I-210 Pilot: System Requirements 1 APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS The flow charts on the following pages illustrate the operational processes that could be carried out by the corridor management system envisioned in this requirements document. They show how the various “actors” in the system (the people and the technical components) could interact to execute a variety of tasks, including: Assessing corridor performance Detecting and verifying incidents Assessing the impact of incidents Creating, reviewing, and approving response plans Reviewing ICM system operations Addressing asset failures

Upload: others

Post on 22-Nov-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

I-210 Pilot: System Requirements

1

APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

The flow charts on the following pages illustrate the operational processes that could be carried out by the corridor management system envisioned in this requirements document. They show how the various “actors” in the system (the people and the technical components) could interact to execute a variety of tasks, including:

• Assessing corridor performance • Detecting and verifying incidents • Assessing the impact of incidents • Creating, reviewing, and approving response plans • Reviewing ICM system operations • Addressing asset failures

Page 2: APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

I-210 Pilot: System Requirements

2

A.1. INCIDENT RESPONSE CONTROL LOOP

Figure A-1 – Envisioned Incident Response Control Loop

Simulation Subsy stem updates model representing current network operations

Incident Management Sy stem updates list of activ e incidents within corridor

Activ e Incidents

No Activ e Incident

DSS determine needs f or response plan

Response Plan Needed

Response Planning Not

Required

DSS Rules Engine identif ies av ailable detours and control alternativ es

DSS Rules Engine generates response plans f or identif ied incident(s)

One or more possible alternativ es

No f easible alternativ e

NEW INCIDENT OCCURS

DSS Rules Engine selects a recommended response plan f or implementation

Rev iew/approv al of recommended plan by Corridor Operators

DSS waits f or next incident to occurs

NEXT INCIDENT

Recommended plan not

approv ed

Rev iew of important sy stem issues by Corridor Manager and Local Transportation Managers

PERIODIC OPERATIONAL REVIEWS

Response Management Subsy stem sends control commands to v arious control dev icesaf f ected by response plan

RMS

Weekly /monthly reviews of sy stem activities by Local Corridor Operators

RUL

RUL

DSS

SIM

IMS

Rev iew of operational issues by ICM/Local Maintenace Staf f

ICM

Implementation of recommended adjustments into ICM sy stem by ICM Sy stem Manager

ICM Configuration Parameters

Simulation Subsy stem ev aluates dev eloped response plans

SIM

DSS Activity Log

Simulation Subsy stem ev aluates current network operations

SIM

Simulation Data

(alternate scenarios)

Simulation Data

(current situation)

DSS sends the selected response plan f or implementation

DSS

RUL

Recommended plan approv ed

Page 3: APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

I-210 Pilot: System Requirements

3

A.2. PERIODIC CORRIDOR PERFORMANCE ASSESSMENT

Figure A-2 – Periodic Corridor Performance Evaluation Process

Simulation Subsy stem continuously updates the status of corridor elements using receiv ed real-time data

SIM

Traffic Signals

Ramp Meters

Data Hub

Traffic Sensors

Bluetooth Devices

Probe Vehicles Incidents

Planned Events

Road Closures

Simulation Subsy stem records perf ormance metrics that hav e been compiled ov er each reporting interv al

SIMSy stem User requests through the ICMS User Interf ace, a corridor-wide perf ormance report f or the past hour

ICMS User Interf ace sends a report generation request to the Analy sis Module

Analy sis Module aggregates the retriev ed statistics to produce the requested report

ICMS User Interf acedisplay s the requested statistics on the terminal used by TMC Operator

ICMData Hub

Historical Data

Default Profiles & Values

Simulation Subsy stem uses stored historical data and def ault prof iles

Data Hub

SIM

Elements with real-time data update

Elements without real-time data update

Continuous Corridor Model Update

Report Generation

Modelers,Operators

Analy sis Module retriev es f rom the Data Hub, DSS and possible other sources relev ant perf ormance statistics f or the requested ev aluation period

x min x min x min x min x min x min

Modelers,Operators,Managers

Configuration Parameters

ICM Sy stem Manager sets up the basic metrics reporting interv al (e.g., 5 min, 15 min)

