ao188/lgs status and schedule
DESCRIPTION
Yutaka Hayano January 31, 2008. AO188/LGS Status and Schedule. Contents. Subaru AO188/LGS overview Performance evaluation Status and Schedule. Upgrade from AO36 to AO188/LGS. System layout. Instruments IRCS (HiCIAO) (Kyoto 3DII). 20mas FOV. N. IRCS 52mas camera. 53” x 53”. E. - PowerPoint PPT PresentationTRANSCRIPT
AO188/LGSAO188/LGSStatus and ScheduleStatus and Schedule
1
Yutaka HayanoYutaka Hayano
January 31, 2008January 31, 2008
ContentsContents
Subaru AO188/LGS overviewSubaru AO188/LGS overview
Performance evaluationPerformance evaluation
Status and ScheduleStatus and Schedule2
Upgrade from Upgrade from AO36 to AO188/LGSAO36 to AO188/LGS
3
AO36 LGSAO188
Focus Cassegrain NasmythWFS Curvature WFS Band K-band 1 – 5 mmLimiting mag of GS
13~16 (NGS) 13 ~ 16 (NGS mode)17 ~ 19 ( LGS mode )
LGS No > 4W SFG 10-11 mag
Strehl ratio ( NGS) ( LGS)
0.3@K, 0.05@J
0.7@K, [email protected]@K
Sky coverage@ K ~1% > 50 %FOV of WFS 2’ 2.7’
System layoutSystem layout
4
InstrumentsIRCS(HiCIAO)(Kyoto 3DII)
AO188/NGS First LightAO188/NGS First Light
5
IRCS 52mas camera53” x 53”
20mas FOV
October 2006
FWHMFWHM
6
K-band V=9.2 guide star
Strehl RatioStrehl Ratio
7
K-band V=9.2 guide star
Seeing
Encircled EnergyEncircled Energy
8
SeeingJz
HK
L’
M’
System upgrade from System upgrade from the first light configurationthe first light configuration
9
OpticsOptics New components. (AOIMR, BS, etc.)New components. (AOIMR, BS, etc.) Upgrade components. (AO Calibration source, Acquisition Unit Upgrade components. (AO Calibration source, Acquisition Unit
etc.)etc.)
ElectronicsElectronics New electronics for new components.New electronics for new components. Minor upgrade.Minor upgrade. Cabling.Cabling.
SoftwareSoftware Re-configurationRe-configuration Minor upgrade.Minor upgrade. New software for new components.New software for new components.
OthersOthers Cover, cooling system, AO/IRCS transfer mechanism.Cover, cooling system, AO/IRCS transfer mechanism.
New/Upgrade items New/Upgrade items on AO optical bench on AO optical bench
10
Imagerotator
ADC
HiCIAO I/FF-conversion
Low-order WFS
AU2
AO CalibrationLight source
High-order WFS
DM
Off-axisParabola
Off-axisParabola
AU1
BS1BS2
Flat mirror
Flat mirror
Current statusCurrent status
11
Cleared up AO optical bench AO calibration light source unit
Schedule and MilestonesSchedule and Milestones
12
2006 2007 2008 2009
First light
Design
Manufacture
Assembly
AO188 assembly/Hilo Test
Summit Transportation
AOCAL HOWFS IMR LOWFS
AOCAL HOWFS IMR LOWFS
AOCAL/HOWFS/IMR LOWFS
Summit Test/Eng Obs
Risk shared open use (NGS)
Laser launch test/LGS test
Risk shared open use (LGS)
Second light (NGS)
April - May
6/5
7/19
S08B
S09A
5/12
Risk-shared open use Risk-shared open use (S08B)(S08B)
13
Limited number of nights, proposals. Limited number of nights, proposals. (~ 10 nights, ~ 5 proposals)(~ 10 nights, ~ 5 proposals)
Use sidereal natural guide star.Use sidereal natural guide star. IRCS. (imaging , spectroscopy)IRCS. (imaging , spectroscopy)
Required functionalityRequired functionality Acquisition Unit (AU) can acquires a sidereal guide Acquisition Unit (AU) can acquires a sidereal guide
star.star. AU can shifts the AO point. (dithering)AU can shifts the AO point. (dithering) Wavefront correction in feedback control.Wavefront correction in feedback control. AOIMR can compensate the image rotation.AOIMR can compensate the image rotation. System startup and shutdown.System startup and shutdown. Individual check system for each component.Individual check system for each component.