Appendix A
Comparison Summary and Process Flow and Logic Diagrams
Idaho Completion Project Bechtel BWXT Idaho, LLC A- 1
Excavation I I I
Pass 1: Forklift/loader digs and hauls Layer A to outside pile.
Comparison Summary of Retrieval Alternatives
Pass 1: Backhoe digs and loads Layer A into soil hopper. Overhead crane (Alt. 1) or forklift/loader
Closure
El 5009 - Topaof Overburden
(3' Overburden)
I Pass 2: Backhoe digs and loads Layer B into soil hopper. Overhead crane (Alt. 1) or forklift/loader (Alt.3) carry and dump soil hopper on inside pile.
Pass 2: Backhoe excavates and forklift/loader hauls Layer B to inside pile.
I Layer B
(2' Overburden)
I
V Pass 3, Part 1: Backhoe excavates and forklift/loader hauls Layer C to sorting deck.
Layer Overburden) Pass 3, Part 1: Backhoe excavates and loads Layer C into a box.
El 5003 - T o p of Waste I
Pass 3, Part 2: Forklifuloader excavates and hauls Layers D and E to sorting deck. As the underburden is cleaned off, gravel is spread by the forklift/loader to harden the surface for wheel traffic.
Layer D (6'
Pass 3, Part 2: Backhoe excavates and loads Layers D and E into separate boxes. The overhead crane (Alt.1) or forklift (Alt.3) carry the boxes from Parts 1, 2 and 3 to the AGV, which delivers them to the sorting deck.
El 5010 - T o p of Backfill
Pass 8: Front-end-loader backfills with outside borrow to form Layer L.
Pass 9: Front-end-loader backfills with outside borrow to form Layer L.
.p I
Layer L (2' Soil Backfill)
Pass 7: Overhead crane (At. 1) or forklift/loader (Alt.3) carries soil hopper from AGV to spread soil from Layer A to form Layer K. Compactor with blade (Alt.1) or forkWloader (Alt.3) spreads and
Pass 8: Forklift/loader hauls, places, and compacts clean fill soil from Layer A to form Layer IC
Layer K (3 ' soil Backfill) compacts soil.
I
Pass 6: Overhead crane (At. 1) or forklift/loader (Alt.3) carries soil hopper from AGV to spread bulk soil from characterization to form Layer J over waste boxes. Compactor with blade (Alt.1) or forkWloader (Alt.3) spreads and compacts soil.
Pass 7: Forklift/loader hauls, places, and compacts soil returned from characterization to form Layer J over waste boxes. Layer J
(2'
I El 5003 - T o p b f Waste Boxes
Pass 6: Six foot high boxes of treated waste placed on top of finished floor by forkWloader
Pass 5: Six foot high boxes of treated waste placed on top of finished floor by overhead crane (Alt.1) or forkWloader (Alt.3) and AGV
\
Layer I te) (6 ' Wa!
El 4991 - Tc, .. Underburden Laver E (6" Underburden) Excavated in Pass 3, Part 2, above. Excavated in Pass 3. Part 2. above.
El 4991 - T O P Backfilled in Pass 5. below. Lave1
Boxes)
. -..... . - . . . . . (6" Gravel) Backfilled in Pass 4. below - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
t Pass 4: Overhead crane (At. 1) or forklift/loader (Alt.3) carries soil hopper from AGV to begin backfill with soil from Layer B to form Layer G. Compactor with blade (Alt. 1) or forklift/loader (Alt.3) spreads and compacts. Layer His added and compacted in same manner.
Pass 3, Part 3: Backhoe excavates and loads Pass 5: ForkWloader backfills and compacts Layer F into a box. soil from Layer B to form Layer G. Forklift/
loader also places and compacts 6" of gravel (Layer H) for finished floor.
Layer G (2'
Pass 4: Backhoe excavates and forklift/loader hauls Layer F to the sorting deck. Layer F
(2' Underburden)
E l 4994 5 Bottom of Excavation
T o p of Basalt Top of Basalt
-9
9-10-03
Figure A- 1. Retrieval methods comparison summary.
A-3
Alternative 1 Passes 5 ,6 ,7 and 8
Waste Box Return with Backhoe and Overhead Crane
Rzgm Pas.; h in parallel with Pass 5 Move
waste boxes and start
returned to s t a t backfill over boxes Ycs > Crimpactor up to lop of > and is Compactor
Usc .4GV and overhead crane fo place boxes of
treated waste on finished flooi
A donc w~ floor backii icess
AG\ ~ Automate Glided Velacle Compactor ~ CP-321 nith blade OD = Overburden
i s m g AGV and overhead crane, transfer dirt rchirned froin charactcriration onto
waste boxes, addmg 2' of fill sod (Layer J) to bring lcvcl up to el. 5005 Ompactor
levels and compacts f i U dirt
krom 4lternathe 1, Pa5s 4 Enough floor space ha? becn proparcd
to slut rehirnmg sas t e bovza
start 0 Pacs 5
Yes I Fnd Pass 5 Continue Pass 6
( End > /1 I Ekein and coinolete Pass R Rackfdl with outside soil to form Layer L. Add 2' of cumpacted
dirt, hrniging level up to cl 5010
Move equipment from pit
, I u I across whole Dit.
A Room and completc Pass 7. Btckfill soil from Layer A to form Layer K with dirt hopper and overhead crane. Add 3' of
compacted dirt, bringing level up to el 5008
in concert wilh dzcontaminnhon cycles
Has backfill over boxe5
across whole pit Perform this ni I ' layen completed?