System Setup

ICM

Simulation Subsy stem sends compiled metrics to the Data Hub

SIM

Analy sis Module summarizes the analy sis results in a PDF f ile

UI

DSS Data

Page 4: APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

I-210 Pilot: System Requirements

4

A.3. INCIDENT/EVENT DETECTION

Figure A-3 – Incident Detection and Verification Process

Drivers &Passengers

IMS retriev es f rom Data Hubinf ormation characterizing the current operational status of corridor roadway s

If unusual congestion exists, the IMS generates a Congestion Warning message with the location of the problem

Local TMC Operator determines that Incident inf ormation is v alid

Local TMC Operator determines that the

incident inf ormation is not v alid

INFORMATION DISCARDED

Local TMC Operator assesses the v alidity of the incident inf ormation receiv ed by rev iewing operational status of corridor elements

IMS assesses whether unusual congestion exists in the corridor by comparing real-time and historical data

INCIDENT CHARACTERIZATION

CHPCAD

Pasadena Traffic Record System

IMS retriev es incident inf ormation f rom connected CAD sy stems v ia Data Hub

IMS

Incident directly observ ed by Local TMC operator on CCTV v ideo f eed

Incident Inf ormation is receiv ed by Local TMC Operator

Drivers &Passengers

Simulation Data

Data Hub

IMS retriev es f rom Data Hubinf ormation characterizing ty pical roadway conditions f or the current day of week and time of day

IMS

IMS

IMS

IMS

If needed, TMC Operator uses the ICMS User Interf ace to consult most recent DSS perf ormance ev aluations

Data Hub

Local TMC Operator instructs IMS to create a new incident record

Traffic Sensors

Bluetooth Devices

Probe Vehicles

IMS retriev es Incident inf ormation f rom Crowdsourcing Application (Waze, other) v ia Data Hub

Data Hub

App

IMS

IMS display f or rev iew Incident Warningand Congestion Warning messages on terminal used by all TMC Operators

ICM

IMS

IMS generates an Incident Warningmessage with the location of the incident

IMS generates an Incident Warningmessage with the location of the incident

IMS IMS

County Data

Police Dispatchers

Transit Dispatchers

Local Agency Personnelreceiv es incident inf ormation

First Responders

Field Personnel

Field Personnel

City Data

Page 5: APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

I-210 Pilot: System Requirements

5

Figure A-4 – Event Detection and Verification Process

Lane closure/ev ent directly observ ed by Local TMC operator on CCTV v ideo f eed

Traffic Signals

Ramp Meters

Data Hub

IMS retriev es f rom Data Hub f ault data receiv ed f rom connected traf f ic control sy stems

IMS

Caltrans LCS

County Road

Closures

Data Hub

IMS retriev es f rom Data Hub f ault data receiv ed f rom connected traf f ic control sy stems

City A Road

Closures

CONTROL DEVICE FAILUREPLANNED LANE/ROAD CLOSURESEM ERGENCY LANE/ROAD CLOSURES

Incident Inf ormation is receiv ed by Local TMC Operator

Field Maintenance Personnel

Transit Dispatchers

Local Agency Personnelreceiv es incident inf ormation

First Responders

Local TMC Operator determines that Incident inf ormation is v alid

Local TMC Operator

determines that the incident inf ormation

is not v alid

INFORMATION DISCARDED

Local TMC Operator assesses the v alidity of the incident inf ormation receiv ed by rev iewing operational status of corridor elements

INCIDENT CHARACTERIZATION

Local TMC Operator instructs IMS to create a new incident record

IMS display f or rev iew receiv ed Lane Closureand Control Dev ice Fault messages on terminal used by all TMC Operators

IMS

City B Road

Closures

IMS

Simulation Data

If needed, TMC Operatoruses the ICMS User Interf ace to consult most recent DSS perf ormance ev aluations

ICM

Field Personnel

Page 6: APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

I-210 Pilot: System Requirements

6

Figure A-5 – Incident Characterization Process

TMC Operator assess incident characteristics• Expected duration• Sev erity based on incident

ty pe

NEW VALID INCIDENT

IMS adds the new incident record to a list of activ e incidents

IMS creates new incident record

IMS assigns incident ID to the identif ied incident

IMS pre-populates incident record with data supplied by connected inf ormation sy stems

