The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix)
AP1-1
AP.1 APPENDIX TO PRE-FEASIBILITY STUDY ON BUSWAY EXTENSION PROJECT (CULCULATION OF BUS SHELTER’S DIMENSIONS AND CONSTRUCTION COST BREAK DOWN)
AP1.1 Design Condition in 2007
AP1.1.1 Number of Passengers by Each Bus Loading Facility
Calculation that is to define the dimensions of the bus loading facilities was carried out using
the actual estimated numbers of passengers for Bus Terminal and Transfer Center, and
standardized numbers of passengers for bus stop.
(1) Bus Terminals and Transfer Centers
For Bus Terminals and Bus-to-bus Transfer Centers, numbers of the transferring passengers as
well as boarding/alighting passengers were tabulated in Table AP.1.1.
Table AP1.1 NB of Passengers at Bus Terminal and Transfer Center (daily)
Bus Type NB (1)Bording
(2)Alighting
(3)Transfering
(4)Σ(1)~(3)
Kota Terminal - 37 1,650 1,280 9,380 12,310L.Bulus Terminal Articulated 16 5,900 8,350 0 14,250
PB02 Ragunan Terminal Articulated 4 1,940 1,620 0 3,560PB03 KP. Rambutan Terminal Single 30 9,900 9,350 0 19,250
Kalideres Terminal 27 5,880 4,610 0 10,490P.Gadung Terminal 27 2,430 2,170 0 4,600
01x02x04 Monas Transer Center - 49 618 319 22,315 23,25101x02x04 Harmoni Transer Center - 49 936 949 5,668 7,553
03x04 Senen Transer Center - 57 2,254 2,915 22,230 27,399
Articulated
NB of DailyBording/Alighting/Transfering
Passenger
PB01
PB04
Traffic Volume(Buses/hour)
(2) Bus Stops
The figure AP.1.1 indicates the
distribution of the numbers of boarding
and alighting passengers according to
the result of the demand forecast.
Since there are around 80 bus stops,
design was carried out using 4
standardized numbers of passengers that
were classified by Table AP.1.2,
Table AP1.2 Class of the Bus Stops
.
Boarding AlightingClass-A 0-1000 0-1000Class-B 1000-2000 1000-2000Class-C 2000-3500 2000-3500Class-D 3500-7000 3500-8000
NB of Passengers
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-2
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000
NB of Boarding Passenger
NB
of A
light
ing
Pass
enge
r
Figure AP1.1 NB of Boarding/Alighting Passengers at Bus Stop (daily)
AP1.2 Size of the Bus Loading facilities
AP1.2.1 Form of Loading Area
In “Highway Capacity Manual”, four different types of bus berths are exhibited as figure
AP.1.2 Liner Type and Sawtooth Type were adopted in this design, since these are easy to
install to the restricted area, such as bus stop along the road.
Figure 1.2 Bus Loading Area Design1
1 Source: “Highway Capacity Manual 2000” Transportation Research Board National Research Council,, USA
A
Class-B
Class-C
Class-D
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-3
It is recognized that the Liner Type is less efficient than other types, so that Sawthooth Type
was adopted when more than three berths would be required.
AP1.2.2 Calculation of Number of Bus Berth
(1) Dwell Time
1) Passenger Volume per Bus Headway
a. Hourly Passenger Volume
Hourly passenger volume was converted from daily volume using following formula.
PFPVPV dailyhourly ×=
Where as;
PVhourly: Hourly passenger volume (shown as ③ in Table AP.1.4 ) PVdaily: Daily passenger volume (shown as ② in Table AP.1.4 ) PF: Peak Factor (0.1)
Peak factor of 10 percent was assumed considering the present condition.
b. Passenger Volume per Bus Headway
Passenger volume per bus headway was calculated by the following formula.
AFBVPVPV hourly ×÷=int
Where as;
PVint: Passenger volume per bus headway (shown as ④ in Table AP.1.4) BV: Hourly bus traffic volume (shown as ① in Table AP.1.4) AF: Proportion of the passenger volume on heavier-direction during the peak hour (0.65)
2) Average dwell time (td)
The results of the calculations are tabulated in Table AP.1.4
In “Transit Capacity and Quality Service Manual”, the time requires for single boarding/
alighting passenger (dwell times) is suggested as per fare condition (Table AP.1.2). Since there
is no available data in Indonesia regarding the dwell time, the times tabulated in Table AP.1.3
were adopted in the study.
The average dwell time for each bus stopping was calculated by multiplying passenger volume
that is built up within the bus interval (shown as ④ in Table AP.1.4) and the tabulated time.
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-4
And in the study, alighting time of 2.0 seconds was used for both boarding and alighting, since
the pre-payment fare system would be adopted.
Table1.3 Required Times for Each Bus Passenger2
Boarding/ Alighting Time(sec)
Remarks
Pre-Payment 2.0 Single Ticket/Token 2.6
Boarding*
Exact Fare 3.0 Alighting 1.7 to 2.0
*Note: Add 0.5 seconds is standees are present on the bus
(2) Number of Bus Berths
The results are tabulated in Table AP. 2.6.
Number of bus berths was set bus traffic volume (shown as ① in Table AP. 2.6) less than bus
berth capacity (shown as ⑦ in Table AP.2.6) multiplied by number of effective loading
area.(Neb; see “3)”)
①≦⑦ x Neb
1) Capacity of Bus Loading Facilities
Capacity of a bus stop was calculated by the following formula.
( )( ) dvadc
ebbbebs tCZtCgtCgNBNB
++==
//600,3
Where as;
Bs: Maximum number of buses per bus stop per hour Neb: Number of effective loading area (see “3)”) Bbb : The number of operating buses per hour (shown as ⑦ in Table AP. 2.6 ) g/C:Ratio of effective green time to a cycle (see “2)”) tc:Clearance time for sequentially arriving buses (15 sec) td:Average dwell time (shown as ⑤ in Table AP. 2.6) Zd:Probability not to emerge bus queues (0.675) Cv:Variation coefficient of stopping time (0.6)
2 Source: ““Transit Capacity and Quality Service Manual” Transportation Research Board National Research Council,, USA
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-5
Table AP.1.4 Calculation Sheet for Dwell Time ③ ④ ⑤
RequiredDwell Time
(sec)
Bus Type NB ①
Bording②
Alighting③
Transfering④
Σ①~③2007
Kota Terminal - 37 1,650 1,280 9,380 12,310 1,231 34 68L.Bulus Terminal Articulated 16 5,900 8,350 0 14,250 1,425 90 180
PB02 Ragunan Terminal Articulated 4 1,940 1,620 0 3,560 356 89 178PB03 KP. Rambutan Terminal Single 30 9,900 9,350 0 19,250 1,925 65 130
Kalideres Terminal 27 5,880 4,610 0 10,490 1,049 39 78P.Gadung Terminal 27 2,430 2,170 0 4,600 460 18 36
01x02x04 Monas Transer Center - 49 618 319 22,315 23,251 2,325 48 9601x02x04 Harmoni Transer Center - 49 936 949 5,668 7,553 755 16 32
03x04 Senen Transer Center - 57 2,254 2,915 22,230 27,399 2,740 49 98Class-A Bus Stop Articulated 16 650 650 0 1,300 130 9 18Class-B Bus Stop Articulated 16 1,300 1,300 0 2,600 260 17 34Class-C Bus Stop Articulated 16 2,275 2,275 0 6,000 600 38 76Class-D Bus Stop Articulated 16 4,550 5,200 0 9,750 975 61 122Class-A Bus Stop Articulated 49 650 650 0 1,300 130 3 6Class-B Bus Stop Articulated 49 1,300 1,300 0 2,600 260 6 12Class-C Bus Stop Articulated 49 2,275 2,275 0 6,000 600 13 26Class-D Bus Stop Articulated 49 4,550 5,200 0 9,750 975 20 40Class-A Bus Stop Articulated 22 650 650 0 1,300 130 6 12Class-B Bus Stop Articulated 22 1,300 1,300 0 2,600 260 12 24Class-C Bus Stop Articulated 22 2,275 2,275 0 6,000 600 28 56Class-D Bus Stop Articulated 22 4,550 5,200 0 9,750 975 45 90Class-A Bus Stop Articulated 6 650 650 0 1,300 130 22 44Class-B Bus Stop Articulated 6 1,300 1,300 0 2,600 260 44 88Class-C Bus Stop Articulated 6 2,275 2,275 0 6,000 600 100 200Class-D Bus Stop Articulated 6 4,550 5,200 0 9,750 975 163 326Class-A Bus Stop Articulated 4 650 650 0 1,300 130 33 66Class-B Bus Stop Articulated 4 1,300 1,300 0 2,600 260 65 130Class-C Bus Stop Articulated 4 2,275 2,275 0 6,000 600 150 300Class-D Bus Stop Articulated 4 4,550 5,200 0 9,750 975 244 488Class-A Bus Stop Single 30 650 650 0 1,300 130 5 10Class-B Bus Stop Single 30 1,300 1,300 0 2,600 260 9 18Class-C Bus Stop Single 30 2,275 2,275 0 6,000 600 20 40Class-D Bus Stop Single 30 4,550 5,200 0 9,750 975 33 66Class-A Bus Stop Single 15 650 650 0 1,300 130 9 18Class-B Bus Stop Single 15 1,300 1,300 0 2,600 260 18 36Class-C Bus Stop Single 15 2,275 2,275 0 6,000 600 40 80Class-D Bus Stop Single 15 4,550 5,200 0 9,750 975 65 130Class-A Bus Stop Articulated 27 650 650 0 1,300 130 5 10Class-B Bus Stop Articulated 27 1,300 1,300 0 2,600 260 10 20Class-C Bus Stop Articulated 27 2,275 2,275 0 6,000 600 23 46Class-D Bus Stop Articulated 27 4,550 5,200 0 9,750 975 37 74
PB04
① ②
Facility'sName
RouteName
PB02-1
PB02-2
PB03-1
PB03-2
PB01(D.M. -K.S.*1)
PB01(Kota - D.M.K.S.-H.I. *2)
PB01
PB04
PB01
Traffic Volume(Buses/hour)
PassengerVolume
perHeadway
PassengerVolume at
Peak1Hour
NB of DailyBording/Alighting/Transfering
Passenger
Articulated
2) Green Time Ratio (g/C)
In the study, green time ratio (shown as ⑥ in Table AP.1.6) was assumed in following
condition.
• g / C = 1.00 : in case of no signalized intersection near the bus loading facility which is
accessed by the pedestrian bridge
• g / C = 0.75 : in case of no signalized intersection near the bus loading facility which is
accessed by the cross-walk with traffic signals
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-6
• g / C = 0.50 : in case of a signalized intersection near the bus loading facility
3) Number of Effective Loading Area (Neb)
The capacity of plural bus berths varies according to the layout of bus berth. As shown in Table
AP.1.5, increasing the number of loading areas at a parallel bus berths has an ever-decreasing
effect on capacity as the number of berths increase because the stopping buses interfere with
other buses.
On the other hand, no decreasing effect is needed to consider in the sawtooth design.
Table 1.5 Effective Loading in case of Parallel Berth (Neb)
On-Line Loading Areas Off-Line Loading Areas Loading Area NB Efficiency
% NB of Cumulative Effective Loading
Areas
Efficiency %
NB of Cumulative Effective Loading
Areas 1 100 1.00 100 1.00 2 85 1.85 85 1.85 3 60 2.45 75 2.60 4 20 2.65 65 3.25 5 5 2.70 50 3.75
Note: On-line values were assumed that buses do not overtake each other.
Table 1.6 Calculation Sheets for Number of Bus Berths
Bus Type NB Parallel[On-Line]
Parallel[Off-Line] Sawtooth
Kota Terminal - 37 68 0.75 15 29 2 2 2 Para(On) 2L.Bulus Terminal Articulated 16 180 1.00 15 13 2 2 2 Para(On) 2
PB02 Ragunan Terminal Articulated 4 178 1.00 15 14 1 1 1 Para(On) 1PB03 KP. Rambutan Terminal Single 30 130 1.00 15 18 2 2 2 Para(On) 2
Kalideres Terminal Articulated 27 78 1.00 15 29 1 1 1 Para(On) 1P.Gadung Terminal 0 27 36 1.00 15 55 1 1 1 Para(On) 1
01x02x04 Monas Transer Center - 49 96 0.75 15 21 3 3 3 Saw 301x02x04 Harmoni Transer Center 49 32 0.75 15 52 1 1 1 Para(On) 1
03x04 Senen Transer Center - 57 98 0.75 15 21 - 4 3 Saw 3
①Traffic Volume(Buses/hour)
PB01
PB04
RouteName
Facility'sName
Bus Berth Configuration⑧ Required NBof Berth by Type
⑥GreenTimeRatio
⑤Required
DwellTime(sec)
LayoutType
NB ofBerth
⑨ AdoptedBerth Design
Clearance TimebetweenBuses
⑦ BusBerth
Capacity(buses/h
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-7
Table 1.6 Calculation Sheets for Number of Bus Berths (Continued)
Bus Type NB Parallel[On-Line]
Parallel[Off-Line] Sawtooth
Class-A Bus Stop Articulated 16 18 1.00 15 89 1 1 1 Para(On) 1Class-B Bus Stop Articulated 16 34 1.00 15 57 1 1 1 Para(On) 1Class-C Bus Stop Articulated 16 76 1.00 15 30 1 1 1 Para(On) 1Class-D Bus Stop Articulated 16 122 1.00 15 19 1 1 1 Para(On) 1Class-A Bus Stop Articulated 16 18 1.00 15 89 1 1 1 Para(On) 1Class-B Bus Stop Articulated 16 34 0.75 15 50 1 1 1 Para(On) 1Class-C Bus Stop Articulated 16 76 0.75 15 26 1 1 1 Para(On) 1Class-D Bus Stop Articulated 16 122 0.75 15 17 1 1 1 Para(On) 1Class-A Bus Stop Articulated 16 18 0.75 15 75 1 1 1 Para(On) 1Class-B Bus Stop Articulated 16 34 0.50 15 39 1 1 1 Para(On) 1Class-C Bus Stop Articulated 16 76 0.50 15 21 1 1 1 Para(On) 1Class-D Bus Stop Articulated 16 122 0.50 15 14 2 2 2 Para(On) 2Class-A Bus Stop Articulated 6 44 1.00 15 47 1 1 1 Para(On) 1Class-B Bus Stop Articulated 6 88 1.00 15 26 1 1 1 Para(On) 1Class-C Bus Stop Articulated 6 200 1.00 15 12 1 1 1 Para(On) 1Class-D Bus Stop Articulated 6 326 1.00 15 8 1 1 1 Para(On) 1Class-A Bus Stop Articulated 6 44 0.75 15 41 1 1 1 Para(On) 1Class-B Bus Stop Articulated 6 88 0.75 15 23 1 1 1 Para(On) 1Class-C Bus Stop Articulated 6 200 0.75 15 11 1 1 1 Para(On) 1Class-D Bus Stop Articulated 6 326 0.75 15 7 1 1 1 Para(On) 1Class-A Bus Stop Articulated 6 44 0.50 15 33 1 1 1 Para(On) 1Class-B Bus Stop Articulated 6 88 0.50 15 19 1 1 1 Para(On) 1Class-C Bus Stop Articulated 6 200 0.50 15 9 1 1 1 Para(On) 1Class-D Bus Stop Articulated 6 326 0.50 15 6 2 2 2 Para(On) 2Class-A Bus Stop Articulated 4 66 1.00 15 33 1 1 1 Para(On) 1Class-B Bus Stop Articulated 4 130 1.00 15 18 1 1 1 Para(On) 1Class-C Bus Stop Articulated 4 300 1.00 15 8 1 1 1 Para(On) 1Class-D Bus Stop Articulated 4 488 1.00 15 5 1 1 1 Para(On) 1Class-A Bus Stop Articulated 4 66 1.00 15 33 1 1 1 Para(On) 1Class-B Bus Stop Articulated 4 130 0.75 15 16 1 1 1 Para(On) 1Class-C Bus Stop Articulated 4 300 0.75 15 7 1 1 1 Para(On) 1Class-D Bus Stop Articulated 4 488 0.75 15 5 1 1 1 Para(On) 1Class-A Bus Stop Articulated 4 66 0.75 15 30 1 1 1 Para(On) 1Class-B Bus Stop Articulated 4 130 0.50 15 14 1 1 1 Para(On) 1Class-C Bus Stop Articulated 4 300 0.50 15 6 1 1 1 Para(On) 1Class-D Bus Stop Articulated 4 488 0.50 15 4 2 2 2 Para(On) 2Class-A Bus Stop Single 30 10 1.00 15 124 1 1 1 Para(On) 1Class-B Bus Stop Single 30 18 1.00 15 89 1 1 1 Para(On) 1Class-C Bus Stop Single 30 40 1.00 15 51 1 1 1 Para(On) 1Class-D Bus Stop Single 30 66 1.00 15 33 1 1 1 Para(On) 1Class-A Bus Stop Single 30 10 1.00 15 124 1 1 1 Para(On) 1Class-B Bus Stop Single 30 18 0.75 15 75 1 1 1 Para(On) 1Class-C Bus Stop Single 30 40 0.75 15 44 1 1 1 Para(On) 1Class-D Bus Stop Single 30 66 0.75 15 30 2 2 2 Para(On) 2Class-A Bus Stop Single 30 10 0.75 15 102 1 1 1 Para(On) 1Class-B Bus Stop Single 30 18 0.50 15 58 1 1 1 Para(On) 1Class-C Bus Stop Single 30 40 0.50 15 35 1 1 1 Para(On) 1Class-D Bus Stop Single 30 66 0.50 15 24 2 2 2 Para(On) 2Class-A Bus Stop Single 15 18 1.00 15 89 1 1 1 Para(On) 1Class-B Bus Stop Single 15 36 1.00 15 55 1 1 1 Para(On) 1Class-C Bus Stop Single 15 80 1.00 15 28 1 1 1 Para(On) 1Class-D Bus Stop Single 15 130 1.00 15 18 1 1 1 Para(On) 1Class-A Bus Stop Single 15 18 1.00 15 89 1 1 1 Para(On) 1Class-B Bus Stop Single 15 36 0.75 15 48 1 1 1 Para(On) 1Class-C Bus Stop Single 15 80 0.75 15 25 1 1 1 Para(On) 1Class-D Bus Stop Single 15 130 0.75 15 16 1 1 1 Para(On) 1Class-A Bus Stop Single 15 18 0.75 15 75 1 1 1 Para(On) 1Class-B Bus Stop Single 15 36 0.50 15 38 1 1 1 Para(On) 1Class-C Bus Stop Single 15 80 0.50 15 21 1 1 1 Para(On) 1Class-D Bus Stop Single 15 130 0.50 15 14 2 2 2 Para(On) 2Class-A Bus Stop Articulated 27 10 1.00 15 124 1 1 1 Para(On) 1Class-B Bus Stop Articulated 27 20 1.00 15 84 1 1 1 Para(On) 1Class-C Bus Stop Articulated 27 46 1.00 15 45 1 1 1 Para(On) 1Class-D Bus Stop Articulated 27 74 1.00 15 30 1 1 1 Para(On) 1Class-A Bus Stop Articulated 27 10 1.00 15 124 1 1 1 Para(On) 1Class-B Bus Stop Articulated 27 20 0.75 15 71 1 1 1 Para(On) 1Class-C Bus Stop Articulated 27 46 0.75 15 40 1 1 1 Para(On) 1Class-D Bus Stop Articulated 27 74 0.75 15 27 2 2 2 Para(On) 2Class-A Bus Stop Articulated 27 10 0.75 15 102 1 1 1 Para(On) 1Class-B Bus Stop Articulated 27 20 0.50 15 54 1 1 1 Para(On) 1Class-C Bus Stop Articulated 27 46 0.50 15 32 1 1 1 Para(On) 1Class-D Bus Stop Articulated 27 74 0.50 15 22 2 2 2 Para(On) 2
PB04[g/C=0.50]
PB02-2[g/C=0.50]
①Traffic Volume(Buses/hour)
PB03-2[g/C=0.50]
RouteName
Facility'sName
PB04[g/C=1.00]
PB03-1[g/C=0.75]
PB03-1[g/C=0.50]
⑤Required
DwellTime(sec)
Bus Berth Configuration⑥
GreenTimeRatio
Clearance TimebetweenBuses
⑦ BusBerth
Capacity(buses/h
⑧ Required NBof Berth by Type
⑨ AdoptedBerth Design
LayoutType
NB ofBerth
PB02-2[g/C=1.00]
PB02-2[g/C=0.75]
PB03-2[g/C=1.00]
PB03-2[g/C=0.75]
PB04[g/C=0.75]
PB02-1[g/C=0.75]
PB01[g/C=1.00]
PB01[g/C=0.75]
PB01[g/C=0.50]
PB03-1[g/C=1.00]
PB02-1[g/C=1.00]
PB02-1[g/C=0.50]
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-8
AP1.2.3 Required Floor Area of Bus Shelters
Waiting areas of the bus shelters that are shown as ⑩ in Table AP.1.7 were calculated by
multiplying 1.2 and boarding/alighting passenger volume per bus headway (shown as ④ in
Table AP.1.7) . 1.2 m2 is assumed as the minimum area when the standing and free circulation
through the queuing area possible without disturbing others within the queue (equivalent to
LOS A in Figure below).
