Appendix 4Technical Design Parameters and Drawings
CO2 RECOVERY STUDYPrepared for: Petroleum Technology Alliance Canada (PTAC) Project 017798, January, 2008 App 4-1 Chemicals and Petroleum
TITLE
DATE SCALEDEC 2007 NTS
DOCUMENT NO.
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
RWSA DM
017798-49-01-BFD-001 Rev.A
BLOCK FLOW DIAGRAMCASE 1
DESIGNED BY CHECKED BY APPROVED
SYNTHESIS GAS
FROM PETROCANADA SMR/HTS PHASE 1
PRELIMINARY DRAWING
HYDROGEN RICH GAS
TO PETROCANADA PSA PHASE 1 FUEL GAS
CO2 TO INJECTION
HP STEAM
LP STEAM
ABSORPTION REGENERATION
DRIVER9,505 kW
LP COMPRESSOR2 STAGES
HP COMPRESSOR3 STAGES
DEHYDRATION
249,000 Sm3/h114 t/h
2070 kPag38 ºC
CO2: 18% (vol.)H2: 74% (vol.)
MAKEUP WATER
208,000 Sm3/h36.9 t/h
2060 kPag45 ºC
3.7 t/h
CO2: 1.5% (vol.)H2: 88.5% (vol.)
46,400 Sm3/h81 t/h
26 kPag50 ºC
CO2: 89.3% (vol.)
1755 kPag
78.2 t/h6150 kPag
399 ºC
281 kPag142 ºC
19,075 kPag60 ºC
CO2: 99.5% (vol.)
41,770 Sm3/h77.3 t/h
28 Sm3/h21 kg/h
1848 t/dPIPELINE6", 1.5 km
POWER
DRIVER16,780 kW
LP COMPRESSOR2 STAGES
HP COMPRESSOR3 STAGES
CO2: 99.4% (vol.)
1755 kPag
19,290 kPag60 ºC
CO2: 99.4% (vol.) 3480 t/d
PIPELINE6", 1.5 km
78,400 Sm3/h145 t/h
16 kPag17 ºC
18,616 kPag396 t/h9504 t/d
SYNTHESIS GAS
HYDROGEN RICH GAS
TO SHELL PSA EXISTING
FUEL GAS
HP STEAM
LP STEAM
ABSORPTION
REGENERATION
DRIVER21,480 kW
LP COMPRESSOR2 STAGES
HP COMPRESSOR3 STAGES
DEHYDRATION
324,000 Sm3/h149 t/h
2070 kPag38 ºC
CO2: 18% (vol.)H2: 74% (vol.)
MAKEUP WATER
269,000 Sm3/h47 t/h
2060 kPag45 ºC
8.2 t/h
CO2: 1.5% (vol.)H2: 88.5% (vol.)
104,500 Sm3/h182 t/h
26 kPag50 ºC
CO2: 89.3% (vol.)
1755 kPag
177 t/h6150 kPag
399 ºC
281 kPag142 ºC
19,829 kPag60 ºC
CO2: 99.5% (vol.)
94,100 Sm3/h174 t/h
62 Sm3/h46 kg/h
4176 t/dPIPELINE8", 8 km
SYNTHESIS GAS
HYDROGEN RICH GAS
TO SHELL PSA PHASE 1
237,000 Sm3/h109 t/h
2070 kPag38 ºC
197,000 Sm3/h35 t/h
2060 kPag45 ºC
ABSORPTION
FROM SHELL SMR/HTS EXISTING
FROM SHELL SMR/HTS PHASE 1
GASIFIER OFF GAS
FROM NORTH WEST UPGRADER
BOILER60.2 MW
BOILER136 MW
FUEL GAS
FUEL GAS
8,080 Sm3/h6 t/h
18,250 Sm3/h13.6 t/h
WATER
WATER263 kg/h
117 kg/h
PETROCANADA SITE
NORTH WEST UPGRADING SITE
SHELL SITE
COMMON DELIVERY POINT
TITLE
DATE SCALEDEC 2007 NTS
DOCUMENT NO.
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
RWSA DM
017798-49-02-BFD-001 Rev.A
BLOCK FLOW DIAGRAMCASE 2
DESIGNED BY CHECKED BY APPROVED
SYNTHESIS GAS
FROM PETROCANADA SMR/HTS PHASE 1
PRELIMINARY DRAWING
HYDROGEN RICH GAS
TO PETROCANADA PSA PHASE 1
FUEL GAS
CO2 TO INJECTIONHP STEAM
LP STEAM
ABSORPTION REGENERATION
DRIVER5,506 kW
LP COMPRESSOR2 STAGES
HP COMPRESSOR3 STAGES
DEHYDRATION
249,000 Sm3/h114 t/h
2070 kPag38 ºC
CO2: 18% (vol.)H2: 74% (vol.)
MAKEUP WATER
208,000 Sm3/h36.9 t/h
2060 kPag45 ºC
3.7 t/h
CO2: 1.5% (vol.)H2: 88.5% (vol.)
46,400 Sm3/h81 t/h
26 kPag50 ºC
CO2: 89.3% (vol.)
66 t/h6150 kPag
399 ºC
1052 kPag223 ºC
135,900 Sm3/h251.4 t/h
90 Sm3/h67 kg/h
PIPELINE10", 1.5 km
POWER
DRIVER16,780 kW
LP COMPRESSOR2 STAGES
HP COMPRESSOR3 STAGES
CO2: 99.4% (vol.)
1755 kPag
19,290 kPag60 ºC
CO2: 99.4% (vol.) 3480 t/d
PIPELINE6", 1.5 km
78,400 Sm3/h145 t/h
16 kPag17 ºC
18,616 kPag396 t/h9504 t/d
SYNTHESIS GAS
HYDROGEN RICH GAS
TO SHELL PSA EXISTING
HP STEAM
LP STEAM
ABSORPTION
REGENERATION
DRIVER13,620 kW
LP COMPRESSOR2 STAGES
324,000 Sm3/h149 t/h
2070 kPag38 ºC
CO2: 18% (vol.)H2: 74% (vol.)
MAKEUP WATER
269,000 Sm3/h47 t/h
2060 kPag45 ºC
8.2 t/h
CO2: 1.5% (vol.)H2: 88.5% (vol.)
104,500 Sm3/h182 t/h
26 kPag50 ºC
CO2: 89.3% (vol.)
151 t/h6150 kPag
399 ºC
866 kPag208 ºC
1749 kPag43 ºC
CO2: 99% (vol.)
PIPELINE18", 8 km
SYNTHESIS GAS
HYDROGEN RICH GAS
TO SHELL PSA PHASE 1
237,000 Sm3/h109 t/h
2070 kPag38 ºC
197,000 Sm3/h35 t/h
2060 kPag45 ºC
ABSORPTION
FROM SHELL SMR/HTS EXISTING
FROM SHELL SMR/HTS PHASE 1
GASIFIER OFF GAS
FROM NORTH WEST UPGRADER
BOILER51 MW
BOILER116.4 MW
FUEL GAS
FUEL GAS
6845 Sm3/h5.1 t/h
15615 Sm3/h11.7 t/h
WATER445 kg/h
PETROCANADA SITE
NORTH WEST UPGRADING SITE
SHELL SITE
COMMON DELIVERY POINT
DRIVER15,200 kW
POWER
1369 kPag43 ºC
CO2: 98.9% (vol.)
TITLE
DATE SCALEDEC 2007 NTS
017798-49-03-BFD-001 Rev.A
BLOCK FLOW DIAGRAMCASE 3
DESIGNED BY CHECKED BY APPROVED
DOCUMENT NO.
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
RWSA DM
SYNTHESIS GAS
FROM PETROCANADA SMR/HTS PHASE 1
PRELIMINARY DRAWING
HYDROGEN RICH GAS
TO PETROCANADA PSA PHASE 1 FUEL GAS
CO2 TO INJECTION
HP STEAM
LP STEAM
ABSORPTION REGENERATION
DRIVER9,420 kW
LP COMPRESSOR2 STAGES
HP COMPRESSOR2 STAGES
DEHYDRATION
249,000 Sm3/h114 t/h
2070 kPag38 ºC
CO2: 18% (vol.)H2: 74% (vol.)
MAKEUP WATER
208,000 Sm3/h36.9 t/h
2060 kPag45 ºC
3.7 t/h
CO2: 1.5% (vol.)H2: 88.5% (vol.)
46,400 Sm3/h81 t/h
26 kPag50 ºC
CO2: 89.3% (vol.)
1749 kPag
77.5 t/h6150 kPag
399 ºC
281 kPag142 ºC
13,610 kPag60 ºC
CO2: 99.5% (vol.)
41,770 Sm3/h77.3 t/h
28 Sm3/h21 kg/h
1848 t/d
PIPELINE6", 1.5 km
POWER
DRIVER16,780 kW
LP COMPRESSOR2 STAGES
HP COMPRESSOR3 STAGES
CO2: 99.4% (vol.)
1755 kPag
13,870 kPag60 ºC
CO2: 99.4% (vol.) 3480 t/d
PIPELINE6", 1.5 km
78,400 Sm3/h145 t/h
16 kPag17 ºC
18,616 kPag396 t/h9504 t/d
SYNTHESIS GAS
HYDROGEN RICH GAS
TO SHELL PSA EXISTING
FUEL GAS
HP STEAM
LP STEAM
ABSORPTION
REGENERATION
DRIVER21,440 kW
LP COMPRESSOR2 STAGES
HP COMPRESSOR2 STAGES
DEHYDRATION
324,000 Sm3/h149 t/h
2070 kPag38 ºC
CO2: 18% (vol.)H2: 74% (vol.)
MAKEUP WATER
269,000 Sm3/h47 t/h
2060 kPag45 ºC
8.2 t/h
CO2: 1.5% (vol.)H2: 88.5% (vol.)
104,500 Sm3/h182 t/h
26 kPag50 ºC
CO2: 89.3% (vol.)
1749 kPag
176.4 t/h6150 kPag
399 ºC
281 kPag142 ºC
14,470 kPag60 ºC
CO2: 99.5% (vol.)
