet legislation. But the report is part of a larger reporting process and for a much wider audience, including:
• Shireresidentsandratepayers• Commercialorganisationsandbusinesses• non-governmentandnon-for-profitorganisations• specialinterestgroupseg.precinctcommittees• schoolsandothereducationalinstitutes• othergovernmentdepartmentsandlocal
government bodies.
The NSW Government introduced Integrated Planning and Reporting in the Local Government Amendment (Planning and Reporting) Act 2009. All NSW councils were given a date, spread over a three-year range, when they were to change their methods of preparing plans and reports to meet the new Act
Sutherland Shire Council was placed in the third year, meaningthisisthefirstyearwearereportingunderthe Integrated Planning and Reporting framework.
The aims of framework are to:
• improveintegrationofvariousstatutoryplanningand reporting processes undertaken by councils as required legislation and by guidelines from the Department of Local Government
• strengthenthestrategicfocusofcouncils• streamlinereportingprocesses• ensuretheActandtheguidelinessupporta
strategic and integrated approach to councils’ planning and reporting.
The reporting cycle starts with the Community Strategic plan, prepared in collaboration with and on behalf of residents, other levels of government andagencies.Counciladopteditsfirststrategicplan in 1999; reviewed it in 2007 and again in 2011 and changed it considerably in response to community aspirations. It is used to steer long-term planning. Where council does not have control over outcomes, it works with other levels of government andkeystakeholderstoinfluencepolicy,planning,infrastructure and service delivery.
The Delivery program 2012/2016 outlines the action council will take to achieve its part in delivering
the community‘s long-term vision and desired local outcomes. It includes six primary strategies.
• Provideeffectiveandintegratedinfrastructure.• Deliverintegratedtransportoptions.• Conservenaturalresources.• Protectourenvironment.• Strengthenourcommunity.• Respectandvalueallcultureandheritage.
These cut across all areas of Shire life, contributing to achievingthecommunityoutcomesidentifiedintheCommunity Strategic Plan.
It also includes a Civic Life section which focuses on council’s own internal operations and encouraging community involvement in civic affairs.
TheProgramalsoidentifiestargetsandmeasurestoenable us to monitor and evaluate our progress and performance. It will next be reviewed following the 2012 local government election to cover the four year period from 1 July 2013.
Council’s annual operational plan supports the Delivery Program. It details the activities which the organisation planned to undertake from 1 July 2012 to 30 June 2013. The Operational Plan is reported on every six months and reviewed annually.
A comprehensive and integrated resourcing Strategy supports the Community Strategic Plan and Delivery Program. The Resourcing Strategy consists of an asset Management Strategy and plans and a Workforce Strategy. All plans will be linked to council’s long Term financial plan.
Council’s range of plans and strategies are integrated into our planning and reporting cycle
inTegraTeD planning anD reporTing
olD legiSlaTion:Management/Delivery plan
2010/11 to 2012/13 (adopted by 30 June 2011)
annual report 2011/12 (previous report)
neW legiSlaTion:Delivery program
2012/13 to 2015/16 (adopted by 30 June 2012)
annual report 2012/13 (this report)
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 5
HOW WE PLAN AND REPORT
through the Delivery Program and Operational Plan. These plans also help council staff to make more informed decisions about daily operations through Business plans and provides tools to measure the effectiveness of what council does. Every four years, council formally evaluates the implementation
of the Strategic plan through the State of the Shire research report. This evaluates if the Shire community as a whole is moving towards meeting community aspirations. This report also incorporates the State of the environment report.
ANNUAL INDIVIDUALWORK PLANS
ANNUAL REPORTCommunity reporting
ANNUAL BUSINESS PLANS
FOUR YEAR DELIVERYPROGRAM & ANNUALOPERATIONAL PLAN
Six monthly corporate performancereporting
COMMUNITY STRATEGIC PLANOur Shire Our Future - Our Guide to
Shaping the Shire to 2030
RESOURCING STRATEGY10-year financial, asset and
workforce planning
reporTing
Council has set four year targets for each strategy in the Delivery program and annual targets/measures to monitor progress towards achieving these longer-term targets. Council reports every six months on the
key activities it has undertaken which contribute to achieving our targets. A comprehensive report of our activities and performance for the year then becomes the central focus of our annual report.
6 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
MAYOR’S REPORT
Itwasanextremelybusyfirstyearofthiscouncil’sfour year term with many changes made and challenges to overcome.
The Sutherland Shire community voted for a change in direction and a more focused council to deliver on our core responsibilities. Supporting local businesses and driving the economy of the Shire was the priority along with reducing bureaucratic obstacles and providing a quality service to our residents.
As elected representatives, my fellow councillors andIhavemadedifficultyetconsidereddecisionstodeliver greater value to our residents.
STraTegiC revieWAn independent report conducted by PricewaterhouseCoopers (PwC) recommended the review and restructure of Sutherland Shire Council to lift service delivery and cut red tape. A Strategic Review Implementation Steering Committee was established and has been driving reforms and communicating change.
The General Manger is ensuring that council’s new structure is put in place and change improvement occurs in the delivery of services and customer focus, while aligning day to day operations with council’s strategic direction.
I stress that change will occur over time and the new service delivery model will be achieved while respecting our council management, staff and contractors and will occur through natural attrition and a voluntary redundancy program.
BuDgeTItisthefirstBudgetforthenewlyelectedcouncilandwe have focused on bringing the Budget into surplus, removing borrowings and ensuring ratepayers won’t behitwithspecialleviesortaxes.Itisafiscallyresponsible and sustainable Budget that will ensure a debt-free council by 2022. It will put us in a better position to deliver a higher level of services the community expects and we will prioritise funding the improvement of the appearance and amenity of the Shire.
projeCTSAs part of a major initiative to improve the appearance and amenity of the Sutherland Shire,
council has allocated an additional $1.5 million on top of the $4 million already committed to pay for cleaning and presenting streets, shopping centres, public toilets and public places generally. Council’s Presenting a Better Shire project gives a greater emphasis to our public places being clean, attractive, freeoflitterandfreeofgraffiti.
We have committed $11.3 million to upgrading, maintaining and improving roads and footpaths in the Shire. A key roads project is Captain Cook Drive. The widened road will improve access for the residents of Kurnell, the new Greenhills residential development, and around the Bate Bay beaches, as well as the newplayingfieldsbeingconstructedtoprovidegreater facilities for our sports loving community. Our playgrounds are receiving much needed attention with works being carried out at locations including Kingswood/Lantana Reserve, Loftus Reserve, Blaxland Drive Reserve, Illawong, Jason Street Reserve, Miranda, Jinatong Street, Miranda and Green Point Reserve at Oyster Bay. The $292,000 upgrade of the Prince Edward Park playground at Woronora has been completed and is being rigorously tested and assessed by local and visiting children.
$2 million is being utilised on our community halls and buildings including Sutherland Leisure Centre and Sutherland Library and we’re focused on the look
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 7
MAYOR’S REPORT
and accessibility of our shopping centres, with new projects at Tom Uglys and Sylvania Heights Shopping Centres.
A $1.832 million upgrade of the Bonna Point Reserve carpark and amenities is underway to improve recreational facilities and protect environmentally sensitive areas on the peninsula.
Work on the Seawall and Esplande at Cronulla has finishedandtheresultisveryimpressive.Thenextproject in that vicinity is the replacement of the old wooden fence on Prince Street.
Ahighlightofthe12/13financialyearwasthecompletionoftheRidgeGolfCourseandtheofficialopening of The Ridge Sports Complex by the NSW Premier. The golf course was built in two stages over six years and is a championship level course; undoubtedly one of Sydney’s leading public golf facilities. The Ridge Sport Complex, worth over $100 million, offers an international standard athletics track, a multi court synthetic netball facility, playing fieldsforsoccer,cricket,rugbyunionandoztag,anaward winning 52 bay multi deck golf driving range and now the completed 18 hole golf course.
CoMMuniTy engageMenTThe councillors who perform their role as your representatives on council do so unpaid. While they receive an allowance, much of what they do comes from a sense of civic pride. They need your opinions and recommendations.
While major issues are publicly advertised, I encourage all members of our community to talk with and contact your local councillors. The best ideas will come from those that know our Shire best, and that is our community.
Looking forward to the next 12 months I can see exciting times and great opportunities to move the Shire forward and maintain our enviable lifestyle. I encourage all of our community to get involved and take a strong interest in the council and our community.
Councillor Kent johnsMayor(September 2012 - September 2013)
Official opening at The Ridge Golf Course, Barden Ridge
8 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
GENERAL MANAGER’S REPORT
Each new council brings with it new strategies, directions and priorities. Staff must and, I am pleased to report, have been able to respond.
In September 2012 the current council was elected and has based its direction on:
• strictfinancialmanagement• reducingredtape• focusoncoreresponsibilities• championinglocalbusiness• protectingtheShire’senvironment.
In addition the council engaged PricewaterhouseCoopers (PwC) to undertake a strategic review of the organisation and set a timetable to introduce the Sutherland Shire Local Environmental Plan 2013.
I am proud of the way staff responded, embracing the new direction, meeting the uncertainty associated with the PwC model for organisational change, and responding to the need to change the approach and service level in parts of the organisation.
In parallel, the NSW Government is changing its direction relating to the way councils operate and the way the planning system operates in NSW. Through the year submissions were made to the NSW Government on the new direction. Staff have modifiedday-to-dayoperationsinanticipationthatthe NSW Government was on the verge of making significantchangestothewaycouncilsundertooktheir business.
An example of this is the change in approach in dealing with development applications. Following an independent report on the development application process, steps are now in place to train staff to be a facilitator and to assist applicants where proposals are reasonable, and to generally improve customer service.
priCeWaTerhouSeCooperS revieWVery early in its term council took the decision to undertake a strategic review of the organisation. Thecouncilneedstoensurethatitisfinanciallysustainable into the future, that its operations areefficientandcompetitiveandthatthecouncilprovides the highest level of customer focus.
The review is a catalyst for further reforms of our organisationandwillassistinfindingadditionalfundsto address the infrastructure backlog.
Validation of the report is now occurring with reviews exploring what savings and gains can be made, in additiontootherefficiencyproposalswhichwouldhave been pursued regardless of the PwC review. As well as recommending changes to the organisation, the PwC report also suggests council should review its service portfolio, which has grown over the years.
Unfortunately the PwC review did not recognise previous gains that have been made; $48m since 2003/04. The savings have enabled council to expand itsservicesandmaintainasignificantcapitalbudget.
STruCTureFollowing the PwC review council restructured the organisation, and whilst major structural change had not occurred since 1988, the structure and responsibilities within each division had been modifiedonanumberofoccasionssincethattime.The new structure reduces the number of divisions to four and places an emphasis on the directors in each division ensuring that their operations are benchmarked and where appropriate examining other service delivery models.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 9
GENERAL MANAGER’S REPORT
2013/14 BuDgeTOne of the directional changes through the 2013/14 budget has been the reallocation of funds to ensure that the appearance of Sutherland Shire, through its public places, is improved. Staff have done an excellent job in examining current service levels and making proposals to the council to improve cleaning and maintenance in line with that direction.
loCal environMenTal planCouncil set an ambitious program to prepare the draft Local Environmental Plan 2013 for presentation to the Minister. Staff performed exceptionally well in meeting that timetable and developed a Housing Strategywithproposedzoningstocopewithhighdensities particularly around the centres.
inTernal oMBuDSManIn considering the recommendations of the PwC reviewcouncilclosedtheOfficeoftheInternalOmbudsman. Whilst council no longer has an Internal Ombudsman, residents can be assured that administrative complaints will be properly dealt with.
appreCiaTionThe support of councillors and staff is essential if the organisation is to progress and be able to meet the needs of the community. I thank councillors and staff for their contribution and for their ongoing commitment to strengthen our organisation.
john rayner general Manager
annual finanCial reporTSCouncil’sauditedfinancialstatementsshowhowcouncilperformedfinanciallyduringthepast12months.Highlights include:
• Operatingresultfromcontinuingoperationswasasurplusof$4.685m;thepreviousyear’sresultincluded $44m being dedicated to council by the state government for ‘Land Under Roads’
• Totalequityhasincreasedby$228msincelastfinancialyear• Cashflowis$41.079m,reflectingareclassificationofinvestmentstoCashandCashEquivalents.
For an introduction to the reports, and the full statements, see page 88.
10 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
AWARD WINNING COUNCILOfficialrecognitionforsomeofcouncil’sworkduringthepastyear.
nSW lgMa aWarDSThe SSHED, our business accelerator, developed a Benchmark, Reporting and Management System (BRMS) that won the ‘Special Projects Initiative’ category at the NSW Local Government Management Association (LGMA) Awards in August 2012. The BRMS was created to assist small business.
greaTer SyDney TouriSM aWarDSCouncil won the Local Government Award for Tourism at these awards in July 2012. This recognises excellence in tourism planning, provision of facilities and services, marketing, event development and management, and overall contribution made ocally and overall to our State’s tourism industry. Our Tourism Manager, Jenny-Lee Stefas, also received the prestigious ‘Outstanding Contribution by an Individual’ Award. Jenny-Lee has been with council for over seven years, during which time many local tourism businesses have been established and grown.
STaTe TouriSM aWarDSOur Tourism Manager’s work was further recognised at the State Tourism Awards in November 2012, winning Gold in ‘Outstanding Contribution to Regional Tourism’. Jenny-Lee has played a huge role in developing and growing the local tourism industry, and this recognised her commitment to uniting and up-skilling local tourism businesses.
nSW parKS & leiSure auSTralia aWarDS of exCellenCeCouncil was recognied at the NSW Parks & Leisure Australia Awards of Excellence in June 2013 with:
• theAwardforSustainableInitiativesfortheCronulla Woolooware Wastewater Reuse Scheme
• theAwardforInclusiveandConnectedCommunities for a facility management and community engagement project
• highlycommendedforTheRidgeSportsComplexat Barden Ridge.
These awards recognise best practice and innovation, and demonstrate the high standard of facilities and programs that council provides to the community.
naTional aWarDS for exCellenCeThe Federal Government’s National Awards for Local Government recognise the innovative work of local governments across Australia. Council received an ‘Asset and Financial Management’ Commendation AwardinJune2013forourGraffitiHotspotReduction Program. The award recognises asset andfinancialmanagementprojectsandinitiativesthat build sustainability and the capacity of local governments to meet future community needs.
auSTralaSian reporTing aWarDSCouncilreceivedaBronzeAwardon6June2013in the 61st Australasian Reporting Awards for our 2011/12 report. The awards encourage excellence in annual reports in both public and private sectors.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 11
AWARDING OUR COMMUNITY
Each year council’s annual community awards program recognises the unsung heroes and organisations who give generously of their time and expertise to help others.
AtaceremonyinNovember2012theCitizen,YoungCitizenandCommunityGroupoftheYearawardsfor2013 were announced.
CiTizen of The yearCitizenoftheYearwasmother-of-fourGayeDoranwho is the coordinator of an ‘English As a Second Language’ group at St Philips Anglican Church in Caringbah. She established the service in 2000 and continues to voluntarily run the service which now provides hundreds of new residents with a recognised program of English education.
young CiTizen of The yearYoungCitizenoftheYearwasGlennHarvey,a24-year-old Miranda man who is committed to social justice;duringthepastfiveyearshevolunteeredtoraise awareness and engage Australian students in combating global poverty.
CoMMuniTy group of The yearThere were two joint winners of the Community Group of the Year award:
• theRotaryClubofEngadine,whichcelebratedits40th year in 2013
• SutherlandEarlySupportServicewhichassistschildren aged 0 to 3 years and their families living in the Shire who have been recognised as needing extra support.
Mayor Kent Johns presented the awards to the recipients who were nominated by their peers and later recognised on Australia Day 2013.
Cr Johns said all of those nominated for the awardsreflectedthelargenumberofhardworking,community-minded people who live in the Shire and that the awards are a way to acknowledge, recognise and thank them for giving of their time, skills, energy and commitment.
(l-r) Gaye Doran, Glen Beauchamp from the Rotary Club of Engadine, Lina Willmott from Sutherland Early Support Service, and Glenn Harvey.
12 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
ABOUT SUTHERLAND SHIRE
Our Shire covers 370 sq.km, about half of which is national parks and bushland. Geographic features include beaches, wetlands, bays, rivers and Hawkesbury sandstone tablelands dissected by deep river valleys and vegetation-covered gorges.
190,000
197,000
204,000
211,000
218,000
225,000
No. of People
201220112010200920082007200620052004200320022001
Estimated residential population
0
5,000
10,000
15,000
20,000
20062011
85 andover80-84
75-7970-74
65-6960-64
55-5950-54
45-4940-44
35-3930-34
25-2920-24
15-1910-145-90-4
Population by age group
0
2000
4000
6000
8000
10000
EgyptGermany
PhilippinesIndia
GreeceItalySouth
AfricaChinaNew
ZealandUnited
Kingdom
Top 10 birthplaces of residents born outside Australia
Est. population is 221,147, making us the 2nd largest local government NSW area, in terms of population.
Population is declining overall in age groups from 5 to 49 but those over 50 are seeing population increases.
Only 16.6% of the Shire’s population was born overseas, compared with Sydney (31.8%).
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 13
ABOUT SUTHERLAND SHIRE
0 2000 4000 6000 8000 10000
No. of jobs
All other categoriesRental, Hiring & Real Estate Services
Administrative & Support ServicesFinancial & Insurance Services
Transport, Postal & WarehousingPublic Administration & Safety
Wholesale TradeConstruction
Accommodation & Food ServicesProfessional, Scientific & Technical Services
Education & TrainingManufacturing
Health Care & Social AssistanceRetail Trade
Looking for part-time work(1,817)
Looking for full-time work(2,247)
Employed - Hours workednot stated (1,991)
Employed part-time(38,108)
Employed full-time (70,367)
Separate house(53,902)
Medium density(13.942)
High density(14.418)
Caravans, cabin, houseboat(214)
Other(198)
The urban area is mainly residential, but there is a small thoughsignificantcommercial and industrial presence and a growing tourism industry.
Socio-economically we rank highly with low unemployment at about 3.5%, compared to 5.7% throughout Greater Sydney.
The dwelling type has changed, with an increase in medium and high density residences, and a decrease in separate houses.
14 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
july 2012naiDoC Week eventsCoffee @ Peace FestivalSutherland to Surf fun runNational Tree DayLifeline Book FairGreater Sydney Tourism Awards
auguST 2012‘ “Look!” The Art of Australian Picture Books Today’ exhibition at HazelhurstChildren’s Book Week at Shire LibrariesSpring Walks at joseph Banks native plants reserve
SepTeMBer 2012Local government electionsCronulla Spring FestivalSutherland Shire Marine and Boat ShowHousehold Chemical Clean OutBike to the Beach
oCToBer 2012Bali bombings 10th anniversary ceremonyfiesta @ The BeachOpen Day at HazelhurstBreakfast Torque motorcycle event Gymea Village FairRide to Work Day
noveMBer 2012Brett Whiteley exhibition opens at HazelhurstShire Animal Shelter Open DayCook Community ClassicSeniors xmas ConcertEngadine Leisure Centre Open Day
DeCeMBer 2012Coast Care Week‘Around Every Corner’ photographic exhibition‘A Joyful Christmas’ Sutherland Shire Symphony Orchestra‘Art Rules’ - HSC artwork exhibition
ThroughouT The year
Events at Sutherland Entertainment Centre
Environmental short courses and workshops
Leisure Centres activities
library events
Student exchanges
CALENDAR OF EVENTSSome of the activities held, or assisted, by council throughout the year for our community.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 15
CALENDAR OF EVENTSSome of the activities held, or assisted, by council throughout the year for our community.
MarCh 2013Shire Vintage & Collectables FairClean Up Australia DaySeniors’ Week events Cronulla Easter ShowBusines Development conferenceShire International Short Film Festival
april 2013Heritage Festivalyouth Week eventsAnzacDayMeeting of Two Cultures Commemoration at Kurnell
january 2013Sydney Film Festival events at SutherlandSutherland Leisure Centre Summer Pool PartyScience of the Surf presentationaustralia Day celebrations at Cronulla and Menai
feBruary 2013Toddler Tuesdays launched at Cronulla CBDHousehold Chemical CleanoutHazelhurstbirthdaycelebrationsartexpress at hazelhurstE-waste collection service
May 2013Cinema Under the Stars‘After Five: Fashion from the Darnell Collection’ ExhibitionInternational Composting Awareness Weekexpanded ridge golf Course - official openingAnnual Library Book Sale
june 2013Sutherland Shire Tourism AwardsSutherland Shire Mayoral Ball including charity fundraising‘Home and Hosed’ Exhibition at Hazelhurst
School holiday fun
Bushcare events
Child car restraint checking days
Business networking
HazelhurstGalleryshort courses
Recycling tours
ThroughouT The year
16 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
CORPORATE GOVERNANCE
The corporate governance arrangements of an organisation are the means by which strategy is set and monitored, accountability is measured, risks are managed, and viability is ensured.
Council’s Corporate Governance includes our internal structures, systems and policies that assist council to achieve our objectives while at the same time containing our risks and ensuring our integrity and accountability.
Ward map ............................................................................................................................... 18
Councillors .............................................................................................................................. 19
Supporting our councillors ......................................................................................................... 24
Organisation chart and senior staff ............................................................................................. 26
Internal audit ........................................................................................................................... 38
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 17
CORPORATE GOVERNANCE
18 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
COUNCILLORS AND WARDS
ROYAL NATIONAL
PARK
KURNELL
MENAI
HEATHCOTE
HOLSWORTHY
ENGADINE
LUCAS HEIGHTS
ILLAWONG
MIRANDA
CRONULLA
BANGOR
SYLVANIA
CARINGBAHBARDEN RIDGE
KIRRAWEE
LOFTUS
COMO
WORONORA DAM
GYMEA
JANNALI
SUTHERLAND
TAREN POINT
CARINGBAH
SOUTH
OYSTER
BAY
GYMEA BAY
LILLI PILLIBURRANEER
BUNDEENA
ALFORDS POINT
WORONORA
KAREELA
YOWIE
BAY
GRAYS POINT
WORONORA
HEIGHTS
BONNET
BAY
WATERFALL
WOOLOOWARE
YARRAWARRAH
SYLVANIA
WATERS
MAIANBAR
KANGAROO
POINT
DOLANS BAY
SANDY POINT
ROYAL NATIONAL
PARK
Bate Bay
Port Hacking
Botany Bay
WARD D
WARD A
WARD EWARD A
WARD C
WARD B
A WARDCouncillor Kevin SchreiberCouncillor Scott WilliamsCouncillor Carol Provan
E WARDCouncillor John RiadCouncillor Steve SimpsonCouncillor Peter Towell
D WARDCouncillor Diedree SteinwallCouncillor Bruce WaltonCouncillor Carmelo Pesce
C WARDCouncillor Hassan AwadaCouncillor Tom CroucherCouncillor Peter Scaysbrook B WARD
Councillor Kent Johns Councillor Phil BlightCouncillor Tracy Cook
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 19
CR KEvin SChREiBERDEputy MAyoR (2012/13)
E: [email protected]: 02 9540 3186F: 02 9540 3186Locked Bag 17, Sutherland 1499
Liberal Party. First elected to council in 1995. Elected Deputy Mayor 24 September, 2012. Cr Schreiber M.A.I.C.D. - Emeritus Mayor*, has resided in the Shire for 30 years. He has been a member of the Local Government and Shires Association for 14 years and is currently also its Treasurer. Cr Schreiber is a local small business owner.
A member of the following Standing Committees:
• StrategyandDirection(Chairperson)• DevelopmentAssessmentandPlanningCommitee• FinanceandManagementCommittee.
A member of the following Subcommittees:
• AboriginalAdvisorySubcommittee• CommercialPropertyProjectSteeringCommittee• SutherlandShireEconomicDevelopmentCommittee(Chairperson)
• SutherlandShireBusinessIncubatorSubcommittee(Chairperson)
• TourismServicesSubcommittee(Chairperson)• BundeenaCreekFloodplainManagement
Committee.
(* an honorary title bestowed by the Local Government and Shires Association - does not necessarily denote current mayor.)
CR SCott WilliAMS
E: [email protected]: 02 9523 4768M: 0448 777 300Locked Bag 17, Sutherland 1499
Party: Liberal Party. Elected to council on 18 September 2012.
A member of the following Standing Committees:
• StrategyandDirection• DevelopmentAssessmentandPlanning
Committee• FinanceandManagementCommittee(DeputyChairperson).
A member of the following Subcommittees:
• SutherlandShireBushfireandSESFacilitiesandEquipmentFund(Chairperson)
• CommercialPropertyProjectSteeringCommittee(Chairperson)
• SutherlandShireYouthCouncil(Co-DeputyChairperson)
• TourismServicesSubcommittee• BundeenaCreekFloodplainManagementCommittee(Chairperson).
CR CARol pRovAn Jp CMCE: [email protected]: 02 9527 6406M: 0434 327 757F: 02 9523 0081Locked Bag 17, Sutherland 1499
Independent. Elected to council on 13 September 2008, having previously served two elected terms asacouncillor(1983-1991)andasMayor(1987-1988and2011-12).CrProvanhaslivedintheShire for over 40 years; has two children and is the grandmother of three boys. Cr Provan also runs her own company and is a registed marriage celebrant.
A member of the following Standing Committees:
• StrategyandDirection• DevelopmentAssessmentandPlanning(DeputyChairperson)
• CommunityServicesandLifestyle(DeputyChairperson).
A member of the following Subcommittees:
• HazelhurstRetreatBoard• CommercialPropertyProjectSteeringCommittee• TourismServicesSubcommittee(DeputyChairperson)
• WooloowareBayCatchmentFloodplainManagementCommittee(DeputyChairperson)
• BundeenaCreekFloodplainManagementCommittee.
A WARD
20 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
CR KEnt JohnSMAyoR (2012/13)
E: [email protected]: 02 9710 0360M: 0414 194 822F: 02 9710 0270Locked Bag 17, Sutherland 1499
Liberal Party. First elected to council in 2004. Elected Mayor on 24 September 2012. Cr Johns is the General Manager of a manufacturing organisation within the Australian water industry. He wants to ensure that the Shire’s enviable lifestyle is maintained and that small business is supported in our area.
A member of the following Standing Committees:
• AsMayor,CouncillorJohnsisamemberofallStanding Committees
• StrategyandDirection• DevelopmentAssessmentandPlanning
Commitee.
A member of the following Subcommittees:
• AboriginalAdvisorySubcommittee• HazelhurstRetreatBoard• SutherlandShireBushfireTrust(Chairperson).
CR phil Blight
E: [email protected]: 02 9531 1480F: 02 9524 4680Locked Bag 17, Sutherland 1499
Party: Australian Labor Party. First elected to council in 1991. Previously Mayor for 2010/11.
A long-term Shire resident, Cr Blight has been a teacher and administrator at local public schools. He has spent most of his life as a participant or other involvement in various sports. He is a university graduate in economics and an elected representative on the Teachers Credit Union Members Committee.
A member of the following Standing Committees:
• DevelopmentAssessmentandPlanning• StrategyandDirection• EnvironmentHealthandRegulation.
A member of the following Subcommittees:
• SportsandActiveCommunitiesSubcommittee• CommercialPropertyProjectSteeringCommittee• HazelhurstRetreatBoard• Heritage(Chairperson)• SutherlandShireEconomicDevelopment
Committee• TenderingProcessandSystemsReviewWorking
Party.
CR tRACy CooK BEd, MEd. J.p
E: [email protected]: 0409 761 781Locked Bag 17, Sutherland 1499
Party: Liberal Party. First elected 2012. Tracy is a high school head teacher and has completed a Masters in educational management and leadership from Sydney University. She strives to represent the community, particularly families, youth and the elderly, in order to ensure our shire continues to provide the required services and facilities.
A member of the following Standing Committees:
• StrategyandDirection• DevelopmentAssessmentandPlanning• CommunityServicesandLifestyle(Chairperson).
A member of the following Subcommittees:
• AccessCommittee• EGWaterhouseNationalCamelliaGardenManagementCommittee(DeputyChairperson)
• HazelhurstRetreatBoard.
B WARD
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 21
CR hASSAn AWADA
E: [email protected]: 0417 286 315Locked Bag 17, Sutherland 1499
Party: Liberal Party. Elected 18 September 2012. Cr Awada is currently the managing director of a family company that owns and operates early learning centres. In the past 22 years he has lived and worked in the Shire, owned and operated a small business in Cronullafor17years.CrAwadaistherecipientofacommendation for brave conduct from Her Majesty QueenElizabethII.
A member of the followng Standing Committees:
• StrategyandDirection• DevelopmentAssessmentandPlanning
Committee• ServicesandFacilitiesCommittee(Chairperson).
A member of the following Subcommittees:
• HazelhurstRetreatBoard• LowerGeorgesRiver&GwawleyBayCatchment
Floodplain Management Committee• SutherlandShireBushfireTrust(DeputyChairperson)
• SutherlandShireBushfireandSESFacilitiesandEquipmentFund(DeputyChairperson)
• SutherlandShireEconomicDevelopmentCommittee
• TenderingProcessandSystemsReviewWorkingParty.
CR toM CRouChER
E: [email protected]: 0408 862 765Locked Bag 17, Sutherland 1499
Party: Liberal party. Elected 18 September 2012.
Cr Croucher has been a resident of Sutherland Shire since birth. He is married and has three grown-up children. He has worked as a high school mathematics teacher and as a software developer in a variety of organisations. He has been active in junior cricket and his local church for many years.
A member of the following Standing Committees:
• DevelopmentAssessmentandPlanning• StrategyandDirection(DeputyChairperson)• EnvironmentHealthandRegulation(DeputyChairperson).
A member of the following Subcommittees:
• AccessCommittee(Chairperson)• SportsandActiveCommunities(DeputyChairperson)
• EGWaterhouseNationalCamelliaGardenManagement
• LowerGeorgesRiver&GwawleyBayCatchmentFloodplainManagement(Chairperson)
• SutherlandTrafficCommittee-ConsultativeTrafficForum(Chairperson)
• WooloowareBayCatchmentFloodplainManagement Committee.
CR pEtER SCAySBRooKE: [email protected]: 02 9528 2946M: 0408 982 972F: 02 9528 6896Locked Bag 17, Sutherland 1499
Party: Australian Labor Party. Elected 18 September 2012.
A member of the following Standing Committees:
• StrategyandDirection• DevelopmentAssessmentandPlanning• FinanceandManagement.
A member of the following Subcommittees:
• HazelhurstRetreatBoard• Heritage(DeputyChairperson)• LowerGeorgesRiver&GwawleyBayCatchment
Floodplain Management• SutherlandEntertainmentCentreUpgrade
Working Party• WooloowareBayCatchmentFloodplainManagement(Chairperson).
C WARD
22 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
CR DiEDREE StEinWAll
E: [email protected]: 02 9548 6180F: 02 9548 6795Locked Bag 17, Sutherland 1499
Party: Australian Labor Party. First elected to council 18 September 2012. Councillor Steinwall has lived with her family in Heathcote for 30 years. She is a Justice of the Peace, Shire high school teacher and actively involved in the Bosco community of Engadine. She is passionate about representing the interests of D Ward on council.
A member of the followng Standing Committees:
• StrategyandDirection• DevelopmentAssessmentandPlanning
Committee• ServicesandFacilitiesCommittee.
A member of the following Subcommittees:
• AnzacYouth&RecreationCentreAdvisoryCommittee(Chairperson)
• ‘TheRidge’AdvisoryWorkingParty• SutherlandShireCouncilBushfireAdvisoryCommittee(DeputyChairperson)
• SutherlandShireCouncilBusinessIncubatorSubcommittee(DeputyChairperson)
• SutherlandShireYouthCouncil.
CR BRuCE WAlton
E: [email protected]: 02 9532 0602 F: 02 9532 0946 Locked Bag 17, Sutherland 1499
Independent. First elected to council in 2010. Cr Walton previously owned and operated the Engadine Book Centre and is a member of the Management Committee of the Sutherland Shire Football Referrees Association.
A member of the following Standing Committees:
• FinanceandManagement(Chairperson)• StrategyandDirection• DevelopmentAssessmentandPlanning.
A member of the following Subcommittees:
• EGWaterhouseNationalCamelliaGardenManagementCommittee(Chairperson)
• SportsandActiveCommunitiesSubcommittee• SutherlandShireEconomicDevelopmentCommittee(DeputyChairperson)
• TenderingProcessandSystemsReviewWorkingParty(Chairperson)
• AnzecYouthandRecreationCentreAdvisoryCommittee.
CR CARMElo pESCE
E: [email protected]: 0408 975 716Locked Bag 17, Sutherland 1499
Party: Liberal Party. Elected 18 September 2012. Cr Pesce is a lifelong resident of the shire and is a self employed local business owner. Cr Pesce is passionate about the shire and keen to see improvements to businesses, environment and lifestyle in the area.
A member of the following Standing Committees:
• StrategyandDirection• DevelopmentAssessmentandPlanning• EnvironmentHealthandRegulation(Chairperson).
A member of the following Subcommittees:
• AnzacYouthandRecreationCentreAdvisoryCommittee(DeputyChairperson)
• SutherlandShireEconomicDevelopmentCommittee
• SutherlandEntertainmentCentreUpgradeWorkingParty(Chairperson).
D WARD
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 23
CR John RiAD
E: [email protected]: 0408 919 760Locked Bag 17, Sutherland NSW 1499
Party: Liberal Party. First elected to council 18 September 2012.
A member of the following Standing Committees:
• StrategyandDirection• DevelopmentAssessmentandPlanning• ServicesandFacilities(DeputyChairperson).
A member of the following Subcommittees:
• SportsandActiveCommunitiesSubcommittee• ‘TheRidge’AdvisoryWorkingParty• SutherlandShireYouthCouncil(Co-Chairperson)• TenderingProcessandSystemsReviewWorking
Party.
CR StEvE SiMpSonE: [email protected]: 02 9541 1681 M: 0414 193 699 F: 02 9543 8756 Locked Bag 17, Sutherland 1499
Liberal Party. First elected to council in 1995. Cr Simpson is a National Safety Advisor with an engineering background. He has been a resident of Sutherland Shire for the past 18 years.
A member of the following Standing Committees:
• DevelopmentAssessmentandPlanning(Chairperson)
• StrategyandDirection• EnvironmentHealthandRegulation.
A member of the following Subcommittees:
• SportsandActiveCommunitiesSubcommittee(Chairperson)
• ‘TheRidge’AdvisoryWorkingParty(Chairperson)• TenderingProcessandSystemsReviewWorkingParty(DeputyChairperson).
CR pEtER toWEllE: [email protected]: 02 9543 9685 M: 0434 327 756 F: 02 9532 0112 Locked Bag 17, Sutherland 1499
Party: Shire Watch Independents. Elected 13 September 2008. Cr Towell is a head teacher of plumbing at TAFE. He is a licensed plumber, drainer andgasfitter,hashadextensiveexperienceinsmallbusiness and has owned a local plumbing business for more than 20 years. He has also studied health and building surveying and has a Bachelor of Adult Education. Prior to his election Cr Towell was President of the Menai West Barden Ridge Precinct Residents Association. He has lived in the Menai area for more than 18 years.
A member of the following Standing Committees:
• ServicesandFacilities• StrategyandDirection• DevelopmentAssessmentandPlanning.
A member of the following Subcommittees:
• AboriginalAdvisory• CommercialPropertyProjectSteeringCommittee• SportsandActiveCommunities• ‘TheRidge’AdvisoryWorkingParty• SutherlandShireCouncilBushfireAdvisoryCommittee(Chairperson)
• AnzacYouthandRecreationCentreAdvisory• SutherlandShireYouthCouncil• SutherlandShireEconomicDevelopment.
E WARD
24 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
SUPPORTING OUR COUNCILLORS
hoW AnD WhEn CounCilloRS ARE ElECtEDSutherland Shire Council comprises 15 councillors who are elected by the residents of the Shire for a four-year term. The most recent election was in September2012(duringthisreportingyear).ThenextgeneralelectionisinSeptember2016.Eachyear the councillors elect a mayor and deputy from among their number.
Council’s policies and direction are determined by the councillors. While three councillors are elected from eachofthefivewardsintheShire,allcouncillorstake part in the review of issues and decision-making across the Shire. The General Manager is responsiblefortheefficientandeffectiveoperationof the organisation. Day-to-day administration of council’s responsibilities and services is undertaken by council’s staff members who are responsible to the General Manager.
Theorganisationchart(seepage25)detailscouncil’s structure for its accountability to residents. Sutherland Shire Council encourages and supports the participation of residents and the community in its activities.
hoW CounCil WoRKSThe mayor, deputy mayor and councillors are paid an annual fee that is within the limit set by the Local Government Remuneration Tribunal. All councillors arepaidforexpensesincurredindischargingtheirfunctions and responsibilities to the Sutherland Shire community. These payments are in accordance withthecouncil’spolicy‘PaymentofExpensesandProvision of Facilities to Councillors’.
WhEn Do CounCil AnD CoMMittEES MEEt?During 2012/13 councillors convened for 14 ordinary and11extraordinary/specialcouncilmeetings,
COUNCILLORS’ EXPENSES AND PROVISION OF FACILITIES 2011/12 $ $Allowances
Mayoral allowance (excluding councillor allowance) * 49,011.00
Deputy mayoral allowance (excluding councillor allowance) 7,519.89
Councillor allowance (per councillor) - $21,700 ea per annum (x15)*** 315,554.12
Total allowances for all councillors 372,085.01
Additional expenses (total for all councillors):
Telephone call expenses ** 5,489.29
Child care -
Postage allowance 478.00
Travel expenses 15,889.61
Dedicated home office equipment computer and fax machine 4,185.00
Internet 9,180.00
Telephone line expenses 1,800.00
Attendance at conferences/seminars 11,963.94
Overseas visits -
Total expenses for councillors 48,985.54
Total cost (allowances + expenditure) for all councillors 421,070.55
* Total mayoral allowance is $56,530.89. 15% of this allowance is paid to the Deputy Mayor.**Totalphone/faxusageis$6,302.38lessreimbursementstocouncilof$813.09forprivatecallsmade
by councillors.*** No councillor or deputy mayoral allowances paid for the period 8-18 September 2012 due to local
government elections in 2012.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 25
including the meeting held in May when the four-year delivery, including the budget, was adopted.
Generally, council and standing committee meetings operate on a three-week cycle, with the Development AssessmentandPlanningCommitteeinthefirstweek, standing committees on the second week and council in the third. Meetings are held in the administration building at Sutherland and members of the public are welcome to attend. The business papers(thereportsthatgotocouncil)areavailablefrom council’s libraries and the internet from 12 noon on the Friday prior to a committee or council meeting, and at the meeting.
Anyone wanting to know the outcome of a matter that went to a meeting can phone council on 02 97100333ontheworkingdayfollowingthemeeting or obtain the minutes after they have been adopted.
CounCilOnce a matter has been considered at the standing committee level, all 15 councillors meet under the chairmanship of the Mayor to decide on the matter. In addition to items from the standing committees, Mayoral Minutes and matters of an urgent nature may be dealt with at this time. All council and standing committee meetings are open to the public, however council or a committee may decide to close the meeting for a limited range of issues including commercial information, contracts, some matters relatingtostaff,orlegalobligationsofconfidenceasspecifiedintheLocalGovernmentAct.Councilensuresthenumberofitemsdealtwithconfidentiallyis kept to a minimum.
Councillors are required by law to disclose any conflictorpecuniaryinteresttheyortheirrelativesorassociates may have in relation to a matter before the council or a standing committee. When a pecuniary interest disclosure is made, the councillor cannot take part in the debate or vote on the matter.
StAnDing CoMMittEESAsattheendof2012/13,councilhadsixstandingcommitteesthatrelatetospecificcouncilfunctions:
• StrategyandDirection• CommunityServicesandLifestyle• DevelopmentAssessementandPlanning• EnvironmentHealthandRegulation• FinanceandManagement• ServicesandFacilities.
The standing committees allow detailed consideration of each matter before it is referred to a council meeting. All councillors are members of the Strategy and Direction Committee, the other standing committeeshavefivecouncillorsassigned.Staffmembers attend these meetings to assist and provide
advice but do not take part in decisions.
There are also subcommittees and working parties forspecificissues,whichreporttothestandingcommittees.
All subcommittees include community representatives. Each standing committee receives reports from staff or subcommittees on matters requiring a decision by council. The committees’ recommendationsthengotothenextcouncilmeetingfor a decision by the council. Committees, in special circumstances, have delegated authority to make decisions on behalf of the council. These decisions are then forwarded to the council for information.
At the end of June 2013, the subcommittees were:
• AboriginalAdvisorySub-Committee• AccessCommittee• ArchitecturalReviewAdvisoryPanel• BundeenaCreekFloodplainManagement
Committee• CommunityManagementCommittee-Tennis
Courts• ConsultativeTrafficForum• EEOAdvisoryCommittee• EGWaterhouseNationalCamelliaGarden
Management Committee• HazelhurstRetreatBoard• HeritageSub-Committee• IndependantHearingandAssessmentPanel• JointConsultativeCommittee• KurnellWorkingParty• LandandEnvironmentCourtAppealForum• LowerGeorgesRiverandGwawleyBay
Catchment Floodplain management Committee• TheRidgeAdvisoryWorkingParty• SportandActiveCommunitiesSub-Committee• SutherlandEntertainmentCentreUpgrade
Working Party• SutherlandShireBushFireAdvisoryCommittee• SutherlandShireBushfireTrust• SutherlandShireBushfireandSESFacilitiesand
Equipment Fund• SutherlandShireBusinessIncubatorSteering
Committee• SutherlandShireEconomicDevelopment
Committee• SutherlandLocalEmergencyManagement
Committee• SutherlandShireYouthCouncil• SutherlandTrafficCommittee• TourismSub-Committee• WooloowareBayCatchmentFloodplain
Management Committee
For councillor membership on individual committees, see page 19.
26 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
NSW Government
Divisions
Commonwealth Government Community
SUTHERLAND SHIRE COUNCIL
Mayor andCouncillors
StandingCommittees
Subcommittees,working groups etc.
General ManagerDirectors’ meeting
Commercial Operations
Corporate Services
Planning and Environment
Shire Infrastructure
Units that report direct to General Manager
Program Office
Communications and Events
SENIOR STAFF ANDORGANISATION CHART
ChAngES to oRgAniSAtion StRuCtuRE AnD SEnioR StAFFThe details given on the following pages are senior staff as at 30 June 2013. However near the year end, council made major changes to the council’s organisational structure.
In June 2013, council resolved to adopt a new organisational structure which decreased the number of seniorstaffpositionssignificantlyandalteredthedivisions.Itisstillundergoingsomestreamliningbuttheindicative new structure is shown below.
For the most recent information please refer to council’s website at www.sutherlandshire.nsw.gov.au or phone uson0297100333.
Information on remuneration for senior staff is shown on page 102.
inDiCAtivE oRgAniSAtion ChARtAS At novEMBER 2013
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 27
SENIOR STAFF ANDORGANISATION CHART
John RAynERgEnERAl MAnAgER
Appointed in 1982 as Shire Clerk, General Manager/Shire Clerk in 1989, and GeneralManagerin1993.PreviousexperienceinotherNSWcouncils.Apastpresident of the Institute of Municipal Management, NSW Division.
Responsibilities: Major issues, policy development, organisation leadership and direction and day-to-day management.
NSW Government
Divisions
Commonwealth Government Community
SUTHERLAND SHIRE COUNCIL
Mayor andCouncillors
StandingCommittees
Subcommittees,working groups etc.
General ManagerDirectors’ meeting
Corporate Services
Community and Recreaton Services
Engineering
Environmental Services
Project Delivery
Units that report direct to General Manager
Internal Ombudsman’s Office
Corporate Development
Communications and Events
Property Services
oRgAniSAtion ChARt AS At 30 JunE 2013AS At 30 JunE 2013
28 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
StEphEn BouRKEDiRECtoR - CoMMunity & RECREAtion SERviCES
Joinedcouncilin1994withpreviousexperienceinlocalgovernment(Victoria),stategovernment(Queensland)andvariousprivatesectororganisations.PastNationalPresident Parks and Leisure Australia, current NSW Director PLA National Board, member NSW Sports Safety Reference Group and NSW Game Plan 2012 Steering Group.Responsibilities: Community development, crime prevention and community safety, youth events, children’s services, childcare facilities, family day care and vacation care, libraries and home-based library service, Sutherland Entertainment Centre, HazelhurstRegionalGallery&ArtsCentreandcommunityartsworkshops,beachmanagement and lifeguards, leisure centres and Menai Indoor Sports Centre, sporting venuesandsportsgrounds,tenniscomplexes,golfcoursesandgolfdrivingrange.
RoBERt honEyMAnDiRECtoR - CoRpoRAtE SERviCES
Joined council in 1988 as Director of Corporate Services under the new divisional structure.Previousexperienceinothercityandcountrycouncilssince1965.
Responsibilities: Administrative support to council/councillors, corporate records and archives, customer service centre, customer call centre, legal services/public officer,landinformation,riskandinsurancemanagement,informationtechnologyservices,financialservices,environmentprotectionandregulation.
DES hEWittDiRECtoR - EnginEERing
Rejoinedcouncilin1974followingaperiodinprivateenterprise.AppointedDirector in July 1999. Currently chairman of Combined Consultative Committee (RoadsandTrafficAuthority).
Responsibilities:Civilworksmaintenanceandconstruction,trafficmanagement,survey and design, stormwater drainage, waste, clean-up, parks maintenance andconstruction,buildingmaintenance,streetcleaning,cleansing,fleet,supply,mechanicalworkshopsandlocalemergencymanagementofficer.
John BRuntonDiRECtoR - EnviRonMEntAl SERviCESPrior to being appointed as Director Environmental Services in July 1996, Johnhadover25yearsenvironmentalplanningexperiencewithseverallocalandNSWGovernmentagencies.Hisexperienceinheritageconservationandstrategic planning has been strengthened through study tours of Europe and NorthAmerica(AlbertMainerdScholarship).AtpresentJohnisamemberoftheMinister for Planning’s Local Government Directors Group.Responsibilities: Environmental research, policy and planning; environmental assessment and application determination; environmental health programs; certification;monitoringandinvestigationforenvironmentalcompliance.
DiRECtoRS
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 29
DERRil gREEnWAyDiRECtoR - pRopERty
Joinedcouncilin1989toestablishthePropertyDivision.PreviousexperienceinNSW Government and the private sector in all states of Australia.
Responsibilities: Commercial and community property sales, acquisitions and property management, major project development and management, Native Title issues, plans of management, council buildings construction and maintenance, asset management, energy management and audit, economic development, tourism, small business incubator, security.
RAy pliBERSEKintERnAl oMBuDSMAn
Joined council in 2006. Previously worked as a lawyer in a number of positions including Litigation Manager with WorkCover NSW, lawyer/policy advisor with NSW CabinetOfficeandProsecutorwithCommonwealth Director of Public Prosecutions.
Responsibilities: Investigation and resolution of complaints about defective administration or conduct, promote appropriate remedies, improve administrative decision-making&achievefair outcomes. Internal audit, corporate probity and fraud prevention, ethical decision-making and practice, policy development, review and education.
KEn ShElStonSEnioR MAnAgER - CoRpoRAtE DEvElopMEnt
Joined council in 1994. Previously Principal Management Consultant on Public Sector Reform in the NSW Premier’s Department. Originally worked as child and family psychologist.
Responsibilities: Corporate development, organisation change and reform program, competition policy, e-business and services, customer service research, personnel and organisation development, shire strategy and integrated planning, community engagement and consultation, performance reporting.
KAthRyn loRDMAnAgER - CoMMuniCAtionS AnD EvEntS
Joined council in 2011. ExperienceinTVjournalism,media relations and PR, as well as communications and events for local government and disability services.
Responsibilities: internal and externalcommunications,media liaison, issues management, publications, advertising,events(civic,ceremonialandcommunity),social media, corporate identity management and sister city relationships.
pEtER hAZElDinEDiRECtoR - pRoJECt DElivERy
Joined council in 2012 to establish the Project Delivery Division. Previously Director Asset Management Services at Sydney Harbour Foreshore Authority.
Responsibilities: Delivering Sutherland Shire Council’s capital works and infrastructure programs, survey services and design services.
MAnAgERS REpoRting DiRECtly to thE gEnERAl MAnAgER
30 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
STAFF
ouR WoRKFoRCESutherland Shire is one of the largest local governments in Australia with over 220,000 residentsandcoveringanareaof370squarekilometres. Council is one of the biggest employers in the Shire with 69.1% of our employees living within the local government area.