Figure 1.3 Level of Service of Queuing Area 3
3 ”Exhibit 11-9 Queuing Area Los” Shown in the “Highway Capacity Manual 2000” Transportation Research Board National Research Council, USA
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-9
Table 1.7 Calculation Sheets for Waiting Area and Ticketing System
(1) (2) (3)Bording Alighting Transfering In Out Bi-Direction
Kota Terminal 1,650 1,280 9,380 5,276 34 3 41 1 1 1 1 1L.Bulus Terminal 5,900 8,350 0 2,991 90 14 108 1 1 1 1 4
PB02 Ragunan Terminal 1,940 1,620 0 2,269 89 4 107 1 1 1 1 1PB03 KP. Rambutan Terminal 9,900 9,350 0 5,107 65 17 78 1 1 1 1 5
Kalideres Terminal 5,880 4,610 0 1,944 39 10 47 1 1 1 1 3P.Gadung Terminal 2,430 2,170 0 1,136 18 5 22 1 1 1 1 2
01x02x04 Monas Transfer Center 618 319 22,315 5,010 48 2 58 1 1 1 1 101x02x04 Harmoni Transer Center 936 949 5,668 3,004 16 2 20 1 1 1 1 1
03x04 Senen Transfer Center 2,254 2,915 22,230 8,604 49 5 59 1 1 1 1 2Class-A Bus Stop 650 650 0 130 9 2 11 1 1 1 1 1Class-B Bus Stop 1,300 1,300 0 260 17 3 21 1 1 1 1 1Class-C Bus Stop 2,275 2,275 0 600 38 4 46 1 1 1 1 1Class-D Bus Stop 4,550 5,200 0 975 61 9 74 1 1 1 1 3Class-A Bus Stop 650 650 0 130 3 2 4 1 1 1 1 1Class-B Bus Stop 1,300 1,300 0 130 6 3 8 1 1 1 1 1Class-C Bus Stop 2,275 2,275 0 130 13 4 16 1 1 1 1 1Class-D Bus Stop 4,550 5,200 0 130 20 9 24 1 1 1 1 3Class-A Bus Stop 0 0 0 130 6 2 8 1 1 1 1 1Class-B Bus Stop 0 0 0 130 12 3 15 1 1 1 1 1Class-C Bus Stop 0 0 0 130 28 4 34 1 1 1 1 1Class-D Bus Stop 0 0 0 130 45 9 54 1 1 1 1 3Class-A Bus Stop 650 650 0 130 22 2 27 1 1 1 1 1Class-B Bus Stop 1,300 1,300 0 260 44 3 53 1 1 1 1 1Class-C Bus Stop 2,275 2,275 0 600 100 4 120 1 1 1 1 1Class-D Bus Stop 4,550 5,200 0 975 163 9 196 1 1 1 1 3Class-A Bus Stop 650 650 0 130 33 2 40 1 1 1 1 1Class-B Bus Stop 1,300 1,300 0 260 65 3 78 1 1 1 1 1Class-C Bus Stop 2,275 2,275 0 600 150 4 180 1 1 1 1 1Class-D Bus Stop 4,550 5,200 0 975 244 9 293 1 1 1 1 3Class-A Bus Stop 650 650 0 130 5 2 6 1 1 1 1 1Class-B Bus Stop 1,300 1,300 0 260 9 3 11 1 1 1 1 1Class-C Bus Stop 2,275 2,275 0 600 20 4 24 1 1 1 1 1Class-D Bus Stop 4,550 5,200 0 975 33 9 40 1 1 1 1 3Class-A Bus Stop 650 650 0 130 9 2 11 1 1 1 1 1Class-B Bus Stop 1,300 1,300 0 260 18 3 22 1 1 1 1 1Class-C Bus Stop 2,275 2,275 0 600 40 4 48 1 1 1 1 1Class-D Bus Stop 4,550 5,200 0 975 65 9 78 1 1 1 1 3Class-A Bus Stop 650 650 0 130 5 2 6 1 1 1 1 1Class-B Bus Stop 1,300 1,300 0 260 10 3 12 1 1 1 1 1Class-C Bus Stop 2,275 2,275 0 600 23 4 28 1 1 1 1 1Class-D Bus Stop 4,550 5,200 0 975 37 9 45 1 1 1 1 3
PB04
② NB of DailyBording/Alighting/Transfering
Passenger
PB01
PB02-1
PB02-2
PB03-1
PB01(D.M. -K.S.*1)PB01
(Kota -D.M.
K.S.-H.I.
PB03-2
⑫Required
TicketVendingMachine
⑩RequiredWaiting
Area(sqm)
Total NB ofTicketing Gate Machine
⑪Required NB of Ticketing Gate
⑤Passenger
Volume PassingThrough the Gate
/peak 1min/direction
TicketingGate Way/direction
④Passenger
Volumeper
Headway
③PassengerVolume at
Peak1Hour
PB01
PB04
RouteName
Facility'sName
AP1.2.4 Ticketing Equipments
(1) Turn Style Gate
In Japan, it is known that 25 passenger can pass through the turn style gate in maximum. In the
study, 20 passengers that are 80% of 25 passengers were adopted and following formula was
used to calculate the required number of the gates, and the results were shown in Table AP.1.7.
( )20
60/,max PFPPN abg
×=
Where as;
Ng: Number of ticketing gate (shown as ⑪ in Table AP. 1.7) Pb: Daily Boarding Passenger (shown as ② in Table AP. 1.7) Pa: Daily Alighting Passenger (Ditto) PF: Peak Factor mentioned in “AP.1.2.2 (1)”
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-10
From the result of the calculations, it was found that one gate has sufficient capacity for the
passengers in 2007 to board or alight. In the study, one gate facility was allocated for each
boarding side and alighting side, and also one reversible gate facility was installed.
(2) Ticket Vending Machine
Number of ticket vending machines was calculated by using formula below, and results were
shown in Table AP.1.7. Capacity of the vending machine was assumed as 4 passengers/second
according to the experience in Japan.
460/PFPN b
tv×
=
Where as;
Ntv: Number of ticket vending machine (shown as ⑫ in Table AP1.7)
AP1.3 Adjustment Work
In aforementioned procedure, general data such as boarding/alighting time, clearance time,
probability, etc was adopted the values that generally used in USA. Therefore, adjustment work
will be occasionally needed using actual observed data on service section.
AP1.4 Construction COST BREAK DOWN
AP1.4.1 Civil Works
This item consists of the civil works relating to busway and bus shelter construction.
Major works of this item are demolition/construction of the pavement/curb,
widening/construction of the bridge, construction of the pedestrian bridge, installation of the
stair, etc.
The cost of civil works shown in the main text of the “Vol.2 Pre Feasibility Study“ is total of
the tabulated cost in B.1.2 and Contingency and VAT.
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-11
(1) Cost Break Down
1) PB01
1 General 2,3211.1 General Lm 420 5,525 2,321
2 Drainage 5,5632.1 Drainage Lm 1,075 5,175 5,563
3 Earth Works 4133.1 Commn Excavation m3 13.0 16,317 212
3.2 Embankment with Material fromCommon or Borrow Excavation m3 20.0 0 0
3.4 Demolition of Pavement m3 20.0 3,071 61Demolition of Curb m 7.0 19,913 139
6 Pavement 12,480Travelled Way m2 150 66,640 9,996Sidewalk m3 80 31,050 2,484
7 Structure 2,4247.0 Pedestrian Bridge m2 8,000 180 1,440 Monas T.C.
7.05 Pedestrian Bridge Stair m2 6,500 60 3907.1 Brdge Widening m2 6,600 70 459
7.5.1 Box Culvert (2.5x2.5) m 3,000 45 135 Duku Atas F.O.
8 Miscellaneous 2,0928.1 Precast Concrete Curb Lm 54 21,713 1,1738.2 Lane Marking m2 71.0 3,672 2618.3 Traffic Sign Each 580.0 12 78.4 Street Lighting Median Each 27,526 0 08.5 Street Tree Median Each 827 0 08.7 Traffic Separater Lm 59 11,050 652
Total 25,2925,269 Mllion Rp./Km
Cost(million Rp.) RemarksNo. Description Unit
Unit Cost(thousand
Rp.)Quantity
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-12
2) PB02
1 General 5,5861.1 General Lm 420 13,300 5,586
2 Drainage 2,7742.1 Drainage Lm 1,075 2,580 2,774
3 Earth Works 9983.1 Commn Excavation m3 13.0 27,204 354
3.2 Embankment with Material fromCommon or Borrow Excavation m3 20.0 0 0
3.4 Demolition of Pavement m3 20.0 19,859 397Demolition of Curb m 7.0 35,319 247
6 Pavement 4,110Travelled Way m2 150 17,355 2,603Sidewalk m3 80 18,840 1,507
7 Structure 26,5587.0 Pedestrian Bridge m2 8,000 0
7.05 Pedestrian Bridge Stair m2 6,500 210 1,3657.1 Brdge Widening m2 6,600 3,808 25,133
7.5.1 Box Culvert (2.5x2.5) m 3,000 20 60 R.Said Station
8 Miscellaneous 2,5408.1 Precast Concrete Curb Lm 54 13,599 7348.2 Lane Marking m2 71.0 6,702 4768.3 Traffic Sign Each 580.0 25 158.4 Street Lighting Median Each 27,526 0 08.5 Street Tree Median Each 827 0 08.7 Traffic Separater Lm 59 22,300 1,316
Total 42,5668,868 Mllion Rp./Km
Cost(million Rp.) RemarksNo. Description Unit
Unit Cost(thousand
Rp.)Quantity
3) PB03
1 General 9,3621.1 General Lm 420 22,290 9,362
2 Drainage 8,7512.1 Drainage Lm 1,075 8,140 8,751
3 Earth Works 1,7023.1 Commn Excavation m3 13.0 77,661 1,010
3.2 Embankment with Material fromCommon or Borrow Excavation m3 20.0 0 0
3.4 Demolition of Pavement m3 20.0 19,826 397Demolition of Curb m 7.0 42,223 296
6 Pavement 18,088Travelled Way m2 150 90,645 13,597Sidewalk m3 80 56,145 4,492
7 Structure 4,8037.0 Pedestrian Bridge m2 8,000 150 1,200 Mangga Dua
7.05 Pedestrian Bridge Stair m2 6,500 270 1,7557.1 Brdge Widening m2 6,600 280 1,848
7.5.1 Box Culvert (2.5x2.5) m 3,000 0 0
8 Miscellaneous 6,4768.1 Precast Concrete Curb Lm 54 47,741 2,5788.2 Lane Marking m2 71.0 15,034 1,0678.3 Traffic Sign Each 580.0 46 278.4 Street Lighting Median Each 27,526 0 08.5 Street Tree Median Each 827 0 08.7 Traffic Separater Lm 59 47,530 2,804
Total 49,18210,246 Mllion Rp./Km
Cost(million Rp.) RemarksNo. Description Unit
Unit Cost(thousand
Rp.)Quantity
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-13
4) PB04
1 General 9,9461.1 General Lm 420 23,680 9,946
2 Drainage 1,2692.1 Drainage Lm 1,075 1,180 1,269
3 Earth Works 6563.1 Commn Excavation m3 13.0 16,403 213
3.2 Embankment with Material fromCommon or Borrow Excavation m3 20.0 0 0
3.4 Demolition of Pavement m3 20.0 6,940 139Demolition of Curb m 7.0 43,388 304
6 Pavement 5,759Travelled Way m2 150 38,396 5,759Sidewalk m3 80 0 0
7 Structure 6,3517.0 Pedestrian Bridge m2 8,000 113 900 Senen T.C.
7.05 Pedestrian Bridge Stair m2 6,500 270 1,7557.1 Brdge Widening m2 6,600 560 3,696
7.5.1 Box Culvert (2.5x2.5) m 3,000 0 0
8 Miscellaneous 4,5818.1 Precast Concrete Curb Lm 54 4,978 2698.2 Lane Marking m2 71.0 6,113 4348.3 Traffic Sign Each 580.0 59 348.4 Street Lighting Median Each 27,526 31 8538.5 Street Tree Median Each 827 237 1968.7 Traffic Separater Lm 59 47,360 2,794
Total 28,5615,950 Mllion Rp./Km
Cost(million Rp.) RemarksNo. Description Unit
Unit Cost(thousand
Rp.)Quantity
(2) Quantity Calculations
Quantities tabulated in the spreadsheets shown in “B.1.2” were calculated adding “Normal
Section” to “Bus Shelter”.