Idaho Completion Project Bechtel BWXT Idaho, LLC A-7
Moco front end loader
Alternative 2 Passes 1 and 2
Overburden Removal with Front End Loader
Record position of uncovered item.
Cover visible nmte items with soil and
leave iii place.
No Continue Pass I
A-8 Idaho Completion Project
Bechtel BWXT Idaho, LLC
h m Alternative 2, Pdsr 3 Enough wa(tv has been removed to
aUoa floor preparation to begin
Go to Alternative
Alternative 2 Passes 4 and 5
Floor Preparation with Front End Loader
Yes Go to ALrzriiative 2,
LB ~ Underburden FEL = Front End Loader OB ~ Ovuhurdcn
2, Pass 6
No Ciintmue Pass 4 I I
Pass b and work Pass 6 I
\ /
U'
" I
Yes I Pass 4 complete. Continuz Pass 5 z
m parallel with Pass 5 .
Csing FEL, backfill with Layer B soil from OR stagrng aoa, adduig 2 feet of fiU dirt and 6'' of grawl (1.qers G & to bring finlshed iloor up to cl 4997. FEL levels
and compacts the fill dirt and gravel.
Idaho Completion Project A-10 Bechtel BWXT Idaho, LLC
k*om AItemati\e 3, Pass 2 Approxlrnately 5 of OH h a
been removed from pit
Alternative 3 Pass 3
Wavte Retriewl and Underburden Excaiation with Backhoe and Forklift
AGV = Automatic Guided Vehicle OB = Overbuden LJB = Llndei burden
A Has a high rad
rource been detected OL is
(el 5004) UB (Laycrs D B item too lage for treatment')
Raluate d s face radration and excmatc wasto item that arc withm reach, includii 5" of
Bogin Pass 3. P a t I Move hackhoe mto thc p t at thc south end on top of remaining OR
whhln reach of ExKarnts raman6llg
OB between
seam (Layer C)
Place OB ni the backhoe and ate Ictrlcvalbor '
t
Go to Altel.l,atlVo 3, Pass 4 and work Pass 4 m parallel with Pass
Y Yes
and charactenstas of
Place high rad item m dosignaled container. grout large obicct m place or move d to designated pzt locatim before
YrouhnE.
retrieval hox full?
Move rehievai box to sorting deck via AGV and ibrkhft
Return an empty box lo backhoe
Idaho Completion Project Bechtel BWXT Idaho, LLC A-13
Alternative 3 Pass 4
Floor Preparation with Backhoe and Forklift
M o ~ c forkliftlhader into pit and work in parallel with Pass 3.
’
,4GV = Automatic Guided Vehicle OR -= Ovsrburden LB = Underburden
Rackfdl Layer B soil from OB staging area into pit with soil hopper on .kGV
and forklift, adding 2’ of soil and 6 inches of gravel to bring fmished floor up to el. 4997. Furktiftiloader Ievvols
and compacts f i U dirt and gravel.
From Alternative 3, Pass 3 Enough UDhas been removed down tu el 4994 5 to begm flooi preparation
Start Pass 4
backfill been completed?
hiove forklifu loader out of’ pit. Pass 4
1 r--
Has enough floor been prepouod to
start returning waste boxes?
--N
Go to Alternative 3. Pass 5 and work Pass 5 < in parallel Nith Pass I
I
Idaho Completion Project A-14 Bechtel BWXT Idaho, LLC
Eroin Alternative 3, Pass 4 Enough floor spa'e hhi been prepared
to start returning waste boxes
boxes been returned to at& backfill over with Pass 5. Move
forklift~loador done of waste boxes and start bacl process
Regin Pass 6 in pa~allel
boxes mid i3 Yes+ forkMt)loader up to top >
Alternative 3 Passes 5,6,7 and 8
Waste Box Return with Backhoe and AGV
lising AGVand forklift, transfer soil returned fmm characterisation onto waste boxes, addmg 2' of soil (Layer J ) to bring lewl up to el. 5005. Forkliftloader levels
md compacts soil
AGV- Automatic Guided Vchicle OB = Overbrirdeii
No I
I
Yes I Coiitlnue Pnss 6
A Move equipment
from pit
Rcgui and complete Pass 7. HackiiU soil from Layer A to fonn Iayer K with soil
hopper and forklff. Add 3' of competed soil brlngrng level up to el. 5008 across whole pit. Perform this in I ' layers m concert with decontamlnalion cycles.
&gin and completc Pass 8. Llackfil with outride soil to form Layer I>. Add 2' ofcompacted
dirt brlnging lex el up to el 501 0 , across whole pit. completed?
I
Idaho Completion Project Bechtel BWXT Idaho, LLC A-15
Appendix B
Detailed Drawings of Alternate Retrieval Facilities
Idaho Completion Project Bechtel BWXT Idaho, LLC B- I
~. . . 8 I I 6 I 5 1 4 I I 2 I 1 ri
DRAWING INDEX '$El DWG NO. I ,,&y:o I REV1 DRAWING TITLE
REV DESCRlPnON EFFECllVE DATE
FOE D R A I N G INDEX SEE DRAMNG NO 6 2 4 9 7 9
10 ISALM?\ !10 BUTT;
lNFK1 -*da*ro-rnn-lrvalvrr
OU 7- 10, PIT 9 REMEDIATION PROJECT
ZbBCONmYl NO S i C * T E / B W X T Y A X O L L G
N/A REQUESTER SL AUSTAO
Q
300
WMF 601
RWMC NORTH
DESCN DN NISHIOKA DRAWN CA BEHM
/--.
