apm terminals powerpoint liberia.pdf · internship programme (mol) oil jetty contingency plan...

21
Tangier, Morocco LIBERIA-UK TRADE AND INVESTMENT FORUM APM TERMINALS LIBERIA LTD George Adjei | Managing Director, APM Terminals Liberia Ltd.

Upload: others

Post on 25-Sep-2020

13 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

Tangier, Morocco

LIBERIA-UK TRADE AND INVESTMENT FORUM

APM TERMINALS LIBERIA LTD

George Adjei | Managing Director, APM Terminals Liberia Ltd.

Page 2: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

APM Terminals is part of the Transport & Logistics unit of the Maersk Group

Maersk Group Copenhagen, Denmark

• 2015 Revenue: $40.3b USD(Shipping, Energy, Ports)

• 89,000 employees in 130 countries.

APM Terminals The Hague, Netherlands

• 2015 Revenue: $4.24b USD

• 2015 container volume: 36m TEUs (Container Volumes weighted by

equity share)

• 22,000 employees, 69 countries

2

The Hague, Netherlands

Page 3: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

APM Terminals: The world’s only geographically balanced Global Terminal Network

Port and container terminal development, management and

operation, and associated inland services capabilities.

3

60 inland services companies with:140 operations

in39 countries

72 operating ports and terminals:9 new projects;16 expansion and upgrade programs

Customer base:

60 shipping

lines and leading importers and exporters

Annual container throughput:

36m TEUs (by equity-weighted volume)

22,000 employees in:69 countries 5 continents2015 Revenues of $4.24b USD

Global market share of container throughput:

5.2%in 2015

Page 4: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

Our port facilities: A balanced global network serving all major markets

Page 5: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

Port facilities: Africa-Middle East

5

Page 6: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

Current Projects

6

Monrovia

Projects under implementation

Salalah

Vado

Callao

Moin

Poti

Apapa

New Terminal Project

Terminal Expansion/Upgrade

Gothenburg

Lazaro Cardenas

Algeciras

Ningbo

Itajai

Buenos Aires

Pointe-Noire

Abidjan

Izmir

Tema

Pecém

Quetzal

Port Elizabeth, NJLos Angeles

Mobile

Page 7: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

Current Projects

New Terminal Development: (9)

• Abidjan, Ivory Coast• Izmir, Turkey• Lazaro Cardenas, Mexico• Moin, Costa Rica• Ningbo, China

7

Terminal Expansions/Upgrades: (16)

• Algeciras, Spain• Apapa, Nigeria• Buenos Aires, Argentina• Callao, Peru• Cartagena, Colombia• Gothenburg, Sweden• Itajaí, Brazil• Los Angeles

• Monrovia, Liberia• Onne, Nigeria• Pecém, Brazil• Pointe-Noire, Republic of the Congo• Poti, Georgia• Port Elizabeth, NJ• Salalah, Oman• Tema, Ghana

• Quetzal, Guatemala• Tanger-Med, Morocco• Tema, Ghana• Vado, Italy

Page 8: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

APM TERMINALS LIBERIA

8

Concession: Container Volumes (2015) :

General Cargo Volumes (2015):

Investment so far: Staff Strength

800,000mTs

100,000TEUs

25Years

US$ 100m255 permanent

300 subcontractors

Page 9: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

9

•TAXES

•ROYALTIES

•LAND LEASE FEES

MEETING ALL STATUTORY OBLIGATIONS

Page 10: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

10

Then…..

MARGINAL WHARF

Page 11: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

Now….

11

MARGINAL WHARF

Page 12: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

LANDSIDE DEVELOPMENT

Page 13: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

Newly paved and handed over

LANDSIDE DEVELOPMENT

Page 14: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

New 3-lane exit under construction

Range marker(Landside navigational aid)

One of the recently installed 30m high light masts

New Admin building under construction

Newly paved and handed over

LANDSIDE DEVELOPMENT

Page 15: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

LANDSIDE DEVELOPMENT

New Reefer area – racks being installed

Pavement works in progress

Area completely paved and in active use

Page 16: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

FREEPORT OF MONROVIA

Keeping our promise…

Page 17: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

COLLABORATION WITH GOL

NAVIGATIONAL AIDS – FREEPORT (NPA)

INTERNSHIP PROGRAMME (MOL)

OIL JETTY CONTINGENCY PLAN (LPRC)

INLAND INFRASTRUCTURE – GANTA DRY PORT

• TARGET MARKET – NORTHERN LIBERIA, SOUTH EAST GUINEA

• LEVERAGE PROXIMITY OF MONROVIA PORT TO THE NZEREKORE AREA

• GOOD ACCESS ROADS

Page 18: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

APMT SUPPORT

TRADE FACILITATION : US$ 500,000 (LRA SUPPORT - 2015)

CSR : EDUCATIONAL ASSISTANCE (2015)

8 SCHOOLS WITHIN DISTRICT 13

ELEMENTARY, JUNIOR HIGH, VOCATIONAL SCHOOLS

APPROX. 400 STUDENTS

Page 19: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

FIGHT AGAINST EBOLA

19

Setup hand washing and temperature check stations

Ebola awareness campaign

Funded the construction of a 100 bed Ebola Treatment Center

Fully operational throughout the Ebola epidemic

Zero case of Ebola in the Port

Page 20: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

• GREAT SUPPORT FROM THE VARIOUS GOVERNMENT

MINISTRIES AND AGENCIES

LIBERIA REVENUE AUTHORITY

MINISTRY OF COMMERCE

OFFICE OF THE PRESIDENT

NATIONAL PORT AUTHORITY

20

GOL SUPPORT

Page 21: APM Terminals PowerPoint Liberia.pdf · internship programme (mol) oil jetty contingency plan (lprc) inland infrastructure –ganta dry port • target market –northern liberia,

www.apmterminals.com