APPENDIX C CORRESPONDENCE Correspondence 1 (EAW Item 12): Environmental Stewardship Contaminated Properties email (6/14/17) Correspondence 2 (EAW Item 13): Department of Natural Resources; email (7/27/2017) DNR Features Map Blandings Turtle Fact Sheets Preventing Entanglement Correspondence 3: (EAW Item 14): MnDOT Cultural Resources Section Tribal Letter (6/14/17) MnDOT Cultural Resources Section 106 Clearance Letter (7/14/2017)

Upload: buihuong

Post on 06-Feb-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

APPENDIX C

CORRESPONDENCE

Correspondence 1 (EAW Item 12) Environmental Stewardship Contaminated Properties email (61417)

Correspondence 2 (EAW Item 13) Department of Natural Resources email (7272017)

DNR Features Map

Blandings Turtle Fact Sheets

Preventing Entanglement

Correspondence 3 (EAW Item 14) MnDOT Cultural Resources Section Tribal Letter (61417) MnDOT Cultural Resources Section 106 Clearance Letter (7142017)

From Boben Carolyn (DOT)To Gombold Brigid (DOT) Adams Jerome (DOT)Cc Carlson Christine R (DOT)Subject M TH10 SP6205-39 - CMMT ENM Response - No Further WorkDate Wednesday June 14 2017 61705 AMAttachments image001png

T9W076Letting 12017 July 2018Report Writer Brigid GomboldProject Manager Jerome AdamsProject Designer M TH10 SP6205-39 This state-funded construction project on eastbound US 10 will create a two-lane exit fromsouthbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exitlane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden HillsMinnesota The Environmental Investigation Unit (EIU) reviewed the Minnesota Pollution Control Agency(MPCA) and Minnesota Department of Agriculture (MDA) databases to check for knowncontaminated sites in the project area The databases searched included leaking undergroundstorage tank facilities landfills salvage yards voluntary investigation and cleanup (VIC) sitesSuperfund sites and dump sites A review of these MPCA files is a component of a Phase IEnvironmental Site Assessment (Phase I ESA) A complete Phase I ESA includes at least two othercomponents research on historic land use and site reconnaissance It should be noted that theMPCA database files are continually being updated Although this information is the most up-to-date available some of the information may be incomplete or inaccurate There is also apossibility that undiscovered contaminated andor regulated materials exist in the project area Based on the database review there are five inactive leaking underground storage tankfacilities one inactive leaking underground storage tankpetroleum brownfield site one activestate assessment site one inactive petroleum brownfield site one active VIC site and oneinactive VIC site within 500 feet of the project area VIC sites are sites with known or potentialreleases of non-petroleum contamination Given the nature and location of the project area and based on the HPDP threshold criteria assummarized below this project has a low to medium risk of impacting potentially contaminatedsites Therefore additional evaluation of the project area for potential contamination may benecessary depending on planned activities 1 The project may involve acquisition of new right-of-way An EDD-1 form has been completedfor the project and a determination made that an EDD-2 is needed 2 Project involves grading andor excavation including minor work (eg turns lanes signalfootings sign posts culvert replacement) Preliminary project information indicates that astormwater pond may be constructed This increases the chances of encounteringcontaminants that may have originated from an off-site source and migrated into project areasrequiring excavation 3 The project is in urban area within the city of Arden Hills More specifically the project is nearthe Twin Cities Army Ammunition Plant This increases the chances of encounteringcontaminants that may have originated from an off-site source and migrated into the right ofway

4 The project may require groundwater dewatering A Phase 2 drilling investigation was completed at the location of the stormwater detention pondis to be included as part of this project Based on the findings of the Phase 2 drilling investigationdid not identify conditions in soil or groundwater which would prohibit siting a pond in thislocation If new information obtained during project development or construction indicates acontaminated site may be impacted by the project the property will be evaluated and soiland groundwater testing completed as appropriate If necessary a plan will be developed forproperly handling and treating contaminated soil andor groundwater during construction inaccordance with all applicable state and federal requirements Carolyn L Boben MS PGHydrogeologistOffice of Environmental Stewardship (MS 620)Environmental Investigative GroupMinnesota Department of Transportation395 John Ireland BlvdSt Paul MN 55155Office 651-366-3621Cell 651-226-1271carolynbobenstatemnus