1) Normal Section
CommonExcavation
(cu.m)
Demolitionof Pave.(sq.m)
Demolitionof Curb (m) Pave. (m) Sidewalk
(m) Curb (m) Separater(m)
Marking(sq.m)
RetainingWall
(sq.m)
StreetLighting
StreetTree
PB0112,925 - 13,275 350 63 70 700 455 700 700 199.513,275 - 13,700 425 3,519 170 1,700 425 3,655 2,550 1700 850 242.313,700 - 14,250 550 6,782 770 1,100 550 7205 3,300 2200 1,100 313.514,250 - 14,600 350 4,568 490 700 350 4865 2,100 1400 700 199.514,600 - 18,450 3,850 1,386 1540 15,400 3,850 48895 23,100 15400 7,700 69.5 2,194.5
TOTAL 5,525 16,317 3,040 19,600 5,175 65,075 31,050 21,400 11,050 70 3,149 0 0
MISCELLANEOUSDRAINAG
E (m)BRIDGE
(sqm)STATION LENGTH (m)
EARTHWORK PAVEMENT
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-14
(Continued)
CommonExcavation
(cu.m)
Demolitionof Pave.(sq.m)
Demolitionof Curb (m) Pave. (m) Sidewalk
(m) Curb (m) Separater(m)
Marking(sq.m)
RetainingWall
(sq.m)
StreetLighting
StreetTree
PB020 - 250 250 225 250 500 50 0 500 142.5
250 - 780 530780 - 1,050 270
1,050 - 1,150 100 1,026 140 400 100 1080 3 400 200 57.01,150 - 1,430 280 560 3,8081,430 - 1,600 170 1,744 238 680 170 1836 3 680 340 96.91,600 - 5,275 3,675 0 0 0 0 0 0 0 7,350 1,212.85,275 - 5,690 415 0 0 0 0 0 0 0 830 255.25,690 - 9,600 3,910 11,965 11,730 23,460 0 0 9,384 7820 7,820 2,228.79,600 - 10,200 600 0 0 0 0 0 0 0 1,200 342.0
10,200 - 10,480 280 1,033 630 840 140 1,148 840 840 560 159.6 245.010,480 - 11,950 1,470 7,673 3,528 5,880 1,470 9,114 4,410 0 2,940 837.911,950 - 12,600 650 878 130 1,300 1,105 0 1300 0 370.512,600 - 13,300 700 2,660 2,240 1,400 700 2,800 4,200 1400 0 399.0
TOTAL 13,300 27,204 18,886 34,460 2,580 17,133 18,840 12,440 22,300 3,808 6,102 245 0 0
PB030 - 400 400 0 0 0 0 0 800 264.0
400 - 2,050 1,650 1,485 7920 6,600 0 3,300 9900 9,900 3,300 1,732.52,050 - 2,840 790 0 0 0 0 0 0 0 5,680 521.42,840 - 6,020 3,180 1,431 318 3,180 0 1908 0 3180 6,360 2,098.86,020 - 6,275 255 436 459 765 128 153 0 255 510 156.86,275 - 6,780 505 364 202 2,020 253 606 0 0 1,010 250.0
7,440 - 9,725 2,285 0 0 0 0 0 0 0 4,570 1,302.59,725 - 11,180 1,455 0 0 0 0 0 0 0 2,910 829.4
11,180 - 11,470 290 0 0 0 0 0 0 0 580 217.511,470 - 12,100 630 397 1,197 1,260 210 567 945 1260 1,260 463.112,100 - 13,250 1,150 311 115 1,150 0 460 0 0 1,150 431.313,250 - 15,400 2,150 0 0 0 0 0 0 0 4,300 1,419.015,400 - 17,750 2,350 20,727 3,055 9,400 2,350 23,970 14,100 9,400 4,700 280 1,339.517,750 - 20,570 2,820 27,664 1,128 5,640 2,820 31,302 16,920 11,280 5,640 1,607.420,570 - 22,950 2,380 24,847 2,142 9,520 2,380 28,084 14,280 9,520 4,760 1,356.6
TOTAL 22,290 77,661 16,536 39,535 8,140 90,350 56,145 44,795 47,530 280 13,990 0 0
PB04-10 - 9,550 9,550 14,612 1910 19100 16,235 0 19,100 0.0
9,550 - 10,900 1,350 729 540 5,400 1,350 0 2,700 0.010,900 - 13,200 2,300 0 0 0 0 0 4,600 759.013,200 560
PB04-20 - 200 200 0 0 0 0 0 400
200 - 1,150 950 0 0 1,900 475 950 1,900 1,306.31,150 - 2,700 1,550 0 0 0 0 0 3,100 511.52,700 - 6,650 3,950 0 0 0 0 0 7,900 1,303.56,650 - 9,300 2,650 0 2,650 10,600 6,360 0 5,300 1,113.09,300 - 10,480 1,180 1,062 590 4,720 1,180 12,154 2,360 2,360 389.4 31 237
TOTAL 23,680 16,403 5,690 41,720 1,180 36,574 0 3,310 47,360 560 5,383 31 237
DRAINAGE (m)
BRIDGE(sqm)STATION LENGT
H (m)
EARTHWORK PAVEMENT MISCELLANEOUS
2) Bus Shelter
Costs relating to bus stop were calculated by multiplying “Number of Bus Shelters by Type”
and “Quantity of Each Bus Shelter”.
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-15
a. Number of Bus Shelters by Type
PB01 PB02 PB03 PB04 TotalLebak Bulus 1 1
Ragunan 1 1KP.Rambutan 1 1Kalideres &Pulogadung 2 2
Monas 1 1Senen 1 1Ic1 5 0 6 3 14Ic2 1 0 2 1 4Ip1 0 1 3 2 6Ip2 1 0 2 1 4IIc1 0 0 8 2 10IIc2 0 3 0 2 5IIc3 0 0 4 2 6IIc4 2 3 0 0 5IIp1 0 0 4 0 4IIp2 0 5 0 0 5IIIc 0 0 0 6 6IIIp 0 1 0 5 6
Total 11 14 30 27 82
Shelter for BusTerminal
Shelter forTransfer Center
Shelter for BusStop
b. Quantities of Each Bus Shelter
The following quantities of shelters are excluded quantities in normal sections.
ITEM UNIT QUANTITY NOTE
Lebak Bulus TerminalDEMOLITION OF PAVE. sq.mDEMOLITION OF CURB mPAVEMENT sq.mCURB mLANE MARK sq.mP. BRIDGE STAIR sq.m
Ragunan TerminalDEMOLITION OF PAVE. sq.m 320.0DEMOLITION OF CURB m 40.0PAVEMENT sq.m 140.0CURB m 340.0LANE MARK sq.m 510.0P. BRIDGE STAIR sq.m
KP.Rambutan TerminalDEMOLITION OF PAVE. sq.m 138.2DEMOLITION OF CURB mPAVEMENT sq.m 8.2CURB m 82.0LANE MARK sq.m 164.0P. BRIDGE STAIR sq.m
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-16
ITEM UNIT QUANTITY NOTE
Kalideres & Pulogadung TerminalDEMOLITION OF PAVE. sq.mDEMOLITION OF CURB mPAVEMENT sq.mCURB mLANE MARK sq.mP. BRIDGE STAIR sq.m
Monas Transfer CenterDEMOLITION OF PAVE. sq.m 31.3DEMOLITION OF CURB m 313.0PAVEMENT sq.m 1,565.0CURB m 313.0LANE MARK sq.m 313.0P. BRIDGE STAIR sq.m 30.0
Senen Transfer CenterDEMOLITION OF PAVE. sq.m 45.0DEMOLITION OF CURB m 450.0PAVEMENT sq.m 1,700.0CURB m 450.0LANE MARK sq.m 450.0P. BRIDGE STAIR sq.m 30.0
Ic1 Type ShelterDEMOLITION OF PAVE. sq.mDEMOLITION OF CURB mPAVEMENT sq.m 220m x 0.25mCURB mLANE MARK sq.m 35.0 Cross-Walk: 22.1m x 3.0m x 1/2P. BRIDGE STAIR sq.m
Ic2 Type ShelterDEMOLITION OF PAVE. sq.mDEMOLITION OF CURB mPAVEMENT sq.m 220m x 0.25mCURB mLANE MARK sq.m 35.0 Cross-Walk: 22.1m x 3.0m x 1/2P. BRIDGE STAIR sq.m
Ip1 Type ShelterDEMOLITION OF PAVE. sq.mDEMOLITION OF CURB mPAVEMENT sq.m 220m x 0.25mCURB mLANE MARK sq.mP. BRIDGE STAIR sq.m 30.0
Ip2 Type ShelterDEMOLITION OF PAVE. sq.mDEMOLITION OF CURB mPAVEMENT sq.m 220m x 0.25mCURB mLANE MARK sq.mP. BRIDGE STAIR sq.m 30.0
(Continued)
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-17
(Continued)
ITEM UNIT QUANTITY NOTE
IIc1 Type ShelterDEMOLITION OF PAVE. sq.m 189.0DEMOLITION OF CURB m 336.0PAVEMENT sq.m 33.6 220m x 0.25mCURB m 336.0LANE MARK sq.m 40.0 Cross-Walk: 25.6m x 3.0m x 1/2P. BRIDGE STAIR sq.m
IIc2 Type ShelterDEMOLITION OF PAVE. sq.m 217.8DEMOLITION OF CURB m 273.0PAVEMENT sq.m 27.3 220m x 0.25mCURB m 273.0LANE MARK sq.m 30.0 Cross-Walk: 19.6m x 3.0m x 1/2P. BRIDGE STAIR sq.m
IIc3 Type ShelterDEMOLITION OF PAVE. sq.m 195.5DEMOLITION OF CURB mPAVEMENT sq.m 220m x 0.25mCURB mLANE MARK sq.m Cross-Walk: 22.1m x 3.0m x 1/2P. BRIDGE STAIR sq.m
IIc4 Type ShelterDEMOLITION OF PAVE. sq.mDEMOLITION OF CURB mPAVEMENT sq.m 220m x 0.25mCURB mLANE MARK sq.m Cross-Walk: 22.1m x 3.0m x 1/2P. BRIDGE STAIR sq.m
IIp1 Type ShelterDEMOLITION OF PAVE. sq.m 214.4DEMOLITION OF CURB mPAVEMENT sq.m 4.4 220m x 0.25mCURB m 44.0LANE MARK sq.m 70.0 Zebra=2*1/2*3*45/2P. BRIDGE STAIR sq.m 30.0
IIp2 Type ShelterDEMOLITION OF PAVE. sq.mDEMOLITION OF CURB mPAVEMENT sq.m 220m x 0.25mCURB mLANE MARK sq.mP. BRIDGE STAIR sq.m 30.0
IIIc Type ShelterDEMOLITION OF PAVE. sq.mDEMOLITION OF CURB mPAVEMENT sq.m 220m x 0.25mCURB mLANE MARK sq.mP. BRIDGE STAIR sq.m
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-18
(Continued)
ITEM UNIT QUANTITY NOTE
IIIp Type ShelterDEMOLITION OF PAVE. sq.mDEMOLITION OF CURB mPAVEMENT sq.m 220m x 0.25mCURB mLANE MARK sq.mP. BRIDGE STAIR sq.m 30.0
AP1.4.2 Bus Shelter Installation
Bus Shelter Installation consists of new bus shelter constructions and existing bus shelter
extensions. Both costs shown in the “B.2.1” and “B.2.2” need to add the contingency and VAT
to calculate the cost described in the main text of “Vol.2. Pre Feasibility Study”.
(1) New Construction
Costs relating to bus shelter installation were calculated by multiplying “Number of Bus
Shelters by Type (mentioned in B.1) ” and “Quantity of Each Bus Shelter”.
Lebak BulusBUS SHELTER sq.m 171.0 FLOOR AREABUS STOP DISP. Set 2.0
RagunanBUS SHELTER sq.m 159.5 FLOOR AREABUS STOP DISP. Set 1.0
KP.RambutanBUS SHELTER sq.m 130.0 FLOOR AREABUS STOP DISP. Set 2.0
Kalideres & PulogadungBUS SHELTER sq.m 92.5 FLOOR AREABUS STOP DISP. Set 1.0
MonasBUS SHELTER sq.m 460.0 FLOOR AREABUS STOP DISP. Set 6.0
SenenBUS SHELTER sq.m 460.0 FLOOR AREABUS STOP DISP. Set 6.0
Ic1BUS SHELTER sq.m 80.5 FLOOR AREABUS STOP DISP. Set 2.0
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-19
(Continued)
ITEM UNIT QUANTITY NOTEIc2
BUS SHELTER sq.m 115.5 FLOOR AREABUS STOP DISP. Set 2.0
Ip1BUS SHELTER sq.m 50.3 FLOOR AREABUS STOP DISP. Set 2.0
Ip2BUS SHELTER sq.m 77.3 FLOOR AREABUS STOP DISP. Set 2.0
IIc1BUS SHELTER sq.m 35.5 FLOOR AREABUS STOP DISP. Set 2.0
IIc2BUS SHELTER sq.m 153.8 FLOOR AREABUS STOP DISP. Set 2.0
IIc3BUS SHELTER sq.m 47.5 FLOOR AREABUS STOP DISP. Set 2.0
IIc4BUS SHELTER sq.m 65.5 FLOOR AREABUS STOP DISP. Set 2.0
IIp1BUS SHELTER sq.m 55.0 FLOOR AREABUS STOP DISP. Set 2.0
IIp2BUS SHELTER sq.m 111.6 FLOOR AREABUS STOP DISP. Set 2.0
IIIcBUS SHELTER sq.m 115.0 FLOOR AREABUS STOP DISP. Set 2.0
IIIpBUS SHELTER sq.m 105.0 FLOOR AREABUS STOP DISP. Set 2.0
(2) Extension of Existing DKI Shelter
Existing 20 bus shelters constructed by DKI alongside of PB01 must be extended to suite to
articulated bus.
45 sqm was considered as requirement floor area for extension for each bus shelter.
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-20
AP1.4.3 Ticketing System Installation
This item consists of the installation of ticketing gate and the ticket vending machine.
From Kota to Blok M, no additional equipment for the ticketing system was considered, since
existing system would be able to apply for the demand in 2007.
The cost tabulated below need to add the Contingency and VAT (31% in total) to calculate the
cost shown in the main text “Vol.2 Pre Feasibility Study”.
Unit Cost(million Rp.) Quantity Amount Quantity Amount Quantity Amount Quantity Amount
Ticket FacilitiesSets of Ticketing Gate
One Direction (Enter/Exit) 410.0 12 4,920 14 5,740 31 12,710 29 11,890Bi-Direction 400.0 12 4,800 14 5,600 31 12,400 29 11,600
Ticket Vending Machine 400.0 14 5,600 14 5,600 35 14,000 41 16,400Total 15,320 16,940 39,110 39,890
PB04ITEM
PB01 PB02 PB03
AP1.4.4 Traffic Signal Installation
Main part of this item is bus priority signal installation, but also the center facility including
software of the Bus Location System. The total cost of the item is that total a cost tabulated in
the table plus 1,572 million Rp (including contingency and VAT). that is the cost for center
facility of the Bus Location System.
Regarding the signals, three types of signals such as
• Signals at intersections,
• Signals nearby the crosswalks to the mid-block bus shelters and
• Signals at u-turn openings
were considered.
The cost tabulated below need to add the Contingency and VAT (31% in total) to calculate the
cost shown in the main text “Vol.2 Pre Feasibility Study”.
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-21
(1) Signals at Intersections
1) PB01
Description Unit Quantity Total RemarksF/C L/C F/C L/C
x1000 Yen x1000 Rp x1000 Rp x1000 Rp Rp. millionBus priority signalLocal controller no. 15 1,400 10,000 1,636,320 150,000 1,786 Footing & wiring includedBus priority/preemption software set 15 200 5,000 233,760 75,000 3093-aspect vehicle lantern set 30 180 2,000 420,768 60,000 481 Signal wiring includedSignal pole (straight) no. 60 1,000 0 0 0Roadside tag reader set 30 500 3,000 1,168,800 90,000 1,259Tag reader pole no. 30 150 2,000 350,640 60,000 411Conduit m 3,000 200 600,000 600 Supply & installationHandhole unit 30 500 15,000 15Timing parameter set set 15 150 4,000 175,320 60,000 235Miscellaneous works LS 1 6,000 100,000 467,520 100,000 568
Sub-total 4,453,128 1,210,000 5,663
AmountUnit price
2) PB02
Description Unit Quantity Total RemarksF/C L/C F/C L/C
x1000 Yen x1000 Rp x1000 Rp x1000 Rp Rp. millionBus priority signalLocal controller no. 11 1,400 10,000 1,199,968 110,000 1,310 Footing & wiring includedBus priority/preemption software set 11 200 5,000 171,424 55,000 2263-aspect vehicle lantern set 22 180 2,000 308,563 44,000 353 Signal wiring includedSignal pole (straight) no. 60 1,000 0 0 0Roadside tag reader set 22 500 3,000 857,120 66,000 923Tag reader pole no. 22 150 2,000 257,136 44,000 301Conduit m 2,200 0 200 440,000 440 Supply & installationHandhole unit 22 0 500 11,000 11Timing parameter set set 11 150 4,000 128,568 44,000 173Miscellaneous works LS 1 6,000 100,000 467,520 100,000 568
Sub-total 3,390,299 914,000 4,304
Unit price Amount
3) PB03
Description Unit Quantity Total RemarksF/C L/C F/C L/C
x1000 Yen x1000 Rp x1000 Rp x1000 Rp Rp. millionBus priority signalLocal controller no. 24 1,400 10,000 2,618,112 240,000 2,858 Footing & wiring includedBus priority/preemption software set 24 200 5,000 374,016 120,000 4943-aspect vehicle lantern set 48 180 2,000 673,229 96,000 769 Signal wiring includedSignal pole (straight) no. 60 1,000 0 0 0Roadside tag reader set 48 500 3,000 1,870,080 144,000 2,014Tag reader pole no. 48 150 2,000 561,024 96,000 657Conduit m 4,800 0 200 960,000 960 Supply & installationHandhole unit 48 0 500 24,000 24Timing parameter set set 24 150 4,000 280,512 96,000 377Miscellaneous works LS 1 6,000 200,000 467,520 200,000 668
Sub-total 6,844,493 1,976,000 8,820
Unit price Amount
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP1-22
4) PB04
Description Unit Quantity Total RemarksF/C L/C F/C L/C
x1000 Yen x1000 Rp x1000 Rp x1000 Rp Rp. millionBus priority signalLocal controller no. 15 1,400 10,000 1,636,320 150,000 1,786 Footing & wiring includedBus priority/preemption software set 15 200 5,000 233,760 75,000 3093-aspect vehicle lantern set 36 180 2,000 504,922 72,000 577 Signal wiring includedPedestrian lantern set 10 100 1,500 77,920 15,000 93 New signalMastarm no. 2 300 20,000 46,752 40,000 87 New signalSignal pole (straight) no. 6 60 1,000 28,051 6,000 34Roadside tag reader set 36 500 3,000 1,402,560 108,000 1,511Tag reader pole no. 36 150 2,000 420,768 72,000 493Conduit m 3,720 0 200 744,000 744 Supply & installationConduit for new signal m 80 200 16,000 16 Supply & installationHandhole unit 44 0 500 22,000 22Timing parameter set set 15 150 4,000 175,320 60,000 235Miscellaneous works LS 1 6,000 200,000 467,520 200,000 668
Sub-total 4,993,893 1,580,000 6,574
Unit price Amount
(2) Signals at Cross Walk/U-turn Opening
Unit cost of the Signals for Cross-Walk and U-turn was estimated roughly refer to the cost
estimated in “B.4.2”.
