Page 1: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

APEX Report:January 15-16, 2008

Fulvia Pilat

Time Meeting, January 22, 2008

Page 2: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

APEX Schedule January 15-16 2008

06-318-27ORMCorrections.OpticsSatogataBai

08-14Collimationon the ramp DreesR-Demolaize

08-17IPKnobsPtitsynMalitsky08-24

Au77Trbojevic+team

08-29Profile with polarimeterHuang, Sivertz, +team

08-28Hybrid TuneTrackerCameron+team

08-25ChromJump @injMontag

08-03Longitudinal matching@transitionAbreuBaiBlaskiewicz

Injection Ramps Store6-12 bunches

StoreBBQ

InjectionBBQ

Ramps

8pm 10pm 12am 2am 4am 6am 8am

7:00 amInjectorsOFF

Page 3: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

9%13.4πmm-mrad

• Deuteron beam profiles (h & v) were taken with one bunch.• Target scan was done and eight of them were found..• No chance to compare with IPM (Booster RF problem, delayed schedule).• Ask for one hour next time:

• Take one bunch measurement to confirm the timing adjustment• 12-20 bunches to compare with IPM• Change RF freq. (+-) and measure profile again to get Dx

HuangSivertzZelenski+team

Horizontal Beam Profile (1)

Page 4: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

BBQ hybrid/245MHz

H

V

Comparison of 3D AFE Signals from 1m BBQ Comparison of 3D AFE Signals from 1m BBQ stripline and resonant 245MHz pickupstripline and resonant 245MHz pickup

no deliberate beam excitation

Cameron + team

Page 5: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

no deliberate beam excitation

Zoom on Betatron Line of Previous SlideZoom on Betatron Line of Previous Slide

BBQ hybrid/245MHz

H

V

Ready to test on the ramp

Page 6: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

Trbojevic + team

Collisions of the Helium like Gold ions Au+77 with CH4Two photon decayExperimental set-up

3.1 3.33.2

Titanium sublimationpumps at 8 o’clock

beam-gas interaction

Page 7: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

Collisions of the Helium like Gold ions Au+77 with CH4

Two photon decayExperimental set-up3.1 3.33.2

Page 8: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

DreesRobert-Demolaize

Collimation on the ramp

bring the collimator jaws towards the beam after transition to scrape awaythe halo particles

try different set of positions depending on beam decay signal

Page 9: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

Comparing beam decay with nominal ramp

last physics ramp

1st APEX ramp

2nd APEX ramp

Page 10: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

RF matching at transition - yellowAbreuBaiBlaskiewicz

Page 11: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

Longitudinal DamperLongitudinal emittance -> 36% smaller (max) and on average 10%.

Longitudinal DamperStep in the voltage

Page 12: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

MalitskyPtitsynBai

IR8 knob:

∆αy = -0.3α(0) = s*/β*

Page 13: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

AC Dipole Measurements for IR8 knob IR8 knob:∆αy = -0.3

• Yellow beta* and waist at IP8 before the knob• V beta*: [email protected]

• Yellow beta* and waist at IP8 after the knob• V beta*: [email protected]

• working point was also changed:• before: Qx=0.2297, Qy=0.2336• after: Qx=0.2312, Qy=0.2278

Page 14: APEX Report - c-ad.bnl.gov · APEX Report: January 15-16, 2008 Fulvia Pilat Time Meeting, January 22, 2008. APEX Schedule January 15-16 2008 06-31 8-27 ORM Corrections. Optics Satogata

APEX Schedule January 23 2008

Ramps

08-14Coll.on therampDreesRobert-D

Back2 physics

Injection

08-29Profile with polarimeterHuang, Sivertz Zelenski, et al

08-28Hybrid TuneTrackerCameron+team

08-34Beta BeatCalaga

08-27GradienterrorsBai

InjectionAC dipole

08-25ChromJumpMontag

08-24Au77Trbojevic+team

InjectionBBQ

08-31TransitionInstabilitymodesPtitsyn+team

06-318-27ORMCorrect.OpticsSatogataBai

StoreRamps

Ramps StoreBBQ(both)

08-06NonlinearChrommeasureLuo08-17IR nonlinmeasurePilat

Prep impedancemeasureCalaga

5am 6am 8am 9am 11am 1pm 3pm 5pm