Rationale ….. “Demand Side Management” (DSM)

24/11/2014

Cost effective to manage electricity demand through demand side measures.

DSM results in either reduction of kWh consumption or load (kW Demand) or combination of both.

Saving potential of DSM measures = 15% of the total electricity demand (Integrated Energy Policy of the Planning Commission of India)

2

Barriers :

Resorting to Power demand management through load shedding.

Conventional notion that Implementing DSM programs will lead to reduction in sales which is in direct conflict with their business.

Non availability of separate fund for DSM activity.

Lack of necessary skill set for program implementation.

24/11/2014 3

Initiatives So Far…… Forum of Regulators (FOR)

• FOR was constituted vide Notification dated 16th February, 2005 in pursuance of the

provision under section 166(2) of the Electricity Act, 2003. • State Electricity Regulatory Commissions as members of Working Groups

Guidelines:

DSM plan and budget provision for each DISCOM.

Load research - provide data on impacts of DSM initiatives in terms of savings in energy and reduction in demand.

Recovery of cost on DSM as a pass through in ARR.

- Pre identified sources of funds such as penal interest on late payment of bills, load management charges could be earmarked for financing DSM activities.

Third party measurement and verification

Promotion of ESCOs for implementing DSM projects

24/11/2014 4

Introduction :

Scheme Approval: September, 2013.

24/11/2014

• Capacity Building of DISCOMs on DSM and EE

• Development of various mechanisms to promote DSM

Objective:

• Establishment of DSM Cell by each DISCOM

• Engagement of dedicated staffs (2)

• Approved DSM regulation(Recovery of cost through ARR)

• DSM Action Plan with MYT (Multi year tariff system)

• Implementation of DSM programs

• Monitoring and Verification

• Reporting to SERC

Outcomes:

5

Major Activities Covered under the Programme…

Selection of 30 DISCOMs based on the criteria developed by BEE.

Signing of Memorandum of Understanding (MoU) with selected 30 DISCOMs.

Training of Trainers (ToT) – Creation of Master Trainers on DSM.

Providing financial/technical support to DISCOMs for organizing Capacity Building Workshops.

Providing Manpower (2 consultants) support to the DISCOMs for 3 years.

Consultancy Support to DISCOMs for load survey and preparation of DSM Action Plan.

Role of BEE

24/11/2014 6

Contd………

Signing of MoU with BEE

(within 6 months from signing of MoU with BEE.)

Establishment of DSM Cell

Engagement of at least 2 officials of DISCOMs for DSM cell

Facilitate Consultant for Load survey and preparation of DSM Action Plan

Organize Capacity Building Workshops for their officials

Incorporation of DSM plan along-with Multi-Year Tariff (MYT).

Adoption of DSM regulations by Regulator

Implementation of DSM activities & M & V

Role of DISCOM

24/11/2014 7

No. of Officials to be trained under Training of Trainers and

Capacity Building Workshops

Training of Trainers Capacity Building Workshops

S. No.

No. of

Consumers

(Lakhs)

No. of

DISCOMs

No. of

Master

Trainers/

DISCOM

Total No. of officials

/DISCOM Total

1 0 - 10 4 10 40 100 400

2 10 - 20 5 12 60 150 750

3 20 - 30 12 15 180 200 2400

4 30 - 50 3 15 45 250 750

5 50 - 100 3 20 60 300 900

6 > 100 3 20 60 300 900

445 6100

24/11/2014 8

Organizational Structure of DSM Cell

DSM Head

Overall Co-ordination of DSM Activities

DSM Experts(2)

-Preparation of Draft DSM Regulation

-Implementation of DSM activity

Consultant for Load Research

- Load Research/survey

- DSM Action Plan

2 Officials of DISCOM -Coordination with DSM Experts

-Coordination with SERC

-Implementation of DSM activities

24/11/2014 9

Implementing Arms…..