Unit Cost(million Rp.) Quantity Amount Quantity Amount Quantity Amount Quantity Amount
Traffic SignalsCrossWalk to Bus Shelter 420.0 6 2,520 4 1,680 11 4,620 13 5,460U-turn opening 430.0 4 1,720 4 1,720 0 0
Total 4,240 3,400 4,620 5,460
PB04ITEM
PB01 PB02 PB03
App
endi
x 2
(1):
Econ
omic
Ana
lysi
s of
Bus
way
Total
2004
~200
10To
tal20
04~2
015
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
1. Co
sts (
billio
n ru
piah
s)1)
Widd
ening
Land
& C
ompe
nsati
on1,1
740
268
374
319
212
00
00
00
-1,17
4Ci
vil w
ork f
or w
idden
ing19
048
1919
7777
00
00
00
0-1
43Su
b-tot
al1,3
6447
287
393
395
289
00
00
00
0-1
,317
2) B
us S
helte
rLa
nd &
Com
pens
ation
00
Inves
tmen
t Cos
t23
823
80
8271
840
00
00
00
0Su
b-tot
al23
823
80
8271
840
00
00
00
03)
Sign
al &
Bus L
ocati
on S
ystem
Land
& C
ompe
nsati
on0
0Ci
vil W
ork
5858
017
1823
00
00
00
00
Sub-
total
5858
017
1823
00
00
00
00
4) B
us O
pera
tion
Bus o
pera
tion c
ost is
inclu
ded i
n VOC
of bu
s for
busw
ay.
5) O
&M of
facil
ities
3476
03
15
88
88
88
88
Tota
l Fin
ancia
l Cos
tLa
nd &
Com
pens
ation
1,174
026
837
431
921
20
00
00
00
-1,17
4Co
nstru
ction
Cos
t48
734
419
119
166
184
00
00
00
0-1
43O&
M34
760
31
58
88
88
88
8To
tal (F
inanc
ial C
ost)
1,694
420
287
496
486
401
88
88
88
8-1
,308
SCF
1) W
idden
ingLa
nd &
Com
pens
ation
70%
821
018
826
222
314
90
00
00
00
-822
Civil
wor
k for
widd
ening
85%
162
4016
1665
650
00
00
00
-121
Sub-
total
983
4020
427
828
821
40
00
00
00
-943
2) B
us S
helte
rLa
nd &
Com
pens
ation
00
Inves
tmen
t Cos
t80
%19
119
10
6657
670
00
00
00
0Su
b-tot
al19
119
10
6657
670
00
00
00
03)
Sign
al &
Bus L
ocati
on S
ystem
Land
& C
ompe
nsati
on70
%0
00
00
00
00
00
00
0Ci
vil W
ork
85%
4949
015
1520
00
00
00
00
Sub-
total
4949
015
1520
00
00
00
00
4) B
us O
pera
tion
5) O
&M of
facil
ities
85%
2965
03
14
77
77
77
77
Tota
l Eco
nom
ic Co
stLa
nd &
Com
pens
ation
821
018
826
222
314
90
00
00
00
-822
Cons
tructi
on C
ost
402
280
1697
137
152
00
00
00
0-1
21O&
M29
650
31
47
77
77
77
7To
tal (E
cono
mic C
ost)
1,252
345
204
361
361
305
77
77
77
7-9
36Di
scou
nted t
otal c
osts
12%
785
204
322
288
217
54
43
33
2-2
69
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-1
App
endi
x 2
(2):
Econ
omic
Ana
lysi
s of
Bus
way
Total
2004
~200
10To
tal20
04~2
015
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2. Be
nefit
s (bi
llion
rupi
ahs)
1) V
OC S
aving
s66
81,4
940
010
613
912
213
716
516
516
516
516
516
52)
Tra
vel C
ost S
aving
sHi
gh in
come
grou
p46
81,1
890
090
114
4475
145
145
144
144
144
144
Midd
le inc
ome g
roup
538
1,370
00
6885
101
126
158
161
163
166
169
172
Low
incom
e gro
up25
390
04
67
53
33
33
3To
tal T
rave
l Cos
t Sav
ings
1,031
2,598
00
163
205
152
206
305
308
311
313
316
319
Total
Ben
efits
1,699
4,092
00
269
343
274
343
470
473
476
478
481
484
Disc
ount
ed b
enef
itsDR
1) V
OC S
aving
s12
%72
30
084
9977
7884
7567
6053
472)
Tra
vel C
ost S
aving
s12
%1,2
150
013
014
697
117
155
139
125
113
102
92To
tal be
nefits
12%
1,938
00
214
244
174
195
238
214
192
173
155
139
3. Ne
t Ben
efits
(billi
on ru
piah
s)Ne
t Ben
efits
(eco
nomi
c pric
es)
3,747
-204
-361
-93
3926
733
646
346
646
947
147
41,4
20Ne
t Ben
efits
(disc
ounte
d at 1
2 %)
1,153
-204
-322
-74
2716
919
123
521
118
917
015
340
8Ac
cumu
lated
Net
Bene
fits (d
iscou
nted a
t 12 %
)-2
04-5
26-6
00-5
72-4
03-2
1222
233
422
592
745
1,153
NPV
12%
(disc
ount
rate
)1,1
53bi
llion
rupi
ahs
EIRR
31.9%
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-2
App
endi
x 3:
Eco
nom
ic A
naly
sis
of T
DM
Total
2004
~201
0To
tal20
04~2
020
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
1. Co
sts (
billio
n ru
piah
s)1)
Fina
ncial
Cos
tLa
nd &
Com
pens
ation
00
Manu
al su
rveilla
nce s
ystem
9292
92ER
P sy
stem
601
601
601
IU68
799
368
726
2728
2930
3132
3335
36O&
M (S
ystem
)17
547
529
2929
2929
3030
3030
3030
3030
3030
30O&
M (IU
)34
457
3436
3738
4041
4344
4648
50To
tal1,5
892,6
180
121
2929
2929
1,352
9194
9699
101
104
107
109
112
116
2) E
cono
mic C
ost
Land
& C
ompe
nsati
on0
00
00
00
00
00
00
00
00
00
Manu
al su
rveilla
nce s
ystem
85%
7878
078
00
00
00
00
00
00
00
0ER
P sy
stem
80%
481
481
00
00
00
481
00
00
00
00
00
IU80
%55
079
40
00
00
055
021
2122
2324
2526
2728
29O&
M (S
ystem
)85
%14
940
40
2525
2525
2526
2626
2626
2626
2626
2626
O&M
(IU)
85%
2938
90
00
00
029
3031
3334
3536
3839
4142
Total
1,286
2,145
010
325
2525
251,0
8576
7880
8285
8789
9194
96Di
scou
nted t
otal c
osts
12%
948
092
2018
1614
550
3532
2927
2422
2019
1716
2. Be
nefit
s (bi
llion
rupi
ahs)
1) V
OC S
aving
s2,1
479,9
690
157
194
230
343
493
730
700
683
680
689
710
745
793
856
934
1,033
2) T
rave
l Cos
t Sav
ings
High
inco
me gr
oup
864
3,933
051
6992
142
211
300
303
305
307
308
309
309
309
308
306
305
Midd
le inc
ome g
roup
1,492
4,444
045
5668
242
423
658
583
511
442
377
314
254
197
143
9141
Low
incom
e gro
up13
329
00
22
126
4458
4534
2619
149
63
10
Total
trav
el co
st sa
vings
2,489
8,667
098
126
161
410
677
1,016
931
851
775
704
636
572
511
453
398
346
Total
bene
fits4,6
3618
,636
025
532
139
175
31,1
701,7
461,6
311,5
341,4
551,3
931,3
471,3
171,3
041,3
091,3
321,3
79Di
scou
nted
ben
efits
DR1)
VOC
Sav
ings
12%
3,477
014
015
516
421
828
037
031
727
624
522
220
419
118
217
517
116
82)
Tra
vel C
ost S
aving
s12
%3,4
020
8810
111
426
138
451
542
134
428
022
718
314
711
793
7356
Total
bene
fits12
%6,8
790
228
256
278
479
664
885
738
620
525
448
387
338
299
268
243
225
3. Ne
t Ben
efits
(billi
on ru
piah
s)Ne
t Ben
efits
(eco
nomi
c pric
es)
16,49
00
152
296
366
729
1,146
662
1,554
1,456
1,375
1,310
1,262
1,230
1,215
1,217
1,238
1,282
Net B
enefi
ts (d
iscou
nted a
t 12 %
)5,9
310
136
236
260
463
650
335
703
588
496
422
363
316
278
249
226
209
Accu
mulat
ed N
et Be
nefits
(disc
ounte
d at 1
2 %)
013
637
263
21,0
951,7
452,0
812,7
843,3
723,8
674,2
894,6
524,9
685,2
465,4
955,7
225,9
31
NPV
12%
(disc
ount
rate
)5,9
30bi
llion
rupi
ahs
EIRR
-B/
C7.2
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-3
App
endi
x 4:
Fin
anci
al A
naly
sis
of T
DM
(Res
tric
ted
Are
a: A
lt 4)
Total
2004
~201
0To
tal20
04~2
020
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
1. Co
sts (
billio
n ru
piah
s)TD
M Land
& C
ompe
nsati
on0
0Ma
nual
surve
illanc
e sys
tem92
9292
ERP
syste
m60
160
160
1IU
(Sub
sidies
: 50%
)34
649
734
67
911
1214
1618
2022
24O&
M (S
ystem
)17
547
529
2929
2929
3030
3030
3030
3030
3030
30O&
M (IU
): Ow
ner's
cost
00
Total
1,213
1,664
012
129
2929
2997
637
3941
4244
4648
5052
54
2. Re
venu
e1)
Tra
ffic G
ener
atio
n (T
rip p
er d
ay)
High
552,6
7059
3,840
638,0
7768
5,609
736,6
8279
1,55
985
0,52
591
3,88
398
1,96
01,
055,
109
1,13
3,70
71,
218,
160
1,30
8,90
41,
406,
408
1,51
1,17
51,6
23,74
7Mi
ddle
704,1
4567
3,132
643,4
8561
5,144
588,0
5156
2,15
153
7,39
251
3,72
449
1,09
846
9,46
844
8,79
142
9,02
541
0,13
039
2,06
637
4,79
835
8,291
Low
74,13
561
,279
50,65
241
,868
34,60
728
,606
23,6
4519
,544
16,1
5513
,353
11,0
389,
124
7,54
16,
234
5,15
34,2
59To
tal1,3
30,95
01,3
28,25
11,3
32,21
41,3
42,62
11,3
59,34
01,3
82,31
61,4
11,56
21,4
47,15
11,4
89,21
31,5
37,93
11,5
93,53
71,6
56,30
91,7
26,57
51,8
04,70
81,8
91,12
61,9
86,29
72)
Trip
in T
DM A
rea (
Trip
per
day
)Rp
. 8,00
0Hi
gh50
5,78
554
2,95
058
2,84
662
5,673
671,6
4872
1,00
077
3,97
983
0,85
189
1,90
195
7,43
81,
027,
790
1,10
3,31
21,
184,
383
1,27
1,41
11,
364,
833
1,465
,121
Midd
le61
1,45
158
3,23
855
6,32
653
0,656
506,1
7148
2,81
546
0,53
743
9,28
741
9,01
839
9,68
438
1,24
236
3,65
134
6,87
133
0,86
631
5,59
930
1,037
Low
28,7
3823
,671
19,4
9716
,059
13,22
810
,895
8,97
47,
392
6,08
85,
015
4,13
13,
402
2,80
22,
308
1,90
11,5
66To
tal1,1
45,97
41,1
49,85
81,1
58,66
91,1
72,38
91,1
91,04
61,2
14,71
11,2
43,49
01,2
77,53
01,3
17,00
81,3
62,13
61,4
13,16
21,4
70,36
51,5
34,05
61,6
04,58
51,6
82,33
41,7
67,72
4
Rp. 1
6,000
High
485,0
6652
0,451
558,4
1659
9,151
642,8
5768
9,75
274
0,06
879
4,05
485
1,97
891
4,12
798
0,81
01,
052,
358
1,12
9,12
51,
211,
491
1,29
9,86
61,3
94,68
8Mi
ddle
472,3
1644
8,131
425,1
8540
3,414
382,7
5736
3,15
834
4,56
332
6,92
031
0,18
029
4,29
727
9,22
826
4,93
025
1,36
523
8,49
422
6,28
221
4,695
Low
3,064
2,567
2,150
1,801
1,509
1,26
41,
059
887
743
622
521
437
366
306
257
215
Total
960,4
4697
1,148
985,7
511,0
04,36
61,0
27,12
31,0
54,17
41,0
85,68
91,1
21,86
01,1
62,90
01,2
09,04
71,2
60,56
01,3
17,72
51,3
80,85
51,4
50,29
11,5
26,40
51,6
09,59
8
Rp. 2
0,000
High
472,1
8750
6,465
543,2
3058
2,664
624,9
6167
0,329
718,9
9077
1,183
827,1
6588
7,211
951,6
151,0
20,69
61,0
94,79
01,1
74,26
41,2
59,50
61,
350,
937
Midd
le38
4,958
363,6
4434
3,510
324,4
9130
6,525
289,5
5427
3,522
258,3
7824
4,073
230,5
5921
7,794
205,7
3519
4,344
183,5
8417
3,420
163,
818
Low
764
648
550
467
396
336
285
242
205
174
148
125
106
9077
65To
tal85
7,909
870,7
5688
7,290
907,6
2293
1,882
960,2
1999
2,797
1,029
,803
1,071
,443
1,117
,944
1,169
,557
1,226
,556
1,289
,241
1,357
,938
1,433
,003
1,514
,820
3) P
ropo
sed
Levy
and
Trip
in T
DM A
rea p
er d
ayPr
opos
ed Le
vy pe
r Trip
Rp.8,
000
Rp.8,
000
Rp.8,
000
Rp.8,
000
Rp.8,
000
Rp.16
,000
Rp.16
,000
Rp.16
,000
Rp.16
,000
Rp.16
,000
Rp.20
,000
Rp.20
,000
Rp.20
,000
Rp.20
,000
Rp.20
,000
Rp.20
,000
High
505,
785
542,
950
582,
846
625,
673
671,
648
689,
752
740,
068
794,
054
851,
978
914,
127
951,
615
1,02
0,69
61,
094,
790
1,17
4,26
41,
259,
506
1,35
0,93
7Mi
ddle
611,
451
583,
238
556,
326
530,
656
506,
171
363,
158
344,
563
326,
920
310,
180
294,
297
217,
794
205,
735
194,
344
183,
584
173,
420
163,
818
Low
28,7
3823
,671
19,4
9716
,059
13,2
281,
264
1,05
988
774
362
214
812
510
690
7765
Total
Trip
in T
DM A
rea
1,145
,974
1,149
,858
1,158
,669
1,172
,389
1,191
,046
1,070
,174
1,101
,689
1,137
,860
1,178
,900
1,225
,047
1,189
,557
1,246
,556
1,309
,241
1,377
,938
1,453
,003
1,514
,820
4) R
even
ue (b
illion
rupi
ahs)
From
Tota
l Day
Trip
15,91
774
,946
2,292
2,300
2,317
2,345
2,382
4,281
4,407
4,551
4,716
4,900
5,948
6,233
6,546
6,890
7,265
7,574
Peak
6 ho
urs
41%
41%
41%
41%
41%
41%
41%
41%
41%
41%
41%
41%
41%
41%
41%
41%
Exem
ption
of 3
in On
e 82
%82
%82
%82
%82
%82
%82
%82
%82
%82
%82
%82
%82
%82
%82
%82
%Re
turn T
raffic
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
60%
Reve
nue
3,211
15,11
846
246
446
747
348
186
488
991
895
198
81,2
001,2
571,3
211,3
901,4
651,5
28
3. Pr
ofits
(billi
on ru
piah
s)1)
Cost
1,213
1,664
012
129
2929
2997
637
3941
4244
4648
5052
542)
Reve
nue
3,211
15,11
80
462
464
467
473
481
864
889
918
951
988
1,200
1,257
1,321
1,390
1,465
1,528
3)Pr
ofit
1,998
13,45
40
342
435
438
444
452
-113
852
879
911
946
1,156
1,212
1,273
1,340
1,414
1,474
NPV:
18%
(disc
ount
rate
)2,9
97bi
llion
rupi
ahs
FIRR
:B/
C:6.0
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-4
App
endi
x 5
(1):
Econ
omic
Ana
lysi
s of
Ser
pong
Lin
e D
oubl
e Tr
acki
ng, A
cces
s Im
prov
emen
t and
Inte
grat
ed L
and
Dev
elop
men
tTo
tal20
04~2
020
Total
2004
~204
020
0420
0520
0620
0720
0820
0920
1020
1120
1220
1320
1420
1520
1620
1720
1820
1920
20
1. Co
sts (
billio
n ru
piah
s)1)
Ser
pong
Line
Dou
ble T
rack
ingLa
nd &
Com
pens
ation
180
065
00
115
0Ci
vil an
d Tra
ck W
ork
545
409
00
158
179
9963
460
00
00
00
00
0El
ectric
Fac
ility
690
1,105
00
012
550
019
450
00
00
00
00
0Bu
ilding
and D
epot
275
206
00
3165
121
2929
00
00
00
00
00
Rollin
g Stoc
k1,5
531,9
300
00
225
150
707
471
00
00
00
00
00
O&M
778
2,326
00
00
014
1475
7575
7575
7575
7575
77Su
b-tot
al4,0
215,9
760
025
459
487
094
860
575
7575
7575
