Westhaven: Pile Berth Redevelopment
Beca // 21 August 2017
3121348 // NZ1-10513716-15 0.15
Appendix A – Geotechnical Analysis Report
Report
Westhaven Marina - Pile Berth Redevelopment Preliminary Geotechnical Assessment
Prepared for Panuku Development Auckland
Prepared by (Beca)
21 August 2017
Westhaven Marina - Pile Berth Redevelopment Preliminary Geotechnical Assessment
Beca // 21 August 2017
3121348 // NZ1-10498439-11 0.11 // i
Revision History
Revision Nº Prepared By Description Date
1 Nicola Ridgley For Review 9/4/2015
2 Nicola Ridgley For Resource Consent Application 21/08/2017
3
4
5
Document Acceptance
Action Name Signed Date
Prepared by Nicola Ridgley 21/08/2017
Reviewed by Do Van Toan 21/08/2017
Approved by Stephen Priestley 21/08/2017
on behalf of
© Beca 2015 (unless Beca has expressly agreed otherwise with the Client in writing).
This report has been prepared by Beca on the specific instructions of our Client. It is solely for our Client’s use for the purpose for which it is intended in accordance with the agreed scope of work. Any use or reliance by any person contrary to the above, to which Beca has not given its prior written consent, is at that person's own risk.
Westhaven Marina - Pile Berth Redevelopment Preliminary Geotechnical Assessment
Beca // 21 August 2017
3121348 // NZ1-10498439-11 0.11 // ii
Executive Summary
Auckland Waterfront Development Agency propose extension of the northern reclamation and car park area
at Westhaven Marina. The extension is proposed to extend around 160m to the east and be around 50m
wide. It is proposed the top of the reclamation will be around 5mCD. The reclamation will support a
promenade along the southern edge, car parking and other landscape and urban design features. In
addition to the extension new mooring piers are also proposed.
This report is based on Beca’s understanding of the proposed development, and exploratory investigations
completed to date based on the proposed and approved scope of works.
The following key points should be read in conjunction with the entire report to provide a complete
understanding.
1) The geotechnical investigations indicate geological profile comprises recent marine sediments overlying
Tauranga Group alluvium all underlain by a weathering profile from Waitemata Group rocks. The recent
marine sediments are weak and around 4m-7m thick. Rock level is relatively uniform over the majority of
the proposed reclamation dipping down towards the eastern end.
2) In terms of NZS 1170.5:2004, the site subsoil class at this site has been determined as Class D, “Deep
Soil Site”.
3) Liquefaction is considered unlikely to occur due to the plastic nature of the soils present.
4) Recommended options for the reclamation include:
� Shallow perimeter Mudcrete shear key 3m deep with 1.5m Mudcrete blanket or,
� Shallow perimeter shear key 3m deep with geogrids reinforcement.
5) At the northern edge along the existing rock bund it is recommended the bund is lowered by 2m and
covered with Mudcrete (plus 2 layers of geogrid) to bring the reclamation up to about +5m Chart Datum
(CD).
6) Total settlements are expected to be of the order 600mm to 1200mm. Settlements are expected to
continue for a relatively long time period of 10+ years.
7) Detailed design will need to address construction schedule, short term risks during construction and long
term post-construction settlements.
8) Further strength testing of the marine sediments (in particular under the old rock bund) is recommended
as part of detailed design or construction.
9) Initial assessment of the required reclamation level to address functionality, access and wave
overtopping requirements was +4.7mCD. It is recommended that the post construction reclamation level
be +5.0mCD to allow for a degree of predicted settlement.
Westhaven Marina - Pile Berth Redevelopment Preliminary Geotechnical Assessment
Beca // 21 August 2017
3121348 // NZ1-10498439-11 0.11 // i
Contents
1 Introduction 1
2 Proposed Development 1
3 Site Description 1
3.1 Site Description 1
3.2 Geology 1
4 Ground Profile 2
4.1 Previous Investigations 2
4.2 Summary of Recent Beca Investigations 2
4.3 Soil Profile 2
4.4 Laboratory Test Results 3
4.5 Material Properties 3
5 Seismicity 4
6 Geotechnical Assessment 5
6.1 Reclamation Options 5
6.2 Settlement 7
6.3 Liquefaction Assessment 8
6.4 Reclamation Levels 8
7 Applicability Statement 9
8 References 9
Appendices
Appendix A
Waterfront Auckland WA Sites Plan
Appendix B
Dredging Plan
Appendix C
Figures
Westhaven Marina - Pile Berth Redevelopment Preliminary Geotechnical Assessment
Beca // 21 August 2017
3121348 // NZ1-10498439-11 0.11 // page 1
1 Introduction
Auckland Waterfront Development Agency has commissioned Beca Limited (Beca) to undertake
geotechnical investigation and preliminary geotechnical assessment for an extension to a reclamation at
Westhaven Marina.
