NEWEA– 2017AnnualConference&Exhibit
January24,2017
“Design/Build”forTrenchlessRehabilitationFindandFix:lessonsforsuccess
NicholasJ.Rystrom,P.E.JonathanE.Kunay,P.E.
![Page 2: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/2.jpg)
NEWEA– 2017AnnualConference&Exhibit
Outline
§ CityofRevereStats§ ProjectBackground§ Find&FixApproach§ IdentificationofPotentialScenarios§ DevelopmentofSpecifications§ Conclusions
2
![Page 3: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/3.jpg)
NEWEA– 2017AnnualConference&Exhibit
CityofRevere,Massachusetts
3
![Page 4: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/4.jpg)
NEWEA– 2017AnnualConference&Exhibit
CityofRevere,MA
§ Population:55,000
§ LandArea:10mi2
§ 99MilesofSanitarySewers§ ClayPipe§ 100YearsOld
§ 12PumpingStations
4
![Page 5: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/5.jpg)
NEWEA– 2017AnnualConference&Exhibit
ConsentDecree(CD)CivilActionNo.1:10-cv-11460
§ Enteredintoin2010withMassDEP &USEPA
§ ViolationsofCleanWaterAct
§ ComplianceRequirements§ Eliminatesanitaryseweroverflows(SSOs)
§ CapacityAssessment§ SewerSystemEvaluationSurvey(SSES)§ ComprehensiveWastewaterManagementPlan(CWMP)§ ComprehensiveStormwater ManagementPlan(CSMP)§ IllicitDischargeDetection&EliminationPlan(IDDE)
5
![Page 6: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/6.jpg)
NEWEA– 2017AnnualConference&Exhibit
CapacityAssessment
§ FlowMeteringProgram
§ DelineateFlowMeterAreas
§ PrioritizeAreastoInvestigate
§ PerformSSES
6
![Page 7: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/7.jpg)
NEWEA– 2017AnnualConference&Exhibit
SewerSystemEvaluationSurvey(SSES)
§ AcceleratedTimeline
§ FlowIsolation
§ 4,000gpd/idm
§ CCTVInspections
§ ManholeInspections
7
![Page 8: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/8.jpg)
NEWEA– 2017AnnualConference&Exhibit
SewerSystemEvaluationSurvey(SSES)
§ WidespreadDefectsFound
§ SewerPipes
§ Manholes
§ DuetoMaterial&Age
§ 100YearOldClaySewers
8
![Page 9: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/9.jpg)
NEWEA– 2017AnnualConference&Exhibit
ComprehensiveWastewaterMasterPlan
§ BasedonMetering&SSESResults
§ LargePortionofSystemtobeRehabilitated
§ PrivateInflowRemoval
§ DrainageImprovements
§ MeetRequirementsofConsentDecree
9
![Page 10: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/10.jpg)
NEWEA– 2017AnnualConference&Exhibit
ComprehensiveRehabilitationProgram
§ EffectivelyAddressWidespreadDefects
§ Consistsof:
§ Cured-In-PlacePipe(CIPP)Lining
§ ServiceLateralConnectionLining
§ ManholeRehabilitation
§ PrivateInflowRemoval
§ 25,000– 30,000LFAreas
10
![Page 11: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/11.jpg)
NEWEA– 2017AnnualConference&Exhibit
ComprehensiveRehabilitationProgram
§ ProventoRemoveHighPercentagesofInfiltration/Inflow
§ 40%- 70%
§ SuccessfullyImplementedinVariousMunicipalitiesThroughouttheCountry
§ RecommendedandInitiatedintheCityofRevere,MA.