Incident record is edited/completed by TMC Operator

Completed incident record is v alidated by TMC Operator

CAD sy stem supplies basic incident inf ormation• Location• Lanes af f ected

TMC Operator checks incident details• CCTV camera• Reports f rom f ield personnel• CAD sy stems• Corridor status f rom DSS reports

DETERM INATION OF RESPONSE PLANNING NEED

CAD

CAD

ICM

IMS

IMS

IMS

IMS

Page 7: APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

I-210 Pilot: System Requirements

7

A.4. ONLINE CORRIDOR MODEL ADJUSTMENTS

Figure A-6 – Corridor Model Online Adjustment Process

M ODEL UPDATE REQUEST (e.g., following an incident)

Simulation Subsy stem retriev es f rom IMS a list of activ e incidents

SIM

Simulation Subsy stem compares list of activ e incidents f rom IMS with ev ents def ined in Current Simulation Model

SIM

IMS

Simulation Subsy stem retriev es the corridor model representing current operations (Current Simulation Model)

SIM

Incident in ICM list identical to incidents coded in Current Simulation Model

IMS incident list dif f er f rom list of incidents coded in Current Simulation Model

Simulation Subsy stem remov es f rom Current Simulation Model all incidents no longer on the IMS list

Simulation Subsy stem adds in Current Simulation Modelincidents on IMS list not already coded in the model.

Simulation Subsy stem retriev es f rom IMS a list of incidents that hav e been recently terminated

SIMIMS

Simulation Subsy stem remov es f rom Current Simulation Model all incidents that hav e been terminated

SIM

Simulation Subsy stem retriev es f rom Data Hubreal-time data characterizing the current status of roadway elements- Flow rates - Queue length- Density - Etc,

Traffic Sensors

Bluetooth Devices

Probe Vehicles

Data Hub

Simulation Subsy stem adjusts, if necessary, the f ollowing elements in Current Simulation Model:

- Roadway characteristics- Trav el demand- Network f low pattern

Simulation Subsy stem retriev es f rom Data Hub data characterizing the current status of control dev ices:- Current timing plan- Current metering rate- Current posted messages

Traffic Signals

Ramp Meters

CMSData Hub

Simulation Subsy stem adjusts if necessary the status the f ollowing modeled control dev ices in Current Simulation Model:- Traf f ic signals- Ramp meters- Changeable message signs

Simulation Subsy stem stores an updated v ersion of Current Simulation Model f or use in subsequent ICM sy stem activities

Simulation Data

Simulation Data

SIM

SIM

SIM

SIM

SIM

SIM

Simulation Subsy stem estimates traf fic conditions on indiv idual roadway links within the modeled network area

SIM

SIM

Simulation Subsy stem adjusts in Current Simulation Model the characteristics of incidents already def ined in model to match incidents in ICM list

SIM

Page 8: APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

I-210 Pilot: System Requirements

8

A.5. INCIDENT/EVENT IMPACT ASSESSMENT (RESPONSE NEED ASSESSMENT)

Figure A-7 – Incident/Event Impact Assessment Process

NEW INCIDENT/EVENTDSS requests f rom Simulation Subsy stem an ev aluation of corridor operations ov er next hour with and without the identif ied incidents

IMSDSS requests f rom Incident Management Sy stem a list of activ e incidents within the corridor

No activ e incident is receiv ed

DSSSS

Activ e incidents are receiv ed

DSS

DSS uses simulation results to quantif ies the impacts of activ e incidents on corridor operations

DSS

DSS ev aluates whether the ev aluated impacts exceed user-def ined thresholds

NO FURTHER ACTION IS CONSIDERED

DSS receiv es simulation results f rom the Simulation Subsy stem

ICM Configuration Parameters

Impacts exceed user-def ined thresholds

Impacts do not exceed user-def ined thresholds

RESPONSE PLANNING INITIATED

NO FURTHER ACTION CONSIDERED

DSS Data

Corridor Operators & Managers

Simulation Sy bsy stem retrieves corridor model representing current operations

SIM

Simulation Subsy stem projects corridor operations ov er next hour f or the f ollowing two scenarios:- Current Network without Incident- Current Network with Incident