This report presents the results from the geotechnical investigation and provides preliminary
recommendations for options with respect to the proposed reclamation. The factual data from the
geotechnical investigation is presented in Beca’s report Westhaven Marina – Pier Mooring Redevelopment –
Geotechnical Factual Report dated February 2015.
2 Proposed Development
The proposed development involves the extension of northern reclamation and car park area including
infilling of the western entrance at Westhaven Marina and the development of new mooring piers. This is
shown on the Waterfront Auckland WA Site Drawing (attached in Appendix A).
The extension is proposed to extend around 160m to the east and be around 50m wide. It is proposed the
top of the reclamation will be around 5mCD. The reclamation will support a promenade along the southern
edge, car parking and other landscape and urban design features.
3 Site Description
3.1 Site Description
The site is located in Westhaven Marina in Auckland. The western entrance to the marina is located
immediately to the east of the existing reclamation and is around 70m wide. To the east of the entrance is a
rock bund breakwater that provides protection to the marina. The top of this existing bund is around -
3.5mCD.
Seabed surveys indicate variable seabed levels in the area of the proposed reclamation. The seabed is
lower in the area of the western entrance at around -4 to -6mCD and rises to the east to typically -2 to
-3mCD.
The Westhaven area is bounded by reclamations for roads, parking, boat ramps and access to moorings.
We understand the most recent reclamation in this area near Pier U was constructed comprising rock bund
perimeter retaining structure in filled with unstabilised marine dredgings (with wick drains), surfaced with a
granular layer.
3.2 Geology
Geological Map 2, Geology of the Auckland Urban Area (Scale 1:50,000) indicates the underlying geology
comprises construction fill, overlying East Coast Bays Formation (ECBF Waitemata Group) residual soils and
rock.
The Tauranga Group alluvium although not indicated on the geological map, was encountered in the
boreholes.
Westhaven Marina - Pile Berth Redevelopment Preliminary Geotechnical Assessment
Beca // 21 August 2017
3121348 // NZ1-10498439-11 0.11 // page 2
4 Ground Profile
4.1 Previous Investigations
Limited previous geotechnical investigations are available within the Westhaven Marina. These include
levels to firm sediments and interface with weathered ECBF rock in the area to the south and adjacent to
piers U to X. These are shown on Dredging Plan attached in Appendix B. The levels shown on this plan
indicate rock level varies from -5.5mCD to greater than RL -22mCD.
4.2 Summary of Recent Beca Investigations
Geotechnical investigations were undertaken between the 2 and 4 February 2015. The scope of the
geotechnical investigations comprised five boreholes to depths of between 3.9m and 16.6m below seabed.
Geonor Vane testing was undertaken down the borehole to measure the shear strengths of the weak marine
sediments.
The investigation details are presented in the Beca Factual Report, and investigation locations are shown on
the site Figure 1 plan (Appendix C).
4.3 Soil Profile
The soil profile encountered in the site investigations generally confirmed the published geology, and was
found to comprise recent marine sediments overlying Tauranga Group alluvium (TGA) all underlain by
Waitemata Group (WG) weathered profile (residual soils followed by rock at depth).
The recent marine sediments is a relatively thick (4m-7m) very weak layer with measured shear strengths
typically between 5kPa and 10kPa covering the site. In several of the boreholes a thin sand layer was
encountered beneath the recent marine sediments which were not able to be penetrated by the Geonor
Vane. This layer was not encountered in all the boreholes, and was typically underlain by weak Tauranga
Group silt. In the area of the proposed reclamation rock level was relatively uniform at around -10m CD
dipping down towards the east to about -16mCD in BH4.
The generalised soil profile is shown on Figure 2 and Figure 3 in Appendix C.