7575
7575
772)
Stat
ion S
quar
eLa
nd &
Com
pens
ation
7474
33
2222
22Inv
estm
ent C
ost
2424
66
44
4O&
M0
0Su
b-tot
al98
980
00
03
106
00
00
022
2626
40
3) A
cces
s Roa
dLa
nd &
Com
pens
ation
684
684
120
120
120
120
6868
68Ci
vil W
ork
283
283
5959
5935
3535
O&M
2911
91
22
22
22
23
44
Sub-
total
996
1,086
00
120
120
179
179
602
22
22
7110
610
739
4To
tal F
inan
cial C
ost
Land
& C
ompe
nsati
on93
875
80
018
512
012
323
80
00
00
091
9191
00
Cons
tructi
on C
ost
3,370
3,958
00
189
594
929
884
657
00
00
00
3939
390
O&M
807
2,444
00
00
014
1577
7777
7777
7777
7879
82To
tal (F
inanc
ial C
ost)
5,115
7,160
00
373
713
1,052
1,136
672
7777
7777
7716
820
720
811
882
SCF
1) S
erpo
ng Li
ne D
ouble
Tra
cking
Land
& C
ompe
nsati
on70
%12
60
00
460
081
00
00
00
00
00
0Ci
vil an
d Tra
ck W
ork
85%
463
347
00
134
152
8454
390
00
00
00
00
0El
ectric
Fac
ility
80%
552
884
00
010
040
016
360
00
00
00
00
0Bu
ilding
and D
epot
85%
234
176
00
2655
103
2525
00
00
00
00
00
Rollin
g Stoc
k80
%1,2
421,5
440
00
180
120
566
377
00
00
00
00
00
O&M
85%
661
1,977
00
00
012
1264
6464
6464
6464
6464
66Su
b-tot
al3,2
794,9
280
020
648
770
775
248
964
6464
6464
6464
6464
662)
Stat
ion S
quar
eLa
nd &
Com
pens
ation
70%
5252
00
00
22
00
00
00
1616
160
0Inv
estm
ent C
ost
80%
1919
00
00
05
50
00
00
03
33
0O&
M85
%0
00
00
00
00
00
00
00
00
00
Sub-
total
7171
00
00
27
50
00
00
1619
193
03)
Acc
ess R
oad
Land
& C
ompe
nsati
on70
%47
947
90
084
8484
840
00
00
048
4848
00
Civil
Wor
k85
%24
124
10
00
050
5050
00
00
00
3030
300
O&M
85%
2510
10
00
00
01
22
22
22
23
34
Sub-
total
744
820
00
8484
134
134
512
22
22
5080
8033
4To
tal E
cono
mic
Cost
Land
& C
ompe
nsati
on65
753
10
012
984
8616
70
00
00
064
6464
00
Cons
tructi
on C
ost
2,751
3,211
00
160
487
757
715
532
00
00
00
3333
330
O&M
686
2,078
00
00
012
1366
6666
6666
6666
6667
70To
tal (E
cono
mic C
ost)
4,094
5,820
00
290
571
843
894
545
6666
6666
6612
916
216
310
070
Disc
ount
ed to
tal c
osts
12%
2,348
00
231
406
536
507
276
3026
2421
1933
3733
1811
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-5
App
endi
x 5
(2):
Econ
omic
Ana
lysi
s of
Ser
pong
Lin
e D
oubl
e Tr
acki
ng, A
cces
s Im
prov
emen
t and
Inte
grat
ed L
and
Dev
elop
men
t
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
1. Co
sts (
billio
n ru
piah
s)1)
Ser
pong
Line
Dou
ble T
rack
ingLa
nd &
Com
pens
ation
-180
Civil
and T
rack
Wor
k0
00
00
00
00
00
00
00
00
00
-136
Elec
tric F
acilit
y0
00
00
012
550
019
450
00
00
00
00
-275
Build
ing an
d Dep
ot0
00
00
00
00
00
00
00
00
00
-69
Rollin
g Stoc
k0
00
00
00
00
00
225
150
707
471
00
00
-1,17
5O&
M77
7777
7777
7777
7777
7777
7777
7777
7777
7777
77Su
b-tot
al77
7777
7777
7720
357
897
123
7730
222
778
554
977
7777
77-1
,758
2) S
tation
Squ
are
Land
& C
ompe
nsati
onInv
estm
ent C
ost
O&M
Sub-
total
00
00
00
00
00
00
00
00
00
00
3) A
cces
s Roa
dLa
nd &
Com
pens
ation
Civil
Wor
kO&
M4
44
44
44
44
44
44
44
44
44
4Su
b-tot
al4
44
44
44
44
44
44
44
44
44
4To
tal F
inan
cial C
ost
Land
& C
ompe
nsati
on0
00
00
00
00
00
00
00
00
00
-180
Cons
tructi
on C
ost
00
00
00
125
500
1945
022
515
070
747
10
00
0-1
,655
O&M
8282
8282
8282
8282
8282
8282
8282
8282
8282
8282
Total
(Fina
ncial
Cos
t)82
8282
8282
8220
758
210
112
782
306
232
789
553
8282
8282
-1,75
3SC
F1)
Ser
pong
Line
Dou
ble T
rack
ingLa
nd &
Com
pens
ation
70%
00
00
00
00
00
00
00
00
00
0-1
26Ci
vil an
d Tra
ck W
ork
85%
00
00
00
00
00
00
00
00
00
0-1
16El
ectric
Fac
ility
80%
00
00
00
100
400
1636
00
00
00
00
0-2
20Bu
ilding
and D
epot
85%
00
00
00
00
00
00
00
00
00
0-5
9Ro
lling S
tock
80%
00
00
00
00
00
018
012
056
637
70
00
0-9
40O&
M85
%66
6666
6666
6666
6666
6666
6666
6666
6666
6666
66Su
b-tot
al66
6666
6666
6616
646
681
102
6624
518
663
244
366
6666
66-1
,395
2) S
tation
Squ
are
Land
& C
ompe
nsati
on70
%0
00
00
00
00
00
00
00
00
00
0Inv
estm
ent C
ost
80%
00
00
00
00
00
00
00
00
00
00
O&M
85%
00
00
00
00
00
00
00
00
00
00
Sub-
total
00
00
00
00
00
00
00
00
00
00
3) A
cces
s Roa
dLa
nd &
Com
pens
ation
70%
00
00
00
00
00
00
00
00
00
00
Civil
Wor
k85
%0
00
00
00
00
00
00
00
00
00
0O&
M85
%4
44
44
44
44
44
44
44
44
44
4Su
b-tot
al4
44
44
44
44
44
44
44
44
44
4To
tal E
cono
mic
Cost
Land
& C
ompe
nsati
on0
00
00
00
00
00
00
00
00
00
-126
Cons
tructi
on C
ost
00
00
00
100
400
1636
018
012
056
637
70
00
0-1
,334
O&M
7070
7070
7070
7070
7070
7070
7070
7070
7070
7070
Total
(Eco
nomi
c Cos
t)70
7070
7070
7017
047
085
106
7024
918
963
544
770
7070
70-1
,391
Disc
ount
ed to
tal c
osts
12%
109
87
66
1331
56
310
721
132
21
1-2
4
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-6
App
endi
x 5
(3):
Econ
omic
Ana
lysi
s of
Ser
pong
Lin
e D
oubl
e Tr
acki
ng, A
cces
s Im
prov
emen
t and
Inte
grat
ed L
and
Dev
elop
men
t
Total
2004
~202
0To
tal20
04~2
040
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2. VO
C an
d TT
C (b
illion
rupi
ahs)
1) N
ew 4b
VO
CH
237,6
0570
4,340
7,601
8,228
8,944
9,760
10,23
210
,847
11,54
012
,251
13,04
013
,914
14,88
315
,956
17,14
518
,463
19,92
321
,542
23,33
7VO
CM
256,3
4260
0,842
12,43
412
,884
13,38
013
,919
13,79
414
,260
15,00
915
,147
15,30
115
,473
15,66
415
,873
16,10
116
,350
16,61
916
,911
17,22
5VO
CL
16,48
320
,856
2,501
2,218
1,971
1,755
1,383
1,124
949
816
702
605
522
450
389
337
291
252
219
VOC
Sub-
total
510,4
301,3
26,03
822
,537
23,33
024
,294
25,43
325
,409
26,23
127
,498
28,21
429
,043
29,99
231
,068
32,27
933
,635
35,14
936
,834
38,70
540
,780
TTC
H14
8,908
707,0
063,3
163,6
714,0
794,5
314,7
265,3
226,1
936,8
827,6
518,5
119,4
7210
,547
11,75
113
,101
14,61
516
,315
18,22
6TT
CM
152,6
2747
0,656
7,125
7,318
7,529
7,753
7,598
8,141
9,221
9,302
9,391
9,486
9,590
9,701
9,821
9,949
10,08
510
,231
10,38
6TT
CL
6,699
9,833
1,044
897
771
663
534
441
378
331
290
254
223
196
172
151
133
116
102
TTC
Sub-
total
308,2
341,1
87,49
511
,486
11,88
612
,379
12,94
712
,859
13,90
515
,792
16,51
517
,332
18,25
219
,285
20,44
421
,743
23,20
024
,832
26,66
228
,715
Total
818,6
642,5
13,53
334
,023
35,21
636
,673
38,38
038
,267
40,13
543
,290
44,72
946
,375
48,24
450
,353
52,72
355
,379
58,34
961
,666
65,36
769
,495
2) W
ithou
t Ser
pong
Lin
eVO
CH
245,3
1174
8,272
7,601
8,228
8,944
9,760
10,23
810
,857
11,55
512
,340
13,21
614
,197
15,29
216
,515
17,88
119
,408
21,11
323
,018
25,14
8VO
CM
257,6
2060
6,843
12,43
412
,884
13,38
013
,919
13,80
514
,276
15,02
915
,180
15,34
915
,538
15,74
715
,977
16,22
816
,500
16,79
617
,116
17,46
1VO
CL
16,51
220
,919
2,501
2,218
1,971
1,755
1,385
1,127
951
818
705
607
524
453
391
338
293
254
220
VOC
Sub-
total
519,4
431,3
76,03
522
,537
23,33
024
,294
25,43
325
,429
26,26
127
,535
28,33
729
,270
30,34
231
,563
32,94
434
,500
36,24
738
,202
40,38
942
,830
TTC
H14
7,413
692,9
053,3
163,6
714,0
794,5
314,7
355,3
366,2
146,8
867,6
368,4
719,4
0410
,445
11,60
912
,909
14,36
415
,992
17,81
5TT
CM
153,3
6147
5,437
7,125
7,318
7,529
7,753
7,608
8,153
9,232
9,322
9,419
9,525
9,639
9,761
9,893
10,03
410
,185
10,34
610
,518
TTC
L6,7
079,8
621,0
4489
777
166
353
544
237
933
229
125
522
419
617
315
213
311
710
3TT
CSu
b-tot
al30
7,481
1,178
,205
11,48
611
,886
12,37
912
,947
12,87
813
,931
15,82
516
,540
17,34
618
,251
19,26
720
,403
21,67
423
,095
24,68
226
,455
28,43
6To
tal82
6,924
2,554
,240
34,02
335
,216
36,67
338
,380
38,30
740
,192
43,36
044
,877
46,61
648
,594
50,82
953
,347
56,17
459
,341
62,88
466
,844
71,26
63.
Bene
fits (
billio
n ru
piah
s)1)
VOC
Sav
ings
9,013
49,99
70
00
020
3037
124
227
350
495
665
865
1,098
1,369
1,684
2,049
2) T
rave
l Cos
t Sav
ings
-753
-9,29
10
00
019
2633
2514
-0-1
8-4
1-6
9-1
05-1
50-2
07-2
79To
tal be
nefits
8,260
40,70
60
00
039
5670
148
241
350
477
625
795
992
1,218
1,477
1,770
Disc
ount
ed b
enef
itsDR
1) V
OC S
aving
s12
%4,5
660
00
013
1719
5692
126
159
191
222
252
280
308
334
2) T
rave
l Cos
t Sav
ings
12%
-567
00
00
1215
1711
6-0
-6-1
2-1
8-2
4-3
1-3
8-4
5To
tal be
nefits
12%
3,999
00
00
2532
3667
9712
615
418
020
422
724
927
028
9
Save
d Co
st o
f Exis
ting
Serp
ong
Line
1) P
rocu
reme
nt co
st of
rollin
g stoc
k46
851
011
20
131
00
075
075
00
075
2) O
M Co
st34
797
732
3232
3232
3232
3232
3232
Total
bene
fits81
41,4
870
00
011
20
162
3232
3210
632
106
3232
3210
6Di
scou
nted
ben
efits
DR1)
Pro
cure
ment
cost
of ro
lling s
tock
12%
278
00
00
710
660
00
240
190
00
122)
OM
Cost
12%
255
00
00
00
1614
1311
109
87
66
5To
tal be
nefits
12%
343
00
00
710
8214
1311
349
277
66
17
4. Ne
t Ben
efits
(billi
on ru
piah
s)Ne
t Ben
efits
(eco
nomi
c pric
es)
36,37
40
0-2
90-5
71-6
92-8
37-3
1211
420
731
651
859
077
386
21,0
871,4
081,8
07Ne
t Ben
efits
(disc
ounte
d at 1
2 %)
1,993
00
-231
-406
-439
-475
-158
5284
114
167
170
198
197
222
257
295
Accu
mulat
ed N
et Be
nefits
(disc
ounte
d at 1
2 %)
00
-231
-637
-1,07
7-1
,552
-1,71
0-1
,658
-1,57
5-1
,461
-1,29
4-1
,125
-926
-729
-506
-249
46
NPV
12%
(disc
ount
rate
)1,9
93bi
llion
rupi
ahs
EIRR
18.9%
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-7
App
endi
x 5
(4):
Econ
omic
Ana
lysi
s of
Ser
pong
Lin
e D
oubl
e Tr
acki
ng, A
cces
s Im
prov
emen
t and
Inte
grat
ed L
and
Dev
elop
men
t
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2. VO
C an
d TT
C (b
illion
rupi
ahs)
1) N
ew 4b
VO
CH
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
VOC
M17
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
5VO
CL
219
219
219
219
219
219
219
219
219
219
219
219
219
219
219
219
219
219
219
219
VOC
Sub-
total
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
TTC
H18
,937
19,67
620
,443
21,24
022
,069
22,92
923
,824
24,75
325
,718
26,72
127
,763
28,84
629
,971
31,14
032
,354
33,61
634
,927
36,28
937
,705
39,17
5TT
CM
10,79
111
,212
11,64
912
,104
12,57
613
,066
13,57
614
,105
14,65
515
,227
15,82
116
,438
17,07
917
,745
18,43
719
,156
19,90
320
,679
21,48
622
,324
TTC
L10
611
011
511
912
412
913
413
914
415
015
616
216
817
518
218
919
620
421
222
0TT
CSu
b-tot
al29
,835
30,99
832
,207
33,46
334
,768
36,12
437
,533
38,99
740
,518
42,09
843
,740
45,44
647
,218
49,06
050
,973
52,96
155
,027
57,17
359
,402
61,71
9To
tal70
,615
71,77
972
,988
74,24
475
,549
76,90
578
,314
79,77
781
,298
82,87
984
,520
86,22
687
,999
89,84
091
,753
93,74
195
,807
97,95
310
0,183
102,4
99
2) W
ithou
t Ser
pong
Lin
eVO
CH
25,14
825
,148
25,14
825
,148
25,14
825
,148
25,14
825
,148
25,14
825
,148
25,14
825
,148
25,14
825
,148
25,14
825
,148
25,14
825
,148
25,14
825
,148
VOC
M17
,461
17,46
117
,461
17,46
117
,461
17,46
117
,461
17,46
117
,461
17,46
117
,461
17,46
117
,461
17,46
117
,461
17,46
117
,461
17,46
117
,461
17,46
1VO
CL
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
220
VOC
Sub-
total
42,83
042
,830
42,83
042
,830
42,83
042
,830
42,83
042
,830
42,83
042
,830
42,83
042
,830
42,83
042
,830
42,83
042
,830
42,83
042
,830
42,83
042
,830
TTC
H18
,509
19,23
119
,981
20,76
121
,570
22,41
223
,286
24,19
425
,137
26,11
827
,136
28,19
529
,294
30,43
731
,624
32,85
734
,138
35,47
036
,853
38,29
0TT
CM
10,92
911
,355
11,79
812
,258
12,73
613
,233
13,74
914
,285
14,84
215
,421
16,02
216
,647
17,29
617
,971
18,67
219
,400
20,15
620
,943
21,75
922
,608
TTC
L10
711
111
612
012
513
013
514
014
515
115
716
316
917
618
319
019
720
521
322
1TT
CSu
b-tot
al29
,545
30,69
731
,895
33,13
834
,431
35,77
437
,169
38,61
840
,125
41,68
943
,315
45,00
546
,760
48,58
350
,478
52,44
754
,492
56,61
758
,825
61,12
0To
tal72
,375
73,52
774
,724
75,96
877
,260
78,60
379
,998
81,44
882
,954
84,51
986
,145
87,83
489
,589
91,41
393
,308
95,27
697
,322
99,44
710
1,655
103,9
493.