- scE. 1'' = 300 o'
DES~GN PHASE PRE CON SAFETV CATEGORY N/A
CONSTRUCTION AREA
PROJECT NO 1 023203 SPEC CODE SITE MAP, AREA MAP AND DRAWING INDEX + sii OAR NO. m a 8 0 FfECiIM D A k . 9-30-2003
- TO REXBURG
TO ARC0
IDAHO FALLS
TO BLACKFOOl CONSTRUCTION AREA-J
INEEL SITE MAP SCALE. NONE
L a I
1 6 2 4 9 7 9 1-T-1 SITE MAP, AREA MAP AND DRAWING INDEX
2 6 2 4 9 8 0 1-C-I EXISTING SITE PLAN 3 624981 1-C-2 IMPROVED SITE PLAN
4 6 2 4 9 8 2 1-A-1 GENERAL BUILDING FLOOR PLAN 5 6 2 4 9 8 3 ~ - A - z UPPER RETRIEVAL PLAN 6 6 2 4 9 8 4 1- A- 3 ELEVATIONS 7 6 2 4 9 8 5 I - A- 4 ENLARGED PLANS
8 6 2 4 9 8 6 1- A- 5 SECTION AND DETAIL 9 6 2 4 9 8 7 1- A- 6 SECTION
1 0 6 2 4 9 8 8 1-HV-1 HVAC FLOW DIAGRAM
11 9 2 4 9 8 9 I- E- 1 ONELINE DIAGRAM
RETRIEVAL OPTION 1
a I 7 I 6 I 5 t 4 I 3 I 4 I
B-3
Q
m I
(0 N
\,
\ \
\ \ \
/ /
.01-.011
C
U
n
t
W 0" I Y [I( x
0
r!T
0 CL
V
0
0 N - P)
in (D m
7
I ,
2 W 0
4 W
5 -
0
N N -
...... W E HSVM X 3 0 l t i l V 11x3
I______ OS1 H13N31
\
S i- (I 0 /
W W '
\. I i
/
,.*-.so 1 l-
+ & R C Y 31 8
490'-0" 155'"''
7 6 5 4 3 2 1
l i 3VERBURDEN STAGING
AREA, BELOW
MAINTENANCE AND
HVAC BUILDING
INLET
6
UPPER RETREIVAL PLAN SCALE 1 ' = 30'-0"
I
INLET AIR DUCT
\IN,, AIR DUCT
(r
h c I
-
NOTE ACCESS AND EQUIPMENT CORRIDORS NOT SHOWN FOR CLARITY
RELEASED FOR RECORD ONLY
DO NOT FABRICATE
B-7
+ & R C Y 31 8 7 6 5 4 3 2 1 REVISIONS
REV DESCRlPnON EFFECllVE DATE
LOOKING NORTH
SOUTH ELEVATION SCALE 1"=2O'
\NEW PILING, BELOW GRADE
EXISTING PILING BELOW GRADE
LOOKING WEST
EAST ELEVATION SCALE 1"=30' RELEASED
FOR RECORD ONLY
DO NOT FABRICATE
B-8
+ & R C Y 31 8
193'-3" - 105'- 4"
7 6 5 4 3 2 1
NORTH
ENLARGED PLAN OVERBURDEN STAGING AREA
SCALE: 1 ' = 2O'-O"
FOE D R A I N G INDEX SEE DRAMNG NO 624979
1O""
r NEW PILES AND SHEET PILES, W P
EXISTING CONCRETE
lNFK1 -*da*ro-rnn-lrvalvrr ZbBCONmACl NO S i C * T E / B W X T Y A X O L L G
N/A
REQUESTER SL AUSTAO OU 7- 1 0 PIT 9 REMEDIATION PROJECT
CONCRETE
a 7
\
6 5 t- 4 3 4 I
\ -rs- \
N
m t u l NEW CONCRETE
2-
SOUTH
ENLARGED PLAN SCALE 1' = 20'-0"
R ETRl EVAL OPTION 1
B-9
Ol-RCY 31 8
---
OVERBURDEN
7 6 5 4 3 2 1
Ft
10'-0"
AIR INTAKE DUCTING ROOF JOISTS VERHEAD CRANE RAIL
I /I111 I \
OVERHEAD CRANE MAINTENANCE AREA VERTICAL SEPARATOR
DETAIL 1 SCALE: 1"=10' -
RELEASED FOR RECORD ONLY
DO NOT FABRICATE
lNFK1 -*da*ro-rnn-lrvalvrr
OU 7-10, PIT 9 REMEDIATION PROJECT
FOE D R A I N G INDEX SEE DRAMNG NO ZbBCONIRYl NO S i C * T E / B W X T Y A X O L L G
624979
B-10
8 7 6 5 4 4 3 2 1 p?
HVAC FLOW DIAGRAM lNFK1 -*da*ro-rnn-lrvalvrr
REQUESTER SL AUSTAO OU 7- 10, PIT 9 REMEDIATION PROJECT DESCN BK GROVER R ETRl EVAL DRAWN CA BEHM OPTION 1 PROJECT NO 1 0203203 SPCL CODE HVAC FLOW DiAGRAM
FOE D R A I N G INDEX SEE DRAMNG NO SbBCDNIRACl NO S i C * T E / B W X T Y A X O L L G
6 2 4 9 7 9
NO SCALE + DESGN PHASE PRE CON SEf DPR NO 105080 SAFtTV CATEGORY N /A EFfEClIM D A k 9-30-2003
,*" Jlmii
DESGN PHASE PRE CON SAFtTV CATEGORY N /A
PROJECT NO 1 0203203 SPCL CODE HVAC FLOW DiAGRAM
SEf DPR NO 105080 EFfEClIM D A k 9-30-2003
+
REV DESCRlPnON EFFECllVE DATE
iEVERSE RETURN WATER SKTEM *
.............