Simulation Subsy stem projects corridor operations ov er next hour f or the f ollowing two scenarios:- Current Network without Incident- Current Network with Incident

DSS stores ev aluation results f or potential later use

DSS

DSS

DSS

Simulation Data

Simulation Subsy stemstores simulation results f or potential later use

SIMSIM

Simulation Data

Page 9: APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

I-210 Pilot: System Requirements

9

A.6. RESPONSE PLAN CREATION

Figure A-8 – Response Plan Creation Envisioned Process

POSITIVE RESPONSE PLANNING DECISION

DSS Data

DSS retriev es f rom storage simulation results f or the Current Network with Incident scenario (“Do nothing scenario”)

DSS

DSS assesses the ov erall operational sev erity of active incidents based on simulation results and produces an ov erall sev erity rating

DSS retriev es list of activ e incident f rom Incident Management Sy stem

DSSIMS

If required, TMC Operator rev iews and approv es/modif y the proposed sev erity rating

Data Hub

DSS retriev es real-time data characterizing the av ailability of traffic control dev ices within the corridor

DSS

Traffic Signals

Ramp Meters

CMS

DSS

DSS Rules Egine identif ies av ailable alternate route(s) around congested corridor elements considering:- Sev erity - Av ailable roadway capacity- Asset av ailability - User-def ined operational constraints

For each alternate route, DSSrequests a simulation ev aluation of corridor operations ov er next hour

DSS computes perf ormance metrics f or each alternativ e, including a “do nothing” scenario (Current Network with Incident scenario)

DSS

DSS receiv es simulation results f rom Simulation Subsy stem

DSS uses computed perf ormance metrics to identif y a recommended response plan.

DSS

DSS uses retriev ed real-time data to compute av ailable capacity along f reeway and arterial segments

Operational Constraints

Corridor Operators & Managers

DSS retriev es f rom Data Hub current status data f or corridor roadway elements

Data Hub

Traffic Sensors

Probe Data

DSS

No f easible alternate route

One or more f easible alternate route(s)

NO RESPONSE PLAN DEVELOPED

DSS

Simulation Subsy stem projects corridor operations ov er next hour f or each dev eloped alternativ e

Simulation Subsy stem projects corridor operations ov er next hour f or each dev eloped alternativ e

Simulation Subsy stem projects corridor operations ov er next hour f or each dev eloped alternativ e

SIM

RESPONSE RECOMMENDATION

DSS

Bluetooth Devices

RUL

DSS stores simulation and recommendation details f or later use

DSS Memory

DSS

DSS Activity Log

DSS logs summary of recent activ ities

DSS

DSS

DSS Rules Egine identif ies appropriate control strategies f or each identif ied alternat route- Timing plan change- Change of ramp metering rate

RUL

DSS Rules Egine identif ies an approprioateinf ormation dissemination strategy

RUL

Control Preferences

DSS Activity Log

Page 10: APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

I-210 Pilot: System Requirements

10

A.7. RESPONSE PLAN REVIEW/APPROVAL

Figure A-9 – Response Plan Review/Approval Envisioned Process

RESPONSE RECOMMENDATION

RMS identif ies the control dev ices that each agency is requested to change to implement the recommended response plan

RMS sends control change requests to each agency af f ected by the recommended response plan

TMC Operator/Manager of Agency C rev iews the requested changes

TMC Operator/Manager of Agency B rev iews the requested changes

TMC Operator or Manager f rom Agency X rev iews the control change request(s)

Simulation Data

If needed, TMC Operator uses ICM User Interf ace to rev iew:- Response plan elements- Status of control dev ices- Current corridor perf ormance- Simulation project resultsTMC Operator or Manager f rom

Agency X approv es/reject the control change request(s)

TMC Operator or Manager f rom Agency X approv es/reject the control change request(s)

TMC Operator or Manager f rom Agency X approv es/reject the control change request(s)

RMS compiles request changes approv als/rejections

All requested changes approv ed

Some changes not approv ed

RECOMMENDED PLAN NOT

IM PLEMNETED

ICM Implementation Subsy stem sends control commands to v ariouscontrol dev ices af fected by response plan