We employ people in a variety of occupations – accountants, early childhood educators, engineers, horticulturalists, information technology specialists, librarians, lifeguards, trades people, town planners, civil works staff, event organisers, and many more. This offers employment opportunities with council and presents options if they are interested in changing their career at different stages throughout their working lives.
As at 30 June 2013 council employed 1,201 people,
including all full-time, part-time and temporary staff.Thisisequalto1074.58full-timeequivalent(FTE),whichisasmalldecreasefrom1100.79in2011/12.
The Engineering Division together with the new Project Delivery Division employed the greatest numberofstaffwith420staffin2012/13(downfrom441staffin2011/12).Thesestaffareresponsible for the maintenance of our parks and gardens, waste collection, and the designing, building and maintenance of critical Infrastructure such as roads and footpaths.
The second largest division was Community and Recreationwith352staff(slightincreasefrom351staffin2011/12).Thesestaffareresponsibleforproviding library services, early childhood education services sports and recreation programs, and community services.
0
300
600
900
1200
1500
Casual staffFull-time, part-time and temporary staff
2007200820092010201120122013
1,201 1,227 1,230 1,225 1,224 1,214 1,180
782700
654 623 629 664 671
ChAngES in 2013/14Immediatelyaftertheendofthisfinancialyear,councildecidedtochangetheorganisationstructure-seepage 26 for this year’s structure and the likely future structure.
StAFF CoMpoSition AS At 30 JunE
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 31
Division number of full-time, part-time and temporary staff as at
30 June 2013 30 June 2012 30 June 2011 30 June 2010
Community and Recreation 352 351 346 351
Corporate Services 178 183 182 174
Engineering/Project Delivery 420 441 447 449
Environmental Services 134 136 131 132
Executive 70* 26 76 74
Property 47 47 48 45
Total 1,201 1,227 1,230 1,225
* The Personnel Unit, Strategic Planning Unit and the Online Business Unit were incorporated into the CorporateDevelopmentUnitwhichreportstotheExecutive.
Council employed 1,983 full-time, part-time, temporary and casual staff as at 30 June 2013.
Division Females Males total
permanent Casuals permanent Casuals permanent Casuals Combined
Community and Recreation 277 531 75 150 352 681 1,033
Corporate Services 118 10 60 1 178 11 189
Engineering 50 12 370 34 420 46 466
Environmental Services 62 1 72 0 134 1 135
Executive 50 25 20 5 70 30 100
Property 29 2 18 11 47 13 60
Total 1,167 581 615 201 1,201 782 1,983
55 and over
45 – 54
35 – 44
25 – 34
Under 25
No. full-time, part-time and temporary employees
AttRACtion, REtEntion AnD tRAining StRAtEgiES
Council has adopted a proactive approach to attracting, retaining and training skilled staff to refresh and renew our ageing workforce. We have adopted family friendly policies to make it possible for our staff to obtain a work-life balance while we still achieve productivity gains throughout the organisation.
Through a targeted marketing campaign we actively encourage young people to consider the career opportunities that we offer. As an outcome of this
recruitment strategy we hope to refresh our workforce anddevelopskilledprofessionalsandexperiencedfuture supervisors.
For the past four years we have had an ongoing relationship with The Shire Group Training Company to provide trainees and apprentices for a variety of different occupations. As at 30 June 2013 council employed17apprenticesandtraineesthroughtheShire Group Training Company as well as 11 through council itself.
Age spread no. full-time, part-time and temporary employees
Under 25 years 42(3.5%)
25 – 34 years 174(14.49%)
35 – 44 years 285(23.73%)
45 – 54 years 348(28.98%)
55 years and over
352(29.31%)
32 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
StAFF RECognition
Wehaveasignificantnumbersofstaffwith10,15,20, 25, 30, 35 or even more years of service with council.
The contribution made by these long serving employeesandtheexperienceandknowledgethat they offer the organisation is acknowledged in November each year at the Staff Recognition Dinner.
AtthesameeventtheTeamoftheYearawardisalsopresented.Thisawardrecognisesexceptionalserviceby a particular unit or group of staff. In 2012 the winners were a cross divisional project team which
was involved the community in preserving the Shire’s treecanopy.(Seebelow.)
We also identify each month employees who have deliveredexcellentserviceandrecognisethemwithan Employee of the Month Award.
The award is presented to the employee at a small ceremony in front of their peers and Supervisors. These outstanding employees can be nominated by their supervisor, their peers or members of the community.
tEAM oF thE yEAR FoR 2012gREEn StREEtS tEAM
StafffromEngineeringandEnviromentalServicesDivisionswonTeamoftheYearfortheirabsolutelyoutstanding work with the Green Streets Project.
The project relied upon community buy-in and its willingness to plant new trees to preserve the Shire’s tree canopy.
This team consisted of Michael Ryan, Jim Van Breda, Andrew Hoff, Russell Pigram, John Smith, John Hilliard, Geoff Doret, Belinda Barter, Adrian Walker, Scott Pracy, Vanessa Bailey, Mark Hunt, June Rose, Tim Vanderlaan, Melissa Daley, Brendan Graham.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 33
21 and over years’ service
11 to 20 years’ service
6 to 10 years’ service
1 to 5 years’ service
Under 1 year of service
3.83%
28.48%
23.06%27.31%
17.32%length of service (years)
no. full-time, part-time and temporary employees
Under 1 46(3.83%)
1 to 5 342(28.48%)
6 to 10 277(23.06%)
11 to 20 328(27.31%)
21 and over
208(17.32%)
FlExiBlE WoRK ConDitionSAnumberofflexible,family-friendlyworkpolicieshave been adopted by council. Depending on the job, benefitsmayinclude
• anine-dayfortnightforoutdoorstaffmembers• a19-daymonthwithlimitedflexiblestartandfinishtimesforsalariedstaff
• workingfromremotelocationsincludingworkingfromhome(telecommuting)
• jobrotation,jobshare/part-timework,casualwork.
We also provide carers’ leave to staff and a sick leave safety net for employees who are seriously ill.
Upto27weekspaidparentalleaveisavailable,with the possible option of returning to part-time work. Personal leave, study assistance and up to 12 months’ leave without pay under special circumstances is also available.
Fourty-four staff took parental leave in 2012/13, which is an increase compared to 33 staff in 2011/12, with many staff returning to work during this period in a part-time capacity. This ensures we retain their skills and knowledge while catering for their family responsibilities.
0
5
10
15
20
25
30
PropertyExecutiveEnvironmentalServices
EngineeringCorporate Services
Community and Recreation
at 30 June 2010at 30 June 2011at 30 June 2012at 30 June 2013
No. of staff in each Division accessing parental leave
34 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Division number of staff accessing parental leave as at
30 June 2013 30 June 2012 30 June 2011 30 June 2010
Community and Recreation 24 28 21 19
Corporate Services 5 3 0 1
Engineering 3 2 6 1
Environmental Services 9 5 1 5
Executive 2 5 5 5
Property 1 0 1 1
Total 44 43 34 32
StuDy, tRAining AnD pRoMotion oppoRtunitiESThe Study Assistance Policy is available to support staff developing skills and competencies relevant to the council, and also to enhance their career development.
Study assistance is available to all permanent part-time and full-time employees; either as time off work (toattendlectures,examinationsorforprivatestudy),orfinancialassistance(toassistwiththepaymentofcostsassociatedwithstudying),oracombinationofboth. It is important that council’s policy is relative to market trends to allow council to retain skilled staff. By allowing a combination of choices by way of trading off time for monetary assistance we believe it does this. Seventy three staff received study
assistance in 2012/13, which is a small increase on the number of staff accessing study assistance in 2011/12.
Our ongoing in-house learning and development program provides learning opportunities for all employees to ensure they are kept up-to-date with the skills required to do their jobs safely and effectively. This program offers opportunities for stafftoexpandontheirexistingskillsbyofferingprofessional development opportunities. In 2012/13 there were 15,438.20 hours of attendance by staff at various courses including operational, safety, communication, and computer training. This is an increase on 2011/12 and 2010/11 attendance.
2012/13 2011/12 2010/11 2009/10 2008/09
Staff accessing study assistance 73 72 79 74 77
Hours of attendance by staff 15,438.20 13,614.20 14,943.75 15,060.1 7,722
Volunteers and staff working at a Bushcare site at Cronulla
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 35
FAiR WoRKplACE (FWp) AnD EquAl EMployMEnt oppoRtunity (EEo)Ongoing policies and procedures review saw information updated for legislative changes to carer responsibilities, and amendments made to our parental leave policy.
We also created a publication on workplace bullying, anda‘KeepingInTouch’guideforstaffonlongtermleave,andexitinterviewsheldwithrelevantdeparting employees so that concerns can be followedupimmediately.Thisyearwealsofinalisedthe Workforce Sustainability Action Plan, and the Integrated Planning and Reporting Workforce Strategy was created.
TheFWPCoordinatorkeepsaconfidentialrecordofallcontacts,andprovidesreports,includingfive-yearrolling data, about grievances annually to Directors. Otherinformation,suchastake-upratesofflexibleworking conditions, is reported more frequently.
Our intranet is used to give staff access to FWP information and to highlight changes to policy and procedures.Thisyearthisincludedthe‘Keepingin Touch’ guide, senior management training, the Springboard program, International Women’s Day, and our inhouse mentoring program.
International Women’s Day was recognised through an educative update on the intranet which also offered support avenues for dealing with violence against women.
Our staff induction includes fair workplace issues, and was completed by 306 new employees this year. Training for senior management in EEO and FWP was
held over three sessions and received very positively, with a followup sheet available to all supervisors and managers. Online training is also being created for internal FWP refreshers. Other training courses such as‘LearningtoLead’includeFWPsegments.
We aim to keep our employment practices free from bias or discriminate unlawfully against employees or potential employees, and to keep workplaces free from bullying and harassment. Every interview panel has at least one member trained in selection techniques, and training in this was given to 13 participants this year.
No grievances relating to recruitment were received in 2012/13. All new position descriptions include EEO/FWP statements.
The Employee Assistance Program gives staff access toanexternalprofessionalcounsellingserviceforawide range of personal and work-related problems. This year, 29 staff made use of the service. We also haveContactOfficers,whoaretrainedvolunteersthroughout council who provide guidance on matters relating to a Fair Workplace.
Our employment programs and practices recognise and include strategies for EEO groups to achieve workforcediversity.SixfemalestaffcompletedtheSpringboardWomen’sDevelopmentProgram,withsixmontors supporting them.
Council also created an internal Mentoring program this year, and has four formal pairings to date.
Councilmaintainsfivelanguageaidepositions, and we make use of the Federal Government’s Translating and Interpreting Services to assist residents, with the most requested language being Mandarin in the last three years. The service was also used for one employee performance review and training meeting.
use of translating and interpreting service for residents
2012/13 2011/12 2010/11
19 11 21
0
5
10
15
20
25 Use of translating andinterpreting service for residents
2010/112011/122012/13
36 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
An Aboriginal trainee was able to complete their qualificationsandgainadditionalworkexperiencewith us this year. A temporary internal secondment was also funded under the NSW Government’s Elsa DixonAboriginalEmploymentProgram,andwehavesuccessfully applied for funding for three positions undertheprogramnextyear.
Underour‘PeoplewithaDisability’support,threestaff positions were maintained and supported to gainTAFEqualifications.Avision-impairedemployeemoved to a new role within the organisation, with support from VIsion Australia and council.
The FWP coordinator is also working with staff in our Communities Unit to ensure cross-over and inclusion of FWP into council’s Access and Disability Plan. We are also working towards meeting our requirements for website accessibility.
CoMpliAnCE With thE nSW CARERS (RECognition) ACt 2010TheCarers(Recognition)Act2010waspromotedon our intranet to staff as well as via email. Information on the Act was distributed through our online Managers Portal to all council managers. The informationexplainsthedefinitionofacarerandthecouncilpoliciesandemploymentbenefitsthatexisttosupport carers.
Councilhasmanyflexibleworkingoptionsalreadyexistinginpoliciesandprocedurestoassiststaffwithcarers responsibilities. These include;
• theuseofflextime• theabilitytoaltertheirstartandfinishtimes• accesstopersonal,annualandlongserviceleave,
and leave without pay• theabilitytoworkparttimeoracompactweek• theabilitytoworkfromhome.
No new human resources policies were developed in relation to the Carers Act 2010 in the last 12 months.
Carers leave 1/7/2012 to 30/6/2013
time taken by staff
10,418.48hours(1,451.5days)
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 37
WoRK hEAlth AnD SAFEty (Wh&S)
Council assesses work health and safety concerns by monitoring trends in occupational work-related incidents and workers’ compensation claims.
This assists us in developing and implementing targetedWH&Sriskmanagementinitiatives,whichaim to prevent personal suffering, and drive down the frequency, and severity of incidents over time, including:
• staffandmanagementawarenesstrainingonWH&Ssystemsandreportingofincidents
• continuingsuccessoftheWH&SCommittees• providinginformationandsafetystandards/
procedures on council’s new WHS intranet site.
These results, shown on the right, improve on the previous year’s poor results, and show that the health and safety of council’s staff is an important issue for the organisation.
Council-wide improvements achieved in 2012/13
Recorded workplace health and safety incidents
4.1% decrease
Average days delay in recording workplace health and safety incidents with personnel services
19.76%increase
Frequency rate of workers’ compensation claims made
20% decrease
Cumulative days lost off work due to a workers’ compensation claims
48.46% decrease
Cost of workers’ compensation claims 40.3% decrease
Average time lost for workers’ compensationclaims(duration).
7.9%decrease
Comparative data covering the previous years, shows how council strives to continue improving its occupational health, safety and welfare performance, are in the table below.
ohS incidents and workers compensation claims
2012/13 2011/12 2010/11 2009/10 2008/09 2007/08 2006/07 2005/06
OHS Incidents – total recorded
303 316 382 354 394 395 407 443
IncidentRate(per100employees)
13.72 16.4 17.39 17.91 19.93 19.69 20.03 21.42
Workers’ compensation claims – total made
78 97 115 93 109 109 104 121
Frequency rate ofclaims(per1,000,000 hours worked)
39.22 32.24 41.07 26.57 35.36 31 42.27 33.7
Average time lost per claim(days)
13.22 11.52 14.15 12.78 9.37 12.21 18.46 9.72
38 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
INTERNAL AUDIT
upDAtE By ChAiRMAn oF thE intERnAl AuDit CoMMittEE
Council has continued with its commitment to organisational governance through the Internal Audit Committee and internal audit function throughout the year. The Internal Audit Committee is well established, having operated under an Internal Audit Charter since 2001.
Duringtheyear,sixmajorauditswerecompletedinaccordance with the newly adopted two-year Audit Program. The program was developed based on a high level risk assessment of council activities with input from various other sources, including senior management and externalaudit.Theremainderoftheprogramisontargetto be completed in the upcoming year.
Another achievement in the 12 months was the Internal Audit Committee-recommended establishment of a Procurement Committee and Cash Handling Committee. This is to improve and oversight these core functions across the organisation and ensure audit recommendations made in these areas are being implemented. The Internal Auditor actively participates on these committees.
In general, the Committee has continued to work productively and effectively to provide assurance that council is suitably addressing its responsibilities in relation to internal controls.
intERnAl AuDit CoMMittEE
The Committee met four times throughout the year. During 2012/13, the Committee’s focus was to regularly review emerging risks and monitor implementation of audit recommendations. It maintained last year’s membership composition including;
• TimRobinson:Chairman&externalrepresentative• DennisBanacevic:externalauditrepresentative• StephenBourke:SutherlandShireCouncil,
Director of Community and Recreation
• KenShelston:SutherlandShireCouncil,SeniorManager of Corporate Development
• GrahamThomas:SutherlandShireCouncil,Manager of Finance
• JulietteHall:SutherlandShireCouncil,InternalAuditor.
RElAtionShip BEtWEEn intERnAl AuDit CoMMittEE, intERnAl AuDit An ExtERnAl AuDit
The Internal Audit Committee, Internal Audit and ExternalAudit(PricewaterhouseCoopers)coordinateactivities to ensure that the resources of all are used moreeffectively.TheExternalAuditorhasinputinto the Audit Program, particularly for items that mayhavebeenidentifiedduringtheinterimorfinalexternalaudits.Similarly,InternalAuditisinvolvedintheInterimExternalAudit.TheExternalAuditorholdsa position on the Internal Audit Committee to ensure that cooperation and communication is achieved. ExternalAuditmattersareastandingitemontheInternal Audit Committee’s Agenda. In 2012/13 theExternalAuditorattendedthreeInternalAuditCommittee meetings with relevant input in to each.
In general, Internal Audit reviews the organisation from a process, system, operational, compliance, control andlegislativeperspective.ExternalAuditfocusesonthefinancialstatementswithaperspectiveoncouncil’sfinancialpositionandreporting.
Internal audit programs, working papers, and reports are madeavailabletotheExternalAuditoronrequest.TheManager, Finance acts as council’s primary contact with theExternalAuditorinrelationtotheinterim,annualandotherauditsperformedbytheExternalAuditors.
intERnAl AuDit pRogRAM 2012/13
During 2012/13, Internal Audit completed the scheduled Audit Program adopted by the Internal Audit Committee. All audits included a series of recommendations aimed at improving controls, efficiencyandeffectiveness.Therecommendations
thE yEAR AhEAD – 2013/14AsatJuly2013,theOfficeoftheInternalOmbudsmanwasofficiallyclosedasaresultofrecommendationsmadeinastrategicreviewofcounciloperations(seeGeneralManager’sreportonpage8forfurtherinformationonthereview).TheInternalAuditSectionresidedwithintheOfficeoftheInternalOmbudsmanas part of the triple governance track, being corruption prevention, education and investigation.
TheInternalAuditfunctionwillremainwithintheorganisationreportingtotheProgramOfficeintheyearahead. It is anticipated that the Audit Program and audit activities will remain unaffected.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 39
were considered and endorsed by the Audit Committee and General Manager and then distributed to senior management for implementation.
The main audits included the following.
1. Sundry debtor income and credit control. Reviewed the robustness of council’s debtor processes including invoicing, timeliness and methods of collection and recovery rates.
2. DivisionofLocalGovernment(DLG)Calendarof Compliance and Reporting Requirements. Reviewed whether council was complying with statutory responsibility and deadlines required by the DLG and ensuring processes and systems were in place to providing assurance that the requirements were met.
3. Community leasing. Reviewed the arrangements between council and community groups who have exclusiveuseofcouncilbuildings.
4. Refundable bonds and security damage deposits. Reviewed the processes for the collection of bond monies, monitoring and compliance with bond conditions and refunds.
5. ICAC Operation Jarek. This audit reviewed recommendations made by the ICAC in their report on purchasing, gift giving and relational selling by suppliers and their relevance to council.
6. RoadsandMaritimeServices(RMS)DataAccessCompliance Audit. This audit was performed as a requirement of the RMS to ensure continuation of
use by council in accessing vehicle and registration details for the purpose of issuing penalty infringement notices and warning letters. The audit wasconductedbytheExternalAuditorthisyear.
othER intERnAl AuDit ACtivitiES 2012/13
In addition to the Audit Program, other audit tasks were performed which resulted in improved accountability,efficiencyandeffectivenessofcounciloperations. Such activities included:
• reviewingIndependentCommissionAgainstCorruption(ICAC)andDivisionofLocalGovernment reports for consideration of recommendations for implementation at council
• provisionofethical,corruptionpreventionandprobity advice
• productionoffactsheetsasatooltoassistmanagement with operational controls
• productionofInternalAuditquarterlynewslettersaimed at raising staff awareness of internal controls and relevant events/issues
• representingSutherlandShireCouncilattheNSWLocal Government Internal Auditors Network quarterly meetings to discuss internal audit issues and current concerns within NSW Local Government including submissions to Division of Local Government
• follow-upofoutstandingauditrecommendations• reviewofinternalauditprocedurestoimprove
reporting, timeliness and quality of information.
Internal Audit
External AuditExternal Audit
General ManagerGeneral Manager
Internal OmbudsmanInternal Ombudsman
Internal AuditCommittee
Senior ExecutiveCommittee
Council
Minutes
Reports administratively
Minutes
Member
Six-monthly report onInternal Ombudsman activities,
including Internal Audit
Advice/FinalAudit Reports
Advice/Input
MemberExit interiew &
management aspectsof External Audit
Independent Audit Report(Section 417(2) LG Act)
Reports/Programs/Activities
RElAtionShip BEtWEEn intERnAl AuDit, ExtERnAl AuDit, SEnioR ExECutivE, CounCil AnD othER FunCtionS oF CounCil
ThisdiagramshowstherelationshipsandreportinglinesexistbetweentheInternalAuditor,InternalOmbudsman,GeneralManager,ExternalAudit,InternalAuditCommittee,SeniorExecutiveCommitteeandcouncil.
40 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
This is the first annual report which is based on the 2012/13 Delivery Program under the legislated Integrated Planning and Reporting requirement, as prescribed by the New South Wales Local Government Act 1993.
Our primary strategies form the central part of our Community Strategic Report. These strategies are at the core of achieving our community vision and desired futures, and are integral to achieving all outcomes.
The relationship between the Strategic Report, the Delivery Program and the Annual Report is detailed on page 4.
The Strategies and Civic Life section deals deals with annual targets/measures and key activities that have been undertaken by council over the year, including recognition of the adopted measure of end August, 2013 for completions.
There are six Strategies, and an additional section Civic Life which is concerned with the efficient and effective council operations underpinned by good corporate governance.
Strategy 1. Provide effective and integrated infrastructure ......................................................... 42
Strategy 2. Deliver integrated transport options ....................................................................... 56
Strategy 3. Conserve natural resources ................................................................................... 58
Strategy 4. Protect our environment ....................................................................................... 61
Strategy 5. Strengthen our community ................................................................................... 68
Strategy 6. Respect and value all culture and heritage ............................................................. 79
Civil Life ............................................................................................................................. 81
These are what guide all council’s work on behalf of the community of Sutherland Shire.
Performance on key activities, programs, projects and works has been coded throughout all Strategies and Civic Life as follows:
Performance Status Progress to Annual Target
Key
Achieved / Acceptable >90%
Alert / Review conditions 50% - 89% !
Alarm / Unacceptable <50%
Not commenced / Cancelled 0% -
A glossary of many of the terms used in this section is available on page 220.
STRATEGIES AND CIVIC LIFE
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 41
STRATEGIES AND CIVIC LIFE
New decking and sunlounges at Cronulla Esplanade
42
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
STRATEGY 1:
PROVIDE EFFECTIVE ANDCRITICAL INFRASTRUCTURE
Infrastructure which supports our neighbourhoods, our economy, our leisure pursuits and future communities. This includes the provision of appropriate and well maintained buildings for community use, and construction and maintenance of critical infrastructure such as roads, footpaths and drains. Infrastructure which protects our environment and connects and strengthens our communities.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 201
2/1
3 - 4
3Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
STATUS as at August 2013 PROGRESS STATUS as at June 2013
PROVIDE: Local roads construction and maintenanceCONSTRUCTION
Complete General Roads Construction Program
100% of planned works completed by August 2013 and within budget
!79% completed. 74% expended. 67% of adopted program work completed. 63% of budget
expended. In addition to the completion of works included in the 2012/13 budget, works using funds totalling $963,800 carried over from the 2011/12 budget have been completed.
Undertake Roads to Recovery Program 100% completed 100% expended
Upgrade Regional Roads 100% completed
• RG0016:CaptainCookDriveStage1,completed• RG0035:CaptainCookDriveStage2,Tenderreportgoing
through council.(Subsequently, council resolved to re-tender the works). This stage was not scheduled for completion in 2012/13.
• RG0037:CaptainCookDriveStreetLightingUpgrades-workscompleted, 90% of payment claimed by the contractor.
The budget overall is 74.1% expended with Stage 2 yet to be constructed.
Menai Road Landscaping 100%completed.87%expended.$25,366saving.
Complete Captain Cook Drive Road widening (Elouera to Woolooware Rd)
Refer to Upgrade Regional Roads above.
Infrastructure works as associated with developments (works in conjuction with development consents)
100% work completed100% of voted budget expended representing 38% of budget allocation. Remainder carried over for future projects. Allocation cannotbespecificasannualdemandvariable.
Roads Pavement Rehabilitation Program 100%completed.99%Spent,$26,853savingwhichwas
allocated to Roads Preventative Maintenance Program.MAINTENANCE
Undertake general roads maintenance program
100% of planned works completed by August 2013 and within budget
100% completed 100% expended
44
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
STATUS as at August 2013 PROGRESS STATUS as at June 2013
Roads Preventative Maintenance Program
100% of planned works completed by August 2013 and within budget
100% completed 100% expended.
Bridges Maintenance/Restoration Works
Tenders to be called in November for maintenance work of all bridges in Sylvania Waters.
Workcompleted:WoronoraRiverFootbridgeandGarnetRoadFootbridge.24.5%expended.Design carried out for six bridges in Sylvania Waters to be done in 2013/14financialyear.Ongoingprogramofworks.
PROVIDE: Infrastructure to support accessible, integrated transport optionsPEDESTRIAN fACILITIES:
Pedestrian lights – Gerrale St/Surf Rd
100% of planned works completed by August 2013 and within budget
100% completed20% completed. 41% expended. Latent conditions delayed the works.
Pedestrian accessibility and improved mobility 100% completed
55%expended.
PAMP study and intersection kerb ramps
This is the same project as pedestrian accessibility and improved mobility above.
This is the same project as pedestrian accessibility and improved mobility above.
RTAtrafficfacilities,linemarkingsignage 100% completed 100% expended.
Provision of bus seats - .Program of works aborted due to withdrawal of WaSIP grant funding for provision of bus seats.
WorksidentifiedbySutherlandTrafficCommittee 100% completed
All funds allocated to Yathong Road/Caringbah Road roundabout project. 7% expended.
PROVIDE: footpathsComplete General Footpath Construction Program
100% of planned works completed by August 2013 and within budget
99% completed with the exception of asbestos Telstra pit adjustments. 86% expended.
Undertake annual footpaths maintenance program
100% of requests met.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 201
2/1
3 - 4
5Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
STATUS as at August 2013 PROGRESS STATUS as at June 2013
PROVIDE: Cycleways – on and off road
Implement Bicycle Network Plan
100% of planned works completed by August 2013 and within budget
The Bicycle Network Plan will be implemented over the long term as funds are made available
The Bicycle Network Plan will be implemented over the long term as funds are made available.
Complete shared cycle paths
!
Cycleway Talara Road to Gymea BayRoad75%completed.69%expended. Contract for remainder due for completion late September 2013.
CyclewayTalaraRoadtoGymeaBayRoad75%completed.69% expended. Contract for remainder due for completion late September 2013.
WooloowareBayStage6:Studies- Design substantially complete and subject to ongoing negotiations with property owners including Fishing Club and resolution of contamination issues. Concept Plan developed for consultation.
WooloowareBayStage6–Studies:DesignOnlyprojectdelayeddue to ongoing negotiations with property owners, government bodies and resolution of contamination issues. Design commenced andcapitalfundsallocatedinfinancialplanfor2014/15construction.
!
Status unchanged Barden Road Shared Pathway - Works in conjunction associated with aged care development site. Shared pathway was constructed prior to June 2013, however a defect notice has been issued by counciltothedeveloperasworksnotconstructedtospecificationatincorrectlevels.Fundscarriedoverpendingrectificationworksby developer.
PROVIDE: Regional and local playgrounds – Undertake playground upgradesCrammond Ave, Caringbah 100% of
planned works completed by August 2013 and within budget
Playground completed.Work50%completed Expended35%.Committed funds of $77,000 carried over for payment to contractor on completion.
Roger Summers Playground Stage 2
-Work 10% completed – design stage.Expended 7.3% internal design costs.Work could not proceed in 2012/13 due to impass with Sydney Water.
46
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
STATUS as at August 2013 PROGRESS STATUS as at June 2013
Green Point Reserve 100% of planned works completed by August 2013 and within budget
Green Point Reserve underway. Completion by December 2013.
Design stage completed.
Holmlea Place Work commenced. Completion
October 2013.Design stage completed.
Generalplaygroundmodificationsand removals
100% completed 100% expended.
PROVIDE: Centres for shopping and business activityUndertakeshoppingcentreimprovementworksto:
Caringbah
100% of planned works completed by August 2013 and within budget
Caringbah 100% completed. Balance held for possible addition to Gymea/Sutherland Centres.
Sutherland Sutherland work suspended due to issues with undergrounding of power lines – report to council December 2013.
Sutherland work suspended except power connection preparations forretailers.Insufficientfundinginaccount,overexpendedby$237,179–5.05%todate.
Gymea ! Gymea85%completed.Practicalcompletion November 2013
Gymea75%completed.87.4%expended.
Undertake Cronulla Plaza redesign and refurbishment C
Major project abandoned in early 2013 after budget review.
PROVIDE: Sustainable management of stormwaterUndertake drainage construction within Gymea Shopping Centre upgrade
100% of planned works completed by August 2013 and within budget
100% completed. 100% expended
Undertake drainage maintenance at11specificsitesacrosstheShire along with stormwater quality device cleaning and maintenance
100% completed. 99% expended.
Ongoing program – Stormwater levy funds
Undertakestormwateractivitiesinaccordancewith:Woolooware Bay Catchment Floodplain Risk Management Study & Plan
100% of planned works completed by August 2013 and within budget
!
Draftfloodstudyadoptedbythe Woolooware Bay Catchment Floodplain Management Committee. Draft report to go on public exhibition for comment and finalisationofstudy.
80%completed.58%expended.DraftfloodstudyadoptedbytheWooloowareBayCatchmentFloodplain Management Committee. Draft report to go on public exhibitionforcommentandfinalisationofstudy.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 201
2/1
3 - 4
7Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
STATUS as at August 2013 PROGRESS STATUS as at June 2013
North West Arm Estuary Management Plan
100% of planned works completed by August 2013 and within budget
!Stage 1 completed. Consultants brief under development for Coastal Zone Management Plan.
80% completed. 49% expended.Scoping exercise, literature and information review completed. Consultants brief under development for Coastal Zone ManagementPlan.58%Stormwaterlevyfunds.
Gwawley Bay Catchment Floodplain Risk Management Study & Plan
!Status unchanged 80% completed. 62% expended.
Flood study adopted in February 2013. Consultants brief under development for Floodplain Risk Management Study and Plan.
Bundeena Creek Catchment Floodplain Risk Management Study & Plan
Status unchanged 20% completed. 1% expended.
Flood study underway. Awaiting expression of interest for community representatives on the Committee.
Kurnell Flooplain Risk Management Study & Plan
Status unchanged 100% completed. 21% expended.Flood study adopted. Floodplain Risk Management Study & Plan completed and report to be submitted to council in November 2013. 44% Stormwater levy funds.
Still Creek Wetland Management Plan
Implementation ongoing.Remaining funds to be used for dredging. Awaiting quotation for dredging.
100% completed. 90% expended.Implementation ongoing. Remaining funds to be used for dredging. Awaiting quotation. Stormwater levy funds.
Sutherland Shire Watercourse Assessment !
Status unchanged 50%completed.0%expended.Watercourse Assessment Study adopted in March 2013. Contract for implementation entered into and proposed works program to be reported to council in November 2013 for use of remaining funds. Stormwater levy funds.
Implement Kareela Golf Course – Stormwater Reuse Scheme
100% of planned works completed by August 2013 and within budget
Status unchanged 25%completed.0%expended.
Consultancyawarded.Studyinprogress.Awaitingfinalreport.Stormwater levy funds.
Undertake safety fencing – stormwater headwall
100% completed. 61% expended.Ongoing program. Stormwater levy funds.
48
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
STATUS as at August 2013 PROGRESS STATUS as at June 2013
Implement Major Flood mitigation works
100% of planned works completed by August 2013 and within budget
Design completed. Awaiting construction.
50%completed.6%expended.All projects funded by Stormwater levy funds.Bridges St Kurnell – design completed. Awaiting construction.Elthan Pl, Heathcote – design completed. Awaiting construction.Taren Rd, Caringbah – Awaiting construction.Scylla Rd, Oyster Bay – Awaiting construction.
Implement Strategic Water Quality Monitoring Program
100% completed. 60% expended.Field work completed. Awaiting results & invoice for payment. Stormwater levy funds.
Undertake Stormwater Quality Urgent Improvement Works
100% completed. 36% expended.Ongoing program. Stormwater levy funds.
Undertake Urgent Infrastructure Rehabilitation Works
100% completed. 49% expended.Ongoing program. Stormwater levy funds.
Ozone St, Cronulla – GPT construction 100% completed. 98% expended.
Woolooware Golf Course foot bridge repair 100% completed. 100% expended.
The Boulevarde, Kirrawee – drainage upgrade -
0% completed. 0% expended.Did not proceed. Work to be completed in conjunction with road reconstruction.
Box Road, Sylvania – trash rack upgrade Status unchanged
25%completed.0%expended.Design completed and awaiting construction estimate. Stormwater levy funds.
Camellia Gardens, Caringbah Sth – GPT construction Feasibility study completed.
Awaiting detailed design.
25%completed.0%expended.Feasibility study completed. Awaiting invoice & detailed design. Stormwater levy funds.
PROVIDE: Sporting, leisure & recreation facilitiesGeneral upgrade works across 4 Leisure Centres
100% of planned works completed by August 2013 and within budget
General upgrade works across leisure centres adhering to schedule.
100% planned maintenance completed.
89% expended.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 201
2/1
3 - 4
9Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
STATUS as at August 2013 PROGRESS STATUS as at June 2013
Undertake Caringbah Leisure Centre (CLC) modernisation
100% of planned works completed by August 2013 and within budget
100% of planned works completed by August 2013 and within budget
Status unchangedWorking group formed with Shire Infrastructure Division, Expression of Interest for modernising CLC being prepared for consultancy to provide concept centre design for 2013/14.
Fencing at Sutherland Leisure Centre
100% completed.100% expended.
Upgrade to facilities at Menai Indoor Sports Complex including vault and front counter
!Frontcounterreconfiguration20%completed. Completion October 2013.
100% lighting upgrade completed.41% expended.FrontcounterreconfigurationtoaddressWHSissues/cashhandlingunder design.
Replacement net program at The Ridge Golf Driving Range
100% completed.100% expended.
Resurface The Ridge Athletics Synthetic Track
100% completed 87.8% expended.Payment claims outstanding.
Commence planning The Ridge Off Road Bike Park
Masterplan 100% completed.68% expended.Remaining budget added to the project budget.
Surfacing/resurfacing, lighting and fencing upgrades of tennis courts ! Status unchanged
10% of budget used on courts to cover 10% of planned works for urgent resurfacing, lighting and or fencing upgrades. A carryover requestwasmadeattheendofthefinancialyearinordertoallow for additional works once actions from report to council no. CSV003A-13areconfirmed.DuringtheperiodCourtCraftwascommissioned to complete a condition assessment of council’s tennis facilities; the report had not been received by 30 June 2013.
Netball court upgrades
100% completed – Dobel Road Oval80% expended.There were additional funds in the 2012/13 budget due to a carryover from the year before for some urgent works being carried out at Bellingarra netball courts.
50
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
STATUS as at August 2013 PROGRESS STATUS as at June 2013
Refurbishmentof2playingfields/ovals
100% of planned works completed by August 2013 and within budget
100%completedforbothfields.93% expended – Lakewood Reserve.100% expended – Oyster Bay.
Upgrade school facilities for community use at Sylvania High School
!
Minister for Education approval for DET contribution of funds towards the project, awaiting DET Asset Management Unit direction.
Successful grant funding of $44,000 from Community Building Partnership. Council resolved on 2 October 202 to seek Department ofEducationfinancialinputforconstructionofamenitiesbuilding.On15April2013theDepartmentindicateditwouldcontributeup to $200,000 for the project. Follow-up contact has been made with the Department’s Manager, Sydney Region Asset Management Unit regarding funding and the next step. Although the Manager is unaware of the funding commitment, he is following up the matter.Concept design completed.
PROVIDE: Passive reserves, parks and open spaces
GreenhillsBeachplayingfields
100% of planned works completed by August 2013 and within budget
! Construction programmed for completion April 2014.
Wanda Skate Park ! Construction programmed for completion April 2014.
Cronulla Park (Esplanade Seawall at Cronulla Surf Life Saving Club) ! 85%completed.Completiondue
Sept/Oct 2013.75%completed,81.9%expended.Completion due Sept/Oct 2013.
Implement EG Waterhouse National Camellia Gardens Plan of Management
Draft Management Plan completed. Adoption for exhibition 26 August 2013.
10% work completed – development of Draft Management Plan and Masterplan.30% expended.Expenditure on urgent repair works to eliminate trip hazards in existing paving & purchase of playground equipment for playground upgrade at asubstantialdiscount(bothitemsidentifiedindraftManagementPlan)
Woronora Heights Recreation Facility Upgrade Council to reconsider in December. Subjecttoredesign.Construction2013/14financialyear.1%
expended design/consultation. PROVIDE: Public ToiletsUpgradesto59publictoiletsacross the Shire
100% of planned works completed by August 2013 and within budget
Upgrades 100% completed 95%ofupgradescompleted.
Replacement/new construction 50%completed(for information only, this is not an annual target)
Replacement/newconstruction:• CronullaBeachToilets-10%completed,2%expended• SalmonHaulToilets-0%completed,7%expended.• CamelliaGardenslowerplayground-0%constructed,1.7%
expended – design costs. Substantial delays due to local issues.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 201
2/1
3 - 5
1Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
STATUS as at August 2013 PROGRESS STATUS as at June 2013
PROVIDE: Surf clubs and buildings which support beach activities
Wanda Surf Life Saving Club structural works 100% of
planned works completed by August 2013 and within budget
Structural works completed 100% completed.
96% expended.Building upgrades including compliance with Building Code of Australia
Elouera disabled ramp completed
Heritage repairs Windows and doors at Cronulla SLC and complex repaired
PROVIDE: Community buildingsUpgrade works at Hazelhurst Art Gallery
100% of planned works completed by August 2013 and within budget
100% completed 100% expended.
Install shade structures
100% completed. Replaced shade structures at Bundeena, Loftus, Yarrawarrah and Oyster Bay Community Centres, and at Allison Crescent Long Day Care Centre
100% completed.
79% expended.
Ongoing program of works.
Undertake softfall upgrades 100% completed 100% expended.
Upgrade playground equipment attached to buildings
100% completed 93% expended.
Ongoing program of works.Upgrade Long Day Care centre playgrounds Moore Street 100% completed 100% expended.
Upgrade car parks attached to buildings 100% completed - Croydon street
trafficdirectionworkscompleted
100% completed 17% expended.
Ongoingprogramofworks.Majorrectificationprojecttobeconducted 2013/14.
Undertake works to improve disabled access
Improved disabled access to beekeepers building at Waratah Park, and ramp and cardio room at Sutherland Leisure Centre improved.
95%completed45%expended.
Preschool works Structural repairs to Jacaranda Preschool completed
100%completed65%expended.
Ongoing program of works.
52
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
STATUS as at August 2013 PROGRESS STATUS as at June 2013
Rehabilitation of Shackles Estate100% of planned works completed by August 2013 and within budget
Shackles Estate work postponed0% completed 0% expended.Work postponed, undertaking review of asbestos management.
Undertake energy works including rain water tanks and energy audit works
100% completed. Energy audits at top 10 energy-consuming premises completed. Cronulla Central lighting upgrade completed.Source of funding is WaSIP allocated on project to project basis.
General upgrades to community buildings
100% work completed.Electrical upgrade at Alfords Point Community Hall. Kitchen upgrade at Miranda Youth Centre.
PROVIDE: Car parking facilities
Engadine parking study
100% of planned works completed by August 2013 and within budget
- Status unchanged
Preparation for the study was commenced but Directors Engineering and Property considered the study may be less accurate if it was undertaken before the aged care facility and new public underground car park was operational. Both are expected to be operational by March 2014.
PROVIDE: Wharves and jetties
Undertakenetworksat:• KurnellBaths• GunnamattaBaths
• GymeaBayTidalBaths
100% of planned works completed by August 2013 and within budget
100% completed 100% expended.
PROVIDE: Bushfire stations
Commence new Menai station construction including water tanks
100% of planned works completed by August 2013 and within budget
-Not commenced. Council decision toawaitconfirmationofStatefunding.
Concept design completed. 2% expended.Constructionnotcommenced.AwaitingconfirmationofStatefunding. Awaiting Gazzetal of land following road closure.
Grays Point extensions Works not proceeding at this stage due to State funding uncertainty.
Works not proceeding at this stage due to State funding uncertainty.
Heathcote Headquarters Carport - Design completed. Additional funding required from RFS.
10% investigation 0% expended.Scope of works required by RFS greatly exceeded budget allocation. Additional funding required from RFS.
Install fencing at Waterfall 100% completed. 100% expended.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 201
2/1
3 - 5
3Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
STATUS as at August 2013 PROGRESS STATUS as at June 2013
Bundeena RFS
100% of planned works completed by August 2013 and within budget
!.
Construction continues
Design/planning completed subject to substantial site related issues.Construction commenced.2.5%expended
PROVIDE: Libraries
Undertake general refurbishment
100% of planned works completed by August 2013 and within budget
Painting of central library completed. Major works for central library in 2013/14
Some planned maintenance work undertaken. Majority of funding reserved for major works in 2013/14. Refer to council business papers (on website) report number FIN 040-14 ongoing program of works..
PROVIDE: Sutherland Entertainment Centre
Undertake minor works and upgrades
100% of planned works completed by August 2013 and within budget
Food service improvements undertaken. Works done as required to maintain service continuity
-Major expenditure deferred while service review is undertaken.
PROVIDE: Infrastructure works associated with estuary managementImplement Port Hacking Plan of Management
100% of planned works completed by August 2013 and within budget
- Project on hold awaiting grant funding, construction in 2013/14 financialyear.
Woronora Headlands (mouth of river at Como) - Dredging works delayed, conditions of dredging licence being
negotiated with Crown Lands.
Other estuary works - Dredging works delayed, conditions of dredging licence being negotiated with Crown Lands.
PROVIDE: Infrastructure works associated with Kurnell Landscape Masterplan
Implement Silver Beach Masterplan works
100% of planned works completed by August 2013 and within budget
-
Workstobeundertaken2013/14financialyear.
54
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
STATUS as at August 2013 PROGRESS STATUS as at June 2013
PROVIDE: Infrastructure works associated with Bate Bay Plan of ManagementImplement shoreline protection works – The Esplanade
100% of planned works completed by August 2013 and within budget
Work 100% completed. Expended 100%.
Completion of Wanda to North Cronulla Shared Walkway/Cycle path
! Final stage programmed for construction winter 2014.
80% completed. 100% of planned works completed. 100% expended. Final stage programmed for construction winter 2014.
Dune protection works north of Cronulla Beach Work 100% completed. Expended 100%.
Bush regeneration south of Cronulla Beach
Bush regeneration south of Cronulla beach completed (works at Cronulla Point)
Work 4% completed. Expended 4%. Funds carried over for commencement of work following completion of The Esplanade and Seawall upgrade.
Upgrades to lighting at Cronulla
30% completed. Installation of lighting of Cronulla Seawall & Esplanade Upgrade completed. Insufficientfundstocompletetheremainder of lighting at Cronulla Park. Investigating alternative opportunities.
10% completed - Design stage for the upgrade of lighting in Cronulla Park & The Esplanade as part of Cronulla Seawall & Esplanade Upgrade.Expended 20%.
PROVIDE: Infrastructure works associated with Scylla Bay Masterplan/Como Pleasure Grounds
Scylla Bay boardwalk – Carina Bay
100% of planned works completed by August 2013 and within budget
-
Funding redirected to pedestrian links near Como Baths, currently in design for construction in 2014.
UpgradeworksatComoPleasureGroundsincluding:Service vehicle access path to upper terrace
100% of planned works completed by August 2013 and within budget
Redesign 90% completed. Construction 2014.
Redesign70%completed.5%expended.Construction2014.
Erosion control works Scope to be determined, construction 2014
Scope to be determined, construction 2014.
Bush regeneration works Completed Completed.
Picket fence at entrance
Project on hold pending completion of adjacent roadworks which is currently under review.
Project on hold pending completion of adjacent roadworks which is currently under review.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 201
2/1
3 - 5
5Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET2012/13 ANNUAL RESPONSE
PROVIDE: A local planning framework that upholds the Shire’s character
Finalise and adopt the new Standard Instrument Local Environmental Plan
LEP adopted ThecontentoftheLEPwasfinalisedbycouncilon10Decemberandexhibited 19 March-1 May 2013. Council considered submission on 29 July 2013. Due to the extent of changes made in response to submissions the plan has required re-exhibition 20 August-17 September 2013.
Finalise and adopt Sutherland Shire Housing Strategy 2013
Housing Strategy adopted HousingStrategywasfinalisedbycouncilon19November2012.
Provideanefficientdevelopmentassessment process
66%ofDA’sdeterminedwithin52days !
1401 applications were determined by staff in 2012/13; including development,modificationandreviewapplications64%ofapplicationsweredeterminedin52daysorless.(2011/12-54%ofdevelopmentapplicationsweredeterminedin52daysorless.66%of applications were determined in 69 days or less)
PROVIDE: Building certification services (Southern Sydney Building Certifiers)Provide a service that meets the needs and expectations of its clients
Maintain a weighted customer response score of at least 80 in SSBC customer surveys
95.9%(2011/12-91%).
Provideanefficientapplicationassessment service while meeting all related legislative requirements
Maintain an average turnaround time not exceeding 7 daysforcomplyingdevelopmentcertificateapplications
6days(2011/12-5.1days).
Maintain average turnaround times not exceeding 7 days and 28 days for combined and non-combined construction certificateapplicationsrespectively
5.8days(2011/12-5.4days).
Maintain a market share of at least 60% for construction andcomplyingdevelopmentcertificatesandprincipalcertifying authority appointments
!38% (2011/12 - 40%).
$50,000ofincomegeneratedfromworkoutsideSutherland Shire $106,000 (2011/12 - $86 000).
PROVIDE: Sustainable asset managementImplement Asset Management Strategy in line with Action Plan
Annual actions completed Actions incorporated into AM Strategy and plans.
PROVIDE: Playground Management Strategy – a long term playgro und replacement and upgrade strategy
Develop Strategy No annual target ! Commenced.Identificationofplaygroundsfor10yearupgradeandrenewal program developed.
LOBBY: federal and state governments for funding for better roadsRoad improvements to Oak Road and Heathcote Road
No annual target ! Ongoing lobbying.
56
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
STRATEGY 2:
DELIVER INTEGRATEDTRANSPORT OPTIONS
Providing effective and safe transport service options that enable us to get to, from and around the Shire. Options that provide flexible and responsive services, integrated modes and opportunities to get around on foot and by bike. Transport modes that connect the Shire to the restof Sydney and the Illawarra, will provide both for our residents and people travelling through the area.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 201
2/1
3 - 5
7Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Develop a Transport Strategy which aligns with NSW State Plan and facilitates broader integrated transport in conjuction with land use planningActivities, programs, projects, works to be determined following completion of strategy
No annual target
Submissions have been prepared to the state government outlining key transport issues relevant to the Sutherland Shire. We have sent submissions including the Sydney Metropolitan Plan 2036, NSW Long Term Transport Master Plan, and NSW Freight & Ports Strategy.
LOBBY: Federal and state governments for key infrastructure funding to support all transport optionsState government to:• complete the Maldon
Dombarton Railway
No annual target. 6 monthly reporting
!
In July 2013 the Federal and NSW Governments called for tenders to undertake specialist engineering and environmental investigations along the Maldon Dombarton rail corridor. The technical investigations would form the basis for the preparation of an Environmental Impact Assessment for the rail line. As the development of the Maldon Dombarton rail line has been steadilly progressing the need to actively lobby the Federal and NSW Government has not been necessary. However, following the recent Federal elections it is uncertain as to whether funding and commitment to the construction of the rail line will be continued. Council will monitor the situation and if necessary commence further lobbying of the Federal Government for the completion of this important regional freight line.
• complete Woolooware Bay shared pathway ! Ongoing lobbying with Department of Environment and Heritage.
• undertake improvements to rail bridge at Gannons Road
!Council has made representations to the state government and local State Member for Cronulla. The Minister for Transport has responded advising council that, if the span of the bridge were to be increased during replacement, council would need to fund the cost over and above the cost of replacement of like for like.
• traffic flow at Sutherland Rail Station
!
Transport for NSW contractor CA&I is continuing construction works for the Sutherland Transport Interchange Project as per approved plans. Works include significant alteration to existing pedestrian and vehicle traffic arrangements with a view to improving vehicular traffic flows. Consideration is being given to retaining the pedestrian crossing at the top of the western ramp. This will improve pedestrian access but reduce the benefits to motorists. The new bus interchange in East Parade on former carpark is operational.
