“arnie laingen award”€¦ · • 2003 george mattson • 2004 john ericson • 2005 gary...

62
2019 CONCRETE PAVING ASSOCIATION OF MINNESOTA “ARNIE LAINGEN AWARD”

Upload: others

Post on 31-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

2019CONCRETE PAVING ASSOCIATION

OF MINNESOTA“ARNIE LAINGEN AWARD”

Previous Recipients• 1990 Wynn Binger • 1991 Ed Egan • 1992 Jerry Ingman • 1993 Eno Olson • 1994 Dan Imholte • 1995 Andy Kraemer• 1996 Al Renier • 1997 Dan Frentress • 1998 Gerry Forkrud • 1999 N/A • 2000 Dick Winslow • 2001 Mike McGray• 2002 Ken Hoffman • 2003 George Mattson • 2004 John Ericson

• 2005 Gary Aamold • 2006 Darrell Stahlecker • 2007 Doug Schwartz • 2008 Terry Kraemer • 2009 Don Shonyo • 2010 Bob McPartlin • 2012 Steve Gentz• 2012 Don Haas• 2013 Gary Shonyo• 2014 Mike Sheehan• 2015 Steve Gerster• 2016 Matt Zeller• 2017 Paul Juckel• 2018 Rich Connoy

Arnie Laingen Award Tributeby

Darrell Stahlecker

John T. “Arnie” Laingen1957 - 1989

“I feel we have a bright future ahead of us and working together we can make it brighter.”

Quote taken from a Concrete Conveyor Newsletter in 1983 after Arnie was on the job as CPAM’s executive director for three months.

Wynn Bnger1990

Jerry Ingman1992

Eno Olson1993

Andy Kraemer1995

Al Renier1996

Gerry Forkrud1998

Dick Winslow2000

John Ericson, Sr.2004

Don Shonyo2009

Steve Gentz2011

SP 5880-194 Work Zone Safety

MnDOT District 1Shafer Contracting

Project Overview

1 Two year construction project on I-35 in Pine County

2 Seven Mile Unbonded Concrete Overlay

3 Reconstruct two I-35 Bridges over the Snake River

4 Reconstruct two Overpass Bridges, TH 70 and Pine County CSAH 7

mndot.gov15

Project Staging and Schedule Change

mndot.gov 16

Staging/Schedule Revision:- NB and SB Snake River

Bridges Constructed in 2018

- MnDOT, Shafer and DNR partnered to accomplish this change

Compliance and Partnering

mndot.gov 17

- Contractor complied with Traffic Control Standards.

- Additional devices used to increase safety.

- Use of Extra Enforcement during peak traffic times.

- Daily Communication between MnDOT and Contractor field staff.

Communication/Public Relations

mndot.gov 18

Communication Efforts- Radio Add campaign- Up-to-date website- Hand delivered letters to local businesses- Portable changeable message signs

Thank you!

SP 5880-194 Project Team

mndot.gov 19

ADA CONSTRUCTION AWARD 2018

In Recognition of Outstanding ADA Construction Performed on

SP 6103-32 in Glenwood, MN.

21

Resident Engineer: Daniel KuhnProject Supervisor : Bradley CeglaChief Inspector: Mark WellingADA Construction Specialist: Dustin WallsADA Inspector: Chad SchwarzADA Inspector: Jeremy EhrpProject Surveyor: Curt GerisProject Surveyor: Brian LevinPrime Contractor: Riley Brothers ConstructionFlatwork Contractor: Ti-Zack Concrete Inc.

District 4 Morris SP 6103-32 TH 28,104 & 29Glenwood Mn.

Project Staff

ADA CONSTRUCTION AWARD 2018

22

. The final course of the bituminous patch shall be compacted using conventional rolling equipment.

ADA CONSTRUCTION AWARD 2018

23

ADA CONSTRUCTION AWARD 2018

. The final course of the bituminous patch shall be compacted using conventional rolling equipment.

24

ADA CONSTRUCTION AWARD 2018

. The final course of the bituminous patch shall be compacted using conventional rolling equipment.

25

ADA CONSTRUCTION AWARD 2018

. The final course of the bituminous patch shall be compacted using conventional rolling equipment.

26

ADA CONSTRUCTION AWARD 2018

. The final course of the bituminous patch shall be compacted using conventional rolling equipment.

27

ADA CONSTRUCTION AWARD 2018

. The final course of the bituminous patch shall be compacted using conventional rolling equipment.

2018MINNESOTA CONCRETE PAVING

AWARD WINNERS

PROJECT AWARD CATEGORIES

MnDOT: 1) New Construction 2) Overlays 3) Concrete Pavement RepairCounty: 4) New Construction 5) Overlays 6) Concrete Pavement RepairCity: 7) New Construction 8) Overlays 9) Concrete Pavement RepairAirport: 10) New Construction 12) Concrete Pavement RepairIndustrial: 13) New Construction 14) Overlays 15) Concrete Pavement RepairOther: 11) Roundabout, Intersections, Etc.Special: The panel may recognize a project that is deserving of special

recognition.

All projects were submitted electronically.

CATEGORY 1MnDOT NEW / RECONSTRUCTION

SP 1703-69 TH 60

IN RECOGNITION OF THE HIGH QUALITY CONCRETE PAVEMENT CONSTRUCTION PERFORMED ON TH 60 FROM WINDOM TO MOUNTAIN LAKE, WHICH HAS BEEN RATED THE BEST PROJECT OF ITS TYPE COMPLETED IN MINNESOTA DURING 2018.