.............
TO PLC MAiNTENANCE ROOM c
7 - - , 7 r--- 450 GPM, 5 HP PUMP 1
37,000 CFM 1
BACK-UP ........................
5 HP PUMP
I I 111 I I I
46"0 ' 36"@
46"0 L! TO w PLC
RETRIEVAL AREA
r 72"@
PRIMARY - 1.5" WG I i I 1 1
, I
I I 73,000 CFM I
I I
-d) I1 I
c
I1 j r 7 2 " 0 3 AC/HR 110,000 CFM 1 AC/HR OSA I 37.000 CFM 11
N ~
PLC TO MASTER
LEGEND PLC
FIT
PROGRAMMABLE LOGIC CONTROLLER
FLOW iNDlCATlNG TRANSMITTER
TEMPERATURE iNDlCATOR
PRESSURE INDICATING DEVICE
VERIAELE FREQUENCY DRIVE
BACK DRAFT DAMPER
RELEASED FOR RECORD ONLY
DO NOT FABRICATE PiD
VFD
BOD HVAC FLOW DIAGRAM
HVAC DUCTING
PIPING
ELECTRONIC SIGNAL
PUNT AIR
B-12
8
FROM SUB-9 P
T
7 6 5 4 3 2 1
CBL-0018 AMPACITY 185 A
CBL-0022 AMPACIN 510 A AMFACIN 510 A
HVF- 1 ti Ds-l
s-PP-2 DEMAND 1 2 KVA
1 S-XFR-1 KVA 1000 .0 KVA PRI 4 1 6 0 V T SEC 480 V
'1 PD-0033
CBL-0006 AMPACIN 1530 A
FOE D R A I N G INDEX SEE DRAMNG NO 6 2 4 9 7 9 ONELINE DIAGRAM
NO SCALE
DESGN PHASE FRE-CON SAFtTV CATEGORY N /A
f SM-1 S-MCC-1
lNFK1 -*da*ro-rnn-lrvalvrr
REQUESTER SL AUSTAO OU 7- 10, FIT 9 REMEDIATION PROJECT DESCN BL COWLN R ETRl EVAL DRAWN EL COWLEY OPTION 1 PROJECT NO 1 023203 SPCL CODE ELECTRICAL ONELINE DIAGRAM
ZbBCONIRACI NO S i C * T E / B W X T Y A X O L L G
N/A
+ DPR NO ia5a8a
FfECiIM D A k 9-30-2003
DEMAND 8 5 1 KVA PF 91.83%
BLO-1 BLO-2 RATED HP 150.0 HP RATED HP 150.0 HF
$-PP--1
OFFICE Eo-1 DEMAND30.00 KVA
8 0 %
LIGHTS-1 DEMAND133.00 KVA
80%
LIGHTS-2 DEMAND133 00 KVA
80%
h3PP-4
GEN L( E - 1 DEMAND50.00 KVA
80%
PUMP-4 RATED HP 2 5 0 HP
HEAT-1 DEMAND332 55 KVA
PF 100
FROM sua-9 B
T CBL-0025 AMPACITY 480 A
PD-0057 4 PD-0056 I
N-XFR-1 KVA 2 0 0 0 . 0 KVA FRI 4 1 6 0 V
CBL-0024 AMPACITY 3120 A
PUMP-3 RATED HP 5.0 HP
BLO-3 1 RATED HP 300.0 HP I BLO-4 CMP-I
caL-ooi 4 AMPACITY 20 A
RATED HP 300.0 HP RATED HP 50.0 HP
N-PP-1 DEMAND 3 7 1 KVA P F 80%
I BL-0013 MPACITY 510 A
C B L - O O Z ~ AMPACIN 680 A
CHILLER- 1 HEAT-2 HEAT-3 DEMAND1 65.15 KVA DEMAND332.55 KVA DEMAND332.55 KVA
P F 80% PF 1.00 P F 1.00
FD-0031
- N-LP-1 "PD-0053 DEMAND 3 9 9 KVA PF 80% t t t $PDF0046 $PD-0047 $?D-0048 '1 PD-0037
r s 1 LIGHTS-4 LIGHTS-5
caL-0017 AMPACIN 5 5 A
LIGHTS-3 PD-0036
DEMAND133 00 KVA DEMAND133 00 KVA DEMAND133 00 KVA 80% 80% 80% OFFICE EQ-2 GEN LOADS-2
cBL-ools DEMAND42 00 DEMAND300 00 KVA AMPACITY 55 A KVA 8 0 %
RELEASED FOR RECORD ONLY
BREATH 1 AIR
RATED HP 2 5 0 HF
DO NOT FABRICATE
B-13
~. . . 8 I I 6 I 5 1 4 I I 2 I 1 ri
DRAWING INDEX '$El DWG NO. I ,,&y:o I REV1 DRAWING TITLE
REV DESCRlPnON EFFECllVE DATE
- scE. 1'' = 300 o'
DES~GN PHASE PRE CON SAFETV CATEGORY N/A
10 ISALM?\ !10 BUTT;
PROJECT NO 1 023203 SPEC CODE SITE MAP, AREA MAP AND DRAWING INDEX + sii OAR NO. m a 8 0 FfECiIM D A k . 9-30-2003
Q WMF 601
RWMC NORTH /--. CONSTRUCTION AREA - TO REXBURG
TO ARC0
IDAHO FALLS
TO BLACKFOOl CONSTRUCTION AREA-J
INEEL SITE MAP SCALE. NONE
L a I
1 6 2 4 9 9 0 2-T-1 SITE MAP, AREA MAP AND DRAWING INDEX