94,100 Sm3/h174 t/h
62 Sm3/h46 kg/h
4176 t/d
PIPELINE8", 8 km
SYNTHESIS GAS
HYDROGEN RICH GAS
TO SHELL PSA PHASE 1
237,000 Sm3/h109 t/h
2070 kPag38 ºC
197,000 Sm3/h35 t/h
2060 kPag45 ºC
ABSORPTION
FROM SHELL SMR/HTS EXISTING
FROM SHELL SMR/HTS PHASE 1
GASIFIER OFF GAS
FROM NORTH WEST UPGRADER
BOILER59.6 MW
BOILER135.7 MW
FUEL GAS
FUEL GAS
8000 Sm3/h6 t/h
18,210 Sm3/h13.6 t/h
WATER
WATER263 kg/h
117 kg/h
PETROCANADA SITE
NORTH WEST UPGRADING SITE
SHELL SITE
COMMON DELIVERY POINT
POWER1,443 kW
12,980 kPag
TITLE
DATE SCALEDEC 2007 NTS
DOCUMENT NO.
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
RWSA DM
017798-49-04-BFD-001 Rev.A
BLOCK FLOW DIAGRAMCASE 4
DESIGNED BY CHECKED BY APPROVED
SYNTHESIS GAS
FROM PETROCANADA SMR/HTS PHASE 1
PRELIMINARY DRAWING
HYDROGEN RICH GAS
TO PETROCANADA PSA PHASE 1
FUEL GAS
CO2 TO INJECTION
HP STEAM
LP STEAM
ABSORPTION
REGENERATION
DRIVER30,880 kW
LP COMPRESSOR2 STAGES
HP COMPRESSOR3 STAGES
DEHYDRATION
249,000 Sm3/h114 t/h
2070 kPag38 ºC
CO2: 18% (vol.)H2: 74% (vol.)
MAKEUP WATER
208,000 Sm3/h36.9 t/h
2060 kPag45 ºC
3.7 t/h
CO2: 1.5% (vol.)H2: 88.5% (vol.)
151,000 Sm3/h263 t/h
19 kPag50 ºC
CO2: 89.3% (vol.)1749 kPag
254 t/h6150 kPag
399 ºC
281 kPag142 ºC
135,900 Sm3/h251 t/h
28 Sm3/h21 kg/h
PIPELINE12", 1.5 km
POWER
DRIVER 16,780 kW
LP COMPRESSOR2 STAGES
HP COMPRESSOR3 STAGES
CO2: 99.4% (vol.)
1755 kPag
19,290 kPag60 ºC
CO2: 99.4% (vol.)
6024 t/dCO2: 99.5% (VOL.)
PIPELINE6", 1.5 km
78,400 Sm3/h145 t/h
16 kPag17 ºC
18,616 kPag396 t/h9504 t/d
SYNTHESIS GAS
HYDROGEN RICH GAS
TO SHELL PSA EXISTING
ABSORPTION
324,000 Sm3/h149 t/h
2070 kPag38 ºC
CO2: 18% (vol.)H2: 74% (vol.)
MAKEUP WATER
269,000 Sm3/h47 t/h
2060 kPag45 ºC
8.2 t/h
CO2: 1.5% (vol.)H2: 88.5% (vol.)
SYNTHESIS GAS
HYDROGEN RICH GAS
TO SHELL PSA PHASE 1
237,000 Sm3/h109 t/h
2070 kPag38 ºC
197,000 Sm3/h35 t/h
2060 kPag45 ºC
ABSORPTION
FROM SHELL SMR/HTS EXISTING
FROM SHELL SMR/HTS PHASE 1
GASIFIER OFF GAS
FROM NORTH WEST UPGRADER
BOILER195.5 MW
FUEL GAS
WATER382 kg/h
PETROCANADA SITE
NORTH WEST UPGRADING SITE
SHELL SITE
COMMON DELIVERY POINT
26,235 Nm3/h20 t/h
PIPELINE12", 1.5 km
RICH AMINE
LEAN AMINE
LEAN AMINE
RICH AMINE
PIPELINE20", 8 km
PIPELINE20", 8 km
3480 t/d
TITLE
DATE SCALENOV 2007 NTS
DOCUMENT NO.
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
RWSA DM
017798-49-01-PFD-001 Rev.A
CASE 1. PROCESS FLOW DIAGRAMPETROCANADA UPGRADER PHASE 1
CARBON DIOXIDE CAPTUREDESIGNED BY CHECKED BY APPROVED
002
SYNTHESIS GAS
FROM SMR/HTS PHASE 1
T-001CO2 ABSORPTION TOWER
CARBON DIOXIDE
TO COMPRESSION
PRELIMINARY DRAWING. DO NOT USE FOR CONSTRUCTION
LP STEAM
STEAM CONDENSATE
T-001
T-002REGENERATION TOWER
T-002
78.2 to/h
142 ºC
281 kPag
3
4
RETURN
1
249 kSm 3/h
38 ºC
2070 kPag
114 to/h
46.4 kSm 3/h
50 ºC
26 kPag
80.8 to/h
NOTES:1. ALL WEIGHT FLOWRATES REPRESENT ACTUAL ON STREAM RATES
HYDROGEN RICH GAS
TO PSA PHASE 1
2
208 kSm 3/h
45 ºC
2060 kPag
36.9 to/h
NN
F
EA-001
EA-002
E-001
E-002
EA-001LEAN AMINE COOLER
EA-002CONDENSER
E-001LEAN-RICH AMINE EXCHANGER
E-002REGENERATION TOWER REBOILER
P-001
P-001LEAN AMINE PUMP
V-001
V-001FLASH
002
MAKEUP WATER5
3.7 to/h
TITLE
DATE SCALENOV 2007 NTS
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
RWSA DMDOCUMENT NO.
017798-49-01-PFD-002 Rev. A
CASE 1. PROCESS FLOW DIAGRAMPETROCANADA UPGRADER PHASE 1
CARBON DIOXIDE LOW PRESSURE COMPRESSIONDESIGNED BY CHECKED BY APPROVED
001
FROM CAPTURE
CARBON DIOXIDE
HEADER
WASTE WATER
V-002ALP COMPRESSOR STAGE 1 INLET SEPARATOR
DIMENSIONS: 3048 mm ID x 3048 mm T/T
V-002BLP COMPRESSOR STAGE 2 INLET SEPARATOR
DIMENSIONS: 2286 mm ID x 2309 mm T/T
K-001ACO2 LP COMPRESSOR STAGE 1
DIFF. PRESS.: 432 kPa
K-001BCO2 LP COMPRESSOR STAGE 2
DIFF. PRESS.: 1506 kPa
EA-003ALP COMPRESSOR STAGE 1 AFTERCOOLER
DUTY: 5476 KW
EA-003BLP COMPRESSOR STAGE 2 AFTERCOOLER
DUTY: 3212 KW
PRELIMINARY DRAWING. DO NOT USE FOR CONSTRUCTION
197 ºC
450 kPag
43 ºC
179 ºC
1887 kPag
43 ºC
43 ºC
1756 kPag
HP STEAM
003
TO HIGH PRESSURE COMPRESSION
CARBON DIOXIDE
003
COMMON SHAFT WITH HIGH PRESSURE COMPRESSOR
X-001CO2 COMPRESSOR STEAM TURBINE DRIVER
RATED POWER: 9505 KW (NOTE 3)
VENDOR PACKAGE
PK-001
NN
F
43.7 kAm 3/h
50 ºC
19 kPag
80.8 to/h
NOTE 1 NOTE 1
NOTES:1. ALL DISCHARGE PRESSURES AND TEMPERATURES ARE THE ORETICAL. ACTUAL OPERATION PARAMETERS BY COMPRESSOR VENDOR2. ALL WEIGHT FLOWRATES REPRESENT ACTUAL ON STREAM RATES3. RATED POWER INCLUDES ESTIMATED 3% POWER LOSS. AC TUAL RATED POWER BY VENDOR
DRAWING # 017798-49-00-PFD-003
K-001A X-001K-001B
EA-003A EA-003B
V-002A V-002B V-002C
7
78.2 to/h
399 ºC
6149 kPag
001
LP STEAM
TO CAPTURE
4
142 ºC
281 kPag
GEAR BOX
6
PK-001CO2 COMPRESSOR PACKAGE
CAPACITY: 46500 Sm3/h
V-002CLP COMPRESSOR STAGE 2 OUTLET SEPARATOR
DIMENSIONS: 1676 mm ID x 2106 mm T/T
TITLE
DATE SCALENOV 2007 NTS RWSA DM
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
DOCUMENT NO.017798-49-01-PFD-003 Rev. A
CASE 1. PROCESS FLOW DIAGRAMPETROCANADA UPGRADER PHASE 1
CARBON DIOXIDE HIGH PRESSURE COMPRESSIONDESIGNED BY CHECKED BY APPROVED
002
FROM LOW PRESSURE COMPRESSION
CARBON DIOXIDE004
TO DEHYDRATION
CARBON DIOXIDE
WASTE WATER
V-003HP COMPRESSOR STAGE 1 OUTLET SEPARATOR
DIMENSIONS: 1372 mm ID x 2030 mm T/T
K-002ACO2 HIGH PRESSURE COMPRESSOR STAGE 1
DIFF. PRESS.: 2355 kPa
K-002BCO2 HIGH PRESSURE COMPRESSOR STAGE 2
DIFF. PRESS.: 4826 kPa
EA-004AHP COMPRESSOR STAGE 1 AFTERCOOLER
DUTY: 1846 KW
EA-004BHP COMPRESSOR STAGE 2 AFTERCOOLER
DUTY: 3191 KW
EA-004CHP COMPRESSOR STAGE 3 AFTERCOOLER
DUTY: 2297 KW
004
FROM DEHYDRATION
CARBON DIOXIDE
TO PIPELINE
CARBON DIOXIDE
K-002CCO2 HIGH PRESSURE COMPRESSOR STAGE 3
DIFF. PRESS.: 10760 kPa
PRELIMINARY DRAWING. DO NOT USE FOR CONSTRUCTION
119 ºC
4104 kPag
43 ºC
8
9
10
11
3.6 to/h
43 ºC
103 ºC
19200 kPag
77.2 to/h
60 ºC
19072 kPag
COMMON SHAFT WITH LOW PRESSURE COMPRESSOR
77.3 to/h
43 ºC
3974 kPag
HEADER
WASTE WATER
002
DRAWING # 017798-49-00-PFD-002
129 ºC
8586 kPag
77.2 to/h
48 ºC
3766 kPag
NOTES:1. ALL DISCHARGE PRESSURES AND TEMPERATURES ARE THE ORETICAL. ACTUAL OPERATION PARAMETERS BY COMPRESSOR VENDOR2. ALL WEIGHT FLOWRATES REPRESENT ACTUAL ON STREAM RATES
K-002A K-002B K-002C
V-003
EA-004A
EA-004C
43 ºC
6
EA-004B
NOTE 1 NOTE 1
NOTE 1
TITLE
DATE SCALENOV 2007 NTS
017798-49-01-PFD-004 Rev. A
CASE 1. PROCESS FLOW DIAGRAMPETROCANADA UPGRADER PHASE 1
CARBON DIOXIDE DEHYDRATIONDESIGNED BY CHECKED BY APPROVED
SA DM
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
RW
DOCUMENT NO.
