Rationale ….. “Demand Side Management” (DSM)
24/11/2014
Cost effective to manage electricity demand through demand side measures.
DSM results in either reduction of kWh consumption or load (kW Demand) or combination of both.
Saving potential of DSM measures = 15% of the total electricity demand (Integrated Energy Policy of the Planning Commission of India)
2
Barriers :
Resorting to Power demand management through load shedding.
Conventional notion that Implementing DSM programs will lead to reduction in sales which is in direct conflict with their business.
Non availability of separate fund for DSM activity.
Lack of necessary skill set for program implementation.
24/11/2014 3
Initiatives So Far…… Forum of Regulators (FOR)
• FOR was constituted vide Notification dated 16th February, 2005 in pursuance of the
provision under section 166(2) of the Electricity Act, 2003. • State Electricity Regulatory Commissions as members of Working Groups
Guidelines:
DSM plan and budget provision for each DISCOM.
Load research - provide data on impacts of DSM initiatives in terms of savings in energy and reduction in demand.
Recovery of cost on DSM as a pass through in ARR.
- Pre identified sources of funds such as penal interest on late payment of bills, load management charges could be earmarked for financing DSM activities.
Third party measurement and verification
Promotion of ESCOs for implementing DSM projects
24/11/2014 4
Introduction :
Scheme Approval: September, 2013.
24/11/2014
• Capacity Building of DISCOMs on DSM and EE
• Development of various mechanisms to promote DSM
Objective:
• Establishment of DSM Cell by each DISCOM
• Engagement of dedicated staffs (2)
• Approved DSM regulation(Recovery of cost through ARR)
• DSM Action Plan with MYT (Multi year tariff system)
• Implementation of DSM programs
• Monitoring and Verification
• Reporting to SERC
Outcomes:
5
Major Activities Covered under the Programme…
Selection of 30 DISCOMs based on the criteria developed by BEE.
Signing of Memorandum of Understanding (MoU) with selected 30 DISCOMs.
Training of Trainers (ToT) – Creation of Master Trainers on DSM.
Providing financial/technical support to DISCOMs for organizing Capacity Building Workshops.
Providing Manpower (2 consultants) support to the DISCOMs for 3 years.
Consultancy Support to DISCOMs for load survey and preparation of DSM Action Plan.
Role of BEE
24/11/2014 6
Contd………
Signing of MoU with BEE
(within 6 months from signing of MoU with BEE.)
Establishment of DSM Cell
Engagement of at least 2 officials of DISCOMs for DSM cell
Facilitate Consultant for Load survey and preparation of DSM Action Plan
Organize Capacity Building Workshops for their officials
Incorporation of DSM plan along-with Multi-Year Tariff (MYT).
Adoption of DSM regulations by Regulator
Implementation of DSM activities & M & V
Role of DISCOM
24/11/2014 7
No. of Officials to be trained under Training of Trainers and
Capacity Building Workshops
Training of Trainers Capacity Building Workshops
S. No.
No. of
Consumers
(Lakhs)
No. of
DISCOMs
No. of
Master
Trainers/
DISCOM
Total No. of officials
/DISCOM Total
1 0 - 10 4 10 40 100 400
2 10 - 20 5 12 60 150 750
3 20 - 30 12 15 180 200 2400
4 30 - 50 3 15 45 250 750
5 50 - 100 3 20 60 300 900
6 > 100 3 20 60 300 900
445 6100
24/11/2014 8
Organizational Structure of DSM Cell
DSM Head
Overall Co-ordination of DSM Activities
DSM Experts(2)
-Preparation of Draft DSM Regulation
-Implementation of DSM activity
Consultant for Load Research
- Load Research/survey
- DSM Action Plan
2 Officials of DISCOM -Coordination with DSM Experts
-Coordination with SERC
-Implementation of DSM activities
24/11/2014 9
Implementing Arms…..
