annual report of the state of the cedar rapids community school district cedar rapids museum of art...
TRANSCRIPT
![Page 1: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/1.jpg)
Annual Report of the State of the Cedar Rapids Community School
District
Cedar Rapids Museum of ArtNovember 4, 2005 – 8:00 a.m.
![Page 2: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/2.jpg)
Quick Facts• 121 square miles• 2,700 employees• 17,500 students• 33 attendance sites• $170 million budget• 56 formal school/business
partnerships• Iowa’s second largest
school district
![Page 3: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/3.jpg)
Did you know??• IASBO and GFOA Certificates of
Excellence in Financial Reporting (10 consecutive years)
• Only school district in Iowa initiating E-procurement processes
• Moving to geo-mapping of transportation
• One of two school districts in the nation involved in the “Switch” Health/Nutrition Study
![Page 4: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/4.jpg)
The Other NCLB •No calorie left behind
![Page 5: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/5.jpg)
![Page 6: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/6.jpg)
A quick look at other measures in the annual report
![Page 7: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/7.jpg)
![Page 8: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/8.jpg)
![Page 9: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/9.jpg)
![Page 10: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/10.jpg)
![Page 11: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/11.jpg)
![Page 12: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/12.jpg)
![Page 13: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/13.jpg)
![Page 14: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/14.jpg)
The biggest challenge and the heart of the problem…
•The opportunity/ excellence/ achievement gap
![Page 15: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/15.jpg)
Grade 4 Reading - ITBS
White 77.1%
Black 47.2%
Asian 68%
Hispanic 66.7%
0102030405060708090
100
Grade 4 Reading - ITBS(October 2004)
WhiteBlackAsianHispanic
![Page 16: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/16.jpg)
Grade 11 Reading - ITBS
White80.4%
Black49.6%
Asian82.8%
Hispanic 73.1%
0102030405060708090
100
Grade 11 Reading - ITBS(October 2004)
WhiteBlackAsianHispanic
![Page 17: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/17.jpg)
• ITBS/ITED• SINA Schools• Watch List Schools• Sanctions• Opportunities for all
students
![Page 18: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/18.jpg)
The World is Flat- Thomas
Friedman
•Numbers Gap•Education Gap•Ambition Gap
![Page 19: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/19.jpg)
The “Boomerang” Generation(% of offspring returning home between the ages of 18-29)
•1990 – 32%•2000 – 60%•2005 – 65%
![Page 20: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/20.jpg)
“Change or Die”- Fast Company
• Outsourcing• Off shoring• Uploading• Supply Chain
![Page 21: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/21.jpg)
Squirm Factors…• Computer programmer…$70,000 U.S.;
$8,250 India; $3,000 China• Irish Americans going ‘home’• China – 350,000 student online
university• Options outside of the public school
![Page 22: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/22.jpg)
Squirm Factors…
• Among adults aged 25-34, the U.S. ranks 9th among industrialized nations in the share of its population with at least a high school diploma; 7th in its share with a college degree
![Page 23: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/23.jpg)
Squirm Factors…
• Although high school graduates are enrolling in college in higher numbers than in the past (70% nationally, compared to 50% or lower in past generations), the percentage who actually earn degrees in about the same as it was in 1950
![Page 24: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/24.jpg)
Squirm Factors…
• In Asia, 60% of the college degrees conferred are in mathematics, science, and engineering, compared to just 5% in the U.S. China alone produces 360,000 engineers annually, compared to 60,000 in the U.S.
![Page 25: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/25.jpg)
How do we make meaningful progress in a
large/complex system reacting to abundant and
varied pressure to improve?
![Page 26: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/26.jpg)
A helpful framework…
Malcolm Baldrige Criteria for
Performance Excellence
![Page 27: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/27.jpg)
The 7 Baldrige Categories
• Leadership• Strategic Planning• Student/Stakeholder
Focus• Information and
Analysis• Human Resource Focus• Process Management• Performance Results
![Page 28: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/28.jpg)
2004-05 Develop awareness for World-Class Operation of the District; Complete an Iowa Recognition for Performance Excellence Self-Assessment
2005-06 (June 06) Apply for IRPE Tier 3 Bronze Award
2006-07 Implementation of IRPE feedback recommendations; Increase deployment of continuous improvement principles and processes
Timeline:Timeline:
2007-08 Apply for IRPE Tier 3 Silver Award
2008-09 Implementation of IRPE feedback recommendations; Increase deployment of continuous improvement principles and processes
2009-10 Apply for IRPE Tier 3 Gold Award
2010-11 Apply for Malcolm Baldrige National Quality Award
![Page 29: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/29.jpg)
It’s About Alignment…
•Can we get everyone rowing in the same direction?