From Leete Peter (DOT)To Gombold Brigid (DOT)Cc Smith Christopher E (DOT) Straumanis Sarma (DOT) Joyal Lisa (DNR) Orne Benjamin G MVP Horton Becky (DNR)

DeBates TJ (DNR) Sorensen Jenifer (DNR) Hoaglund Erica (DNR) Noland Scott (DNR)Subject DNR Comments on MnDOT Early Notification TH10 Rehabilitation (SP6205-39) Ramsy CoDate Thursday July 27 2017 102031 AMAttachments Ebflyerampfactsheet2008_9pdf

re review ENMpdfDNRbasemap(July2017)pdf

BrigidThis email is the DNR response for your project records This is a re-review of the project (originally reviewed in 2015) I have notsent this Early Notification Memo (ENM) out for full DNR review However based on the information in the submitted documentsregarding the proposed rehabilitation of TH10 between I-35E and TH96 Please consider the following comments as final designsand special provisions are developed

1 For MnDOT planning purposes attached to this email is a map of the project area (DNRbasemappdf)showing nearby locations of DNR areas concern (if they exist) such as Public Waters (in blue)waterbodies designated as infested with aquatic invasive species (AIS) snowmobile Trails (in pink) andvarious green shaded polygons for Sites of Biodiversity Significance This map may be shared or includedin project documentation as all information is from publically available data layers Most of thisinformation is also available on the MnDOT georilla website (httpgeorillametrogis) in the naturalresources catalog (DNR ENM) The Natural Heritage Information System (NHIS) database has beenreviewed though in order to prevent the inadvertent release of a rare features location those detailsare not shown on the map Comments on potential impacts to rare features listed in the NHIScomments are below If you have questions regarding proposed work near any of the data shownplease give me a call

2 The project has numerous culvert repairs or replacements Rice Creek and Round Lake are the only Public Waters near

the project area Please take appropriate sediment containment and contaminant prevention measures in areas thatdrain to these waters As proposed a Public Waters Permit is not required Should plans change to include work in thesePublic Waters please contact me as further review may be required

3 A general comment on CIPP lining projects is that installation methods may temporarily alter thechemical or thermal properties in the receiving water during the installation process curing process orinitial flush These by-products of installation have potential for adverse impacts to receiving waters Inextreme cases impacts may result in a localized fish kill To help assure that suitable containment ortreatment prior to discharge to Public Waters is conducted the following is recommended

a Special Conditions to construction specifications should be written to prevent hot waterprecipitate or chemical containing precipitate (eg styrene or cement waste) from discharginginto receiving waters This will be a requirement for locations that would fall under PublicWaters jurisdiction (2 above)

4 Please remind contractors that a separate water use permit is required for withdrawal of more than

10000 gallons of water per day or 1 million gallons per year from surface water or ground waterGP1997-0005 (temporary water appropriations) covers a variety of activities associated with roadconstruction and should be applied of if applicable An individual appropriations permit may be requiredfor projects lasting longer than one year or exceeding 50 million gallons Information is located at httpwwwdnrstatemnuswaterswatermgmt_sectionappropriationspermitshtml The Minnesota Natural Heritage Information System (NHIS) has been queried to determine if any rareplant or animal species native plant communities or other significant natural features are known tooccur within an approximate one-mile radius of the project area There are records of a dozen rare

CAUTION

BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

Environmental Review Fact Sheet Series

Endangered Threatened and Special Concern Species of Minnesota

Blandingrsquos Turtle (Emydoidea blandingii)

Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

It is illegal to possess this threatened species

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

2

RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

GENERAL

A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

If a Blandingrsquos turtle nests in your yard do not disturb the nest

If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

WETLANDS

Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

ROADS

Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

Roads should be ditched not curbed or below grade

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Friday April 10 2015 422 PMTo Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn

(DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT)

Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT)Subject For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Cover Email to Early Notification Memo136205-39 (US 10)13