Table 4.1 – Generalised Soil Profile
Geologic Unit Depth to top of layer (m)
Thickness (m)
General Soil Description Measured Strength Parameters
Corrected vane shear strength (kPa)
SPT N (blows/ 300mm)
Recent Marine Sediments
0 4-7 Very soft SILT, some shells and sand.
2-18 N/A
Tauranga Group Alluvium
4-7 0-6 Very loose SAND, some silt and shells
Very soft SILT
6-150+ (UTP) 0-3
Waitemata Group Residual Soil and Rock
5-13 N/A Interbedded SANDSTONE and SILTSTONE
N/A 50+
Westhaven Marina - Pile Berth Redevelopment Preliminary Geotechnical Assessment
Beca // 21 August 2017
3121348 // NZ1-10498439-11 0.11 // page 3
4.4 Laboratory Test Results
Laboratory testing comprised Atterberg Limit, and particle size gradings. The results of the tests are
summarised in the Table 4.2 below and contained within the Geotechnical Factual Report.
Table 4.2 – Summary Laboratory Test Results
Sample Origin Geologic Unit Atterberg Limits Grading
BH02 2-4m
Recent Marine Sediments WC = 55.4 CPL= 50 PL = 25 PI = 25
38% Silt/Clay 54% Sand 8% Gravel
BH03 3-4m
Recent Marine Sediments WC = 54.9 LL = 54 PL = 22 PI = 32
47% Silt/Clay 49% Sand 4% Gravel
BH04 3-4m
Recent Marine Sediments WC = 55.5 CPL = 50 PL = 23 PI = 27
30% Silt/Clay 51% Sand 19% Gravel
BH02 6-6.5m
Tauranga Group Alluvium WC = 25.1 CPL = 39 PL = 21 PI = 17
10% Clay 17% Silt 73% Sand
BH04 9.5-10.5m
Tauranga Group Alluvium WC = 75.5 LL = 85 PL = 32 PI = 53
47% Clay 43% Silt 10% Sand
BH04 12.6 -13.1m
Tauranga Group Alluvium WC = 77 LL = 87 PL = 35 PI = 52
53% Clay 41% Silt 6% Sand
Note: WC = Water Content; LL = Liquid Limit; CPL = Cone Penetration Limit; PL = Plastic Limit; PI = Plasticity Index
4.5 Material Properties
This preliminary assessment is based on the geotechnical parameters listed in Table 4.3 below. The
parameters have been assessed from the investigation data, experience with these soils at other sites in
Auckland, and back analysis of the existing rock bund.
It is noted construction details of the existing rock bund are not available; it has been assumed the rock was
placed directly on the seabed.
Westhaven Marina - Pile Berth Redevelopment Preliminary Geotechnical Assessment
Beca // 21 August 2017
3121348 // NZ1-10498439-11 0.11 // page 4
Table 4.3 – Preliminary Design Parameters
Geologic Unit Unit Weight, ɣ (kN/m3)
Shear Strength (kPa)
Friction Angle, Φ’ (degrees)
Cohesion, c’ (kPa)
Settlement Parameters
Cc/(1+e0)(2)
(%)
Cv(3)
(m2/year)
Recent Marine Sediments
� Unconsolidated (1)
15
5 + 0.6kPa/m
18-22
0
15-25
2
� Consolidated (beneath Mudcrete)
15 10 +0.6kPa/m 20-26 0.5-1.5 15-25 2
� Consolidated (beneath existing rock breakwater)
15 15 +0.6kPa/m 20-26 0.5-1.5 15-25 2
Tauranga Group Alluvium
� Sand
16
-
2
28
-
-
� Silt/Clay 16 10 + 1.5kPa/m
- - 15-25 2
Waitemata Group Residual Soil and Rock
20 200 34 25-50 - -
Mudcrete Bund 15 150 32 25 - -
Mudcrete Reclamation 15 100 32 15 - -
Existing Rock Bund 18 - 40 5 - -
Note:
1) Unconsolidated shear strength based on Geonor Vane test readings
2) Compressibility
3) Rate of consolidation
5 Seismicity
For the purposes of this preliminary assessment, we have assumed the Design Life is 50 years and
Importance Level 2.
The site is assessed to be Seismic Soil Class D (deep or soft soil).
The Peak Ground Acceleration (PGA) has been calculated in accordance with NZ Geotechnical Society’s
“Earthquake geotechnical engineering practice Module 1: Overview of the Guidelines”, which recommends
NZTA Bridge Manual for assessment of liquefaction and stability and displacement of slopes. The PGA
values adopted for our geotechnical assessment are summarised in Table 5.1 below.
