Page 1: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

Appalachia StorageHub Conference

PANEL DISCUSSION:

State of development,unique aspects,multiple storageoptions?

Page 2: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves
Page 3: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

AECOMAppalachian Oil & Gas Infrastructure3,600 Environmental & Engineering Staff throughout the Appalachian Basin

Shell,

Falcon Ethane100-mile Pipeline

WV, OH, PA

Environmental, Engineering, Environmental Inspection

PennEast128-mile NaturalGas Pipeline

PA

Routing Studies, FERC, Cultural Resources, Biological Surveys, Engineering

Williams,

Atlantic Sunrise197-mile Pipeline

PA, MD, VA,NC, SC

Cultural Resources, Geotechnical Engineering, Environmental Inspection

Kinder Morgan,Utopia Pipeline

Under theDetroit River

Environmental, HDD, Geotechnical Engineering

Page 4: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

Shell Pipeline Company LP 4Date Month 2016Footer

To change the picture, delete thesample picture. Then click the

insert picture icon in the middle ofthe picture box. If you paste a

picture into the empty picture box,you will need to use the Reset

Slide command to see the picturecut-out.

Falcon Ethane Pipeline System

Page 5: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

December 2018 5

Page 6: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

Project Timeline

2017 2018 2019 2020

• Wetland & CulturalSurvey

• T & E Studies

• Civil Survey

• Engagements

• Route Acquisition

• Pipe Delivery

• ROW preparation

• Mainline Construction/ HDDs

• Facility Construction

• Engagements /CommunityFeedbackMechanism

• Restoration

• FacilityConstruction

• Hydro-testing

• Commissioningof the line

• Final Restoration

• Engagements

• PermitSubmissions

• Engagements

• ContractorSelection

• Secured Permits

December 2018 6

Page 7: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

RESTRICTED

February 2019

Page 8: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

Enterprise FacilityOperations and Maintenance

Page 9: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

Key ProjectsOperations & Maintenance

60 yearsexecuted 20million+ work-hours providingmaintenance andcapital projects

BP Husky Toledo RefineryToledo, OH

26 years ,12 MM+work hoursprovidingmaintenance andmodifications,turnarounds,outages andcapital projects

Multiple Locations, USA

Light ends unitproducing fourproduct streamsfrom fivesources on acontinuous basis

ExxonMobil Billings SLEB ProjectBillings, MT

DuPont Chemical Plant Site Maintenance Services

$100Mmaintenanceservicescontract

Shell SarniaSarnia, Ontario, Canada

AECOM’s extensive O&M experience in the power, oil, gas and chemical business sectors give us a unique perspective.

Page 10: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

Main mechanicalmaintenancecontract

Shell’s PetrochemicalPlant underconstruction inBeaver County, PA

AECOM has been involved in theenvironmental studies and permitting

for Shell’s Petrochemical Plantfrom inception.

As well as the environmental permitting andengineering design for the pipeline

that will feed the plant.

Page 11: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

DOEStrategic PetroleumReserve (SPR) LifeExtension Program

40+ years of service to theDOE SPR

- Overall project management- Conceptual and detail design- Permitting- Procurement support

Construction management

Jointly these facilities store between500 and 600 million barrels of crudeoil belonging to the DOE with anavailable capacity of 750 millionbarrels:- Grassroots Crude Oil Storage

Facility-Big Hill, Texas;- Bryan Mound, Texas;- Big Hill site, Texas;- West Hackberry, Louisiana; and- Bayou Choctaw, Louisiana.

AECOM’s services focus on SPR’s Life Extension Program, whichextends the life of DOE’s crude oil storage facilities to the year 2025.

- General architectural/engineering services including the design andinspection services required for the construction of modifications, additionsand expansion to the SPR facilities and connecting pipelines.

- An additional benefit of the Life Extension Program is to simplify andstandardize the configuration and operation of the various SPR crude oilstorage sites.

- This greatly reduces maintenance and operating costs over the life ofthe facilities.

- AECOM provided engineering design services which included:- 40 miles of 36-inch crude oil pipelines- 22 miles of 48-inch brine disposal pipelines (from site to Gulf of Mexico)- 6 miles of 36-inch raw water pipelines- Pump stations: 1500 Hp turbine pumps in series with 3500 HP pumps

Page 12: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

Innovation

Page 13: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

Technological Advances

Page 14: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

Over 400 dedicated GISstaff globally

140 Certified GISPs• 60 GIS professionals in

Mid-Atlantic region

Esri Silver Business PartnerGlobal ELA holderEsri-certified staff

Geohazard: Large-scale Monitoring for Pipelines

Slope Movement• Common geological hazard

to operating pipelines• Detected remotely and efficiently

via aerial LiDAR imagery

LiDAR data processed in aGeographic Information System (GIS)• Displays past earth movement• Run predictive analyses

Geotechnical specialists use this data to• Focus field reconnaissance• Modify monitoring intervals• Design mitigation efforts

Page 15: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

Innovation

Infield Technology Seamless end-to-end process that involves allowing direct access to design whereFM shapes the design through data analysis.

RFID TechnologyThrough barcodes or QR codes to track assets. The use of tablets is common place with the AECOMworld for the use of many functions including asset tagging, but far more than that, direct photo linksback to the original specification documents for handover and commissioning of equipment.

Mobile Asset StrategyNew technologies must be deployed with the mobile worker in mind. This is consistent with our“anytime, anywhere, any device” concept going forward.

Readiness ReviewProgram

Used to deliver projects successfully by reducing duration and cost.

Quality ProgramsReduction or elimination in weld repairs and rejects. With World Class being considered 3%we’ve been able to demonstrate, sustain and bring value (savings & schedule time) to our clientswith a 0.53% over the past five years.

UAV To support inspection of grounds, property, mechanical equipment, piping and electrical systems.

Page 16: Appalachia Storage Hub Conference · Shell Pipeline Company LP Footer Date Month 2016 4 To change the picture, delete the ... Infield Technology Seamless end-to-end process that involves

Thank you.