11
![Page 12: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/12.jpg)
NEWEA– 2017AnnualConference&Exhibit
TraditionalComprehensiveRehabilitationDesignApproach
§ PerformSewerSystemInvestigations
§ CCTVInspection
§ ManholeInspection
§ DevelopDesignDrawings&Specifications
12
![Page 13: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/13.jpg)
NEWEA– 2017AnnualConference&Exhibit
TraditionalComprehensiveRehabilitationDesignApproach
§ CCTVInspectionCosts
13
PipeSize(inches)
CCTVInspection&PreparatoryCleaning
CCTVInspection&HeavyCleaning
8”-10” $1.25- $1.65/ft $2.00– $3.00/ft
12”-15” $1.50- $1.75/ft $3.00- $3.50/ft
24”– 36” $2.50- $3.00/ft $9.00- $10.00/ft
![Page 14: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/14.jpg)
NEWEA– 2017AnnualConference&Exhibit
TraditionalComprehensiveRehabilitationDesignApproach
§ ManholeInspectionCosts
§ VaryBasedonType
14
InspectionType Cost
SurfaceInspection $55- $75/each
VideoInspection $100- $125/each
![Page 15: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/15.jpg)
NEWEA– 2017AnnualConference&Exhibit
TraditionalComprehensiveRehabilitationDesignApproach
§ DevelopDesignDrawings&Specifications
§ ReviewCCTVInspectionVideos
§ IdentifyLocations&ExtentsofSpotRepairs
§ DeterminePipeSize,Material,Depth,NumberofServiceConnections(open/capped),DropConnections
§ DefineSurfaceConditions
§ ReviewManholeInspections
§ DetermineRehabilitationRecommendations(Cementitious/EpoxyLining,Frame&CoverReplacement)
15
![Page 16: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/16.jpg)
NEWEA– 2017AnnualConference&Exhibit
TraditionalComprehensiveRehabilitationDesignApproach
§ DesignDrawings&Specifications
§ ExtentsofCIPPLining&SpotRepairs
§ ManholeRehabilitationActions
§ DetailHowSpotRepairsandTrenchlessRehabilitationArePerformed
§ ApprovedMaterials&InstallationMethods
16
![Page 17: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/17.jpg)
NEWEA– 2017AnnualConference&Exhibit
TraditionalComprehensiveRehabilitationDesignApproach
§ DesignDrawings&Specifications§ ContainPermitObligations
§ Wetlands
§ StateHighwayAccess
§ AdjacentBuriedInfrastructure
§ PermitRequirements
§ SpecialMaterials/Procedures(ControlDensityFill)
§ PavementThickness
§ TrafficManagement
17
![Page 18: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/18.jpg)
NEWEA– 2017AnnualConference&Exhibit
Find&FixMethod
§ “Design/Build”forTrenchlessRehabilitation
§ CanSaveMoneyandReduceProjectDuration
§ EliminatetheNeedtoPerformInspectionsPriortoDesign
§ SuccessDirectlyRelatedtoCompletenessofDesignSpecifications
§ CarryItemstoCoverallTypesofScenariosThatMayBeEncounteredDuringConstruction
§ ConstructionOversite(ResidentEngineering)isEquallyImportant
18
![Page 19: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/19.jpg)
NEWEA– 2017AnnualConference&Exhibit
DeterminationofPotentialScenarios
§ SpotReplacementofSewers§ FederalorStateOwnedRoadways
§ SpecialPavingRequirements
§ GenericPermits
§ GroundSurfaceFeatures
§ PrivateProperty
§ Easements
§ CurbingTypes
§ SubsurfaceConditions§ Cobbles,RailTies,Contaminated/UnsuitableSoils,Etc.
19
![Page 20: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/20.jpg)
NEWEA– 2017AnnualConference&Exhibit20
![Page 21: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/21.jpg)
NEWEA– 2017AnnualConference&Exhibit
DeterminationofPotentialScenarios
§ PreviouslyLinedPipe
§ MayRequireLateralLining
§ ServicesNotProperlyReinstated
§ CappedServicesReinstated
§ ProtrudingTapsNotGroundDown
21
![Page 22: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/22.jpg)
NEWEA– 2017AnnualConference&Exhibit
DeterminationofPotentialScenarios
§ MultipleProtrudingTaps
§ PreventsAccessfromBothSides
§ TypicalRotaryCutterCannotBeUsed
§ LateralReinstatementDeviceIsNeeded
§ EquipmentNotUsuallyOwnedbyCCTVContractor
22
![Page 23: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/23.jpg)
NEWEA– 2017AnnualConference&Exhibit
DeterminationofPotentialScenarios