CARBON DIOXIDE
FROM HP COMPRESSION
003
003
CARBON DIOXIDE
TO HP COMPRESSION
WATER VAPOR TO ATMOSPHERE
VENTTO ATMOSPHERE
PRELIMINARY DRAWING. DO NOT USE FOR CONSTRUCTION
12
21 kg/h
28 Sm3/h FUEL GAS
FLUE GAS TO ATMOSPHERE
CO2 DEHYDRATION VENDOR PACKAGE
NOTE 1
PK-002 CO2 DEHYDRATION PACKAGECAPACITY: 1853 TPD (DRY CO2)
PK-002
NOTES:1. VENDOR PACKAGE INTERNAL CONFIGURATION IS FOR INF ORMATION ONLY. THE ACTUAL CONFIGURATION MAY BE DIFF ERENT.2. ALL WEIGHT FLOWRATES REPRESENT ACTUAL ON STREAM RATES
13
0.4 to/h
TITLE
DATE SCALENOV 2007 NTS
017798-49-01-PFD-005 Rev.A
PROCESS FLOW DIAGRAMSHELL EXISTING AND PHASE 1 UPGRADERS
CARBON DIOXIDE CAPTUREDESIGNED BY CHECKED BY APPROVED
DOCUMENT NO.
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
RWSA DM
006
T-003/ACO2 ABSORPTION TOWER
CARBON DIOXIDE
TO COMPRESSION
PRELIMINARY DRAWING. DO NOT USE FOR CONSTRUCTION
LP STEAM
STEAM CONDENSATE
T-003A
T-004REGENERATION TOWER
T-004
177 to/h
142 ºC
281 kPag
18
19
20
RETURN
14
324 kSm 3/h
38 ºC
2070 kPag
149 to/h
104.5 kSm 3/h
50 ºC
26 kPag
182 to/h
NOTES:1. ALL WEIGHT FLOWRATES REPRESENT ACTUAL ON STREAM RATES
TO EXISTING PSA
15
269 kSm 3/h
45 ºC
2060 kPag
46.9 to/h
NN
F
EA-005EA-006
E-003
E-004
EA-005LEAN AMINE COOLER
EA-006CONDENSER
E-003LEAN-RICH AMINE EXCHANGER
E-004REGENERATION TOWER REBOILER
P-002
P-002LEAN AMINE PUMP
V-004
V-004FLASH
006
T-003B
16
237 kSm 3/h
38 ºC
2070 kPag
109 to/h
TO PSA PHASE 1
17
197 kSm 3/h
45 ºC
2060 kPag
35 to/h
NN
F
SYNTHESIS GAS
FROM SMR/HTS PHASE 1
HYDROGEN RICH GAS
SYNTHESIS GAS
FROM EXISTING SMR/HTS
HYDROGEN RICH GAS
MAKEUP WATER 8.2 to/h
T-003/BCO2 ABSORPTION TOWER
TITLE
DATE SCALENOV 2007 NTS
DOCUMENT NO.017798-49-01-PFD-006 Rev. A
CASE 1. PROCESS FLOW DIAGRAMSHELL EXISTING AND PHASE 1 UPGRADERS
CARBON DIOXIDE LOW PRESSURE COMPRESSIONDESIGNED BY CHECKED BY APPROVED
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
RWSA DM
005
FROM CAPTURE
CARBON DIOXIDE
HEADER
WASTE WATER
V-005ALP COMPRESSOR STAGE 1 INLET SEPARATOR
DIMENSIONS: 4572 mm ID x 4572 mm T/T
V-005BLP COMPRESSOR STAGE 2 INLET SEPARATOR
DIMENSIONS: 3200 mm ID x 3200 mm T/T
K-003ACO2 LP COMPRESSOR STAGE 1
DIFF. PRESS.: 432 kPa
K-003BCO2 LP COMPRESSOR STAGE 2
DIFF. PRESS.: 1506 kPa
EA-007ALP COMPRESSOR STAGE 1 AFTERCOOLER
DUTY: 12330 KW
EA-007BLP COMPRESSOR STAGE 2 AFTERCOOLER
DUTY: 7234 KW
PRELIMINARY DRAWING. DO NOT USE FOR CONSTRUCTION
197 ºC
450 kPag
43 ºC
179 ºC
1887 kPag
43 ºC
43 ºC
1756 kPag
HP STEAM
007
TO HIGH PRESSURE COMPRESSION
CARBON DIOXIDE
007
COMMON SHAFT WITH HIGH PRESSURE COMPRESSOR
X-002CO2 COMPRESSOR STEAM TURBINE DRIVER
RATED POWER: 21480 KW (NOTE 3)
VENDOR PACKAGE
PK-003
NN
F
98.4 kAm 3/h
50 ºC
19 kPag
182 to/h
NOTE 1 NOTE 1
NOTE 1
NOTES:1. ALL DISCHARGE PRESSURES AND TEMPERATURES ARE THE ORETICAL. ACTUAL OPERATION PARAMETERS BY COMPRESSOR VENDOR2. ALL WEIGHT FLOWRATES REPRESENT ACTUAL ON STREAM RATES3. RATED POWER INCLUDES ESTIMATED _ KW POWER LOSS. ACTUAL RATED POWER BY VENDOR
DRAWING # 017798-49-00-PFD-007
K-003A X-002K-003B
EA-007A EA-007B
V-005A V-005B V-005C
22
177 to/h
399 ºC
6149 kPag
005
LP STEAM
TO CAPTURE
19
142 ºC
281 kPag
GEAR BOX
21
PK-003CO2 COMPRESSOR PACKAGE
CAPACITY: 104600 Sm3/h
V-005CLP COMPRESSOR STAGE 2 OUTLET SEPARATOR
DIMENSIONS: 2286 mm ID x 2309 mm T/T
18
TITLE
DATE SCALENOV 2007 NTS
DOCUMENT NO.017798-49-01-PFD-007 Rev. A
CASE 1. PROCESS FLOW DIAGRAMSHELL EXISTING AND PHASE 1 UPGRADERS
CARBON DIOXIDE HIGH PRESSURE COMPRESSIONDESIGNED BY CHECKED BY APPROVED
RWSA DM
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
006
FROM LOW PRESSURE COMPRESSION
CARBON DIOXIDE
008
TO DEHYDRATION
CARBON DIOXIDE
WASTE WATER
V-006HP COMPRESSOR STAGE 1 OUTLET SEPARATOR
DIMENSIONS: 1981 mm ID x 2182 mm T/T
K-004ACO2 HIGH PRESSURE COMPRESSOR STAGE 1
DIFF. PRESS.: 2355 kPa
K-004BCO2 HIGH PRESSURE COMPRESSOR STAGE 2
DIFF. PRESS.: 5033 kPa
EA-008AHP COMPRESSOR STAGE 1 AFTERCOOLER
DUTY: 4157 KW
EA-008BHP COMPRESSOR STAGE 2 AFTERCOOLER
DUTY: 7623 KW
EA-008CHP COMPRESSOR STAGE 3 AFTERCOOLER
DUTY: 4945 KW
008
FROM DEHYDRATION
CARBON DIOXIDE
TO PIPELINE
CARBON DIOXIDE
K-004CCO2 HIGH PRESSURE COMPRESSOR STAGE 3
DIFF. PRESS.: 11310 kPa
PRELIMINARY DRAWING. DO NOT USE FOR CONSTRUCTION
119 ºC
4104 kPag
43 ºC
23
24
25
26
8 to/h
43 ºC
101 ºC
19960 kPag
173.8 to/h
60 ºC
19829 kPag
COMMON SHAFT WITH LOW PRESSURE COMPRESSOR
174 to/h
43 ºC
3974 kPag
HEADER
WASTE WATER
006
DRAWING # 017798-49-00-PFD-006
131 ºC
8793 kPag
173.8 to/h
48 ºC
3965 kPag
NOTES:1. ALL DISCHARGE PRESSURES AND TEMPERATURES ARE THE ORETICAL. ACTUAL OPERATION PARAMETERS BY COMPRESSOR VENDOR2. ALL WEIGHT FLOWRATES REPRESENT ACTUAL ON STREAM RATES
K-004A K-004B K-004C
V-006
EA-008A
EA-008C
43 ºC
21
EA-008B
TITLE
DATE SCALE#REF! NTS
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
RW
DOCUMENT NO.017798-49-01-PFD-008 Rev. A
CASE 1. PROCESS FLOW DIAGRAMSHELL EXISTING AND PHASE 1 UPGRADERS
CARBON DIOXIDE DEHYDRATIONDESIGNED BY CHECKED BY APPROVED
SA DM
CARBON DIOXIDE
FROM HP COMPRESSION
007
007
CARBON DIOXIDE
TO HP COMPRESSION
WATER VAPOR TO ATMOSPHERE
VENTTO ATMOSPHERE
PRELIMINARY DRAWING. DO NOT USE FOR CONSTRUCTION
27
46 kg/h
62 Sm3/h FUEL GAS
FLUE GAS TO ATMOSPHERE
CO2 DEHYDRATION VENDOR PACKAGE
NOTE 1
PK-004 CO2 DEHYDRATION PACKAGECAPACITY: 4171 TPD (DRY CO2)
PK-004
NOTES:1. VENDOR PACKAGE INTERNAL CONFIGURATION IS FOR INF ORMATION ONLY. THE ACTUAL CONFIGURATION MAY BE DIFF ERENT.2. ALL WEIGHT FLOWRATES REPRESENT ACTUAL ON STREAM RATES
28
1 to/h
TITLE
DATE SCALENOV 2007 NTS
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
RWSA DMDOCUMENT NO.