Bene
fits (
billio
n ru
piah
s)1)
VOC
Sav
ings
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2,049
2) T
rave
l Cos
t Sav
ings
-290
-301
-313
-325
-338
-351
-364
-379
-393
-409
-425
-441
-458
-476
-495
-514
-534
-555
-577
-599
Total
bene
fits1,7
601,7
481,7
361,7
241,7
121,6
981,6
851,6
711,6
561,6
401,6
251,6
081,5
911,5
731,5
541,5
351,5
151,4
941,4
721,4
50Di
scou
nted
ben
efits
DR1)
VOC
Sav
ings
12%
298
266
238
212
190
169
151
135
121
108
9686
7768
6155
4943
3935
2) T
rave
l Cos
t Sav
ings
12%
-42
-39
-36
-34
-31
-29
-27
-25
-23
-21
-20
-18
-17
-16
-15
-14
-13
-12
-11
-10
Total
bene
fits12
%25
622
720
217
915
814
012
411
097
8676
6759
5246
4136
3228
25
Save
d Co
st o
f Exis
ting
Serp
ong
Line
1) P
rocu
reme
nt co
st of
rollin
g stoc
k0
00
00
00
00
00
011
20
131
00
075
-275
2) O
M Co
st32
3232
3232
3232
3232
3232
3232
3232
3232
3232
32To
tal be
nefits
3232
3232
3232
3232
3232
3232
144
3216
232
3232
106
-244
Disc
ount
ed b
enef
itsDR
1) P
rocu
reme
nt co
st of
rollin
g stoc
k12
%0
00
00
00
00
00
04
04
00
01
-52)
OM
Cost
12%
54
43
33
22
22
11
11
11
11
11
Total
bene
fits12
%5
44
33
32
22
21
15
15
11
12
-4
4. Ne
t Ben
efits
(billi
on ru
piah
s)Ne
t Ben
efits
(eco
nomi
c pric
es)
1,721
1,710
1,698
1,686
1,674
1,660
1,547
1,232
1,602
1,566
1,586
1,390
1,545
969
1,270
1,497
1,477
1,456
1,509
2,597
Net B
enefi
ts (d
iscou
nted a
t 12 %
)25
122
219
717
515
513
711
481
9482
7458
5832
3840
3531
2944
Accu
mulat
ed N
et Be
nefits
(disc
ounte
d at 1
2 %)
296
519
716
891
1,046
1,183
1,297
1,378
1,472
1,555
1,629
1,687
1,745
1,777
1,815
1,855
1,890
1,921
1,950
1,993
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-8
App
endi
x 6
(1):
Fina
ncia
l Ana
lysi
s of
Ser
pong
Lin
e D
oubl
e Tr
acki
ng, A
cces
s Im
prov
emen
t and
Inte
grat
ed L
and
Dev
elop
men
tA
ssum
ptio
nsTa
riff (
Cas
e 3)
: Fl
ag F
all=
Rp.
1,0
00D
ista
nce
Por
tion=
Rp.
200/
kmC
ost B
urde
n by
PT.
KA
1) C
apita
l cos
t bur
den:
Sta
tion
Bui
ldin
g an
d S
tatio
n P
laza
and
Pur
ocur
emen
t of R
ollin
g S
tock
2) O
M c
ost
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2004
~20
2004
~204
01.
Proj
ect C
ost (
Rp. b
illion
)(1
) Cap
ital C
ost
1) L
and
Proc
urem
ent :
18
018
065
00
115
0
2) C
onst
ruct
ion
cost
< 1 >
Civi
l Wor
ks13
013
069
4015
42
< 2 >
Brid
ge W
orks
205
205
5468
1444
26<
3 > T
rack
Wor
ks92
920
3349
29
< 4 >
Elec
tric F
acilit
ies54
086
50
9839
215
35<
5 > S
tation
Buil
ding a
nd S
tation
Plaz
a16
616
624
3660
2323
< 6 >
Con
struc
tion o
f Stab
ling Y
ard
5050
015
350
0<
7-1 >
Roll
ing S
tock
1,294
1,673
018
712
558
939
3<
7-2 >
Roll
ing S
tock (
Repla
ceme
nt)0
315
<I>
: SUB
TOT
AL : <
1> ~
<7>
2,477
3,495
148
476
689
677
487
00
00
00
00
00
< II >
Phy
sical
Conti
ngen
cy :
<I>
x 10 %
24
835
015
4869
6849
00
00
00
00
00
< III
> Co
nsult
ing C
ost :
(<I>
+ <
II>) x
7 %
; Exc
luding
Roll
ing S
tock C
ost
9111
611
2243
77
00
00
00
00
00
< IV
> V
AT : (
<I>
x 10 %
248
350
1548
6968
490
00
00
00
00
0To
tal C
onstr
uctio
n Cos
t : (<
I>+<
II>+<
III>+<
IV>)
3,063
4,311
189
594
870
819
592
00
00
00
00
00
Tota
l Cap
ital C
ost (
Land
, Con
stru
ctio
n &
Rollin
g St
ock)
3,243
4,491
254
594
870
934
592
00
00
00
00
00
(2) O
M Co
st1)
Ser
pong
- Ta
nah A
bang
164
455
1414
1414
1414
1414
1414
1415
2) P
almer
ah -
Mang
gara
i61
41,9
0261
6161
6161
6161
6161
63To
tal77
82,3
5714
1475
7575
7575
7575
7575
77
2. Fi
nanc
ial A
nalys
is of
PT.
KA
Cost
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
burd
en20
04~2
020
04~2
040
(1) C
apita
l Cos
t Bur
den
by P
T. K
A1)
Lan
d Pr
ocur
emen
t :
gove
rnme
nt0
00
00
00
00
00
00
00
00
2) C
onst
ruct
ion
cost
< 1 >
Civi
l Wor
ksgo
vern
ment
00
00
00
00
00
00
00
00
0<
2 > B
ridge
Wor
ksgo
vern
ment
00
00
00
00
00
00
00
00
0<
3 > T
rack
Wor
ksgo
vern
ment
00
00
00
00
00
00
00
00
0<
4 > E
lectric
Fac
ilities
gove
rnme
nt0
00
00
00
00
00
00
00
00
< 5 >
Stat
ion B
uildin
g and
Stat
ion P
laza
PT. K
A16
616
624
3660
2323
00
00
00
00
00
< 6 >
Con
struc
tion o
f Stab
ling Y
ard
gove
rnme
nt0
00
00
00
00
00
00
00
00
< 7 >
Roll
ing S
tock
PT. K
A1,2
941,9
880
187
125
589
393
00
00
00
00
00
<I>
: SUB
TOT
AL : <
1> ~
<7>
1,460
2,154
2422
318
561
241
60
00
00
00
00
0<
II > P
hysic
al Co
nting
ency
: <I
> x 1
0 %
146
216
222
1961
420
00
00
00
00
0<
III >
Cons
ulting
Cos
t : (<
I> +
<II>
) x 7
%; E
xclud
ing R
olling
Stoc
k Cos
t13
132
35
22
00
00
00
00
00
< IV
> V
AT : (
<I>
x 10 %
146
216
222
1961
420
00
00
00
00
0
Total
Con
struc
tion C
ost :
(<I>
+<II>
+<III>
+<IV
>)1,7
652,5
9831
271
226
737
501
00
00
00
00
00
Tota
l Cap
ital C
ost B
urde
n by
PT.
KA
1,765
2,598
3127
122
673
750
10
00
00
00
00
0
(2) O
M Co
stSe
rpon
g - T
anah
Aba
ngPT
.KA
164
455
1414
1414
1414
1414
1414
1415
Palm
erah
- Ma
ngga
rai
PT.K
A61
41,9
0261
6161
6161
6161
6161
63To
tal O
M Co
st B
urde
n by
PT.
KA
778
2,357
1414
7575
7575
7575
7575
7577
Total
Total
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-9
App
endi
x 6
(2):
Fina
ncia
l Ana
lysi
s of
Ser
pong
Lin
e D
oubl
e Tr
acki
ng, A
cces
s Im
prov
emen
t and
Inte
grat
ed L
and
Dev
elop
men
t
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
1. Pr
ojec
t Cos
t (Rp
. billi
on)
(1) C
apita
l Cos
t 1)
Lan
d Pr
ocur
emen
t :
2) C
onst
ruct
ion
cost
< 1 >
Civi
l Wor
ks<
2 > B
ridge
Wor
ks<
3 > T
rack
Wor
ks<
4 > E
lectric
Fac
ilities
098
392
1535
00
00
00
00
0-2
16<
5 > S
tation
Buil
ding a
nd S
tation
Plaz
a<
6 > C
onstr
uctio
n of S
tablin
g Yar
d<
7-1 >
Roll
ing S
tock
125
125
125
125
125
125
-369
< 7-
2 > R
olling
Stoc
k (Re
place
ment)
018
712
558
939
30
00
0-9
79
<I>
: SUB
TOT
AL : <
1> ~
<7>
125
012
50
012
598
517
1535
125
187
125
589
518
00
00
-1,56
4
< II >
Phy
sical
Conti
ngen
cy :
<I>
x 10 %
13
013
00
1310
522
413
1913
5952
00
00
-156
< III
> Co
nsult
ing C
ost :
(<I>
+ <
II>) x
7 %
; Exc
luding
Roll
ing S
tock C
ost
00
00
00
830
13
00
00
00
00
0-1
7<
IV >
VAT
: (<I
> x 1
0 %13
013
00
1310
522
413
1913
5952
00
00
-156
Total
Con
struc
tion C
ost :
(<I>
+<II>
+<III>
+<IV
>)15
00
150
00
150
125
650
1945
150
225
150
707
621
00
00
-1,89
3To
tal C
apita
l Cos
t (La
nd, C
onst
ruct
ion
& Ro
lling
Stoc
k)15
00
150
00
150
125
650
1945
150
225
150
707
621
00
00
-1,89
3
(2) O
M Co
st1)
Ser
pong
- Ta
nah A
bang
1515
1515
1515
1515
1515
1515
1515
1515
1515
1515
2) P
almer
ah -
Mang
gara
i63
6363
6363
6363
6363
6666
6666
6666
6666
6666
67To
tal77
7777
7777
7777
7777
8080
8080
8080
8080
8080
83
2. Fi
nanc
ial A
nalys
is of
PT.
KA
Cost
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
burd
en(1
) Cap
ital C
ost B
urde
n by
PT.
KA
1) L
and
Proc
urem
ent :
go
vern
ment
00
00
00
00
00
00
00
00
00
00
2) C
onst
ruct
ion
cost
< 1 >
Civi
l Wor
ksgo
vern
ment
00
00
00
00
00
00
00
00
00
00
< 2 >
Brid
ge W
orks
gove
rnme
nt0
00
00
00
00
00
00
00
00
00
0<
3 > T
rack
Wor
ksgo
vern
ment
00
00
00
00
00
00
00
00
00
00
< 4 >
Elec
tric F
acilit
iesgo
vern
ment
00
00
00
00
00
00
00
00
00
00
< 5 >
Stat
ion B
uildin
g and
Stat
ion P
laza
PT. K
A0
00
00
00
00
00
00
00
00
00
0<
6 > C
onstr
uctio
n of S
tablin
g Yar
dgo
vern
ment
00
00
00
00
00
00
00
00
00
00
< 7 >
Roll
ing S
tock
PT. K
A12
50
125
00
125
012
50
012
518
712
558
951
80
00
0-1
,348
<I>
: SUB
TOT
AL : <
1> ~
<7>
125
012
50
012
50
125
00
125
187
125
589
518
00
00
-1,34
8<
II > P
hysic
al Co
nting
ency
: <I
> x 1
0 %
130
130
013
013
00
1319
1359
520
00
0-1
35<
III >
Cons
ulting
Cos
t : (<
I> +
<II>
) x 7
%; E
xclud
ing R
olling
Stoc
k Cos
t0
00
00
00
00
00
00
00
00
00
0<
IV >
VAT
: (<I
> x 1
0 %13
013
00
130
130
013
1913
5952
00
00
-135
Total
Con
struc
tion C
ost :
(<I>
+<II>
+<III>
+<IV
>)15
00
150
00
150
015
00
015
022
515
070
762
10
00
0-1
,618
Tota
l Cap
ital C
ost B
urde
n by
PT.
KA
150
015
00
015
00
150
00
150
225
150
707
621
00
00
-1,61
8
(2) O
M Co
stSe
rpon
g - T
anah
Aba
ngPT
.KA
1515
1515
1515
1515
1515
1515
1515
1515
1515
1515
Palm
erah
- Ma
ngga
rai
PT.K
A63
6363
6363
6363
6363
6666
6666
6666
6666
6666
67To
tal O
M Co
st B
urde
n by
PT.
KA
7777
7777
7777
7777
7780
8080
8080
8080
8080
8083
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-10
App
endi
x 6
(3):
Fina
ncia
l Ana
lysi
s of
Ser
pong
Lin
e D
oubl
e Tr
acki
ng, A
cces
s Im
prov
emen
t and
Inte
grat
ed L
and
Dev
elop
men
tAn
nual
grow
th ra
te20
0420
0520
0620
0720
0820
0920
1020
1120
1220
1320
1420
1520
1620
1720
1820
1920
2020
10~2
020
04~2
020
04~2
040
(3) N
umbe
r of P
asse
nger
1) T
otal G
et-on
(Pas
seng
er pe
r day
)Se
rpon
g3.8
%10
,562
15,38
3Ra
wa B
untu
3.6%
24,79
035
,394
Ciate
r3.6
%3,0
994,4
24Su
dimar
a3.0
%15
,197
20,36
7Ju
rang
mang
u3.0
%16
,245
21,77
1Pd
. Ran
ji3.0
%7,8
6110
,535
Binta
ro3.0
%6,2
888,4
28Pd
. Betu
ng3.0
%6,8
129,1
30Ke
bayo
rang
2.3%
22,23
327
,943
Limo
2.3%
10,22
712
,854
Pal M
erah
2.3%
12,00
615
,089
Kare
t2.3
%7,8
829,9
39Su
dirma
n2.3
%49
,262
62,12
2Ra
suna
2.3%
24,63
131
,061
Manp
anmg
2.1%
2,030
2,501
Mang
gara
iTo
tal
2.7%
219,1
2528
6,941
2) T
otal S
ectio
n Volu
me (P
asse
nger
per d
ay)
Serp
ong
Rawa
Bun
tu2.9
%45
,413
60,35
2Ra
wa B
untu
Ciate
r3.1
%92
,223
125,6
35Ci
ater
Sudim
ara
3.1%
96,14
213
1,014
Sudim
ara
Jura
ngma
ngu
2.5%
104,1
2413
2,843
Jura
ngma
ngu
Pd. R
anji
2.8%
118,1
0315
5,298
Pd. R
anji
Binta
ro2.5
%12
0,103
153,3
87Bi
ntaro
Pd. B
etung
2.1%
127,5
9215
6,590
Pd. B
etung
Keba
yora
ng2.1
%13
0,954
161,0
96Ke
bayo
rang
Limo
2.1%
144,0
6517
7,574
Limo
Pal M
erah
2.1%
143,6
2717
7,024
Pal M
erah
Kare
t0.5
%16
4,185
172,9
08Ka
ret
Sudir
man
0.8%
168,6
1318
3,229
Sudir
man
Rasu
na1.5
%22
1,684
256,8
96Ra
suna
Manp
anmg
2.2%
249,9
8531
0,023
Manp
anmg
Mang
gara
i2.2
%24
7,897
308,6
17To
tal2,6
62,48
61.2
4(4
) Pas
seng
er R
even
ue (R
p. b
illion
per
year
)1)
Flag
Fall
1,000
Rp.