PRIME CONTRACTOR MATHIOWETZ CONSTRUCTION CO.

CONCRETE PAVING CONTRACTOR PCIROADS, LLC

OWNER/AGENCY MnDOT DISTRICT 7

CONSULTING ENGINEERS ALLIANT ENGINEERING

PROJECT MANAGEMENT WSE ENGINEERING SERVICES

CATEGORY 2MnDOT OVERLAYS

SP 5880-194 I-35

IN RECOGNITION OF THE HIGH QUALITY CONCRETE PAVEMENT CONSTRUCTION PERFORMED ON I-35 FROM SOUTH PINE COUNTY LINE TO PINE CITY, WHICH HAS BEEN RATED THE BEST PROJECT OF ITS TYPE COMPLETED IN MINNESOTA DURING 2018.

CONTRACTOR SHAFER CONTRACTING COMPANY, INC.

OWNER/AGENCY MnDOT DISTRICT 1

CONSULTING ENGINEER TKDA

CATEGORY 3MnDOT CPR

SP 2781-432, I-94IN RECOGNITION OF THE HIGH QUALITY CONCRETE PAVEMENT REHABILITATION PERFORMED ON I-94 IN MINNEAPOLIS FROM NICOLLET AVENUE TO HIGHWAY 55, WHICH HAS BEEN RATED THE BEST PROJECT OF ITS TYPE COMPLETED IN MINNESOTA DURING 2017.

CPR CONTRACTOR PCiROADS, LLC

OWNER/AGENCY MnDOT METRO DISTRICT

CATEGORY 4COUNTY NEW / RECONSTRUCTION

SAP 023-601-034 / 055-601-021CSAH 1

IN RECOGNITION OF THE HIGH QUALITY CONCRETE PAVEMENT CONSTRUCTION PERFORMED ON CSAH FROM THE NORTH CITY LIMITS OF SPRING VALLEY TO TH 30, WHICH HAS BEEN RATED THE BEST PROJECT OF ITS TYPE COMPLETED IN MINNESOTA DURING 2018.

PAVING CONTRACTOR PCiROADS, LLC

OWNER/AGENCY FILLMORE COUNTY

CATEGORY 5COUNTY OVERLAYS

SAP 085-625-063CSAH 25

IN RECOGNITION OF THE HIGH QUALITY CONCRETE PAVEMENT CONSTRUCTION PERFORMED ON CSAH 25 FROM TH 14 TO 7 MILES NORTH, WHICH HAS BEEN RATED THE BEST PROJECT OF ITS TYPE COMPLETED IN MINNESOTA DURING 2018.

PAVING CONTRACTOR CROELL, INC.

OWNER/AGENCY WINONA COUNTY

CATEGORY 7CITY: NEW / RECONSTRUCTION

SAP 082-623-008CSAH 23 (3RD STREET)

IN RECOGNITION OF THE HIGH QUALITY CONCRETE PAVEMENT CONSTRUCTION PERFORMED ON CSAH 23 (3RD STREET) FROM FROM WALNUT TO CHESTNUT STREET IN STILLWATER, MN, WHICH HAS BEEN RATED THE BEST PROJECT OF ITS TYPE COMPLETED IN MINNESOTA DURING 2018.

PRIME CONTRACTOR MEYER CONTRACTING, INC.PAVING CONTRACTOR DOYLE CONNER CO.OWNER/AGENCY WASHINGTON COUNTY /

CITY OF STILLWATERCONSULTING ENGINEERS ALLIANT ENGINEERING, INC.

KIMLEY-HORN AND ASSOCIATES, INC.CONCRETE SUPPLIER CEMSTONE PRODUCTS COMPANY

CATEGORY 11

SP 0704-108 / 007-070-005ROUNDABOUT MN-22 & CSAH 90

IN RECOGNITION OF THE HIGH QUALITY CONCRETE PAVEMENT CONSTRUCTION PERFORMED ON THE ROUNDABOUT LOCATED AT THE JUNCTION OF MN-22 AND BLUE EARTH CSAH 90, WHICH HAS BEEN RATED THE BEST PROJECT OF ITS TYPE COMPLETED IN MINNESOTA DURING 2018.

PRIME CONTRACTOR: MATHIOWETZ CONSTRUCTION CO.CONCRETE PAVING CONTRACTOR: HOFFMAN CONCRETE, INC.CONCRETE SUPPLIER: CEMSTONE PRODUCTS COMPANY OWNER/AGENCY: MNDOT DISTRICT 7CONSULTING ENGINEER: BOLTON AND MENK, INC. /

SRF CONSULTING GROUP, INC.CONCRETE SUPPLIER CEMSTONE PRODUCTS COMPANY

ROUNDABOUTS, INTERSECTIONS, ETC.

SPECIAL CATEGORYINNOVATION

SP 5510-84TH 63

IN RECOGNITION OF THE HIGH QUALITY CONCRETE PAVEMENT CONSTRUCTION PERFORMED ON TH 63 FROM CSAH 33 TO TH 60 IN ZUMBRO FALLS, WHICH HAS BEEN RATED THE BEST PROJECT OF ITS TYPE COMPLETED IN MINNESOTA DURING 2018.

OWNER/AGENCY MNDOT DISTRICT 6

CONTRACTOR CROELL, INC.

Thank You & Congratulations

Hospitality RoomsBREEZY CENTER 254 & 255