017798-49-01-PFD-009 Rev. A
CASE 1. PROCESS FLOW DIAGRAMNORTH WEST UPGRADER
CARBON DIOXIDE LOW PRESSURE COMPRESSIONDESIGNED BY CHECKED BY APPROVED
FROM RECTISOL UNIT
CARBON DIOXIDE
HEADER
WASTE WATER
V-007ALP COMPRESSOR STAGE 1 INLET SEPARATOR
DIMENSIONS: 4115 mm ID x 4115 mm T/T
V-007BLP COMPRESSOR STAGE 2 INLET SEPARATOR
DIMENSIONS: 2896 mm ID x 2896 mm T/T
K-005ACO2 LP COMPRESSOR STAGE 1
DIFF. PRESS.: 400 kPa
K-005BCO2 LP COMPRESSOR STAGE 2
DIFF. PRESS.: 1547 kPa
EA-009ALP COMPRESSOR STAGE 1 AFTERCOOLER
DUTY: 4082 KW
EA-009BLP COMPRESSOR STAGE 2 AFTERCOOLER
DUTY: 5818 KW
PRELIMINARY DRAWING. DO NOT USE FOR CONSTRUCTION
151 ºC
409 kPag
43 ºC
189 ºC
1887 kPag
43 ºC
43 ºC
1756 kPag
010
TO HIGH PRESSURE COMPRESSION
CARBON DIOXIDE
010
COMMON SHAFT WITH HIGH PRESSURE COMPRESSOR
KM-005CO2 COMPRESSOR DRIVER
RATED POWER: 16780 KW (NOTE 3)
VENDOR PACKAGE
PK-005
NNF
NOTE 1 NOTE 1
NOTE 1
NOTES:1. ALL DISCHARGE PRESSURES AND TEMPERATURES ARE THE ORETICAL. ACTUAL OPERATION PARAMETERS BY COMPRESSOR VENDOR2. ALL WEIGHT FLOWRATES REPRESENT ACTUAL ON STREAM RATES3. RATED POWER INCLUDES ESTIMATED _ KW POWER LOSS. ACTUAL RATED POWER BY VENDOR
DRAWING # 017798-49-00-PFD-010
K-005A K-005B
EA-009A EA-009B
V-007A V-007B V-007C
GEAR BOX
30
PK-005CO2 COMPRESSOR PACKAGE
CAPACITY: 78390 Sm3/h
V-007CLP COMPRESSOR STAGE 2 OUTLET SEPARATOR
DIMENSIONS: 2134 mm ID x 2309 mm T/T
29
78.4 kSm 3/h
17 ºC
16 kPag
145 to/h
KM-005
TITLE
DATE SCALENOV 2007 NTS DM
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
DOCUMENT NO.017798-49-01-PFD-010 Rev. A
CASE 1. PROCESS FLOW DIAGRAMNORTH WEST UPGRADER
CARBON DIOXIDE HIGH PRESSURE COMPRESSIONDESIGNED BY CHECKED BY APPROVED
RWSA
009
FROM LOW PRESSURE COMPRESSION
CARBON DIOXIDE
WASTE WATER
V-008HP COMPRESSOR STAGE 1 OUTLET SEPARATOR
DIMENSIONS: 1829 mm ID x 2182 mm T/T
K-006ACO2 HIGH PRESSURE COMPRESSOR STAGE 1
DIFF. PRESS.: 2355 kPa
K-006BCO2 HIGH PRESSURE COMPRESSOR STAGE 2
DIFF. PRESS.: 3316 kPa
EA-010AHP COMPRESSOR STAGE 5 AFTERCOOLER
DUTY: 3370 KW
EA-010BHP COMPRESSOR STAGE 2 AFTERCOOLER
DUTY: 5377 KW
EA-010CHP COMPRESSOR STAGE 3 AFTERCOOLER
DUTY: 4410 KW
TO PIPELINE
CARBON DIOXIDE
K-006CCO2 HIGH PRESSURE COMPRESSOR STAGE 3
DIFF. PRESS.: 10970 kPa
PRELIMINARY DRAWING. DO NOT USE FOR CONSTRUCTION
119 ºC
4104 kPag
43 ºC
31
104 ºC
19420 kPag
145 to/h
60 ºC
19290 kPag
COMMON SHAFT WITH LOW PRESSURE COMPRESSOR
HEADER
WASTE WATER
009
DRAWING # 017798-49-00-PFD-009
117 ºC
8586 kPag
NOTES:1. ALL DISCHARGE PRESSURES AND TEMPERATURES ARE THE ORETICAL. ACTUAL OPERATION PARAMETERS BY COMPRESSOR VENDOR2. ALL WEIGHT FLOWRATES REPRESENT ACTUAL ON STREAM RATES
K-006A K-006B K-006C
V-008
EA-010A
EA-010C
43 ºC
30
EA-010B
NNF
Rev./Date By Checked ApprovedA /Dec. 2007 RT / RW SA DM
Project:Doc. #:Page
Stream Number Units 1 2 3 4 5 6 7 8 9 10 11 12 13
Stream DescriptionSynthesis gas from SMR/HTS
phase 1
Hydrogen rich gas to PSA
phase 1
Carbon dioxide to compression - Petro-Canada
Upgrader Phase 1
LP steam to capture Petro-
Canada Upgrader Phase
1
Make up water to capture Petro-
Canada Upgrader Phase 1
Carbon dioxide high pressure compression Petro-Canada
Upgrader Phase 1
HP steam to carbon dioxide compression Petro-Canada
Upgrader Phase 1
Carbon dioxide to dehydration - Petro-Canada
Upgrader Phase 1
Carbon dioxide from
dehydration - Petro-Canada
Upgrader Phase 1
Carbon dioxide from
Petrocanada SMR to Pipeline
Waste water from Petro-
Canada Upgrader Phase
1
Fuel gas to dehydration
package - Petro-Canada
Upgrader Phase 1
Flue gas to atmosphere
from dehydration
package - Petro-Canada
Upgrader Phase 1
Vapor Weight Fraction 1.00 1.00 1.00 0.99 0.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00Temperature ºC 38 45 50.0 135 30.0 43.0 399.0 43.0 48.0 60.0 43.0 40.0 200.0Pressure kPag 2070 2060 25.8 217 2060.0 1756.4 6148.8 3973.7 3766.9 19071.5 25.8 8.7 0.0Molar Rate kg-mol/hr 10550 8785 1963 3990 203.0 1770 3990 1767 1760 1760 197 1.17 14.6Mass Rate Ton/hr 114 36.9 80.8 71.9 3.66 77.3 71.9 77.3 77.2 77.2 3.55 0.021 0.406Actual Volumetric Flow Am3/hr 12700 10900 43689 41565 3.70 2293 3254.021 909 999 116 11.76 27.6 565Standard Volumetric Flow Sm3/hr 249000 208000 46418 94349 3.661 41859 94349 41770 41617 N/A 3.56 27.6 344Enthalpy GJ/h 98.5 83.2 -737.6 -950.9 N/A -692.7 -916.7 -693.7 -691.4 -703.7 -56.0 -0.095 -0.99Molecular Weight 10.8 4.2 41.2 18.0 18.0 43.7 18.0 43.7 43.8 43.8 18.1 17.7 27.9Actual Density kg/m3 9.02 3.38 1.8 1.7 987.60 33.721 22.1 85.045 77.250 667.08 302.12 0.748 0.718Dynamic Viscosity cP 0.014 0.011 0.015 N/A 0.540 0.016 0.025 0.017 0.018 0.049 N/A 0.012 0.023Thermal Conductivity W/m-ºC 0.11 0.15 0.019 N/A N/A 0.020 0.062 0.023 0.023 0.038 N/A 0.034 0.036Specific Heat kJ/kg-ºC 31.5 30.2 0.940 2.234 4.200 0.990 2.579 1.210 1.159 2.726 4.299 2.157 1.151Surface Tension dyne/cm N/A N/A N/A 51.81 N/A N/A N/A N/A N/A 0.01 68.94 N/A N/ACompressibility 1.01 1.01 0.9940 N/A N/A 0.9120 0.9110 0.7959 0.8205 0.4547 N/A 0.9976 0.9997Composition
Carbon dioxide % weight 72.9 15.8 95.44 0.00 0.00 99.71 0.00 99.80 99.95 99.86 0.55 4.74 13.58Water % weight 0.5 1.9 4.5 100.0 100.00 0.25 100.0 0.16 0.01 0.09 99.45 0.00 10.53
Carbon monoxide % weight 2.6 8.0 0.01 0.00 0.00 0.01 0.00 0.01 0.01 0.01 0.00 0.00 0.00
Methane % weight 10.3 31.9 0.02 0.00 0.00 0.02 0.00 0.02 0.02 0.02 0.00 82.79 0.00Hydrogen % weight 13.7 42.4 0.02 0.00 0.00 0.02 0.00 0.02 0.02 0.02 0.00 0.00 0.00
Nitrogen % weight 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.32 72.83
Argon % weight 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Methanol % weight 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17798017798-49-01-HM-001
HEAT AND MATERIAL BALANCE
1 of 3
Client:
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
Rev./Date By Checked ApprovedA /Dec. 2007 RT / RW SA DM
Project:Doc. #:Page
Stream Number Units 14 15 16 17 18 19 20 21 22 23 24 25 26
Stream DescriptionSynthesis gas from existing
SMR/HTS
Hydrogen rich gas to existing
PSA
Synthesis gas from SMR/HTS
phase 1
Hydrogen rich gas to PSA
phase 1
Carbon dioxide to compression from
capture Shell existing and
phase 1 upgraders
LP steam to capture - Shell
existing and phase 1
upgraders
Make up water - Shell existing and phase 1 upgraders
Carbon dioxide to high pressure compression - Shell existing and phase 1 upgraders
HP steam - Shell existing and phase 1 upgraders
Carbon dioxide from
Petrocanada SMR to
Dehydration
Carbon dioxide from
dehydration - Shell existing and phase 1 upgraders