• EESL(Energy Efficiency Services Limited)
• Manpower support
• Consultancy support
• NPTI(National Power Training Institute)
• Creation of about 500 Master Trainers under ToT
24/11/2014 10
Selection of DISCOMs and Signing of MoU S.No Name of the DISCOM State Status
1 Madhya Kshetra Vidyut Vitran Co. Ltd MKVVCL MP MoU signed
2 Uttar Gujarat Vij Company Limited UGVCL Gujarat MoU signed
3 Madhya Gujarat Vij Company Limited MGVCL Gujarat MoU signed
4 Dakshin Gujarat Vij Company Limited DGVCL Gujarat MoU signed
5 Paschim Gujarat Vij Company Limited PGVCL Gujarat MoU signed
6 Himachal Pradesh State Electricity Board Ltd. HPSEBL HP MoU signed
7 Bangalore Electricity Supply Company Limited BESOM Karnataka MoU signed
8 Chamundeshwari Electricity Supply Corporation Limited CESC Karnataka MoU signed
9 Gulbarga Electricity Supply Company Limited GESCL Karnataka MoU signed
10 Assam Power Distribution Company Limited APDCL Assam MoU signed
11 Tata Power Delhi Distribution Limited TPDDL Delhi MoU signed
12 BSES Rajdhani Power Ltd. BSES Delhi MoU signed
13 Kerala State Electricity Board Ltd. KSEBL Kerala MoU signed
14 South Bihar Power Distribution Company Ltd. SBPDCL Bihar MoU signed
15 North Bihar Power Distribution Company Limited NBPDCL Bihar MoU signed
16 Jodhpur Vidyut Vitran Nigam Ltd. JVVNL Rajasthan MoU signed
17 Jaipur Vidyut Vitran Nigam Limited JVVNL Rajasthan MoU signed
18 Ajmer Vidyut Vitran Nigam Limited AVVNL Rajasthan MoU signed
19 Meghalaya Power Distribution Corporation Limited Me PDCL Meghalaya MoU signed
20 Punjab State Power Corporation Limited PSPCL Punjab MoU signed
21 Southern Power Distribution Co. of A.P. Ltd. SPDCL AP MoU signed
22 Uttar Haryana Bijli vitran nigam UHBVN Haryana MoU signed
23 Dakshin Haryana Bijli Vitran Nigam DHBVN Haryana MoU signed
24 Maharashtra State Electricity D. Co. Ltd. MSEDCL Maharashtra MoU signed
25 Tripura State Electricity Corporation Limited TSECL Tripura MoU signed
26 Power & Electricity Department ,Government of Mizoram P&E Dept. Mizoram MoU signed
27 Electricity Department, Government of Goa E Dept. Goa MoU signed
28 Western Electricity Supply Company of Odisha Limited WESCO Odisha MoU signed
29 Uttarakhand Power Corporation Limited UPCL Uttarakhand MoU signed
30 Tamil Nadu Generation & Distribution Corporation Limited TANGEDCO Tamil Nadu MoU Signed
24/11/2014 12
Establishment of DSM Cell
S.No. Name of the DISCOM State Number of
Members
1 Himachal Pradesh State Electricity Board Ltd. HPSEBL Himachal Pradesh 4
2 Jaipur Vidyut Vitran Nigam Limited JVVNL Rajasthan 4
3 Kerala State Electricity Board Limited KSEBL Kerala 11
4 Punjab State Power Corporation Limited PSPCL Punjab 62
5 Maharashtra State Electricity Distribution Co.
Ltd. MSEDCL Maharashtra 3
6 Chamundeshwari Electricity Supply Corporation
Limited CESC Karnataka 7
7 Ajmer Vidyut Vitran Nigam Limited AVVNL Rajasthan 2
8 Meghalaya Power Distribution Corporation Ltd. MePDCL Meghalaya 3
9 Uttar Gujarat Vij Company Ltd. UGVCL Gujarat 5
10 Dakshin Gujarat Vij Company Limited DGVCL Gujarat 5