• Sutherland to Cronulla shared pathway incl. use of rail corridor
!The RTA indicated in a response to council in 2011 that it would include the Sutherland to Cronulla cycleway in a future review of the NSW Bike Plan. As part of its recent submission to the draft Long Term Transport Master Plan, council has sought support for the construction of sections of the proposed Sutherland to Cronulla Cycleway within the rail corridor.
• Improve the link to Sydney Airport !
Council as part of its recent submission to the Sydney Airport Preliminary Draft Master Plan reconfirmed its support for Sydney Airport and Transport for NSW jointly working together in improving public and active transport links to the airport, particularly in relation to the high proportion of employees from the Shire and St George area. Council’s support has been conveyed for the removal of the airport rail station fee levy and for improved express bus services to and from the Shire.
CityRail for consistency in rail ticketing
No annual target. 6 monthly reporting
Successful lobbying of CityRail by council has seen it amend ticketing prices to provide consistency to Shire commuters. With exception of Waterfall, all stations within the Shire have the same ticket prices for commuters travelling to and from the Sydney CBD.
58
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
STRATEGY 3:
CONSERVE NATURAL RESOURCES
Our natural resources are both precious and finite. Their wise use now will not only ensure their availability for our use but also for generations to come. Finding solutions that achieve energy conservation in our activities is critical. A holistic approach - individual, business and agency - is critical to achieving this.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 5
9Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Develop and implement new Energy and Water Efficiency Strategy
Improve the quality of energy and water data, and integrate with council’s Asset Management System
Data quality improved !
Mapping and asset/account linking ongoing.
Monitor energy and water usage across council sites
New framework of analysis and reporting developed and delivered
Completed.
PROVIDE: Energy and water efficiency projects funded through Waste and Sustainability Improvement Program (WaSIP)
Undertake the following key projects:( * indicates 2 or more year project commencing 2012/13)
• Undertake energy audits of key council sites *
1 year projects completed
• Completed energy audits of key council sites.
• Cronulla Central lighting upgrade • Completed Cronulla Central lighting upgrade.
• Use of compost for sports field renovations* ! • Commenced and ongoing use of compost for sports field renovations.
• Improvement program targeting air conditioning efficiency – Sutherland Precinct*
• Completed improvement program targeting air conditioning efficiency – Sutherland Precinct.
• Infra-red reflective paint to reduce heat load in The Ridge Cubhouse*
-• Project not commencing - Infra-red reflective paint to reduce heat load in The Ridge Clubhouse
60
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Ensure all relevant council policies and guidelines meet WaSIP requirements
Review and update the following council documents:
• Fleet Management Guidelines
• Sustainable Events Policy
• Purchasing Policy and Procedures
Policies updated
All policies and guidelines updated to the satisfaction of the Office of Environment and Heritage. Action Table for expenditure of WaSIP funds for 2012/13 developed and approved.
PROVIDE: Further develop Cronulla-Woolooware Wastewater Scheme (CWWS) to playing fields at Greenhills Beach
Develop site plans for improved water conservation at council sites receiving recycled water
Plans completed andimplemented
! Plans under development.
PROVIDE: Regulate development to ensure and promote energy and/or water efficiency
Ensure compliance with BASIX as part of the development assessment process
100% of DA’s comply with BASIX
100% of DA’s comply with BASIX
LOBBY: For changes to legislation, infrastructure or programs to conserve natural resources
Improved efficiency of street lighting
No annual target
!Sodium (HPS) accelerated deployment commenced. A 56% reduction in electricity consumption is expected by this fleet of 1,729 lights.
70w Ceramic Metal Halide now adopted as the default for all intermediate roads, using 38% less energy than the previous default 125w MV. Total costs to council expected to be 17% lower.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 6
1
STRATEGY 4
PROTECT OUR ENVIRONMENT
The natural environment of the Sutherland Shire is treasured by residents and visitors alike. It adds to the amenity of the Shire and for many people is the key factor which makes living here so enjoyable. Mitigating the effects of our activities in each domain of Shire life is critical to ensuring its ongoing viability and protection.
62
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Management plans which promote the protection and regeneration of natural areas
Develop Estuary Management Plan for North West Arm
Planned 2012/13 works completed
First stage – scoping exercise, literature, information review completed. Consultants brief being prepared for next stage.
Implement:
Albert Delardes Conservation Management Plan and Master Plan
Planned 2012/13 works completed
Albert Delardes Conservation Management Plan and Masterplan completed and adopted.
Joseph Banks Native Plants Reserves - Management Plan and Master Plan
Joseph Banks Management Plan and Masterplan completed and adopted.
Cronulla Park Master Plan ! Draft Cronulla Park Master Plan to be finalised. Works proposed for 2012/13 completed.
EG Waterhouse National Camellia Gardens Plan of Management
Camellia Gardens Masterplan draft completed. Adoption in principle for exhibition on 19 August 2013.
Head of Gunnamatta Bay Master Plan Head of Gunnamatta Bay masterplan completed and adopted.
Scylla Bay Master Plan Scylla Bay masterplan completed and adopted.
Review:
Port Hacking Plan of Management Planned
2012/13 works completed
! Port Hacking review underway.
Woronora Estuary Management Plan - Woronora Estuary review deferred pending other priorities.
Bate Bay Coastline Management Plan - Bate Bay Coastline review deferred pending other priorities
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 6
3Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Timely, effective domestic and commercial waste collection services
Provide timely and effective household bin service within service standard time
> 90% of customer requests relating to bin services are actioned within service standard
• 92% of 4200 additional bins delivered within service level agreement.
• 89% of 7500 missed services collected within service level agreement.
Conduct annual program of household chemical collection
Program conducted
2 collections carried out in September 2012 and February 2013. A total of 5,214 cars visited with 184 tonnes of chemicals collected avoiding going to landfill.
PROVIDE: Responsible, ethical waste management
Deliver awareness programs to encourage waste minimisation and increased participation in council’s waste services
Down from 2011/12 in kgs of waste per household to landfill, greenwaste, co-mingled and cleanup
2012/13 2011/12
Red lid bin 506kg/hh 514kg/hh
Yellow lid bin 310kg/hh 333kg/hh
Green lid bin 321kg/hh 359kg/hh
Cleanup service 90kg/hh 119kg/hh
PROVIDE: Community education to promote practices which minimise waste
Produce household waste and recycling collection booklet
Booklet produced and distributed
Booklet produced and distributed in June 2013.
Conduct Waste Wise Living workshops
90% satisfaction by workshop participants
91.37% satisfaction rate achieved over 29 workshops during 2012/13.
64
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Review council plant requirements and equipment
Introduce green solutions to minor plant and/or equipment
No annual target. 6 monthly reporting
Replacement program of minor plant, 2-stroke items are replaced with 4-stroke machines where possible. Five large Deutscher mowers disposed for newer smaller models which have lower db (noise levels), are more fuel efficient and have less emission.
Management of chemical base for vegetation management
No annual target. 6 monthly reporting
Ongoing rationalisation of chemicals used operationally, and greater use of mechanical/manual vegetation management techniques.
PROVIDE: Protect native bushland and vegetation
Implement council’s Urban Tree and Bushland Policy
No annual target. 6 monthly reporting
Native Plant Selector was launched in July 2013 - the culmination of two years of work across the organisation. This tool assists council and residents in making the most appropriate replanting selections for the persistence of native bushland in the urban setting.
Tree replanting ratio of 4:1 is well established.
$100 per tree by way of Deed of Agreement has been a highly successful strategy in collecting funds to replant off site and ensure the persistence of the native tree canopy in the urban context.
The Tree Replanting Team was engaged in June 2013 and a specification has been developed and training has taken place.
Two Masterplans have been finalised and are ready to commence replanting – Kingsway, and Lantana and Kingswood (partnership with Ausgrid) the next two masterplans are in development.
PROVIDE: Introduce and administer strategies and programs to replace lost trees*Note, figures do not include Bushcare planting activities or other council unit’s tree planting initiatives / activities, eg Greenweb
Implement tree planting program on council land
No annual target. 6 monthly reporting
1,179 street trees planted under Parks Operations planting program*
Maintain resident tree issue program 7,846 trees issued from council Community Nursery under ratepayer giveaway program*
Regulate tree planting program on private property
5,037 Tree Management Applications were finalised, and 89% of these were approved. Furthermore there were a number of highly successful local court prosecutions for unauthorised tree removal which netted council approx $60,000 in tree replacement funds throughout the year.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 6
5Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Regulate and enforce environmental protection measures in the urban environment(CRMS - Customer Response Management System records)
Undertake:
• Animal control services• Community law
enforcement• Illegal dumping patrols • Parking and traffic patrol
No annual target. 6 monthly reporting
• Animal control services - 2,790 CRMS received and actioned.• Community law enforcement - 516 CRMS received and responded.• Illegal dumping patrols - 1,256 CRMS received and responded.• Parking and traffic patrols - 2,150 CRMS received and responded.
In excess of 580 patrols conducted in high profile areas such as Cronulla mall, and surrounding foreshore areas continuing to be monitored with 2,790 reactive customer requests responded to in relation to companion animal complaints. (2011/12 – 850 patrols, 1,855 reactive customer requests)
2,212 patrols of all schools and responded to 2,150 parking related requests. (2011/12 - 1,372 patrols, 2,100 parking) The Unit has continued its school safety campaign in conjunction with NSW Police concentrating on illegal parking and speeding in and around school areas. 210 courtesy speed checks were provided to drivers in and around schools with the data collected and then provided to council’s Road Safety Officer for collation. (2011/12 – 160)
80 programmed heavy vehicle inspections occurred with a focus on correct weight limits and secure loads. (2011/12 – 155)
PROVIDE: Enforce compliance with laws and regulations to ensure quality of noise, air, water and land pollution
Investigate incidents of pollution
No annual target. 6 monthly reporting
Environmental and Health Regulation:
• 289 Noise pollution complaints investigated (2011/12 – 260)• 58 Air pollution complaints investigated (2011/12 – 52)• 75 Water pollution complaints investigated (2011/12 – 82)
Environment Protection and Regulation:
• 66 pollution and illegal dumping matters investigated and prosecuted.
Conduct audits of commercial and industrial premises
No annual target. 6 monthly reporting
48 New audits undertaken (2011/12 – 39)
33 existing audit reinspections undertaken (2011/12 – 91)
None of the premises inspected had air related issues. 4 of the premises inspected had water related issues with none of the 4 complying after reinspection. (2011/12 - 2 premises inspected had air related issues with neither premises complying after reinspection. 8 of the premises inspected had water related issues with 2 of the 8 complying after reinspection)
66
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Investigate options for council to reduce greenhouse gasses and explore opportunities to explore carbon credits
Pursue further vehicle fleet emission reduction options
No annual target. 6 monthly reporting
Purchase of 10 new recycling waste vehicles and 4 new operational trucks equivalent to Euro 5 stated CO2 reduction is a further 25% and a particulate reduction of 90%. Council continues to invest in the renewal of fleet assets, introducing modern clean technologies and fuel efficient assets.
PROVIDE: Manage and promote the management of pest species
Implement Feral Animal Policy
No annual target. 6 monthly reporting
Pest Species captured / controlled: 2012/13 2011/12
Deer 52 70
Rabbit 114 194
Foxes 146 117
Indian Myna birds 378 432
Cane Toads 182 w/ 300 tadpoles 984, tadpoles 4300
Treatment of rats 9 sites 6 sites
Treatment of cats 6 sites -
Treatment of carp 3 sites
PROVIDE: Local community groups, business, industry and residents initiatives which protect and/or enhance nature
Manage ongoing Bushcare Program
No annual target. 6 monthly reporting
1,513 registered Bushcare volunteers with 632 regular Bushcare volunteers dedicating 11,213 hours.
(2011/12 - 690 active volunteers. Total Bushcare volunteer hours = 16,167)
Catchment Management Programs
No annual target. 6 monthly reporting
1. Restoration of the vegetative corridors of the Kurnell Peninsula
2. Protection and restoration of the headwaters of the Mill Creek Catchment
3. Protection of the littoral rainforest of Hacking River Catchment
4. Restoration of the coastal reserves of Hacking River
5. Noxious weed control (Crown lands) Georges River and Hacking River Catchments
6. Vertebrate pest control programs Georges River and Hacking River Catchments (SSC and Crown lands)
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 6
7Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
Implement corporate partnerships for Bushcare (as appropriate) No annual
target
Bushcare corporate partnerships not applicable for this period.
Continue Greenweb Program and Greenweb Schools
604 properties participating in Greenweb Program. (2011/12 – 566)
Schools continue to participate in Greenweb and this financial year saw 11 schools participate in ‘Schools in Greenweb’. (2011/12 – 16)
LOBBY: For changes to legislation, infrastructure or programs to conserve natural resources
Changes to container deposit legislation
No annual target
! Council supports this position.
Extended producer responsibility of e-waste Sita has opened an e-waste free drop off site at Lucas Height facility.
Waste infrastructure for processed material In progress as part of $465.7M Waste Less/Recycle more iniative.
68
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
STRATEGY 5
STRENGTHENING OUR COMMUNITY
Facilitating community connections and providing the social services to support the people who make up the Sutherland Shire community is fundamental to our quality of life and success in all domains of Shire life. Making sure people feel safe to live, work and enjoy the Shire and their life is part of strengthening our social fabric.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 6
9Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Quality and responsive childhood education and care
Operate: 11 long day care centres, 1 OOSH and 4 vacation care programs
Manage Family Day Care Scheme
At minimum meet national quality sandards
Occupancy of 95%
Revenue neutral status
The Early Education Centres and Family Day Care all have current Quality Improvement Plans which are reflected on monthly. Seven services (6 Early Education Centres and the Family Day Care scheme) have commenced and/or completed the Assessment and Rating process by the legislative body. Allison Crescent, Hobart Place and Moore Street Child Care Centres have undergone their visit and are awaiting the final report; Canberra Road and Dianella Street received an overall rating of Exceeding the National Quality Standard; Fauna Place received working towards, however this is due to sustainability and all other elements were rating at either meeting or exceeding. Family Day Care received an overall rating of Meeting the National Quality Standard.
Early Education Centres maintained occupancy above 95% The average between January – June was 98.79%. This is a decrease of 1.78% from the previous 6 months 0.82% decrease from the same reporting period in 2012. The occupancy outcome resulted in an increase in the budget estimate for revenue, hence maintaining cost neutrality
!MOOSH maintained occupancy above 70% (budget estimate). The average between January – June was 79.95%, which is an increase of 15.50% on June - December 2012 and an increase of 16.56% from the same reporting period in 2012. The occupancy outcome recorded a surplus which will be put towards capital improvements.
Family Day Care January-June 2013 charged hours av 88.10% a decrease of 13.31% on July - December 2012. The decrease resulted from a group of educators leaving the scheme and moving to a private provider. The occupancy outcome meant a shortfall which has been covered from previous reserve funds.
Vacation Care occupancy was below the budget estimate of 82.80%. The average recorded between January – June was 66.61%. This is a decrease from July – December by 5.95% and a decrease of 0.57% from the same reporting period in 2012.
70
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
Support vulnerable children and families
No annual target. 6 monthly reporting
Special Child Care Benefit (SCCB) is administered for vulnerable families. During Jan-Jun, 13 children received fee relief via SCCB. This is an increase of two from July - Dec 2012 & a decrease of two from the same reporting period in 2012.
11 children were enrolled in June 2013 who are registered under the Strengthening Families Program which is an increase of 5 from December 2012.
There has been a slight increase in children with additional needs receiving Inclusion Support Subsidy with 15 children as at 30 June 2013, which is an increase of 1 from December 2012, however a significant decrease from 30 reported in the same period in 2012. The decrease is a result of the funding having much tighter restrictions on who is eligible for funding & what it can be used for.
Children’s Services facilitates the State funded inclusion support program. The funding under this program is based per calander year. In 2013, 35 children received funding compared to 15 in 2012. The dramatic increase was a result of promoting the funding.
Services have accessed Bicultural support for children which has aided in their ability to settle & feel secure within the environment
During the period from Jan- June, training was provided to staff on attachment & relationships with children as well as the required accredited child protection training ‘Identify and respond to Children & Young People at Risk of Harm’. These courses were offered through the training unit of Children’s Services, with the Child Protection course delivered by an internal staff member. An online child protection course was developed to enable all staff including casuals to keep abreast of their legislative requirements.
The training unit also facilitated parent workshops during this period which included ‘Triple P Parenting Program’ and an Information forum which involved external support agencies and the services available for families.
Individual Family Service plans were facilitated when required, involving all external services who have involvement with the child.
Liaison with external agencies continues to occur to support children’s development & placement at the service. These include speech therapist, Occupational therapists and transition to school programs etc
A number of referrals were made to support agencies, diagnostic services & paediatricians to assist families to identify & manage concerns with their child’s development and behaviour.
The Child Protection Policy has been updated.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 7
1Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Training to build the capacity of child care professionals and parents
Deliver quality early childhood care training
Satisfaction with Children’s Services remains at or above 80%
The overall satisfaction for the professional development training sessions reported by both internal & external staff averaged at 96.2% satisfaction during the period January - June, compared to 89.9% in the previous 6 months.Children’s Services has had 53 learners enrolled between January to June in either Certificate III in Children’s Services, Certificate IV in Children’s Services (Outside school hours care), Diploma of Children’s Services (Outside school hours care) or the Diploma in Children’s Services (Early childhood education and care). This figure represents a 29.2% increase from the previous 6 months & a 72% increase from the same period in 2012. During January – June 9 learners graduated, which is the same as the number recorded in 2012. The training unit delivered 13 professional development workshops with 231 attendees, a 31% decrease in workshops delivered & 27% decrease in the number of attendees from the previous 6 months. This reflects a 35% decrease in the number of workshops delivered & a 44% decrease in attendees from the same reporting period in 2012. There were 7 parenting workshops conducted with a total of 123 attendees, the number of workshops decreased by 12.5%, the number of attendees decreased by 45.09% from the previous 6 months. The number of workshops delivered increased from the same reporting period in 2012 by 2, however the attendees were still significantly less (25%). The Children’s Services unit was sought from external service providers to deliver 3 customised training sessions, this is a 25% decrease from the previous 6 months, however an increase from the same reporting period in 2012.
PROVIDE: Life Guard services and initiatives at the Shire’s beaches
Patrols, surf education programs and events at beaches
No loss of life between the flags
Winter: 1 July 2012 – 21 September 2012, Winter: 22 April 2013 – 30 June 2013During this period lifeguards patrolled both North and Cronulla beaches. North Cronulla beach was patrolled via surveillance from 10:30am – 3:30pm and opened whilst schools attend the beach between 12 – 2pm. Cronulla beach was patrolled from 7:30am - 3:30pm. Surf education programs including Surf Awareness and Surf Safety resulted in 26 schools with a total of 1144 students. This is an increase on last years student numbers (previous period 33 schools/705 students). Rescues 31, Preventative Actions 1356, First Aids 725 (previous period: Rescues 28, Preventative Actions 1281, First Aids 675 ) These stats are slightly up due to extended patrols at Nth Cronulla on weekends.Summer: 22nd September 2012 – 21st April 2013During this period lifeguards patrolled all of the Bate Bay beaches including Wanda, Elouera, North Cronulla and Cronulla. Daily patrol hours were between 8am-4:30pm and 8am- 5:30pm during day light savings. Surf education programs including Surf Awareness and Surf Safety resulted in 69 schools with a total of 3157 students this is comparable to this period last year (68 schools/3248 students). Rescues 319, Preventative Actions 14017 First Aids 3335 (previous period: Rescues 199, Preventative Actions 10,176, First Aids 3838 )20 local community organisations were supported to run recreational and leisure activities on our beaches. A total of 1047 individual bookings for beach areas were placed into the events booking system during the period. Previously only major events were counted, but this figure gives a more accurate account of the beach unit’s involvement with the community.
72
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Professional expertise and support to community agencies servicing the Shire community
Resource local service inter-agencies to build community capacity
No annual target. 6 monthly reporting
Provided support and convened 10 interagency meetings. Participated in 2 Neighbourhood Centres Forums, Multicultural Interagency, Domestic Violence Interagency, Mental Health Interagency, Caringbah Hub Steering Committee and support to Caringbah Women’s Heath and Info Service.
Deliver training and education to the community sector
Delivered 6 training sessions with 108 in attendance from service providers. Session topics include: Developing Organisational Partnerships, Work Health and Safety, Homelessness, Alcohol and Other Drug Use, Child Protection, and Grant Writing.
PROVIDE: Community initiatives which respond to local social issues
Implement Ageing Well Strategy
100% of planned activities completed
Ageing Well Strategy – 100% of planned activities completed, highlights include: successful workshop with Directors, Staff and Community reps to prioritise Ageing Well strategies, $25,000 Grant from NSW Govt – Ageing Friendly Public Places(Caringbah),Probus Club Ageing Well Promotion (300 participants), Linking Generations Art Project, highly popular Cross Divisional Seniors Week activities, Can Do seminar - strategic approach to managing change in the sector with 50 services and Govt agencies, Squalor and Hoarding Seminar encouraging cooperation across agencies.
Finalise and implement Youth Strategy
!
Youth Strategy- Draft Youth Strategy completed, consultation with council staff and local service providers concluded. Scheduled for exhibition first half of 2013/14. Youth events include: Youth Week Event April 2013, local youth arts organisation developing Cronulla Laneways project, Anti-graffiti mosaic in Engadine (EDYS), 3 Youth Council meetings developing local leaders, 3 Youth Network Interagency meetings linking services to local state and national youth initiatives, partner on Headspace steering group a one stop shop health service for young people, Schools and Services forum linking Department of Education and local service providers.
Provide financial subsidies and grants to facilitiate a range of social support
No annual target. 6 monthly reporting
Administer Clubs Grants Program - $350,000 allocated to 39 groups. There were 141 applications with a value $1.1m in requests.
Annual Community Services and Arts Grants - $189,561 allocated to 29 groups to enable local organisations to develop projects which progress the Community Strategic Plan and other plans of council.
Information provided to and referral of residents to local community services
No annual target. 6 monthly reporting
Extensive referral to community directory, website development and Facebook Pages (eg Greenhills Skate Facility), hard copy Seniors Directory distributed,Youth Info card, Homelessness Accommodation card and
Mental Health card reprinted & distributed.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 7
3Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Community safety and public place improvement initiatives
Implement Crime Prevention Plan
100% of planned activities completed
100% completed
Respond to crime and malicious hot spots
No annual target. 6 monthly reporting
8 GRIP sessions attended, 10 Hotspots, removal kits continued, Skate Facility Anti-Graffiti project, Menai Safety, 2 graffiti removal projects with 5 squads and 20 volunteers, Engadine Community Services Volunteer Graffiti Removal Project in partnership with Dunlea for the three month period (17 students 2 teachers),CCTV’s (Sutherland & Engadine), Green screening project completed, Sutherland Overpass.
Remove graffiti 80% of reported graffiti incidents cleaned and removed within 7 days
1126 graffiti incidents reported. 84% of reported graffiti incidents cleaned and removed within 7 days. (2011/12 – 92%)
Review Access Policy Adopted Access Policy
Access Policy adopted. Action plan in development, 10 Access Audits undertaken.
PROVIDE: Community events which facilitate people connecting at the local and Shire-wide level and encourage local economic activity
Conduct community based events
100% of planned events undertaken
100% of planned events undertaken. The following events conducted: Opening of Bate Bay Lifeguards HQ, Handover of Cronulla Surf Club Records, NAIDOC Week Celebrations, Oak Park Expansion Opening, Shiprock Stairs Upgrade Launch, 10-Year Bali Memorial, Debating Finals, Public Speaking Finals, Seniors Christmas Concert, Citizen of the Year, Bushcare Volunteers Thankyou BBQ, Len Waters Memorial Opening, Australia Day, International Women’s Day, Gymea Baths Upgrade Opening, Seniors Lunch, Seniors Concert, Lakewood 35th Anniversary Event, Cook’s Landing (Meeting of Two Cultures), Cinema Under the Stars, The Ridge Golf Course Opening, Mayoral Ball.
74
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
Conduct events in Cronulla CBD, Fiesta at the Beach and Coffee at Peace Park to stimulate economic activity
100% of planned events undertaken
Cronulla CBD: 100% of planned events undertaken, highlight as follows:School Holiday Activities – Cronulla Clue Challenge & Cosmodome (2 to 13 Jul 2012)Cronulla Spring Festival (8 to 9 Sep 2012)School Holiday Activities – International Gymnastics Competition & Dinosaur Activities (24 Sep to 7 Oct 2012)Summer Santa Photos (26 Nov to 24 Dec 2012)Christmas Creche (3 to 21 Dec 2012) New eventToddler Tuesday (Feb to Jul 2013 –during school terms) New eventGift Card Giveaway (11 to 24 Mar 2013)Cronulla Easter Show (29 Mar to 1 Apr 2013)Mother’s Day Shoppers Competition (29 Apr to 12 May 2013)Fiesta @ the Beach - increased visitor numbers from across the Sutherland Shire and Greater Metropolitan Sydney. Attendance estimated at 8,000 people. Multicultural program of song and dance and cuisine from around the world, celebrating Australia’s cultural diversity. Retailers and cafes in Cronulla benefited from increased trade.Coffee @ Peace - increased visitor numbers to well over 10,000 people in Peace Park. Sutherland Rotary raised money for charity through its ‘cook off’ and local businesses and coffee shops raised profile and benefited financially through stalls and foot traffic.
PROVIDE: Quality and responsive library services and spaces
Provide community and online library facilities and services that encourage library participation by diverse groups
Nil reduction in participation in library services from 2011/12
!
Visits per capita 5. 8 (6.0– 2011/12)
Physical visits were down by -8% but electronic visits were up by 4%. The total number of visits was down by 5%. This trend is evident in public libraries across the world. Changes in usage of collections will be addressed with heavy weeding of those areas no longer in demand.
Implement a new library management system
Library management system operational
System live and operational from June 2012.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 7
5Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Community facilities and spaces for neighbourhood and Shire wide community and small business activity
Manage community halls and spaces for local groups to meet and or operate within
Nil reduction in no. of users of community hall facilities from 2011/12.
!
2012/13 users = 525, 855. Decrease from 2011/12 = 551,020
2012/13 meetings = 24,848. Increase from 2011/12 = 24,094
2012/13 hours = 81,109. Increase from 2011/12 = 72,613
Per capita cost/revenue per visitor to council managed community halls.
Net revenue 33 cents per visitor
s.356 subsidies as % of total revenue.
2012/13 = 6.41%. Decrease from 2011/12 = 7.88%
PROVIDE: Initiatives which support the local economy and tourism
Monitor and respond to trends and changes in the local economy
No annual target. 6 monthly reporting
Co-ordinated feedback from business networks and the Economic Development Committee on ‘red tape’ to be included as part of council’s red tape review.
Worked with Environmental Operations Unit to develop fact sheets for business on the Change of Use DA Process to assist with customer expectations.
Development of a Home Base Business Guide commenced.
Further analysis of results from November 2012 Business Survey – ‘What 3 things can Council do to help Business and Red Tape review?’
76
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
Implement economic and tourism related activities and events
No annual target. 6 monthly reporting
Economic Development: Shared opportunities for local business to attend events and workshops via SSC website, Shire Business Facebook page and emails to our database.Tourism: Sutherland Shire hosted the Greater Sydney Tourism Awards in July. Council won the Local Government in Tourism category, our Tourism Manager (Jenny-Lee Stefas) won the individual contribution category. and local businesses won three gold and four highly commended awards. Seven local entries went on to be finalists in the NSW Tourism Awards with our Tourism Manager taking the gold award for regional contribution to tourism in NSW, and Sydney Coast Walks the bronze award for Eco Tourism. These were the first NSW awards to the Shire in over a decade.A new edition of the Shire Visitor Guide was launched in January, featuring over 100 things to see and do. The 76 page guide was supported by over 75 local business advertisements. The guide is distributed locally, through the VIC network and via the informed tourist in Sydney hotels and accommodation facilities. Shire Tourism ran a business development conference in March. ‘Put the Shire on the Map’ was attended by 50 people from the local business community.Council engaged consultancy firm 2T in March to identify opportunities for accommodation development in the Shire. A draft report with recommendations was received in June.Tourism partnered with Understand Down Under, Natures Tours and Cronulla & National Park Ferry Cruises to represent the Shire at the 2013 Australian Tourism Exchange in April. This international trade show resulted in 150+ leads with both international wholesalers and Australian inbound tour operators. The Visit the Shire website received over 108,000 visitors for the year and the ‘Visit the Shire’ Facebook page hit 3,000 likes as a result of the Show the Shire photo comp. The Shire Tourism Awards were held in June at the Hospitality Establishment.
PROVIDE: Opportunities for local businesses, community agencies and education/training providers to connectCoordinate, facilitate and refer business networks for local business to connect
No annual target. 6 monthly reporting
Marine Network – attend and coordinated 3 network meetings, network event 27 March to discuss council Boat Ramp upgrades and gauge interest in the 2013 Marine and Boat Show. Manufacturing network – Manager Economic Development elected on Board of Directors for Southern Strength Agile Manufacturing Network – attended and coordinated 6 network meetings. Commercial Centres – developed a Commercial Centres Program to be piloted in Gymea and Engadine – program centred on business development, centre marketing and events and centre cleaning and maintenance. Health and Wellbeing – commenced discussions with Kogarah and Hurstville City Councils to merge our networks to become the Southern Sydney Health and Wellbeing Network to open further referral opportunities for business.
PROVIDE: Opportunities to assist the growth of small businessManage the SSHED to support the development of small business in the Shire
70% or above occupancy at the SSHED
!
Average of 66% with 6 months of the year at 71%. Measures to increase the occupancy level include; introduction of business assessment workshops, SSHED commercial lease, ongoing marketing using a range methodologies.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 7
7Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: A range of leisure and recreation opportunities in council facilities
Provide programs at council’s leisure centre facilities
Nil reduction in school participation rates from 2011/12Increase in senior participation rates from 2011/12
Achieved increase in school participation rates across Leisure Centres from last year.
Continued strong participation rates for seniors with an increase across the Leisure Centres.
Programs offered include: learn to swim and stroke correction, squad programs, aquatics inflatables, swim club, Spa, Steamroom, Fitness classes to suit all ages and fitness levels including Aerobic, Spin, Boxing, Circuit and Aquarobics as well as a Cardio and Weights room, Boot Camp, Pilates and Personal Trainers,Creche and Pool Parties. Disabled access facilities.
PROVIDE: Equitable support to sporting groups to provide sport and leisure opportunities in the Shire
Provide active open space for registered sporting groups to operate on
No annual target. 6 monthly reporting
889,440 sqm of active open space was available for approximately 49,476 registered sporting players. 17,997 sqm per person with 205 sporting playing fields.
PROVIDE: Regulation program that protects and improves community health
Ensure all registered businesses comply with prescribed health-related standards
Meet or exceed statutory inspection requirements
2012/13 2011/12No. Inspections % Complete % Target No. Inspections % Complete % Target
Food businesses 940 1,780 99.66% 95% 940 1,797 98.9% 95%Skin Penetration 107 105 98.13% 1 inspection
per business123 123 100%
Premises with cooling systems
55 55 100% 1 inspection per premises
56 53 98.2%
Brothels 5 5 100% 1 inspection per brothel
4 4 100%
Caravan parks 4 4 100% 1 inspection per caravan park
4 4 100%
Mortuary 1 1 100% 1 inspection per mortuary
1 1 100%
Mobile food vendors
8 8 100% 1 inspection per mobile food vendor
8 8 100%
78
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PARTNER: Education and training providers to fill local gaps to support local industryEstablish partnership with TAFE for the recognition of Certificate 4 and small business management accreditation No annual
target. 6 monthly reporting
TAFE reviewed SSHEDprogram and have identified four activities that would be recognised as credits toward Certificate 4 in Small Business Management Course.This course has 10 units. Further evidence based assessment of business management activities promoted by the SSHED program would likely result in the recognition of up to an additional four or five unit credits.Any SSHEDprogram business would need to enroll in the Loftus TAFE Certificate 4 in Small Business Management course and complete the minimum class time requirement.There are no current tenants engaged in this program.
Partnerships with education/training providers and other government agencies to identify gaps and facilitate solutions
Manager Economic Development on Board of Sutherland Business Education Network (includes representatives from TAFE, local schools, etc)Participated in the University of Wollongong’s Univative Program – working with teams of students to provide a report with recommendations on a real business problem – briefed, mentored and judged university teams for this program.
PARTNER: Local emergency services to prepare for, respond and manage natural disastersProvide support to the Rural Fire Service and State Emergency Service as required
As appropriate. 6 monthly reporting
Support provided as appropriate. Position of Local Emergency Management Officer (LEMO) taken up by Michael O’Leary (Manager Civil Operations) following retirement of Director Engineering.
PARTNER: Local business, government and other councils and organisations to promote economic growthPartnership projects with government agencies, industry peak and community based organisations
No annual target. 6 monthly reporting
Sponsored F1 in Schools Program – an initiative that is part of the high school curriculum exposing students to develop an interest and learn skills in engineering/manufacturing.Combined Chambers of Commerce – co-ordinated and met with all 6 Shire Chambers Of Commerce (Menai, Bundeena, Cronulla, Miranda, Gymea and Engadine) to discuss local issues.
PARTNER: Local community groups and agencies to build strong community connectionsPartnership projects with government agencies, industry peak and community based organisations
No annual target. 6 monthly reporting
Liquor Accords, Sutherland Shire Crime Prevention and Community Safety Precinct Committee, Safer Suburbs Safe Taxi Rank project (Federal Govt funding), Ageing Friendly Communities project (State Govt funding)
LOBBY: For appropriate services and programs to support local human service needsLobby for services and programs
As required. 6 monthly reporting
Lobby Ministers and Dept of Community Services & Health for Caringbah Women’s Health and Info Centre, Centrelink regarding defunding Homeless Persons Outreach Service, 7 support letters for Capital Assistance funding for local organisations.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 7
9
STRATEGY 6
RESPECT AND VALUE ALL HERITAGE AND CULTURE
Natural, manmade, historical and diverse people’s culture and heritage – it is all part of what enriches the Sutherland Shire and makes it unique. Valuing it in our individual and corporate actions is essential to its appreciation and celebration now and well into the future.
80
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET
2012/13 ANNUAL RESPONSE
PROVIDE: Local cultural, arts and entertainment opportunities
Provide events, classes and space at Hazelhurst Regional Gallery and Arts Centre
No annual target. 6 monthly reporting
Hazelhurst: 182,148 visitors, 284 holiday workshops, 28 master classes, 163 schools tours/visits, 209 term classes (2011/12: 153,679 visitors, 282 holiday workshops, 35 master classes, 112 school tours/visiting, 192 term classes)
Provide entertainment at the Sutherland Entertainment Centre which is otherwise not provided locally
Total attendance at SEC for the year was 152,141 (Up from 147,266 for 2011/12).
PROVIDE: Community cultural events which celebrate the range of cultures in the Shire
Provide financial subsidies and grants to facilitate a range of arts, cultural activities and heritage
Heritage and Cultural Grants Programs delivered
8 Heritage Building Grants were awarded for the total amount of $25,111.00.
Cultural Grants as follows:
Annual Community Services and Arts Grants Guidelines reviewed as identified in Mayoral Minute.
Annual Community Services and Arts Grants allocated $189,561 to 29 groups to enable local organisations to develop projects which progress the Community Strategic Plan and other plans of council.
Annual Community Arts subsidies review process commenced as identified in Mayoral Minute.
2012/13 Arts and Cultural Subsidies allocated $87,288 to 21 groups.
PROVIDE: Support for community based arts and cultural activities
Provide assistance to community groups and organisations conducting community cultural events
No annual target. 6 monthly reporting
Cook Community Classic Sutherland to Surf Boree Regatta Festival of KurnellGymea Village Fair MS Gong Ride Cops & Rodders Shirelive CarolsGunnamatta Festival Volleyball Championships Phil Bates Cycling Red Nose Day WalkathonSounds of the Suburbs Light the Night One Foot Forward Family Fun Day RegattaReclaim the Night Veteran’s Health Week 3 circuses.
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 8
1
CIVIC LIFE
Essential to carrying out this Delivery Program and Operational Plan is having efficient and effective council operations that are underpinned by good corporate governance.
82
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET 2012/13 ANNUAL RESPONSE
Community SatisfactionUndertake and report on Community Satisfaction Survey (every two years)
Score of > 7 on ‘overall satisfaction’
Satisfaction maintained at 7.3 from Community Satisfaction Survey 2011. Community Satisfaction Survey 2013 is under review. (compared with previous 2009 satisfaction result of 7.4).
Develop and implement communications campaigns for council programs and initiatives
No annual target. 6 monthly reporting -
A number of communications campaigns were undertaken during this period: Draft LEP and Housing Strategy, On Call Clean Up, Gymea Village Marketing Plan, Seniors Activity and Australia Day events, Animal Shelter, Report It App, Garage Sale Trail, and Change Management Plan.
Produce council newsletter ‘Our Shire’
6 times/year - % who read ‘Our Shire’ is at least 90% (from Community Satisfaction Survey)
Council newsletter Our Shire printed and distributed through the Leader newspaper to 75,000 households. Published on council’s website and electronic edition available. Readers invited to subscribe by email.
Of the people who received ‘Our Shire’, 92% read it. (Community Satisfaction Survey 2011)
Undertake community engagement to assist in decision making
No annual target. 6 monthly reporting
Research/community engagement was undertaken to support 45 council plans, infrastructure & community projects, and policy updates using a variety of methodologies including surveys, workshops, information sessions and online communication. Your Shire Your Say Residents Panel currently has 249 members with a relatively even gender balance.
Use the web to communicate with the community
> 2010/11 visitors (595,300)
980,942 visitors (2011/12 – 720,928)
> 64% who regard quality of web information as ‘good or excellent’ (from Community Satisfaction Survey)
63.8% (Community Satisfaction Survey 2011)
Provide customer service at council’s front counter and over the telephone in a timely manner
Telephone: Average telephone waiting time < 15 secs
6 secs (2011/12 – 6 secs)
% answered within 15 secs is > 70%
82.8% (2011/12 – 82.8%)
Abandonment rate <2% 0.5% (2011/12 – 0.6%)Counter: % rating service as ‘excellent or good’ is > 95%
97.9% (98.5%)
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 8
3Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET 2012/13 ANNUAL RESPONSE
Respond to formal access requests for information, in accordance with Government Information (Public Access) Act 2009
100% of GIPA requests processed within the statutory timeframe
100% of GIPA requests processed within the statutory timeframe.(2011/12 – 100%)
Management by fact
Undertake long term planning
Community Strategic Plan review complete within 9 months of council election
Completed.
Undertake research projects
No annual target. 6 monthly reporting
The main research project that commenced during this period was the update of the State of the Shire report, however, this has been put on hold pending review. Other research-related projects are referred to earlier in the community engagement activity indicator.
Provide community statistics to council staff and the community
Total number of visitors > 2010/11 figure (7,335)
!The number of visits is 5,844. (2011/12 - 19,825 and 2010/11 - 7,335).
Continuous improvement
Maintain a financially sustainable organisation
Equal or exceed industry financial unrestricted current ratio and debt service ratio
• Unrestricted Current Ratio: 1.37 :1• Debt Service Ratio: 2.53%Both ratios are better than industry benchmark standards.
Participate in SSROC procurement and shared services projects
No annual target. 6 monthly reporting
Council currently participates in 18 procurement contracts negotiated by SSROC. At this stage their have been no shared service projects.
Continue to implement organisation change and review program
No annual target. 6 monthly reporting
Strategic Review Implementation Steering Committee established to oversee implementation of PwC Review recommendations. Divisional restructure completed and recruitment of new Directors currently in progress. A process for developing a new Long Term Strategy, reviews of duplication and fragmentation and improving customer service are underway.
EthicsTrain council staff in ethical practice
100% of all new staff trained All staff trained as required.
Manage formal complaints to Internal Ombudsman Unit
95% of complaints received are finalised ! As reported to council on 26/08/13, 11 matters carried into 3rd quarter, 49 new matters received and
39 matters finalised through quarters 3 & 4.
84
- SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UA
L REP
OR
T 20
12
/13
Achieved/acceptable (>90%
) Alert/review conditions (50-89%
)!
Alarm/unacceptable (<
50%)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET 2012/13 ANNUAL RESPONSE
Undertake Internal Audit program in accordance with Internal Audit Committee’s requirements
100% of program completed Audit program undertaken and completed in accordance with Internal Audit Committee’s direction.
Uphold and enforce our local planning laws and regulations through legal action where required
No annual target. 6 monthly reporting
Legal Services: Land & Environment Court cases = Class 1,2&3 – 18, Class 4 – 0, Class 5 - 2 (2011/12 Class 1,2&3 – 21,Class 4 – 1,Class 5 – 0)
Local Court prosecutions (development matters) = 24 (2011/12 – 21)
Environmental & Building Compliance:
The following investigations were finalised;
• Non compliance with Development Consent: 397 (2011/12 – 411)• Pollution – Development site: 31 (2011/12 – 39)• Unauthorised Development: 457 (2011/12 – 514)• Swimming Pool Fencing: 154 (2011/12 – 233)• Development Controls, Building Complaints, PCA : 22 (2011/12 – 25)• Other (mix of request types finalised by Compliance Unit): 550 (2011/12 – 457)• Illegal/Pruning Removal: 267 (2011/12 – 256)• Fire Safety Statements: 1,546 (2011/12 – 1,543)
The total value of PINS issued for the period was $153,800.Our commitment to our staffUndertake staff satisfaction survey (every 4 years)
Score of > 7 on staff satisfaction survey
2011 Survey Overall Staff Satisfaction: The overall level of satisfaction for the Directors is 8.83 (up from 8.38 in 2004), 7.97 for the Managers (up from 7.86 in 2004) and 7.51 for the staff (up from 7.23 in 2004).
Ensure a safe workplace WHS incidents per 100 workers is decreasing.
Trend from 2006/07 to 2012/13 is decreasing to 13.72. (2011/12 - 16.28)
Workers compensation claims incident rate per 100 workers is decreasing
Trend from 2006/07 to 2012/13 is decreasing to 3.53. (2011/12 - 4.99)
Lost time injury rate is decreasing. Trend from 2006/07 to 2012/13 is decreasing to 14.58. (2011/12 – 32.24)
SUTH
ERLA
ND
SHIR
E CO
UN
CIL A
NN
UAL R
EPO
RT 2
01
2/1
3 - 8
5Achieved/acceptable (>
90%)
Alert/review conditions (50-89%)
!Alarm
/unacceptable (<50%
)
Not comm
enced/cancelled (0%)
-
ACTIVITIES, PROGRAMS, PROJECTS, WORKS
ANNUAL TARGET 2012/13 ANNUAL RESPONSE
Implement Equal Employment Opportunity Management Plan
No annual target.
The EEO Management Plan, September 2012 - September 2016 continues to be implemented across the organisation with a variety of initiatives, projects and programs. Examples of some of the achievements include; all senior management attendance at bullying prevention training, Continuation of recording of all grievances and annual reporting to Directors, our identified EEO trainees completing studies and work, training and refresher information to staff for Fair Workplace, diversity events held and completion of external mentoring program for six women.
Provide programs which promote Equal Employment Opportunity for women, youth under 25, people with disability, and Aboriginal and Torres Strait Islander people
No annual target. 6 monthly reporting
Gender: 6 females completed the Springboard Women’s Development Program with support from six mentors. Creation by Personnel of an internal Mentoring Program and four formal pairings to date. International Women’s Day event celebrated within the community, with event managed by council. International Women’s Day acknowledged internally with an educative update via Corporate News article and offering of support avenues for violence against women. Keeping in Touch Program created.
Youth: For the period 1/7/12 to 30 June 2013 council employed 37 trainees and apprentices made up of 10 apprentices and 27 trainees consisting of 23 males and 14 females with all but 2 under the age of 25.
People with a disability: 3 positions maintained and supported through a TAFE qualification. Visually impaired employee moved from outdoor work to call centre role with support from Vision Australia, Personnel, FWP Co-ordinator and Management. Working with Communities unit to ensure coverage in Access and Disability Action Plan. Online Business Development Team working towards relevant industry targets for ensuring website accessibility.
Aboriginal & Torres Strait Islander people: Trainee in ESD completed qualifications and additional work experience. The 12 month Elsa Dixon funded temporary internal secondment position maintained, ending December 2013. Three successful applications received for funding for temporary positions through the Elsa Dixon Program for 2013/14. Attendance at Aboriginal Advisory Committee meetings and/or information supplied. Exploration of an external cultural training program, to be re-considered 2013/14.
Provide a supportive working environment
Number of grievances referred to Fair Workplace is decreasing
!
There has been a slight increase of 4 in the number of contacts to FWP in comparison to 2011/12, however, still a reduction since the peak in 2010/11.
Advice sought increased by 5 from 2011/12. The levels where the FWP contact is coming from shows an increase in manager and supervisor contact to FWP for advice on managing a concern in their team, this is proactive and to be encouraged. The end action has remained fairly consistent over the past two years, particularly the 40% taking independent action themselves. This is a reflection of the changed FWP procedures and the focus on addressing any concerns early.In 2012/13, 1 division saw an increase in their specific incidents from 1% to 3% of their total headcount. The areas where these came from have been supported and managed and it is not anticipated will be of concern in future.
86 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
OTHER STATUTORY INFORMATIONThis section contains information required under various legislation and which is not covered elsewhere.A complete index for all statutory information in this report is on page 219.
INFORMATION REQUESTS UNDER GIPA (GOVERNMENT INFORMATION (PUBLIC ACCESS) ACT 2009)
Access applications received
2012/13 2011/12
Customer services Open applications 481 590
Records management Open applications 1218 1050
Epa 19 1237 442 1492
Governance Open applications 32 32
Proactive release 3
Informal applications 19 37
Formal applications 87 42
Invalid formal applications 11 12
Other applications 5 15
Internal review 1 1
Subpoenas/notice to produce 18 13
Through other legislation 10 6
Withdrawn formal 1 2
Duplicate 4 -
Gipa enquiry - preapplication 1 192 - 160
Total applications 1910 2242
PUBLIC INTEREST DISCLOSURES (PID) INTERNAL REPORTING POLICY
PID information category July 2012 to June 2013
2 (a) Total number of disclosures made 0
2 (b) Total number of disclosures received 0
2 (b) (i) Disclosure re corrupt conduct 0
2 (b) (ii) Disclosure re maladministration 0
2 (b) (iii) Disclosure re waste of public money 0
2 (b) (iv) Disclosure re government information contraventions
0
2 (b) (v) Disclosure re pecuniary interest conventions 0
2 (c) Number of disclosures finalised 0
2 (d) PID Policy in place Yes, since 10 October 2011
2 (e) Action taken by General Manager to ensure awareness
NSW Department of Local Government circulars 11-13,11-31 and 11-43 circulated by email to all staff.
Report about new PID Policy presented to Directors meeting September 2011.
Memo sent to all staff and councillors via council’s internal web site on 18 July 2011.