From Gombold Brigid (DOT)To Leete Peter (DOT) Smith Christopher E (DOT) Boben Carolyn (DOT) Vogel Mark (DOT) Voigt Paul (DOT)

Heinz Katherine (DOT) MN_DOT_CulturalResourcesCc Adams Jerome (DOT) Dalton Richard (DOT) Moynihan Debra (DOT)Subject Re-Review of ENM for SP 6205-39 TH 10Date Friday June 09 2017 90200 AM

Hi ReviewersUnfortunately the EAW did not get published during the time period that some of the reviews wouldstill be valid In addition this project has had Federal funds added to it so the state only reviews arealso invalid The good news is that there is a layout with the proposed ponding site The green onthe layout is Not MnDOT ndash it is Ramsey County Attached are all of the reviews that were receivedPlease respond if a new review is needed Approximate tree removal is in the ENM Here is the link to the ENMhttpedmscyberdocsquickstartaspshow=view1568435ampnoframes=yes CRIS 24416 The document we had discussed with FHWA prior to Emekarsquos departure and while Ryan was startingwas a EAW and separate Non-Programmatic CE If you have any questions regarding the design of the project please contact Jerome Adam the PMat 651-234-7611 Thanks Brigid Brigid GomboldMnDOT ndash Environmental Coordinator1500 Co Rd B2Roseville MN 55113(651) 234-7674

Minnesota Department of Transportation

Early Notification Memo

Metro District Office Tel 651234-7677 Waters Edge Building - Mail Stop 050 Fax 651234-7608 1500 W County Road B-2 Roseville Minnesota 55113-3175

File 6205-39 (US 10) ENM (EAW)

Date April 10 2015 Subject Early Notification Memo

SP 6205-39 (US 10) Job Number T9W076 Letting Date January 2017 Type of project Construct a two-lane exit on southbound I-35W to eastbound US 10 construct an auxiliary lane on eastbound US 10 from CR 10 to CR 96 PPMS project limits On US 10 from I-35W to CR 96 in Arden Hills Ramsey County Minnesota Funding State-only (CMSP) ENM response date May 22 2015

To The following MnDOT Functional Groups (checked with an ldquoXrdquo) (Addressees - additional information is available by clicking ldquosee belowrdquo or HPDPrdquo links in the table below) Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

X Peter Leete (MS 620) ndash DNR questionnaire (for thresholds on when to use see ldquoHPDPrdquo link to the right [links to DNRMnDOT MOU] then go to bottom of page 24)

See below HPDP ENM1040

Respond using officialletterhead

For projects near the Mississippi River IF project lies in MNRRA (map at EDMS 508748) contact Alan Robbins-Fenger Resource Management - Planning and Land Use MNRRA National Park Service 111 East Kellogg Boulevard Suite 105 St Paul Mn 55101 alan_robbins_fengernpsgov 651-290-3030 ext 250

See Below HPDP None

For projects near the St Croix River contact Jill Medland Jill_Medlandnpsgov St Croix National Scenic Riverway 401 North Hamilton Street Saint Croix Falls WI 54024 Phone715-483-2284 Fax 715-483-3288

NPS web page None

Jason Alcott (MS 620) ndash Federal TampE Species Review See below HPDP ENM1060

X Cultural Resources Unit Review (see guidance at EDMS doc 1274121 for state-funded pavement rehab projects)

See below HPDP ENM1010

X

Keri Aufdencamp (Metro West and East Areas) Carolyn Boben (Metro North Area) Sarah Jarman (Metro South Area) (MS 620) ndash Contaminated property review

See below HPDP ENM1020

Respond by Email or memo

X Mark Vogel (Metro North and East Areas) Jackie Klein (Metro South and West Areas) (MS 620) ndash Regulated Waste

See below HPDP ENM1030

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 1 of 11
gomb1bri
Text Box
Chris Smith
gomb1bri
Text Box
X
gomb1bri
Cross-Out
gomb1bri
Inserted Text
gomb1bri
Typewritten Text
Federal Funds
gomb1bri
Cross-Out
gomb1bri
Typewritten Text
July 2018
gomb1bri
Typewritten Text
Resent 692017

TO Addressees Page 2 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

(Building DemolitionRelocation and Bridge ReconstructionPainting)