§ LargeChangesinQuantities
§ SewersMightBeLinedorPVCPipe
§ LessLiningThanOriginallyThought
§ GISDatabaseCouldHaveInaccuratePipeSizes
§ BidItemsforSpecificSizesCouldbeLargerorSmaller
§ ReviewRecordDrawings
23
![Page 24: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/24.jpg)
NEWEA– 2017AnnualConference&Exhibit
DeterminationofPotentialScenarios
§ UnknownServiceLateralConnections
§ Status:ActiveorCappedisUnknown
§ DyeTestingMayBeRequiredtoConfirm
§ IncorrectReinstatementCouldResultinBackupsorNeedforShortLiner
24
![Page 25: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/25.jpg)
NEWEA– 2017AnnualConference&Exhibit
DeterminationofPotentialScenarios
§ SurchargedSewers
§ InitialCCTVInspectionCannotbePerformed
§ BypassPumpingMayBeRequiredtoPerformInspection/Rehabilitation
25
![Page 26: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/26.jpg)
NEWEA– 2017AnnualConference&Exhibit
DeterminationofPotentialScenarios
§ ProjectDelays/ContractDuration
§ ManyUnknownsThatCouldCauseDelays
§ ExtraSpotRepairs
§ ChangesinLinerQuantitiesAffectCIPPOrdering
§ ProjectsCouldExtendIntoWinterMonths§ CertainRehabilitationProductsDoNotWorkinColdWeather
26
![Page 27: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/27.jpg)
NEWEA– 2017AnnualConference&Exhibit
DeterminationofPotentialScenarios
§ UnknownInfrastructure
§ ConnectivityIssues
§ MissingorExtraSewerPipes
§ MissingorExtraManholes
§ ManholesCouldBeBuried
27
![Page 28: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/28.jpg)
NEWEA– 2017AnnualConference&Exhibit
DeterminationofPotentialScenarios
§ AdditionalTrenchlessOptions
§ ConventionalDigandReplaceSpotRepairNotPossible
§ UtilityConflicts
§ DepthofRepair
§ OtherRehabilitationTechniquesMayBeNeeded
§ PipeBursting
28
![Page 29: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/29.jpg)
NEWEA– 2017AnnualConference&Exhibit
DevelopmentofSpecifications
§ DevelopmentofRobustandDetailedTechnicalSpecificationsisCriticaltoSuccess
§ UniqueBidItemsRequired
§ EnhancedLanguageinMeasurement&PaymentNeeded
29
![Page 30: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/30.jpg)
NEWEA– 2017AnnualConference&Exhibit
DevelopmentofSpecifications
§ SpotReplacementofSewers
§ IncludeBidItemstoAccountforVariousPossibilities
§ PipeSize
§ Depth
§ LengthofRepair
§ SurfaceandSubsurfaceConditions
§ EstimateQuantitiesBasedonReviewofSystem
30
![Page 31: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/31.jpg)
NEWEA– 2017AnnualConference&Exhibit
SpotReplacementBidItemsItemNumber Description EstimatedQuantity Unit UnitPrice Total
14a
RemoveandReplace(8-inthru12-in)existingVCsewer(0'-8'deep)up
to8linearfeet11 Each $7,743.25 $85,175.75
14b
RemoveandReplace(8-inthru12-in)existingVCsewer(9'-12'deep)up
to8linearfeet8 Each $7,924.38 $63,395.04
14c
RemoveandReplace(8-inthru12-in)existingVCsewer(13'-16'deep)
upto8linearfeet4 Each $10,867.50 $43,470.00
14d
RemoveandReplace(8-inthru12-in)existingVCsewer(17-20'deep)
upto8linearfeet1 Each $12,075.00 $12,075.00
15a
RemoveandReplace(8-inthru12-in)existingVCsewer(0'-8'deep)beyond8linearfeetspecifiedin
Item14a20 LinearFoot $370.75 $7,415.00
15b
RemoveandReplace(8-inthru12-in)VCSewer(9'-12'deep)beyond8linearfeetspecifiedinItem14b
16 LinearFoot $370.75 $5,932.00
15c
RemoveandReplace(8-inthru12-in)existingVCsewer(13'-16'deep)beyond8linearfeetspecifiedin
Item14c8 LinearFoot $302.40 $2,419.20
15d
RemoveandReplace(8-inthru12-in)VCSewer(17'-20'deep)beyond8
linearfeetspecifiedinItem14d4 LinearFoot $302.40 $1,209.60
31
![Page 32: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/32.jpg)
NEWEA– 2017AnnualConference&Exhibit
DevelopmentofSpecifications
§ SpotReplacementofSewers
§ IncludeDetailedLanguageinMeasurementandPayment
§ RestoringPrivateProperty
§ RemovingTrolleyTracks
§ RestoringSidewalksandCurbing
§ DisposingofUnsuitable/ContaminatedSoils
32
![Page 33: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/33.jpg)
NEWEA– 2017AnnualConference&Exhibit