At induction all new staff trained in council’s PID Policy.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 87
LEGAL REPORTING (LOCAL GOVT ACT CLAUSE 217(1)(A3))LAND AND ENVIRONMENT COURT MATTERS
Party Matter Progress/result
Zervos Appeal against refusal of DA for a residential flat building
Appeal upheld (proposal amended)
Sammut Developments Appeal against refusal of DA for a mixed use development
Appeal discontinued
Zreika Appeal against refusal of DA for subdivision Appeal upheld following submission of further information
Coneliano Appeal against refusal of DA for ancillary development to dwelling
Appeal dismissed
Kelly Appeal against refusal of DA for subdivision Appeal discontinued
Amed Appeal against refusal of DA for subdivision Appeal discontinued
Integrated Packaging Group Pty Ltd
Appeal against an Order Appeal discontinued
Panayi Appeal against refusal of DA for a dwelling Matter resolved by Section 34 Agreement
Betts Appeal against refusal of DA for subdivision Appeal dismissed
Imbree Class 4 proceedings against council Appeal discontinued
Imbree Appeal against refusal of DA for a dwelling and subdivision
Appeal dismissed
Imbree Appeal against refusal of DA for alterations and additions to dwelling
Appeal dismissed
Imbree Section 56A appeal against the detemination of the Senior Commissioner of the Land and Environment Court
Appeal dismissed
Imbree Section 56A appeal against the detemination of the Senior Commissioner of the Land and Environment Court
Appeal dismissed
Rosenthal Appeal against refusal of DA for garage Appeal dismissed
Heathcote Gospel Trust Appeal against refusal of DA for a meeting hall
Appeal upheld (proposal amended)
Magiros Appeal against refusal of DA for a dwelling Matter resolved by Consent Orders
Mihajlov Appeal against refusal of DA for ancillary development to dwelling
Matter resolved by Section 34 Agreement
Dimovski Appeal against refusal of DA for a dwelling Matter resolved by Section 34 Agreement
Benson Appeal against refusal of DA for alterations and additions to dwelling
Matter resolved by Section 34 Agreement
McLaren Appeal against refusal of DA for waterfront development
Matter resolved by Section 34 Agreement
Sutherland District Trade Union Limited
Appeal against refusal of DA to modify trading hours
Matter resolved by Section 34 Agreement
Cordon Investments Pty Ltd
Appeal against deemed refusal of DA for a boarding house
Matter resolved by Section 34 Agreement
Elassal Appeal against refusal of DA for a child care centre
Appeal upheld (proposal amended)
88 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Party Matter Progress/result
Maguire Appeal against refusal of DA for a child care centre
Appeal upheld
Furia Pty Ltd Appeal against refusal of DA for a child care centre
Appeal upheld (proposal amended)
H & J Standen Pty Limited
Appeal against the refusal of DA for a marina
Appeal dismissed
H & J Standen Pty Limited
Section 56A appeal against the detemination of the Senior Commissioner of the Land and Environment Court
Continuing
Sud Appeal against the refusal of an application for a building certificate
Appeal dismissed
Benedict Industries Pty Ltd
Class 5 proceedings in the Land and Environment Court
Continuing
Benedict Industries Pty Ltd
Class 5 proceedings in the Land and Environment Court
Continuing
(Note: DA = development application)
LOCAL COURT MATTERS
Party Matter Progress/result Fine and legal costs/fees awarded
Thomas Biggart Fail to comply with order no.21 (safety of land)
Convicted Fine $1,200
Legal costs/fees awarded $483
Thomas Biggart Fail to comply with order no.27 (remove article etc)
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Scott Hall Not comply with notice - laden mass exceeds by >3 <=4 tonnes
Convicted Fine $300
Legal costs/fees awarded $283
Marina Rettenbeck Stop on path/strip in built-up area
Convicted Fine $100
Legal costs/fees awarded $83
Peter Gibson In charge of dog that attacks - not dangerous dog
Convicted Fine $500
Legal costs/fees awarded $383
Peter Gibson Dog owner fail to comply with destruction/control order
Convicted Fine $500
Legal costs/fees awarded $383
Sue Brown In charge of dog that attacks - not dangerous dog
Convicted Fine $550
Legal costs/fees awarded $83
Sue Brown In charge of dog that attacks - not dangerous dog
Convicted Fine $550
Legal costs/fees awarded $283
Gumbusters-Bye-Gum Pty Ltd [ACN 080 569 964]
Stop in bus zone (in school zone)
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Dimitria Dimitriev Fail to comply with order no.21 (safety of land)
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Vineta Dimitriev Fail to comply with order no.21 (safety of land)
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 89
Party Matter Progress/result Fine and legal costs/fees awarded
Adam Titcume Stop within 10 metres of an intersection without traffic lights
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Ian Baas Disobey no stopping sign Convicted Fine $200
Legal costs/fees awarded $Nil
Christopher Hennessy Disobey no parking sign Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Seongeun Nam Not park rear to kerb where indicated
Convicted Fine $88
Legal costs/fees awarded $83
Noisi Pty Ltd Disobey no stopping sign Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $300
Darren Gould Owner of dog uncontrolled in public place - not dangerous dog
Convicted Fine $300
Legal costs/fees awarded $283
John Hayes Development without development consent
Convicted Fine $5,000
Legal costs/fees awarded $750
Mina Boctor Disobey no stopping sign Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Craig Dillon Stop on/across driveway etc to/from land (in school zone)
Convicted Fine $200
Legal costs/fees awarded $289
Paul Edwards Stop in bus zone (in school zone)
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Stuart Gilliland Stop in bus zone (in school zone)
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Morteza Mahdilar Disobey no stopping sign Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Yuri Tyurikov Disobey no stopping sign Convicted Fine $50
Legal costs/fees awarded $Nil
Bhupinder Singh Not comply with notice - laden mass exceeds by >3 <=4 tonnes
Convicted Fine $300
Legal costs/fees awarded $283
Susana De Valle Parallel park close to dividing line/strip
Withdrawn by consent
Fine $Nil
Legal costs/fees awarded $Nil
90 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Party Matter Progress/result Fine and legal costs/fees awarded
Corey Villagrand Disobey no stopping sign Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $83
Kenneth Irving Not comply with notice - laden mass exceeds by >2 <=3 tonnes
Convicted Fine $800
Legal costs/fees awarded $1,380
Nickolas Bozionelos Not comply with notice - laden mass exceeds by >2 <=3 tonnes
Convicted Fine $1,000
Legal costs/fees awarded $233
Nathan Karpenko Owner of dog uncontrolled in public place - not dangerous dog
Convicted Fine $150
Legal costs/fees awarded $183
Nathan Karpenko Owner of dog uncontrolled in public place - not dangerous dog
Convicted Fine $150
Legal costs/fees awarded $183
Chris Voukidis Cause/permit/transport waste to unlawful waste facility - Annulment Application
Convicted Fine $1,500
Legal costs/fees awarded $1,083
Eureka Operations Pty Ltd [ACN 104 811 216]
Development without development consent
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Urban Maintenance Systems Pty Ltd [ACN 005 251 954]
Development without development consent
Offence proven – no conviction recorded – Section 10(1)(b) 12 month good behaviour bond
Fine $Nil
Legal costs/fees awarded $15,000
Jennifer Gibson Appeal against Dangerous Dog Declaration
Withdrawn by consent
Fine $Nil
Legal costs/fees awarded $Nil
Gregory O’Donnell Stop in bus zone (not clearway or transit/bus lane)
Offence not proven
Fine $Nil
Legal costs/fees awarded $Nil
Kylie Smith Stop in parking area for disabled without current disability permit displayed
Convicted Fine $50
Legal costs/fees awarded $83
Raymond Castany Not comply with notice - laden mass exceeds by >3 <=4 tonnes
Convicted Fine $1,000
Legal costs/fees awarded $283
Adam Wixx Owner of dog that attacks - not dangerous dog
Offence not proven
Fine $Nil
Legal costs/fees awarded $Nil
Sean Fennell District Court appeal against conviction of ‘In charge of dog which attacked person or animal - not dangerous dog’
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Jane Muddle Disobey no stopping sign Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 91
Party Matter Progress/result Fine and legal costs/fees awarded
Kristina Stewart Stand vehicle in area when area closed to public
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Kristina Stewart Stand vehicle in area when area closed to public
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Kristina Stewart Stand vehicle in area when area closed to public
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Jerry Brindley Park continuously for longer than permitted
Offence proven – no conviction recorded – Section 10 dismissal
Fine $ Nil
Legal costs/fees awarded $83
Robert Hankinson Disobey no parking sign Offence proven – no conviction recorded – Section 10 dismissal
Fine $ Nil
Legal costs/fees awarded $Nil
Jeremiah Hurley Disobey no stopping sign Convicted Fine $85
Legal costs/fees awarded $83
Ronald Gadd Not comply with notice - laden mass exceeds by >3 <=4 tonnes
Offence proven – no conviction recorded – Section 10 dismissal
Fine $ Nil
Legal costs/fees awarded $83
Adam Hucker Double park Convicted Fine $ Nil
Legal costs/fees awarded $283
Stephen Cartwright Owner of dog attacks - not dangerous dog
Offence proven – no conviction recorded – Section 10(1)(b) 6 month good behaviour bond
Fine $ Nil
Legal costs/fees awarded $483
Supabarn Supermarkets Pty Ltd [052 318 395]
Sell unsafe food Convicted Fine $3,000
Legal costs/fees awarded $583
Meryl Ings Fail to comply with order no.21 (safety of land)
Offence proven – no conviction recorded – Section 10 dismissal
Fine $ Nil
Legal costs/fees awarded $1,337
David Barber Park continuously for longer than permitted
Convicted Fine $99
Legal costs/fees awarded $83
James Greenham Stop on/near intersection (no traffic lights)
Convicted Fine $150
Legal costs/fees awarded $233
Milad Gadallah Stand vehicle in disabled persons parking space without authority
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Joan Smith Stop in loading zone Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
92 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Party Matter Progress/result Fine and legal costs/fees awarded
Mark Christopher Disobey no stopping sign Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Basil Boutros Not comply with notice - laden mass exceeds by <=1 tonne
Convicted Fine $298
Legal costs/fees awarded $Nil
Profile Plaster And Metal Pty Ltd [ACN 062 411 616]
Stop heavy/long vehicle longer than 1 hour
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Seth Brennan Development without development consent
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Network Consumer Finance Pty Ltd [ACN 003 644 264]
Stop heavy/long vehicle longer than 1 hour
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Sasha Gassin Parallel park close to dividing line/strip
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $83
Stuart Hansman Park continuously for longer than permitted
Offence not proven
Fine $Nil
Legal costs/fees awarded $Nil
Sandra Rix Stop in bus zone (not clearway or transit/bus lane)
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $83
Helen Boulmetis Stop in bus zone - School Zone
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $83
Jeanette Brennan Development without development consent
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Profile Plaster And Metal Pty Ltd [ACN 062 411 616]
Stop heavy/long vehicle longer than 1 hour
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Profile Plaster And Metal Pty Ltd [ACN 062 411 616]
Stop heavy/long vehicle longer than 1 hour
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Vasilios Delfakis Stop in bus zone (not clearway or transit/bus lane)
Convicted Fine $300
Legal costs/fees awarded $233
Stan Bury Disobey no stopping sign Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
SJR Logistics Pty Ltd Not comply with notice - laden mass exceeds by >3 <=4 tonnes
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 93
Party Matter Progress/result Fine and legal costs/fees awarded
Vanessa Oros Stop in parking area for disabled without current disability permit displayed
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Wing Ha Stop in parking area for disabled without current disability permit displayed
Convicted Fine $600
Legal costs/fees awarded $83
Trevor Hall Stop in bus zone (in school zone)
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Julie Anderson Disobey no stopping sign Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Karen Inman Disobey no stopping sign Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Jennifer Hawkes Not park rear to kerb where indicated
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Kelly O’brien Disobey no parking sign Convicted Fine $99
Legal costs/fees awarded $83
Geoffrey Gooch Stop in bus zone (not clearway or transit/bus lane)
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Licha Sarkis Development not in accordance with consent
Withdrawn by consent
Fine $Nil
Legal costs/fees awarded $Nil
Licha Sarkis Development not in accordance with consent
Continuing Fine $ To be determined
Legal costs/fees awarded $ To be determined
Licha Sarkis Development not in accordance with consent
Withdrawn by consent
Fine $Nil
Legal costs/fees awarded $Nil
Faale Vaotuua Development without development consent
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Licha Sarkis Development not in accordance with consent
Continuing Fine $ To be determined
Legal costs/fees awarded $ To be determined
Licha Sarkis Development without development consent
Continuing Fine $ To be determined
Legal costs/fees awarded $ To be determined
94 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Party Matter Progress/result Fine and legal costs/fees awarded
Samira Dib Development without development consent
Continuing Fine $ To be determined
Legal costs/fees awarded $ To be determined
Neil East Development without development consent
Convicted Fine $6,000
Legal costs/fees awarded $2,858
Greg Hay Park continuously for longer than permitted
Convicted Fine $300
Legal costs/fees awarded $83
Greg Hay Disobey no stopping sign Convicted Fine $300
Legal costs/fees awarded $83
Paul Haslam Disobey no parking sign Convicted Fine $99
Legal costs/fees awarded $Nil
Jason Dean Rowe Disobey no stopping sign - school zone
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Gee Kui Chen Not park rear to kerb where indicated
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Christopher Spring Stop heavy/long vehicle longer than 1 hour
Convicted Fine $175
Legal costs/fees awarded $83
Lee Strawbridge Stop heavy/long vehicle longer than 1 hour
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $350
Lee Strawbridge Stop heavy/long vehicle longer than 1 hour
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Lee Strawbridge Stop heavy/long vehicle longer than 1 hour
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Licha Sarkis Fail to cease specified building work
Continuing Fine $ To be determined
Legal costs/fees awarded $ To be determined
Samira Dib Development without development consent
Continuing Fine $ To be determined
Legal costs/fees awarded $ To be determined
George Dib Development without development consent
Continuing Fine $ To be determined
Legal costs/fees awarded $ To be determined
Matthew Cavill Development without development consent
Convicted Fine $5,000
Legal costs/fees awarded $1,583
Michael Badaoui Development without development consent
Convicted Fine $12,500
Legal costs/fees awarded $2,085
Clayton Browne Stand vehicle in area longer than allowed
Convicted Fine $88
Legal costs/fees awarded $233
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 95
Party Matter Progress/result Fine and legal costs/fees awarded
Reynaldo Villavicencio Disobey no stopping sign Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Ahmad Harmouche Double Park Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Glen Carter Disobey no stopping sign Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Charles Hasson Interfere/hinder/obstruct authorised person
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Michelle Hasson Interfere/hinder/obstruct authorised person
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Shaun Gordon Deposit litter from vehicle Convicted Fine $200
Legal costs/fees awarded $200
Movete Pale Stop on path/strip in built up area
Convicted Fine $50
Legal costs/fees awarded $Nil
Robert Carnegie Not comply with notice - laden mass exceeds by >3 <=4 tonnes
Convicted Fine $300
Legal costs/fees awarded $250
Ingrid Van Beek Own dog in prohibited place - not dangerous dog
Offence proven – no conviction recorded – Section 10(1)(b) 6 month good behaviour bond
Fine $Nil
Legal costs/fees awarded $Nil
Tony Intonato Stop on/across driveway/other access to/from land
Convicted Fine $300
Legal costs/fees awarded $200
Xiao Huang Disobey no stopping sign Convicted Fine $500
Legal costs/fees awarded $250
Paul Haynes Stop in bus zone (not clearway or transit/bus lane)
Convicted Fine $200
Legal costs/fees awarded $Nil
Danielle Davey Disobey no parking sign (in school zone)
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Dheeraj Guptaa Disobey no stopping sign Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Pauline Maroney Disobey no stopping sign Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
96 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Party Matter Progress/result Fine and legal costs/fees awarded
Ramy Elads Double park Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Neale Constantinou Disobey no stopping sign (in school zone)
Offence not proven
Fine $Nil
Legal costs/fees awarded $Nil
David Kennedy Stop within 10 metres of an intersection without traffic lights
Convicted Fine $250
Legal costs/fees awarded $285
Kim Mccormack Park continuously for longer than permitted
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
James Bailey Not stand vehicle in marked parking space
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Gary Fordham Stop on path/strip in built-up area
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
David Kennedy Double park Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Nigel Francisco Stop in bus zone (not clearway or transit/bus lane)
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Hayley Henson Parallel park close to dividing line/strip
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Theresa Simpson Disobey no stopping sign in school zone
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Brendan Johansen Stop on/across driveway etc to/from land (in school zone)
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Steven Cheetham Disobey no stopping sign Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Qiao Wang Not park rear to kerb where indicated
Convicted Fine $65
Legal costs/fees awarded $Nil
Menios Mitakidis Stop on/across driveway/other access to/from land
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Martin Beudeker Double park in school zone Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Kim Maree Tudjman Double park in school zone - Annulment Application
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Elaine Attenborough Stop in parking area for disabled without current disability permit displayed
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 97
Party Matter Progress/result Fine and legal costs/fees awarded
James Leutogi Development without development consent
Convicted Fine $1,800
Legal costs/fees awarded $1,085
Hizkia Oktavianus Stop on/near intersection (no traffic lights)
Convicted Fine $150
Legal costs/fees awarded $185
Joel Gedeon Not park rear to kerb where indicated
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
William Hamilton Double park Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Zoe Foote Stop on/near pedestrian crossing
Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Bella Orgad Double park Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Luke O’shea Stop in parking area for disabled without current disability permit displayed
Convicted Fine $250
Legal costs/fees awarded $85
Richard Wakeling Stand vehicle in area when area closed to public
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Steve Du Casse Stop in bus zone (in school zone)
Convicted Fine $150
Legal costs/fees awarded $Nil
Angela Genas Stop on/near pedestrian crossing (in school zone)
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
Yingte Chen Disobey no stopping sign Withdrawn and dismissed
Fine $Nil
Legal costs/fees awarded $Nil
Anthony English Stop in bus zone (not clearway or transit/bus lane)
Offence proven – no conviction recorded – Section 10 dismissal
Fine $Nil
Legal costs/fees awarded $Nil
98 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Other cOurt matters
Party Matter Progress/result
Ismail District Court proceedings Settled on confidential terms
Comacho District Court proceedings Settled on confidential terms
Hebbron District Court proceedings Verdict for council
Boskovski District Court proceedings Settled on confidential terms
Lapham District Court proceedings Settled on confidential terms
Mathai District Court proceedings Ongoing
Collum District Court proceedings Ongoing
Major District Court proceedings Ongoing
Driscoll District Court proceedings Verdict for council
summary Of the amOunts incurred by cOuncil during the year in relatiOn tO legal prOceedings taken by Or against cOuncil
• Land and Environment Court Proceedings – $615,488
• Local Court proceedings – $20,265
• Other Court proceedings – $109,492
industrial staff matters
• Costs relating to staff industrial matters - $29,754.20. Status: Finalised.
OVerseas Visits representing cOuncilIn August 2012 whilst overseas, the Manager Library and Information Services attended the International Federation of Library Associations conference in Helsinki, Finland. Total cost to council was $1,180 for registration and accommodation.
In October 2012, council’s Environmental Asssessment Officer Architect attended the Royal Australian Institute of Architects Country Division Conference in New Zealand. Total cost to council was $528.
Whilst on an international exchange study program (paid for by the League of California Cities City Managers) council’s Privacy and Access Officer attended a conference January/February 2013 in Calfornia USA. Total cost to council was $1,483.25 for meals, accommodation, petrol and misc. expenses.
cOntractsInformation about council’s contracts is available on the Register of Council Contracts, which is on our website at www.sutherlandshire.nsw.gov.au/Register_of_Council_Contracts.
in this register, class 1 contracts are those that have, or are likely to have, a value of $150,000.
rates and charges Written Off (2012/13 year)Pensioner rebates – mandatory (Section 575 of the Local Government Act) .................. -$2,551,919.84
Pensioner rebates – voluntary (Section 582 of the Local Government Act) .................... -$1,056,802.96
Rates – other ............................................................................................................. -$22,359.55
Interest ....................................................................................................................... -$6,176.15
Legal costs ................................................................................................................ -$41,070.96
Domestic waste charges ............................................................................................... -$3,177.45
total ....................................................................................................................... -$3,681,506.91
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 99
GRANTS UNDER LOCAL GOVERNMENT ACT SECTION 356
2010/11 2011/12 2012/13
General subsidies program 48,647.00 27,622.38 28,323.76
Sutherland Entertainment Centre hire subsidies 67,143.00 92,724.50 86,218.43
Community services / seniors grants
Caringbah Community Resources Centre Subsidy 55,981.00 58,620.19 59,118.36
Engadine Community Resources Centre Subsidy 55,981.00 51,333.00 53,248.09
Gymea Community Resources Centre Subsidy 55,981.00 60,304.31 60,950.01
Sutherland Community Resources Centre Subsidy 7,000.00 -
Sutherland Community Resources Centre Subsidy 55,981.00 64,660.00 65,655.00
Annual Community Services Grants Program 137,987.00 140,942.00 189,436.00
Annual Seniors Grants Program 3,230.00 - -
Men’s Shed 14,648.00 5,352.00 -
Childrens Services 2,340.00
Outreach Youth Works 42,614.00
Cultural planning and events grants
Annual Community Arts Grants Program 39,468.00 40,446.95 34,600.00
Menai Australia Day celebrations organisation 24,738.00 38,270.81 46,577.20
Bundeena Art of Living Festival Grant 10,300.00 18,828.00 10,000.00
Sutherland Shire Symphony Orchestra Conductors fee 3,425.00 3,528.00 3,500.00
Sutherland Shire Symphony Orchestra Concert rental 17,641.00 18,170.00 18,170.00
Sutherland Shire Symphony Orchestra Rehearsal rental 3,057.00 3,149.00 3,149.00
Miranda Musical Society 7,057.00 7,269.00 7,269.09
Seniors Group Subsidy - 26,190.00 25,398.05
Sutherland Shire Creative Writing Group 1,906.00 - 600.00
Bundeena Youth Vacation Program - 12,115.00
Toy Library - 6,530.00
Heritage Festival - 10,000.00
YOUTHS - Youth Music Awards Grant 2,450.00 2,328.20
Property Management
Annual Hall hire subsidies 69,917.00 67,978.49 64,943.27
Heritage Grants
Heritage Grants - Publications 11,525.00 - -
Heritage Grants - Buildings 8,264.00 45,128.00 -
TOTAL 699,877.00 772,966.63 833,083.46
100 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
SPECIAL VARIATION EXPENDITUREThere was no special variation expenditure in 2012/13.
CAPITAL EXPENDITURE REPORTINGNo Capital Expenditure reviews were presented to council for consideration in 2012/13.
COMPLIANCE WITh ThE COMPANION ANIMALS ACT AND REGULATIONLodgement of pound data returns with the Department of Local Government.
COUNCIL SEIzE ACTIVITY
Cats Dogs Total
Seized 2 453 455
Returned to owner 0 170 170
Transferred to council’s facility 215 283 498
COUNCIL ANIMAL CARE FACILITY ACTIVITY
Animals in and arriving at council’s facility
Cats Dogs Total
Animals in council’s facility 219 289 508
From seizures 2 15 283 498
Dumped 0 0 0
Surrendered by owners 4 6 10
Animals leaving council’s facility
Released to owners 3 196 199
Euthanased 11 10 21
Sold 176 64 240
Released to organisation to re-home
1 5 6
Died at council facility 4 0 4
Stolen from council facility 0 0 0
Escaped from council facility 0 0 0
LODGEMENT OF DATA RELATING TO DOG ATTACkS WITh DEPARTMENT OF LOCAL GOVERNMENT
Status Incidents entered Attacking dogs Victims (human and animal)
Commenced 22 27 27
Finalised 100 115 124
Under investigation 10 12 11
Total 132 154 162
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 101
AMOUNT OF FUNDING SPENT RELATING TO COMPANION ANIMAL MANAGEMENT AND ACTIVITIES
The total amount of salaries and expenses associated with council’s companion animal management and activities is $668,821.00 of which $347,666.20 is the operational cost of the animal shelter and veterinary services.
COMPANION ANIMAL COMMUNITY EDUCATION PROGRAMS CARRIED OUT
Throughout the year council provides general information to the public through newspaper articles, council’s website, and social media including facebook and general publications that are provided to all households, local businesses and schools throughout the Local Government area on a bi-monthly basis. Council also runs open days and discount microchipping weeks at its animal shelter facility and attends many local community events through each year.
STRATEGIES COUNCIL hAS IN PLACE TO PROMOTE AND ASSIST ThE DE-SEXING OF DOGS AND CATS
Council organises a mail out to identified companion animal owners every month providing information on a companion animal owner’s requirement to have their dogs micro-chipped and registered. This is also endorsed by the sending of SMS messages to the listed mobile phone numbers of the identified companion animal owners reminding of their requirement.
The information reminds companion animal owners that their pets must be registered at six months of age. The advantage for owners is that once micro-chipped, companion animals that stray or become lost can be returned to their owners. It also reminds them of the benefits of desexing and the reduced financial implication for registration in doing so.
Similarly, owners of dangerous dogs can be readily located in the event of a dog attacking a member of the public. The information provided in the monthly mail out also covers the de-sexing of dogs, with the enclosed registration form advising the difference in fees for an unsexed versus a de-sexed animal.
Council seeks to rehouse the dogs and cats at its Animal Shelter. All dogs and cats rehoused are de-sexed, lifetime registered, vaccinated and micro chipped.
They also leave the shelter with a collar and council made-tag.
Council participates in the promotion of National De-sexing Month held in August of each year with the National De-sexing Network.
STRATEGIES IN PLACE TO COMPLY WITh ThE REQUIREMENT UNDER SECTION 64 (COMPANION ANIMALS ACT) TO SEEk AN ALTERNATIVE TO EUThANASIA OR UNCLAIMED ANIMALS
The shelter operates under a ‘low euthanasia’ policy, whereby only those dogs or cats assessed to be either dangerous/restricted or as having an illness that would affect its quality of life are euthanased.
In some circumstances dogs that have been declared ‘dangerous’ are euthansed at the request of their owners as the shelter is unable to rehome or sell them.
To this end the shelter recorded a 4.13% euthanase rate out of a total 508 animals that entered the shelter facility. The strategies employed by Sutherland are clearly the best in NSW (Council) operated facilities.
SPECIALIzED OFF- AND ON-LEASh AREAS PROVIDED IN ThE COUNCIL AREA
• Wanda Beach, Wanda• Wanda Reserve, Wanda• Greenhills, Wanda• Gunyah Beach, Bundeena• Horderns Beach – Bundeena• Carina Bay Reserve - Tivoli Esplanade, Como• Helena Street Reserve - Helena Street, Kirrawee• Silver Beach – Kurnell
Council continues to work with animal welfare and re-homing organisations in order to provide greater exposure for the animals in finding new owners.
102 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
STORMWATER MANAGEMENTCouncil levies an annual charge for its stormwater management services. Under the Local Government Regulation 2005, the annual report must include statement detailing the stormwater management services provided by the council during that year.
Stormwater Management 2012/13
Category Total budget estimate Actual expenditure
Drainage construction $1,790,067 $1,422,468
Drainage studies $631,824 $235,147
Stormwater maintenance $867,369 $760,746
Stormwater reuse $40,000 $0
Water quality $458,816 $247,034
Total $3,788,076 $2,665,395
SENIOR STAFF REMUNERATION 2012/13Senior staff as defined by the Local Government Act are the General Manager and Directors.
Total remuneration
Salary component
Non-cash benefits
Running cost of vehicle
Total non-cash benefits
Superannuation (inclusive of salary sacrifice)
FBT payable
General Manager $354,112 $309,686 $2,301 $3,566 $5,867 $25,000 $5,860
Directors $1,366,760 $1,157,566 $31,649 $137,979 $41,413
VOLUNTARY PLANNING AGREEMENTSThe following agreements were in force in 2012/13.
Land Parties to the
Agreement
Agreement Status
The land to which the agreement applies comprises: lot 1 in DP1101922; lot 111 in DP 777967; proposed lot 1 of the Consolidated Development Pty Ltd lots as identified in plan 2 in Schedule 1; proposed lot 1059 of the Australand Kurnell Pty Ltd lots in plan 2 in Schedule 1; proposed lot 2 of the Consolidated Development Pty Ltd lots in plan 2 in Schedule 1; lot 1122 in DP 794114; proposed lots 3 and 4 of the
Consolidated Development Pty Ltd lots in plan 2 in Schedule 1. The land is currently identified as: Lot 1122 DP 794114, Lot 22 DP 226424, Lot C DP 370539, Lot 111 DP 777967, Lot 116 DP 777967, Lot 1123 DP 794114, Lot 2 DP
1101922, Lot 1 DP 1101922, Lot 1054 DP 1140838, Lot 1055 DP 1140838, Lot 1056 DP 1140838, Lot 1057 DP 1140838, Lot 1058 DP 1140838, Lot 1059 DP 1140838.
Sutherland Shire Council, Australand
Kurnell Pty Ltd, Breen Holdings Pty Ltd.
The agreement was entered into on 3 June 2010. The planning agreement sets out provisions for how approximately 91 hectares of open space will be embellished with playing fields, associated amenities, and landscaping and then dedicated to council.
Ongoing
The land to which the agreement applies comprises: lot 42 and 43 in DP1061416.
Sutherland Shire Council and Gandangara Local Aboriginal Land Council.
The agreement was entered into on 16 December 2009. The planning agreement sets out provisions for how open space will be embellished and dedicated to council.
Ongoing
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 103
WORk ON PRIVATE LANDThere were no resolutions by council in 2012/13 concerning work on private land, as per Section 67(3) of the Local Government Act and Clause 217(1) of the Local Government (General) Regulation.
ENVIRONMENTAL UPGRADE AGREEMENTSNo environmental upgrade agreements were entered into (under Section 406) in 2012/13.
COASTAL PROTECTION SERVICESNo annual charge was levied for coastal protection services in 2012/13.
EXTERNAL BODIES ThAT EXERCISED FUNCTIONS DELEGATED BY COUNCILCouncil does not have any external bodies such as county councils exercising functions delegated by council. Community management committees manage many council functions such as halls, but report through council’s own standing committee system.
CORPORATIONS AND OThER BODIES IN WhICh COUNCIL hELD A CONTROLLING INTEREST OR PARTICIPATEDCronulla Promotions Ltd, a company limited by guarantee, was set up by council in 1988 to manage the operation of Cronulla Plaza in promoting business activity for the Cronulla Business District. There are five directors: four are nominees of the Cronulla Chamber of Commerce and the fifth is an employee of council. Council controls the company in that it has to approve the company’s annual budget and supplies the company’s major source of income through a special rate levied on property owners in the area.
See also ‘Note 19: Controlled Entities, Associated Entities and Interests in Joint Ventures ‘in the Financial Statements on page 181.
104 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
FINANCIAL INFORMATION
All councils have a legal requirement to produce an audited financial statement each financial year.
These statements show how council performed financially during the past 12 months.
Understanding the annual financial reports ................................................................... 106
General purpose financial statements ........................................................................... 108
Special purpose financial statements ............................................................................ 191
Special schedules....................................................................................................... 206
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 105
FINANCIAL INFORMATION
106 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT
UNDERSTANDING THEANNUAL FINANCIAL REPORTS
INTRODUCTIONAll councils have a legal requirement to produce an audited financial statement each financial year. These statements show how council performed financially during the past 12 months through an income statement, and also on the overall financial position at the end of that period through a balance sheet. Council operates as a ‘not-for-profit’ organisation providing services and replacing assets for the community on a balanced budget approach each year.
Council is committed to accountability. This ‘Understanding the Annual Financial Reports guide has been developed to help readers understand and analyse the financial reports as part of that accountability.
WHAT IS IN THE ANNUAL FINANCIAL REPORT?Council’s financial report is presented in the following sections:
• Principal Financial Statements• Notes to, and forming part of, the Principal
Financial Statements• Special Purpose Financial Reports• Special Schedules.
All sections are prepared by council staff. The first three sections are audited by council’s appointed external auditor. After audit approval we adopt the reports as a true and fair representation of council’s financial position and performance.
PRINCIPAL FINANCIAL STATEMENTS
These are the four statements included in the first few pages of the financial report. They are the Income Statement, Balance Sheet, Statement of Changes in Equity and Cash Flow Statement. Individual line items within these statements will be referenced to a Note to provide more detailed information.
INCOME STATEMENT
The Income Statement is sometimes referred to as a Profit and Loss Statement or Operating Statement in many business sectors. In local government it shows:
• the sources of council’s revenue, including capital grants and contributions, received or accrued within the financial year
• the expenses incurred in council delivering services to the community during the year.
The key figure to look at is the Operating Result from Continuing Operations. This can be a surplus, or deficit, for the year that is the equivalent to the profit, or loss, of council for the year. A surplus means that the revenue was greater than the expenses.
For the year ended 30 June 2013 this is a surplus of $4.685 million.
This has reduced by $47.824 million compared to 2011/12 and is a result mainly attributable to $44 million being dedicated to council by the state government for Land Under Roads in 2011/12. Under accounting standards this must be shown as an income item.
BALANCE SHEET
This one-page summary is a snapshot of the financial situation as at 30 June. It shows what council owns as assets and what it owes as liabilities. The bottom line of this statement is Net Assets. This is the net worth of council, which has been built up since council’s inception.
The assets and liabilities are separated into current and noncurrent. Current means those assets or liabilities that will fall due in the next 12 months whilst non-current is greater than the 12 months.
The total of current and non-current assets is the Total Assets held by council. For the year ended 30 June 2013 the total is $1.542 billion. For the year ended 30 June 2013 total liabilities is $ 82.899 million.
Net Assets is the term used to describe the difference between the value of Total Assets and the value of Total Liabilities.
It represents the net worth, or equity, of council as at 30 June. For the year ended 30 June 2013 this is $1.459 billion.
Total Equity is the net worth of council and is always equal to Net Assets.
Council’s total equity has increased by $ 228 million since last financial year and is attributable to the following movements:
• A revaluation of council’s Operational Land and Drainage Assets :$223.591 million
STATEMENT OF CHANGES IN EQUITY
During the course of the year the value of Total Equity as set out in the Balance Sheet will move according to financial activity. The Changes in Equity Statement
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT - 107
UNDERSTANDING THEANNUAL FINANCIAL REPORTS
shows the values of such changes and how these changes arose.
The main reasons for a change in equity stem from:
• the profit or loss from operations as described in the Income Statement as Result from Continuing Operations for the year.
• the revaluation of assets that takes place on a regular basis to ensure the most up-to-date value is included in council’s books; it also occurs when existing assets are taken up in the books for the first time.
CASH FLOW STATEMENT
The Cash Flow Statement summarises council’s cash payments and cash receipts for the year. The values usually differ from those shown in the Income Statement because that statement is prepared on an accrual accounting basis, whilst the Cash Flow Statement shows pure cash movements during the year. Essentially
it is the movement of cash in and out of council’s bank account during the year.
Council’s cash arises from, and is used in, three main areas:
Operating Activities
• Receipts – all cash received into council’s bank account except the costs associated with the sale of assets, or capital.
• Payments – All cash paid by council from its bank account except costs associated with the creation of assets, or capital.
Investing Activities
• Cash invested in infrastructure, property, plant and equipment assets and the cash received from the sale of these assets.
Financing Activities
• Receipt and repayment of borrowed funds and advances. The bottom line of the Cash Flow Statement is the cash held at the end of financial year.
For the year ended 30 June 2013 this is $41.079 million.
NOTES TO, AND FORMING PART OF, THE PRINCIPAL FINANCIAL STATEMENTS
There are 20 specific Notes detailing council’s accounting policies and the detailed makeup of the amounts shown in the Principal Financial Statements. The Notes are numbered 1 to 20 and are specifically referenced to individual line items on the Principal Financial Statements.
Note 1 is very important as it outlines the details of council’s accounting policies to complement the treatment of the Australian equivalents to International Financial Reporting Standards (AIFRS). Some AIFRS are not prescriptive on subjects, therefore it is necessary to establish local government prescribed codes and regulations and also council accounting policies to follow and also convey to the reader. The Notes read in conjunction with the Principal Financial Statements should provide a much clearer picture of the accounts and financial performance.
SPECIAL PURPOSE FINANCIAL REPORTS
These reports show the financial position and performance of council’s declared Business Activities under the National Competition Policy guidelines. Council has five declared activities: Long Day Child Care, Operational Property, Sutherland Entertainment Centre, Commercial Waste and the Certification Unit.
SPECIAL SCHEDULES
Council prepares four Special Schedules to assist the reader and the NSW Department of Local Government with more financial information. These Schedules are not audited by the appointed external auditor. The Schedules completed by council are:
• Special Schedule 1 – Net Cost of Services (by function or activity)
• Special Schedule 2 (a) – Statement of Long Term Debt (All Purpose)
• Special Schedule 7 – Condition of Public Works• Special Schedule 8 – Financial Projections (next 4
years forecast).
108 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Sutherland Shire Council GENERAL PURPOSE FINANCIAL STATEMENTS for the year ended 30 June 2013
“Sutherland Shire, in Sydney’s south, shaped bybays, rivers, beaches and national parks…”
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 109
Financial Statements 2013
page 1
Sutherland Shire Council
General Purpose Financial Statements for the financial year ended 30 June 2013
Contents
1. Understanding Council's Financial Statements
2. Statement by Councillors & Management
3. Primary Financial Statements:
- Income Statement- Statement of Comprehensive Income- Statement of Financial Position- Statement of Changes in Equity- Statement of Cash Flows
4. Notes to the Financial Statements
5. Independent Auditor's Reports:
- On the Financial Statements (Sect 417 [2]) - On the Conduct of the Audit (Sect 417 [3])
Overview
(i) These financial statements are General Purpose Financial Statements and cover the consolidated operationsfor Sutherland Shire Council.
(ii) Sutherland Shire Council is a body politic of NSW, Australia - being constituted as a Local Government areaby proclamation and is duly empowered by the Local Government Act (LGA) 1993 of NSW.
Council's Statutory Charter is detailed in Paragraph 8 of the LGA and includes giving Council;
the ability to provide goods, services & facilities, and to carry out activities appropriate to the current & futureneeds of the local community and of the wider public,
the responsibility for administering regulatory requirements under the LGA and
a role in the management, improvement and development of the resources in the area.
A description of the nature of Council's operations and its principal activities are provided in Note 2(b).
(iii) All figures presented in these financial statements are presented in Australian Currency.
(iv) These financial statements were authorised for issue by the Council on 23/10/13.Council has the power to amend and reissue these financial statements.
Page
4
67
5
2
3
8
9
7981
110 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Understanding Council's Financial Statements
page 2
Introduction Each year, individual Local Governments across NSW are required to present a set of audited financial statements to their Council & Community. What you will find in the Statements The financial statements set out the financial performance, financial position & cash flows of Council for the financial year ended 30 June 2013. The format of the financial statements is standard across all NSW Councils and complies with both the accounting & reporting requirements of Australian Accounting Standards and requirements as set down by the NSW Division of Local Government. About the Councillor/Management Statement The financial statements must be certified by Senior staff as "presenting fairly" the Council's financial results for the year, and are required to be adopted by Council - ensuring both responsibility for & ownership of the financial statements. About the Primary Financial Statements The financial statements incorporate 5 "primary" financial statements: 1. The Income Statement
Summarises Council's financial performance for the year, listing all income & expenses. This statement also displays Council's original adopted budget to provide a comparison between what was projected and what actually occurred. 2. The Statement of Comprehensive Income
Primarily records changes in the fair values of Council's Infrastructure, Property, Plant & Equipment. 3. The Statement of Financial Position
A 30 June snapshot of Council's financial position indicating its Assets, Liabilities & “Net Wealth”. 4. The Statement of Changes in Equity
The overall change for the year (in dollars) of Council's "Net Wealth".
5. The Statement of Cash Flows
Indicates where Council's cash came from and where it was spent. This statement also displays Council's original adopted budget to provide a comparison between what was projected and what actually occurred.
About the Notes to the Financial Statements The Notes to the financial statements provide greater detail and additional information on the 5 primary financial statements. About the Auditor's Reports Council's financial statements are required to be audited by external accountants (that generally specialize in Local Government). In NSW, the Auditor provides 2 audit reports: 1. An opinion on whether the financial statements
present fairly the Council's financial performance & position, &
2. Their observations on the conduct of the Audit
including commentary on the Council's financial performance & financial position.
Who uses the Financial Statements ? The financial statements are publicly available documents & must be presented at a Council meeting between 7 days & 5 weeks after the date of the Audit Report. Submissions from the public can be made to Council up to 7 days subsequent to the public presentation of the financial statements. Council is required to forward an audited set of financial statements to the Division of Local Government.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 111
112 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
This Statement should be read in conjunction with the accompanying Notes. page 4
Sutherland Shire Council
Income Statement for the financial year ended 30 June 2013
$ '000
Income from Continuing OperationsRevenue:Rates & Annual ChargesUser Charges & FeesInterest & Investment RevenueOther RevenuesGrants & Contributions provided for Operating PurposesGrants & Contributions provided for Capital PurposesOther Income:Investment Revaluation IncreasesNet Share of interests in Joint Ventures & AssociatedEntities using the equity method
Total Income from Continuing Operations
Expenses from Continuing OperationsEmployee Benefits & On-CostsBorrowing CostsMaterials & ContractsDepreciation & AmortisationImpairmentOther ExpensesNet Losses from the Disposal of Assets
Total Expenses from Continuing Operations
Operating Result from Continuing Operations
Discontinued Operations
Net Profit/(Loss) from Discontinued Operations
Net Operating Result for the Year
Net Operating Result attributable to CouncilNet Operating Result attributable to Non-controlling Interests
Net Operating Result for the year before Grants andContributions provided for Capital Purposes
Original Budget as approved by Council - refer Note 16
4a
4d
1,034
243,316
93,268 1,669
34,179 24,033
52,509
-
4e
Budget (1)
-
-
4c
3e,f
36,624
52,509
52,509
40,461
4d
4b
24
5
19
7,822 14,775 16,729
4,830 14,152
94,535
201,721
16,268 54,010
-
-
123,150 125,732 28,491
-
2013
4,265
11,652
28,838
17,892 11,239
3b
Notes
3a
3d3c
3e,f
(1)
7,261
-
(4,391)
7,261
1,429 34,634
125,381
-
-
192,951
7,261
500
200,212
96,005
23,459 -
36,924
945
(7,563)
197,036
4,685
4,685
-
4,685
579
-
26,830
190,807
Actual 2012
(1,501)
-
26,182 -
34,158
Actual 2013
1,121
12,248
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 113
Financial Statements 2013
This Statement should be read in conjunction with the accompanying Notes. page 5
Sutherland Shire Council
Statement of Comprehensive Income for the financial year ended 30 June 2013
$ '000
Net Operating Result for the year (as per Income statement)
Other Comprehensive Income:
Amounts which will not be reclassified subsequently to the Operating Result
Gain (loss) on revaluation of I,PP&ETotal Items which will not be reclassified subsequentlyto the Operating Result
Amounts which will be reclassified subsequently to the Operating Resultwhen specific conditions are met
Nil
Total Other Comprehensive Income for the year
Total Comprehensive Income for the Year
Total Comprehensive Income attributable to CouncilTotal Comprehensive Income attributable to Non-controlling Interests
Notes
20b (ii)
2013
223,591
4,685
228,276
- 228,276
Actual
223,591
223,591
34,754
Actual
-
2012
34,754
52,509
34,754
87,263
87,263
114 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
This Statement should be read in conjunction with the accompanying Notes. page 6
Sutherland Shire Council
Statement of Financial Position as at 30 June 2013
$ '000
ASSETSCurrent AssetsCash & Cash EquivalentsInvestmentsReceivablesInventoriesOtherNon-current assets classified as "held for sale"Total Current Assets
Non-Current AssetsInvestmentsReceivablesInventoriesInfrastructure, Property, Plant & EquipmentInvestments accounted for using the equity methodInvestment PropertyIntangible AssetsTotal Non-Current Assets
TOTAL ASSETS
LIABILITIESCurrent LiabilitiesPayablesBorrowingsProvisionsTotal Current Liabilities
Non-Current LiabilitiesPayablesBorrowingsProvisionsTotal Non-Current Liabilities
TOTAL LIABILITIES
Net Assets
EQUITYRetained EarningsRevaluation ReservesCouncil Equity InterestNon-controlling Interests
Total Equity
6b
8
7
Notes
8
1,459,058 -
-
8
1,542,057
18,097
6b
10
85,316
2013
1,456,741
14,368
10
10
20
10
20
6,945
Actual
1,230,782 1,459,058
1,230,782
1,088,691
61,891
-
1,093,376
21,108 22,465
83,033
60,568
4,755
1,230,782 82,999
1,459,058
-
16,353 5,550
142,091
16,915
1,213,63225
10
365,682
10
9,368
-
3,847 7
14199
2012Actual
17,588
-
7,399 35,581 36,849
-
- 48,052
1,151,829
100,183-
1,313,815
-
4,838 5,269
21,269 13,949
23,317 55,991
12,582
22
6a 45,207
- 50,447
1,390,474
1,420
1,988
1,657 -
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 115
Financial Statements 2013
Sutherland Shire Council
Statement of Changes in Equity for the financial year ended 30 June 2013
$ '000
Opening Balance (as per Last Year's Audited Accounts)
a. Losses Realisedb. Changes in Accounting Policies (prior year effects)
Revised Opening Balance (as at 1/7/12)
c. Net Operating Result for the Year
d. Other Comprehensive Income - Revaluations : IPP&E Asset Revaluation Rsve - Revaluations: Other Reserves - Transfers to Income Statement - Impairment (loss) reversal relating to I,PP&E - Other Movements (enter details here)
Other Comprehensive Income
Total Comprehensive Income (c&d)
e. Distributions to/(Contributions from) Non-controlling Interests
f. Transfers between Equity
Equity - Balance at end of the reporting period
$ '000
Opening Balance (as per Last Year's Audited Accounts)
a. Correction of Prior Period Errorsb. Changes in Accounting Policies (prior year effects)
Revised Opening Balance (as at 1/7/11)
c. Net Operating Result for the Year
d. Other Comprehensive Income - Revaluations : IPP&E Asset Revaluation Rsve - Revaluations: Other Reserves - Transfers to Income Statement - Impairment (loss) reversal relating to I,PP&E - Other Movements (enter details here)
Other Comprehensive Income
Total Comprehensive Income (c&d)
e. Distributions to/(Contributions from) Non-controlling Interests
f. Transfers between Equity
Equity - Balance at end of the reporting period
-
- -
Interest
-
52,509
Earnings
Non-
Notes
2013
- 20b (ii)
20b (ii)
- 20 (c)
-
1,088,691
-
4,685
1,088,691 - 20 (d)
20b (ii)
- -
4,685
20b (ii)
2012
- 52,509
1,036,182
- 107,337
107,337 -
20 (d) -
Earnings (Refer 20b)
-
- 20b (ii) -
- -
Interest
- - -
34,754
- -
34,754
-
-
- -
-
34,754 87,263
20b (ii)
20b (ii)
20b (ii)
-
1,230,782
52,509
20b (ii)
141,716
Retained
20b (ii) -
Notes
1,036,182
20 (c) -
- -
1,093,376
-
1,088,691 142,091 -
- -
- - - -
-
142,091
223,591
- -
-
223,591
375
Interest(Refer 20b)
1,230,782
1,230,407 375
-
- -
-
- -
228,276
-
- -
-
- -
- -
Equity
34,754
1,143,519
-
-
1,143,519
1,143,519 -
-
34,754
-
-
-
-
223,591
-
-
- 223,591
1,230,782 -
- 223,591
-
Equity
365,682
-
Reserves
-
87,263 -
1,230,782
-
- -
4,685
1,230,407
Council controlling
-
223,591
-
-
34,754
52,509
-
1,143,519
-
-
34,754
-
-
223,591
1,459,058
-
-
controllingInterest
- - -
- 375 -
Non-
228,276
Council
1,459,058
4,685 -
Total
Retained Reserves Total
This Statement should be read in conjunction with the accompanying Notes. page 7
116 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
This Statement should be read in conjunction with the accompanying Notes. page 8
Sutherland Shire Council
Statement of Cash Flows for the financial year ended 30 June 2013
$ '000
Cash Flows from Operating ActivitiesReceipts:Rates & Annual ChargesUser Charges & FeesInvestment & Interest Revenue ReceivedGrants & ContributionsOtherPayments:Employee Benefits & On-CostsMaterials & ContractsBorrowing CostsOtherNet Cash provided (or used in) Operating Activities
Cash Flows from Investing ActivitiesReceipts:Sale of Investment SecuritiesSale of Infrastructure, Property, Plant & EquipmentOther Investing Activity ReceiptsPayments:Purchase of Investment SecuritiesPurchase of Investment PropertyPurchase of Infrastructure, Property, Plant & EquipmentNet Cash provided (or used in) Investing Activities
Cash Flows from Financing ActivitiesReceipts:Proceeds from Borrowings & AdvancesProceeds from Finance LeasesPayments:Repayment of Borrowings & AdvancesRepayment of Finance Lease LiabilitiesNet Cash Flow provided (used in) Financing Activities
Net Increase/(Decrease) in Cash & Cash Equivalents
plus: Cash & Cash Equivalents - beginning of year
Cash & Cash Equivalents - end of the year
(1,400) (1,669) (1,121) (32,491) (95,175)
(7,634)
2,300
41,079
(516)
67
19,264
21,815
(1,090) (876)
19,264
(21,953)
14,836
(13,060)
4,428
(35,923) 11b
1,452 -
30,539 31,035
146,200 100,320
(122,900)
- 476
869
(38,310)
(70,120)
(33,079) - (5,220)
(13,547)
8,900
(2,941)
(93,998)
27,380
Budget
124,127
22,891
2013
28,838 4,222
(34,288)
(2,516)
14
(253)
17,713
8,000
31,919 (36,186)
11a
-
4,752
(2,792)
(616) (900)
7,544
(34,095)
11a
2,800
(42,856)
1,000
-
Actual
28,492
(40,497)
4,234 26,906 5,183
(90,359)
16,525 23,532
121,817
(34,977)
13,162
Notes
126,555
20122013Actual
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 117
Financial Statements 2013
page 9
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Contents of the Notes accompanying the Financial Statements
Details
Summary of Significant Accounting PoliciesCouncil Functions / Activities - Financial InformationCouncil Functions / Activities - Component DescriptionsIncome from Continuing OperationsExpenses from Continuing OperationsGains or Losses from the Disposal of AssetsCash & Cash Equivalent AssetsInvestmentsRestricted Cash, Cash Equivalents & Investments - DetailsReceivablesInventories & Other AssetsInfrastructure, Property, Plant & EquipmentExternally Restricted Infrastructure, Property, Plant & EquipmentInfrastructure, Property, Plant & Equipment - Current Year ImpairmentsPayables, Borrowings & ProvisionsDescription of (and movements in) ProvisionsStatement of Cash Flows - Additional InformationCommitments for ExpenditureStatement of Performance Measures:13a (i) Local Government Industry Indicators (Consolidated)13a (ii) Local Government Industry Graphs (Consolidated)13b Local Government Industry Indicators (by Fund)Investment PropertiesFinancial Risk ManagementMaterial Budget VariationsStatement of Developer ContributionsContingencies and Other Liabilities/Assets not recognisedControlled Entities, Associated Entities & Interests in Joint VenturesEquity - Retained Earnings and Revaluation Reserves
Financial Result & Financial Position by Fund"Held for Sale" Non Current Assets & Disposal GroupsEvents occurring after the Reporting PeriodDiscontinued OperationsIntangible AssetsReinstatement, Rehabilitation & Restoration Liabilities
Additional Council Disclosures
Council Information & Contact Details
n/a - not applicable
2(a)
32(b)
6(b)
5
48
41
4244
54
52
53
49
23
26
Note
22
14
10(a)10(b)
17
6(a)
4
6(c)
9(c)
11
24
Page
1
25
19
1516
20
21
58
56
51
52 n/a
18
1213
10303132
78
9(a)9(b)
27
37
42
55
71
61
78
7776 n/a
76 n/a
n/a59
76 n/a
60
74
66
76 n/a
68
76 n/a
75
118 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 10
The principal accounting policies adopted by Council in the preparation of these consolidated financial statements are set out below in order to assist in its general understanding. Under Australian Accounting Standards (AASBs), accounting policies are defined as those specific principles, bases, conventions, rules and practices applied by a reporting entity (in this case Council) in preparing and presenting its financial statements. (a) Basis of preparation (i) Background These financial statements are general purpose financial statements which have been prepared in accordance with; Australian Accounting Standards and
Interpretations issued by the Australian Accounting Standards Board,
the Local Government Act (1993) & Regulation,
and the Local Government Code of Accounting
Practice and Financial Reporting. For the purpose of preparing these financial statements, Council has been deemed to be a not-for-profit entity. (ii) Compliance with International Financial Reporting Standards (IFRSs) Because AASBs are sector neutral, some standards either:
(a) have local Australian content and prescription that is specific to the Not-For-Profit sector (including Local Government) which are not in compliance with IFRS’s, or
(b) specifically exclude application by Not for Profit entities.