Cabon dioxide to pipeline from Shell existing and phase 1 upgraders
Waste water from Shell
existing and phase 1
upgraders
Vapor Weight Fraction 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 0.00Temperature ºC 38 45 38 45 50.0 134 30.0 43.0 399.0 43.0 48.0 60.0 43.0Pressure kPag 2070 2060 2070 2060 25.8 214 2060.0 1756.4 6148.8 3973.7 3766.9 19829.3 25.8Molar Rate kg-mol/hr 13700 11390 10000 8340 4422 8996 457 3988 8996 3979 3965 3965 443Mass Rate Ton/hr 149.0 46.9 109.0 35.0 182.0 162 8.24 174.2 162.1 174.0 173.8 173.8 8.00Actual Volumetric Flow Am3/hr 16500 14200 12000 10400 98409 94528 8.34 5166 7336 2046 2250 255 26Standard Volumetric Flow Sm3/hr 324000 269000 237000 197000 104555 212704.38 8.25 94286 212704 94087 93741 93741 8.01Enthalpy GJ/h 128.0 108.0 93.6 79.0 -1661.32 -2143.93 N/A -1560.4 -2066.6 -1562.4 -1557.4 -1585.6 -126.2Molecular Weight 10.8 4.2 10.8 4.2 41.2 18.02 18.0 43.7 18.0 43.7 43.8 43.8 18.1Actual Density kg/m3 9.02 3.38 9.02 3.38 1.8 1.71 987.60 33.7 22.1 85.0 77.3 682.8 302.1Dynamic Viscosity cP 0.014 0.011 0.014 0.011 0.01 N/A 0.540 0.016 0.025 0.017 0.018 0.050 N/AThermal Conductivity W/m-ºC 0.11 0.15 0.11 0.15 0.02 N/A N/A 0.020 0.062 0.023 0.023 0.038 N/ASpecific Heat kJ/kg-ºC 31.5 30.2 31.5 30.2 0.940 2.23 4.200 0.990 2.579 1.210 1.159 2.652 4.299Surface Tension dyne/cm N/A 51.87 N/A N/A N/A N/A N/A 0.01 68.94Compressibility 1.01 1.01 1.01 1.01 0.99 N/A N/A 0.9120 0.9110 0.7959 0.8205 0.4617 N/AComposition
Carbon dioxide % weight 72.9 15.8 72.9 15.8 95.44 0.00 0.00 99.7 0.0 99.8 99.95 99.95 0.55Water % weight 0.5 1.9 0.5 1.9 4.5 100.00 100.0 0.2 100.0 0.2 0.01 0.01 99.45
Carbon monoxide % weight 2.6 8.0 2.6 8.0 0.01 0.00 0.00 0.01 0.00 0.01 0.01 0.01 0.00
Methane % weight 10.3 31.9 10.3 31.9 0.02 0.00 0.00 0.02 0.00 0.02 0.02 0.02 0.00Hydrogen % weight 13.7 42.4 13.7 42.4 0.02 0.00 0.00 0.02 0.00 0.02 0.02 0.02 0.00
Nitrogen % weight 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Argon % weight 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Methanol % weight 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 of 3
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
17798017798-49-01-HM-001
Client:HEAT AND MATERIAL BALANCE
Rev./Date By Checked ApprovedA /Dec. 2007 RT / RW SA DM
Project:Doc. #:Page
Stream Number Units 27 28 29 30 31
Stream Description
Fuel gas to dehydration
package - Shell existing and
phase 1 upgraders
Flue gas to atmosphere
from dehydration
package - Shell existing and
phase 1 upgraders
Carbon dioxide from rectisol
unit
Carbon dioxide to high pressure compression -
North West Upgrader
Carbon dioxide to pipeline from North West Upgrader
Vapor Weight Fraction 1.00 1.00 1.00 1.00 0.00Temperature ºC 40.0 200.0 16.5 43.0 60.0Pressure kPag 8.7 0.0 15.8 1756 19290Molar Rate kg-mol/hr 2.63 32.8 3316 3316 3316Mass Rate Ton/hr 0.046 0.915 145.2 145.2 145.168Actual Volumetric Flow Am3/hr 62.1 1274 72113 4301 217Standard Volumetric Flow Sm3/hr 62.2 776 78394 78394 N/AEnthalpy GJ/h -0.213 -2.23 -1299.4 -1298.3 -1323.8Molecular Weight 17.7 27.9 43.8 43.8 43.8Actual Density kg/m3 0.748 0.718 2.0 33.8 669.1Dynamic Viscosity cP 0.012 0.023 0.014 0.016 0.049Thermal Conductivity W/m-ºC 0.034 0.036 0.017 0.020 0.038Specific Heat kJ/kg-ºC 2.157 1.151 0.873 0.987 2.705Surface Tension dyne/cm N/A N/A N/A N/A 0.00Compressibility 0.9976 0.9997 0.9935 0.9133 0.4580Composition
Carbon dioxide % weight 4.74 13.58 99.91 99.9 99.9Water % weight 0.00 10.53 0.00 0.0 0.0
Carbon monoxide % weight 0.00 0.00 0.03 0.03 0.03
Methane % weight 82.79 0.00 0.02 0.02 0.02Hydrogen % weight 0.00 0.00 0.02 0.02 0.02
Nitrogen % weight 0.32 72.83 0.00 0.00 0.00
Argon % weight 0.00 0.00 0.00 0.00 0.00
Methanol % weight 0.00 0.00 0.01 0.01 0.01
17798017798-49-01-HM-001
HEAT AND MATERIAL BALANCE
3 of 3
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY
Client:
Project No.:
Document #:Date By Checked Approved
Dec. 2007 VC SA DM
Rev.: A Page 1 of 5
POWER Sm3/hr DUTY Sm3/hr
kW kW kW kW V kW kWP-001 339 424 339EA-001 42 52 42EA-002 14 17 14EA-003 A 14 17 14EA-003 B 9 11 9EA-004 A 7 9 7EA-004 B 6 7 6EA-004 C 20 24 20PK-02 11 14 11
460 575 46015% 86 86
661 546
P-002 764 955 764EA-005 28 35 28EA-005 25 31 25EA-006 21 26 21EA-007 A 17 22 17EA-007 B 13 17 13EA-008 A 9 11 9EA-008 B 18 22 18EA-008 C 23 29 23PK-04 25 32 25
944 1180 94415% 177 177
1356 1121
EA-009 A 9 11 9EA-009 B 17 22 17EA-010 A 8 10 8EA-010 B 22 28 22EA-010 C 18 23 18KM-005 16780 20975 16780
17798 23781 1909615% 3567 3567
27348 22663
25536 20500
15% 3830 383029370 24330
NOTES:1. Electrical Power for Air Coolers include a 80% efficiency factor.2. All the design values include a design margin (20%).3. Preliminary Issue. To be updated based on vendor data
LEAN AMINE COOLER - SHELL
CO2 COMPRESSOR DRIVER - NORTH WEST
TOTAL SHELL
HP COMPRESSOR 2ND STAGE AFTERCOOLER - SHELLHP COMPRESSOR 3RD STAGE AFTERCOOLER - SHELL
LP COMPRESSOR 1ST STAGE AFTERCOOLER - NORTH WEST
CONTINGENCY
CO2 DEHYDRATION PACKAGE - SHELL
SUBTOTAL SHELL
CONTINGENCY
HP COMPRESSOR 1ST STAGE AFTERCOOLER - NORTH WESTHP COMPRESSOR 2ND STAGE AFTERCOOLER - NORTH WESTHP COMPRESSOR 3RD STAGE AFTERCOOLER - NORTH WEST
SUBTOTAL NORTH WEST
CONDENSER - SHELLLP COMPRESSOR 1ST STAGE AFTERCOOLER - SHELLLP COMPRESSOR 2ND STAGE AFTERCOOLER - SHELLHP COMPRESSOR 1ST STAGE AFTERCOOLER - SHELL
HP COMPRESSOR 1ST STAGE AFTERCOOLER - PETROCANADAHP COMPRESSOR 2ND STAGE AFTERCOOLER - PETROCANADAHP COMPRESSOR 3RD STAGE AFTERCOOLER - PETROCANADA
LEAN AMINE COOLER - SHELL
CO2 DEHYDRATION PACKAGE - PETROCANADA
CONTINGENCYTOTAL PETROCANADA
SUBTOTAL PETROCANADA
LEAN AMINE COOLER - PETROCANADACONDENSER - PETROCANADALP COMPRESSOR 1ST STAGE AFTERCOOLER - PETROCANADALP COMPRESSOR 2ND STAGE AFTERCOOLER - PETROCANADA
017798
DESIGNNORMAL
EQUIPMENT DESCRIPTION REMARKS
LEAN AMINE PUMP - SHELL
LP COMPRESSOR 2ND STAGE AFTERCOOLER - NORTH WEST
INTERMITTENTTAG NUMBER
VOLTAGE CONTINUOUS
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 1
Utility Balance Electrical Power
017798-49-01-UB-001
LEAN AMINE PUMP - PETROCANADA
TOTAL NORTH WEST
TOTALCONTINGENCY
TOTAL MAIN OPERATION AREA
Project No.:Document #:
Date By Checked ApprovedDec. 2007 VC SA DM
Rev.: A Page 2 of 5
Sm3/hr Sm3/hr
PK-02 27.60 33.12 27.607733.00 9279.60 7733.00
7760.60 9312.72 7760.60
PK-04 62.20 74.64 62.2016734.00 20080.80 16734.00
16796.20 20155.44 16796.20
24556.80 0.00
NOTES:1. All the design values include a design margin (20%)2. Preliminary Issue. To be updated based on vendor data.