RestoringPrivateProperty
33
![Page 34: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/34.jpg)
NEWEA– 2017AnnualConference&Exhibit
CobbledStreets
34
![Page 35: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/35.jpg)
NEWEA– 2017AnnualConference&Exhibit
Trolley/StreetcarTracks
35
![Page 36: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/36.jpg)
NEWEA– 2017AnnualConference&Exhibit
SidewalksandCurbing
36
![Page 37: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/37.jpg)
NEWEA– 2017AnnualConference&Exhibit
ContaminatedSoils
37
![Page 38: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/38.jpg)
NEWEA– 2017AnnualConference&Exhibit
DevelopmentofSpecifications
§ SpotReplacementofSewers
§ DigginginStateOwnedRoadwaysorEasements
§ PermitRequirements
§ ReducedWorkingHours
§ DifficultAccess
38
![Page 39: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/39.jpg)
NEWEA– 2017AnnualConference&Exhibit
SpotReplacementBidItems
ItemNumber Description EstimatedQuantity Unit UnitPrice Total
21
RemoveandReplace(8-inthru12-in)existingVC
sewer(0'-8'deep),inStateHighway,upto8linear
feet
2 Each $8,223.25 $16,446.50
22
RemoveandReplace(8-inthru12-in)existingVC
sewer(0'-8'deep),inStateHighway,beyond8linearfeetspecifiedinItem21
10 LinearFoot $400.75 $4,007.50
23
RemoveandReplace(8-inthru12-in)existingVCsewer(9'-12'deep),in
cross-countryareas,upto8linearfeet
1 Each $8,500.00 $8,500.00
24
RemoveandReplace(8-inthru12-in)VCSewer(9'-12'deep),incross-countryareas,beyond8linearfeet
specifiedinItem23
5 LinearFoot $375.50 $1,877.50
39
![Page 40: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/40.jpg)
NEWEA– 2017AnnualConference&Exhibit
DevelopmentofSpecifications
§ PreviouslyCIPPLinedSewers
§ IfServiceLateralLiningisPartofScope
§ IncludeBidItemsFor:
§ AdditionalServiceLateralReinstatement/Brushing
§ InstallationofShortLiners
§ GrindingDownProtrudingTaps
40
![Page 41: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/41.jpg)
NEWEA– 2017AnnualConference&Exhibit
DevelopmentofSpecifications
§ MultipleProtrudingTaps
§ CannotBeCutWithRotaryCutter
§ ChangedCondition
§ IncludeBidItemForGrindingDownProtrudingTapwithLateralReinstatementEquipment
41
ItemNumber Description EstimatedQuantity Unit UnitPrice Total
8
Grind-downMultipleProtrudingTapsUsingLateralReinstatement
Equipment12 each $442.50 $5,310.00
![Page 42: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/42.jpg)
NEWEA– 2017AnnualConference&Exhibit
DevelopmentofSpecifications
§ DyeTesting
§ StatusofAllServiceConnectionsWillNotBeKnown
§ RiskinReinstatingorNotReinstatingServices
§ IncludeBidItemForDyeTestingofServices
42
![Page 43: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/43.jpg)
NEWEA– 2017AnnualConference&Exhibit
DevelopmentofSpecifications
§ Dewatering/BypassPumping
§ SewersCouldBeSurcharged
§ MustbeCleanedandInspected
§ IncludeBidItemForDewatering/BypassPumping/HeavyCleaning
43
ItemNumber Description EstimatedQuantity Unit UnitPrice Total
48
Dewater/BypassPumpandPerformTelevisionInspectionofSewerPipe- 8"-24"
5,271 LinearFoot $3.00 $15,813.00
![Page 44: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/44.jpg)
NEWEA– 2017AnnualConference&Exhibit
DevelopmentofSpecifications
§ AdditionalTrenchlessAlternatives
§ SpotReplacementofSewersNotAlwaysPossible
§ UtilityConflicts
§ DepthofRepair
§ IncludeBidItemForPipeBursting
§ DetailedLanguagewithAssumptionsonPipeSize
44
![Page 45: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/45.jpg)
NEWEA– 2017AnnualConference&Exhibit
Conclusions
§ Find&FixMethodis“Design/Build”forTrenchlessRehabilitation§ CanSaveMoneyandTime§ AllowMunicipalitiestoRehabilitateLargePortionsoftheirSewerSystem§ DetailedSpecificationsareCrucialtoLimitChangeOrders
45
![Page 46: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure](https://reader031.vdocument.in/reader031/viewer/2022013020/5e8efc13689e0343d60f7b91/html5/thumbnails/46.jpg)
NEWEA– 2017AnnualConference&Exhibit