Accordingly in preparing these financial statements and accompanying notes, Council has been unable to comply fully with International Accounting Standards, but has complied fully with Australian Accounting Standards.
Under the Local Government Act (LGA), Regulations and Local Government Code of Accounting Practice & Financial Reporting, it should be noted that Councils in NSW only have a requirement to comply with AASBs. (iii) New and amended standards adopted by Council None of the new standards and amendments to standards that are mandatory for the first time for the financial year beginning 1 July 2013 affected any of the amounts recognised in the current period or any prior period and are not likely to affect future periods. (iv) Early adoption of Accounting Standards Council has not elected to apply any pronouncements before their operative date in the annual reporting period beginning 1 July 2013. Refer further to paragraph (ab) relating to a summary of the effects of Standards with future operative dates. (v) Basis of Accounting These financial statements have been prepared under the historical cost convention except for: (i) financial assets and liabilities at fair value
through profit or loss, available-for-sale financial assets and investment properties which are all valued at fair value,
(ii) the write down of any Asset on the basis of Impairment (if warranted) and
(iii) certain classes of Infrastructure, property, plant
& equipment that are accounted for at fair valuation.
The accrual basis of accounting has also been applied in their preparation. (vi) Changes in Accounting Policies Council’s accounting policies have been consistently applied to all the years presented, unless otherwise stated.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 119
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 11
There have also been no changes in accounting policies when compared with previous financial statements unless otherwise stated [refer Note 20(d)].
(vii) Critical Accounting Estimates The preparation of financial statements requires the use of certain critical accounting estimates (in conformity with AASBs). Accordingly this requires management to exercise its judgement in the process of applying the Council's accounting policies. Estimates and judgements are continually evaluated and are based on historical experience and other factors, including expectations of future events that may have a financial impact on the entity and that are believed to be reasonable under the circumstances. Critical accounting estimates and assumptions Council makes estimates and assumptions concerning the future. The resulting accounting estimates will, by definition, seldom equal the related actual results. The estimates and assumptions that have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial year are set out below. (i) Estimated fair values of investment properties
(ii) Estimated fair values of infrastructure, property,
plant and equipment.
(iii) Estimated tip remediation provisions.
Critical judgements in applying the entity's accounting policies (i) Impairment of Receivables - Council has made
a significant judgement about the impairment of a number of its receivables in Note 7.
(ii) Projected Section 94 Commitments - Council
has used significant judgement in determining future Section 94 income and expenditure in Note 17.
(b) Revenue recognition Council recognises revenue when the amount of revenue can be reliably measured, it is probable that future economic benefits will flow to the entity and specific criteria have been met for each of the Council’s activities as described below. Council bases any estimates on historical results, taking into consideration the type of customer, the type of transaction and the specifics of each arrangement. Revenue is measured at the fair value of the consideration received or receivable. Revenue is measured on major income categories as follows: Rates, Annual Charges, Grants and Contributions Rates, annual charges, grants and contributions (including developer contributions) are recognised as revenues when the Council obtains control over the assets comprising these receipts. Control over assets acquired from rates and annual charges is obtained at the commencement of the rating year as it is an enforceable debt linked to the rateable property or, where earlier, upon receipt of the rates. A provision for the impairment on rates receivables has not been established as unpaid rates represent a charge against the rateable property that will be recovered when the property is next sold. Control over granted assets is normally obtained upon their receipt (or acquittal) or upon earlier notification that a grant has been secured, and is valued at their fair value at the date of transfer. Revenue from Contributions is recognised when the Council either obtains control of the contribution or the right to receive it, (i) it is probable that the economic benefits comprising the contribution will flow to the Council and (ii) the amount of the contribution can be measured reliably. Where grants or contributions recognised as revenues during the financial year were obtained on condition that they be expended in a particular manner or used over a particular period and those conditions were undischarged at balance date, the
120 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 12
unused grant or contribution is disclosed in Note 3(g). Note 3(g) also discloses the amount of unused grant or contribution from prior years that was expended on Council’s operations during the current year. The Council has obligations to provide facilities from contribution revenues levied on developers under the provisions of S94 of the EPA Act 1979. Whilst Council generally incorporates these amounts as part of a Development Consents Order, such developer contributions are only recognised as income upon their physical receipt by Council, due to the possibility that individual Development Consents may not be acted upon by the applicant and accordingly would not be payable to Council. Developer contributions may only be expended for the purposes for which the contributions were required but the Council may apply contributions according to the priorities established in work schedules. A detailed Note relating to developer contributions can be found at Note 17. User Charges, Fees and Other Income User charges, fees and other income (including parking fees and fines) are recognised as revenue when the service has been provided, the payment is received, or when the penalty has been applied, whichever first occurs. A provision for the impairment of these receivables is recognised when collection in full is no longer probable. A liability is recognised in respect of revenue that is reciprocal in nature to the extent that the requisite service has not been provided as at balance date.
Sale of Infrastructure, Property, Plant and Equipment The profit or loss on sale of an asset is determined when control of the asset has irrevocably passed to the buyer.
Interest and Rents Rents are recognised as revenue on a proportional basis when the payment is due, the value of the payment is notified, or the payment is received, whichever first occurs. Interest Income from Cash & Investments is accounted for using the Effective Interest method in accordance with AASB 139. (c) Principles of Consolidation These financial statements incorporate (i) the assets and liabilities of Council and any Entities (or operations) that it controls (as at 30 June 2013) and (ii) all the related operating results (for the financial year ended the 30th June 2013). The financial statements also include Council’s share of the assets, liabilities, income and expenses of any Jointly Controlled Operations under the appropriate headings. In the process of reporting on Council’s activities as a single unit, all inter-entity year end balances and reporting period transactions have been eliminated in full between Council and its controlled entities. (i) The Consolidated Fund
In accordance with the provisions of Section 409(1) of the LGA 1993, all money and property received by Council is held in the Council’s Consolidated Fund unless it is required to be held in the Council’s Trust Fund. The Consolidated Fund and other entities through which the Council controls resources to carry on its functions have been included in the financial statements forming part of this report. The following entities have been included as part of the Consolidated Fund: General Purpose Operations Hazelhurst Regional Art Gallery Cronulla Plaza Management and Promotions Sutherland, Engadine and Caringbah Leisure
Centres Sutherland Entertainment Centre Commercial (Business) Waste Certification Unit
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 121
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 13
Long Day Care Centres Operational Property Domestic Waste Management Due to their immaterial value and nature, the following Committees, Entities & Operations have been excluded from consolidation: Como School of Arts EG Waterhouse National Camellia Gardens Gymea Community Hall Loftus Community Hall Maianbar Community Hall Marton Hall Community Oyster Bay Oval Sandy Point Community Hall Sutherland Multipurpose Centre The (i) total income and expenditure from continuing operations and (ii) the net assets held by these excluded Committees & Operations is as follows:
Total incomefrom continuing operations $130,533 Total expenditurefrom continuing operations $106,436 Total net assets held (ie Equity) $285,871
Note: Where actual figures are not known, best estimates have been applied. (ii) The Trust Fund In accordance with the provisions of Section 411 of the Local Government Act 1993 (as amended), a separate and distinct Trust Fund is maintained to account for all money and property received by the Council in trust which must be applied only for the purposes of or in accordance with the trusts relating to those monies. Trust monies and property subject to Council’s control have been included in these statements. Trust monies and property held by Council but not subject to the control of Council, have been excluded from these statements. A separate statement of monies held in the Trust Fund is available for inspection at the Council office by any person free of charge.
(iii) Joint Ventures
Jointly Controlled Assets & Operations The proportionate interests in the assets, liabilities and expenses of a Joint Venture Activity have been incorporated throughout the financial statements under the appropriate headings. Jointly Controlled Entities
Any interests in Joint Venture Entities & Partnerships are accounted for using the equity method and is carried at cost. Under the equity method, the share of the profits or losses of the partnership is recognised in the income statement, and the share of movements in retained earnings & reserves is recognised in the balance sheet. (iv) Associated Entities Where Council has the power to participate in the financial and operating decisions (of another entity), ie. where Council is deemed to have “significant influence” over the other entities operations but neither controls nor jointly controls the entity, then Council accounts for such interests using the equity method of accounting – in a similar fashion to Joint Venture Entities & Partnerships. Such entities are usually termed Associates.
(v) County Councils
Council is not a member of any County Councils.
(vi) Additional Information Note 19 provides more information in relation to Joint Venture Entities, Associated Entities and Joint Venture Operations where applicable. (d) Leases All Leases entered into by Council are reviewed and classified on inception date as either a Finance Lease or an Operating Lease.
122 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 14
Finance Leases Leases of property, plant and equipment where the Council has substantially all the risks and rewards of ownership are classified as finance leases. Finance leases are capitalised at the lease’s inception at the lower of the fair value of the leased property and the present value of the minimum lease payments. The corresponding rental obligations, net of finance charges, are included in borrowings. Each lease payment is allocated between the liability outstanding and the recognition of a finance charge. The interest element of the finance charge is costed to the income statement over the lease period so as to produce a constant periodic rate of interest on the remaining balance of the liability for each period. Property, plant and equipment acquired under finance leases is depreciated over the shorter of each leased asset’s useful life and the lease term.
Operating Leases Leases in which a significant portion of the risks and rewards of ownership are retained by the lessor are classified as operating leases. Payments made under operating leases (net of any incentives received from the lessor) are charged to the income statement on a straight-line basis over the period of the lease. Lease income from operating leases is recognised in income on a straight-line basis over the lease term.
(e) Cash and Cash Equivalents Cash and cash equivalents includes; cash on hand, deposits held at call with financial institutions, other short-term, highly liquid investments with
original maturities of three months or less that are readily convertible to known amounts of cash and which are subject to an insignificant risk of changes in value, and
bank overdrafts. Bank overdrafts are shown within borrowings in current liabilities on the balance sheet but are incorporated into Cash & Cash Equivalents for presentation of the Cash Flow Statement. (f) Investments and Other Financial Assets Council (in accordance with AASB 139) classifies each of its investments into one of the following categories for measurement purposes: financial assets at fair value through profit or
loss, loans and receivables, held-to-maturity investments, and available-for-sale financial assets. Each classification depends on the purpose/intention for which the investment was acquired & at the time it was acquired. Management determines each Investment classification at the time of initial recognition and re-evaluates this designation at each reporting date. (i) Financial assets at fair value through profit or loss Financial assets at fair value through profit or loss include financial assets that are “held for trading”. A financial asset is classified in the “held for trading” category if it is acquired principally for the purpose of selling in the short term. Derivatives are classified as held for trading unless they are designated as hedges. Assets in this category are primarily classified as current assets as they are primarily held for trading &/or are expected to be realised within 12 months of the balance sheet date.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 123
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 15
(ii) Loans and receivables Loans and receivables are non derivative financial assets with fixed or determinable payments that are not quoted in an active market. They arise when the Council provides money, goods or services directly to a debtor with no intention (or in some cases ability) of selling the resulting receivable. They are included in current assets, except for those with maturities greater than 12 months after the balance sheet date which are classified as non-current assets. (iii) Held-to-maturity investments Held-to-maturity investments are non-derivative financial assets with fixed or determinable payments and fixed maturities that the Council’s management has the positive intention and ability to hold to maturity. In contrast to the “Loans & Receivables” classification, these investments are generally quoted in an active market. Held-to-maturity financial assets are included in non-current assets, except for those with maturities less than 12 months from the reporting date, which are classified as current assets. (iv) Available-for-sale financial assets Available-for-sale financial assets are non-derivatives that are either designated in this category or not classified in any of the other categories. Investments must be designated as available-for-sale if they do not have fixed maturities and fixed or determinable payments and management intends to hold them for the medium to long term. Accordingly, this classification principally comprises marketable equity securities, but can include all types of financial assets that could otherwise be classified in one of the other investment categories. They are generally included in non-current assets unless management intends to dispose of the investment within 12 months of the balance sheet
date or the term to maturity from the reporting date is less than 12 months.
Financial Assets – Reclassification Council may choose to reclassify a non-derivative trading financial asset out of the held-for-trading category if the financial asset is no longer held for the purpose of selling it in the near term. Financial assets other than loans and receivables are permitted to be reclassified out of the held-for-trading category only in rare circumstances arising from a single event that is unusual and highly unlikely to recur in the near term. Council may also choose to reclassify financial assets that would meet the definition of loans and receivables out of the held-for-trading or available-for-sale categories if it has the intention and ability to hold these financial assets for the foreseeable future or until maturity at the date of reclassification. Reclassifications are made at fair value as of the reclassification date. Fair value becomes the new cost or amortised cost as applicable, and no reversals of fair value gains or losses recorded before reclassification date are subsequently made. Effective interest rates for financial assets reclassified to loans and receivables and held-to-maturity categories are determined at the reclassification date. Further increases in estimates of cash flows adjust effective interest rates prospectively.
General Accounting & Measurement of Financial Instruments: (i) Initial Recognition Investments are initially recognised (and measured) at fair value, plus in the case of investments not at “fair value through profit or loss”, directly attributable transactions costs Purchases and sales of investments are recognised on trade-date - the date on which the Council commits to purchase or sell the asset. Financial assets are derecognised when the rights to receive cash flows from the financial assets have expired or have been transferred and the Council has
124 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 16
transferred substantially all the risks and rewards of ownership. (ii) Subsequent Measurement Available-for-sale financial assets and financial assets at fair value through profit and loss are subsequently carried at fair value. Loans and receivables and held-to-maturity investments are carried at amortised cost using the effective interest method. Realised and unrealised gains and losses arising from changes in the fair value of the financial assets classified as “fair value through profit or loss” category are included in the income statement in the period in which they arise. Unrealised gains and losses arising from changes in the fair value of non monetary securities classified as "available-for-sale" are recognised in equity in the available-for-sale investments revaluation reserve. When securities classified as "available-for-sale" are sold or impaired, the accumulated fair value adjustments are included in the income statement as gains and losses from investment securities.
Impairment Council assesses at each balance date whether there is objective evidence that a financial asset or group of financial assets is impaired. A financial asset or a group of financial assets is impaired and impairment losses are incurred only if there is objective evidence of impairment as a result of one or more events that occurred after the initial recognition of the asset (a ‘loss event’) and that loss event (or events) has an impact on the estimated future cash flows of the financial asset or group of financial assets that can be reliably estimated. If there is evidence of impairment for any of Council’s financial assets carried at amortised cost (eg. loans and receivables), the amount of the loss is measured as the difference between the asset’s carrying amount and the present value of estimated future cash flows (excluding future credit losses that have not been incurred) discounted at the financial asset’s original effective interest rate.
(iii) Types of Investments Council has an approved Investment Policy in order to undertake its investment of money in accordance with (and to comply with) Section 625 of the Local Government Act and S212 of the LG (General) Regulation 2005. Investments are placed and managed in accordance with the Policy and having particular regard to authorised investments prescribed under the Ministerial Local Government Investment Order. Council maintains its investment Policy in compliance with the Act and ensures that it or its representatives exercise care, diligence and skill that a prudent person would exercise in investing Council funds. Council amended its policy following revisions to the Ministerial Local Government Investment Order arising from the Cole Inquiry recommendations. Certain investments that Council holds are no longer prescribed (eg. managed funds, CDOs, and equity linked notes), however they have been retained under grandfathering provisions of the Order. These will be disposed of when most financially advantageous to Council. (g) Fair value estimation The fair value of financial assets and financial liabilities must be estimated for recognition and measurement or for disclosure purposes. The fair value of financial instruments traded in active markets is based on quoted market prices at the balance sheet date. The fair value of financial instruments that are not traded in an active market is determined using valuation techniques. Council uses a variety of methods and makes assumptions that are based on market conditions existing at each balance date. Quoted market prices or dealer quotes for similar instruments are used for long-term debt instruments held.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 125
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 17
If the market for a financial asset is not active (and for unlisted securities), the Council establishes fair value by using valuation techniques. These include reference to the fair values of recent arm’s length transactions, involving the same instruments or other instruments that are substantially the same, discounted cash flow analysis, and option pricing models refined to reflect the issuer’s specific circumstances. The nominal value less estimated credit adjustments of trade receivables and payables are assumed to approximate their fair values. The fair value of financial liabilities for disclosure purposes is estimated by discounting the future contractual cash flows at the current market interest rate that is available to the Council for similar financial instruments.
(h) Receivables Receivables are initially recognised at fair value and subsequently measured at amortised cost, less any provision for impairment. Receivables (excluding Rates & Annual Charges) are generally due for settlement no more than 30 days from the date of recognition. The collectibility of receivables is reviewed on an ongoing basis. Debts which are known to be uncollectible are written off in accordance with Council’s policy. A provision for impairment (ie. an allowance account) relating to receivables is established when there is objective evidence that the Council will not be able to collect all amounts due according to the original terms of each receivable. The amount of the provision is the difference between the asset’s carrying amount and the present value of estimated future cash flows, discounted at the effective interest rate. Impairment losses are recognised in the Income Statement within other expenses. When a receivable for which an impairment allowance had been recognised becomes
uncollectible in a subsequent period, it is written off against the allowance account. Subsequent recoveries of amounts previously written off are credited against other expenses in the income statement. (i) Inventories Raw Materials and Stores, Work in Progress andFinished Goods Raw materials and stores, work in progress and finished goods in respect of business undertakings are all stated at the lower of cost and net realisable value. Cost comprises direct materials, direct labour and an appropriate proportion of variable and fixed overhead expenditure, the latter being allocated on the basis of normal operating capacity. Costs are assigned to individual items of inventory on the basis of weighted average costs. Net realisable value is the estimated selling price in the ordinary course of business less the estimated costs of completion and the estimated costs necessary to make the sale. Inventories held in respect of non-business undertakings have been valued at cost subject to adjustment for loss of service potential. Land Held for Resale/Capitalisation of Borrowing Costs Land held for resale is stated at the lower of cost and net realisable value. Cost is assigned by specific identification and includes the cost of acquisition, and development and borrowing costs during development. When development is completed borrowing costs and other holding charges are expensed as incurred. Borrowing costs included in the cost of land held for resale are those costs that would have been avoided if the expenditure on the acquisition and development of the land had not been made.
126 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 18
Borrowing costs incurred while active development is interrupted for extended periods are recognised as expenses.
(j) Infrastructure, Property, Plant and Equipment (I,PP&E)
Acquisition of assets Council’s non current assets are continually revalued (over a 5 year period) in accordance with the fair valuation policy as mandated by the Division of Local Government. At balance date, the following classes of I,PP&E were stated at their Fair Value; - Investment Properties – refer Note 1(p), - Water and Sewerage Networks
(External Valuation)
- Operational Land (External Valuation)
- Buildings – Specialised/Non Specialised (External Valuation)
- Plant and Equipment
(as approximated by depreciated historical cost)
- Roads Assets incl. roads, bridges & footpaths (Internal Valuation)
- Drainage Assets (/Internal Valuation) - Bulk Earthworks (Internal Valuation)
- Community Land (External Valuation)
- Land Improvements
(as approximated by depreciated historical cost)
- Other Structures (as approximated by depreciated historical cost)
- Other Assets (as approximated by depreciated historical cost)
The 2013 revaluations for Operational Land were based on independent revaluations made by McLennan Steege Smith and Associates.
Initial Recognition On initial recognition, an assets cost is measured at its fair value, plus all expenditure that is directly attributable to the acquisition. Where settlement of any part of an asset’s cash consideration is deferred, the amounts payable in the future are discounted to their present value as at the date of recognition (ie. date of exchange) of the asset to arrive at fair value. The discount rate used is the Council’s incremental borrowing rate, being the rate at which a similar borrowing could be obtained from an independent financier under comparable terms and conditions. Where infrastructure, property, plant and equipment assets are acquired for no cost or for an amount other than cost, the assets are recognised in the financial statements at their fair value at acquisition date - being the amount that the asset could have been exchanged between knowledgeable willing parties in an arm’s length transaction. Subsequent costs Subsequent costs are included in the asset’s carrying amount or recognised as a separate asset, as appropriate, only when it is probable that future economic benefits associated with the item will flow to Council and the cost of the item can be measured reliably. All other repairs and maintenance are charged to the income statement during the financial period in which they are incurred.
Asset Revaluations (including Indexation) In accounting for Asset Revaluations relating to Infrastructure, Property, Plant & Equipment: Increases in the combined carrying amounts of
asset classes arising on revaluation are credited to the asset revaluation reserve.
To the extent that a net asset class increase
reverses a decrease previously recognised via the profit or loss, then increase is first recognised in profit or loss.
Net decreases that reverse previous increases of
the same asset class are first charged against revaluation reserves directly in equity to the
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 127
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 19
extent of the remaining reserve attributable to the asset, with all other decreases charged to the Income statement.
Water and sewerage network assets are indexed annually between full revaluations in accordance with the latest indices provided in the NSW Office of Water - Rates Reference Manual. For all other assets, Council assesses at each reporting date whether there is any indication that a revalued asset’s carrying amount may differ materially from that which would be determined if the asset were revalued at the reporting date. If any such indication exists, Council determines the asset’s fair value and revalues the asset to that amount. Full revaluations are undertaken for all assets on a 5 year cycle. Capitalisation Thresholds Items of infrastructure, property, plant and equipment are not capitalised unless their cost of acquisition exceeds the following;
Land- council land 100% Capitalised - open space 100% Capitalised
Plant & EquipmentOffice Furniture > $1,000 Office Equipment > $1,000 Other Plant &Equipment > $1,000
Buildings & Land ImprovementsPark Furniture & Equipment > $1,000 Building - construction/extensions 100% Capitalised - renovations > $5,000
Stormwater AssetsDrains & Culverts > $10,000 Other > $10,000
Transport AssetsRoad construction & reconstruction > $10,000 Reseal/Re-sheet & major repairs: > $10,000 Bridge construction & reconstruction > $10,000
Depreciation Depreciation on Council's infrastructure, property, plant and equipment assets is calculated using the straight line method in order to allocate an assets cost (net of residual values) over its estimated useful life. Land is not depreciated. Estimated useful lives for Council's I,PP&E include:
Plant & Equipment- Office Equipment 10 years - Office furniture 10 years - Computer Equipment 3 years - Heavy Vehicles 4 to 5 years - Heavy Plant/Road Making equip. 5 to 8 years - Other plant and equipment 5 to 15 years
Other Equipment- Playground equipment 10 years - Benches, seats etc 10 years
Buildings- Buildings 50 years
Stormwater Drainage- Drains 100 years - Culverts 100 years
Transportation Assets- Sealed Roads: Surface 40 years - Sealed Roads: Structure 75 years - Bridges 80 years
- Road Pavements 20 years - Kerb, Gutter & Paths 70 years - Footpaths 50 years
Other Infrastructure Assets - Bulk earthworks Infinite All asset residual values and useful lives are reviewed and adjusted (where appropriate), at each balance sheet date. An asset’s carrying amount is written down immediately to its recoverable amount if the asset’s carrying amount is greater than its estimated recoverable amount – refer Note 1(s) on Asset Impairment.
128 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 21
The last full revaluation for Council’s Investment Properties was dated 30 June 2013. (q) Provisions for close down, restoration
and for environmental clean up costs – including Tips and Quarries Close down, Restoration and Remediation costs include the dismantling and demolition of infrastructure, the removal of residual materials and the remediation of disturbed areas. Estimated close down and restoration costs are provided for in the accounting period when the obligation arising from the related disturbance occurs, whether this occurs during the development or during the operation phase, based on the net present value of estimated future costs. Provisions for close down and restoration costs do not include any additional obligations which are expected to arise from future disturbance. Costs are estimated on the basis of a closure plan. The cost estimates are calculated annually during the life of the operation to reflect known developments, eg updated cost estimates and revisions to the estimated lives of operations, and are subject to formal review at regular intervals. Close down, Restoration and Remediation costs are a normal consequence of tip and quarry operations, and the majority of close down and restoration expenditure is incurred at the end of the life of the operations. Although the ultimate cost to be incurred is uncertain, Council estimates the respective costs based on feasibility and engineering studies using current restoration standards and techniques. The amortisation or ‘unwinding’ of the discount applied in establishing the net present value of provisions is charged to the income statement in each accounting period. This amortisation of the discount is disclosed as a borrowing cost in Note 4(b). Other movements in the provisions for Close down, Restoration and Remediation costs including those
resulting from new disturbance, updated cost estimates, changes to the estimated lives of operations and revisions to discount rates are capitalised within property, plant and equipment. These costs are then depreciated over the lives of the assets to which they relate. Where rehabilitation is conducted systematically over the life of the operation, rather than at the time of closure, provision is made for the estimated outstanding continuous rehabilitation work at each balance sheet date and the cost is charged to the income statement. Provision is made for the estimated present value of the costs of environmental clean up obligations outstanding at the balance sheet date. These costs are charged to the income statement. Movements in the environmental clean up provisions are presented as an operating cost, except for the unwind of the discount which is shown as a borrowing cost. Remediation procedures generally commence soon after the time the damage, remediation process and estimated remediation costs become known, but may continue for many years depending on the nature of the disturbance and the remediation techniques. As noted above, the ultimate cost of environmental remediation is uncertain and cost estimates can vary in response to many factors including changes to the relevant legal requirements, the emergence of new restoration techniques or experience at other locations. The expected timing of expenditure can also change, for example in response to changes in quarry reserves or production rates. As a result there could be significant adjustments to the provision for close down and restoration and environmental clean up, which would affect future financial results. Specific Information relating to Council's provisions relating to Close down, Restoration and Remediation costs can be found at Note 26.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 129
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 22
(r) Non-Current Assets (or Disposal Groups) “Held for Sale” & DiscontinuedOperations
Non-current assets (or disposal groups) are classified as held for sale and stated at the lower of either (i) their carrying amount and (ii) fair value less costs to sell, if their carrying amount will be recovered principally through a sale transaction rather than through continuing use. The exception to this is plant and motor vehicles which are turned over on a regular basis. Plant and motor vehicles are retained in Non Current Assets under the classification of Infrastructure, Property, Plant and Equipment - unless the assets are to be traded in after 30 June and the replacement assets were already purchased and accounted for as at 30 June. For any assets or disposal groups classified as Non-Current Assets “held for sale”, an impairment loss is recognised at any time when the assets carrying value is greater than its fair value less costs to sell. Non-current assets “held for sale” are not depreciated or amortised while they are classified as “held for sale”. Non-current assets classified as “held for sale” are presented separately from the other assets in the balance sheet. A Discontinued Operation is a component of the entity that has been disposed of or is classified as “held for sale” and that represents a separate major line of business or geographical area of operations, is part of a single co-ordinated plan to dispose of such a line of business or area of operations, or is a subsidiary acquired exclusively with a view to resale. The results of discontinued operations are presented separately on the face of the income statement. (s) Impairment of assets All Council's I,PP&E is subject to an annual assessment of impairment. Assets that are subject to amortisation are reviewed for impairment whenever events or changes in
circumstances indicate that the carrying amount may not be recoverable. An impairment loss is recognised for the amount by which the asset’s carrying amount exceeds its recoverable amount. The recoverable amount is the higher of an asset’s fair value less costs to sell and value in use. Where an asset is not held principally for cash generating purposes (for example Infrastructure Assets) and would be replaced if the Council was deprived of it then depreciated replacement cost is used as value in use, otherwise value in use is estimated by using a discounted cash flow model. Non-financial assets (other than goodwill) that suffered a prior period impairment are reviewed for possible reversal of the impairment at each reporting date. Goodwill & other Intangible Assets that have an indefinite useful life and are not subject to amortisation are tested annually for impairment. (t) Payables These amounts represent liabilities and include goods and services provided to the Council prior to the end of financial year which are unpaid. The amounts for goods and services are unsecured and are usually paid within 30 days of recognition. (u) Borrowings
Borrowings are initially recognised at fair value, net of transaction costs incurred. Borrowings are subsequently measured at amortised cost. Amortisation results in any difference between the proceeds (net of transaction costs) and the redemption amount being recognised in the Income Statement over the period of the borrowings using the effective interest method.
130 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 23
Borrowings are removed from the balance sheet when the obligation specified in the contract is discharged, cancelled or expired. Borrowings are classified as current liabilities unless the Council has an unconditional right to defer settlement of the liability for at least 12 months after the balance sheet date. (v) Borrowing costs Borrowing costs are expensed except to the extent that the they are incurred during the construction of qualifying assets. Borrowing costs incurred for the construction of any qualifying asset are capitalised during the period of time that is required to complete and prepare the asset for its intended use or sale. (w) Provisions Provisions for legal claims, service warranties and other like liabilities are recognised when: Council has a present legal or constructive
obligation as a result of past events; it is more likely than not that an outflow of
resources will be required to settle the obligation; and
the amount has been reliably estimated. Provisions are not recognised for future operating losses. Where there are a number of similar obligations, the likelihood that an outflow will be required in settlement is determined by considering the class of obligations as a whole. A provision is recognised even if the likelihood of an outflow with respect to any one item included in the same class of obligations may be small. Provisions are measured at the present value of management’s best estimate of the expenditure required to settle the present obligation at the reporting date.
The discount rate used to determine the present value reflects current market assessments of the time value of money and the risks specific to the liability. The increase in the provision due to the passage of time is recognised as interest expense. (x) Employee benefits (i) Short Term Obligations Short term employee benefit obligations include liabilities for wages and salaries (including non-monetary benefits), annual leave and vesting sick leave expected to be settled within the 12 months after the reporting period. Leave liabilities are recognised in the provision for employee benefits in respect of employees’ services up to the reporting date with other short term employee benefit obligations disclosed under payables.. These provisions are measured at the amounts expected to be paid when the liabilities are settled. Liabilities for non vesting sick leave are recognised at the time when the leave is taken and measured at the rates paid or payable, and accordingly no Liability has been recognised in these reports. Wages & salaries, annual leave and vesting sick leave are all classified as Current Liabilities. (ii) Other Long Term Obligations The liability for all long service and annual leave in respect of services provided by employees up to the reporting date (which is not expected to be settled within the 12 months after the reporting period) are recognised in the provision for employee benefits. These liabilities are measured at the present value of the expected future payments to be made using the projected unit credit method. Consideration is given to expected future wage and salary levels, experience of employee departures and periods of service.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 131
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 24
Expected future payments are then discounted using market yields at the reporting date based on national government bonds with terms to maturity and currency that match as closely as possible the estimated future cash outflows. Due to the nature of when and how Long Service Leave can be taken, all Long Service Leave for employees with 4 or more years of service has been classified as Current, as it has been deemed that Council does not have the unconditional right to defer settlement beyond 12 months – even though it is not anticipated that all employees with more than 4 years service (as at reporting date) will apply for and take their leave entitlements in the next 12 months. (iii) Retirement benefit obligations All employees of the Council are entitled to benefits on retirement, disability or death. Council contributes to various defined benefit plans and defined contribution plans on behalf of its employees. Defined Benefit Plans A liability or asset in respect of defined benefit superannuation plans would ordinarily be recognised in the balance sheet, and measured as the present value of the defined benefit obligation at the reporting date plus unrecognised actuarial gains (less unrecognised actuarial losses) less the fair value of the superannuation fund’s assets at that date and any unrecognised past service cost. The present value of the defined benefit obligation is based on expected future payments which arise from membership of the fund to the reporting date, calculated annually by independent actuaries using the projected unit credit method. Consideration is given to expected future wage and salary levels, experience of employee departures and periods of service. However, when this information is not reliably available, Council can account for its obligations to defined benefit plans on the same basis as its obligations to defined contribution plans – i.e. as an expense when they become payable.
Council is party to an Industry Defined Benefit Plan under the Local Government Superannuation Scheme, named the “Local Government Superannuation Scheme – Pool B” This Scheme has been deemed to be a “multi employer fund” for the purposes of AASB 119. Sufficient information is not available to account for the Scheme as a defined benefit plan (in accordance with AASB 119) because the assets to the scheme are pooled together for all Councils. The last valuation of the Scheme was performed by Mr Martin Stevenson BSc, FIA, FIAA on 24 February 2013 and covers the period ended 30 June 2013. However the position is monitored annually and the Actuary has estimated that as at 30 June 2013 the prior period deficit still exists. Effective from 1 July 2009, employers are required to contribute additional contributions to assist in extinguishing this deficit. The amount of employer contributions to the defined benefit section of the Local Government Superannuation Scheme and recognised as an expense and disclosed as part of Superannuation Expenses at Note 4(a) for the year ending 30 June 2013 was $2,998,750.09. The amount of additional contributions included in the total employer contribution advised above is $1,276,224.96. The share of this deficit that can be broadly attributed to Council is estimated to be in the order of $ 5,933,608 as at 30 June 2013. Council’s share of that deficiency cannot be accurately calculated as the Scheme is a mutual arrangement where assets and liabilities are pooled together for all member councils. For this reason, no liability for the deficiency has been recognised in these financial statements. Council has, however, disclosed a contingent liability in Note 18 to reflect the possible obligation that may arise should the Scheme require immediate payment to correct the deficiency.
132 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 25
Defined Contribution Plans Contributions to Defined Contribution Plans are recognised as an expense as they become payable. Prepaid contributions are recognised as an asset to the extent that a cash refund or a reduction in the future payments is available.
(iv) Employee Benefit On-Costs Council has recognised at year end the aggregate on-cost liabilities arising from employee benefits, and in particular those on-cost liabilities that will arise when payment of current employee benefits is made in future periods. These amounts include Superannuation and Workers Compensation expenses which will be payable upon the future payment of certain Leave Liabilities accrued as at 30/6/13.
(y) Self insurance Council has determined to self-insure for various risks including public liability and professional indemnity. A provision for self-insurance has been made to recognise outstanding claims the amount of which is detailed in Note10. Council also maintains cash and investments to meet expected future claims and these are detailed in Note 6(c).
(z) Allocation between current andnon-current assets & liabilities
In the determination of whether an asset or liability is classified as current or non-current, consideration is given to the time when each asset or liability is expected to be settled. The asset or liability is classified as current if it is expected to be settled within the next 12 months, being the Council’s operational cycle. Exceptions In the case of liabilities where Council does not have the unconditional right to defer settlement beyond 12
months (such as vested long service leave), the liability is classified as current even if not expected to be settled within the next 12 months. In the case of inventories that are “held for trading”, these are also classified as current even if not expected to be realised in the next 12 months. (aa) Taxes
The Council is exempt from both Commonwealth Income Tax and Capital Gains Tax. Council does however have to comply with both Fringe Benefits Tax and Goods and Services Tax (GST).
Goods & Services Tax (GST)
Income, expenses and assets are all recognised net of the amount of GST, except where the amount of GST incurred is not recoverable from the Australian Tax Office (ATO). In these circumstances the GST is recognised as part of the cost of acquisition of the asset or as part of the revenue / expense.
Receivables and payables within the Balance Sheet are stated inclusive of any applicable GST. The net amount of GST recoverable from or payable to the ATO is included as a current asset or current liability in the Balance Sheet. Operating cash flows within the Cash Flow Statement are on a gross basis, ie. they are inclusive of GST where applicable. Investing and Financing cash flows are treated on a net basis (where recoverable form the ATO), ie. they are exclusive of GST. Instead, the GST component of investing and financing activity cash flows which are recoverable from or payable to the ATO are classified as operating cash flows. Commitments and contingencies are disclosed net of the amount of GST recoverable from (or payable to) the ATO.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 133
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 26
(ab) New accounting standards and UIG interpretations
Certain new (or amended) accounting standards and interpretations have been published that are not mandatory for reporting periods ending 30 June 2013. Council has not adopted any of these standards early. Council’s assessment of the impact of these new standards and interpretations is set out below. Applicable to Local Government with implications: AASB 9 Financial Instruments, associated standards, AASB 2010-7 Amendments to Australian Accounting Standards arising from AASB 9 and AASB 2012-6 Amendments to Australian Accounting Standards – Mandatory Effective Date of AASB 9 and transitional disclosures (effective from 1 January 2015) AASB 9 Financial Instruments addresses the classification, measurement and de-recognition of financial assets and financial liabilities. The standard is not applicable until 1 January 2015 but is available for early adoption. When adopted, the standard will affect in particular Council’s accounting for its available-for-sale financial assets, since AASB 9 only permits the recognition of fair value gains and losses in other comprehensive income if they relate to equity investments that are not held for trading. Fair value gains and losses on available-for-sale debt investments, for example, will therefore have to be recognised directly in profit or loss although there is currently a proposal by the IASB to introduce a Fair value through Other Comprehensive Income category for debt instruments. There will be no impact on Council’s accounting for financial liabilities, as the new requirements only affect the accounting for financial liabilities that are designated at fair value through profit or loss and Council does not have any such liabilities.
The de-recognition rules have been transferred from AASB 139 Financial Instruments: Recognition and Measurement and have not been changed. AASB 13 Fair Value Measurement and AASB 2011-8 Amendments to Australian Accounting Standards arising from AASB 13 (effective 1 January 2013) AASB 13 explains how to measure fair value and aims to enhance fair value disclosures. Council has yet to determine which, if any, of its current measurement techniques will have to change as a result of the new guidance. It is therefore not possible to state the impact, if any, of the new rules on any of the amounts recognised in the financial statements. However, application of the new standard will impact the type of information disclosed in the notes to the financial statements. Council does not intend to adopt the new standard before its operative date, which means that it would be first applied in the annual reporting period ending 30 June 2014. Applicable to Local Government but no implications for Council; AASB 2012-2 Amendments to Australian Accounting Standards – Disclosures – Offsetting Financial Assets and Financial Liabilities [AASB 132 & AASB 7] (effective 1 January 2013) This Standard amends the required disclosures in AASB 7 to include information that will enable users of an entity’s financial statements to evaluate the effect or potential effect of netting arrangements, including rights of set-off associated with the entity’s recognised financial assets and recognised financial liabilities, on the entity’s financial position. This Standard also amends AASB 132 to refer to the additional disclosures added to AASB 7 by this Standard. The adoption of this standard will not change the reported financial position and performance of the
134 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 27
entity, there are no impact on disclosures as there are no offsetting arrangements currently in place. AASB 2012-3 Amendments to Australian Accounting Standards – Offsetting Financial Assets and Financial Liabilities [AASB 132] (effective 1 January 2014). This Standard adds application guidance to AASB 132 to address inconsistencies identified in applying some of the offsetting criteria of AASB 132, including clarifying the meaning of “currently has a legally enforceable right of set-off” and that some gross settlement systems may be considered equivalent to net settlement. The adoption of this standard will not change the reported financial position and performance of the entity, there are no impact on disclosures as there are no offsetting arrangements currently in place.
Applicable to Local Government but not relevant to Council at this stage;
AASB 10 Consolidated Financial Statements, AASB 11 Joint Arrangements, AASB 12 Disclosure of Interests in Other Entities, revised AASB 127 Separate Financial Statements andAASB 128 Investments in Associates and Joint Ventures and AASB 2011-7 Amendments to Australian Accounting Standards arising from the Consolidation and Joint Arrangements Standards (effective 1 January 2013) This suite of five new and amended standards address the accounting for joint arrangements, consolidated financial statements and associated disclosures. AASB 10 replaces all of the guidance on control and consolidation in AASB 127 Consolidated and Separate Financial Statements, and Interpretation 12 Consolidation – Special Purpose Entities. The core principle that a consolidated entity presents a parent and its subsidiaries as if they are a single economic entity remains unchanged, as do the mechanics of consolidation. However, the standard introduces a single definition of control that applies to all entities.
It focuses on the need to have both power and rights or exposure to variable returns. Power is the current ability to direct the activities that significantly influence returns. Returns must vary and can be positive, negative or both. Control exists when the investor can use its power to affect the amount of its returns. There is also new guidance on participating and protective rights and on agent/principal relationships. Council does not expect the new standard to have a significant impact on its composition. AASB 11 introduces a principles based approach to accounting for joint arrangements. The focus is no longer on the legal structure of joint arrangements, but rather on how rights and obligations are shared by the parties to the joint arrangement. Based on the assessment of rights and obligations, a joint arrangement will be classified as either a joint operation or a joint venture. Joint ventures are accounted for using the equity method, and the choice to proportionately consolidate will no longer be permitted. Parties to a joint operation will account their share of revenues, expenses, assets and liabilities in much the same way as under the previous standard. AASB 11 also provides guidance for parties that participate in joint arrangements but do not share joint control. Council's investment in the joint venture partnership will be classified as a joint venture under the new rules. As Council already applies the equity method in accounting for this investment, AASB 11 will not have any impact on the amounts recognised in its financial statements. AASB 12 sets out the required disclosures for entities reporting under the two new standards, AASB 10 and AASB 11, and replaces the disclosure requirements currently found in AASB 127 and AASB 128.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 135
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 28
Application of this standard by Council will not affect any of the amounts recognised in the financial statements, but will impact the type of information disclosed in relation to Council's investments. Amendments to AASB 128 provide clarification that an entity continues to apply the equity method and does not remeasure its retained interest as part of ownership changes where a joint venture becomes an associate, and vice versa. The amendments also introduce a “partial disposal” concept. Council is still assessing the impact of these amendments. Council does not expect to adopt the new standards before their operative date. They would therefore be first applied in the financial statements for the annual reporting period ending 30 June 2014.
Revised AASB 119 Employee Benefits, AASB 2011-10 Amendments to Australian Accounting Standards arising from AASB 119 (September 2011) and AASB 2011-11 Amendments to AASB 119 (September 2011) arising from Reduced Disclosure Requirements (effective 1 January 2013) This revised standard on accounting for employee benefits requires the recognition of all re-measurements of defined benefit liabilities/assets immediately in other comprehensive income (removal of the so-called 'corridor' method) and the calculation of a net interest expense or income by applying the discount rate to the net defined benefit liability or asset. This replaces the expected return on plan assets that is currently included in profit or loss. The standard also introduces a number of additional disclosures for defined benefit liabilities/assets and could affect the timing of the recognition of termination benefits. The amendments will have to be implemented retrospectively.
Council does not recognise defined benefit assets and liabilities for the reasons set out in paragraph (x) (iii) and so these changes will not have an impact on its reported results. Not applicable to Local Government per se; AASB 2012-5 Amendments to Australian Accounting Standards arising from Annual Improvements 2009–2011 Cycle (effective 1 January 2013) AASB 1 - this standard clarifies that an entity can apply AASB 1 more than once. An entity can elect to apply AASB 123 from the transition date or an earlier date. AASB 101 - clarifies that a third statement of financial position is required when the opening statement of financial position is materially affected by any adjustments. AASB 116 - clarifies the classification of servicing equipment. AASB 132 and Interpretation 2 - clarifies that income tax relating to distributions to holders of an equity instrument and to transaction costs of an equity transaction shall be accounted for in accordance with AASB 112 Income Taxes AASB 134 - provides clarification about segment reporting. The amendments arising from this standard are not expected to change the reported financial position or performance of the Council. There are no other standards that are not yet effective and that are expected to have a material impact on the entity in the current or future reporting periods and on foreseeable future transactions.
(ac) Rounding of amounts Unless otherwise indicated, amounts in the financial statements have been rounded off to the nearest thousand dollars.
136 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013_
Sutherland Shire Council Notes to the Financial Statements for the financial year ended 30 June 2013 Note 1. Summary of Significant Accounting Policies
page 29
(ad) Comparative Figures To ensure comparability with the current reporting period’s figures, some comparative period line items and amounts may have been reclassified or individually reported for the first time within these financial statements and/or the notes.
(ae) Disclaimer Nothing contained within these statements may be taken to be an admission of any liability to any person under any circumstance.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 137
Sut
herla
nd S
hire
Cou
ncil
Not
es to
the
Fina
ncia
l Sta
tem
ents
for t
he fi
nanc
ial y
ear e
nded
30
June
201
3
Not
e 2(
a). C
ounc
il Fu
nctio
ns /
Act
iviti
es -
Fina
ncia
l Inf
orm
atio
n
1. G
over
nanc
e (O
pera
ting
Exp
ense
s) to
talli
ng $
4,99
8,20
8.95
are
incl
uded
in th
e E
xecu
tive
Offi
ce a
nd C
orpo
rate
Ser
vice
s di
visi
on a
bove
. Ope
ratin
g R
even
ues
tota
lling
$16
,419
.15
are
attri
buta
ble
to th
is a
ctiv
ity.
2. In
clud
es: R
ates
& A
nnua
l Cha
rges
(inc
l. E
x-G
ratia
), U
ntie
d G
ener
al P
urpo
se G
rant
s &
Unr
estri
cted
Inte
rest
& In
vest
men
t Inc
ome.
1,31
3,81
5
-
-
1,31
3,81
5
Tota
l Ass
ets
held
(C
urre
nt &
Non
-cur
rent
)
Inco
me,
Exp
ense
s an
d A
sset
s ha
ve b
een
dire
ctly
attr
ibut
ed to
the
follo
win
g Fu
nctio
ns /
Act
iviti
es.
Det
ails
of t
hese
Fun
ctio
ns/A
ctiv
ities
are
pro
vide
d in
Not
e 2(
b).
