API WIWC TG-5
Well Intervention Well Control Task Group
Winter Conference Update Alex Sas-Jaworsky P.E
Chairman
![Page 2: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/2.jpg)
API WIWC TG-5
Technologies Addressed
• Coiled Tubing• Snubbing/Hydraulic Workover• Wireline (Slickline and E-Line)
![Page 3: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/3.jpg)
API WIWC TG-5
Standards Developed
• Recommended Practice 16ST
Coiled Tubing Well Control Equipment Systems
First Edition – March 2009
![Page 4: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/4.jpg)
API WIWC TG-5
2014 RP 16ST TG Membership
• Operators (3)• CT Vendors (6)• Manufacturers (3)• Consultants (1)• Regulatory (1)
![Page 5: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/5.jpg)
API WIWC TG-5
Current Activities
• 5-Year Review of RP 16ST
Further Align RP 16ST Standards with Established SC16 Standards to Maintain Consistency Where Possible
![Page 6: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/6.jpg)
API WIWC TG-5
RP 16ST Review Priority
• Well Control Equipment Operating Systems (Pumps & Accumulators)
• Establish Basis for Maximum Ram Actuation Time (Response Time)
• Align with Spec 16D (where possible)
![Page 7: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/7.jpg)
API WIWC TG-5
RP 16ST Review Priority• Conducted Preliminary Testing of
Hydraulic Power Fluids at Various Temperatures to Establish Basis for Maximum Ram Actuation Times: February 6-7, 2013 – 95VI ISO 46 AW August 27-28, 2013 – ISO 10 Syn.
![Page 8: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/8.jpg)
API WIWC TG-5
![Page 9: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/9.jpg)
API WIWC TG-5
RP 16ST Review Priority• January 8, 2014 TG Meeting• Discussed Test Results for CT Rams• Proposal for CT SBR is 10-Seconds• Proposal for all Other Rams in CT
Stack is 30-Seconds.
![Page 10: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/10.jpg)
API WIWC TG-5
RP 16ST Review Priority• May 14, 2014 TG Meeting
• Rewriting RP Sections to Require “Emergency” SBR for All CT Pressure Categories
![Page 11: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/11.jpg)
API WIWC TG-5
RP 16ST Review Priority• May 14, 2014 TG Meeting
• Rewriting RP Accumulator Design Sections to More Closely Align With API Spec 16D
![Page 12: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/12.jpg)
API WIWC TG-5
RP 16ST Review Priority
• Upon Final Ballot Resolution of API Spec 16C, Revise RP 16ST Sections Related to Well Control Choke and Kill Lines
![Page 13: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/13.jpg)
API WIWC TG-5
RP 16ST Review Priority
• Well Control Equipment Repair & Remanufacture Issues (small rams)
• Reference STD 16AR (if possible, or)• Establish Recommendations Within
RP 16ST Consistent with STD 16 AR
![Page 14: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/14.jpg)
API WIWC TG-5
RP 16ST Review Priority
• Conducting Line-By-Line Review of Remainder of RP 16ST to Correct Typos, Reconfirm Value of Standards and Clarify Performance Expectations
![Page 15: API WIWC TG-5 Well Intervention Well Control Task Group Winter Conference Update Alex Sas-Jaworsky P.E Chairman](https://reader035.vdocument.in/reader035/viewer/2022062422/56649f355503460f94c53e5c/html5/thumbnails/15.jpg)
API WIWC TG-5
RP 16ST Review Priority
• Request That Current Edition of API RP 16ST be Reaffirmed for Two Years to Allow TG to Complete Critical Revisions and Submit 2nd Ed. Letter Ballot in 2nd Quarter, 2016.