Westhaven Marina - Pile Berth Redevelopment Preliminary Geotechnical Assessment
Beca // 21 August 2017
3121348 // NZ1-10498439-11 0.11 // page 5
Table 5.1 – Geotechnical Design PGA
Importance Level
Design Life
(years)
Limit State
Probability of Exceedance (per annum)
Spectral Shape Factor (T=0), Ch(T)
Return Period
Factor, R
Hazard Factor, Z
Design PGA (g)
2 50 SLS 1/25 1.12 0.25 0.13 0.04
ULS 1/500 1.12 1.0 0.13 0.15
6 Geotechnical Assessment
The soil encountered in the investigations typically comprised marine sediments overlying Tauranga Group
alluvium all underlain by Waitemata Group soil and rock. The key geotechnical issues associated with the
proposed development include:
� Presence of very weak marine sediments
� Potential for instability of the reclamation
� Potential for significant long term settlements
Preliminary options for the reclamation have been assessed and are discussed further below.
6.1 Reclamation Options
Several options for development of the reclamation have been assessed, these include
� Rock bund and dredged marine sediment fill
� Mudcrete bund and fill
6.1.1 Rock Bund and Dredged Marine Sediment Reclamation Fill
This option comprises perimeter retaining bunds constructed using crushed rock and the space backfilled
with reclaimed dredged marine sediments. To provide a stable rockfilled bund, undercutting of the marine
sediments to form a shear key would be required, founded in the Waitemata Group rock. This option would
require staged construction to allow the underlying sediments to consolidate and gain strength beneath the
reclamation before a trafficable surfacing could be added, therefore resulting in a much longer construction
period.
Settlement of the reclamation would be large (of the order 2m-3m) and occur over a long period of time
(greater than 10-15 years). Wick drains could be used to accelerate consolidation reducing the time for
settlement to about 1 year but not for the total amount.
While this option is similar to existing reclamation fills in the Westhaven area it is not favoured because of the
depth of underlying weak sediments and a high level of differential settlement across the proposed
reclamation.
6.1.2 Mudcrete Bund and Fill
Recently reclamations have been constructed using cement stabilised marine dredgings (named as
“Mudcrete”, a technique developed by Beca). The advantages of Mudcrete include improved stability,
reduced total and consolidation settlement and reduced differential settlement.
Westhaven Marina - Pile Berth Redevelopment Preliminary Geotechnical Assessment
Beca // 21 August 2017
3121348 // NZ1-10498439-11 0.11 // page 6
6.1.3 Options assessed include:
[a] Deep perimeter shear key into rock;
[b] Shallow perimeter shear key - 3m deep with 1.5m stabilisation beneath reclamation; and
[c] Shallow perimeter shear key - 3m deep with geogrids.
Preliminary assessment of slope stability was undertaken using Geostudio SLOPE/W, Morgernstern and
Price method of analyses. The preliminary design options are based on obtaining a minimum long term
factor of safety of 1.5 for static conditions. Seismic stability under 0.15g has been checked and for the
options presented below the factor of safety is around 1 to 1.1.
The following assumptions have been made as part of the preliminary analyses:
� Two sections have been assessed, cross section with both the southern and northern edges (including
the existing rock bund); and long section with the eastern edge where the rock dips down
� Top of reclamation of +5mCD
� Side slopes of 1.5H:1V
� Vertical face extending from -1m CD along the south edge (representing the promenade)
� A 0.5m tidal lag, with seawater level +1.2mCD through the reclamation lowering to +0.7m CD (mean low
water) on the seaward side
� 12kPa traffic surcharge
� Tension crack in the Mudcrete bund and outer reclamation edge to RL +0.7mCD
� Consolidated soils beneath the reclamation and bund for long term stability assessment
Construction staging is likely to be critical; however no specific details have been determined at this stage.
Such details may include the following and will be finalised during detailed design:
� Construction of Mudcrete bund and reclamation in uniform layers across the area of reclamation
� Staged construction to allow the recent marine sediments to consolidate and gain strength prior to raising
to the final height and constructing pavements
� Temporary surfacing until consolidation settlements have reached an acceptable level for final pavement
construction
6.1.3.1 Deep perimeter shear key into rock
This option [a] involves treating the full depth of marine soils at the front of the bund to key into the
underlying rock. This option would provide a more secure edge to the reclamation; however the depth of
treatment would be at 6m to 8m below seabed. This would likely involve in-situ stabilisation which would
require costly specialist construction equipment, but would provide the most reliable solution.