2013
Act
ual
2012
Act
ual
103,
315
51
4,16
1
-
54,5
29
637,
558
42
4,11
0
100
88,0
89
743,
217
-
55,0
30
649,
528
1,19
5
4,
282
717
1,54
2,05
8
-
-
-
-
11,3
92
52,5
09
21
,616
-
-
1,54
2,05
8
8,06
4
19,4
56
54
-
Pro
ject
Del
iver
y-
17
5
-
-
2,68
7
-
-
(2
,512
)
2013
Act
ual
2012
Act
ual
2012
2013
$ '0
00
Inco
me
from
Con
tinui
ng
Ope
ratio
nsEx
pens
es fr
om C
ontin
uing
O
pera
tions
Fun
ctio
ns/A
ctiv
ities
2013
2012
Act
ual
Act
ual
Gra
nts
incl
uded
in
Inco
me
from
C
ontin
uing
Ope
ratio
ns
Ope
ratin
g R
esul
t fro
m
Con
tinui
ng O
pera
tions
Orig
inal
Bud
get
Orig
inal
Act
ual
2013
2012
2013
2013
Act
ual
Orig
inal
Bud
get
2013
Act
ual
Bud
get
Act
ual
7,26
1
-
4,68
5
108,
772
(12,
183)
(8,8
73)
(9
,434
)
-
(60,
194)
(6,5
76)
(9,4
67)
(8,9
01)
41,0
68
-
(104
,087
)
91,1
66
T
otal
Fun
ctio
ns &
Act
iviti
es
112,
703
10
9,04
6
201,
721
200,
212
19
7,03
619
2,95
124
3,31
5
-
-
-
-
-
-
130,
612
19
2,95
1
197,
036
page 30
92,9
49
S
hare
of g
ains
/(los
ses)
in A
ssoc
iate
s &
Gen
eral
Pur
pose
Inco
me
(2)
Con
tinui
ng O
pera
tions
108,
772
J
oint
Ven
ture
s (u
sing
the
Equ
ity M
etho
d)
Ope
ratin
g R
esul
t fro
m
-
Non
Div
isio
nal
23
11
,025
4,86
4
4,
830
5,74
1
11
,440
(4,8
07)
5,28
4
E
ngin
eerin
g42
,639
29,2
91
30
,526
83,3
79
78
,234
78,5
22
(4
0,74
0)
(48,
943)
25,9
68
39
,687
36,9
03
38
,151
(13,
911)
(8
,299
)
Financial Statements 2013
(47,
996)
4,
794
6,07
6
-
9,78
9
11,8
27
190,
806-
-
190,
806
(101
,785
)
4,90
9
4,
617
112,
703
10
9,04
6
Pro
perty
Ser
vice
s11
,990
11,2
60
58
,280
17,6
97
25
,881
17,2
12
(5
,707
)
(1
4,62
1)
1,31
9
83
6
Com
mun
ity &
Rec
reat
ion
25,7
76
28
,604
202
90
Cor
pora
te S
ervi
ces
(1)
6,45
6
6,
905
6,73
0
25
,062
24,4
32
22
,930
(18,
606)
(1
7,52
7)
(16,
200)
70
183
Env
ironm
enta
l Ser
vice
s4,
120
4,04
8
3,
838
13,5
87
12
,949
44
25
Exe
cutiv
e O
ffice
(1)
162
1,
641
406
8,
709
10,2
09
9,
840
(8,5
47)
(8,5
68)
12,7
11
138 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 31
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 2(b). Council Functions / Activities - Component Descriptions
Details relating to the Council's functions / activities as reported in Note 2(a) are as follows:
EXECUTIVE OFFICE
CORPORATE SERVICES
ENVIRONMENTAL SERVICES
PROJECT DELIVERY
PROPERTY SERVICES
COMMUNITY & RECREATION
ENGINEERING SERVICES
Responsibilities include Leisure Centres, Beaches, Tennis Complexes, Golf Courses, Sporting Facilities andGrounds, Child Care Services, Libraries, Community Development, Cultural Planning & Events, HazelhurstRegional Gallery & Arts Centre, Sutherland Entertainment Centre and Tourism.
Responsibilities include General Managers office, Communications Unit, Strategic Planning Unit, CorporateDevelopment, Regulation and Enforcement, and the Internal Ombudsman.
Responsibilities include Corporate Governance, Corporate Support, Records & Archives, AdministrationServices, Customer Service Centre, Customer Call Centre, Personnel, Legal Services / Public Officer, Risk &Insurance Management, Occupational Health and Safety Administration, Information Systems and Services,Finance, Procurement and Land Information.
Responsibilities include Environmental Planning, Environmental Assessment and Application determination,Environmental Health, Certification Unit, Compliance Unit, Science and Policy.
Responsibilities include Commercial and Community Property, Property Management, Management of CronullaPlaza, Economic Development, Business Incubator, Lucas Heights Project and Building Asset Management,Maintenance and Construction, and Energy Sustainability.
Responsibilites include the planning and delivery of all Infrastructure related works.
Responsibilities include Civil Works maintenance and construction, Traffic Management, Consulting Services,Waste Services, Parks maintenance and construction, Building maintenance and construction, CleansingServices, Emergency Management, Fleet and Stores, and Mechanical Workshop.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 139
Financial Statements 2013
page 32
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 3. Income from Continuing Operations
$ '000
(a) Rates & Annual Charges
Ordinary RatesResidentialBusinessTotal Ordinary Rates
Special RatesCronulla Beach CBDTotal Special Rates
Annual Charges (pursuant to s.496, s.496A, s.496B, s.501 & s.611)Domestic Waste Management ServicesStormwater Management ServicesSection 611 ChargesTotal Annual Charges
TOTAL RATES & ANNUAL CHARGES
Council has used 2011 year valuations provided by the NSW Valuer General in calculating its rates.
Note (1) : Pensioner rebates granted under provisions of the Local GovernmentAct 1993 have been netted off against Residential Rates andDomestic Waste Charges as follows:
Residential RatesGross Residential RatesLess: Rebates under Section 575Less: Rebates under Section 582Net Residential Rates
Domestic Waste Management ChargesGross Domestic Waste ManagementLess: Rebates under Section 575 & 582Net Domestic Waste Management Charges
479
24,126 2,021
83
123,150
23,49677
99,175
21,381
89,808 (2,578)
499 479
(1,069)
Notes 2013 2012
86,161 13,014
Actual
86,116 12,887
Actual
499
99,003
86,161
22,432 (1,051)
2,038
(2,552) (1,057) 86,116
21,381
89,725
26,230
125,732
25,269 (1,142) 24,127
140 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 33
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 3. Income from Continuing Operations (continued)
$ '000
(b) User Charges & Fees
Specific User Charges (per s.502 - Specific "actual use" charges)
Waste Management Services (non-domestic)Total User Charges
Other User Charges & Fees(i) Fees & Charges - Statutory & Regulatory Functions (per s.608)
Building ControlLifetime RegistrationsRegulatory/ Statutory FeesTown PlanningOtherTotal Fees & Charges - Statutory/Regulatory
(ii) Fees & Charges - Other(incl. General User Charges (per s.608)
Administration and Inspection - HealthBeach ControlBuilding ControlBuilding CleaningBusiness UndertakingsChild CareCommunity CentresEngineering WorksFamily Day CareLibrariesOther Cultural ActivitiesOther Family and GardenParks and GardensPrivate WorksPublic HallsRestoration ChargesSport and RecreationSporting GroundsSwimming PoolsOtherTotal Fees & Charges - Other
TOTAL USER CHARGES & FEES
22,105
7,887 7,635
28,491
23,562
341 298 674 533
434 4,086
955
694
11
436 32
381
409 159 172 235 233
1,672 1,426 644 628
41 29
859 892 1,168
816
941 276
355 364
755
Actual
6,674
3,970
2,349 2,294
2012
101
Actual
843843
26,830
356
755
2013
23
356
417
76
487
992
43
1,030
6,839
55
Notes
-
1 -
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 141
Financial Statements 2013
page 34
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 3. Income from Continuing Operations (continued)
$ '000
(c) Interest & Investment Revenue (incl. losses)
Interest & Dividends - Interest on Overdue Rates & Annual Charges (incl. Special Purpose Rates)
- Interest earned on Investments (interest & coupon payment income)
Fair Value Adjustments - Fair Valuation movements in Investments (at FV or Held for Trading)
OtherTOTAL INTEREST & INVESTMENT REVENUE
Interest Revenue is attributable to:Unrestricted Investments/Financial Assets:Overdue Rates & Annual Charges (General Fund)
General Council Cash & InvestmentsRestricted Investments/Funds - External:Development Contributions - Section 94Domestic Waste Management operationsRestricted Investments/Funds - Internal:Internally Restricted AssetsTotal Interest & Investment Revenue Recognised
(d) Other Revenues
Fair Value Adjustments - Investment PropertiesRental Income - Investment PropertiesEx Gratia RatesFinesLegal Fees Recovery - Rates & Charges (Extra Charges)Legal Fees Recovery - OtherArtworksBus SheltersBusiness UndertakingsCompensationCronulla Beach CBD Festivals Casual LearningDiesel RebateFinancial Assistance ConsultancyInsurance Claim RecoveriesLease RentalsSales - GeneralSES ReimbursementSupplier Rebates
(continued on the next page)
3,883
34
319
141
435
2012Actual
2013
397 4,626
Actual
467
78
339
23
9
7,822
4,713
3,118
1,181
239
77
2,481
3,592
4,830
435
75
73 741 516
(1,085) 3,421
(2,395)
77
27
4,830
813 397
4,654
7,822374
172
1414
478
Notes
2,722
1,438
97
-
2,175
13
3,688
115
90
1,522
83
397
152 145
2,163
159 114
92 -
142 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 35
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 3. Income from Continuing Operations (continued)
$ '000
(d) Other Revenues (continued)
Recycling Disposal Fee RebateTipping of Bulk Fill at the RidgeBonus PoolArt Gallery MerchandisePublic LiabilityWorkers CompensationSponsorshipsArt ExhibitionsDisposal FeesGeographical InformationOtherTOTAL OTHER REVENUE
$ '000
(e) Grants
General Purpose (Untied)Financial Assistance - General ComponentFinancial Assistance - Local Roads ComponentPensioners' Rates Subsidies - General Component
Total General Purpose
Specific PurposeChild CareDredgingEngineering and WorksFamily Day CareLibrariesLibrary - per capitaOther InfrastructureParks and GardensRMS WorksStreet LightingTransport (Other Roads & Bridges Funding)Urban Stormwater DrainageWharves and SeawallsOtherTotal Specific PurposeTotal Grants
Grant Revenue is attributable to:- Commonwealth Funding- State Funding- Other Funding
4,780
4,964
453 -
1,223
210
9,789
-
232 -
920
-
5,933
1,002
270
1,223 1,640
983
4,780
11,069
(8)
5,933
1,835 1,349
4,780
37 3,565
5,933
4,023
120
-
481
-
- -
539
-
735
130
-
1,640
-
-
26
3,203
408
-
-
806 293
-
- 53
- - 246
-
-
351
4,344
-
8,064- 1,811
478 408
2,377 5,601
294 102
Capital
14,152 384
-
1,868 1,852
108 343
15,683
-
3,499
14,676
9,635 4,577
2012Actual Actual
Notes 2013
150 349
2012
33 94
150
107 510
-
-
-
5,894
77
-
125
170
Operating
- -
Capital
14,775 704
-
- 109
-
36
20122013
36 144
349
-
Operating 2013
25
14,676
1,303 6,612
-
15,683
112
-
-
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 143
Financial Statements 2013
page 36
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 3. Income from Continuing Operations (continued)
$ '000
(f) Contributions
Developer Contributions:(s93 & s94 - EP&A Act, s64 of the LGA):S 94 - Contributions towards amenities/servicesTotal Developer Contributions
Other Contributions:Australand (Sand Dune Rehabilitation)Land Dedications (other than by S94)
Other Councils - Joint Works/ServicesOther CulturalParks and GardensParkingRMS Contributions (Regional Roads, Block Grant)
Sporting GroundsUrban Roads - DedicationsWaste Board (Lucas Heights): Facility ConstructionOtherTotal Other ContributionsTotal Contributions
TOTAL GRANTS & CONTRIBUTIONS
$ '000
(g) Restrictions relating to Grants and Contributions
Certain grants & contributions are obtained by Council on conditionthat they be spent in a specified manner:
Unexpended at the Close of the Previous Reporting Periodadd: Grants & contributions recognised in the current period but not yet spent:less: Grants & contributions recognised in a previous reporting period now spent:
Net Increase (Decrease) in Restricted Assets during the Period
Unexpended and held as Restricted Assets
Comprising: - Specific Purpose Unexpended Grants - Developer Contributions - Other Contributions
2,842
- - 151
Capital
10
- -
16,729
3,655
38,839
158
5,649
-
-
136
1,004
38,317
54,010
48,077
106
673
30,879 5,154
30,339
931
Actual
-
(11,772)
39,543
41
220
2012
46,515220
12,248
-
20122013
3,510
(9,352)
Actual
Capital
1,562
- - 1,609
1,5621,819
1,226
10,578
39,543
7,468
2013
44,225 6
39,543
17 -
2013Operating
-
Operating
- 1,819
16,268
1,592376 401
1,046
-
2012
-
- 39
967
-
80 80
516
-
1,592 1,046
4,845
38,839
3,655
(704)
6 - - -
5 - - -
144 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 37
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 4. Expenses from Continuing Operations
$ '000
(a) Employee Benefits & On-Costs
Salaries and WagesTravellingEmployee Leave Entitlements (ELE)SuperannuationWorkers' Compensation InsuranceFringe Benefit Tax (FBT)Training Costs (other than Salaries & Wages)
Total Employee Costsless: Capitalised CostsTOTAL EMPLOYEE COSTS EXPENSED
Number of "Equivalent Full Time" Employees at year end
(b) Borrowing Costs
(i) Interest Bearing Liability CostsInterest on LoansCharges relating to Finance LeasesTotal Interest Bearing Liability Costs Expensed
(ii) Other Borrowing CostsNil
TOTAL BORROWING COSTS EXPENSED
16,879
2012Actual
95,815
1,090
(2,367)
1,121
68
36
1,669
96,902
60
8,450
595
(2,547) 94,535
1,557
93,268
1,061
68,210
1,121
112 1,669
2013
71,371 69
8,594
131 (455)
16,676
Notes
516
Actual
1,108
1,577
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 145
Financial Statements 2013
page 38
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 4. Expenses from Continuing Operations (continued)
$ '000
(c) Materials & Contracts
Raw Materials & ConsumablesContractor & Consultancy CostsAuditors Remuneration (1)
Legal Expenses: - Legal Expenses: Planning & Development - Legal Expenses: Debt Recovery - Legal Expenses: OtherOperating Leases: - Operating Lease Rentals: Minimum Lease Payments (2)
Total Materials & Contractsless: Capitalised CostsTOTAL MATERIALS & CONTRACTS
1. Auditor Remuneration During the year, the following fees were incurred for services provided by the Council's Auditor (& the Auditors of other Consolidated Entities):
(i) Audit and Other Assurance Services - Audit & review of financial statements: Council's AuditorRemuneration for audit and other assurance services
(iii) Other Services - Strategic ReviewRemuneration for other services
Total Auditor Remuneration
2. Operating Lease Payments are attributable to:ComputersMotor Vehicles, Plant and EquipmentOther
-
10,268
363
32
-
414
274
3,655 156
64 261
3,843
17,695
Notes
378
9,426
2013Actual Actual
3,913
19,709
34,179
-
102
34,179
1,052
-
274
104104
34,158
34,158
11
4,287
4,287
378
3,843
102
102
777
2012
61
102
146 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 39
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 4. Expenses from Continuing Operations (continued)
$ '000
(d) Depreciation, Amortisation & Impairment
Plant and EquipmentOffice EquipmentFurniture & FittingsProperty, Plant & Equipment - LeasedLand Improvements (depreciable)Buildings - Non SpecialisedBuildings - SpecialisedInfrastructure: - Roads, Bridges & Footpaths - Stormwater DrainageOther Assets - Library BooksTotal Depreciation & Impairment Costsless: Capitalised CostsTOTAL DEPRECIATION &IMPAIRMENT COSTS EXPENSED
96
8,149
24,033
896 24,258
846
(225)
2,586
4,467
538
26,366
1,428
877
102
Actual
2,524
6,007
8,481
2012
(184)
2013
1,153 4,129
1,460
Actual
1,573
26,182
Impairment Costs Actual Actual
-
-
- -
- -
-
--
--
- -
Notes
- -
-
-
- -
2013
-
-
-
2012
-
-
-
536
4,248 528
Depreciation/Amortisation
-
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 147
Financial Statements 2013
page 40
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 4. Expenses from Continuing Operations (continued)
$ '000
(e) Other Expenses
Other Expenses for the year include the following:
AdvertisingArtist Fees - HazelhurstBank ChargesBuilding MaintenanceCompanion Animals PaymentsComputer OperationsContributions to TourismContributions/Levies to Other Levels of Government - Department of Planning - Dust Disease Board - NSW State Emergency Services - NSW Fire and Rescue - NSW Rural Fire Service - WorkcoverCouncillor Expenses - Mayoral FeeCouncillor Expenses - Councillors' FeesElection ExpensesDonations, Contributions & Assistance to other organisations (Section 356)
Utilities - Electricity - Gas - WaterEntertainment Hire / ServicesFamily Day Care PaymentsHire of Plant, Vehicles & EquipmentInsuranceOffice Expenses (including computer expenses)PostagePrinting & StationeryRepairs to EquipmentState Debt Recovery Office PaymentsStreet LightingSubscriptions and PublicationsTelephone and CommunicationsTipping FeesValuation Fees - Land and Property ManagementOtherTOTAL OTHER EXPENSES
365
123 337
52
4,025 500
55
2,881 242
2,457
696 729
24
319 255
52 332
137
413
26
324
93
351
107 454
378
573
1 2,157
1,725
465 117
43 437
Actual 2012
151
690 916
2013
128
378
123
863
311
439
13,633
839
66
11,993 313
47 41
356
424 423
2,551
533
517
40,461
614
36,624
2,761
2,853
694 1,227
2,139
437
Actual
-
298
4,515 567
57
Notes
1,971 1,972
148 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 41
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 5. Gains or Losses from the Disposal of Assets
$ '000
Property (excl. Investment Property)Proceeds from Disposal - Propertyless: Carrying Amount of Property Assets Sold / Written OffNet Gain/(Loss) on Disposal
Plant & EquipmentProceeds from Disposal - Plant & Equipmentless: Carrying Amount of P&E Assets Sold / Written OffNet Gain/(Loss) on Disposal
Financial Assets*Proceeds from Disposal / Redemptions / Maturities - Financial Assetsless: Carrying Amount of Financial Assets Sold / Redeemed / MaturedNet Gain/(Loss) on Disposal
NET GAIN/(LOSS) ON DISPOSAL OF ASSETS
(56)
(2,430)
Actual
(56)
(146,200) 146,200
- -
(1,034)
-
1,452
(978)(507)
2012
(72)
(983)
(72)
(100,320)
Actual
476
2013
(579)
100,320
-
Notes
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 149
Financial Statements 2013
page 42
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 6a. - Cash Assets and Note 6b. - Investments
$ '000
Cash & Cash Equivalents (Note 6a)Cash on Hand and at BankCash-Equivalent Assets1
- Deposits at CallTotal Cash & Cash Equivalents
Investments (Note 6b)- Long Term Deposits- Equity Linked Notes- NCD's, FRN's (with Maturities > 3 months)
- CDO's- Other Long Term Financial Assets
Total InvestmentsTOTAL CASH ASSETS, CASHEQUIVALENTS & INVESTMENTS
1 Those Investments where time to maturity (from date of purchase) is < 3 mths.
Cash, Cash Equivalents & Investments wereclassified at year end in accordance withAASB 139 as follows:
Cash & Cash Equivalentsa. "At Fair Value through the Profit & Loss"
Investmentsa. "At Fair Value through the Profit & Loss"- "Held for Trading"- "Designated at Fair Value on Initial Recognition"b. "Held to Maturity"c. "Loans & Receivables"d. "Available for Sale"Investments
10,368
-
45,20741,471
-
9,368
-
9,368
Non Current
10,368
-
-
-
Actual
19,750
-
-
9,368
-
-
24,791
6(b-ii)
-
-
14,368
6(b-iii)
4,786
6(b-i)
14,368 -
-
3,000
- -
18,269
21,269
-
- 14,368
1,810 7,953
3,000
45,207
66,476 14,368
- 14,368
-
-
3,720
-
3,736
- 1,698
6(b-i)
6(b-iv)21,269
-
Actual 2012
-
-
54,991
30,200
-
23,317
31,200
-
55,991
3,567
23,317
79,308
-
-
3,576
2013
Non Current
8,096 11,421
2012
Current Notes
2013Actual
Current Actual
150 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 43
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 6b. Investments (continued)
$ '000
Note 6(b-i)Reconciliation of Investments classified as"At Fair Value through the Profit & Loss"Balance at the Beginning of the YearRevaluations (through the Income Statement)AdditionsDisposals (sales & redemptions)Balance at End of Year
Comprising:- NCD's, FRN's (with Maturities > 3 months)- CDO's- Listed Equity Securities- Unlisted Equity Securities- Other Long Term Financial Assets
Total
Note 6(b-ii)Reconciliation of Investmentsclassified as "Held to Maturity"Balance at the Beginning of the YearAdditionsDisposals (sales & redemptions)Balance at End of Year
Comprising:- Other Long Term Financial Assets
Total
Note 6(b-iii)Reconciliation of Investmentsclassified as "Loans & Receivables"Nil
Note 6(b-iv)Reconciliation of Investmentsclassified as "Available for Sale"Nil
-
-
-
-
-
-
- - -
10,368
2012
- 18,269
-
- -
7,000 3,368
10,368
58,120
3,00014,368
- 107,900
3,577 11,421
-
30,200 30,200
Actual
30,200
Non Current
- -
- 10,368
4,000 41,000
(85,320)
14,368
24,791
(118,700)
8,096
24,791
1,697 -
30,200 10,368
3,000
4,786 -
18,269(15,000)
8,000
6,770
-
-
-
2013
-
-
2013
Current Actual Actual
Non Current
3,000
478 24,791
2,993
3,720
14,368
-
41,569
Actual
2,722
(27,500) 8,000
2012
Current
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 151
Financial Statements 2013
page 44
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 6c. Restricted Cash, Cash Equivalents & Investments - Details
$ '000
Total Cash, Cash Equivalentsand Investments
attributable to:External Restrictions (refer below)
Internal Restrictions (refer below)
Unrestricted
$ '000
Details of Restrictions
External Restrictions - Included in LiabilitiesNil
External Restrictions - OtherDeveloper Contributions - General (D)Specific Purpose Unexpended Grants (F)Domestic Waste Management (G)Stormwater Management (G)External Restrictions - OtherTotal External Restrictions
D Development contributions which are not yet expended for the provision of services and amenities in accordancewith contributions plans (refer Note 17).
F Grants which are not yet expended for the purposes for which the grants were obtained. (refer Note 1) G Water, Sewerage, Domestic Waste Management (DWM) & other Special Rates/Levies/Charges are externally
restricted assets and must be applied for the purposes for which they were raised.
External Restrictions arise pursuant to section 409(3) of the Local Government Act, the Local Government (FinancialManagement) Regulation 1999 and other applicable legislation. Further information relating to Developer Contributionsis provided in Note 17 and Unexpended Grants in Note 3. Amounts raised by special rates (eg. Water & Sewer) or forDomestic Waste Management may only be used for those purposes.
3,655
Actual Current
14,3687,558
34,364
2013 Closing Transfers from
9,368 28,254
79,308
-
2013 2012Actual
14,368
Opening
35,540
Non Current
79,308
Transfers to
9,368
Current
-
Balance
9,368-
Non Current
2012
Restrictions
(12,210)35,540
-
37,386 10,364
3,400 3,510
2,682
30,879
-
66,476
66,476
4,936
Balance
1,890
Restrictions
14,368
2013Actual
37,386
Actual
30,339 (3,255) (5,476)
747 799
(1,143) (2,336)
35,540
2,028 37,386 (12,210) 10,364 1,107
152 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 45
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 6c. Restricted Cash, Cash Equivalents & Investments - Details (continued)
$ '000
Internal RestrictionsFleet and Plant (UU)Employees Leave Entitlement (L)Building Damage Deposits (M)Business Accelerator IT & Furniture (EE)Certification Unit (V)Long Day Care Operations( R)Anzac Youth & Recreation Centre Fund (O)Elections (N)Energy Audit Upgrade (CC)Family Day Care (S)Future Works Reserve (GG)Hazelhurst Gallery Cafe Equipment (DD)Hazelhurst Gallery Upgrade (JJ)Infrastructure Levy Works (MM)Kareela Oval Upgrade Works (PP)Kindergarten Upgrades (AA)Land Acquisitions / Easements (W)Leisure Facilities (NN)Loan Funds Not Utilised (LL)Long Day Care Maternity Leave (FF)Office Automation (P)Property Development (Q)Property Internal Funding Restrictions (LL)RFS Building Construction (OO)Works in Progress/Unspent All. (Z)Community Facilities Fund (QQ)Sutherland Entertainment Centre Redevelopment (RR)Before and After School CareCronulla Plaza Refurbishment (SS)Cronulla Watewater Reuse Scheme (TT)Parks Capital (VV)Tennis Facilities (WW)Total Internal Restrictions
TOTAL RESTRICTIONS
See on the page following for descriptions of internal restrictions (as identified above).
Internal Restrictions arise pursuant to resolutions of Council to set aside reserves of cash resources either relatingto liabilities recognised in these reports or to fund future expenditure for the stated purpose. Such reserves are notpermitted to exceed the amounts of cash assets and cash investments not otherwise restricted.
662
1,348 (154)
88 (489)
Balance
(16,786) 9,317
-
- 65
234 (13) -
45 (15) 123 -
9,707 (2,951)
2,651 2,624
662
763 (866)
77 (3)
138 - -
57
3,177
-
6,476 6,177
-
-
- 166
507 976
1,760 (140)
(43,372)
(33)
42,622
100
943
270
123 100 - 100
- 30 - 30 -
29
-
200
417
6
6,352 338
Closing Restrictions
338 -
-
205
-
5,480 3,472 (6,895)
166
78,162 (55,582)
2013Balance
Transfers to
161
-
1,629
7,029
1,349
293
2,243
577
43,732123
9,357 79 3
247 (75)
81,118
1,519
60
401
-
- -
80
100
2,927
42,262
29
52,626
Opening
6,165
507
66
-
Restrictions
- 153
-
(9,476) 235
2,057
235 -
-
9
(2,967) 94
562
-
-
138
Transfers from
- 200
5,629
-
(266)
15
75 417
-
-
(2,243)
381
16,973
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 153
Financial Statements 2013
page 46
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 6c. Restricted Cash, Cash Equivalents & Investments - Details (continued)
$ '000
D Development contributions which are not yet expended for the provision of services and amenities in accordance with
contributions plans (refer Note 17).
E RTA Contributions which are not yet expended for the provision of services and amenities in accordance with those contributions.
F Grants which are not yet expended for the purposes for which the grants were obtained. (refer Note 1)
G Water, Sewerage, Domestic Waste Management (DWM) & other Special Rates/Levies/Charges are externally restricted assets
and must be applied for the purposes for which they were raised.
H Agreement between NSW Waste Recycling and Council, where the former pays Council quarterly contributions to be used solely
for sporting & recreational development facilities on the old tip site.
I Agreement between NSW Waste Recycling and Council, where the former pays Council for excess tonnage above agreed
amount (applied same as above).
J Agreement in place with loan provider that Council is to set aside funds annually until maturity of loan when principal is due in full.
K Loan funds received on 29/06/07 from the CBA to fund the Cronulla Community Centre project.
Funds are borrowed on semi-annual interest payable only with full principal to be repaid within two to three years.
L Council policy to maintain in reserve at least 10% of ELE liability for a future “buffer”.
M Reserve reoresents the accummulated bonds, deposits and retentions held by Council in relation to private building works,
contract retention to cover possible rectification works, miscellaneous bonds for activities such as hall hire.
N An amount is set aside each year for 4 years to raise sufficient funds for the quadrennial Council elections.
O Funds are set aside for Anzac Youth & Recreation Centre to assist in future upgrades & maintenance of community halls.
P Funds from IT operations & IT projects uncompleted are set aside to meet future technology upgrades.
Q Council policy to account for the property development fund separately in accordance with the property business plan.
R Conditions tied to grant funding commits any surplus to be reserved to meet future centre upgrades, improvements or major
maintenance.
S Conditions tied to grant funding commits any surplus to be reserved to meet future centre upgrades, improvements or major
maintenance.
T Conditions tied to grant funding commits any surplus to be reserved to meet future centre upgrades, improvements or major
maintenance.
U Funds from insurance proceeds as a result of a fire and risk budget set aside for future youth centre facilities at Engadine.
V Enterprise agreement condition where the nett surplus of the Certification Unit is retained as a reserve for staff bonus
distribution or future business needs.
W Balance reserved for funding recreation space land acquisitions and unidentified drainage easements when required.
X Funds from past operational savings set aside to assist funding a new or upgraded telecommunications system.
Y Represents net funds from sale of old Cronulla Library site in Surf Rd which are to be used to partially repay the Cronulla Community
Facilities financing loan.
Z The General Revenue funded portion of works in progress & unspent allocations is reserved each year & released in the next
year for continuation of works.
AA Council decision to reserve the insurance proceeds from Talara Rd Scout Hall fire to assist in funding 3 kindergarten upgrades
across the shire.
BB An initial $6 million was reserved for environmental projects, with the capital being preserved and any income earned to fund
environmental projects.
CC Funds for the purpose of undertaking energy audit upgrades to reduce energy consumption across the organisation.
DD Half the operating surplus from Hazelhurst Gallery Cafe is reserved each year to assist in funding ongoing equipment replacement.
EE A proportion of the rent paid by SSHED tennants is taken to reserve to assist with the future IT upgrades & furniture at the facility.
(continued on the next page)
2013
154 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 47
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 6c. Restricted Cash, Cash Equivalents & Investments - Details (continued)
$ '000
The Long Day Care budgets are framed to allow for probable excessive maternity leave occurrences and this amount is set
aside for future impacts.
The surplus funds from the 2009/10 financial year are reserved to assist in meeting future budget shortfalls or specific project
funding.
The surplus funds from the 2009/10 financial year are reserved for future developments at Kareela Golf Course.
This reserve represents the balance of internal funding for projects from the Property Fund that have not been fully utilised.
funds by the finance provider.
Balance of Infrastructure levies being unspent allocations carried forward.
Council decision to set aside any surplus to budget for the Leisure Centre for future capital works/renewals to be financed from
funds derived from the facilities.
Reserve created from savings in the construction of Rural Fire Service buildings for future building works.
Reserve created from unspent funds set aside for oval drainage & irrigation works at Kareela Oval to commence in September 2012.
Funds are set aside from community management committees to assist in future upgrades & maintenance of community halls.
Reseve established from unexpended funds for the upgrade of the Sutherland Entertainment Centre.
Reserve established for the ongoing minor upgrades at Cronulla Plaza until a major upgrade is undertaken.
Reserve established for future capital works and replacements in relation to the Cronulla Wastewater Reuse Scheme.
Reserve estabished for future plant and vehicle replacements across all Council activities, along with provisions for future
mechanical workshop upgrades.
Reserve established from unspent allocations for specific parks capital works that can only be undertaken under specific
circumstances or at a particular time.
WW Reserve established for future upgrade works at Tennis facilities upon the determination of the future use and management of the
Tennis Facilities.
VV
UUTTSSRRQQPPOO
NNMM
KKHH
GG
FF
2013
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 155
Financial Statements 2013
page 48
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 7. Receivables
$ '000
PurposeRates & Annual ChargesInterest & Extra ChargesAccrued Revenues - Interest on InvestmentsGovernment Grants & SubsidiesDeferred DebtorsNet GST ReceivableSection 611 (AGL/Telstra/Optus)Sundry DebtorsThe RidgeOther DebtorsTotal
less: Provision for ImpairmentRates & Annual ChargesOther DebtorsTotal Provision for Impairment - Receivables
TOTAL NET RECEIVABLES
Externally Restricted ReceivablesDomestic Waste Management - Cronulla Plaza Special RateTotal External RestrictionsInternally Restricted ReceivablesNilUnrestricted ReceivablesTOTAL NET RECEIVABLES
Notes on Debtors above:(i) Rates & Annual Charges Outstanding are secured against the property.
(ii) Doubtful Rates Debtors are provided for where the value of the property is less than the debt outstanding. An allowance for other doubtful debts is made when there is objective evidence that a receivable is impaired.
(iii) Interest was charged on overdue rates & charges at 9.00% (2012 9.00%). Interest on Deferred Rates is 7.0%Generally all other receivables are non interest bearing.
(iv) Please refer to Note 15 for issues concerning Credit Risk and Fair Value disclosures.
1,001 723
5,724
Current Non Current 2012
13,632
12,582
801
(175)
82
1,750
4,900
2013Notes
815 1,001
18
12,582
(875) -
1,046
3,847
18
40
- 4,335
41
Non Current
1,042
-
-
3,8473,847
1,98896 -
12,903
1,032
1,988
-
- -
- 5,635 - - 37 -
2,819 - 946
27
(1,050) -
-
- 3,847
(225)
13,949
(1,113) -
1,988
- -
-
865
-
- 988
13,949
14 -
1,007
922
-
Current
- 19 -
-
11,575
(888)
1,988
-
15,062
891
156 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 49
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 8. Inventories & Other Assets
$ '000
InventoriesReal Estate for resale (refer below)
Stores & MaterialsTrading StockTotal Inventories
Other AssetsPrepaymentsTotal Other Assets
TOTAL INVENTORIES / OTHER ASSETS
Externally Restricted Assets
Domestic Waste ManagementPrepaymentsTotal Domestic Waste Management
OtherNil
Total Externally Restricted AssetsTotal Internally Restricted AssetsTotal Unrestricted AssetsTOTAL INVENTORIES & OTHER ASSETS
- 129 129
- 129 - -
-
-
1,420
6,258
Current
-
6,2586,129
-
-
2012Non Current
164 175
- -
-
145
1,420
-
Non Current
-
Notes
4,838
4,532 161
-
2013
-
-
6,926
5,269
1,657 -
Current
8484
84
6,842
-
-
6,926
-
-
-
-
-
1,657
-
- 4,930
-
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 157
Financial Statements 2013
page 50
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 8. Inventories & Other Assets (continued)
$ '000
(i) Other Disclosures
(a) Details for Real Estate DevelopmentResidentialIndustrial/CommercialOther PropertiesTotal Real Estate for Resale(Valued at the lower of cost and net realisable value)
Represented by:Acquisition CostsDevelopment CostsOther Properties - Book ValueTotal CostsTotal Real Estate for Resale
Movements:Real Estate assets at beginning of the year - Purchases and other costsTotal Real Estate for Resale
(b) Current Assets not anticipated to be settled within the next 12 monthsThe following Inventories & Other Assets, even though classifiedas current are not expected to be recovered in the next 12 months;
Real Estate for Resale
(398) 4,936
4,930
2013Non Current
-
- - 4,930
4,532
423
4,532 -
-
-
- 160 -
4,532 4,930
159
-
4,532
2013
4,930
2012
3,772 601
-
Current
4,532 -
-
3,949
4,532
-
-4,930
- 559
- -
559 3,764
-
3,957
Current
- -
-- (6)
-4,930
4,930
-
414
Non Current
607
2012
158 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Suth
erla
nd S
hire
Cou
ncil
Not
es to
the
Fina
ncia
l Sta
tem
ents
for t
he fi
nanc
ial y
ear e
nded
30
June
201
3
Not
e 9a
. Inf
rast
ruct
ure,
Pro
perty
, Pla
nt &
Equ
ipm
ent
At
At
Car
ryin
gA
tA
tC
arry
ing
$ '0
00C
ost
Fair
Valu
eD
ep'n
Impa
irmen
tVa
lue
Cos
tFa
ir Va
lue
Dep
'nIm
pairm
ent
Valu
e
Cap
ital W
ork
in P
rogr
ess
472
-
-
-
47
2
303
-
-
(3
42)
-
43
3
-
-
-
433
P
lant
& E
quip
men
t-
30
,778
17,8
66
-
12
,912
1,49
7
(9
34)
(1
,428
)
-
-
-
30
,836
18,7
89
-
12
,047
Offi
ce E
quip
men
t-
3,
753
2,86
3
-
89
0
116
-
(1
02)
-
-
-
3,
869
2,96
5
-
90
4
Fur
nitu
re &
Fitt
ings
-
10,3
59
7,
336
-
3,02
3
33
6
(49)
(536
)
-
-
-
10,6
44
7,
870
-
2,77
4
P
lant
& E
quip
men
t (un
der F
inan
ce L
ease
)-
2,
484
1,11
0
-
1,
374
67
-
(5
28)
-
-
-
2,
045
1,13
2
-
91
3
Lan
d:
- O
pera
tiona
l Lan
d-
10
2,05
6
-
-
102,
056
-
-
-
1,
055
9,52
8
-
11
2,63
9
-
-
112,
639
- C
omm
unity
Lan
d-
19
3,57
8
-
-
193,
578
1,
667
-
-
(655
)
-
-
194,
590
-
-
19
4,59
0
-
Land
und
er R
oads
(pre
1/7
/08)
-
-
-
-
-
-
-
-
-
-
-
57,9
38
-
-
57
,938
-
Land
und
er R
oads
(pos
t 30/
6/08
)-
57
,938
-
-
57,9
38
-
-
-
-
-
-
9,
594
-
-
9,59
4
L
and
Impr
ovem
ents
- no
n de
prec
iabl
e-
7,
948
-
-
7,94
8
1,
646
-
-
-
-
-
-
-
-
-
Lan
d Im
prov
emen
ts -
depr
ecia
ble
-
156,
259
79
,584
-
76,6
75
9,
549
-
(4,2
48)
342
-
-
16
6,14
9
83,8
31
-
82
,318
Bui
ldin
gs -
Non
Spe
cial
ised
-
77,2
03
31
,615
-
45,5
88
66
-
(1,5
73)
-
-
-
77,2
70
33
,189
-
44,0
81
B
uild
ings
- S
peci
alis
ed-
31
0,22
8
124,
917
-
18
5,31
1
2,45
4
(7
2)
(6
,007
)
-
-
-
31
2,54
7
130,
861
-
18
1,68
6
Infr
astr
uctu
re:
-
Roa
ds, B
ridge
s, F
ootp
aths
-
453,
015
14
2,11
3
-
310,
902
19
,945
-
(8,4
81)
-
-
-
472,
960
15
0,59
4
-
322,
366
- B
ulk
Ear
thw
orks
(non
-dep
reci
able
)-
5,
950
-
-
5,95
0
49
7
-
-
-
-
-
6,44
6
-
-
6,
446
-
Sto
rmw
ater
Dra
inag
e-
22
3,06
5
78,6
18
-
14
4,44
7
3,01
4
-
(2
,586
)
-
21
4,06
3
-
565,
333
20
6,39
5
-
358,
938
O
ther
Ass
ets:
-
Her
itage
Col
lect
ions
-
256
-
-
25
6
13
-
-
-
-
-
27
0
-
-
270
- Li
brar
y B
ooks
-
5,75
6
3,
548
-
2,20
8
90
6
-
(877
)
-
-
-
6,66
1
4,
425
-
2,23
6
- O
ther
-
382
81
-
301
-
-
-
-
-
-
38
2
81
-
30
1
TOTA
L IN
FRA
STR
UC
TUR
E,
PR
OP
ER
TY, P
LAN
T &
EQ
UIP
.
Addi
tions
to D
epre
ciab
le L
and
Impr
ovem
ents
, Bui
ldin
gs, O
ther
Stru
ctur
es &
Infra
stru
ctur
e As
sets
are
mad
e up
of A
sset
Ren
ewal
s ($
30,5
84,4
85.4
6) a
nd N
ew A
sset
s ($
11,4
91,8
87.9
2).
Ren
ewal
s ar
e de
fined
as
the
repl
acem
ent o
f exi
stin
g as
sets
(as
oppo
sed
to th
e ac
quis
ition
of n
ew a
sset
s).
page 51
Financial Statements 2013
as a
t 30/
6/20
12A
sset
Mov
emen
ts d
urin
g th
e R
epor
ting
Perio
das
at 3
0/6/
2013
Asse
t Ad
ditio
ns
WD
Vof
Ass
et
Dis
posa
ls
Dep
reci
atio
n Ex
pens
e
Rev
alua
tion
Incr
emen
tsto
Equ
ity
(AR
R)
Acc
umul
ated
Acc
umul
ated
472
1,64
1,00
848
9,65
1-
1,15
1,82
9
Adju
stm
ents
& Tr
ansf
ers
223,
591
42,0
76(1
,055
)(2
6,36
6)40
043
32,
030,
173
640,
132
-1,
390,
474
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 159
Financial Statements 2013
page 52
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 9b. Externally Restricted Infrastructure, Property, Plant & Equipment
Note 9c. Infrastructure, Property, Plant & Equipment - Current Year Impairments
Council has recognised no impairment losses during the reporting period nor reversed any prior period losses.
9 Furniture & Fittings - 22 15 7 -
6,744
Actual
71,076
- -
1,0605,654
13 22
-
6,744 5,668825 1,076
Actual2012
A/Dep & Carrying ValueCost
Actual
At A/Dep &At2013
CostAt
Impairm'tFair ValueAtCarrying
ValueImpairm'tFair Value
6,714 811
8258
5,909 1
6,704
-
- -
$ '000
Class of Asset
Domestic Waste Management
Other Assets6,734
Plant & Equipment
Total DWM
- 5,893
1 8 5,668
7
-5,909TOTAL RESTRICTED I,PP&E
Actual
6,734
160 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 53
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 10a. Payables, Borrowings & Provisions
$ '000
PayablesGoods & ServicesPayments Received In AdvanceSecurity Bonds, Deposits & Retentions (<12 months)
Security Bonds, Deposits & Retentions (>12 months)
OtherTotal Payables
BorrowingsBank OverdraftLoans - Secured 1
Finance Lease LiabilitiesTotal Borrowings
ProvisionsEmployee Benefits;Annual LeaveSick LeaveLong Service LeaveGratuitiesSub Total - Aggregate Employee BenefitsSelf Insurance - Workers CompensationSelf Insurance - Public LiabilityAsset Remediation/Restoration (Future Works)Other - Motor VehiclesOther - AuditTotal Provisions
Total Payables, Borrowings & Provisions
(i) Liabilities relating to Restricted Assets
Externally Restricted AssetsDomestic Waste ManagementLiabilities relating to externally restricted assets
Internally Restricted AssetsNil
Total Liabilities relating to restricted assetsTotal Liabilities relating to Unrestricted AssetsTOTAL PAYABLES, BORROWINGS & PROVISIONS
1. Loans are secured over the General Rating Income of Council Disclosures on Liability Interest Rate Risk Exposures, Fair Value Disclosures & Security can be found in Note 15.
4,064 -
3,252 - -
-
9,395
16,915
22,465 21,108
1,935
1,935
61,891 59,956
-
35,650
Current
223
52 61
1,935
3,980
61
1,192
4,053
- -
2,580
502
Non Current
21,108
183
Current 2013
903
-
-
4,755
22,465
378
-
22,465
Non Current
-
5,550
824
6,735
159
- 8,298
-
-
1,980 - -
16,091
2012
-
2,844
2012
61,891
21,108
36,849
334
Non Current
6,437 714 -
35,581
58,795
2013
-
992
485
-
34,355
- - 1,773
Current
-
54 -
60,568
1,773
-
-
15,868
2,344 1,192
Non Current Current
-
Notes
18,097
6,061 -
391
-
4,128
-
-
16,353
1,000
1,773
264
60,568
-
6,945
3,254 19,477 992
9,509
-
890
2,231
820
26
7,399
20,543
2,426
17,588
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 161
Financial Statements 2013
page 54
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 10a. Payables, Borrowings & Provisions (continued)
$ '000
(ii) Current Liabilities not anticipated to be settled within the next 12 months
The following Liabilities, even though classified as current, are not expectedto be settled in the next 12 months.
Provisions - Employees BenefitsPayables - Security Bonds, Deposits & Retentions
Note 10b. Description of and movements in Provisions
Asset Remediation
a. Employees Leave Entitlements & On-Costs represents those benefits accrued and payable and an estimate of thosethat will become payable in the future as a result of past service.
b. Self Insurance Provisions represent both (i) Claims Incurred but Not reported and (ii) Claims Reported & Estimatedas a result of Council's being a self insurer up to certain levels of Excess.
c. Asset Remediation, Reinstatement & Restoration Provisions represent the Present Value estimate of future costs Council will incur in order to remove, restore & remediate assets &/or activities as a result of past operations (Note 26)
TOTAL 41,13151 Other
(2,540)
-
113 (49)
24,709
-
41,603
2013
-
915
(18,448)
5,471 - - -
Annual Leave
1,000
23,799
Asset RemediationSelf Insurance
(2,952)
2,231
(10,825)
Long Service Leave 20,669 Gratuities
Sick Leave 2,954
Additional ProvisionsClass of Provision Decrease due to
Payments
OpeningBalance
as at 1/7/12
113 2,948
22,729
9,395 3,252
10,939
1,000
(2,082) -
2012
2,344
2012
-
-
ClosingBalance
as at 30/6/13
9,509
115
1,980
3,254
-
- - -
-
Remeasurement effects due to
Discounting
Actual Actual
4,064
2013
18,920
3,846
-
-
Unused amounts reversed
-
-
27,863
21,535
-
162 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 55
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 11. Statement of Cash Flows - Additional Information
$ '000
(a) Reconciliation of Cash AssetsTotal Cash & Cash Equivalent AssetsLess Bank OverdraftBALANCE as per the STATEMENT of CASH FLOWS
(b) Reconciliation of Net Operating Result to Cash provided from Operating Activities
Net Operating Result from Income StatementAdjust for non cash items:Depreciation & AmortisationNet Losses/(Gains) on Disposal of AssetsNon Cash Capital Grants and ContributionsLosses/(Gains) recognised on Fair Value Re-measurements through the P&L: - Investments classified as "At Fair Value" or "Held for Trading" - Investment PropertiesCapitalised Plant Hire / Internal Charges
+/- Movement in Operating Assets and Liabilities & Other Cash Items:Decrease/(Increase) in ReceivablesIncrease/(Decrease) in Provision for Doubtful DebtsDecrease/(Increase) in InventoriesDecrease/(Increase) in Other AssetsIncrease/(Decrease) in PayablesIncrease/(Decrease) in Other LiabilitiesIncrease/(Decrease) in Employee Leave EntitlementsIncrease/(Decrease) in Other ProvisionsNET CASH PROVIDED FROM/(USED IN)OPERATING ACTIVITIES from the STATEMENT of CASH FLOWS
30
10
291
431
1,095
30,539
1,085 (431)
Actual
970
(2,722)
41,079
2012Actual
(45,230)
(63)
(344)
26,182
236
579
4,685
(429)
(478)
(4,451)
410
(4,128)
Notes
64
31,035
(777)
913
24,033
(2,484)
23,317 (4,053)
1,034
45,207 6a
-
52,509
2,395
2013
(38)
2,079
19,264
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 163
Financial Statements 2013
page 56
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 11. Statement of Cash Flows - Additional Information (continued)
$ '000
(c) Non-Cash Investing & Financing Activities
Acquisition of Plant & Equipment by means of Finance LeaseRoads DedicationsLand Dedications (Other than S94)Total Non-Cash Investing & Financing Activities
(d) Financing Arrangements
(i) Unrestricted access was available at balance date to the following lines of credit:
Bank Overdraft Facilities (1)
Credit Cards / Purchase CardsTotal Financing Arrangements
1. The Bank overdraft facility may be drawn at any time and may be terminated by the bank without notice. Interest rates on overdrafts are Interest Rates on Loans & Other Payables are disclosed in Note 15.
(ii) Secured Loan Liabilities
Loans are secured by a mortgage over future years Rate Revenue only.
Note 12. Commitments for Expenditure
(a) Capital Commitments (exclusive of GST)
Capital expenditure committed for at the reporting date but notrecognised in the financial statements as liabilities:
Property, Plant & EquipmentBuildingsPlant & EquipmentOther - incl. Works/Construction of Public Amenities
Total Commitments
These expenditures are payable as follows:Within the next yearTotal Payable
Sources for Funding of Capital Commitments:Unrestricted General FundsTotal Sources of Funding
1,609
2013
800
8,738
8,738 9,067
750 50
44,225
Actual Notes
869
Actual
Actual
67 2,842
4,518
71
9,0678,738
1,005
105
46,099
2012
9,067
8,738 9,067
6,699
2,297
Actual
1,936
6,543
855
259
8,7389,067
750
164 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 57
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 12. Commitments for Expenditure (continued)
$ '000
(b) Finance Lease Commitments
(i) Commitments under Finance Leases at the Reporting Date are payable as follows:
Within the next yearLater than one year and not later than 5 yearsTotal Minimum Lease Paymentsless: Future Finance ChargesAmount Recognised as a Liability
(ii) Finance Lease Liability Recognised represent;
Current LiabilitiesNon-Current LiabilitiesTotal Finance Lease Liabilities Disclosed
(i) General Details
Council Leases the following Property, Plant & Equipment underFinance Leases:
PurchaseComputers - Carrying ValueComputers - Carrying ValueOther Equipment/AssetsOther Equipment/AssetsTotal Carrying Value at Year End
(c) Operating Lease Commitments (Non Cancellable)
a. Commitments under Non Cancellable Operating Leases at the Reporting date, but not recognised as Liabilities are payable:
Within the next yearLater than one year and not later than 5 yearsLater than 5 yearsTotal Non Cancellable Operating Lease Commitments
b. Non Cancellable Operating Leases include the following assets:Garbage Compactors, Tractors, Road Sweepers, Leisure Centre Equipment & other Plant & Equipment.Contingent Rentals may be payable depending on the condition of items or usage during the lease term.