2 624991 2-C-1 EXISTING SITE PLAN 3 6 2 4 9 9 2 2- C- 2 IMPROVE0 SITE PLAN
4 6 2 4 9 9 3 2-A- 1 GENERAL BUILDING FLOOR PLAN
5 6 2 4 9 9 4 2- A- 2 UPPER RETRIEVAL PLAN 6 6 2 4 9 9 5 2- A- 3 ELEVATIONS 7 6 2 4 9 9 6 2- A- 4 ENLARGED PLANS
8 6 2 4 9 9 7 2- A- 5 SECTION AND DETAIL 9 6 2 4 9 9 8 2- A- 6 SECTION
10 6 2 4 9 9 9 2-HV-1 HVAC FLOW DIAGRAM
11 6 2 5 0 0 0 2-E-1 ONELINE DIAGRAM
RELEASED FOR RECORD ONLY
DO NOT FABRICATE
DESCN DN NISHIOKA 300 DRAWN CA BEHM
RETREIVAL OPTION 2
a I 7 I 6 I 5 t 4 I 3 I 4 I
B-14
+ & R C Y 31 8 7 6 5 4 3 2 1 REVISIONS
REV DESCRlPnON EFFECllVE DATE
INLET AIR DUCT--'
1 12'-4"
I ___
4 9 0 '- 0 '
1 \ /
\
NEW CONCRETE- TRACK, BELOW
MAINTENANCE AND
HVAC BUILDING
I
6
UPPER RETREIVAL PLAN SCALE 1 ' = 30 ' -0"
NOTE ACCESS AND EQUIPMENT CORRIDORS NOT SHOWN FOR CLARITY
W I
N -
&INLET AIR DUCT 1
RE LEAS ED FOR RECORD ONLY
DO NOT FABRICATE
a t A 4
B-18
+ & R C Y 31 8
t r
7 6 5 4 3 2 1
FINISH GRADE
a
LOOKING NORTH
SOUTH ELEVATION SCALE 1"=2O'
I 7 6 5 4 3 4 I I
\--NEW PILING, BELOW GRADE
a
655'-3" -
7 6 5 4 3 4 I
I I I ' I I H H
. . .. . . . . .. . . . . .. . .
\
LOOKING WEST
EAST ELEVATION SCALE: 1"=30 RELEASED
FOR RECORD ONLY
DO NOT FABRICATE
,mp r ,8Ec"TELmT,xT Y l x o - r i r
N/A 6 2 4 9 9 0 z0 REQUESTER SL AUSTAO OU 7- 10, PIT 9 REMEDIATION PROJECT
RETRIEVAL SCALE 1. 20 0 DRAWN ?A KFI I FY OPTION 2
B-19
+ & R C Y 31 8
y- - - - - -- - - - - / -\
NDERBURDEN
OVERBURDEN
7 6 5 4 3 2 1
r A I R INTAKE DUCTING r ROOF JOISTS
PERSONNEL ACCESS AND EMERGENCY EGRESS CORRIDOR
b t I ll~ n I fi'
?BURDEN STAGING AREA .-
NEW CONCRETE
DETAIL 1 SCALE: 1"=10' -
RELEASED FOR RECORD ONLY
DO NOT FABRICATE
B-2 I
+ & R C Y 31 8 7 6 5 4 3 2 1 REVISIONS
REV DESCRlPnON EFFECllVE DATE
150'-0'
L 20"" I 1 IO'"''
SECONDARY CONFINEMENT DIVIDING WALL SECONDARY CONFINEMENT ZONE TO ZONE ACCESS DOOR
AIR-INLET DUCTING
/-PERSONNEL ACCESS ZONE/ SECONDARY CONFINEMENT
/ 24'-3 1/2" I --- I 1
AIR INLET / ~~,~ ^ : w - I
- - A .I :
:o 0
N N
I f t
SECONDARY CONFINEMENT
SECONDARY CONFINEMENT
/ /
0 I i?
OPERATING CORRIDOR MEZZANINE
CONFINEMENT /// HVAC ROOM
AIR RETURN DUCT, 6'-0"@
EXISTING CONCRETE, N P
EXISTING PILES, TYP
7'-4' - BACKHOE
EXISTING PILES AND--- SHEET PILING j E X I S T I N G PILES AND
SHEET PILING
142'-6" 10'"'' tj
20'""
RELEASED FOR RECORD ONLY
DO NOT FABRICATE
I I I t 4 I I 4 I
B-22
8 7 6 5 4 4 3 2 1 p?
HVAC FLOW DIAGRAM lNFK1 -*da*ro-rnn-lrvalvrr
REQUESTER SL AUSlAO OU 7- 1 0 , PIT 9 REMEDIATION PROJECT DESCN BK GROVER R ETRl EVAL DRAWN CA BEHM OPTION 2 PROJECT NO 1 0203203 SPCL CODE HVAC FLOW DIAGRAM
FOE D R A I N G INDEX SEE DRAMNG NO SbBCDNIRACl NO S i C * T E / B W X T Y A X O L L G
624990
NO SCALE + DESGN PHASE PRE CON SEf DPR NO 105080 SAFtTV CATEGORY N /A EFfEClIM D A k 9-30-2003
,*" Jlmii
DESGN PHASE PRE CON SAFtTV CATEGORY N /A
PROJECT NO 1 0203203 SPCL CODE HVAC FLOW DIAGRAM
SEf DPR NO 105080 EFfEClIM D A k 9-30-2003
+
REV DESCRlPnON EFFECllVE DATE
iEVERSE RETURN WATER SKTEM *
.............
