ap06 - mobile visibility and control key to w/ww predictive maintenance and operator efficacy
TRANSCRIPT
Copyright © 2015 Rockwell Automation, Inc. All Rights Reserved. Rockwell Automation TechED 2015 @ROKTechED #ROKTechED
PUBLIC INFORMATION
AP06 - Mobile Visibility and Control Key to W/WW Predictive Maintenance and Operator Efficiency
1
D. John Costello 2015
D. John Costello
• Over 41 years of Control System Design and Integration Experience
• With CH2M (Hill) for over 22 years
• CH2M Water Market West Regional Technology Leader – Automation Systems
• Rockwell Automation PlantPAx® System Integrator
• Certified Profibus DP & PA Network Engineer
3
Presenter Introduction
CH2M Hill
26,000 employees on six continents
Provides water industry planning, engineering, construction, and operations services
Provides Intelligent Water Solutions Services
Facility Automation
Smart Grid
Water Information Management
Integrated Security and Emergency Preparedness
Rockwell Automation® Recognized Control System Integrator
Rockwell Automation Recognized Process System Integrator
Rockwell Automation Recognized Information System Integrator
4
Company Introduction
Safety Moment
5
Exit Plan? Fall Restraint?
Picture from www.BrainJet.com
Project Overview
Client: Metro Wastewater Reclamation District
Project: Northern Treatment Plant – Brighton, CO
• 28.8 MGD Wastewater Treatment Plant
• Future Expansion to 75 MGD
• 1.0 Mile Long by 0.25 Mile Wide
Design-Build Contractor: CH2M HILL / Garney Construction
Cost: $250 Million
Delivery Method - Fast Track Progressive Design-Build
6
Site Overview
7
PlantPAx Integrated Architecture
FIELD DEVICE LEVEL • Profibus, DeviceNet, BACNet, DNP3
PROCESS CONTROL LEVEL • CompactLogix™ Hardware Platform
OPERATIONS LEVEL • FactoryTalk® View SE / ME HMI software
• Site Edition (SE): Uses FactoryTalk® Alarms and Events for alarming • Machine Edition (ME): Designed for use on PanelView™
• SUPERVISORY / MAINTENANCE CONTROL LEVEL • FactoryTalk® Historian / FactoryTalk® VantagePoint® Vantage Point Software
• Microsoft Excel reporting from FactoryTalk Historian and FactoryTalk Alarms and Events • FactoryTalk® AssetCentre Software
• Document Control / Disaster Recovery • Process device configuration • Calibration management
8
Northern Treatment Plant - Special Features
• Rockwell Automation PlantPAx based
• HMI graphics developed to support ISA Standard 18.2 and a modified grey scale
• State-of-the-art video wall in the plant control room
• Wireless mobility using iPads
• Virtualized control system using high availability redundant SAN
• Virtual environment with zero clients
• Replica process simulation software
• Redundant Network(s)
9
Control Room Video Wall
10
Video Wall
11
PASS Virtualized Servers
Process Network:
DMZ:
• Domain Controller – Primary
• Domain Controller – Secondary
• FactoryTalk Historian (5000 Tags)
• FactoryTalk VantagePoint
• Operator Workstations (Six Total + Video Wall)
Total of 18 Virtual Servers
• FactoryTalk® Directory
• FactoryTalk View SE [Unlimited Graphics] Primary Server
• FactoryTalk View SE [Unlimited Graphics] Secondary Server
• Engineering Server
• Engineering Workstation
• WIN911
• Windows Update Server
PASS Overview
13
PASS Sizing
14
Controller Verification
Control System Overview
Six Redundant Controllers & Four Non-Redundant Controllers
• 41 Hard-wired Analog Inputs
• 13 Hard-wired Analog Outputs
• 390 Hard-wired Digital Inputs
• 129 Hard-wired Digital Outputs
• 561 Profibus DP Devices
• 425 Profibus PA Devices
• 375 DeviceNet Devices
Thirteen Vendor supplied Controllers – Redundant & Non-Redundant Configurations
(ControlLogix® & CompactLogix™ + 1 non-Rockwell Automation solution)
15
PASS Architecture
16
Network / Processor Redundancy
17
Simplified Diagram
Fieldbus Implementation
18
Plant Control System (PCS) I/O Communicate via Fieldbus
Field Instruments Communicate via Profibus DP/PA
• Prosoft DP Module
• DP – Control Valves, Metering Pumps, Flowmeters and Analytical Instruments
• PA – Level, Pressure, Temperature, Weight
MCCs Communicate via DeviceNet
• MCC Bucket Control
• VFD Control
Most Packaged Systems Communicate via EtherNet/IP
Rockwell Automation’s AssetCentre Software
19
Provides Automatic Program Version Control.