RMS checks whether plan approv al is required f rom each af f ected agencies

Agency staf f approv al not

required

Agency staf f approv al required

IMS = Incident Management SystemDSS = Decision Support SystemIMPL = Implementation Module

Data Hub

Traffic Sensors

Bluetooth Devices

Probe Vehicles

Traffic Signals

Ramp Meters

CMS

Traffic Signals

Ramp Meters

CMS

511 & Media

RMS inf orms all corridor partners of the recommended changes

Road OperatorsTransit OperatorsFirst Responders

?Operators allowed to suggest changes? Or

system just wait for next decision interval?

DSS Activity Log

DSS logs summary of recent activ ities

DSS sends the recommended response plan to the ICM Response Management Sy stem (RMS)

DSS

RMS

RMS

RMS

RMS

RMS

RMS

DSS

ICM

Page 11: APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

I-210 Pilot: System Requirements

11

A.8. ICM SYSTEM OPERATIONAL REVIEW

Figure A-10 – ICM System Operation Review Envisioned Process

DSS Activity

Log

Following and incident, Local TMC Operator decides to rev iew how the ICM sy stem responded to the ev ent

TMC Operator uses the ICMS User Interf ace to request a summary of sy stem activities associated with a specif ic ev ent or specif ic day /time period

ICM

Simulation Data

ICMS User Interf ace retriev es f rom the Data Hub the DSS activ ity log f or the day /time of interest

ICMS User Interf ace retriev es f rom the Data Hub the DSS activ ity log f or the day /time of interestData

Hub

Data Hub

Following and incident, Local TMC Operator uses the ICMS User Interf ace to rev iew the retriev ed operational statistics

ICM

Following the rev iew of the incident response rev iew, Local TMC Operator identif ies potential issue(s) with sy stem operations

UI

UI

Local TMC Operator brings the identif ied issue(s) to the ICM Corridor Manager

ICM Corridor Manager rev iews the issue(s) brought to his attention, contracting if necessary Local Transportation Managers

Local Transportation Managers

If relev ant, Corridor Manager brings the issue(s) to the attention of the ICM Sy stem Manager

ICM Sy stem Manager rev iews submitted issue(s), consulting if needed with ICM/Local Maintenance Staf f, Local TMC Operators, Local Transportation Managers, and ICM Corridor Manager

ICM Sy stem Manager determines, in consultation with Local Maintenance Staf f , Local TMC Operators and ICM Corridor Manager changes to make to the ICM sy stem to correct the identif ied problems

Local TMC Operators

ICM Corridor Manager

Local Transportation Managers

Problem related to ICM Sy stem Component

Problem related to local sy stem

ICM Maintenance Staf f instructed to modif y the sy stem to address the identif ied issue(s)

Local Maintenance Staf f instructed to f ix the identif ied issue(s) with local sy stem

UI

SIM

RUL

RMS

DSS

REP

IMS

Local TCS

Traffic Signals

Ramp Meters

Traffic Sensors

Bluetooth Devices

Probe Vehicles

CMS

Local Maintenance Staff

ICM Maintenance Staff

DSS Activity

Log

DSS Activity

Log

Repairs/adjustments Repairs/adjustments

Page 12: APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

I-210 Pilot: System Requirements

12

A.9. RESPONDING TO ASSET FAILURES

Figure A-11 – Envisioned Process for Addressing a Traffic Sensor Fault

Data Hub receiv es a f ault/error message f rom a traf f ic detector

Data Hub

Data Hub uses inf ormation receiv ed to assess the reported problem (if possible)

Data Hub

Fault af f ecting signal operations

Data Hub sends a Control Dev ice Fault warning to the IMS

Data Hub

Fault not af f ecting signal operations

Data Hub archiv es the f ault message

Data Hub

NO FURTHER ACTIONS

Need f or correctiv e

actions

Local TMC Operatorassesses the sev erity of the f ault message receiv ed

IMS display a f ault message on computer terminal f or rev iew by TMC Operators

IMS

If needed, TMC Operator uses the ICMS User Interf ace to consult most recent DSS perf ormance ev aluations