1,010
3,824
8082
8487
8992
9497
9910
210
52)
Dist
ant P
ortio
n20
0Rp
./ km
3,248
11,50
626
627
127
728
328
829
530
130
731
432
032
7To
tal P
asse
nger
Reve
nue
4,258
15,33
134
635
336
136
937
838
639
540
441
342
243
2
3) B
reak
down
of D
istan
t Por
tion R
even
ueDi
stanc
e (km
)Se
rpon
gRa
wa B
untu
1.404
5922
85
55
55
56
66
66
Rawa
Bun
tuCi
ater
2.077
180
716
1414
1515
1616
1717
1818
19Ci
ater
Sudim
ara
2.481
225
892
1718
1919
2020
2122
2223
24Su
dimar
aJu
rang
mang
u1.9
9118
969
215
1616
1617
1718
1818
1919
Jura
ngma
ngu
Pd. R
anji
2.231
244
926
1920
2021
2122
2323
2425
25Pd
. Ran
jiBi
ntaro
1.620
177
651
1415
1515
1616
1617
1718
18Bi
ntaro
Pd. B
etung
1.625
185
649
1515
1616
1617
1717
1818
19Pd
. Betu
ngKe
bayo
rang
2.972
347
1,222
2829
3030
3132
3233
3434
35Ke
bayo
rang
Limo
1.396
180
634
1515
1516
1616
1717
1718
18Lim
oPa
l Mer
ah2.3
2729
91,0
5324
2525
2627
2728
2829
2930
Pal M
erah
Kare
t2.6
4435
81,0
6332
3232
3232
3333
3333
3333
Kare
tSu
dirma
n0.8
6112
237
311
1111
1111
1111
1111
1112
Sudir
man
Rasu
na0.5
8611
237
09
1010
1010
1010
1111
1111
Rasu
naMa
npan
mg1.1
7226
393
321
2222
2323
2424
2525
2627
Manp
anmg
Mang
gara
i1.3
9030
91,1
0425
2626
2727
2829
2930
3131
Total
26.77
73,2
4811
,506
266
271
277
283
288
295
301
307
314
320
327
(5) N
et R
even
ue1,7
1610
,376
00
-31
-271
-226
-750
-169
278
286
294
303
311
320
329
338
347
354
NPV
(Disc
ount
rate
=18%
):-5
9.5Rp
. billi
onFI
RR:
16.8%
Total
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-11
App
endi
x 6
(4):
Fina
ncia
l Ana
lysi
s of
Ser
pong
Lin
e D
oubl
e Tr
acki
ng, A
cces
s Im
prov
emen
t and
Inte
grat
ed L
and
Dev
elop
men
tAn
nual
grow
th ra
te20
2120
2220
2320
2420
2520
2620
2720
2820
2920
3020
3120
3220
3320
3420
3520
3620
3720
3820
3920
4020
10~2
0(3
) Num
ber o
f Pas
seng
er1)
Tota
l Get-
on (P
asse
nger
per d
ay)
Serp
ong
3.8%
Rawa
Bun
tu3.6
%Ci
ater
3.6%
Sudim
ara
3.0%
Jura
ngma
ngu
3.0%
Pd. R
anji
3.0%
Binta
ro3.0
%Pd
. Betu
ng3.0
%Ke
bayo
rang
2.3%
Limo
2.3%
Pal M
erah
2.3%
Kare
t2.3
%Su
dirma
n2.3
%Ra
suna
2.3%
Manp
anmg
2.1%
Mang
gara
iTo
tal
2.7%
2) T
otal S
ectio
n Volu
me (P
asse
nger
per d
ay)
Serp
ong
Rawa
Bun
tu2.9
%Ra
wa B
untu
Ciate
r3.1
%Ci
ater
Sudim
ara
3.1%
Sudim
ara
Jura
ngma
ngu
2.5%
Jura
ngma
ngu
Pd. R
anji
2.8%
Pd. R
anji
Binta
ro2.5
%Bi
ntaro
Pd. B
etung
2.1%
Pd. B
etung
Keba
yora
ng2.1
%Ke
bayo
rang
Limo
2.1%
Limo
Pal M
erah
2.1%
Pal M
erah
Kare
t0.5
%Ka
ret
Sudir
man
0.8%
Sudir
man
Rasu
na1.5
%Ra
suna
Manp
anmg
2.2%
Manp
anmg
Mang
gara
i2.2
%To
tal1.2
41.2
40(4
) Pas
seng
er R
even
ue (R
p. b
illion
per
year
)1)
Flag
Fall
1,000
Rp.
108
111
114
117
120
123
126
130
133
137
141
145
149
153
157
161
166
170
175
180
2) D
istan
t Por
tion
200
Rp./ k
m33
434
134
935
636
437
238
038
839
640
541
442
343
244
245
146
147
248
249
350
4To
tal P
asse
nger
Reve
nue
442
452
462
473
484
495
506
518
530
542
555
568
581
594
608
623
637
652
668
683
3) B
reak
down
of D
istan
t Por
tion R
even
ueDi
stanc
e (km
)Se
rpon
gRa
wa B
untu
1.404
67
77
77
88
88
89
99
910
1010
1111
Rawa
Bun
tuCi
ater
2.077
2020
2122
2223
2424
2526
2728
2829
3031
3233
3435
Ciate
rSu
dimar
a2.4
8124
2526
2728
2929
3031
3233
3435
3738
3940
4143
44Su
dimar
aJu
rang
mang
u1.9
9120
2021
2122
2223
2324
2525
2627
2728
2929
3031
31Ju
rang
mang
uPd
. Ran
ji2.2
3126
2727
2829
3031
3132
3334
3536
3738
3940
4143
44Pd
. Ran
jiBi
ntaro
1.620
1919
2020
2021
2222
2323
2424
2526
2627
2728
2930
Binta
roPd
. Betu
ng1.6
2519
1920
2021
2121
2222
2323
2424
2525
2626
2727
28Pd
. Betu
ngKe
bayo
rang
2.972
3636
3738
3940
4041
4243
4445
4647
4849
5051
5253
Keba
yora
ngLim
o1.3
9618
1919
2020
2121
2122
2223
2324
2425
2526
2627
27Lim
oPa
l Mer
ah2.3
2731
3132
3333
3435
3636
3738
3939
4041
4243
4445
46Pa
l Mer
ahKa
ret
2.644
3434
3434
3434
3535
3535
3536
3636
3636
3637
3737
Kare
tSu
dirma
n0.8
6112
1212
1212
1212
1212
1313
1313
1313
1313
1313
14Su
dirma
nRa
suna
0.586
1111
1112
1212
1212
1313
1313
1314
1414
1414
1515
Rasu
naMa
npan
mg1.1
7227
2828
2930
3031
3232
3334
3435
3637
3738
3940
41Ma
npan
mgMa
ngga
rai
1.390
3233
3334
3536
3737
3839
4041
4243
4344
4546
4749
Total
26.77
733
434
134
935
636
437
238
038
839
640
541
442
343
244
245
146
147
248
249
350
4
(5) N
et R
even
ue21
537
423
539
540
626
842
929
145
246
232
526
335
1-1
93-9
354
355
757
258
82,2
19
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-12
App
endi
x 7
(1):
Econ
omic
Ana
lysi
s of
2nd
JO
RR
Total
2004
~202
0To
tal20
04~2
040
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
1. Co
sts (
billio
n ru
piah
s)1)
Tota
l Fin
ancia
l Cos
tLa
nd &
Com
pens
ation
2,061
00
00
2266
228
649
364
231
7834
2910
317
771
70
Cons
tructi
on C
ost
4,997
2,498
00
00
4010
037
182
668
932
216
644
6747
51,0
6473
110
2O&
M43
42,4
320
00
00
00
44
3540
5050
5252
5693
Total
(Fina
ncial
Cos
t)7,4
914,9
300
00
2210
632
81,0
191,1
9492
543
524
012
222
070
31,1
8679
419
5SC
F2)
Tota
l Eco
nom
ic Co
stLa
nd &
Com
pens
ation
60%
1,236
00
00
1340
137
389
219
139
4720
1762
106
434
0Co
nstru
ction
Cos
t84
%4,1
972,0
990
00
034
8431
169
457
927
013
937
5639
989
461
486
O&M
85%
369
2,067
00
00
00
03
330
3442
4244
4447
79To
tal (E
cono
mic C
ost)
5,802
4,166
00
013
7322
170
191
672
134
719
496
160
549
980
666
165
3)Di
scou
nted
tota
l cos
ts12
%2,0
200
00
947
125
355
414
291
125
6228
4112
620
112
227
2. VO
C an
d TT
C (b
illion
rupi
ahs)
1) N
ew 4b
VO
CH
237,6
0570
4,340
7,601
8,228
8,944
9,760
10,23
210
,847
11,54
012
,251
13,04
013
,914
14,88
315
,956
17,14
518
,463
19,92
321
,542
23,33
7VO
CM
256,3
4260
0,842
12,43
412
,884
13,38
013
,919
13,79
414
,260
15,00
915
,147
15,30
115
,473
15,66
415
,873
16,10
116
,350
16,61
916
,911
17,22
5VO
CL
16,48
320
,856
2,501
2,218
1,971
1,755
1,383
1,124
949
816
702
605
522
450
389
337
291
252
219
VOC
Sub-
total
510,4
301,3
26,03
822
,537
23,33
024
,294
25,43
325
,409
26,23
127
,498
28,21
429
,043
29,99
231
,068
32,27
933
,635
35,14
936
,834
38,70
540
,780
TTC
H14
8,908
707,0
063,3
163,6
714,0
794,5
314,7
265,3
226,1
936,8
827,6
518,5
119,4
7210
,547
11,75
113
,101
14,61
516
,315
18,22
6TT
CM
152,6
2747
0,656
7,125
7,318
7,529
7,753
7,598
8,141
9,221
9,302
9,391
9,486
9,590
9,701
9,821
9,949
10,08
510
,231
10,38
6TT
CL
6,699
9,833
1,044
897
771
663
534
441
378
331
290
254
223
196
172
151
133
116
102
TTC
Sub-
total
308,2
341,1
87,49
511
,486
11,88
612
,379
12,94
712
,859
13,90
515
,792
16,51
517
,332
18,25
219
,285
20,44
421
,743
23,20
024
,832
26,66
228
,715
Total
818,6
642,5
13,53
334
,023
35,21
636
,673
38,38
038
,267
40,13
543
,290
44,72
946
,375
48,24
450
,353
52,72
355
,379
58,34
961
,666
65,36
769
,495
2) W
ithou
t 2nd
JORR
VOC
H23
9,452
713,2
917,6
018,2
288,9
449,7
6010
,249
10,88
211
,596
12,31
713
,118
14,00
714
,995
16,09
217
,310
18,66
320
,165
21,83
523
,692
VOC
M25
7,145
603,1
5712
,434
12,88
413
,380
13,91
913
,811
14,29
715
,068
15,20
815
,364
15,53
815
,730
15,94
116
,171
16,42
116
,692
16,98
517
,301
VOC
L16
,503
20,90
72,5
012,2
181,9
711,7
551,3
841,1
2595
081
770
460
752
445
239
133
829
325
422
0VO
CSu
b-tot
al51
3,100
1,337
,355
22,53
723
,330
24,29
425
,433
25,44
326
,303
27,61
428
,342
29,18
630
,152
31,24
932
,485
33,87
235
,422
37,15
139
,075
41,21
3TT
CH
150,9
2172
0,002
3,316
3,671
4,079
4,531
4,742
5,357
6,252
6,955
7,741
8,620
9,604
10,70
511
,939
13,32
314
,877
16,62
218
,585
TTC
M15
3,110
472,9
047,1
257,3
187,5
297,7
537,6
068,1
589,2
499,3
329,4
239,5
229,6
289,7
429,8
659,9
9610
,136
10,28
510
,444
TTC
L6,7
089,8
691,0
4489
777
166
353
544
237
933
229
125
522
419
717
315
213
311
710
3TT
CSu
b-tot
al31
0,739
1,202
,776
11,48
611
,886
12,37
912
,947
12,88
313
,957
15,87
916
,620
17,45
618
,397
19,45
620
,644
21,97
723
,471
25,14
627
,024
29,13
2To
tal82
3,839
2,540
,131
34,02
335
,216
36,67
338
,380
38,32
540
,260
43,49
344
,961
46,64
148
,550
50,70
553
,129
55,84
958
,893
62,29
766
,099
70,34
53.