This option has not been assessed further due to the likely higher cost.
6.1.3.2 Shallow perimeter Mudcrete shear key 3m deep + 1.5m Mudcrete Blanket
Option [b] includes a 3m deep shear key with 1.5m stabilisation below the reclamation. With a shallower
shear key than option [a] the reclamation would be “floating” on the weaker existing marine sediments. With
only a 3m deep key, the FoS is less than 1.5, therefore additional support is required to obtain a factor of
safety of 1.5. This option includes a wider stabilisation of 1.5m depth of the marine sediments beneath the
entire reclamation to obtain a long term FoS >1.5. This option is shown on Figure 4a & 4b, Appendix C.
Additional stabilisation beneath the reclamation has the advantage of reduced consolidation settlement (due
to the reduced thickness of remaining marine sediment) and potentially reduced differential settlement as the
thicker stabilised reclamation would act as a “raft” across the softer spots in the sediments.
Westhaven Marina - Pile Berth Redevelopment Preliminary Geotechnical Assessment
Beca // 21 August 2017
3121348 // NZ1-10498439-11 0.11 // page 7
6.1.3.3 Shallow perimeter Mudcrete shear key 3m deep with geogrids
This option [c] is similar to above with the shallow 3m deep Mudcrete shear key, however instead of 1.5m
Mudcrete blanket, two layers of geogrids be placed within the reclamation to provide the required
improvement to stability. This option is shown on Figure 5a & 5b Appendix C. To improve constructability the
geogrids have been placed at +1.5 and +2m CD i.e. above low water, however final location would be
subject to more detailed analyses. Long term FoS is >1.5 but settlements would be greater. Detailed
analysis is required to design/select the tensile strength of geogrid.
6.1.4 Existing Rock Bund
The existing rock bund is located approximately at the northern extent of the proposed reclamation. As there
are no details available regarding construction of this rock wall, this assessment is based on the assumption
that the rock was placed directly on the seabed.
A back analysis of the stability of the rock wall is based on an assessed FoS of 1.2. This resulted in an
assessed shear strength of the underlying material as 15kPa + 0.6kPa/m.
Several options were assessed including:
� Place Mudcrete on existing rock
� Lower existing rock wall and place Mudcrete over the remaining old bund
� Place Mudcrete in front of the old wall to construct shear key.
[a] The recommended FoS of 1.5 cannot be obtained by just placing Mudcrete on top of the existing rock
bund. Therefore this option is not recommended.
[b] Constructing a shallow shear key on the northern face and encasing the old rock wall in Mudcrete does
not meet the required level of stability without using geogrids as well. Construction of a shear key at the toe
of the existing rock wall is likely required in short sections. With the use of geogrids still being required, this
option will likely be more costly and is therefore not considered further.
[c] Preliminary analyses indicate lowering the rock bund wall by 2m, placing Mudcrete and two layers of
geotextile provides a minimum FoS of 1.5. However this assumes the underlying soils are uniformly and
completely consolidated. This is shown on Figure 6, Appendix C.
6.2 Settlement
Settlement of the reclamation will occur due to consolidation of the recent marine sediments beneath the
reclamation and Tauranga Group alluvium. Parameters for assessing settlement and rate of settlement have
been based on the consolidation test results from other projects in the area in similar soils and are
summarised above in Table 4.3.
Westhaven Marina - Pile Berth Redevelopment Preliminary Geotechnical Assessment
Beca // 21 August 2017
3121348 // NZ1-10498439-11 0.11 // page 8
Preliminary assessment of settlements are summarised on Table 6.1 below.
Table 6.1 – Settlement
Option Total Settlement (mm)
Estimated Time for 50% Consolidation
(years)
Estimated Time for 90% Consolidation
(years)
Estimated Post Construction Settlement (1)
(mm)
3m Shear key with Geogrid (Option [c])
800-1200 4 15 600-900
3m shear key with Undercut & 1.5m Mudcrete (Option [b])
600-1000 2 10 400-600
Northern Bund Edge + 2m Mudcrete/Geogrids
100-300 2 10 50-200
Note: 1) Assume construction period 1 year 2) One way drainage of marine sediment
The marine sediments are relatively fine grained and have a low rate of consolidation. Post construction
settlements and periods could be reduced by installing wick drains through the marine sediments to increase
the rate of consolidation.