• EESL(Energy Efficiency Services Limited)

• Manpower support

• Consultancy support

• NPTI(National Power Training Institute)

• Creation of about 500 Master Trainers under ToT

24/11/2014 10

Activities So Far …

24/11/2014 11

Selection of DISCOMs and Signing of MoU S.No Name of the DISCOM State Status

1 Madhya Kshetra Vidyut Vitran Co. Ltd MKVVCL MP MoU signed

2 Uttar Gujarat Vij Company Limited UGVCL Gujarat MoU signed

3 Madhya Gujarat Vij Company Limited MGVCL Gujarat MoU signed

4 Dakshin Gujarat Vij Company Limited DGVCL Gujarat MoU signed

5 Paschim Gujarat Vij Company Limited PGVCL Gujarat MoU signed

6 Himachal Pradesh State Electricity Board Ltd. HPSEBL HP MoU signed

7 Bangalore Electricity Supply Company Limited BESOM Karnataka MoU signed

8 Chamundeshwari Electricity Supply Corporation Limited CESC Karnataka MoU signed

9 Gulbarga Electricity Supply Company Limited GESCL Karnataka MoU signed

10 Assam Power Distribution Company Limited APDCL Assam MoU signed

11 Tata Power Delhi Distribution Limited TPDDL Delhi MoU signed

12 BSES Rajdhani Power Ltd. BSES Delhi MoU signed

13 Kerala State Electricity Board Ltd. KSEBL Kerala MoU signed

14 South Bihar Power Distribution Company Ltd. SBPDCL Bihar MoU signed

15 North Bihar Power Distribution Company Limited NBPDCL Bihar MoU signed

16 Jodhpur Vidyut Vitran Nigam Ltd. JVVNL Rajasthan MoU signed

17 Jaipur Vidyut Vitran Nigam Limited JVVNL Rajasthan MoU signed

18 Ajmer Vidyut Vitran Nigam Limited AVVNL Rajasthan MoU signed

19 Meghalaya Power Distribution Corporation Limited Me PDCL Meghalaya MoU signed

20 Punjab State Power Corporation Limited PSPCL Punjab MoU signed

21 Southern Power Distribution Co. of A.P. Ltd. SPDCL AP MoU signed

22 Uttar Haryana Bijli vitran nigam UHBVN Haryana MoU signed

23 Dakshin Haryana Bijli Vitran Nigam DHBVN Haryana MoU signed

24 Maharashtra State Electricity D. Co. Ltd. MSEDCL Maharashtra MoU signed

25 Tripura State Electricity Corporation Limited TSECL Tripura MoU signed

26 Power & Electricity Department ,Government of Mizoram P&E Dept. Mizoram MoU signed

27 Electricity Department, Government of Goa E Dept. Goa MoU signed

28 Western Electricity Supply Company of Odisha Limited WESCO Odisha MoU signed

29 Uttarakhand Power Corporation Limited UPCL Uttarakhand MoU signed

30 Tamil Nadu Generation & Distribution Corporation Limited TANGEDCO Tamil Nadu MoU Signed

24/11/2014 12

Establishment of DSM Cell

S.No. Name of the DISCOM State Number of

Members

1 Himachal Pradesh State Electricity Board Ltd. HPSEBL Himachal Pradesh 4

2 Jaipur Vidyut Vitran Nigam Limited JVVNL Rajasthan 4

3 Kerala State Electricity Board Limited KSEBL Kerala 11

4 Punjab State Power Corporation Limited PSPCL Punjab 62

5 Maharashtra State Electricity Distribution Co.

Ltd. MSEDCL Maharashtra 3

6 Chamundeshwari Electricity Supply Corporation

Limited CESC Karnataka 7

7 Ajmer Vidyut Vitran Nigam Limited AVVNL Rajasthan 2

8 Meghalaya Power Distribution Corporation Ltd. MePDCL Meghalaya 3

9 Uttar Gujarat Vij Company Ltd. UGVCL Gujarat 5

10 Dakshin Gujarat Vij Company Limited DGVCL Gujarat 5

11 Pachim Gujarat Vij Company Limited PGVCL Gujarat 4 12 BSES Rajadhani Power LTD. BRPL Delhi 1