.............
450 GPM, 5 HP PUMP 1
37,000 CFM 1
BACK-UP ........................
5 HP PUMP
46"Q 46"Q
RETRIEVAL AREA
r 72"@
PRIMARY - 1.5" WG I i I 1 1
I I 73,000 CFM I
I I
d) I1 I
c
50" Q
I1 j r 7 2 " 0 3 AC/HR 110,000 CFM 1 AC/HR OSA 46"0 37.000 CFM
36"O I
N
TO MASTER PLC
LEGEND PLC
Fir PROGRAMMABLE LOGIC CONTROLLER
FLOW INDICATING TRANSMITTER
TEMPERATURE INDICATOR
PRESSURE INDICATING DEVICE
VERiABLE FREQUENCY DRIVE
BACK DRAFT DAMPER
RELEASED FOR RECORD ONLY DO NOT FABRICATE PID
VFD
BDD HVAC FLOW DIAGRAM
HVAC DUCTING
PIPING
ELECTRONIC SIGNAL
PUNT AIR
B-23
+ & R C Y 31 8
FROM SUB-9 P
T
7 6 5 4 3 2 1
CBL-0018 AMPACITY 185 A
SSP-3 SSP-4
HVF- 1 ti Ds-l 1 S-XFR-1 KVA 1000.0 KVA PRI 4 1 6 0 V T SEC 4 8 0 V
CBL-0006 AMPACIN 1530 A
f SM-1 S-MCC-1 DEMAND 8 5 1 KVA PF 91.83%
BL0-1 BLO-2 RATED HP 150.0 HP RATED HP 150.0 HP
$-PP--1
SB-3 ;) SB-5
EL-0015 MPACIN 510 A
$#0510 A p ~ ~ ~ 7 AMPACITY 55 A
RATED HP 2 5 0 HP HEAT-1
DEMAND332 55 KVA PF 100
PUMP-3 RATED HP 5.0 HP
BL0-3 RATED HP 300.0 HP
BL0-4 CMP-1 RATED HP 300.0 HP RATED HP 50.0 HP
EL-001 4 VlPACITY 20 A
! OFFICE Eo-1 DEMAND30 0 0 KVA
8 0 %
LIGHTS-1 DEMAND133 0 0 KVA
8 0 %
LIGHTS-2 DEMAND133 0 0 KVA
8 0 %
GEN LOADS-1 DEMAND50 0 0 KVA
8 0 %
FROM SUE-9 B
T CBL-0025 AMPACITY 480 A
PD-0057 4 PD-0056 I
N-XFR-1 KVA 2 0 0 0 . 0 KVA PRI 4 1 6 0 V
T S E C 4 8 0 v
CBL-0024 AMPACITY 3120 A
PUMP-2 RATED HP 5 0 HP
PUMP-1 RATED HP 5.0 HP
'0-0033
- N-PP-1 DEMAND 371 KVA PF 8 0 %
3-6
I BL-0013 MPACITY 510 A
PO-0031
-
OFFICE EQ-2 GEN LOADS-2 CBL-Ools DEMAND42.00 DEMAND300.00 KVA AMPACIN 55 A KVA 8 0 %
BREATH AIR RATED HP 25.0 HP
CBL-0021 CBL-0022 4MPACIN 510 A IAMPALIIY 510 A I
CEL-0023 AMPACIN 680 A
CHILLER- 1 HEAT-2 HEAT-3 DEMAND1 65.15 KVA DEMAND332.55 KVA DEMAND332.55 KVA
PF 80% PF 1.00 PF 1.00
N- LP- 1 "PD-0053 DEMAND 3 9 9 KVA PF 8 0 %
"?D-0048 1 J" r s
"PD-0047
LIGHTS-3 LIGHTS-4 LIGHTS-5 DEMAND133.00 KVA DEMAND133.00 KVA DEMAND1 33.00 KVA
80% 8 0 % 8 0 %
ONELINE DIAGRAM OU 7- 1 0 , PIT 9 REMEDIATION PROJECT
PROJECT NO 1 023203 SPCL CODE ELECTRICAL ONELINE DIAGRAM +
DES~GN PHASE PRE-CON sii DPR NO. 1~x080 SAFETV CATEGORY N /A FfECiIM D A k . 9-30-2003
a I 7 I 6 I 5 t- 4 I 3 I 4 I I
RELEASED FOR RECORD ONLY
DO NOT FABRICATE
lNFK1 -*da*ro-rnn-lrvalvrr
OU 7- 1 0 , PIT 9 REMEDIATION PROJECT R ETRl EVAL OPTION 2
FOE D R A I N G INDEX SEE DRAMNG NO sbBCONmY1 NO S i C * T E / B W X T Y A X O L L G
6 2 4 9 9 0
a I 7 I 6 I 5 t- 4 I 3 I 4 I I
B-24
~. . . 8 I I 6 I 5 1 4 I I 2 I 1 ri
DRAWING INDEX '$El DWG NO. I ,,&y:O I REV1 DRAWING TITLE
REV DESCRlPnON EFFECllVE DATE
WMF 601
RWMC NORTH /--. CONSTRUCTION AREA - TO REXBURG
TO ARC0
IDAHO FALLS
TO BLACKFOOl CONSTRUCTION AREA-J
INEEL SITE MAP SCALE. NONE
L a I
1 625001 3-T-1 SITE MAP, AREA MAP AND DRAWING INDEX
2 6 2 5 0 0 2 3-C-1 EXISTING SITE PLAN 3 6 2 5 0 0 3 3- C- 2 IMPROVED SITE PLAN
4 6 2 5 0 0 4 3-A- 1 GENERAL BUILDING FLOOR PLAN