017798
CONTINUOUS INTERMITTENT
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 1
Utility Balance Natural Gas
REMARKS
017798-49-UB-001
TAG NUMBER EQUIPMENT DESCRIPTION
CO2 DEHYDRATION PACKAGE - PETROCANADA
CO2 DEHYDRATION PACKAGE - SHELL
BOILER PACKAGE - PETROCANADA
TOTAL 24556.80 29468.16
SUBTOTAL SHELL
BOILER PACKAGE - SHELL
NORMAL DESIGN (1)
Sm3/hr Sm3/hr
SUBTOTAL PETROCANADA
Project No.:Document #:
Date By Checked ApprovedDec. 2007 VC SA DM
Rev.: A Page 3 of 5
Sm3/hr Rate Sm3/hr Rate Sm3/hr Sm3/hr Mass Flow Rate
Ton/hr SCMH Ton/hr SCMH Ton/hr SCMH Ton/hr SCMHX-001 71.9 94349
71.9 94349
X-002 162.1 212704
162.1 212704
0.00 0.00 0.00 0.00 0.00 0.00 234.00 307053NOTES:
SHUTDOWN
SUBTOTAL SHELL
TOTAL
TAG NUMBER EQUIPMENT DESCRIPTION
CO2 STEAM TURBINE DRIVER - PETROCANADA
CO2 STEAM TURBINE DRIVER - SHELL
SUBTOTAL PETROCANADA
REMARKSEMERGENCY
INTERMITENT REQUIREMENTS
STARTUP
017798-49-UB-001PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 1
Utility Balance HP Steam
017798
NORMAL
Project No.:Document #:
Date By Checked ApprovedDec. 2007 VC SA DM
Rev.: A Page 4 of 5
Sm3/hr Rate Sm3/hr Rate Sm3/hr Sm3/hr Mass Flow Rate
Ton/d SCMH Ton/d SCMH Ton/d SCMH Ton/hr SCMH
E-002 71.9 94349
71.9 94349
E-004 162.1 212704
162.1 212704
0.00 0.00 0.00 0.00 0.00 0.00 234.00 307053NOTES:
TOTAL
SUBTOTAL SHELL
REGENERATION TOWER REBOILER - PETROCANADA
REGENERATION TOWER REBOILER - SHELL
SUBTOTAL PETROCANADA
TAG NUMBER EQUIPMENT DESCRIPTION
INTERMITENT REQUIREMENTS
STARTUP SHUTDOWN EMERGENCY
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 1
Utility Balance LP Steam
017798-49-UB-001
REMARKS
NORMAL
017798
Project No.:Document #:
Date By Checked ApprovedDec. 2007 VC SA DM
Rev.: A Page 5 of 5
Sm3/hr Rate Sm3/hr Rate Sm3/hr Sm3/hr Mass Flow Rate
Ton/d SCMH Ton/d SCMH Ton/d SCMH Ton/hr ACMH
3.66 3.70
3.66 3.70
8.24 8.34
8.24 8.34
0.00 0.00 0.00 0.00 0.00 0.00 11.90 12NOTES:
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 1
Utility Balance Make-up Water
017798017798-49-UB-001
TAG NUMBER EQUIPMENT DESCRIPTION
INTERMITENT REQUIREMENTSNORMAL
REMARKSSTARTUP SHUTDOWN EMERGENCY
CO2 CAPTURE - PETROCANADA
SUBTOTAL PETROCANADA
CO2 CAPTURE - SHELL
SUBTOTAL SHELL
TOTAL
Project No.:
Document #:Date By Checked Approved
Dec. 2007 RT SA DM
Rev.: A Page 1 of 5
POWER Sm3/hr DUTY Sm3/hrkW kW kW kW V kW kW
P-001 339 424 339EA-001 42 52 42EA-002 14 17 14EA-003 A 14 17 14EA-003 B 9 11 9
416 521 41615% 78 78
599 495
P-002 764 955 764EA-005 28 35 28EA-005 25 31 25EA-006 21 26 21EA-007 A 17 22 17EA-007 B 13 17 13
868 1085 86815% 163 163
1248 1031
EA-008 A 19 23 19EA-008 B 21 26 21EA-008 C 75 94 75PK-04 43 53 43
15200 19000 15200
15357 19196 1535715% 2879 2879
22076 18236
EA-009 A 9 11 9EA-009 B 17 22 17EA-010 A 8 10 8EA-010 B 22 28 22EA-010 C 18 23 18KM-005 16800 21000 16800
16875 21093 1687515% 3164 3164
24257 20039
41895 33516
15% 6284 628448184 39801
NOTES:1. Electrical Power for Air Coolers include a 80% efficiency factor.2. All the design values include a design margin (20%).3. Preliminary Issue. To be updated based on vendor data
TOTAL NORTH WEST
TOTALCONTINGENCY
TOTAL MAIN OPERATION AREA
INTERMITTENTTAG NUMBER
VOLTAGE CONTINUOUS
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 2
Utility Balance Electrical Power
017798-49-02-UB-001
LEAN AMINE PUMP - PETROCANADA
LP COMPRESSOR 2ND STAGE AFTERCOOLER - NORTH WEST
017798
DESIGNNORMAL
EQUIPMENT DESCRIPTION REMARKS
LEAN AMINE COOLER - PETROCANADACONDENSER - PETROCANADALP COMPRESSOR 1ST STAGE AFTERCOOLER - PETROCANADALP COMPRESSOR 2ND STAGE AFTERCOOLER - PETROCANADA
LEAN AMINE COOLER - SHELL
CONTINGENCYTOTAL PETROCANADA
SUBTOTAL PETROCANADA
LEAN AMINE PUMP - SHELL
HP COMPRESSOR 3RD STAGE AFTERCOOLER - COMMON DEL. PT.
CONDENSER - SHELLLP COMPRESSOR 1ST STAGE AFTERCOOLER - SHELLLP COMPRESSOR 2ND STAGE AFTERCOOLER - SHELL
TOTAL SHELL
CONTINGENCY
HP COMPRESSOR 1ST STAGE AFTERCOOLER - NORTH WESTHP COMPRESSOR 2ND STAGE AFTERCOOLER - NORTH WESTHP COMPRESSOR 3RD STAGE AFTERCOOLER - NORTH WEST
SUBTOTAL NORTH WEST
CO2 COMPRESSOR DRIVER - NORTH WEST
LP COMPRESSOR 1ST STAGE AFTERCOOLER - NORTH WEST
HP COMPRESSOR 1ST STAGE AFTERCOOLER - COMMON DEL. PT.HP COMPRESSOR 2ND STAGE AFTERCOOLER - COMMON DEL. PT.
SUBTOTAL COMMON DELIVERY POINTCONTINGENCYTOTAL COMMON DELIVERY POINT
CO2 COMPRESSOR DRIVER - COMMON DELIVERY POINT
LEAN AMINE COOLER - SHELL
CONTINGENCYSUBTOTAL SHELL
CO2 DEHYDRATION PACKAGE - COMMON DELIVERY POINT
Project No.:Document #:
Date By Checked ApprovedDec. 2007 RT SA DM
Rev.: A Page 2 of 5
Sm3/hr Sm3/hr
PK-02 6845 8214 6845
PK-04 15615 18738 15615
90 108 90
22550.00 0.00
NOTES:1. All the design values include a design margin (20%)2. Preliminary Issue. To be updated based on vendor data.
BOILER PACKAGE - SHELL
NORMAL DESIGN (1)
Sm3/hr Sm3/hr
27060.0022550.00TOTAL
TAG NUMBER EQUIPMENT DESCRIPTION
CO2 DEHYDRATION PACKAGE - COMMON DEL. PT.