Field Personnel

Simulation Data

ICM

Local TMC Operator inf orms Local Maintenance Staf f of faulty detector(s)

Local Maintenance Staf f schedule repair work

Local Road

Closures

Local TMC Operator of agency responsible f or detector maintenance takes note of the f ault

Faulty detector is f ixed

Local Maintenance Staf f inf orms Local TMS Operator that f aulty detector is f ixed

Local Road

Closures

DSS Rules Enginedev elop response plans based on supplied data

Simulation Subsy stem uses supplied data to characterize traf f ic conditions at detector`s location

SIM

RUL

Fault reported through local traf f ic control sy stem

Local TCS

Data Hub marks the data receiv ed f rom f aulty detector(s) as potentially inaccurate

Data Hub

SUBSEQUENT CONTROL INTERVAL

Data Hub stops receiv ing error messages f rom traf f ic detector

Data Hub

Local Maintenance Staf f terminates the road closure plan associated with the detector repair

Data Hub

Data Hub f ulf ills data requests using historical av erage prof iles f or the corresponding day and time

Data Hub returns “no av ailable data” f or any data request

Historical data av ailableHistorical data not av ailable

DSS Rules Engine dev elop response plans based on supplied data

RUL

Simulation Subsy stem uses supplied data to characterize traf f ic conditions at the f aulty detector’s location

SIMData Hub

Data Hub

Data Hub

IMS updates list of activ e incidents /ev ents

IMS

Local TCS

Local TCS

Data Hub starts to f ulf ill data requests using real-time data

Data Hub

Data Hub sets detector status to “Normal”

Data Hub

IMS updates list of activ e incidents/ev ents

IMS

Local Maintenance Staf f enters any planned lane closures into local reporting sy stem

Page 13: APPENDIX A. OPERATIONAL PROCESS FLOW CHARTS

I-210 Pilot: System Requirements

13

Figure A-12 – Envisioned Process for Addressing a Traffic Signal Controller Fault

Data Hub receiv es a f ault/error message f rom a traf f ic signal controller

Data Hub

Data Hub uses inf ormation receiv ed to assess the reported problem (if possible)

Data Hub

Fault af f ecting signal controller operations

Data Hub sends a Control Dev ice Fault warning to the IMS

Fault not af f ecting signal operations

Data Hub archiv es the f ault message

Data Hub

NO FURTHER ACTIONS

Need f or correctiv e

actions

Local TMC Operator assesses the v alidity /severity of the receiv ed f ault message

IMS creates a new incident record

IMS display a f ault message on computer terminal f or rev iew by TMC Operators

IMS

If needed, TMC Operator uses the ICMS User Interf ace to consult most recent DSS perf ormance ev aluations

Field Personnel

Simulation Data

ICM

DSS Rules Engine considers f aulty controller when dev eloping new response plans

Simulation Subsy stem updates traf f ic signal operational parameters in corridor models

IMS updates list of activ e incidents/ev ents in corridor

IMS

Local TMC Operator inf orms Local Maintenance Staf f of the f aulty controller

Local Maintenance Staf f schedule repair work

Local TMC Operator of agency responsible f or controller maintenance takes note of the f ault

Signal controller is f ixed

Local Maintenance Staf f inf orms Local TMS Operator that controller is f ixed

DSS Rules Engine considers updated controller status when dev eloping response plan

Simulation Subsy stemupdates traf f ic signal operational parameters in corridor models

IMS updates list of activ e incidents/ev ents

IMS

Fault reported through local traf f ic control sy stem

Local TCS

IMS

Data Hub sets controller as unav ailable f or response planning

Data Hub

Data Hub adjust operating status of controller (f lashing mode, def ault timing plan, etc.)

Data Hub

SUBSEQUENT CONTROL INTERVAL

Data Hub sets controller’s operating status to “Normal”

Data Hub

Local TMC Operator sets to “Terminated” the incident record associated with the f aulty controller

Data Hub sets controller as av ailable f or response planning

SIM

RUL

RUL

SIMData Hub stops receiv ing f ault messages

Local TCS

Local TCS

Data Hub

Data Hub

Data Hub