apnic update - afrinic 6 · 03/05/2007  · apnic update afrinic 6 abuja, nigeria may 2007. 2 apnic...

23
1 APNIC Update AfriNIC 6 Abuja, Nigeria May 2007

Upload: others

Post on 29-Sep-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

1

APNIC Update

AfriNIC 6Abuja, Nigeria

May 2007

Page 2: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

2

APNIC Survey 2007

Page 3: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

3

APNIC Surveys

• Three surveys previously…– Members and other stakeholders– Conducted independently (KPMG)– Guaranteed confidentiality– Face-face, written and online response

• Analysis of past results (KPMG)– 90% of items actioned (39% completed)

• Fourth survey – 2007– Launched November 2006– Published March 2007

Page 4: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

4

All surveys

0

50

100

150

200

250

300

350

1999 2001 2004 2007

0

5

10

15

20

25

30

35

Responses

Economies

Page 5: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

5

Page 6: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

6

Survey 2007 – Membership category

Associate

20

Very Small

44

Small

92

Medium

66

Large

25

Very Large

9

Extra Large

9

Non-member

45

N/A

5

Page 7: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

7

Survey 2007 – Membership duration

23

0-1

59

1-5

136

5-10

82

10+

16

Page 8: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

8

Part 1 – Analysis of APNIC performance

6.06

6.196.35

6.75

6.78

6.80

6.82

6.86

6.99

7.06

7.07

7.147.18

7.19

7.33

7.36

7.36

7.37

7.39

7.46

7.47

7.47

7.517.53

7.56

7.57

7.60

7.71

7.76

7.79

7.87

7.91

7.91

7.917.94

7.95

7.98

8.05

8.06

8.09

8.17

8.27

8.45

7.03

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

1.34

1.3

1.401.11

1.5

1.2

1.6

1.12

1.29

1.31

1.9

1.18

1.4

1.271.30

1.19

1.26

1.25

1.20

1.7

1.28

1.39

1.13

1.14

1.171.35

1.33

1.37

1.23

1.42

1.43

1.22

1.16

1.36

1.1

1.211.8

1.32

1.41

1.15

1.10

1.38

1.24

1.44

Page 9: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

9

Part 1 – Top 101. Support for DNS root server operations2. Statistics and other reports3. Support for Internet development4. Email is an effective and efficient way to contact APNIC5. APNIC whois database quality, usability and reliability6. APNIC servers and services maintenance and

availability7. Technical content in APNIC Open Policy Meetings8. The APNIC helpdesk service quality9. APNIC use of email and mailing lists10.Overall services provided are satisfactory

Page 10: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

10

Part 1 – Low 1035.Policy development process is fair and accessible36.Policy documents are easy to access and understand37.Phone (VoIP) is an effective way to contact APNIC38.Obtaining IPv4, IPv6 or ASN is easy and straightforward39.Value members get from APNIC justifies the cost40.Online eLearning is readily available41.Phone (PSTN) is an effective way to contact APNIC42.The NRO and ASO are well understood43.APNIC training is easy to attend44.Open Policy Meetings are affordable and accessible to

attend in person

Page 11: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

11

Part 2 – Allocation of resources

2.234

2.468

2.873

11.842

12.329

17.206

17.278

17.389

17.623

18.617

21.307

21.415

22.222

22.962

23.801

24.085

26.959

17.785

0.000 5.000 10.000 15.000 20.000 25.000 30.000

2.3.6

2.2.6

2.1.6

2.2.2

2.1.5

2.3.4

2.1.2

2.3.2

2.2.3

2.3.3

2.3.5

2.1.4

2.2.1

2.1.1

2.2.5

2.2.4

2.1.3

2.3.1

Page 12: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

12

Part 2 – Top 101. Technical research and development activities2. Streamline resource requests and allocation process3. Increase accessibility of APNIC meetings and policy

processes4. Represent the needs of the ISP community to

governments and regulators5. Expand training activities in scope, geographical

coverage and online options.6. Improve the APNIC website7. Support ISP education in the AP region8. Deploy more DNS root servers in the Asia Pacific region9. Resource certification to support better routing security10.Expand external communication and outreach activities

Page 13: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

13

Average ratings by Member category

6

6.5

7

7.5

8

8.5

9

Ass

ociat

e

Ver

y Sm

all

Sm

all

Med

ium

Large

Ver

y Lar

ge

Ext

ra L

arge

Non-m

ember N

/A

Page 14: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

14

Average Ratings by Member duration

6.6

6.8

7

7.2

7.4

7.6

7.8

8

8.2

– 0-1 1-5 5-10 10+

Page 15: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

15

APNIC surveys

• For more informationhttp://www.apnic.net/survey

Page 16: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

16

Other developments…

Page 17: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

17

Other developments

• Resource certification R&D• MyAPNIC• Public statistics (O3)• ICONS• ARMS• Content Management System• Human Resources Information System

• … and much much more

Page 18: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

18

http://icons.afrinic.net

Page 19: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

19

APNIC meetings

• APNIC 24, SANOG 10– New Delhi, India– 29 August - 7 September 2007

• APNIC 25, APRICOT 2008– Taipei, Taiwan– 25 - 29 February 2008

• All welcome!!!http://www.apnic.net/meetings

Page 20: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

20

Finally, a word from our sponsors…

Page 21: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

2121

Page 22: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

22

ecoAPNIC…

• A staff-driven project aimed at reducing the“ecological footprint” of APNIC operations

– Recycling

– Paper reduction

– Reduce energy consumption and waste

– Look at transportation and travel

– Monitoring and reporting

– http://www.apnic.net/ecoapnic

Page 23: APNIC Update - AfriNIC 6 · 03/05/2007  · APNIC Update AfriNIC 6 Abuja, Nigeria May 2007. 2 APNIC Survey 2007. 3 APNIC Surveys • Three surveys previously

Thank You

This presentation brought toyou by ecoAPNIC, using100% recycled electrons.