13 Uttrakhand Power corporation UPCL Uttrakhand 3

14 Tripura State Electricity Corporation Limited TSECL Tripura 5

15 Madhya Gujarat Vij Company Ltd. MGVCL Gujarat 4

16 Western Electricity Supply Company of Odisha

Ltd. WESCO Odisha 5

17 Madhya Pradesh Madhya Kshetra Vidyut Vitran

Company Limited MKVVCL Madhya Pradesh 5

18 Tata Power Delhi Distribution Limited TPDDL Delhi 2

19 Tamil Nadu Generation and Distribution

Corporation Limited TANGEDCO Tamil Nadu 10

20 Assam Power Distribution Corporation Limited APDCL Assam 21 North Bihar Power Distribution Company Limited NBPDCL Bihar

22 South Bihar Power Distribution Company

Limited SBPDCL Bihar

23 Jodhpur Vidyut Vitran Nigam Limited JDVVNL Rajasthan 24 Banglore Electricity Supply Company limited BESCOM Karnataka

24/11/2014 13

Engagement of DSM experts

• 54 experts selected by EESL for 28 DISCOMs under

“Manpower Support”.

• All the above experts have joined the DISCOMs.

24/11/2014 14

Engagement of Consultant for load research

• 7 consultants engaged by EESL for Load survey in 17

DISCOMs.

24/11/2014 15

4

17

4

5 Load surveycompleted

Under progress

By EESL

RFP floated

Training of Trainers • Training need assessment of DISCOMs completed.

Some useful findings:

16

Group (Training level) DISCOM State Training Focus

Preliminary (12)

WESCO

NBPDCL

SBPDCL

MEDCL

Mizoram

TSECL

MPMKVVNL

APSPDCL

KSEB

GESCOM

CESCOM

Goa

Odisha

Bihar

Bihar

Meghalaya

Mizoram

Tripura

MP

AP

Kerala

Karnataka

Karnataka

Goa

Introduction about DSM

Functions of DSM cell

National level schemes suitable for DSM program

Basics of DSM project/process cycle

DSM regulation

Understanding Load Research (LR)

Aspects of Consumer survey / Market research

Formulation of load strategies

DSM measures

Technical and economic potential estimation

Case studies on LR, survey, potential estimation

Intermediate (10)

APDCL

TANGEDCO

JVVNL

JDVVNL

AVVNL

UPCL

HSEB

UHBVN

DHBVN

PSPSCL

Assam

Tamil Nadu

Rajasthan

Rajasthan

Rajasthan

Uttarakhand

HP

Haryana

Haryana

Punjab

Refresher topics on basics of DSM

Load Research : Approach & Methodology

Consumer survey / Market research

Formulation of load strategies

DSM measures

Technical and economic potential estimation

DSM Action plan preparation

Regulatory tests (cost benefit analysis)

Monitoring and Verification (M&V) methodology

Case studies on action plan, regulatory tests, M&V

Advanced (8)

BESCOM

MSEDCL

TPDDL

BSES

DGVCL

MGVCL

UGVCL

PGVCL

Karnataka

Maharashtra

Delhi

Delhi

Gujarat

Gujarat

Gujarat

Gujarat

Refresher course on basics on DSM and DSM program cycle

Prioritizing national programs for DSM

Advanced tools for DSM program selection and implementation

Incentive design

DSM projects preparation and regulatory filing

DSM implementation planning

Conducting M&V

Introduction of integrated DSM & Smart grid approach

Contact Information:

Pravatanalini Samal, AEE

Bureau of Energy Efficiency

(Govt. of India, Ministry of Power)

4th Floor, Sewa Bhawan,

R. K. Puram

New Delhi- 110 066, India.

Tel: 011- 26179699

Fax: 011- 26178352

Email: [email protected]

Website: www.bee.gov.in