“ everest puf panel puf panel.pdf6 d 1 manufacturing puf insulated panels / slabs for roof / wall...
TRANSCRIPT
5/11/2
016
EV
ER
ES
T C
OM
PO
SIT
ES
PV
T L
TD
1
Manufacturing PUF INSULATED Panels / Slabs for Roof / Wall /
Partitions & FloorIndustrial Products
Visit us: www.everestcomposites.com
Contact Us:09909918288
“ EVEREST PUF PANEL ”
Prefab Portable & Dismantle Designed products to be used as;
PUF Insulated Panels / Slabs (Roof/Wall/Partition/Floor)APPLICATIONS….• Project Site Office• Workmen / Labour Colony (Ground floor to 2nd Storied)• Store• Security Cabin• Farm House / Cottages• Canteen• Toilet Block• Cold Storage/ Ripping Room
• PUF panels are available in different combination of SKINS, like, Cement Sheet/Ply/Laminates/FRP/PPGI/etc…
• Prefab School, Vender Booth, Change Room, Health Centre, R.O. Plant Room, And More…
5/11/2
016
EV
ER
ES
T C
OM
PO
SIT
ES
PV
T L
TD
2
“EVEREST PUF PANEL”- Insulated / Sandwich Panel Structure Products..
5/11/2016 EVEREST COMPOSITES PVT LTD 3
SALIENT FEATURES
Light Weight and Sturdy
5/11/2016 EVEREST COMPOSITES PVT LTD 4
Durable And
Economical
5/11/2016 EVEREST COMPOSITES PVT LTD 5
Long lasting with low maintenance
5/11/2016 EVEREST COMPOSITES PVT LTD 6
5/11/2016 EVEREST COMPOSITES PVTLTD 7
- Termites Resistance
- Corrosion free
- Weather Resistance
5/11/2016 EVEREST COMPOSITES PVT LTD 8
- Quick Mobility- Customized Design
“EVEREST PUF PANEL” Structural DESIGN.
“ CONVENTIONAL” M.S. METAL CONTAINER DESIGN
Dismantle Design Static Design
Light Weight Heavy Weight
Size Feasibility Restricted to Vehicle Size.
Low Maintenance Periodical Maintenance
Machine Made Product Hand Made Product
Mfgr. At Established Unit Mfgr. At Roadside Unit
40kg/M3 Insulation Density 20Kg/M3 Insulation Density
Chloro Floro Carbon (CFC) Free Insulation Not CFC Free
Economy Installation Costly Installation
5/11/2016 EVEREST COMPOSITES PVT LTD 9
COMPARISON 9
5/11/2016 EVEREST COMPOSITES PVT LTD 10
10PRESS & PUF INJECTION MACHINES
Superb Aesthetic Appearance
5/11/2016 EVEREST COMPOSITES PVT LTD 11
Office - Emerald Resort, Baroda Yr.2013
Functionally Provides efficient work atmosphere
5/11/2016 EVEREST COMPOSITES PVT LTD 12
Project Site Office - RIL, Jamnagar Yr. 2013
Quick mobility saves movement expense and time
5/11/2016 EVEREST COMPOSITES PVT LTD 13
20ftx10ftx9ftH Site Office - Shifting In Open Body TRUCK
Customized design to suit individual requirements
5/11/2016 EVEREST COMPOSITES PVT LTD 14
Terrace Office - GEA PHARMA TERRACE, BARODA.