Provides ability to configure and troubleshoot field instrumentation over HART or
Profibus communications technology.
Provides ability to schedule, manage, track, and report on field instrumentation
calibration activities.
AssetCentre
20
File Organization / Archiving
AssetCentre Process Device Configuration
21
Via Profibus
AssetCentre Process Device Configuration
22
Online Values
REPLICA SIMULATION SOFTWARE
23
Use of Replica Process Simulation Software
24
Influent Pump Station and the Tertiary Pump Station
modeled using Replica
Replica software blocks replicated in RSLogix™ 5000
(LogixDesigner) software.
Pump block resides in an Add-On-Instruction (AOI)
Incorporates pump curves to find most efficient
operating point.
Modified Gray Scale Technology
25
Gray Scale Technology
26
Gray Scale Technology
27
Situational Awareness
Gray Scale Technology
28
Situational Awareness
Liquids Flow Model
29
Solids Flow Model
30
ISA Standard 18.2 - Workflow
31
Construction Phase
Operations Phase
Programming Phase
ISA Standard 18.2 - Philosophy
32
Alarm definition
Roles and requirements
Rationalization requirements
Alarm class definitions, design, requirements
Alarm priorities, definitions, etc.
Alarm shelving / suppression rules
Alarm system monitoring requirements
Management of change
Training
Requires a committee of stakeholders
• Senior Management • Operators • Maintenance • SCADA Design Team
Draft, review, edit, repeat as necessary
Once approved, review the alarm philosophy periodically for any necessary changes
• Document should contain the minimum review period.
ISA 18.2 – Quick Drill Down
33
Drilling Down to Problems
ISA 18.2 Alarm Features
34
Ability to Shelve Alarms
ISA 18.2 Alarm Features
35
Breadcrumbs – Alarm Priorities
ISA 18.2 Alarm Features
36
ISA 18.2 Alarm Management
37
Single Alarm – Multiple Causes
ISA 18.2 - Monitoring
38
Alarms per Day: ~150/Day Target ~300/Day Maximum
Alarms per Hour: ~6 Average ~12 Maximum
Alarms per 10 Min: ~1 Average ~2 Average
Hours containing >30 Alarms: ~<1%
Priority Distribution:
•P1 (Urgent) ~5%
• P2 (High) ~15%
• P3 (Medium) ~80%
• P4 (Low / Maintenance Required) Event
ISA 18.2 Monitoring
FactoryTalk VantagePoint reporting installed to provide Alarming Key Performance Indicator Monitoring
39
ISA 18.2 Alarming KPI Reports
40
Alarms Grouped by Class
ISA 18.2 Alarming KPI Reports
41
Top Alarms – Time to Acknowledge
ISA 18.2 Alarming KPIs
42
Alarms – Hourly Alarm Counts
24 Alarms/Hour
ISA 18.2 Alarming KPI Reports
43
Drill Down into 24 Alarms/Hour
Tools to Help Improve Integration Effort
44
“Smart” P&IDs
Tools to Help Improve Integration Effort
45
P&IDs Linked to Database
Tools to Help Improve Integration Effort
46
Database creates CSV Tag file for RSLogix5000
Tools to Help Improve Integration Effort
47
Same information used for HMI
Tools to Help Improve Integration Effort
48
PlantPAx_OnlineConfigTool_xxx.XLS
Tools to Help Improve Integration Effort
49
PAX_AlarmsBuilder_Vxxxx
Tools to Help Improve Integration Effort
50
PAX_AlarmsBuilder_Vxxxx
Tools to Help Improve Integration Effort
51
PAX_AlarmsBuilder_Vxxxx
Tools to Help Improve Integration Effort
52
PAX_AlarmsBuilder_Vxxxx
Summary
Modeled the Process Using Replica
Used Fieldbus Technology
Used existing AOI (P_Alarm), knowing it would be upgraded at a later time to support S18.2
Alarm Management.
• This allowed development to start before the desired functionality was actually available without impacting
the project schedule.
Linked Directly to the AOIs
• Eliminated the HMI Tag Database
– Reduced Development Time.
– Reduces Processor Memory Usage roughly 50% over using UDTs
Implemented Rockwell Devices
• Rockwell Automation PowerMonitor™
– Imported the Add-On Profile and Configured the Device – Reduced Development Time.
Implemented FactoryTalk AssetCentre PDC
• Configure and Verify Instrument Operation – Reduce Start-Up Time
53
www.rockwellautomationteched.com
Copyright © 2015 Rockwell Automation, Inc. All Rights Reserved.
PUBLIC INFORMATION
Rockwell Automation TechED 2015 @ROKTechED #ROKTechED
Thank you!