BOILER PACKAGE - PETROCANADA
017798
CONTINUOUS INTERMITTENT
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 2
Utility Balance Natural Gas
017798-49-02-UB-001
REMARKS
Project No.:Document #:
Date By Checked ApprovedDec. 2007 RT SA DM
Rev.: A Page 3 of 5
Sm3/hr Rate Sm3/hr Rate Sm3/hr Sm3/hr Mass Flow Rate
Ton/hr SCMH Ton/hr SCMH Ton/hr SCMH Ton/hr SCMHX-001 66.0 86533
66.0 86533
X-002 151.0 197978
151.0 197978
0.00 0.00 0.00 0.00 0.00 0.00 217.00 284511NOTES:
NORMAL
017798-49-02-UB-001PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 2
Utility Balance HP Steam
017798
REMARKSEMERGENCY
INTERMITENT REQUIREMENTS
STARTUPTAG NUMBER EQUIPMENT DESCRIPTION
CO2 STEAM TURBINE DRIVER - PETROCANADA
CO2 STEAM TURBINE DRIVER - SHELL
SUBTOTAL PETROCANADA
TOTAL
SHUTDOWN
SUBTOTAL SHELL
Project No.:Document #:
Date By Checked ApprovedDec. 2007 RT SA DM
Rev.: A Page 4 of 5
Sm3/hr Rate Sm3/hr Rate Sm3/hr Sm3/hr Mass Flow Rate
Ton/d SCMH Ton/d SCMH Ton/d SCMH Ton/hr SCMH
E-002 66.0 86533
66.0 86533
E-004 151.0 197978
151.0 197978
0.00 0.00 0.00 0.00 0.00 0.00 217.00 284511NOTES:
017798-49-02-UB-001
REMARKS
NORMAL
017798
TAG NUMBER EQUIPMENT DESCRIPTION
INTERMITENT REQUIREMENTS
STARTUP SHUTDOWN EMERGENCY
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 2
Utility Balance LP Steam
REGENERATION TOWER REBOILER - PETROCANADA
REGENERATION TOWER REBOILER - SHELL
SUBTOTAL PETROCANADA
SUBTOTAL SHELL
TOTAL
Project No.:Document #:
Date By Checked ApprovedDec. 2007 RT SA DM
Rev.: A Page 5 of 5
Sm3/hr Rate Sm3/hr Rate Sm3/hr Sm3/hr Mass Flow Rate
Ton/d SCMH Ton/d SCMH Ton/d SCMH Ton/hr ACMH
3.70 3.70
3.70 3.70
8.20 8.20
8.20 8.20
0.00 0.00 0.00 0.00 0.00 0.00 11.90 12NOTES:
TOTAL
SUBTOTAL SHELL
CO2 CAPTURE - SHELL
SUBTOTAL PETROCANADA
CO2 CAPTURE - PETROCANADA
REMARKSSTARTUP SHUTDOWN EMERGENCY
TAG NUMBER EQUIPMENT DESCRIPTION
INTERMITENT REQUIREMENTSNORMAL
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 2
Utility Balance Make-up Water
017798017798-49-02-UB-001
Project No.:
Document #:Date By Checked Approved
Dec. 2007 RT SA DM
Rev.: A Page 1 of 5
POWER Sm3/hr DUTY Sm3/hr
kW kW kW kW V kW kWP-001 339 424 339EA-001 42 52 42EA-002 14 17 14EA-003 A 14 17 14EA-003 B 9 11 9EA-004 A 10 12 10EA-004 B 7 9 7PK-02 11 14 11
445 556 44515% 83 83
639 528
P-002 764 955 764EA-005 28 35 28EA-005 25 31 25EA-006 21 26 21EA-007 A 17 22 17EA-007 B 13 17 13EA-008 A 13 16 13EA-008 B 22 28 22PK-04 25 32 25
928 1160 92815% 174 174
1334 1102
EA-009 A 9 11 9EA-009 B 17 22 17EA-010 A 11 13 11EA-010 B 30 37 30KM-005 16800 21000 16800
16867 21083 1686715% 3162 3162
24246 20029
1443 1804 144315% 271 271
2074 1714
24603 19683
15% 3690 369028298 23373
NOTES:1. Electrical Power for Air Coolers include a 80% efficiency factor.2. All the design values include a design margin (20%).3. Preliminary Issue. To be updated based on vendor data
TOTAL NORTH WEST
TOTALCONTINGENCY
TOTAL MAIN OPERATION AREA
CO2 INJECTION PUMP
INTERMITTENTTAG NUMBER
VOLTAGE CONTINUOUS
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 3
Utility Balance Electrical Power
017798-49-03-UB-001
LEAN AMINE PUMP - PETROCANADA
LP COMPRESSOR 2ND STAGE AFTERCOOLER - NORTH WEST
017798
DESIGNNORMAL
EQUIPMENT DESCRIPTION REMARKS
LEAN AMINE COOLER - PETROCANADACONDENSER - PETROCANADALP COMPRESSOR 1ST STAGE AFTERCOOLER - PETROCANADALP COMPRESSOR 2ND STAGE AFTERCOOLER - PETROCANADAHP COMPRESSOR 1ST STAGE AFTERCOOLER - PETROCANADAHP COMPRESSOR 2ND STAGE AFTERCOOLER - PETROCANADA
LEAN AMINE COOLER - SHELL
CO2 DEHYDRATION PACKAGE - PETROCANADA
CONTINGENCYTOTAL PETROCANADA
SUBTOTAL PETROCANADA
LEAN AMINE PUMP - SHELL
CO2 DEHYDRATION PACKAGE - SHELL
SUBTOTAL SHELL
CONDENSER - SHELLLP COMPRESSOR 1ST STAGE AFTERCOOLER - SHELLLP COMPRESSOR 2ND STAGE AFTERCOOLER - SHELLHP COMPRESSOR 1ST STAGE AFTERCOOLER - SHELL
CONTINGENCY
HP COMPRESSOR 1ST STAGE AFTERCOOLER - NORTH WESTHP COMPRESSOR 2ND STAGE AFTERCOOLER - NORTH WEST
SUBTOTAL NORTH WEST
CONTINGENCYTOTAL COMMON DELIVERY POINT
LEAN AMINE COOLER - SHELL
CO2 COMPRESSOR DRIVER - NORTH WEST
TOTAL SHELL
HP COMPRESSOR 2ND STAGE AFTERCOOLER - SHELL
LP COMPRESSOR 1ST STAGE AFTERCOOLER - NORTH WEST
CONTINGENCY
Project No.:Document #:
Date By Checked ApprovedDec. 2007 RT SA DM
Rev.: A Page 2 of 5
Sm3/hr Sm3/hr
PK-02 27.60 33.12 27.608000.00 9600.00 8000.00
8027.60 9633.12 8027.60
PK-04 62.20 74.64 62.2018210.00 21852.00 18210.00
18272.20 21926.64 18272.20
26299.80 0.00
NOTES:1. All the design values include a design margin (20%)2. Preliminary Issue. To be updated based on vendor data.
SUBTOTAL SHELL
BOILER PACKAGE - SHELL
NORMAL DESIGN (1)
Sm3/hr Sm3/hr
SUBTOTAL PETROCANADA
31559.7626299.80TOTAL
REMARKS
017798-49-03-UB-001
TAG NUMBER EQUIPMENT DESCRIPTION
CO2 DEHYDRATION PACKAGE - PETROCANADA
CO2 DEHYDRATION PACKAGE - SHELL
BOILER PACKAGE - PETROCANADA
017798
CONTINUOUS INTERMITTENT
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 3
Utility Balance Natural Gas
Project No.:Document #:
Date By Checked ApprovedDec. 2007 RT SA DM
Rev.: A Page 3 of 5
Sm3/hr Rate Sm3/hr Rate Sm3/hr Sm3/hr Mass Flow Rate
Ton/hr SCMH Ton/hr SCMH Ton/hr SCMH Ton/hr SCMHX-001 77.5 101611
77.5 101611
X-002 176.4 231280
176.4 231280
0.00 0.00 0.00 0.00 0.00 0.00 253.90 332891NOTES:
NORMAL
017798-49-03-UB-001PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 3
Utility Balance HP Steam
017798
REMARKSEMERGENCY
INTERMITENT REQUIREMENTS
STARTUPTAG NUMBER EQUIPMENT DESCRIPTION
CO2 STEAM TURBINE DRIVER - PETROCANADA
CO2 STEAM TURBINE DRIVER - SHELL
SUBTOTAL PETROCANADA
TOTAL
SHUTDOWN
SUBTOTAL SHELL
Project No.:Document #:
Date By Checked ApprovedDec. 2007 RT SA DM
Rev.: A Page 4 of 5
Sm3/hr Rate Sm3/hr Rate Sm3/hr Sm3/hr Mass Flow Rate
Ton/d SCMH Ton/d SCMH Ton/d SCMH Ton/hr SCMH
E-002 77.5 101611
77.5 101611
E-004 176.4 231280
176.4 231280
0.00 0.00 0.00 0.00 0.00 0.00 253.90 332891NOTES:
017798-49-03-UB-001
REMARKS
NORMAL
017798
TAG NUMBER EQUIPMENT DESCRIPTION
INTERMITENT REQUIREMENTS
STARTUP SHUTDOWN EMERGENCY
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 3
Utility Balance LP Steam
REGENERATION TOWER REBOILER - PETROCANADA
REGENERATION TOWER REBOILER - SHELL
SUBTOTAL PETROCANADA
SUBTOTAL SHELL
TOTAL
Project No.:Document #:
Date By Checked ApprovedDec. 2007 RT SA DM
Rev.: A Page 5 of 5
Sm3/hr Rate Sm3/hr Rate Sm3/hr Sm3/hr Mass Flow Rate
Ton/d SCMH Ton/d SCMH Ton/d SCMH Ton/hr ACMH
3.66 3.70
3.66 3.70
8.24 8.34
8.24 8.34
0.00 0.00 0.00 0.00 0.00 0.00 11.90 12NOTES:
TOTAL
SUBTOTAL SHELL
CO2 CAPTURE - SHELL
SUBTOTAL PETROCANADA
CO2 CAPTURE - PETROCANADA
REMARKSSTARTUP SHUTDOWN EMERGENCY
TAG NUMBER EQUIPMENT DESCRIPTION
INTERMITENT REQUIREMENTSNORMAL
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 3
Utility Balance Make-up Water
017798017798-49-03-UB-001
Project No.:
Document #:Date By Checked Approved
Dec. 2007 RT SA DM
Rev.: A Page 1 of 5
POWER Sm3/hr DUTY Sm3/hr
kW kW kW kW V kW kWP-001 809 1011 809EA-001 42 52 42
47 59 47
897 1122 89715% 168 168
1290 1066
P-002 2211 2764 2211EA-005 28 35 28EA-005 25 31 25
836 1046 836
3100 3875 310015% 581 581
4456 3681
EA-009 A 9 11 9EA-009 B 17 22 17EA-010 A 8 10 8EA-010 B 22 28 22EA-010 C 18 23 18KM-005 16780 20975 16780
16855 21068 1685515% 3160 3160
24229 20015
27 34 2719 24 1914 18 1417 21 1741 51 4128 35 2888 110 88
234 292 23415% 44 44
336 278
26358 21086
15% 3954 395430315 25040
NOTES:1. Electrical Power for Air Coolers include a 80% efficiency factor.2. All the design values include a design margin (20%).3. Preliminary Issue. To be updated based on vendor data
LP COMPRESSOR 2ND STAGE AFTERCOOLER - COMMON DEL. PT.HP COMPRESSOR 1ST STAGE AFTERCOOLER - COMMON DEL. PT.HP COMPRESSOR 2ND STAGE AFTERCOOLER - COMMON DEL PT.HP COMPRESSOR 3RD STAGE AFTERCOOLER - COMMON DEL PT.