Yr 2011
FRP SKIN PUF PANEL OFFICE APPERANCE
5/11/2016 EVEREST COMPOSITES PVT LTD 15
FRP Office – Pancham Group, Atladara, Baroda. Yr. 2013
5/11/2016 EVEREST COMPOSITES PVT LTD 16
DISMANTLE / KNOCKDOWN OFFICE
Office – Kirti Infrastructure Ltd, JP SEZ, Ankleshwar. Yr. 2012
5/11/2016 EVEREST COMPOSITES PVT LTD 17
PORTABLE & DISMANTLECONTROL CABIN / LAB / ELE. PANEL
ROOM
Control Cabin – Ashok Quorry, Savli. Yr.2010
Ele. Panel Room – KYB Conmat, Por. Yr.2010
LAB Cabin – Elecon – Power Build Ltd. Yr.2014
5/11/2016 EVEREST COMPOSITES PVT LTD 18
DISMANTLE WORKMEN / LABOUR COLONY
Workmen Colony (Single & Ground + 1st Floor) – L&T / RIL, Dahej. 2012
5/11/2016 EVEREST COMPOSITES PVT LTD 19
DRAWING - WORKMEN / LABOUR COLONY
Workmen Colony (Single & Ground + 1st Floor)
5/11/2016 EVEREST COMPOSITES PVT LTD 20
DRAWING - WORKMEN / LABOUR COLONY
Workmen Colony (Single & Ground + 1st Floor)
5/11/2016 EVEREST COMPOSITES PVT LTD 21
G+1 WORKMEN / LABOUR COLONY
Workmen Colony (Single & Ground + 1st Floor) – L&T / RIL, Dahej. 2012
PUF PANEL TOILET BLOCK
5/11/2016 EVEREST COMPOSITES PVT LTD 22
TWIN Toilet Block (Exterior & Interior)
MULTI UNITS TOILET BLOCK
5/11/2016 EVEREST COMPOSITES PVT LTD 23
Toilet Block – SAS GROUP, Lucknow, UP. Yr. 2013
MULTI UNITS TOILET & BATH BLOCK
5/11/2016 EVEREST COMPOSITES PVT LTD 24
TOILET-Bath Block - Adani Solar Park, Madurai, Yr. 2016
PORTABLE DWELLING UNIT
5/11/2016 EVEREST COMPOSITES PVT LTD 25
12 Beds 2 Tire DWELLING UNIT – KP Buildcon (Surat), Charanka Solar Park. & Archean Chem, Kutch LOC. Yr. 2013
PORTABLESECURITY CABINS
5/11/2016 EVEREST COMPOSITES PVT LTD 26
SECURITY CABIN – NDDB, Anand. Yr. 2011
PORTABLE VENDOR BOOTH
5/11/2016 EVEREST COMPOSITES PVT LTD 27
VENDOR BOOTH – Amul Dairy - Railway(w), Vishwamitri Sta., Baroda. Yr. 2013
DISMANTLE PARTITION OFFICE
5/11/2016 EVEREST COMPOSITES PVT LTD 28
PARTITION OFFICE – ECPL, Manjusar. Yr 2011
Modular PUF Insulated Panel StructureFARM HOUSE (MODEL)
5/11/2016 EVEREST COMPOSITES PVT LTD 29
OTHER APPLICATIONS
5/11/2016 EVEREST COMPOSITES PVT LTD 30
TELEPHONEBOOTH –
Chashmita Engg., Baroda.
Yr. 2013
Store – L & T, Dahej. Yr. 2012
Project Office – RIl, Jamnagar. Yr. 2012
5/11/2016 EVEREST COMPOSITES PVT LTD 31
OUR Other Products at Glance
GUTTER - DOWNTAKE NOZZLE & STOP END
5/11/2016 EVEREST COMPOSITES PVT LTD 32
ROOF LIGHT SHEET / PANEL
5/11/2016 EVEREST COMPOSITES PVT LTD 33
GUJCON COMPOSITE DOORSComposite doors are machine processed & PUF Insulated Solid Doors.
Uniform thickness. Excellent Textures And Cost effective
5/11/2016 EVEREST COMPOSITES PVT LTD 34
“ORNASTONE”
GRC / GFRC ELEVATIONS
5/11/2016 EVEREST COMPOSITES PVT LTD 35
FRP COMPOSITE SWIMMING POOL
5/11/2016 EVEREST COMPOSITES PVT LTD 36
FRP Composite Fun pools- UV treated
- Less maintenance - Topside GEL coat finish
- Stain Resistance
Affiliation
• Builder association of India (B.A.I)
• Indian Institute of Interior Designer (IIID).
• Indian Green Building Council (IGBC)
• Indian Polyurethane Association (IPUA)
• VCCI, Vadodara
5/11/2016 EVEREST COMPOSITES PVT LTD 37
Or Email us @
5/11/2
016 E
VE
RE
ST
CO
MP
OS
ITE
S P
VT
LT
D
38
Or call us @
Mob. Nos. : +91 99099 18288+91 9978992929
Thank you !
5/11/2016 EVEREST COMPOSITES PVT LTD 39