APPENDICES
APPENDIX 1 Member List of the Survey Team
Ap 1 - 1
(1) Preparatory Survey Team
Name Assignment Authority/Firm
Mr. A. Kaneko Team Leader JICA Chief Representative /JICA Sri Lanka Office
Mr. T. Okawa Project Coordinator
JICA Assistant Director for Transportation and ICT Division 1 /Transport and ITC Group /Economic Infrastructure Department
Dr. H. Yoneyama Chief Consultant
/Bridge Planner Oriental Consultants
Mr. H. Takaura Bridge designer
/Construction PlanningJapan Bridge Structure Institute
Mr. H. Tanaka Environmental Analyst Japan Bridge Structure Institute (Lantech)
Mr. T. Nakajima River / Hydrological
Analyst Oriental Consultants
Mr. H. Kobayashi Topographic Surveyor
(Geology) Oriental Consultants
Mr. H. Okita Procurement planning
/Cost estimator Oriental Consultants
Mr. H. Morimoto Coordinator Oriental Consultants
(2) Draft Report Explanation Team
Name Assignment Authority/Firm
Mr. T. Okawa Team Leader
JICA Assistant Director for Transportation and ICT Division 1 /Transport and ITC Group /Economic Infrastructure Department
Mr. H. Takaura Bridge designer
/Construction PlanningJapan Bridge Structure Institute
【Appendix 1: Member List of the Survey Team】
APPENDIX 2 Survey Schedule
Ap. 2 - 1
Preparatory Survey Field Survey Schedule
Team LeaderProject
CoordinatorChief Consultant
/Road Traffic PlannerBridge Designer /Construction Planner
Environment and SocialConsideration Analyst
Natural ConditionSurveyor I (Weather
/Hydrology)
Natural ConditionSurveyor I (Topography
/Geology)
Procurement Planner/Cost Estimator
Coordinator
Mr. A. Kaneko Mr. T. Okawa Dr. H. Yoneyama Mr. H. Takaura Mr. H. Tanaka T. Nakajima H. Kobayashi H. Okita H. Morimoto
1 Feb. 26 Thu
2 27 Fri
3 28 Sat
4 Mar. 1 Sun Narita→Colombo
5 2 Mon
6 3 Tue
7 4 Wed Explanation on Tender Narita→Colombo
8 5 Thu
9 6 Fri
10 7 Sat Narita→Colombo
11 8 Sun
12 9 Mon
13 10 Tue Colombo→Narita
14 11 Wed
15 12 Thu
16 13 Fri
17 14 Sat
18 15 Sun
19 16 Mon
20 17 Tue
21 18 Wed
22 19 Thu
23 20 Fri
24 21 Sat
25 22 Sun Narita→Colombo
26 23 Mon
27 24 Tue Colombo→Narita Colombo→Narita
28 25 Wed
29 26 Thu
30 27 Fri Colombo→Narita Colombo→Narita Colombo→Narita
31 28 Sat
32 29 Sun
33 30 Mon Colombo→Narita
34 31 Tue
35 Apr. 1 Wed
36 2 Thu
46 12 Sun
47 13 Mon
48 14 Tue
49 15 Wed
50 16 Thu
51 17 Fri
52 18 Sat
53 19 Sun
54 20 Mon Colombo→Narita
Reception of Deliverables
Confirmation of thedeliverables
M/M Sign M/M Sign, Discussion among Study Team
Preparation of Reports on the Result of Site SurveyTechnical Study, Data Collection and Arrangement
Coordination betweenthe Study Team in Japan
and MOH・RDA in SriLanka
Monitoring onSubcontractors work
Study on procurement ofMaterials and Equipmentfrom the third Country
Report to JICA on Tender, Discussion among Study Team
~
Reporting to ICA and Japanese Embassy in Sri Lanka
Technical Study, DataCollection andArrangement
Technical Study, DataCollection andArrangement
Handover of Monitoringwork on Subcontractors
Technical Study, DataCollection andArrangement
Handover of Monitoringwork on Subcontractors
Discussion among Study Team Preparation for the Report on Tender result
Discussion among the Team, Preparation for Site Survey
Site Survey for 5 Bridges(A Team)
Site Survey for 5 Bridges(B Team)
Site Survey for 5 Bridges(C Team)
Discussion with RDA Discussion with RDA
Preparation of Minutes of Meeting Tender Closing/ Evaluation
Site Survey for 5 Bridges(Discussion with Baticaroa RDA)
Preparation forSub-contract
Discussion with MOH and RDA
Discussion with RDA Request of Tender
No. Date
Courtesy Call to JICA、MOH、RDA and Explanation of IC/R
Narita →Colombo
【Appendix 2: Survey Schedule】
APPENDIX 3 List of Parties Concerned in the Recipient Country
Ap. 3 - 1
(1) Road Development Authority(RDA)
Mr. R.W.R Pemasiri General Manager, Road Development Authority(RDA)
Mr. H.M.K.G.G Bandara Director, Planning Division, Road Development Authority (RDA)
Ms. Namalie Siyambalapitiya Deputy Director, Planning Division, Road Development Authority (RDA)
Mr. Gayashantea Deputy Director, Planning Division, Road Development Authority (RDA)
Ms. Anoja Silva Engineer, Planning Division, Road Development Authority (RDA)
Mr. Rohitha Swarna Director, Engineering Service, Road Development Authority (RDA)