LP COMPRESSOR 1ST STAGE AFTERCOOLER - NORTH WEST
CONTINGENCY
RICH AMINE PUMP - SHELL
SUBTOTAL SHELL
HP COMPRESSOR 3RD STAGE AFTERCOOLER - NORTH WEST
SUBTOTAL NORTH WEST
LEAN AMINE COOLER - SHELL
CO2 COMPRESSOR DRIVER - NORTH WEST
TOTAL SHELL
TOTAL PETROCANADA
SUBTOTAL PETROCANADA
CONDENSER - COMMON DELIVERY POINT
SUBTOTAL NORTH COMMON DELIVERY POINT
LEAN AMINE COOLER - SHELL
CO2 DEHYDRATION PACKAGE - COMMON DELIVERY POINT
CONTINGENCY
HP COMPRESSOR 1ST STAGE AFTERCOOLER - NORTH WESTHP COMPRESSOR 2ND STAGE AFTERCOOLER - NORTH WEST
LEAN AMINE COOLER - PETROCANADA
CONTINGENCYTOTAL NORTH COMMON DELIVERY POINT
RICH AMINE PUMP - PETROCANADA
LEAN AMINE PUMP - SHELL
LP COMPRESSOR 2ND STAGE AFTERCOOLER - NORTH WEST
LP COMPRESSOR 1ST STAGE AFTERCOOLER - COMMON DEL. PT.
CONTINGENCY
017798
DESIGNNORMAL
EQUIPMENT DESCRIPTION REMARKSINTERMITTENT
TAG NUMBERVOLTAGE CONTINUOUS
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 4
Utility Balance Electrical Power
017798-49-04-UB-001
LEAN AMINE PUMP - PETROCANADA
TOTAL NORTH WEST
TOTALCONTINGENCY
TOTAL MAIN OPERATION AREA
Project No.:Document #:
Date By Checked ApprovedDec. 2007 RT SA DM
Rev.: A Page 2 of 5
Sm3/hr Sm3/hr
PK-02 28.00 33.60 28.0026235.00 31482.00 26235.00
26263.00 31515.60 26263.00
26263.00 0.00
NOTES:1. All the design values include a design margin (20%)2. Preliminary Issue. To be updated based on vendor data.
017798
CONTINUOUS INTERMITTENT
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 4
Utility Balance Natural Gas
REMARKS
017798-49-04-UB-001
TAG NUMBER EQUIPMENT DESCRIPTION
CO2 DEHYDRATION PACKAGE - COMMON DEL. PT.BOILER PACKAGE - COMMON DELIVERY POINT
TOTAL 26263.00 31515.60
NORMAL DESIGN (1)
Sm3/hr Sm3/hr
SUBTOTAL COMMON DELIVERY POINT
Project No.:Document #:
Date By Checked ApprovedDec. 2007 RT SA DM
Rev.: A Page 3 of 5
Sm3/hr Rate Sm3/hr Rate Sm3/hr Sm3/hr Mass Flow Rate
Ton/hr SCMH Ton/hr SCMH Ton/hr SCMH Ton/hr SCMHX-001 254.0 333022
254.0 333022
0.00 0.00 0.00 0.00 0.00 0.00 254.00 333022NOTES:
SHUTDOWN
TOTAL
TAG NUMBER EQUIPMENT DESCRIPTION
CO2 STEAM TURBINE DRIVER - COMMON DEL. PT.
SUBTOTAL COMMON DELIVERY POINT
REMARKSEMERGENCY
INTERMITENT REQUIREMENTS
STARTUP
017798-49-04-UB-001PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 4
Utility Balance HP Steam
017798
NORMAL
Project No.:Document #:
Date By Checked ApprovedDec. 2007 RT SA DM
Rev.: A Page 4 of 5
Sm3/hr Rate Sm3/hr Rate Sm3/hr Sm3/hr Mass Flow Rate
Ton/d SCMH Ton/d SCMH Ton/d SCMH Ton/hr SCMH
E-002 254.0 333022
254.0 333022
0.00 0.00 0.00 0.00 0.00 0.00 254.00 333022NOTES:
TOTAL
REGENERATION TOWER REBOILER - COMMON DEL.
SUBTOTAL COMMON DELIVERY POINT
TAG NUMBER EQUIPMENT DESCRIPTION
INTERMITENT REQUIREMENTS
STARTUP SHUTDOWN EMERGENCY
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 4
Utility Balance LP Steam
017798-49-04-UB-001
REMARKS
NORMAL
017798
Project No.:Document #:
Date By Checked ApprovedDec. 2007 VC SA DM
Rev.: A Page 5 of 5
Sm3/hr Rate Sm3/hr Rate Sm3/hr Sm3/hr Mass Flow Rate
Ton/d SCMH Ton/d SCMH Ton/d SCMH Ton/hr ACMH
3.66 3.70
3.66 3.70
8.24 8.34
8.24 8.34
0.00 0.00 0.00 0.00 0.00 0.00 11.90 12NOTES:
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY Case 4
Utility Balance Make-up Water
017798017798-49-04-UB-001
TAG NUMBER EQUIPMENT DESCRIPTION
INTERMITENT REQUIREMENTSNORMAL
REMARKSSTARTUP SHUTDOWN EMERGENCY
CO2 CAPTURE - PETROCANADA
SUBTOTAL PETROCANADA
CO2 CAPTURE - SHELL
SUBTOTAL SHELL
TOTAL
Absorber Lean-Rich Exch OH Drum Flash Drum Regenerator Regen ReboilerT-001 E-001 (2 x 2) V-001 T-002 E-002
3.0 m Dia 32.25 MW 4.3 m Dia 4.3 m Dia 42.75 MW
Lean Amine PumpsP-001 A/B
849 M3/Hr, 250 m Head
Solvent MU PumpsLean Amine Cooler Regen O/H Cond
EA-001 EA-00232.25 MW 2.25MW
Solvent Tank
LP Comp LP Comp HP Comp HP Comp HP Comp 1st Aftercooler 2nd Aftercooler 1st Aftercooler 2nd Aftercooler 3rd Aftercooler
EA-003A EA-003B EA-004A EA-004B EA-004C
4.83 MW 3.48 MW 3.20 MW 3.20 MW 6.20 MW
LP 1st Inlet LP 2nd Inlet LP 2nd Outlet HP 1st OutletSeparator Separator Separator Separator
3.05 m Dia 2.29 m Dia 1.68 m Dia 1.37 m Dia
COMPRESSION PACKAGEPK-001
PK-002
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY PLOT PLAN STUDY - PETROCANADA SITE
T-001 T-002V-001
DEHYDRATION PACKAGE
BFW TANK
TREATEDWATERTANK
DEAREATOR
AUXILIARYBOILER
PACKAGE
TREATEDWATER
PACKAGE
DEMINERALIZEDWATER
PACKAGE
CO2 CAPTURE AREA32m x 27m
CO2 COMPRESSION AND DEHYDRATION AREA
40m x 40m UTILITY AREA
35m x 40m
K-001 A / BLP Compressors
X-001Steam Turbine
V002A
V002B
V002C
K-002 A / B / CHP Compressors
V003
CO2 RECOVERY STUDYPrepared for: Petroleum Technology Alliance Canada (PTAC) Project 017798, January, 2008 App 4-39 Chemicals and Petroleum
Absorber Lean-Rich Exch OH Drum Flash Drum Regenerator Regen ReboilerT-003A E-003 (4 x 4) V-004 T-004 E-004
3.8 m Dia 72.70 MW 6.5 m Dia 6.5 m Dia 96.38 MW
Lean Amine PumpsP-002 A/B
1914 M3/Hr, 250 m Head
Lean Amine Cooler Lean Amine Cooler Regen O/H CondEA-005A EA-005B EA-006
48.40 MW 35.5 MW 5.08 MW
Solvent MU Pumps
AbsorberT-003A Solvent Tank
3.2 m Dia
LP Comp LP Comp HP Comp HP Comp HP Comp 1st Aftercooler 2nd Aftercooler 1st Aftercooler 2nd Aftercooler 3rd Aftercooler
EA-007A EA-007B EA-008A EA-008B EA-008C
10.8 MW 7.7 MW 4.04 MW 7.60 MW 7.04 MW
LP 1st Inlet LP 2nd Inlet LP 2nd Outlet HP 1st OutletSeparator Separator Separator Separator
4.57 m Dia 3.20 m Dia 2.29 m Dia 1.98 m Dia
COMPRESSION PACKAGEPK-003
PK-004
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY PLOT PLAN STUDY - SHELL SITE
T-003A T-004V-004
DEHYDRATION PACKAGE
BFW TANK
TREATEDWATERTANK
DEAREATOR
AUXILIARYBOILER
PACKAGE
TREATEDWATER
PACKAGE
DEMINERALIZEDWATER
PACKAGE
CO2 CAPTURE AREA
CO2 COMPRESSION AND DEHYDRATION AREA
UTILITY AREA
K-003 A / BLP Compressors
X-002Steam Turbine
V005A
V005B
V005C
K-004 A / B / CHP Compressors
V006
T-003B
CO2 RECOVERY STUDYPrepared for: Petroleum Technology Alliance Canada (PTAC) Project 017798, January, 2008 App 4-40 Chemicals and Petroleum
LP Comp LP Comp HP Comp HP Comp HP Comp 1st Aftercooler 2nd Aftercooler 1st Aftercooler 2nd Aftercooler 3rd Aftercooler
EA-009A EA-009B EA-010A EA-010B EA-010C
4.1 MW 5.8 MW 3.2 MW 5.4 MW 6.2 MW
LP 1st Inlet LP 2nd Inlet LP 2nd Outlet HP 1st OutletSeparator Separator Separator Separator
4.12 m Dia 2.90 m Dia 2.13 m Dia 1.83 m Dia
COMPRESSION PACKAGEPK-005
PTAC CO2 ENHANCED HYDROCARBON RECOVERY STUDY PLOT PLAN STUDY - NWU SITE
K-005 A / BLP Compressors
KM-005Motor
V007A
V007B
V007C
K-006 A / B / CHP Compressors
V008
CO2 COMPRESSION AREA
CO2 RECOVERY STUDYPrepared for: Petroleum Technology Alliance Canada (PTAC) Project 017798, January, 2008 App 4-41 Chemicals and Petroleum