5 6 2 5 0 0 5 3- A- 2 UPPER RETRIEVAL PLAN 6 6 2 5 0 0 6 3- A- 3 ELEVATIONS 7 6 2 5 0 0 7 3- A- 4 ENLARGED PLANS
8 6 2 5 0 0 8 3- A- 5 9 6 2 5 0 0 9 3- A- 6 SECTION
1 0 6 2 5 0 1 0 3-HV-1 HVAC FLOW DIAGRAM
11 625011 3-E-1 ONELINE DIAGRAM
SECTION AND DETAIL
RELEASED FOR RECORD ONLY
DO NOT FABRICATE
lNFK1 -*da*ro-rnn-lrvalvrr FOE D R A I N G INDEX SEE DRAMNG NO ZbBCONIRYl NO
REQUESTER SL AUSTAO OU 7- 10, PIT 9 REMEDIATION PROJECT DESCN WH LANDMAN RETREIVAL
OPTION 3
S i C * T E / B W X T Y A X O L L G
N/A 625001
a I 7 I 6 I 5 4 I 3 4 I I
B-25
01 R I Y I . 4 8 7 6 5 4 3 2 1 REVISIONS
REV DESCRlPnON EFFECllVE DATE
TREATMENT AREA BY OTHERS
B-27
+ & R C Y 31 8
INLET AIR DUCT--'
7 6 5 4 3 2 1
1 12'-4"
I ___
4 9 0 '- 0 '
1 \ /
\
NEW CONCRETE- TRACK, BELOW
MAINTENANCE AND
HVAC BUILDING
I
6
UPPER RETREIVAL PLAN SCALE 1 ' = 30 '- 0"
W I
N -
&INLET AIR DUCT 1
NOTE ACCESS AND EQUIPMENT CORRIDORS NOT SHOWN FOR CLARITY
RELEASED FOR RECORD ONLY
DO NOT FABRICATE
B-29
+ & R C Y 31 8
t r
7 6 5 4 3 2 1
FINISH GRADE
a
LOOKING NORTH
SOUTH ELEVATION SCALE 1"=2O'
I 7 6 5 4 3 4 I I
\--NEW PILING, BELOW GRADE
a
655'-3" -
7 6 5 4 3 4 I
I I I ' I I H H
. . .. . . . . .. . . . . .. . .
\
LOOKING WEST
EAST ELEVATION SCALE: 1"=30 RELEASED
FOR RECORD ONLY
DO NOT FABRICATE
B-30
+ & R C Y 31 8 7 6 5 4 3 2 1 REVISIONS
REV DESCRlPnON EFFECllVE DATE
NORTH OVERBURDEN STAGING AREA
ENLARGED PLAN SCALE 1 ' = 20'-0"
lo'-"' -ir NEW PILES AND SHEET PILES, TYP r
ENLARGED PLAN SCALE: 1 ' = 20'-0"
RELEASED FOR RECORD ONLY
DO NOT FABRICATE
lNFK1 -*da*ro-rnn-lrvalvrr
OU 7-10 PIT 9 REMEDIATION PROJECT
FOE D R A I N G INDEX SEE DRAMNG NO ZbBCONIRYl NO S i C * T E / B W X T Y A X O L L G
625001
DESCN Bc SPAULDING 'u DRAWN CA KELLN R ETRl EVAL OPTION 3
I I I t 4 I I 4 I
B-3 I
+ & R C Y 31 8
--\- - L- A
7 6 5 4 3 2 1
a I 7
OVERBURDEN STAGING SOIL
'-CLEAN OVERBURDEN
L ASTE SEAM
io'""
ROOF JOISTS AIR INTAKE DUCTING
PERSONNEL ACCESS AND EMERGENCY EGRESS CORRIDOR
.
t ~~ N N I %ll n i I lllll II I i b ,, 9
OVERBURDEN STAGING AREA 1 : GRADE EL 5009
NEW CONCRETE
DETAIL 1 SCALE: i " = l O ' -
RELEASED FOR RECORD ONLY
DO NOT FABRICATE
I 5 t 4 I I 4 I
B-32
+ & R C Y 31 8 7 6 5 4 3 2 1 REVISIONS
REV DESCRlPnON EFFECllVE DATE
150'-0'
L 20"" I 1 IO'"''
SECONDARY CONFINEMENT DIVIDING WALL SECONDARY CONFINEMENT ZONE TO ZONE ACCESS DOOR
AIR-INLET DUCTING
/-PERSONNEL ACCESS ZONE/ SECONDARY CONFINEMENT
/ 24'-3 1/2" I --- I 1
AIR INLET / ~~,~ ^ : w - I
- - A .I :
:o 0
N N
I f t
SECONDARY CONFINEMENT
SECONDARY CONFINEMENT
/ /
0 I i?
OPERATING CORRIDOR MEZZANINE
CONFINEMENT /// HVAC ROOM
AIR RETURN DUCT, 6'-0"@
EXISTING CONCRETE, NP
EXISTING PILES, TYP
7'-4' - BACKHOE
EXISTING PILES AND--- SHEET PILING j E X I S T I N G PILES AND
SHEET PILING
142'-6" 10'"'' tj
20'""
RELEASED FOR RECORD ONLY
DO NOT FABRICATE
R ETRl EVAL OPTION 3
DESCN Bc SPAULDING
I I I t 4 I I 4 I
B-33
+ & R C Y 31 8 7 6 5 4 4 3 2 1 p? I RF\4ClflhlC
REV DESCRlPnON EFFECllVE DATE
Y0 iEVERSE RETURN WATER SKTEM "
.............