Mr. T. Vasanthakumar Senior Design Engineer, Bridge Desing Division, Road Development Authority (RDA)
Mr. Gayashingha Environment and Resettlement Division, Road Development Authority (RDA)
Mr. S. Chandrapalan Project Director, Road Project Preparatory Facility, Road Development Authority (RDA)
Mr. K. Ekanayake Deputy Project Director, ADB Funded Projects Division, Road Development Authority (RDA)
Mr. Tharmakulasingam Deputy Director, ADB Funded Projects Division, Road Development Authority (RDA)
(2) RDA Batticaloa
Mr. Y. Dharmaratnam Provincial Director (PD), Road Development Authority (RDA) Batticaloa Office
Mr. T. Mohanathas Chief Engineer, Road Development Authority (RDA) Batticaloa Office
(3) Ministry of Highways and Road Development
Mr. N. J. Baranasuriya Additional Secretary (Engineering), Ministry of Highways and Road Development
【Appendix 3: List of Parties Concerned in the Recipient Country】
Ap. 3 - 2
(4) Ministry of Finance and Planning
Ms. D.C.W. Hapugoda Director-Japan Division, Department of External Resources, Ministry of Finance and Planning
Ms. Ajitha Batagoda Assistant Director-Japan Division, Department of External Resources, Ministry of Finance and Planning
(5) Ministry of Nation Building and Estate Infrastructure Development
Mr. M. S. Jayasinghe Chairman, Ministry of Nation Building and Estate Infrastructure Development
Mr. K. Sivanathan Project Director, District Rehabilitation and Reconstruction Secretariat, Ministry of Nation Building and Estate Infrastructure Development, Batticaloa
(6) Batticaloa District Secretariat
Mrs. R. Kethwswaran Acting Government Agent, Batticaloa District Secretariat
(7) Batticaloa Police
Mr. Keerthipala ASP, Batticaloa (Police)
(8) FSD (Foundation Suisse de Deminage)
Mr. Marc Farineau Officer, FSD (Foundation Suisse de Deminage) Colombo
Mr. Raju Pillai Chief Technical Officer, FSD (Foundation Suisse de Deminage) Batticaloa
(9) Local Contractor
Mr. M. Selvarajah Managing Director, SSM Development Consortium
Ap. 3 - 3
(10) Japanese Contractor in Sri Lanka
Masahiro Tatsumi General Manager, Sri Lanka Office, Wakachiku Construction Co. Lted
Masayuki Himeno Deputy Director, International Division, Tokyo Head Office, Wakachiku Construction Co. Lted
(11) Consultants for Other Doners
Mr. Colin Aspinall
Team Leader, Component C-Road Rehabilitation & Reconstruction – South and South East Region, ADB-EU Funded Tsunami Affected Areas Rebuilding Project, Pacific
Mr. Alex Chapla Team Leader – National Highways, ADB Loan 2080 – SRI: Feasibility Study and Detailed Engineering Design of Provincial Roads, Cardno (Australia)
Mr. Graham Johnson Team Leader – Detailed Design, ADB Loan 2080 – SRI: Feasibility Study and Detailed Engineering Design of Provincial Roads, Cardno (Australia)
(12) Embassy of Japan
Mr. Masayuki Taga Counsellor, Head of the Economic Cooperation Section, Embassy of Japan
Mr. Katsuho Hayashi Second Secretary, Economic Cooperation, Embassy of Japan
(13) JICASri Lanka Office
Mr. Atsushi Kaneko Chief Representative, JICA Sri Lanka Office (The Preparatory Survey from Feburuary through April)
Mr. Akira Shimura Chief Representative, JICA Sri Lanka Office (The Draft Report Explanation in September)
Mr. Masanari Yanagiuchi Representative, JICA Sri Lanka Office
Mr. Kosuke Odawara Representative, JICA Sri Lanka Office
Mr. Gen Hashimoto Assistant Resident Representative, JICA Sri Lanka Office
Mr. Takaoki Ichioka JICA Expert, Planning Division, Road Development Authority (RDA)
APPENDIX 4 Minutes of Discussion
Ap. 4 - 1
(1) Preparatory Survey Field Survey (march 9, 2009)
【Appendix 4: Minutes of Discussion】
Ap. 4 - 2
Ap. 4 - 3
Ap. 4 - 4
Ap. 4 - 5
Ap. 4 - 6
Ap. 4 - 7
Ap. 4 - 8
Ap. 4 - 9
Ap. 4 - 10
Ap. 4 - 11
Ap. 4 - 12
Ap. 4 - 13
Ap. 4 - 14
Ap. 4 - 15
Ap. 4 - 16
Ap. 4 - 17
Ap. 4 - 18
Ap. 4 - 19
(2) Draft Report Explanation(September 17, 2009)
Ap. 4 - 20
Ap. 4 - 21
Ap. 4 - 22
CONFIDENTIAL
ANNEX-1
Project Cost to be Borne by Japan’s Grant Aid
Components Cost (Million Yen)
Construction Reconstruction of 5 Bridges
Substructures Superstructures Revetments Approach Roads
Confidential
Detailed Design and Construction Supervision Confidential Total Confidential
Ap. 4 - 23
Ap. 4 - 24
Ap. 4 - 25
Ap. 4 - 26
Ap. 4 - 27
Ap. 4 - 28
Ap. 4 - 29