Bene
fits (
billio
n ru
piah
s)1)
VOC
Sav
ings
2,669
11,31
70
00
034
7211
612
814
216
018
120
623
727
331
737
043
22)
Tra
vel C
ost S
aving
s2,5
0515
,281
00
00
2452
8710
412
414
617
120
023
327
131
336
241
7To
tal be
nefits
5,174
26,59
80
00
058
125
203
232
266
306
352
406
470
544
631
732
850
Disc
ount
ed b
enef
itsDR
1) V
OC S
aving
s12
%1,2
650
00
022
4159
5858
5858
5961
6365
6871
2) T
rave
l Cos
t Sav
ings
12%
1,350
00
00
1530
4447
5053
5558
6062
6466
68To
tal be
nefits
12%
2,616
00
00
3771
103
105
107
110
113
117
121
125
129
134
139
4. Ne
t Ben
efits
(billi
on ru
piah
s)Ne
t Ben
efits
(eco
nomi
c pric
es)
22,43
20
00
-13
-15
-96
-497
-684
-455
-41
158
310
309
-5-3
4966
685
Net B
enefi
ts (d
iscou
nted a
t 12 %
)59
50
00
-9-1
0-5
4-2
52-3
09-1
84-1
551
8979
-1-7
112
112
Accu
mulat
ed N
et Be
nefits
(disc
ounte
d at 1
2 %)
00
0-9
-19
-74
-326
-635
-819
-834
-783
-693
-614
-615
-687
-675
-563
NPV:
12%
(disc
ount
rate
)59
5bi
llion
rupi
ahs
EIRR
:16
.3%
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-13
App
endi
x 7
(2):
Econ
omic
Ana
lysi
s of
2nd
JO
RR
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
1. Co
sts (
billio
n ru
piah
s)1)
Tota
l Fin
ancia
l Cos
tLa
nd &
Com
pens
ation
00
00
00
00
00
00
00
00
00
0-2
,061
Cons
tructi
on C
ost
00
00
00
00
00
00
00
00
00
0-2
,498
O&M
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
Total
(Fina
ncial
Cos
t)10
010
010
010
010
010
010
010
010
010
010
010
010
010
010
010
010
010
010
0-4
,459
SCF
2)To
tal E
cono
mic
Cost
Land
& C
ompe
nsati
on60
%0
00
00
00
00
00
00
00
00
00
-1,23
6Co
nstru
ction
Cos
t84
%0
00
00
00
00
00
00
00
00
00
-2,09
9O&
M85
%85
8585
8585
8585
8585
8585
8585
8585
8585
8585
85To
tal (E
cono
mic C
ost)
8585
8585
8585
8585
8585
8585
8585
8585
8585
85-3
,250
3)Di
scou
nted
tota
l cos
ts12
%12
1110
98
76
65
44
43
33
22
22
-55
2. VO
C an
d TT
C (b
illion
rupi
ahs)
1) N
ew 4b
VO
CH
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
23,33
723
,337
VOC
M17
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
517
,225
17,22
5VO
CL
219
219
219
219
219
219
219
219
219
219
219
219
219
219
219
219
219
219
219
219
VOC
Sub-
total
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
40,78
040
,780
TTC
H18
,937
19,67
620
,443
21,24
022
,069
22,92
923
,824
24,75
325
,718
26,72
127
,763
28,84
629
,971
31,14
032
,354
33,61
634
,927
36,28
937
,705
39,17
5TT
CM
10,79
111
,212
11,64
912
,104
12,57
613
,066
13,57
614
,105
14,65
515
,227
15,82
116
,438
17,07
917
,745
18,43
719
,156
19,90
320
,679
21,48
622
,324
TTC
L10
611
011
511
912
412
913
413
914
415
015
616
216
817
518
218
919
620
421
222
0TT
CSu
b-tot
al29
,835
30,99
832
,207
33,46
334
,768
36,12
437
,533
38,99
740
,518
42,09
843
,740
45,44
647
,218
49,06
050
,973
52,96
155
,027
57,17
359
,402
61,71
9To
tal70
,615
71,77
972
,988
74,24
475
,549
76,90
578
,314
79,77
781
,298
82,87
984
,520
86,22
687
,999
89,84
091
,753
93,74
195
,807
97,95
310
0,183
102,4
99
2) W
ithou
t 2nd
JORR
VOC
H23
,692
23,69
223
,692
23,69
223
,692
23,69
223
,692
23,69
223
,692
23,69
223
,692
23,69
223
,692
23,69
223
,692
23,69
223
,692
23,69
223
,692
23,69
2VO
CM
17,30
117
,301
17,30
117
,301
17,30
117
,301
17,30
117
,301
17,30
117
,301
17,30
117
,301
17,30
117
,301
17,30
117
,301
17,30
117
,301
17,30
117
,301
VOC
L22
022
022
022
022
022
022
022
022
022
022
022
022
022
022
022
022
022
022
022
0VO
CSu
b-tot
al41
,213
41,21
341
,213
41,21
341
,213
41,21
341
,213
41,21
341
,213
41,21
341
,213
41,21
341
,213
41,21
341
,213
41,21
341
,213
41,21
341
,213
41,21
3TT
CH
19,31
020
,063
20,84
521
,658
22,50
323
,381
24,29
325
,240
26,22
427
,247
28,31
029
,414
30,56
131
,753
32,99
134
,278
35,61
537
,004
38,44
739
,946
TTC
M10
,851
11,27
411
,714
12,17
112
,646
13,13
913
,651
14,18
414
,737
15,31
115
,909
16,52
917
,174
17,84
318
,539
19,26
220
,014
20,79
421
,605
22,44
8TT
CL
107
111
116
120
125
130
135
140
146
151
157
163
170
176
183
190
198
206
214
222
TTC
Sub-
total
30,26
831
,449
32,67
533
,950
35,27
436
,649
38,07
939
,564
41,10
742
,710
44,37
646
,106
47,90
449
,773
51,71
453
,731
55,82
658
,003
60,26
562
,616
Total
71,48
172
,662
73,88
875
,162
76,48
677
,862
79,29
180
,776
82,31
983
,923
85,58
887
,319
89,11
790
,985
92,92
694
,943
97,03
999
,216
101,4
7810
3,829
3. Be
nefit
s (bi
llion
rupi
ahs)
1) V
OC S
aving
s43
243
243
243
243
243
243
243
243
243
243
243
243
243
243
243
243
243
243
243
22)
Tra
vel C
ost S
aving
s43
345
046
848
650
552
554
556
758
961
263
666
068
671
374
177
080
083
186
389
7To
tal be
nefits
866
883
900
919
938
957
978
999
1,021
1,044
1,068
1,093
1,118
1,145
1,173
1,202
1,232
1,263
1,296
1,329
Disc
ount
ed b
enef
itsDR
1) V
OC S
aving
s12
%63
5650
4540
3632
2825
2320
1816
1413
1210
98
72)
Tra
vel C
ost S
aving
s12
%63
5954
5047
4340
3735
3230
2826
2422
2019
1816
15To
tal be
nefits
12%
126
115
105
9587
7972
6660
5550
4642
3835
3229
2725
22
4. Ne
t Ben
efits
(billi
on ru
piah
s)Ne
t Ben
efits
(eco
nomi
c pric
es)
781
798
815
834
853
872
893
914
936
959
983
1,008
1,034
1,060
1,088
1,117
1,147
1,178
1,211
4,579
Net B
enefi
ts (d
iscou
nted a
t 12 %
)11
410
495
8679
7266
6055
5046
4239
3532
3027
2523
77Ac
cumu
lated
Net
Bene
fits (d
iscou
nted a
t 12 %
)-4
49-3
45-2
51-1
64-8
5-1
353
113
168
218
264
307
345
381
413
443
470
495
518
595
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-14
App
endi
x 8
(1):
Fina
ncia
l Ana
lysi
s of
2nd
JO
Toll S
ectio
n: 1~
14,
With
Lan
d de
velo
pmen
t sce
nario
alon
g 2n
d JO
RR,
Tarif
f: Rp
.500 p
er P
CU-k
m in
2003
and
annu
al in
crea
se b
y 7%
(rea
l gro
wth
rate
) afte
r 201
0
Total
Cost
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
1. Co
st S
ched
ule (
Rp. B
illion
)(2
004-
2020
)To
llLa
nd10
0%1,7
290
00
2266
228
649
364
231
7525
913
3511
00
00
0Se
ction
1Ci
vil w
ork &
Stru
cture
2,311
00
00
3176
283
631
526
246
127
3451
114
138
550
00
1214
15I
Engin
eerin
g, VA
T, C
TG71
60
00
09
2488
196
163
7639
1016
3543
170
00
44
5Se
ction
14To
tal ca
piotal
cost
4,755
00
022
106
328
1,019
1,191
921
397
190
5279
184
193
720
00
1618
20An
nual
OM co
st40
10
00
00
00
44
3540
5050
5252
5660
6060
6061
612.
Traf
fic d
eman
d1)
PCU
per
day
(2 d
irect
ions
)Le
ngth
(km)
Toll
110
.650
00
00
00
00
12,38
012
,999
13,64
914
,331
15,04
815
,800
16,59
017
,420
18,29
119
,206
20,16
621
,174
22,23
3To
ll2
6.23
00
00
00
00
00
026
,851
28,19
329
,603
31,08
332
,637
34,26
935
,982
37,78
239
,671
41,65
443
,737
Toll
32.7
60
00
00
00
00
37,91
339
,809
41,80
043
,890
46,08
448
,388
50,80
853
,348
56,01
558
,816
61,75
764
,845
68,08
7To
ll4
7.85
00
00
00
00
00
033
,107
34,76
236
,501
38,32
640
,242
42,25
444
,367
46,58
548
,914
51,36
053
,928
Toll
58.2
60
00
00
00
00
039
,014
40,96
543
,013
45,16
447
,422
49,79
352
,283
54,89
757
,642
60,52
463
,550
66,72
8To
ll6
4.13
00
00
00
00
016
,261
30,70
045
,140
47,39
749
,767
52,25
554
,868
57,61
160
,492
63,51
666
,692
70,02
773
,528
Toll
71.8
70
00
00
00
00
20,86
628
,661
36,45
538
,278
40,19
242
,201
44,31
146
,527
48,85
351
,296
53,86
156
,554
59,38
2To
ll8
5.77
00
00
00
00
020
,866
28,66
136
,455
38,27
840
,192
42,20
144
,311
46,52
748
,853
51,29
653
,861
56,55
459
,382
Toll
92.7
90
00
00
00
00
36,35
642
,878
49,40
051
,870
54,46
357
,186
60,04
663
,048
66,20
069
,510
72,98
676
,635
80,46
7To
ll10
3.28
00
00
00
34,74
236
,479
38,30
340
,218
43,97
947
,739
50,12
652
,633
55,26
458
,028
60,92
963
,975
67,17
470
,533
74,06
077
,763
Toll
112.9
70
00
00
00
00
00
28,41
129
,831
31,32
332
,889
34,53
336
,260
38,07
339
,977
41,97
544
,074
46,27
8To
ll12
5.76
00
00
00
00
00
00
025
,884
27,17
828
,537
29,96
431
,462
33,03
534
,687
36,42
138
,243
Toll
139.5
70
00
00
00
00
00
00
00
20,02
221
,023
22,07
423
,178
24,33
725
,554
26,83
1To
ll14
8.76
00
00
00
00
00
00
00
00
9,636
10,11
810
,624
11,15
511
,713
12,29
8To
ll Fre
e15
00
00
00
00
00
00
00
00
00
00
00
Toll F
ree
160
00
00
00
00
00
00
00
00
00
00
0To
ll Fre
e17
00
00
00
00
00
00
00
00
00
00
00
2) P
CU-k
m p
er ye
ar (1
,000,0
00)
Toll
10
00
00
00
00
4851
5356
5861
6468
7175
7882
86To
ll2
00
00
00
00
00
061
6467
7174
7882
8690
9510
0To
ll3
00
00
00
00
038
4042
4446
4951
5456
5962
6569
Toll
40
00
00
00
00
00
9510
010
511
011
512
112
713
414
014
715
5To
ll5
00
00
00
00
00
118
124
130
136
143
150
158
166
174
183
192
201
Toll
60
00
00
00
00
2446
6871
7579
8387
9196
100
105
111
Toll
70
00
00
00
00
1420
2526
2729
3032
3335
3738
40To
ll8
00
00
00
00
044
6077
8185
8993
9810
310
811
311
912
5To
ll9
00
00
00
00
037
4450
5355
5861
6467
7174
7882
Toll
100
00
00
042
4446
4853
5760
6366
6973
7680
8489
93To
ll11
00
00
00
00
00
031
3234
3637
3941
4346
4850
Toll
120
00
00
00
00
00
00
5457
6063
6669
7377
80To
ll13
00
00
00
00
00
00
00
070
7377
8185
8994
Toll
140
00
00
00
00
00
00
00
031
3234
3637
39To
tal0
00
00
042
4446
254
431
682
717
807
847
959
1,038
1,090
1,145
1,202
1,262
1,325
3. An
nual
Toll R
even
ue (R
p. B
illion
)To
tal (2
004-
2050
)To
ll rev
enue
234,9
190
00
00
020
.823
.326
156
282
479
538
648
728
882
1,021
1,147
1,289
1,448
1,627
1,828
4. An
nua
(Sec
tion
1-14
)To
tal (2
004-
2050
)Inv
estm
ent c
ost
5,084
00
022
106
328
1,019
1,191
921
397
190
5279
184
193
720
00
1618
20O&
M2,3
300
00
00
00
44
3540
5050
5252
5660
6060
6061
61To
tal7,4
140
00
2210
632
81,0
191,1
9492
543
223
010
212
923
624
412
860
6060
7679
81
5. Ne
t Rev
enue
(Rp.
Billi
on)
227,5
050
00
-22
-106
-328
-999
-1,17
1-8
98-2
7652
376
409
412
484
754
961
1,087
1,229
1,372
1,548
1,747
NPV
(disc
ount
rate
=18%
):Rp
.111 b
illion
FIRR
:18
.6%
Inter
media
te-ter
m pe
riod
Long
-term
perio
d
Case
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-15
App
endi
x 8
(2):
Fina
ncia
l Ana
lysi
s of
2nd
JO
RR
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050
1. Co
st S
ched
ule (
Rp. B
illion
)To
llLa
nd0
00
00
00
00
00
00
00
00
00
00
00
00
Secti
on 1
Civil
wor
k & S
tructu
re0
400
370
290
00
758
010
00
00
00
029
00
00
IEn
ginee
ring,
VAT,
CTG
012
011
09
00
02
180
30
00
00
00
90
00
0Se
ction
14To
tal ca
piotal
cost
052
048
038
00
09
760
130
00
00
00
380
00
0An
nual
OM co
st61
6163
6363
6364
6464
6464
6666
6666
6666
6666
6666
6767
6767
2. Tr
affic
1) P
CU p
er d
ay (2
dire
ctio
ns)
Toll
123
,344
24,51
225
,737
27,02
428
,375
29,79
431
,284
32,84
834
,490
36,21
538
,026
39,92
741
,923
44,01
946
,220
48,53
150
,958
53,50
656
,181
58,99
061
,940
65,03
768
,289
71,70
375
,288
Toll
245
,924
48,22
050
,631
53,16
255
,821
58,61
261
,542
64,61
967
,850
71,24
374
,805
78,54
582
,472
86,59
690
,926
95,47
210
0,246
105,2
5810
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
Toll
371
,491
75,06
678
,819
82,76
086
,898
91,24
395
,805
100,5
9610
5,625
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
Toll
456
,624
59,45
662
,428
65,55
068
,827
72,26
975
,882
79,67
683
,660
87,84
392
,235
96,84
710
1,689
106,7
7410
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
Toll
570
,064
73,56
777
,246
81,10
885
,163
89,42
293
,893
98,58
710
3,517
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
Toll
677
,204
81,06
485
,118
89,37
493
,842
98,53
410
3,461
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
Toll
762
,351
65,46
868
,742
72,17
975
,788
79,57
783
,556
87,73
492
,120
96,72
610
1,563
106,6
4110
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
Toll
862
,351
65,46
868
,742
72,17
975
,788
79,57
783
,556
87,73
492
,120
96,72
610
1,563
106,6
4110
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
Toll
984
,490
88,71
593
,151
97,80
810
2,699
107,8
3310
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
Toll
1081
,651
85,73
390
,020
94,52
199
,247
104,2
0910
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
Toll
1148
,592
51,02
153
,573
56,25
159
,064
62,01
765
,118
68,37
471
,792
75,38
279
,151
83,10
987
,264
91,62
796
,209
101,0
1910
6,070
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
108,0
0010
8,000
Toll
1240
,155
42,16
244
,270
46,48
448
,808
51,24
953
,811
56,50
259
,327
62,29
365
,408
68,67
872
,112
75,71
879
,503
83,47
987
,653
92,03
596
,637
101,4
6910
6,542
108,0
0010
8,000
108,0
0010
8,000
Toll
1328
,173
29,58
131
,061
32,61
434
,244
35,95
637
,754
39,64
241
,624
43,70
545
,891
48,18
550
,594
53,12
455
,780
58,56
961
,498
64,57
367
,801
71,19
174
,751
78,48
882
,413
86,53
490
,860
Toll
1412
,913
13,55
914
,237
14,94
915
,696
16,48
117
,305
18,17
019
,079
20,03
321
,034
22,08
623
,190
24,35
025
,567
26,84
628
,188
29,59
731
,077
32,63
134
,262
35,97
637
,774
39,66
341
,646
Toll F
ree
150
00
00
00
00
00
00
00
00
00
00
00
00
Toll F
ree
160
00
00
00
00
00
00
00
00
00
00
00
00
Toll F
ree
170
00
00
00
00
00
00
00
00
00
00
00
00
2) P
CU-k
m p
er ye
ar (1
,000,0
00)
Toll
191
9510
010
511
011
612
212
813
414
114
815
516
317
118
018
919
820
821
822
924
125
326
527
929
3To
ll2
104
110
115
121
127
133
140
147
154
162
170
179
188
197
207
217
228
240
246
246
246
246
246
246
246
Toll
372
7679
8388
9297
101
107
109
109
109
109
109
109
109
109
109
109
109
109
109
109
109
109
Toll
416
217
017
918
819
720
721
822
824
025
226
427
829
230
631
031
031
031
031
031
031
031
031
031
031
0To
ll5
211
222
233
245
257
270
283
297
312
326
326
326
326
326
326
326
326
326
326
326
326
326
326
326
326
Toll
611
612
212
813
514
114
815
616
316
316
316
316
316
316
316
316
316
316
316
316
316
316
316
316
316
3To
ll7
4245
4749
5254
5760
6366
6973
7474
7474
7474
7474
7474
7474
74To
ll8
131
138
145
152
160
168
176
185
194
204
214
225
228
228
228
228
228
228
228
228
228
228
228
228
228
Toll
986
9095
9910
411
011
011
011
011
011
011
011
011
011
011
011
011
011
011
011
011
011
011
011
0To
ll10
9810
210
811
311
912
512
912
912
912
912
912
912
912
912
912
912
912
912
912
912
912
912
912
912
9To
ll11
5355
5861
6467
7174
7882
8690
9599
104
110
115
117
117
117
117
117
117
117
117
Toll
1284
8993
9810
310
811
311
912
513
113
714
415
215
916
717
518
419
320
321
322
422
722
722
722
7To
ll13
9810
310
811
412
012
613
213
814
515
316
016
817
718
519
520
421
522
523
724
926
127
428
830
231
7To
ll14
4143
4648
5053
5558
6164
6771
7478
8286
9095
9910
411
011
512
112
713
3To
tal1,3
911,4
611,5
341,6
111,6
911,7
761,8
581,9
382,0
142,0
902,1
532,2
182,2
762,3
332,3
812,4
282,4
772,5
252,5
672,6
052,6
452,6
792,7
112,7
442,7
803.
Annu
al To
ll Rev
enue
(Rp.
Billi
on)
Toll r
even
ue2,0
542,3
072,5
922,9
123,2
723,6
764,1
154,5
925,1
095,6
716,2
506,8
937,5
688,3
009,0
649,8
8910
,795
11,77
412
,809
13,90
815
,108
16,37
217
,727
19,20
420
,813
4. Co
st(S
ectio
n 1-
14)
Inves
tmen
t cos
t0
520
480
380
00
976
013
00
00
00
038
00
00
O&M
6161
6363
6363
6464
6464
6466
6666
6666
6666
6666
6667
6767
67To
tal61
114
6311
163
101
6464
6473
140
6679
6666
6666
6666
6610
467
6767
67
5. Ne
t Rev
enue
(Rp.
Billi
on)
1,992
2,194
2,530
2,802
3,209
3,575
4,051
4,528
5,044
5,598
6,110
6,827
7,489
8,234
8,998
9,823
10,72
911
,707
12,74
313
,842
15,00
416
,305
17,66
119
,137
20,74
6
The Study on Integrated Transportation Master Plan for JABODETABEK (Phase II) Final Report, Volume 2: Pre-Feasibility Studies (Appendix 1)
AP2-16