.............
450 GPM, 5 HP PUMP 1 1
37,000 CFM
1 i 1
BACK-UP ........................
5 HP PUMP
37,000 CFM, 15" SP
50" Q
/ / ~ L .................. i 1 ........................
LEGEND PLC
FIT
PROGRAMMABLE LOGIC CONTROLLER
FLOW INDICATING TRANSMITTER
TEMPERATURE INDICATOR
PRESSURE INDICATING DEVICE
VERIAELE FREQUENCY DRIVE
BACK DRAFT DAMPER
HVAC DUCTING
PIPING
ELECTRONIC SIGNAL
PUNT AIR
RELEASED FOR RECORD ONLY
DO NOT FABRICATE PID
VFD
BOD
- --- I
lNFK1 -*da*ro-rnn-lrvalvrr
OU 7-10, PIT 9 REMEDIATION PROJECT R ETRl EVAL
FOE D R A I N G INDEX SEE DRAMNG NO ZbBCONIRYl NO S i C * T E / B W X T Y A X O L L G HVAC FLOW DIAGRAM 625001 N/A
DESCN BK GROVER IDRAWN CA BEHM I OPTION 3
I I I t 4 I I 4 I
B-34
8 7 6 5 t 4 3 2 1 REVlSIONS
REV DESCXIPIION EFfECllVE DATE
FROM SUB-9 A
T CBL-0018 AMPACITY 185 A
DS-1
HVF-1
S-XFR-1 KVA 1000.0 KVA PRI 4 1 6 0 V SEC 480 v
S-MCC-1 DEMAND 8 5 1 KVA PF 91.83%
BLO-1 BLO-2 RATED HP 150.0 HP RATED HP 150.0 HP
$-PP-I
SB-3 ;) 3 - 4 ;) SB-5
CBL-0020
EL-0015 MPACIW 510 A I
PUMP-4 RATED HP 2 5 0 HP
t HEAT-1
DEMAND332 55 KVA PF 1 0 0
LIGHTS - 2 DEMAND1 3 3 00 KVA
8 0 %
GEN LOADS-1 DEMAND50 00 KVA
8 0 %
FROM SUB-9 8
T CBL-0025 AMPACITY 480 A
~ P ~ - 0 0 5 ,
PD-0056 I
N-XFR-1 KVA 2000.0 KVA PRI 4 1 6 0 V
T S E c 4 8 0 v
CBL-0024 AMPACITY 3120 A
PUMP-3 RATED HP 5.0 HP f&
BLO-3 RATED HP 300.0 HP
BLO-4 CMP-1 RATED HP 300.0 HP RATED HP 50.0 HP
EL-001 4 VIPACITY 20 A
s -PP-2 DEMAND 12 KVA >D-0033
- PF 80% ')SBP-3 $1 SBP-4
9 S S P - 3 9 S S P - 4
CBL-0003 CBL-0004 AMPACITY 20 A AMPACITY 20 A
PUMP-2 RATE0 HP 5.0 HP
PUMP-1 RATED HP 5.0 HP
3-6
EL-0013 MPACITY 510 A
PO-0031
- N-PP-1 DEMAND 371 KVA PF 80%
'1 PD-0037
CBL-0017 AMPACIN
fPD-00 j2
55 A ~'PD-0051 I t PO-0036
OFFICE EQ-2 GEN LOADS-2
BREATH AIR RATED HP 25.0 HP
CBL-0021 CBL-0022 4MPACIW 510 A IAMF'ACIW 510 A I
CBL-0023 AMPACIN 680 A
CHILLER- 1 HEAT-2 HEAT-3 DEMAND1 65.15 KVA DEMAND332.55 KVA DEMAND332.55 KVA
PF 80% PF 1.00 PF 1.00
N- LP- 1 DEMAND 3 9 9 KVA
I t)PD-0053
PF 80% I ~ P D - 0 0 4 7 1;:...8
LIGHTS-3 LIGHTS-4 LIGHTS-5 DEMANDl 33.00 KVA DEMANDl 33.00 KVA DEMAND1 3 3 . 0 0 KVA
80% 8 0 % 80%
RELEASED FOR RECORD ONLY
ONELINE DIAGRAM OU 7- 10, PIT 9 REMEDIATION PROJECT
R ETRl EVAL DESlGN BL COWLN
DO NOT FABRICATE , N F E, --*4rrr4*in*-aullrrr S l O X T E L B W X T i O l X D L L C
FOR ORAMNG 6 2 5 0 0 1 INDEX SEE DRAWING NO S~SCONIRACI NO
OU 7- 10, PIT 9 REMEDIATION PROJECT R ETRl EVAL
NO SCALE DRlW BL CGWLEY OPTION 3
REQUESTER SL AUSTAD DESlGN BL COWLN
PhOJECl NO 1 023203 SPCL CODE ELECTRICAL ONELINE DIAGRAM ~
- FOR hEVIEW//PPROVAL SIGNAIURES ~ I ~ ~ ~ ~ ~ r n D W G - 6 2 5 0 1 "" IN NU 11 REV DESGN PHASE PRE-CON sEt DAR NO 105080 098 9999 10 090 SAFETY CATEGORY N /A EIECW DIE 9-30-2003 S c k E NONE /SHEET 3-E- 1
8 I I I 4 I 3 I 7 I
B-35