Conditions relating to Finance & Operating Leases:- All Finance & Operating Lease Agreements are secured only against the Leased Asset.- No Lease Agreements impose any financial restrictions on Council regarding future debt etc.
Yes
(57)
Yes
6,196
141
Contingent
1,438
4,048
24
876
876
3,865
Yes
Yes
Rent ClausesYes
15
508
2013
425
1,326
34
2012Actual Actual
577
933
10,268
1,326
- 7,451
(112)
593 417
-
(Years)4
Yes
Option to
35
Term
5Yes
Yes
560
3,586
Notes
878
876
391
425
502 824
1,326
485
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 165
Financial Statements 2013
page 58
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 13a(i). Statement of Performance Measurement - Indicators (Consolidated)
$ '000
Local Government Industry Indicators - Consolidated
1. Unrestricted Current RatioCurrent Assets less all External Restrictions (1)
Current Liabilities less Specific Purpose Liabilities (2,3)
2. Debt Service RatioDebt Service CostIncome from Continuing Operations(excl. Capital Items & Specific Purpose Grants/Contributions)
3. Rates & Annual Charges Coverage RatioRates & Annual ChargesIncome from Continuing Operations
4. Rates, Annual Charges, Interest & Extra Charges Outstanding PercentageRates, Annual & Extra Charges Outstanding Rates, Annual & Extra Charges Collectible
4a. Rates, Annual Charges, Interest & Extra Charges Outstanding Percentage
The Rates and Annual charges outstanding includes an amount of $1,608,838 due but not pursued as recover due toCouncil policies. This amount can be split between Eligible Pensioners & Arrangements under financial hardship
If Council policies were discounted from the amount outstanding then the Outstanding Percentage Ratio would be:
Rates, Annual & Extra Charges OutstandingRates, Annual & Extra Charges Collectible
5. Building & Infrastructure Renewals RatioAsset Renewals(4)
Depreciation, Amortisation & Impairment
Notes
(1) Refer Notes 6-8 inclusive. Also excludes any Real Estate & Land for resale not expected to be sold in the next 12 months(2) Refer to Note 10(a).(3) Refer to Note 10(a)(ii) - excludes all payables & provisions not expected to be paid in the next 12 months (incl. ELE).
Notes continued
(4) Asset Renewals represent the replacement &/or refurbishment of existing assets to an equivalent capacity/performanceas opposed to the acquisition of new assets (or the refurbishment of old assets) that increases capacity/performance.Asset Renewals include building and infrastructure assets only.
5.56%4.89%
2011Indicator
2013
3.95%
2012
1.66
4.90%6,541
32,093
2013
201,721 62.33%
4,578
26,929 142.20%144.41%
2.53%
114.32%
1.37 : 1
60.07%
133,787
7.84%
44,108
Amounts Prior Periods
125,732
18,647
1.69
50.58%
181,269
4,932133,787
3.69%
166 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 59
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 13a(ii). Local Government Industry Indicators - Graphs (Consolidated)
To assess the impact of uncollected rates and annual charges on Council's liquidity and the adequacy of
recovery efforts.
2012/13 Ratio 1.37 : 1
2012/13 Ratio 4.89%
Commentary on 2012/13 Result
This ratio is better than the industry recognised benchmark of 1.00:1. A
movement of $5 million for cash investments from current assets to non-
current has resulted in the majority of the downturn in this ratio.
Commentary on 2012/13 Result
Ths ratio is 2012 was impacted by $43 million in land dedications being identified
as income. This caused the ratio to be lower than normal years. The 2013 figure has returned to reflect the normal trend in
previous years.
Commentary on 2012/13 Result
2012/13 Ratio 2.53%
This ratio is better than the industry recognised benchmark of 5%
This ratio shows that Council is spending more on asset renewals than consumed
through the depreciation charged.
Purpose of Unrestricted Current
Ratio
This ratio is well below the industry recognised benchmark of 10%. Council continues to liquidate debt without any
further major borrowings.
Commentary on 2012/13 Result
To assess the rate at which these assets are being renewed
relative to the rate at which they are depreciating.
Purpose of Debt Service Ratio
To assess the impact of loan principal &
interest repayments on the discretionary revenue of council.
Purpose of Asset Renewals Ratio
Purpose of Rates & Annual Charges Coverage Ratio
2012/13 Ratio 144.41%
To assess the degree of Council's
dependence upon revenue from rates and annual charges and to assess the
security of Council's income.
To assess the adequacy of working capital and its ability to satisfy obligations in the short term for
the unrestricted activities of Council.
Commentary on 2012/13 Result
Purpose of Rates & Annual Charges
Outstanding Ratio
2012/13 Ratio 62.33%
1.53 1.69 1.66 1.37
0.0
0.5
1.0
1.5
2.0
2.5
3.0
2010 2011 2012 2013
Rat
io :
1
1. Unrestricted Current Ratio
4.11%
7.84%
3.95%2.53%
0%
2%
4%
6%
8%
10%
12%
2010 2011 2012 2013
Rat
io %
2. Debt Service Ratio
58.72% 60.07%50.58%
62.33%
0%
20%
40%
60%
80%
100%
2010 2011 2012 2013
Rat
io %
3. Rates & Annual Charges Coverage Ratio
4.72% 4.90%5.56%
4.89%
0%
2%
4%
6%
8%
10%
2010 2011 2012 2013
Rat
io %
4. Rates, Annual Charges, Interest & Extra Charges Outstanding Percentage
89.09%
142.20%114.32%
144.41%
0%
50%
100%
150%
200%
2010 2011 2012 2013
Rat
io %
5. Building & Infrastructure Renewals Ratio
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 167
Financial Statements 2013
page 60
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 14. Investment Properties
$ '000
(a) Investment Properties at Fair value
Investment Properties on Hand
Reconciliation of Annual Movement:Opening Balance- Acquisitions- Net Gain/(Loss) from Fair Value AdjustmentsCLOSING BALANCE - INVESTMENT PROPERTIES
Externally Restricted Investment Properties (included above)
Section 94
(b) Valuation Basis
The basis of valuation of Investment Properties is Fair Value, being the amounts for which the properties couldbe exchanged between willing parties in arms length transaction, based on current prices in an active marketfor similar properties in the same location and condition and subject to similar leases.
The 2013 revaluations were based on Independent Assessments made by:Alan Seege of McLennan Steege Smith and Associates.
(c) Leasing Arrangements
Details of leased Investment Properties are as follows;
Future Minimum Lease Payments receivable undernon-cancellable Investment Property Operating Leasesnot recognised in the Financial Statements are due:Within 1 yearLater than 1 year but less than 5 yearsLater than 5 yearsTotal Minimum Lease Payments Receivable
(d) Investment Property Income & Expenditure - summary
Rental Income from Investment Properties:- Minimum Lease PaymentsDirect Operating Expenses on Investment Properties:- that generated rental incomeNet Revenue Contribution from Investment Propertiesplus:
Fair Value Movement for yearTotal Income attributable to Investment Properties
7,907
Actual
50,447
(2,395)
2012
5,220
Actual
50,447
-
(283) 3,339
Notes 2013
(1,085)
(1,085)
46,312
3,138
5,220
90,232 9,031
105,234
3,421
(253)
2,053
92,825
3,592
944
3,047
48,052
(2,395)
5,220
101,186
50,447
3,378
48,052
168 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 61
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 15. Financial Risk Management
$ '000
Risk Management
Council's activities expose it to a variety of financial risks including (1) price risk, (2) credit risk, (3) liquidity riskand (4) interest rate risk.
The Council's overall risk management program focuses on the unpredictability of financial markets and seeksto minimise potential adverse effects on the financial performance of the Council.
Council does not engage in transactions expressed in foreign currencies and is therefore not subject to foreigncurrency risk.
Financial risk management is carried out by Council's Finance Section under policies approved by the Council.
A comparison by category of the carrying amounts and fair values of Council's Financial Assets & FinancialLiabilities recognised in the financial statements is presented below.
Financial AssetsCash and Cash EquivalentsInvestments - "Held for Trading" - "Held to Maturity"ReceivablesTotal Financial Assets
Financial LiabilitiesBank OverdraftPayablesLoans / AdvancesLease LiabilitiesTotal Financial Liabilities
Fair Value is determined as follows:
- Cash & Cash Equivalents, Receivables, Payables - are estimated to be the carrying value which approximates mkt value.
- Borrowings & Held to Maturity Investments - are based upon estimated future cash flows discounted by the current market interest rates applicable to assets & liabilities with similar risk profiles, unless quoted market prices are available.
- Financial Assets classified (i) "at fair value through profit & loss" or (ii) Available for Sale - are based upon quoted market prices (in active markets for identical investments) at the reporting date or independent valuation.
41,188
17,194
8,096 18,269 18,269
2013Carrying Value
45,207
4,128
876
14,991
18,935
4,053
1,326
16,874
17,368
18,294 18,935 18,294
57,263 17,368
97,273
4,128
97,27316,429
103,667
8,096
41,18840,492
23,317
2013 2012
103,667
40,492876
4,053
2012Fair Value
14,991 57,263
16,874
45,207 23,317
17,194
16,429
1,326
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 169
Financial Statements 2013
page 62
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 15. Financial Risk Management (continued)
$ '000
(a) Fair Value Measurements
The fair value of financial assets and financial liabilities must be estimated in accordance with AccountingStandards for either recognition and measurement requirements or for disclosure purposes.
AASB 7 Financial Instruments: Disclosures, requires the disclosure of how fair valuations have been arrived atfor all financial assets and financial liabilities that have been measured at fair value.
Arriving at fair values for financial assets & liabilities can be broken up into 3 distinct measurement hierarchies:
Level 1: Quoted prices (unadjusted) in active markets for identical assets or liabilitiesLevel 2: Inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either directly (as prices) or indirectly (derived from prices) Level 3: Inputs for the asset or liability that are not based on observable market data (unobservable inputs)
The following table presents the financial assets and financial liabilities that have been measured & recognisedat fair values:
2013Financial AssetsInvestments- "Held for Trading"Total Financial Assets
Financial Liabilities- PayablesTotal Financial Liabilities
2012Financial AssetsInvestments- "Held for Trading"Total Financial Assets
Financial Liabilities- PayablesTotal Financial Liabilities
- - --
--
Level 2
-
-
-
-
- 18,269
- 23,317
- -
-
-
Level 3
23,317
18,269
Total
-
Level 2
-
Level 1
-
Level 1
23,317 -
Level 3
18,269
23,317
-
-
- -
Total
18,269
170 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 63
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 15. Financial Risk Management (continued)
$ '000
(b) Cash & Cash Equivalents, Financial assets 'at fair value through the profit & Loss' "Available-for-sale" financial assets & "Held-to-maturity" Investments
Council's objective is to maximise its return on cash & investments whilst maintaining an adequate level ofliquidity and preserving capital.
Council's Finance area manages the Cash & Investments portfolio with the assistance of independent advisors.
Council has an Investment Policy which complies with the Local Government Act & Minister's Investment Order.This Policy is regularly reviewed by Council and it's staff and an Investment Report is tabled before Council ona monthly basis setting out the portfolio breakup and its performance.
The major risk associated with Investments is price risk - the risk that the capital value of Investments mayfluctuate due to changes in market prices, whether there changes are caused by factors specific to individualfinancial instruments or their issuers or are caused by factors affecting similar instruments traded in a market.
Cash & Investments are also subject to interest rate risk - the risk that movements in interest rates could affectreturns and income.
A further risk associated with Cash & Investments is credit risk - the risk that the investment counterparty) willnot complete their obligations particular to a financial instrument, resulting in a financial loss to Council - be itof a capital or income nature.
Council manages these risks (amongst other measures) by diversifying its portfolio and only purchasinginvestments with high credit ratings or capital guarantees.
Council also seeks advice from independent advisers before placing any funds in Cash Equivalents &Investments.
The following represents a summary of the sensitivity of Council's Income Statement and Accumulated Surplus(for the reporting period) due to a change in either the price of a financial asset or the interest rates applicable.
It is assumed that the change in interest rates would have been constant throughout the reporting period.
2013Possible impact of a 10% movement in Market ValuesPossible impact of a 1% movement in Interest Rates
2012Possible impact of a 10% movement in Market ValuesPossible impact of a 1% movement in Interest Rates
(2,479)
(2,647)
639
Equity Increase of Values/Rates
Profit Decrease of Values/Rates
(2,479)
1,827
639
(535)
(639)
625
(639)
Equity (2,647)
Profit
2,479
1,827
2,479
(535) 625
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 171
Financial Statements 2013
page 64
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 15. Financial Risk Management (continued)
$ '000
(c) Receivables
Council's major receivables comprise (i) Rates & Annual charges and (ii) User Charges & Fees.
The major risk associated with these receivables is credit risk - the risk that debts due and payable to Councilmay not be repaid in full.
Council manages this risk by monitoring outstanding debt and employing stringent debt recovery procedures.It also encourages ratepayers to pay their rates by the due date through incentives.
Credit risk on rates and annual charges is minimised by the ability of Council to secure a charge over the landrelating to the debts - that is, the land can be sold to recover the debt. Council is also able to charge intereston overdue rates & annual charges at higher than market rates which further encourages the payment of debt.
There are no significant concentrations of credit risk, whether through exposure to individual customers,specific industry sectors and/or regions.
The level of outstanding receivables is reported to Council monthly and benchmarks are set and monitored foracceptable collection performance.
Council makes suitable provision for doubtful receivables as required and carries out credit checks on mostnon-rate debtors.
There are no material receivables that have been subjected to a re-negotiation of repayment terms.
A profile of Council's receivables credit risk at balance date follows:
(i) Ageing of ReceivablesCurrent (not yet overdue)Overdue
(ii) Movement in Provision for Impairment of ReceivablesBalance at the beginning of the year+ new provisions recognised during the year- amounts already provided for & written off this year- amounts provided for but recovered during the year- previous impairment losses reversedBalance at the end of the year
2013
-
Annual Charges
0%
2012
100%100%
Rates & Annual
100%
-
1,113
(17)
2012
100%
1,050
100%
1,113-
2012
Other
55%
20132013
45%100%
1,113 9 -
Rates &
27%
-
Receivables Other
Charges 0%
Receivables 73%
(55)
172 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 65
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 15. Financial Risk Management (continued)
$ '000
(d) Payables & Borrowings
Payables & Borrowings are both subject to liquidity risk - the risk that insufficient funds may be on hand tomeet payment obligations as and when they fall due.
Council manages this risk by monitoring its cash flow requirements and liquidity levels and maintaining anadequate cash buffer.
Payment terms can (in extenuating circumstances) also be extended & overdraft facilities utilised as required.
The contractual undiscounted cash outflows (ie. principal and interest) of Council's Payables & Borrowings areset out in the Liquidity Table below:
$ '000
Bank OverdraftTrade/Other PayablesLoans & AdvancesLease LiabilitiesTotal Financial Liabilities
Bank OverdraftTrade/Other PayablesLoans & AdvancesLease LiabilitiesTotal Financial Liabilities
Borrowings are also subject to interest rate risk - the risk that movements in interest rates could adverselyaffect funding costs & debt servicing requirements. Council manages this risk through the diversification ofborrowing types, maturities & interest rate structures.
The following interest rates were applicableto Council's Borrowings at balance date:
Bank OverdraftTrade/Other PayablesLoans & Advances - Fixed Interest RateLoans & Advances - Variable Interest RateLease Liabilities
5.5%17,475
5.3%1,326
4,053
934
-
-
-
2-3 YrsCarrying
Outflows
2012
2013- 4,128 -
1-2 Yrs
Subject
maturitypayable in:
-
-
4,164 13,030
- -
15,400
-
-
3-4 YrsCash
Valuesto no
≤ 1 Year
ActualTotal
-
4,128
4-5 Yrs
3,400
9,240 45,624 -
18,294
20,984
426
10,728
508 -
-
-
- -
> 5 Yrs
9,240
-
17,194 -
23,368
- -
- -
1,980
501
4,053
16,874
5.5%1,460
0.0%
-
15.1%
Interest RateValue
2012Carrying
46,596
1,326- 1,325
-
3.9%
16,874
41,188 23,207
14,894
4.9%
4,128
-
-
-
16,874
4,128
-
ValueAverage
- -
14.7% 4,053
4,053 -
824
10,213 3,759
-
Interest RateCarrying
-
13,017
-
17,194
17,194 17,705
40,492 876 589
5.9%
-
24,344 - -
2013
- -
-
-
10,372
41,188
0.0%
Average
10,372
40,492
- -
18,935
876
-
-
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 173
Financial Statements 2013
page 66
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 16. Material Budget Variations
$ '000
Council's Original Financial Budget for 12/13 was adopted by the Council on 23 May 2013.
While the Income Statement included in this General Purpose Financial Report must disclose the OriginalBudget adopted by Council, the Local Government Act requires Council to review its Financial Budget on aQuarterly Basis, so that it is able to manage the various variations between actuals versus budget thatinvariably occur throughout the year.
This Note sets out the details of MATERIAL VARIATIONS between Council's Original Budget and its Actualresults for the year as per the Income Statement - even though such variations may have been adjusted forduring each Quarterly Budget Review.
Note that for Variations* of Budget to Actual :Material Variations represent those variances that amount to 10% or more of the original budgeted figure.F = Favourable Budget Variation, U = Unfavourable Budget Variation
$ '000
REVENUESRates & Annual Charges
User Charges & Fees
Interest & Investment RevenueIn the original budget, the estimated provision was based on a conservative outlook, due to the Fair Value write backin the 2009 financial year. There has been a positive fair value reflected in the current financial year. There were also some longer term deposits that are still benefiting from higher interest rates so the overall return to Council isgreater than expected.
Other RevenuesIn terms of the original budget, the estimate for the adjustment to fair values of investment properties are difficult toprovide. The revaluation amount was $1.3million higher than the previous year. There were also allocations of estimates in the property projects and transport and traffic areas in the original budget that did reflect the actualsas at 30 June 2013.
Operating Grants & ContributionsIn many instances, the actual amount of grants received depends on decisions made by the State and Commonwealth Governments, after the original budget has been adopted. In the current year, Council has received grant funding from various additional sources.
5,029
U
0%
(21%) U
565 13%
2013
(347)
45%
---------- Variance* ----------
351
F
F
(3,740)
4,265
17,892
11,239
125,732
16,268
125,381
28,838
14,152
28,491
Actual2013 2013
Budget
4,830
(1%)
F
174 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 67
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 16. Material Budget Variations (continued)
$ '000
EXPENSESBorrowing CostsThere has been a reduction in borrowing costs due to a number of factors. During the financial year the prevailinginterest rates were lower than expected. Some loans were only take up towards the end of the financial year resulting in a lower expense to Council.
Depreciation & AmortisationWith the revaluation of Buildings during 2012, the depreciation charge was higher than in the previous year.The orginal budget is adopted, it is difficult to ascertain the final effect of the revaluation on individual asset classesso estimates are indexed at a nominated rate across all classes.
Net Losses from Disposal of AssetsThere is only a general allocation for the Net Loss from Disposal of Assets in the original budget as it is difficult to ascertaini the level of sales and acquisitions of fixed assets during the financial year.
Budget Variations relating to Council's Cash Flow Statement include:Cash Flows from Operating Activities
Cash Flows from Investing Activities
Cash Flows from Financing ActivitiesThere were higher than expected lease payments during the financial year compared to the amount adopted in the original budget.
76.9%
(77.6%)
(1,090)
(34,095) 26,461
31,919 30,539
U(616)
F(7,634)
(474)
500 579 (16%) U(79)
(12%)(2,723)
---------- Variance* ----------
308 F22%
(4.3%)(1,380) U
23,459 U26,182
Actual
1,429
Budget
1,121
2013 2013 2013
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 175
Sut
herla
nd S
hire
Cou
ncil
Not
es to
the
Fina
ncia
l Sta
tem
ents
for t
he fi
nanc
ial y
ear e
nded
30
June
201
3
Not
e 17
. Sta
tem
ent o
f Dev
elop
er C
ontri
butio
ns
$ '0
00
Cou
ncil
reco
vers
con
tribu
tions
, rai
ses
levi
es &
ent
ers
into
pla
nnin
g ag
reem
ents
on
deve
lopm
ent w
orks
that
are
sub
ject
to a
dev
elop
men
t con
sent
issu
ed b
y C
ounc
il.A
ll co
ntrib
utio
ns m
ust b
e sp
ent/u
tilis
ed fo
r the
spe
cific
pur
pose
they
wer
e le
vied
and
any
inte
rest
app
licab
le to
uns
pent
fund
s m
ust b
e at
tribu
ted
to re
mai
ning
fund
s.
The
follo
win
g ta
bles
det
ail t
he re
ceip
t, in
tere
st a
nd u
se o
f the
abo
ve c
ontri
butio
ns &
levi
es a
nd th
e va
lue
of a
ll re
mai
ning
fund
s w
hich
are
"res
trict
ed" i
n th
eir f
utur
e us
e.
SUM
MAR
Y O
F C
ON
TRIB
UTI
ON
S &
LEV
IES
Ope
n Sp
ace
Com
mun
ity F
acilit
ies
* Fo
r the
yea
r end
ed 3
0 Ju
ne 2
013,
the
Inve
stm
ent I
ncom
e in
clud
es th
e un
real
ised
loss
on
inve
stm
ents
of $
684,
100
whi
ch is
attr
ibut
able
to th
e D
evel
oper
Con
tribu
tions
.
Inte
rest
Con
trib
utio
nsEx
pend
iture
-
-
-
-
PUR
POSE
Ope
ning
Bal
ance
25,2
60
1,
418
- -
(10)
-
(5,3
97)
(5,4
65)
3,11
8
-
26,9
14
Bor
row
ing -
13
8
-
(5,4
75)
(68) -
-
(4)
Non
Cas
hre
ceiv
ed d
urin
g th
e Ye
arC
ash
-
earn
eddu
ring
2,98
0282,
952
-
(5,3
93)
2,93
6
Year
in Y
ear
Inte
rnal
Hel
d as
-
1,08
1S9
4 C
ontr
ibut
ions
- un
der a
Pla
n
-
26,1
371,
610
1,81
977
7
-
30,8
77
3,
963
1,
819
Tota
l S94
Rev
enue
Und
er P
lans
Tota
l Con
tribu
tions
- C
ash
S94A
Lev
ies
- und
er a
Pla
n
-
877
16
19
2
209
S94
not
und
er P
lans
5,22
0
-
(40,
394)
8,
018
-
-
(2,9
83)
-
25,3
02
26,2
484,
091
30,3
39
946
-
7,19
2
Futu
reR
estr
icte
d(to
)/fro
m
(39,
616)
24,2
21in
com
eAs
set
-
Cum
ulat
ive
Proj
ectio
ns
(8,2
03)
8,01
8
(40,
394)
-
(778
)
82
6
-
Exp still
Inte
rnal
Ove
r or
-
-
outs
tand
ing
Bor
row
ings
(und
er)
(7,0
74)
Fund
ing
1,12
9
due/
(pay
able
)
4,09
1
-
page 68
Financial Statements 2013
5,22
0
Tota
l Con
trib
utio
ns (C
ash
& In
v.Pr
oper
ty)
36,0
971,
819
-3,
118
(5,4
75)
-35
,559
8,01
8(4
0,39
4)(2
,983
)-
Tota
l Con
tribu
tions
- In
vest
men
t Pro
perty
176 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Sut
herla
nd S
hire
Cou
ncil
Not
es to
the
Fina
ncia
l Sta
tem
ents
for t
he fi
nanc
ial y
ear e
nded
30
June
201
3
Not
e 17
. Sta
tem
ent o
f Dev
elop
er C
ontri
butio
ns (c
ontin
ued)
$ '0
00
S94
CO
NTR
IBU
TIO
NS
- UN
DER
A P
LAN
CO
NTR
IBU
TIO
N P
LAN
- SH
IRE
WID
E PL
AN (2
005)
Ope
n Sp
ace
Tota
l Con
trib
utio
ns (C
ash)
Tota
l Con
tribu
tions
(Inv
estm
ent P
rope
rty)
CO
NTR
IBU
TIO
N P
LAN
NU
MBE
R 3
- C
OM
MU
NIT
Y FA
CIL
ITIE
S M
ENAI
DIS
TRIC
T &
WO
RO
NO
RA
HEI
GH
TS (1
993)
Com
mun
ity F
acilit
ies
CO
NTR
IBU
TIO
N P
LAN
- C
ARR
ING
BAH
CEN
TRE
(199
7)
Ope
n Sp
ace
5,22
0
Fund
ing
(778
)
durin
gEx
pend
iture
earn
edin
Yea
r
Inte
rest
1,33
9
(to)/f
rom
-
2,
921
Bor
row
ing
(5,2
38)
Year
Ove
r or
(und
er)
still
Futu
rePU
RPO
SE
Tota
l
Tota
l
23,7
96
Con
trib
utio
nsIn
tere
st
Inte
rest
-
-
-
rece
ived
dur
ing
the
Year
Bal
ance
Ope
ning87
7
362
Bal
ance
Con
trib
utio
nsPU
RPO
SEN
on C
ash
Cas
h 192
Cas
h
-
1,33
9
-
rece
ived
dur
ing
the
Year -
362
-
5,
220
in Y
ear 1313
N
on C
ash
earn
ed
rece
ived
dur
ing
the
Year
1,33
9
Bal
ance 87
7
31
375
--
108
Proj
ectio
ns
1,12
9
1,
129
-
29,9
94
Ope
ning
Expe
nditu
re
16
(4)
19
2
-2,
921
Non
Cas
hC
ashCon
trib
utio
ns
in Y
ear
Hel
d as
(5,2
38)
-
24,7
74
Ope
ning
(4)
-
PUR
POSE
durin
g
Tota
l Con
trib
utio
ns (C
ash
and
Inve
st)
-
16
24,7
74
-
Hel
d as
Res
tric
ted
inco
me
(298
)
(to)/f
rom
Asse
tR
estr
icte
d
31
Expe
nditu
reE
xp
826
(298
)
-
-
37
5
-
2,
921
-
outs
tand
ing
Fund
ing
-
(5,2
38)
(38,
978)
-
Futu
reYe
area
rned
29,0
16-
Proj
ectio
ns
Inte
rnal
(to)/f
rom
1,08
1
-
Bor
row
ing
outs
tand
ing
Bor
row
ings
Bor
row
ing
1,08
1
durin
gYe
ar
-
-(7
78)
(und
er)
-
108
Asse
t
826
Fund
ing
(38,
978)
(8,3
33)
-
(8
,333
)
Cum
ulat
ive
Bor
row
ings
Inte
rnal
due/
(pay
able
)
still
still
Cum
ulat
ive
(und
er)
due/
(pay
able
)
inco
me
Inte
rnal
due/
(pay
able
)
Cum
ulat
ive
Exp
Bor
row
ings
outs
tand
ing
6,84
9
-
(38,
978)
Ove
r or
(3,1
13)
Exp
inco
me
Futu
re
Hel
d as
-
Inte
rnal
6,84
9
23,7
96
Inte
rnal
Asse
tR
estr
icte
d
5,22
06,
849
Ove
r or
Proj
ectio
ns
-
-
Inte
rnal
-
Financial Statements 2013
page 69
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 177
Sut
herla
nd S
hire
Cou
ncil
Not
es to
the
Fina
ncia
l Sta
tem
ents
for t
he fi
nanc
ial y
ear e
nded
30
June
201
3
Not
e 17
. Sta
tem
ent o
f Dev
elop
er C
ontri
butio
ns (c
ontin
ued)
$ '0
00
S94
CO
NTR
IBU
TIO
NS
- UN
DER
A P
LAN
CO
NTR
IBU
TIO
N P
LAN
- SU
THER
LAN
D C
ENTR
E (2
006)
Ope
n Sp
ace
S94A
LEV
IES
- UN
DER
A P
LAN
Ope
n Sp
ace
S94
CO
NTR
IBU
TIO
NS
- NO
T U
ND
ER A
PLA
N
Roa
dsPa
rkin
gO
ther
PUR
POSE
-
49
946
Con
trib
utio
ns
(to)/f
rom
Proj
ectio
ns
Hel
d as
Inte
rnal
durin
gea
rned
1,44
9
Cas
hin
com
eAs
set
(und
er)
Bor
row
ing
Futu
re
-
-
-
28
rece
ived
dur
ing
the
Year
Non
Cas
h -
Expe
nditu
re
in Y
ear
Year
-
page 70
Tota
l
Bal
ance
209
-
Ope
ning
PUR
POSE
Bal
ance
Ope
ning 77
7
777
209
Cas
h
2To
tal
124
PUR
POSE
Bal
ance
Con
trib
utio
ns
-
rece
ived
dur
ing
the
Year -
in Y
ear
79
Cas
hN
on C
ash
Con
trib
utio
ns
312
(340
)
31
2
Asse
t
4,09
1To
tal
3,96
3-
-
9
(1
0)-
-26
5
-
-
-
138
--
1,
410
2,
368
4,09
1
-
-
-
274
274
-
80
2,28
8
-
-
-
2,
368
(1
0)
-
Inte
rest
Ove
r or
Fund
ing
outs
tand
ing
still
Exp
Res
tric
ted
-
1,
449
Non
Cas
h12
4
Ope
ning
79
2
earn
edIn
tere
st
-
-
rece
ived
dur
ing
the
Year
-
(6
8)
28
in Y
ear
earn
edIn
tere
st
outs
tand
ing
(68)
(to)/f
rom
946
Fund
ing
durin
gYe
ar
Expe
nditu
reR
estr
icte
dIn
tern
al
inco
me
(und
er)
Ove
r or
Bor
row
ing
Hel
d as
-
Inte
rnal
Proj
ectio
ns
Futu
re
Exp still
due/
(pay
able
)
Cum
ulat
ive -
Bor
row
ings
page xx
(155
)-
50
outs
tand
ing
durin
g (155
)
-
50(to
)/fro
m
Inte
rnal
Bor
row
ing
Fund
ing
(340
)
Proj
ectio
ns
inco
me
Futu
rest
ill
Expe
nditu
re
Year
Ove
r or
Bor
row
ings
Exp
Financial
Asse
tR
estr
icte
d(u
nder
)
-
Cum
ulat
ive
Hel
d as
22
22
-
Inte
rnal
due/
(pay
able
)
Cum
ulat
ive
Inte
rnal
due/
(pay
able
)
Bor
row
ings
-
-
-
-
Financial Statements 2013
178 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 71
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 18. Contingencies & Other Assets/Liabilities Not Recognised
$ '000
LIABILITIES NOT RECOGNISED:
The following assets and liabilities do not qualify forrecognition in the Statement of Financial Position, buttheir knowledge & disclosure is considered relevantto the users of Council's Financial Report.
1. Guarantees 1. Guarantees (continued)
(i) WorkCover NSW (iv) Defined Benefit Superannuation Contribution Plans (continued)
In accordance with requirements of WorkCover NSW,Council as a self insurer for workers compensation is Council participates in an employer sponsoredrequired to lodge a cash deposit or a bank guarantee Defined Benefit Superannuation Scheme, and makesas security against potential claims upon Council. In contributions as determined by the Superannuationprevious years a cash deposit was lodged, however, Scheme's Trustees.in 1998/99 Council changed this for a bank guarantee.
Member Councils bear responsibility of ensuring thereAs at 30 June 2013 the bank guarantee held by are sufficient funds available to pay out the required$5,100,000.00. benefits as they fall due.
At 30 June 2013, Council’s actuarial assessment The Schemes most recent full actuarial reviewhas recommended a security of $3,400,000 be held indicated that the Net Assets of the Scheme wereto satisfy the new calculation formula. WorkCover not sufficient to meet the accrued benefits of thehas been advised of the recommendation and once Schemes Defined Benefit member category withreviewed and agreed by them, the appropriate member Councils required to make significantlyamount of the guarantee will be organised with higher contributions in future years.Council’s banker.
The Local Government Superannuation Scheme(ii) Sydney however is unable to provide Council with an accurate
estimate of its share of the net deficit and accordinglyAs at 30 June 2013, a bank guarantee was held Council has not recorded any net liability from it'sby Sydney Water totalling $10,000 for the purposes Defined Benefit Scheme obligations in accordanceof contract performance. with AASB 119.
(iii) Elouera Surf Life Saving Club Future contributions made to the defined benefitscheme to rectify the net deficit position will be
As at 30 June 2013, a security deposit was held by recognised as an expense when they becomeNational Australia Bank Ltd totalling $600,000 on payable - similar to the accounting for Definedbehalf of Elouera Surf Life Saving Club for a loan to Contributions Plans.undertake Club building improvements.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 179
Financial Statements 2013
page 72
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 18. Contingencies & Other Assets/Liabilities Not Recognised (continued)
$ '000
LIABILITIES NOT RECOGNISED (continued):
1. Guarantees (continued) (vii) Other Guarantees
(v) Statewide Limited Council has provided no other Guarantees other thanthose listed above.
Council is a member of Statewide Mutual, a mutualpool scheme providing liability insurance to LocalGovernment. 2. Other Liabilities
Membership includes the potential to share in either (i) Third Party Claimsthe net assets or liabilities of the fund depending onits past performance. Council’s share of the Net The Council is involved from time to time in variousAssets or Liabilities reflects Councils contributions to claims incidental to the ordinary course of businessthe pool and the result of insurance claims within including claims for damages relating to its services.each of the Fund Years.
Council believes that it is appropriately coveredThe future realisation and finalisation of claims for all claims through its Insurance Coverage andincurred but not reported to 30/6 this year may result does not expect any material liabilities to eventuate.in future liabilities or benefits as a result of pastevents that Council will be required to fund or share (ii) S94 Plansin respectively.
Council levies Section 94/94A Contributions upon(vi) StateCover Limited various development across the Council area through
the required Contributions Plans.Council is a member of StateCover Mutual Limitedand holds a partly paid share in the entity. As part of these Plans, Council has received funds
for which it will be required to expend the monies inStateCover is a company providing workers accordance with those Plans.compensation insurance cover to the NSW LocalGovernment Industry and specifically Council. As well, these Plans indicate proposed future
expenditure to be undertaken by Council, which willCouncil has a contingent liability to contribute further be funded by making levies and receipting funds inequity in the event of the erosion of the Company's future years or where a shortfall exists by the use ofcapital base as a result of the company's past Council's General Funds.performance and/or claims experience or as a resultof any increased prudential requirements from APRA. These future expenses do not yet qualify as liabilities
as of the Reporting Date, but represent CouncilsThese future equity contributions would be required intention to spend funds in the manner and timingto maintain the company’s minimum level of Net set out in those Plans.Assets in accordance with its Licence Requirements. Council has provided no other Guarantees other than
those listed above.
180 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 73
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 18. Contingencies & Other Assets/Liabilities Not Recognised (continued)
$ '000
LIABILITIES NOT RECOGNISED (continued): ASSETS NOT RECOGNISED:
2. Other Liabilities (i) Land Under Roads
(iii) Potential Land Acquisitions due to Planning As permitted under AASB 1051, Council has elected Restrictions imposed by Council not to bring to account Land Under Roads that it
owned or controlled up to & including 30/6/08.Council has classified a number of privately ownedland parcels as Local Open Space or Bushland. (ii) Infringement Notices/Fines
As a result, where notified in writing by the various Fines & Penalty Income, the result of Council issuingowners, Council will be required to purchase these Infringement Notices is followed up and collected byland parcels. the Infringement Processing Bureau.
At reporting date, reliable estimates as to the value Councils Revenue Recognition policy for suchof any potential liability (& subsequent land asset) income is to account for it as revenue on receipt.from such potential acquisitions has not beenpossible. Accordingly, at Year End, there is a potential asset
due to Council representing issued but unpaid(iv) Tip Remediation - Ferntree Reserve Infringement Notices.
Restrictions imposed by CouncilDue to the limited information available on the status,
Council has identified requirements for remediation value and duration of outstanding Notices, Council isof an old tip site at Ferntree Reserve Engadine. unable to determine the value of outstanding income.
A risk analysis has been completed and discussionsare being held between Council, its consultants andSydney Water as to works required to mitigatethe risks associated with land slip likely to damage the main Woronora Dam water distribution pipelinelocated downslope of the old tip.
As at the date of reporting, negotiations are still underway and it is not possible to finalise the cost of works required.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 181
Financial Statements 2013
page 74
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 19. Controlled Entities, Associated Entities & Interests in Joint Ventures
$ '000
A Joint Venture exists between Council & GBS Group Pty Ltd under a deed of agreement dated 20 June 1991 and varied 12 July 1995. GBS Group Pty Ltd has assigned its rights and obligations of this joint venture to GBS Investments Pty Ltd (GBS) by deed made 26 August 2005.
In essence, this agreement states that both parties will take part in the development of certain lands in the Sutherland business centre with GBS as the preferred developer, constructing buildings over a number ofyears according to a Master Plan approved by Council. Some of the land is owned by Council - some of theland is owned by GBS.
The construction of the buildings (whether on Council-owned land or GBS-owned land) is undertaken by GBS, as agreed by Council.
The deed of agreement provides for the sharing of profit on each building constructed, under a formula set out in the agreement.
The development consent for Stage 1A of the Council Car Park has been granted and a feasibility assessment of this project was ongoing as at 30 June 2013.
This is a no separate joint venture entity.
There are no specified assets or liabilities relating to the joint venture agreement.
182 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 20. Equity - Retained Earnings and Revaluation Reserves
$ '000
(a) Retained Earnings
Movements in Retained Earnings were as follows:Balance at beginning of Year (from previous years audited accounts)
a. Net Operating Result for the YearBalance at End of the Reporting Period
(b) Reserves
(i) Reserves are represented by:
- Infrastructure, Property, Plant & Equipment Revaluation Reserve- "Available for Sale" Financial Investments Revaluation ReserveTotal
(ii) Reconciliation of movements in Reserves:
Infrastructure, Property, Plant & Equipment Revaluation Reserve- Opening Balance- Revaluations for the year- Balance at End of Year
"Available for Sale" Financial Investments Revaluation Reserve- Opening Balance- Losses Realised- Balance at End of Year
TOTAL VALUE OF RESERVES
(c) Correction of Error/s relating to a Previous Reporting Period
Council made no correction of errors during the current reporting period.
(d) Voluntary Changes in Accounting Policies
Council made no voluntary changes in any accounting policies during the year.
20(c)
52,509 1,088,691
2013
365,682
142,091
1,036,182
Actual
4,685
142,466
1,088,691
(375)
NotesActual
107,712
2012
(375)
-
365,682
375
365,682
223,591
365,682
142,091 9(a)
1,093,376
(375)
(375)
34,754
-
142,466
142,091
-
page 75
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 183
Financial Statements 2013
page 76
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 21. Financial Result & Financial Position by Fund
$ '000
Council utilises only a General Fund for its operations.
Note 22. "Held for Sale" Non Current Assets & Disposal Groups
Council did not classify any Non Current Assets or Disposal Groups as "Held for Sale".
Note 23. Events occurring after the Reporting Period
Council is unaware of any material or significant "non-adjusting events" that should be disclosed.
Note 24. Discontinued Operations
Council has not classified any of its Operations as "Discontinued".
Note 25. Intangible Assets
Intangible Assets represent identifiable non-monetary asset without physical substance.
Council is unaware of any control over Intangible Assets that warrant recognition in the Financial Statements,including either internally generated and developed assets or purchased assets.
184 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Financial Statements 2013
page 77
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 26. Reinstatement, Rehabilitation & Restoration Liabilities
$ '000
Council has legal/public obligations to make restore, rehabilitate and reinstate the following assets/operations:
Asset/Operation
Site remediation works at 2R Alexander Rd Taren Point.Balance at End of the Reporting Period
Reconciliation of movement in Provision for year:
Balance at beginning of yearProvision RecognitionTotal - Reinstatement, rehabilitation and restoration provision
- 10(a) 1,000 -
2013
Estimated
2012restorationyear of
1,000 -
- - - 1,000
NPV of Provision
1,000
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 185
Financial Statements 2013
page 78
Sutherland Shire Council
Notes to the Financial Statements for the financial year ended 30 June 2013
Note 27. Council Information & Contact Details
Principal Place of Business:4-20 Eton StreetSUTHERLAND NSW 2232
Contact DetailsMailing Address: Opening Hours:Locked Bag 17 Monday - FridaySUTHERLAND NSW 1499 8:30am - 4:30pm
Telephone: 02 9710 0333 Internet: www.sutherland.nsw.gov.auFacsimile: 02 9710 0265 Email: [email protected]
Officers Elected MembersGENERAL MANAGER MAYORMr John W Rayner Clr Steve Simpson
RESPONSIBLE ACCOUNTING OFFICER COUNCILLORSMr John W Rayner Clr Hassan Awada
Clr Phil BlightPUBLIC OFFICER Clr Tracy CookMr Trevor Rowling Clr Tom Croucher
Clr Carmelo PesceAUDITORS Clr Carol ProvanPricewaterhouse Coopers Clr John Riad201 Sussex Street Clr Peter ScaysbrookSYDNEY NSW 1171 Clr Kevin Schreiber
Clr Kent JohnsClr Diedree SteinwallClr Peter TowellClr Bruce WaltonClr Scott Williams
Other InformationABN: 52 018 204 808
186 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
page 79
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 187
page 80
188 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
page 81
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 189
page 82
190 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
page 83
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 191
Sutherland Shire Council SPECIAL PURPOSE FINANCIAL STATEMENTS for the year ended 30 June 2013
“Sutherland Shire, in Sydney’s south, shaped bybays, rivers, beaches and national parks…”
192 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
SPFS 2013
page 1
Sutherland Shire Council
Special Purpose Financial Statements for the financial year ended 30 June 2013
Contents
1. Statement by Councillors & Management
2. Special Purpose Financial Statements:
Income Statement - Water Supply Business ActivityIncome Statement - Sewerage Business ActivityIncome Statement - Other Business Activities
Statement of Financial Position - Water Supply Business ActivityStatement of Financial Position - Sewerage Business ActivityStatement of Financial Position - Other Business Activities
3. Notes to the Special Purpose Financial Statements
4. Auditor's Report
Background
These Special Purpose Financial Statements have been prepared for the use by both Council and the Division ofLocal Government in fulfilling their requirements under National Competition Policy.
The principle of competitive neutrality is based on the concept of a "level playing field" between persons/entitiescompeting in a market place, particularly between private and public sector competitors.
Essentially, the principle is that government businesses, whether Commonwealth, State or Local, should operatewithout net competitive advantages over other businesses as a result of their public ownership.
For Council, the principle of competitive neutrality & public reporting applies only to declared business activities.
These include (a) those activities classified by the Australian Bureau of Statistics as business activities beingwater supply, sewerage services, abattoirs, gas production and reticulation and (b) those activities with a turnoverof over $2 million that Council has formally declared as a Business Activity (defined as Category 1 activities).