11 Pachim Gujarat Vij Company Limited PGVCL Gujarat 4 12 BSES Rajadhani Power LTD. BRPL Delhi 1
13 Uttrakhand Power corporation UPCL Uttrakhand 3
14 Tripura State Electricity Corporation Limited TSECL Tripura 5
15 Madhya Gujarat Vij Company Ltd. MGVCL Gujarat 4
16 Western Electricity Supply Company of Odisha
Ltd. WESCO Odisha 5
17 Madhya Pradesh Madhya Kshetra Vidyut Vitran
Company Limited MKVVCL Madhya Pradesh 5
18 Tata Power Delhi Distribution Limited TPDDL Delhi 2
19 Tamil Nadu Generation and Distribution
Corporation Limited TANGEDCO Tamil Nadu 10
20 Assam Power Distribution Corporation Limited APDCL Assam 21 North Bihar Power Distribution Company Limited NBPDCL Bihar
22 South Bihar Power Distribution Company
Limited SBPDCL Bihar
23 Jodhpur Vidyut Vitran Nigam Limited JDVVNL Rajasthan 24 Banglore Electricity Supply Company limited BESCOM Karnataka
24/11/2014 13
Engagement of DSM experts
• 54 experts selected by EESL for 28 DISCOMs under
“Manpower Support”.
• All the above experts have joined the DISCOMs.
24/11/2014 14
Engagement of Consultant for load research
• 7 consultants engaged by EESL for Load survey in 17
DISCOMs.
24/11/2014 15
4
17
4
5 Load surveycompleted
Under progress
By EESL
RFP floated
Training of Trainers • Training need assessment of DISCOMs completed.
Some useful findings:
16
Group (Training level) DISCOM State Training Focus
Preliminary (12)
WESCO
NBPDCL
SBPDCL
MEDCL
Mizoram
TSECL
MPMKVVNL
APSPDCL
KSEB
GESCOM
CESCOM
Goa
Odisha
Bihar
Bihar
Meghalaya
Mizoram
Tripura
MP
AP
Kerala
Karnataka
Karnataka
Goa
Introduction about DSM
Functions of DSM cell
National level schemes suitable for DSM program
Basics of DSM project/process cycle
DSM regulation
Understanding Load Research (LR)
Aspects of Consumer survey / Market research
Formulation of load strategies
DSM measures
Technical and economic potential estimation
Case studies on LR, survey, potential estimation
Intermediate (10)
APDCL
TANGEDCO
JVVNL
JDVVNL
AVVNL
UPCL
HSEB
UHBVN
DHBVN
PSPSCL
Assam
Tamil Nadu
Rajasthan
Rajasthan
Rajasthan
Uttarakhand
HP
Haryana
Haryana
Punjab
Refresher topics on basics of DSM
Load Research : Approach & Methodology
Consumer survey / Market research
Formulation of load strategies
DSM measures
Technical and economic potential estimation
DSM Action plan preparation
Regulatory tests (cost benefit analysis)
Monitoring and Verification (M&V) methodology
Case studies on action plan, regulatory tests, M&V
Advanced (8)
BESCOM
MSEDCL
TPDDL
BSES
DGVCL
MGVCL
UGVCL
PGVCL
Karnataka
Maharashtra
Delhi
Delhi
Gujarat
Gujarat
Gujarat
Gujarat
Refresher course on basics on DSM and DSM program cycle
Prioritizing national programs for DSM
Advanced tools for DSM program selection and implementation
Incentive design
DSM projects preparation and regulatory filing
DSM implementation planning
Conducting M&V
Introduction of integrated DSM & Smart grid approach
Contact Information:
Pravatanalini Samal, AEE
Bureau of Energy Efficiency
(Govt. of India, Ministry of Power)
4th Floor, Sewa Bhawan,
R. K. Puram
New Delhi- 110 066, India.
Tel: 011- 26179699
Fax: 011- 26178352
Email: [email protected]
Website: www.bee.gov.in