![Page 30: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/30.jpg)
![Page 31: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/31.jpg)
Dave’s Goals: 2005 - 06
• Goal 1- Diverse Workforce• Goal 2- Continuous
Improvement• Goal 3- Compensation• Goal 4- Enrollment/Facility
Study
![Page 32: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/32.jpg)
Drilling down: Goal 1 Action Plan
Description of Activity Research & Rationale Results Funding TimelinePersons Impacted
![Page 33: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/33.jpg)
Drilling Down: Dave’s Goal 2 – 05 - 06
Drilling Down: Dave’s Goal 2 – 05 - 06
•During the 2005-06 school year, a plan to continue the deployment of continuous improvement efforts in the CRCSD will be formalized.
One-year targets:One-year targets:
![Page 34: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/34.jpg)
Dave’s Goal 2 – 05-06Dave’s Goal 2 – 05-06
•Continuous Improvement Outcomes
One-year targets:One-year targets:
District & Cabinet School & Departments Classroom Student
![Page 35: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/35.jpg)
Dave’s Goal 2 – 05-06 (265/49)Dave’s Goal 2 – 05-06 (265/49)
Action Research Deployment Team Workshops
•Elementary: – 129 individuals representing 24 teams
•-Middle School: – 42 individuals representing 7 teams
•-High School: – 42 individuals representing 4 teams
•-Support Services: – 52 individuals representing 14 teams
One-year targets:One-year targets:
![Page 36: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/36.jpg)
Monitoring Monitoring Progress…Progress…
–Keeping track of ourselves (District balanced scorecard)
![Page 37: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/37.jpg)
![Page 38: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/38.jpg)
Monitoring Monitoring Progress…Progress…
–What are our stakeholders telling us?
![Page 39: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/39.jpg)
Do you enjoy reading to learn?
![Page 40: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/40.jpg)
Question #1• To provide the highest
quality education to all CRCSD students, what challenges will the district have to address as it plans for the future?
![Page 41: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/41.jpg)
![Page 42: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/42.jpg)
Administrators Administrators FeedbackFeedback• I support the
District’s continuous improvement efforts… – YES (99%)– NEED CLARIFICATION
(1%)
– NO (0%)
• The pace of our continuous improvement effort is…
– Just Right (94%)– Too Fast (5%)– Too Slow (1%)
![Page 43: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/43.jpg)
Staff FeedbackStaff Feedback
District Focus:StronglyAgree
Agree Disagree Strongly Disagree
Regarding District direction… I believe the District is
heading in the right direction.
41% 57% 2% 0%
Regarding District direction… I believe the District has
identified the right vision, mission, goals, core values and guiding behavior which I support.
43% 55% 2% 0%
98%98%
98%98%
![Page 44: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/44.jpg)
![Page 45: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/45.jpg)
“We can, whenever and wherever we choose, successfully teach all children whose schooling is of interest to us.
We already know more than we need to know to do that. Whether or not we do it must finally depend on how we feel about the fact that we haven’t so far.”
“We can, whenever and wherever we choose, successfully teach all children whose schooling is of interest to us.
We already know more than we need to know to do that. Whether or not we do it must finally depend on how we feel about the fact that we haven’t so far.”
-Ron Edmunds-Ron Edmunds
![Page 46: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/46.jpg)
The only thing more exciting than our past is our future!
Visit us onlinewww.cr.k12.ia.us
![Page 47: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/47.jpg)
![Page 48: Annual Report of the State of the Cedar Rapids Community School District Cedar Rapids Museum of Art November 4, 2005 – 8:00 a.m](https://reader035.vdocument.in/reader035/viewer/2022070415/56649ed85503460f94be6693/html5/thumbnails/48.jpg)
Annual Report of the State of the Cedar Rapids Community School
District
Cedar Rapids Museum of ArtNovember 4, 2005 – 8:00 a.m.