In preparing these financial statements for Council's self classified Category 1 businesses and ABS definedactivities, councils must (a) adopt a corporatisation model and (b) apply full cost attribution including tax equivalentregime payments & debt guarantee fees (where the business benefits from councils borrowing position bycomparison with commercial rates).
n/a
Page
n/an/a3
2
(iv)
9
6n/a
(i)
(ii)
13
(iii)
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 193
194 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
SPFS 2013
page 3
Sutherland Shire Council
Income Statement of Council's Other Business Activities for the financial year ended 30 June 2013
$ '000
Income from continuing operationsAccess chargesUser chargesFeesInterestGrants and contributions provided for non capital purposesProfit from the sale of assetsOther incomeTotal income from continuing operations
Expenses from continuing operationsEmployee benefits and on-costsBorrowing costsMaterials and contractsDepreciation and impairmentCalculated taxation equivalentsInternal RentOther Notional Internal ExpensesOther expensesTotal expenses from continuing operationsSurplus (deficit) from Continuing Operations before capital amounts
Grants and contributions provided for capital purposesSurplus (deficit) from Continuing Operations after capital amounts
Surplus (deficit) from discontinued operationsSurplus (deficit) from ALL Operations before taxless: Corporate Taxation Equivalent (30%) [based on result before capital]
SURPLUS (DEFICIT) AFTER TAX
plus Opening Retained Profitsplus/less: Prior Period Adjustmentsplus Adjustments for amounts unpaid:- Taxation equivalent payments- Internal Rent- Other Notional Internal Expenses- Corporate taxation equivalentadd:- Subsidy Paid/Contribution To Operationsless:- TER dividend paid- Dividend paidClosing Retained Profits
Return on Capital %Subsidy from Council
34
26 19 56 341,151 1,143 - -
6,675
Actual
-
-
1,644260393
3,999
1,788
-
3,861-
1,348
--
-581.5%
-
11
-
3,861 3,999
1,158 1,146
68
-694
-
-560.3%
Long Day Care Operational Property
1,682
-
-
1,518
1,457
-
2013Actual
2012Actual Actual
20122013
-
773--
-
4,8704,9555,643
-
-
--
6,83111
3,222-5
7,745
706
5,649
2,981-
7,584
49
3,999
116-
39
8
-
41
(1,506)
387 364
---
41
-
811 6351
11,181 1,219
9,675
1,151 1,143 - -26 19 55
-
(1,339)
-(1,339)
-
(1,339)-
1,457
387
10,069
(1,339)
-
11,408 1,352
-
(1,506)
-(1,506)
(1,506)-
-
-
-
1,158
1,158
2,799
-
364
(5,280)(5,101)
1,200
-
-
-
--
1,146
49,26549,1641,437
2,703
7.1%
49,138
6.5%-
49,164
-
3,861(1,200)(1,158)
Category 1 Category 1
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 195
SPFS 2013
page 4
Sutherland Shire Council
Income Statement of Council's Other Business Activities for the financial year ended 30 June 2013
$ '000
Income from continuing operationsAccess chargesUser chargesFeesInterestGrants and contributions provided for non capital purposesProfit from the sale of assetsOther incomeTotal income from continuing operations
Expenses from continuing operationsEmployee benefits and on-costsBorrowing costsMaterials and contractsDepreciation and impairmentCalculated taxation equivalentsInternal RentOther Notional Internal ExpensesOther expensesTotal expenses from continuing operationsSurplus (deficit) from Continuing Operations before capital amounts
Grants and contributions provided for capital purposesSurplus (deficit) from Continuing Operations after capital amounts
Surplus (deficit) from discontinued operationsSurplus (deficit) from ALL Operations before taxless: Corporate Taxation Equivalent (30%) [based on result before capital]
SURPLUS (DEFICIT) AFTER TAX
plus Opening Retained Profitsplus/less: Prior Period Adjustmentsplus Adjustments for amounts unpaid:- Taxation equivalent payments- Internal Rent- Other Notional Internal Expenses- Corporate taxation equivalentadd:- Subsidy Paid/Contribution To Operationsless:- TER dividend paid- Dividend paidClosing Retained Profits
Return on Capital %Subsidy from Council
192 187 11 11936 935 1 1
-
No Assets
-
-
-
-
-
-
380
2,040
-
--611.9% -484.1% No Assets
1,804
131368
698466368 131
-
53
-
54
39
(1,675)
-(1,675)
-(1,793)
67
- -(2,536)
(39)(110)
258
-
2,183- -
192 187 11 11936 935 1 1
8291 84
--
131
- -
-
507
-
2013
-963
2012
-
Actual
1,104
Entertainment Centre
Actual
-
---
745
2012Actual Actual
-833
2013
-
Commercial Waste
-
-
101-
1,691
-
-668
- -44
-
30
-1,496
1,914
834
-
2,442
-
-1,479
78
-
79
-
2,600
740
-
-
-
- -
(1,793)
(3,022)
(1,675)4,393 4,117
479
67
(1,793)
515
(1,675)
-
-
2,563--
1,685
368
92
2,183- -
110
(1,793)
-
-
79
(3,608) (3,022)
-
Category 2 Category 2
196 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
SPFS 2013
page 5
Sutherland Shire Council
Income Statement of Council's Other Business Activities for the financial year ended 30 June 2013
$ '000
Income from continuing operationsAccess chargesUser chargesFeesInterestGrants and contributions provided for non capital purposesProfit from the sale of assetsOther incomeTotal income from continuing operations
Expenses from continuing operationsEmployee benefits and on-costsBorrowing costsMaterials and contractsDepreciation and impairmentCalculated taxation equivalentsInternal RentOther Notional Internal ExpensesOther expensesTotal expenses from continuing operationsSurplus (deficit) from Continuing Operations before capital amounts
Grants and contributions provided for capital purposesSurplus (deficit) from Continuing Operations after capital amounts
Surplus (deficit) from discontinued operationsSurplus (deficit) from ALL Operations before taxless: Corporate Taxation Equivalent (30%) [based on result before capital]
SURPLUS (DEFICIT) AFTER TAX
plus Opening Retained Profitsplus/less: Prior Period Adjustmentsplus Adjustments for amounts unpaid:- Taxation equivalent payments- Internal Rent- Other Notional Internal Expenses- Corporate taxation equivalentadd:- Subsidy Paid/Contribution To Operationsless:- TER dividend paid- Dividend paidClosing Retained Profits
Return on Capital %Subsidy from Council
237 231- 36 35
(569)-
(652)
-
(652)
1,313-
25
(569)
952
569No Assets No Assets
21
-
--
--
-
- -
-
652
(652)-
-
(569)-
21 25
237 23136 35
-
(569) (652)1,489
281,482
16
-
1,174
830- 2
920
2-1
-
- -
2013
-- --
890 795- -
3330
Certification Unit
2012Actual Actual
0 Category 2
-
1,165
952677
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 197
SPFS 2013
page 6
Sutherland Shire Council
Statement of Financial Position - Council's Other Business Activities as at 30 June 2013
$ '000
ASSETSCurrent AssetsCash and cash equivalentsInvestmentsReceivablesInventoriesOtherNon-current assets classified as held for saleTotal Current Assets
Non-Current AssetsInvestmentsReceivablesInventoriesInfrastructure, property, plant and equipmentInvestments accounted for using equity methodInvestment propertyOtherTotal Non-Current AssetsTOTAL ASSETS
LIABILITIESCurrent LiabilitiesBank OverdraftPayablesInterest bearing liabilitiesProvisionsTotal Current Liabilities
Non-Current LiabilitiesPayablesInterest bearing liabilitiesProvisionsOther LiabilitiesTotal Non-Current LiabilitiesTOTAL LIABILITIESNET ASSETS
EQUITYRetained earningsRevaluation reservesCouncil equity interestNon-controlling equity interestTOTAL EQUITY
1,044
-
-
-
-
-239
-
-
-
1,885-
-
--
Actual 2013
2 2
7,914
2,057
--
1,784
1,121
-
-
21,52851,718
21,513
-
21,513---
15
73,246
-
Actual
--
-
15
5,480
60,365
2,471
-
-194
1,3361,2833,168
-
1,140
1,555
171-
26,522
1,457
203
1,4571,682
227
-
56,096
8,715
4,532
-
-4,930
-
12,881
68,005
4,269
-
-
-
-
259
3,120
- - -
-
59,290--
49,397
2,554
Long Day Care
-
-
1,315
-
-
Category 1
1,077
Actual
1,618265
Operational Property
Category 1
-
2013
-
2012
1,325
Actual 2012
51,718
1,457
75,919
1,682
1,682-
-
-
1,682 1,457-
203
49,397-
-
-
-
1,663
-
1,486
259
49,397
171
1,460
320
-
49,16449,138
26,505
17
26,505
17
--
51,718
198 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
SPFS 2013
page 7
Sutherland Shire Council
Statement of Financial Position - Council's Other Business Activities as at 30 June 2013
$ '000
ASSETSCurrent AssetsCash and cash equivalentsInvestmentsReceivablesInventoriesOtherNon-current assets classified as held for saleTotal Current Assets
Non-Current AssetsInvestmentsReceivablesInventoriesInfrastructure, property, plant and equipmentInvestments accounted for using equity methodInvestment propertyOtherTotal Non-Current AssetsTOTAL ASSETS
LIABILITIESCurrent LiabilitiesBank OverdraftPayablesInterest bearing liabilitiesProvisionsTotal Current Liabilities
Non-Current LiabilitiesPayablesInterest bearing liabilitiesProvisionsOther LiabilitiesTotal Non-Current LiabilitiesTOTAL LIABILITIESNET ASSETS
EQUITYRetained earningsRevaluation reservesCouncil equity interestNon-controlling equity interestTOTAL EQUITY
2,310
-
-
-
2,183
2,183-
2,183
-
2,599
-
-
- -
- -
109
-
Actual Actual
293
-
346
--
Commercial Waste
---
454
Category 2
Actual
60
Actual 2013 2012
-
Entertainment Centre
65
2012
2,245
---
-
4
-
122
3919
--
- -
402
202 197
468
- -97 88
293 346 2,590
Category 2
9
---
- - 2,590 2,245
2013
--
9
-
65
--
-
4317
-
3,680 3,158
-- -
-31 47
748
--
- --
- --
127
- -28 5336285299
-4,010
(3,608)
-127
(3,608) (3,022)
3,2053,711363,490
(3,022) 2,563
2,563
-2,563(3,022)
- --(3,608)
-
-2,183(3,022) 2,563(3,608)
- - - -
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 199
SPFS 2013
page 8
Sutherland Shire Council
Statement of Financial Position - Council's Other Business Activities as at 30 June 2013
$ '000
ASSETSCurrent AssetsCash and cash equivalentsInvestmentsReceivablesInventoriesOtherNon-current assets classified as held for saleTotal Current Assets
Non-Current AssetsInvestmentsReceivablesInventoriesInfrastructure, property, plant and equipmentInvestments accounted for using equity methodInvestment propertyOtherTotal Non-Current AssetsTOTAL ASSETS
LIABILITIESCurrent LiabilitiesBank OverdraftPayablesInterest bearing liabilitiesProvisionsTotal Current Liabilities
Non-Current LiabilitiesPayablesInterest bearing liabilitiesProvisionsOther LiabilitiesTotal Non-Current LiabilitiesTOTAL LIABILITIESNET ASSETS
EQUITYRetained earningsRevaluation reservesCouncil equity interestNon-controlling equity interestTOTAL EQUITY
-
2012
- -- -
9 4- -
2013Actual Actual
Certification Unit
-
Category 2
- -- -- -
- -9 4
1,239 1,4351,230 1,431
- -- -
- -
--
-
562 483562 483
- -- -
562 483
- -677 952
-
677 952
- -
- ---
- -677 952
677 952
1,230 1,431
- -
200 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
SPFS 2013
page 9
Sutherland Shire Council
Special Purpose Financial Statements for the financial year ended 30 June 2013
Contents of the Notes accompanying the Financial Statements
Details
Summary of Significant Accounting Policies
Water Supply Business Best Practice Management disclosure requirements
Sewerage Business Best Practice Management disclosure requirements n/a3
Note Page
1
2
10
n/a
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 201
SPFS 2013_
Sutherland Shire Council
Notes to the Special Purpose Financial Statementsfor the financial year ended 30 June 2013
Note 1. Significant Accounting Policies
page 10
These financial statements are a Special Purpose Financial Statements (SPFS) prepared for use by Council and the Division of Local Government.
For the purposes of these statements, the Council is not a reporting not-for-profit entity.
The figures presented in these special purpose financial statements, unless otherwise stated, havebeen prepared in accordance with:
the recognition and measurement criteria of relevant Australian Accounting Standards,
other authoritative pronouncements of the Australian Accounting Standards Board (AASB) &
Australian Accounting Interpretations.
The disclosures in these special purpose financial statements have been prepared in accordance with:
the Local Government Act and Regulation, and
the Local Government Code of Accounting Practice and Financial Reporting.
The statements are also prepared on an accruals basis, based on historic costs and do not take into account changing money values nor current values of non-current assets (except where specifically stated).
Certain taxes and other costs (appropriately described) have been imputed for the purposes of the National Competition Policy.
National Competition Policy
Council has adopted the principle of ‘competitive neutrality’ to its business activities as part of thenational competition policy which is being applied throughout Australia at all levels of government.
The framework for its application is set out in the June 1996 Government Policy statement on the “Application of National Competition Policy to Local Government”.
The “Pricing & Costing for Council Businesses A Guide to Competitive Neutrality” issued by the Division of Local Government in July 1997 has also been adopted.
The pricing & costing guidelines outline the process for identifying and allocating costs to activities andprovide a standard of disclosure requirements. These disclosures are reflected in Council’s pricing and/or financial reporting systems and include taxation equivalents; council subsidies; return on investments (rate of return); and dividends paid.
Declared Business Activities
In accordance with Pricing & Costing for Council Businesses - A Guide to Competitive Neutrality,Council has declared that the following are to be considered as business activities:
Category 1
(where gross operating turnover is over $2 million)
a. Long Day Care CentresThe centres aim to provide care for pre-school age children, focussing on customer satisfaction and community needs.
b. Operational PropertyCouncil maintains a large portfolio of operational and commercial property in order to develop and maintain an alternative income stream to fund essential community works and services. Annual activity includes buying and selling of property as well as managing existing rental properties.
Category 2
(where gross operating turnover is less than $2 million)
a. Sutherland Entertainment CentreProvision of high quality multi-functional and performing arts facility which responds to the diverse needs of the community.
b. Commercial WasteProvision of waste collection and disposal service to business properties within the Shire.
c. Certification UnitProvision of certification and inspection services to applicants, on behalf of council, as provided for in Part 4A of the Environmental Planning and Assessment Act 1979.
202 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
SPFS 2013_
Sutherland Shire Council
Notes to the Special Purpose Financial Statementsfor the financial year ended 30 June 2013
Note 1. Significant Accounting Policies
page 11
Monetary Amounts
Amounts shown in the financial statements are in Australian currency and rounded to the nearest one thousand dollars.
(i) Taxation Equivalent Charges
Council is liable to pay various taxes and financial duties in undertaking its business activities. Where this is the case, they are disclosed in these statements as a cost of operations just like all other costs.
However, where Council is exempt from paying taxes which are generally paid by private sector businesses (such as income tax), equivalent tax payments have been applied to all Council nominated business activities and are reflected in these financial statements.
For the purposes of disclosing comparative information relevant to the private sector equivalent, the following taxation equivalents have been applied to all council nominated business activities (this does not include council’s non-business activities):
Notional Rate Applied %
Corporate Income Tax Rate – 30%
Land Tax – The first $406,000 of combined land values attracts 0%. From $406,001 to $2,482,000 the rate is 1.6% + $100. For the remaining combined land value that exceeds $2,482,000, a premium marginal rate of 2.0% applies.
Payroll Tax – 5.45% on the value of taxable salaries and wages in excess of $689,000.
Income Tax
An income tax equivalent has been applied on the profits of each reported Business Activity.
Whilst income tax is not a specific cost for the purpose of pricing a good or service, it needs to be taken into account of in terms of assessing the rateof return required on capital invested.
Accordingly, the return on capital invested is set at a pre-tax level (gain/(loss) from ordinary activities before capital amounts) as would be applied by a
private sector competitor – that is, it should include a provision equivalent to the corporate income tax rate, currently 30%.
Income Tax is only applied where a positive gain/(loss) from ordinary activities before capitalamounts has been achieved.
Since this taxation equivalent is notional - that is, it is payable to the “Council” as the owner of business operations, it represents an internal payment and has no effect on the operations of the council.Accordingly, there is no need for disclosure of internal charges in Council's General Purpose Financial Statements.
The rate applied of 30% is the equivalent company tax rate prevalent as at balance date.
Local Government Rates & Charges
A calculation of the equivalent rates and charges payable on all Category 1 businesses has been applied to all land assets owned or exclusively used by the Business Activity.
Loan & Debt Guarantee Fees
The debt guarantee fee is designed to ensure that council business activities face “true” commercialborrowing costs in line with private sector competitors.
In order to calculate a debt guarantee fee, council has determined what the differential borrowing rate would have been between the commercial rate and the council’s borrowing rate for its business activities.
(ii) Subsidies
Government policy requires that subsidies provided to customers and the funding of those subsidiesmust be explicitly disclosed.
Subsidies occur where council provides services on a less than cost recovery basis. This option is exercised on a range of services in order for council to meet its community service obligations.
Accordingly, Subsidies disclosed (in relation to National Competition Policy) represents the
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 203
SPFS 2013_
Sutherland Shire Council
Notes to the Special Purpose Financial Statementsfor the financial year ended 30 June 2013
Note 1. Significant Accounting Policies
page 12
difference between revenue generated from ‘rate of return’ pricing and revenue generated from prices set by the council in any given financial year.
The overall effect of subsidies is contained within the Income Statement of each reported Business Activity.
(iii) Return on Investments (Rate of Return)
The Policy statement requires that councils with Category 1 businesses “would be expected togenerate a return on capital funds employed that is comparable to rates of return for private businessesoperating in a similar field”.
Such funds are subsequently available for meeting commitments or financing future investment strategies.
The Rate of Return on Capital is calculated as follows:
Operating Result before Capital Income + Interest Expense
Written Down Value of I,PP&E as at 30 June
As a minimum, business activities should generate a return equal to the Commonwealth 10 year bond rate which is 3.77% at 30/6/13.
The actual rate of return achieved by each Business Activity is disclosed at the foot of each respective Income Statement.
(iv) Dividends
Council is not required to pay dividends to either itself (as owner of a range of businesses) or to anyexternal entities.
204 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
page 13
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 205
page 14
206 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Sutherland Shire Council SPECIAL SCHEDULES for the year ended 30 June 2013
“Sutherland Shire, in Sydney’s south, shaped bybays, rivers, beaches and national parks…”
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 207
Special Schedules 2013
page 1
Sutherland Shire Council
Special Schedules for the financial year ended 30 June 2013
Contents
Special Schedules1
Net Cost of Services
Statement of Long Term Debt (all purposes)
Statement of Internal Loans (Sect. 410(3) LGA 1993)
Water Supply - Income StatementWater Supply - Statement of Financial Position
Sewerage Service - Income StatementSewerage Service - Statement of Financial Position
- Notes to Special Schedules No. 3 & 5
Condition of Public Works
Financial Projections
1 Special Purpose Schedules are not audited.
Background
These Special Schedules have been designed to meet the requirements of special purpose users such as;
the NSW Grants Commissionthe Australian Bureau of Statistics (ABS),the NSW Office of Water,the Department of Environment, Climate Change and Water, andthe Division of Local Government (DLG).
The financial data is collected for various uses including;
the allocation of Financial Assistance Grants,the incorporation of Local Government financial figures in national statistics,the monitoring of loan approvals,the allocation of borrowing rights, andthe monitoring of the financial activities of specific services.
- Special Schedule No. 5 n/a
Page
2
4
n/a
- Special Schedule No. 1
- Special Schedule No. 2(a)n/a
- Special Schedule No. 4
- Special Schedule No. 2(b)
- Special Schedule No. 3n/a
- Special Schedule No. 8
(i)
- Special Schedule No. 6
7
5- Special Schedule No. 7
n/a
n/a
(ii)
208 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Special Schedules 2013
page 2
Sutherland Shire Council
Special Schedule No. 1 - Net Cost of Services for the financial year ended 30 June 2013
$'000
Governance
Administration
Public Order and Safety
Beach ControlEnforcement of Local Govt. RegulationsAnimal ControlOtherTotal Public Order & Safety
Health
EnvironmentNoxious Plants and Insect/Vermin ControlOther Environmental ProtectionSolid Waste ManagementStreet CleaningDrainageStormwater ManagementTotal Environment
Community Services and EducationAdministration & EducationSocial Protection (Welfare)Aged Persons and DisabledChildren's ServicesTotal Community Services & Education
Housing and Community AmenitiesPublic CemeteriesPublic ConveniencesStreet LightingTown PlanningOther Community AmenitiesTotal Housing and Community Amenities
Water Supplies
Sewerage Services
-
(930)-
-
-(1,704)
(1,666)
-
-
(704)(672)
-
(158)
4
-
(6,356)
(1,300)
829708
-
-
-
26
-
26-
1,676924
26,702
31,568359
-
210
14,209
1,277
52-
-
--
7,326
-
Net Cost.of Services.
791(1,664)(3,858)
(898)
(4,894)304
4,998 16 - (4,982)
(601)--
(49,884)
-
498
-
Function or Activity
11
Fire Service Levy, Fire Protection, Emergency Services
1,675
12,462
4,5151,534
59,036
4,112
4,744
- -(5,332)
- (675)
-
1,036
1,099-
11,300
157
-
970
-
-
-
-
-(1,162)
(1,030)(4,164)
234
-
-
--
115
504
12,90912,696
-
351
--
Expenses from. Continuing. Operations. Non Capital.
4,414
10
663-
Capital.
Income fromcontinuing operations
5,205
361
203-
25,772
5,968
26,648
1,907
254 -
4,408
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 209
Special Schedules 2013
page 3
Sutherland Shire Council
Special Schedule No. 1 - Net Cost of Services (continued) for the financial year ended 30 June 2013
$'000
Recreation and CulturePublic LibrariesMuseumsArt GalleriesCommunity Centres and HallsPerforming Arts VenuesOther Performing ArtsOther Cultural ServicesSporting Grounds and VenuesSwimming PoolsParks & Gardens (Lakes)Other Sport and RecreationTotal Recreation and Culture
Fuel & Energy
Agriculture
Mining, Manufacturing and ConstructionBuilding ControlOtherMining,Manufacturing&ConstructionTotal Mining, Manufacturing and Const.
Transport and CommunicationUrban Roads (UR) - LocalUrban Roads - RegionalSealed Rural Roads (SRR) - LocalSealed Rural Roads (SRR) - RegionalUnsealed Rural Roads (URR) - LocalUnsealed Rural Roads (URR) - RegionalBridges on UR - LocalBridges on SRR - LocalBridges on URR - LocalBridges on Regional RoadsParking AreasFootpathsAerodromesOther Transport & CommunicationTotal Transport and Communication
Economic AffairsCamping Areas & Caravan ParksOther Economic AffairsTotal Economic Affairs
Totals – FunctionsGeneral Purpose Revenues(2)
Share of interests - joint ventures &associates using the equity method
NET OPERATING RESULT (1)
(1) As reported in the Income Statement (2) Includes: Rates & Annual Charges (incl. Ex Gratia, excl. Water & Sewer), Non Capital General Purpose Grants, Interest on Investments (excl. Ext. Restricted Assets) & Interest on overdue Rates & Annual Charges
-
(915)
(4,311)
(561)
(2,592)
-
Net Cost.of Services.
-
(4,311)
-
-
(3,711)
-
-
285(9,114)
7,025-
-
(6,137)-
3,615
108,772
12,248
----
4,685
-
(104,087)(522)
-
(1,193)3,625
(522)
-
(64)
-
-
-(1,043)
(5,106)
-(498)
-
(24,638)
1,737535
-
Capital.
130
-
-
-
---
--
--
8,723 2,170
-
3,087
1,824
-
-
7,398
7,398
- -- -
1,991
-
Non Capital.
-
Expenses from. Continuing. Operations.
11,386
2,42613,391
718
1,023
220-
-
-
-
-
-
-
-
-
--
-
1,90842,8882,336 2,621
16,342
--
Function or Activity
3,087
-
-
2,842
-
- -
-
-
41
--
12,248
-
-
3,064
--
-
-1,178
64
617-
1,043 -
-
-
- -
5,906
197,036
-
10,447 3,348
6,8306,830
189,473
6,308
--
108,772197,036
6,308
-
80,701
8,285
758
1,076
Income fromcontinuing operations
---
210 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Sut
herla
nd S
hire
Cou
ncil
Spe
cial
Sch
edul
e N
o. 2
(a) -
Sta
tem
ent o
f Lon
g Te
rm D
ebt (
all p
urpo
se)
for t
he fi
nanc
ial y
ear e
nded
30
June
201
3
$'00
0
Not
es: E
xclu
des
(i) In
tern
al L
oans
& (i
i) P
rinci
pal I
nflo
ws/
Out
flow
s re
latin
g to
Loa
n R
e-Fi
nanc
ing.
T
his
Sch
edul
e is
pre
pare
d us
ing
the
face
val
ue o
f deb
t obl
igat
ions
, rat
her t
han
fair
valu
e (w
hich
are
repo
rted
in th
e G
PFS
).
Loan
s (b
y So
urce
)C
omm
onw
ealth
Gov
ernm
ent
Cur
rent
--
--
--
-
Prin
cipa
l out
stan
ding
New
Lo
ans
rais
ed
durin
g th
e ye
ar
at b
egin
ning
of t
he y
ear
Cla
ssifi
catio
n of
Deb
tC
urre
ntN
on
Cur
rent
Tota
l
-
--
---
-
Deb
t red
empt
ion
durin
g th
e ye
ar
From
R
even
ueSi
nkin
g Fu
nds
-
2,42
6--
1,06
1-1,
061
-
15,8
68-
-
-
-
-
Special Schedules 2013
Tran
sfer
s to
Sin
king
Fu
nds
Prin
cipa
l out
stan
ding
Inte
rest
ap
plic
able
fo
r Yea
rTo
tal
Non
C
urre
nt
at th
e en
d of
the
year
-
-
--
--
--
--
18,2
94
--
2,42
615
,868
18,2
94-
-- -
Oth
er S
tate
Gov
ernm
ent
--
--
--
--
--
Trea
sury
Cor
pora
tion
-
-
--
Publ
ic S
ubsc
riptio
n-
-
--
---
-
Fina
ncia
l Ins
titut
ions
2,84
416
,091
18,9
35-
2,30
0
--2,
300
- -2,
941
--
-2,
941
2,84
416
,091
Tota
l Loa
ns-
18,9
35O
ther
--
-O
ther
Lon
g Te
rm D
ebt
Rat
epay
ers
Adva
nces
--
-
502
Gov
ernm
ent A
dvan
ces
-Fi
nanc
e Le
ases
824-
--
516
-67
-1,
326
--
-48
6-
-
2,81
7
877
391
60
19,1
71
486
391
877
16,3
54
60
1,12
1--
--D
efer
red
Paym
ents
824-
3,34
6-
16,9
15
--
--
page 4
Tota
l Lon
g Te
rm D
ebt
502
516
Tota
l Deb
t
67
20,2
61
1,32
6
2,36
73,
457
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 211
Sut
herla
nd S
hire
Cou
ncil
Spe
cial
Sch
edul
e N
o. 7
- C
ondi
tion
of P
ublic
Wor
ks a
s at
30
June
201
3
$'00
0
Special Schedules 2013
-8,
480
1,68
8
2.83
%
7,58
1
2.00
%
2.00
%
145
1,53
1 22 383
0.67
%
675
3
2.00
%
ASSE
T C
LASS
Bui
ldin
gs
Seal
ed R
oads
Publ
ic R
oads
sub
tota
l
Art G
alle
ry
8,55
4
Cou
ncil
Hou
ses
2.00
%
Expe
nse
Asse
t Cat
egor
y
Amen
ities
/Toi
lets
Cou
ncil
Offi
ces
2.00
%
Cou
ncil
Hal
ls
Libr
ary
Chi
ldca
re C
entre
(s)
per N
ote
1
(%)
Valu
atio
n
Rat
eD
ep'n
.
2.00
%
Cou
ncil
Wor
ks D
epot
2.00
%
2.00
%
2.00
%
23,4
3918
,032
389,
971
satis
fact
ory
Cos
t
Accu
m.
Dep
reci
atio
nAm
ortis
atio
n&
Impa
irmen
t
Dep
'n
482
-
13,1
1210
,327
37,
970
120
312
256
per N
ote
4
42,4
35
($)
208
brin
g up
to a
Con
ditio
n#.co
nditi
on /
Mai
nten
ance
Ass
et
cost
to
8,14
89,
884
7,56
82,
609
3,99
2
36,9
77
180
Annu
al
Annu
al
Am
ount
(W
DV)
19,8
04
Cur
rent
(3)
Mai
nten
ance
<<<<
<<<<
<<<<
per
Not
e 9
>>>>
>>>>
>>>>
Req
uire
d(2)
Estim
ated
Car
ryin
g
sub
tota
l
1.43
%
4,71
1
Foot
path
sC
ycle
way
s
Roa
d Fu
rnitu
re
Brid
ges
Kerb
and
Gut
ter
262,
487
2.69
%10
,164
5,91
440
,933108
77,9
7416
,078
208
36,
453
431,
017
4,42
61,
125
118,
907
11,6
7068
,276
25,1
915,
217
43,0
853,
063
73,2
3118
9,25
63
8,16
722
5,92
116
4,05
0
8,47
82.
00%
183,
446
166
3,61
6
1,68
485
7
110,
554
72,8
92
16,0
9612
,735
5,16
7
3318
048
,333
8,12
6
5,86
9
85,3
1022
,631
311
02,
610
675
339
650
371
891
23
stan
dard
(1)
707
190
241
645
819
557
519
537
8,66
2
407
5,32
642
3
6,29
414
7
3
300
3
55,8
33
-
280
6,52
2
5,68
6
3,72
465
0
10,7
60 571-
1,00
11,
243
220
7,61
367
,929
753
327,
949
478,
543
150,
594
page 5
212 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Sut
herla
nd S
hire
Cou
ncil
Spe
cial
Sch
edul
e N
o. 7
- C
ondi
tion
of P
ublic
Wor
ks (c
ontin
ued)
as
at 3
0 Ju
ne 2
013
$'00
0
Not
es:
(1).
Sat
isfa
ctor
y re
fers
to e
stim
ated
cos
t to
brin
g th
e as
set t
o a
satis
fact
ory
cond
ition
as
deem
ed b
y C
ounc
il. It
doe
s no
t inc
lude
any
pla
nned
enh
ance
men
ts to
the
exis
ting
asse
t.(2
).R
equi
red
Ann
ual M
aint
enan
ce is
wha
t sho
uld
be s
pent
to m
aint
ain
asse
ts in
a s
atis
fact
ory
stan
dard
.(3
).C
urre
nt A
nnua
l Mai
nten
ance
is w
hat h
as b
een
spen
t in
the
curre
nt y
ear t
o m
aint
ain
asse
ts.
#A
sset
Con
ditio
n "K
ey"
- as
per t
he D
LG In
tegr
ated
Pla
nnin
g &
Rep
ortin
g M
anua
l
Exce
llent
- No
wor
k re
quire
d (n
orm
al m
aint
enan
ce)
Goo
d- O
nly
min
or m
aint
enan
ce w
ork
requ
ired
Ave
rage
- Mai
nten
ance
wor
k re
quire
dPo
or- R
enew
al re
quire
dVe
ry P
oor-
Urg
ent r
enew
al/u
pgra
ding
requ
ired
Annu
al
Mai
nten
ance
19,0
46
360
843
746
025
28
stan
dard
(1)
Cur
rent
(3)
Special Schedules 2013
1,49
4
Con
ditio
n#.M
aint
enan
ce
85,0
4852
1,03
991
3,67
21,
434,
711
TOTA
L - A
LL A
SSET
S
-
42
18,6
46-
1
359,
802
sub
tota
l2,
585
206,
395
566,
197
3
Inle
t and
Jun
ctio
n Pi
ts1.
00%
Out
fall
Stru
ctur
es3.
33%
Hea
d W
alls
3.33
%
12,7
6661
990
34
42,9
24
7,23
41,
522
475
165
438
5,53
295
47,
744
238
1,03
279
165
377
41,
298
14,6
5828
,266
Stor
mw
ater
Con
duits
1.00
%50
8,98
532
3,68
3
cond
ition
/
per N
ote
4<<
<<<<
<<<<
<< p
er N
ote
9 >>
>>>>
>>>>
>>18
5,30
2D
rain
age
Wor
ks
Req
uire
d(2)
brin
g up
to a
per N
ote
1
Cos
t Va
luat
ion
(WD
V)
(%)
Annu
al
Ass
et
satis
fact
ory
Asse
t Cat
egor
y
($)
Rat
eA
mou
nt
Expe
nse
Car
ryin
g Ac
cum
.D
epre
ciat
ion
Amor
tisat
ion
&Im
pairm
ent
Dep
'n.
Dep
'n
cost
toEs
timat
ed
1,83
0
page 6
ASSE
T C
LASS
19,8
67
5
8,95
2
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 213
Special Schedules 2013
page 7
Sutherland Shire Council
Special Schedule No. 8 - Financial Projections as at 30 June 2013
$'000
(i) OPERATING BUDGETIncome from continuing operationsExpenses from continuing operations
Operating Result from Continuing Operations
(ii) CAPITAL BUDGETNew Capital Works (2)
Replacement/Refurbishment of Existing AssetsTotal Capital Budget
Funded by:– Loans– Asset sales– Reserves– Grants/Contributions– Recurrent revenue– Other
Notes:(1) From 12/13 Income Statement.(2) New Capital Works are major non-recurrent projects, eg new Leisure Centre, new Library, new Swimming pool etc.(3) Financial projections should be in accordance with Council’s Integrated Planning and Reporting framework.
16/17 Forecast(3)Forecast(3)
15/16
217,172209,848 223,222
12/13Forecast(3)
14/15 13/14 Forecast(3)Actual(1)
27,191 23,360 24,577
197,036 199,614
4,685 3,233
21,690 19,135 13,090 13,465
201,721 204,595206,615
15,470
4,981 2,749
220,473
3,412
213,760
48,881 42,495 40,047
4,543 ---
- -
8,186900
--
17,887 18,239
-
31,704
-
30,977
-
17,922 31,562
31,704 48,881 42,495 1,000
40,547 31,477 7,232 1,0001,254 1,000
8,57122,133
18,605 17,301 900746
17,755 22,951 17,390
21,346 21,391
900
1,000
-
31,562
Forecast(3)
17/18
229,385227,448
1,937
13,640
--
9,04621,516
214 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
Global reporting initiative ..........................................................216
General Index ..........................................................................218
Statutory index ........................................................................219
Glossary ..................................................................................220
Contact directory......................................................................222
APPENDICES
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 215
APPENDICES
Official opening of Len Waters Park, Barden Ridge
216 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
GLOBAL FINANCIAL INDICATORS
The Global Reporting Initiative (GRI) Reporting Framework sets out the principles and indicators that organizations can use to measure and report their economic, environmental, and social performance.
Because the report must be prepared under a structure determined by activities and other matters as per the NSW Local Government Act and other legislation, the indicators shown below are indicative of how our reporting currently reflects some GRI principles. However where our indicators overlap with GRI indicators we have cross-referenced them below. The Global Reporting Initiative G3.1 indicators have been used.
GRI Ref
Description Section of this report Page
Profile disclosures
Strategy and analysis
1.1 Statement from organisation’s most senior decision-maker
Mayor’s report, General Manager’s report
6,8
Organisational profile
2.1 Name of the organisation Front cover
2.2 Primary brands, products, and/or services Senior staff and organisation chart, Principal activities
26, 40
2.3 Operational structure of the organisation, including main divisions, operating companies, subsidiaries, and joint ventures
Senior staff and organisation chart, Other statutory Information, Special Purpose Financial Statements
26, 103, 193
2.4 Location of organisation’s head office Back cover
2.5 No. of countries where organisation operates Australia
2.6 Nature of ownership and legal form Local government, proclaimed under NSW Government
2.7 Markets served How we plan and report, About Sutherland Shire
4, 12
2.8 Scale of the reporting organisation Senior staff and organisation chart 26, 30
2.9 Significant changes to the organisation Mayor’s report, General Manager’s report, Senior staff and organisation chart
6, 8, 26
2.10 Awards received in the reporting period Award winning council 10
Report parameters
3.1 Reporting period (eg - fiscal/calendar year) for information provided
Front cover
3.2 Date of most recent previous report (if any) 2011/12 year - published November 2012
3.3 Reporting cycle (annual, biennial, etc.) Annual (financial year)
3.4 Contact point for questions regarding the report Back cover
3.5 Process for defining report content. How we plan and report 4
3.6, 3.7
Boundary of, and limitations on scope of, this report How we plan and report 4
3.8 Basis for reporting on joint ventures, subsidiaries, leased facilities, outsourced operations and others
Other statutory reporting, Financial statements
103, 181
3.12 Location of standard disclosures Statutory index 219
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 217
GLOBAL FINANCIAL INDICATORS
Governance, commitments and engagement
4.1 Governance structure of the organisation, including committees under the highest governance body responsible for specific tasks
Councillors, Supporting our councillors, Senior staff and organisation chart
18, 24, 26
4.5 Linkage between compensation for members of the highest governance body, senior managers, and executives, and the organisation’s performance
Supporting our councillors, Other statutory information
24, 86
4.8 Internally developed statements of mission or values, codes of conduct, and principles relevant to economic, environmental, and social performance and the status of their implementation.
Vision and values 2
Performance indicators
Economic performance
EC1 Direct economic value generated and distributed, including revenues, operating costs, employee compensation, donations and other community investments, retained earnings, and payments to capital providers and governments.
Financial Reports 104
EC4 Significant financial assistance received from government.
Financial Reports 104
Biodiversity
EN3 Direct energy consumption by primary energy source.
Principal Activity 3: Nature 58
EN6 Initiatives to provide energy-effi cient or renewable energy based products and services, and reductions in energy requirements as a result of these initiatives.
Principal Activity 3: Nature 58
Emissions, effluents and waste
EN18 Initiatives to reduce greenhouse gas emissions and reductions achieved.
Principal Activity 3: Nature 66
EN22 Total weight of waste by type and disposal method. Principal Activity 3: Nature 63
Employment
LA1 Total workforce by employment type, employment contract, and region, broken down by gender.
Staff 30
LA2 Total number and rate of new employee hires and employee turnover by age group, gender, and region.
Staff 30
Occupational health and safety
LA7 Rates of injury, occupational diseases, lost days, and absenteeism, and number of work-related fatalities by region and by gender.
Staff 30
Society
SO3 Percentage of employees trained in organization’s anti-corruption policies and procedures.
Civic Life 83
218 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
GENERAL INDEX
Animal shelter ................................14, 82, 100
Animals, pest and feral ..................................66
Arts .........................14, 28, 51, 71, 72, 80, 97
Audit, Internal ..................................29, 38, 84
Awards ......................................10, 11, 32, 76
Beaches .................14, 28, 51, 53, 54, 71, 101
Budget .............................................6, 8, 9, 26
Bushcare .............................15, 34, 64, 64, 73
Bushfire .............19, 20, 21, 22, 23, 25, 52, 78
Business incubator ....10, 19, 22, 25, 29 76, 78.
Calendar ......................................................14
Childcare/children
...6, 11, 14, 15, 24, 28, 30, 69, 70, 71, 72, 90
Citizens/Community Group of the Year .......11, 73
Committees and subcommittees, council
.....................................19, 20, 21, 22, 23, 25
Community engagement ..........7, 10, 29, 82, 83
Community satisfaction ..................2, 63, 71, 82
Competitive neutrality ..........................192, 201
Contracts .........................................25, 83, 98
Councillors .........................................6, 18, 26
Cronulla Beach CBD and Plaza ...........................
.......................14, 15, 46, 59, 65, 72, 74, 103
Cycleways ..................................45, 49, 57, 80
Directors
.. 8, 26, 27, 28, 29, 35, 38, 83, 84, 85, 86, 102
Economic development
.........................19, 20, 21, 22, 23, 25, 29, 73
Education and learning ..........13, 30, 31, 34, 37,
............. 50, 63, 69, 70, 71, 72, 76, 78, 85, 101
Energy and sustainability .............29, 52, 59, 60
Entertainment Centre, Sutherland
.................14, 21, 22, 25, 28, 53, 80, 99, 107
EEO: Equal employment opportunity ...26, 35, 85
Fair Workplace - see EEO
Financial statements ...................................104
Footpaths and pathways ...........6, 30 44, 45, 57
General Manager .5, 24, 26, 27, 29, 38, 86, 102
Global Reporting Initiative ............................216
Governance ..........................16, 38, 40, 81, 86
Graffiti .............................................10, 72, 73
Grants to the community....................72, 80, 99
Greenhills.............................6, 50, 60, 72, 101
Greenweb ..............................................64, 67
Heritage ...................15, 20, 21, 25, 79, 80, 99
Housing .......................................9, 13, 55, 82
Indigenous/Aboriginal people
.............................19, 20, 23, 25, 36, 85, 102
Infrastructure ..................................4, 8, 26, 29
Integrated planning and reporting
.......30, 42, 43, 44, 48, 49, 53, 54, 57, 67, 82
Legal proceedings .................25, 28, 84, 87, 98
Leisure centres .....6, 10, 14, 15, 28, 48, 49, 77
Libraries ....................6, 14, 15, 25, 30, 53, 74
Local Environmental Plan, Sutherland Shire .8, 9, 55
Management Plan/Delivery Program ........4, 5, 40
Mayor ......6, 11, 15, 19, 20, 24, 25, 26, 27, 73
OHS: Occupational health and safety ..34, 37, 72
Ombudsman, Internal ........9, 27, 29, 38, 39, 83
Overseas visits ........................................24, 98
Parks and reserves .............6, 7, 14, 28, 30, 46,
..............................50, 51, 54, 62,64, 73, 101
Planning agreements ...................................102
Playgrounds .....................6, 45, 46, 50, 51, 55
Population ....................................................12
Rates and charges written off .........................98
Roads ......6, 9, 28, 30, 39, 43, 44, 55, 65, 106
Seniors ..........................14, 72, 73, 77, 82, 99
Shopping centres ..................................6, 7, 46
Sport ................................6, 7, 10, 21, 22, 23,
.........................25, 28, 30, 48, 49, 50, 59, 77
Staff ...................2, 6, 8, 9, 24, 25, 26, 30, 39,
.................70, 71, 72, 83, 84, 85, 86, 98, 102
State of the Shire/Environment reports ...............5
Stormwater ........................28, 46, 27, 48, 102
Strategic Plan ...........................4, 5, 72, 80, 83
Strategic Review ..............................6, 8, 38 83
Strategies and Civic Life .................................40
Tourism .......10, 13, 14, 15, 19, 26, 29, 75, 76
Vision statement .............................................2
Waste and recycling ..15, 28, 30, 59, 63, 66, 67
Wastewater ............................................10, 60
Websites and intranet .................35, 37, 72, 76,
........................82, 85, 86, 98, 101, back cover
Workplace health and safety - see OHS
Youth .....15, 19, 20, 22, 23, 25, 28, 72, 75, 99
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 219
STATUTORY INDEXThis index shows the various government acts and regulations which require council to include information in its annual report, and where to find that information.
STATUTORY INDEX
This index shows the various government acts and regulations which require council to include information in its annual report, and where to find that information.
LEGISLatIon PaGE
NSW Local Government Act 1993 and NSW Local Government (General) Regulation 1999
s428(1) Implementing the delivery program and effectiveness of principal activities undertaken 86
s428(4)(a) Audited financial reports and notes and information 104
cl 132 Amount of rates and charges written off during the year 98
s428(4)(b) and cl 217(1)(a) Details of overseas visits 98
cl 217(1)(a1) Payment of expenses of, and the provision of facilities to, councillors 24
cl 217(1)(a2) Details of contracts awarded for amounts greater than $150,000 98
cl 217(1)(a3) Summary of amounts incurred by the council in relation to legal proceedings 87
s67(3) and cl 217(1)(a4) Work carried out on private land 103
cl 217(1)(a5) Total amount contributed or otherwise granted under Section 356 99
cl 217(1)(a6) External bodies that exercised functions delegated by council 103
cl 217(1)(a7) Bodies in which council held a controlling interest 103
cl 217(1)(a8) Bodies in which the council participated 103
cl 217(1)(a9) Statement of activities to implement its EEO management plan 35
cl 217(1)(b) Total remuneration comprised in remuneration package of the General Manager. 102
cl 217(1)(c) Total remuneration comprised in remuneration packages of all senior staff 102
cl 217(1)(e) Stormwater management services provided (if levied) 102
cl 217(1)(e1) Coastal protection services provided (if levied) 103
Part 2A S54P - Environmental upgrade agreement 103
s508(2) and s508A Special variation expenditure 100
Capital Expenditure Guidelines - Report on capital works projects. 100
Local Government (General) Regulation 2008, Companion Animals Act 1998 and Companion Animals Regulation 2008
Cl 217(1) and 16(2) Enforcing and ensuring compliance with Companion Animals Act and Regulation
100
Government Information (Public Access) Act 2009 and Regulation
s125(1) and cl 7 Schedule 2 - GIPA activity 86
Environmental Planning And Assessment Act 1979 - 93G(5)
s93G(5) - Planning agreements 102
Public Interest Disclosure Act 1994 and Regulation
Information on number of public interest disclosures and whether disclosure policy is in place 86
Carers (Recognition) Act 2010
8(2) Report on compliance with this Act 36
220 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
term Definition
Biodiversity Biological diversity or ‘biodiversity’ is the variety of life - includes all species of plants, animals and micro-organisms, the genetic material they contain and the ecosystems they form.
Bushcare A volunteer-based program which maintains remnant bushland areas.
Business cluster A network of similar business within a related industry which can share information and provide support.
Community Building Partnership
A NSW Government grants program
Competitive neutrality principles
Principles adopted under the National Competition Policy in Australia which aim to remove any unfair advantage government business activities can obtain over their private sector rivals as a result of their public ownership.
CRMS Customer request management system i.e. a CRMS is a logged customer requests
Cronulla Promotions Ltd
A company set up by council to manage the operation of Cronulla Plaza.
Destination 2036 A NSW Government action plan for local government to consider and develop structures and approaches to meet future community needs.
DET NSW Department of Education and Training
DCP Development Control Plan.
Enviro-Works Education program teaching ways to minimise waste, such as through composting and recycling.
EEO Equal employment opportunity.
GIPA The Government Information (Public Access) Act, known as GIPA, came into force on 1 July 1010 and replaced the Freedom of Information Act 1989.
Greenwaste Waste comprising lawn clippings, branches and other garden plant waste which can be recycled.
Greenweb A program to protect native plant and animal populations via corridors linking bushland habitat areas.
Hazard reduction Reducing bushfire fuel (flammable material) in order to minimise danger and to create space in which to fight fires.
Integrated Planning and Reporting
A NSW Government framework for local government to improve statutory planning and reporting processes and strengthen strategic processes
Internal Audit Charter
A formal document which provides a framework under which the audit function in council is performed.
JRPP Joint Regional Planning Panel - NSW government body which makes decisions on ‘regional develoment’ development applications
Language Aide program
Council’s program of providing staff with language proficiency in the most commonly spoken non-English languages in use in Sutherland Shire; this program is complemented by the use of the NSW Translation Service.
LEP Local Environmental Plan
National Childcare Accreditation Council
A Federal Government organisation which administers Child Care Quality Assurance (CCQA) systems for children’s services.
GLOSSARYTerms and abbreviations used in this publication.
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 221
GLOSSARYTerms and abbreviations used in this publication.
National Competition Policy
A series of reforms to encourage competition and discourage anti-competitive behaviour.
Pedestrian Access Mobility Plan (PAMP)
A detailed plan to develop pedestrian policies and build pedestrian facilities
PID Public Interest Disclosures (from Public Interest Disclosure Act 1994)
Principal activity A key objective within the adopted management plan.
Registered training organisations (RTOs)
RTOs provide, assess and issue nationally recognised qualifications.
RFS Rural Fire Service
RTA NSW Roads and Traffic Authority.
S356 (Section 356) Section 356 of the NSW Local Government Act 1993, referring to financial assistance granted by council.
S94 (Section 94) Section 94 of the NSW Environmental Planning and Assessment Act 1979, which refers to contributions paid by developers for provision, extension or augmentation of public amenities and public services required as a result of development.
Social sustainability Where members of the current generation have equal access to social resources, and future generations will have the same or more access to those resources..
SOE The State of the Environment is a mandatory report required of all councils by the NSW Department of Local Government. Sutherland Shire Council has incorporated the SOE into its State of the Shire report.
SOS State of the Shire - A research report which evaluates whether the Shire community as a whole is moving towards meeting community aspirations.
SQID Stormwater quality improvement device
SSHED Sutherland Shire Hub for Economic Development - council’s business accelerator (also known as an incubator) at Loftus.
SSLEP Sutherland Shire Local Environmental Plan.
SSROC Southern Sydney Regional Organisation of Councils, a local government group of which Sutherland Shire Council is a member.
Standing Committees Committees which assist council by considering reports and make recommendations.
Strategic Plan A community plan prepared by council in collaboration with and on behalf of residents, other levels of government agencies. It is used to steer planning for the Shire to achieve long term outcomes that residents want for the Shire.
Stormwater harvesting
Collection and treatment of stormwater for reuse.
Sustainability Sustainability aims to protect the environmental, social and economic rights of future generations while supporting those of the current generation.
WaSIP Waste and Sustainability Improvement Payment - a NSW Government program to assist councils
Wastewater Used water, from baths, septic systems, washing machines etc., which can come from commercial, domestic or industrial sources.
WHS Workplace Health and Safety
222 - SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13
ADMINISTRATION CENTRE Address: 4-20 Eton St, Sutherland
Post: Locked Bag 17, Sutherland NSW 1499
Document Exchange: DX 4511 Sutherland
Office Hours: Mon-Fri - 8.30am-4.30pm
Phone - 24 Hours 7 Days: ...........................................................................................(02) 9710 0333
Fax: ...........................................................................................................................(02) 9710 0265
Email: [email protected]
Web: www.sutherlandshire.nsw.gov.au
COUNCIL SERVICESANIMALS (DOGS AND CATS)
Sutherland Shi re Animal Shelter, Production Avenue, Taren Point ...................................... (02) 9710 0401
WASTE SERVICES
On-call clean-up bookings .............................................................................................(02) 9710 5722
AQUATIC/FITNESS/LEISURE CENTRES
Menai Indoor Sports Centre 98 Allison Crescent, Menai .................................................... (02) 9532 0444
Sutherland Leisure Centre, Rawson Ave, Sutherland ........................................................ (02) 8536 9777
Caringbah Leisure Centre, 9 Jacaranda Rd, Caringbah ..................................................... (02) 9525 6777
Engadine Leisure Centre, Anzac Ave, Engadine ................................................................(02) 9548 4200 Freshwater Cafe .........................................................................................................(02) 9548 4228
GOLF
The Ridge Golf Course and Driving Range, off New Illawarra Rd, Barden Ridge ................... (02) 9541 4960
Kareela Golf Course, Bates Drive, Kareela .......................................................................(02) 9521 6279
Woolooware Golf Course off Harnleigh Avenue, Woolooware .............................................. (02) 9523 3882
WET WEATHER LINE (SPORTING OVAL CLOSURES
Recorded information) .................................................................................................(02) 9710 0105
BEACHES
Beach Administration (Bate Bay Beaches) .....................................................................(02) 9527 9441
Surf Education Office ...................................................................................................(02) 8522 2100
CONTACT DIRECTORY
SUTHERLAND SHIRE COUNCIL ANNUAL REPORT 2012/13 - 223
CONTACT DIRECTORY
PaRKS
E G Waterhouse National Camellia Gardens, Cnr President Avenue and Kareena Road), Caringbah - there is no public phone at the Gardens.
Camellia Gardens Teahouse ..........................................................................................(02) 9540 2018
PLANT NURSERY
Sutherland Shire Community Nursery, 345 The Boulevarde, Gymea ................................... (02) 9524 5672
CHILDREN’S SERVICES
All enquiries re child care centres, long day care, family day care, vacation care and out of school hours care .(02) 9710 0466
aRtS anD EntERtaInMEnt
Hazelhurst Regional Gallery & Art Centre, 782 Kingsway, Gymea ...................................... (02) 8536 5700
Cafe Ph/Fax ...............................................................................................................(02) 8536 5755
Sutherland Entertainment Centre, 30 Eton Street, Sutherland............................................ (02) 9521 8888
TOURISM
www.visittheshire.com.au(02) 9710 0419
COMMUNITY DIRECTORY INFORMATION
Sutherland Shire Community Directory ...........................................................................(02) 9710 0437
http://www.datadiction.com.au/bin/dd.dll/Lincs?xps&MBR=SSC
LIBRaRIES
Central Library, 30-36 Belmont St, Sutherland ............................................................... (02) 9710 0351
Bundeena, Scarborough St, Bundeena ............................................................................(02) 9523 0932
Caringbah, 376-378 -378 Port Hacking Rd, Caringbah .................................................... (02) 9524 3803
Cronulla, Cronulla Central, 38-60 Croydon Street, Cronulla ............................................... (02) 9523 4980
Engadine, 116 Caldarra Rd, Engadine ............................................................................(02) 9548 6003
Menai, 34 Alison Crescent, Menai ..................................................................................(02) 9543 5747
Miranda, 31 Wandella Rd, Miranda ...............................................................................(02) 9524 8217
Sylvania, Southgate Shopping Centre, cnr Princes Highway & Port Hacking Rd, Sylvania ...... (02) 9522 7544
BUSINESS AND ECONOMIC
SSHED (business accelerator), 1 Pitt St, Loftus - www.sshed.com.au ................... (02) 9545 7777Economic Development ...............................................................................................................(02) 9527 0607
ADMINISTRATION CENTRE
Address: 4-20 Eton Street, SutherlandPost: Locked Bag 17, Sutherland NSW 1499Document Exchange: DX 4511 SutherlandOffice Hours: Mon-Fri - 8.30am-4.30pmPhone - 24 Hours 7 Days: (02) 9710 0333Fax: (02) 9710 0265Email: [email protected]: www.sutherlandshire.nsw.gov.au
A more detailed listing of contacts is inside.