6.3 Liquefaction Assessment
Liquefaction is a phenomenon where under earthquake shaking loose sandy/gravelly deposits below the
groundwater contract with a corresponding rise in groundwater pressure. In the event of liquefaction, loss of
strength, settlement and instability (lateral spreading) may occur.
Laboratory testing indicates the recent marine sediments and Tauranga Group soils typically have a plastic
index greater than 12, therefore soils at this site are considered unlikely to liquefy under the 0.15g design
level tabled above. Cyclic softening of the marine sediments is also considered unlikely as the cyclic shear
stress generated by a 1/500 year return period earthquake is less than the measured peak soil shear
strength.
6.4 Reclamation Levels
Initial assessment of the required reclamation level to address functionality, access and wave overtopping
requirements was +4.7mCD. It is recommended that the post construction reclamation level be +5.0mCD to
allow for a degree of predicted settlement.
Westhaven Marina - Pile Berth Redevelopment Preliminary Geotechnical Assessment
Beca // 21 August 2017
3121348 // NZ1-10498439-11 0.11 // page 9
7 Applicability Statement
This report has been prepared by Beca on the specific instructions of our Client. It is solely for our Client’s
use for the purpose for which it is intended in accordance with the agreed scope of work. Any use or reliance
by any person contrary to the above, to which Beca has not given its prior written consent, is at that person's
own risk.
Should you be in any doubt as to the applicability of this report and/or its recommendations for the proposed
development as described herein, and/or encounter materials on site that differ from those described herein,
it is essential that you discuss these issues with the authors before proceeding with any work based on this
document.
8 References
1) Beca – Westhaven Marina – Pier Mooring Redevelopment – Geotechnical Factual Report, dated
February 2015.
2) GNS Science – Geological Map 2, Geology of the Auckland Urban Area (Scale 1:50,000).
3) NZ Geotechnical Society – Earthquake geotechnical engineering practice, Module 1: Overview of the
guidelines, dated March 2016.
4) NZ Transport Agency Bridge Manual 3rd Edition, Amendment 2 dated May 2016.
Appendix A
Waterfront Auckland WA Site
´
Date: 14th October 2014Ref Number:File Name: AWDA_Asset_Register_A0.mxdPublished Name: WA_Westhaven_Projects_20141014.pdf
This map/plan is illustrative only and all informationshould be independently verified on site before takingany action.Copyright Auckland Waterfront DevelopmentAgency Ltd (AWDAL). Land Parcel Boundary informationfrom LINZ (Crown Copyright Reserved).Whilst due care has been taken, AWDAL gives no warranty as to the accuracy and completeness of any information on this map/plan and accepts no liability for any error, omission or use of the information.Height datum: Auckland 1946. 0 40 80 120 160 20020
Meters1:1,250 @ A0
LegendPlatform_2_BuildingsBerth, Marina BerthBerth, Multi HullBerth, PileGangwayPierNew Westhaven BerthsWaterfront PromenadeProposed Reclamation
Orthophotography - 2014WA / Architectus / LINZ Data
WA Sites
Appendix B
Dredging Plan
Appendix C
Figures
-35
-30
-25
-20
-15
-10
-5
0
5
10
15
0 20 40 60 80 100 120 140 160 180 200
-35
-30
-25
-20
-15
-10
-5
0
5
10
15
7
6
1450+
50+
BH15
5
8UTP 3
50+
BH2
2
10
18
17
10
7
UTP
612
0
0
0
3
50+
50+
50+
BH4
Distance (m)
Ele
vati
on
, RL
(m
)
3121348/212 Printed 24/02/2015
SECTION Westhaven MarinaFIGURE Section 2
-35
-30
-25
-20
-15
-10
-5
0
5
10
15
0 5 10 15 20 25 30 35 40 45 50 55
-35
-30
-25
-20
-15
-10
-5
0
5
10
15
5
5
8UTP 3
50+
BH2
6
14
8
UTP
50+
BH3
Distance (m)
Ele
vati
on
, RL
(m
)
3121348/212 Printed 25/02/2015