X Tina Markeson (MS 620) ndash Forestry tree survey See below HPDP ENM1070

Kathryn McFadden (MS 686) - Historic Properties Program See below None Rob Williams (MS 686) - Safety Rest Area Program See below Na Vera Westrum Ostrom (MS 686) - State Entry Monuments See below Na

Gina Mitteco (Metro) ndash Bicycle and Pedestrian review Accessibility Requirements (ADA)

See below HPDP ENM1090 ENM1100

Dan Prather (MS 610) ndash Bridge Projects See Below All Bridge projects None

X Jason Richter (MS XXX) ndash Geology review for EAW Item 10 (MnDOT written EA only)

See Below None

X Jim Weatherhead (all Metro Areas) (MS 470) ndash Railroad Review (rail contacts list)

See below HPDP ENM1120

X Debra Sorenson (MS 410) -- Office of Aeronautics See below HPDP ENM1110

X Jim Henrickson (Metro) ndash Traffic Forecasts None X Peter Wasko (Metro) ndash Noise review See below HPDP ENM1050 XXXXX ndash Metro Right of Way (click here for maps) See below None

X Katherine Heinz ndash District Wetlands review See below HPDP None

X Brian Kellyndash Metro Water Resources (click here for map) Only send WRE federally-funded projects and EAW projects

See below None

XXXXX ndash Metro Traffic (click here for map) See below None

X Deb Moynihan - (MS 620) ndash Environmental Review Document See below None

X

Emeka Ezekwemba (FHWA Area Engineer) ndash Emeka Ezekwemba (East West and North Areas) Abbi Ginsberg (South Area) Environmental Review Document (EAW EA vs CAT EX) Interstate Access Request

See below See below

None

Cc X Keith Baker ndash Consultant Administration

Minnie Milkert - Value Engineering (for projects with total costs gt$20 million)

See below

X Deb Moynihan - (MS 620) ndash Environmental Review Document

X Jerome Adams ndash Metro District Project Manager (PPMS Fin Des Proj)

X XXXXX ndash Metro District Project Designer (PPMS DES ENG)

Brigid Gombold ndash Metro Environmental Coordinator (Cat_Ex and Cat_Ex_Not documents)

X Rick Dalton ndash Metro Environmental Coordinator (EAW EA and EIS documents)

For additional information about the project please contact the Project Designer or the Project Manager Project Manager Jerome Adams Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7611

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 2 of 11

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

From Boben Carolyn (DOT)To Gombold Brigid (DOT) Adams Jerome (DOT)Cc Carlson Christine R (DOT)Subject M TH10 SP6205-39 - CMMT ENM Response - No Further WorkDate Wednesday June 14 2017 61705 AMAttachments image001png

T9W076Letting 12017 July 2018Report Writer Brigid GomboldProject Manager Jerome AdamsProject Designer M TH10 SP6205-39 This state-funded construction project on eastbound US 10 will create a two-lane exit fromsouthbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exitlane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden HillsMinnesota The Environmental Investigation Unit (EIU) reviewed the Minnesota Pollution Control Agency(MPCA) and Minnesota Department of Agriculture (MDA) databases to check for knowncontaminated sites in the project area The databases searched included leaking undergroundstorage tank facilities landfills salvage yards voluntary investigation and cleanup (VIC) sitesSuperfund sites and dump sites A review of these MPCA files is a component of a Phase IEnvironmental Site Assessment (Phase I ESA) A complete Phase I ESA includes at least two othercomponents research on historic land use and site reconnaissance It should be noted that theMPCA database files are continually being updated Although this information is the most up-to-date available some of the information may be incomplete or inaccurate There is also apossibility that undiscovered contaminated andor regulated materials exist in the project area Based on the database review there are five inactive leaking underground storage tankfacilities one inactive leaking underground storage tankpetroleum brownfield site one activestate assessment site one inactive petroleum brownfield site one active VIC site and oneinactive VIC site within 500 feet of the project area VIC sites are sites with known or potentialreleases of non-petroleum contamination Given the nature and location of the project area and based on the HPDP threshold criteria assummarized below this project has a low to medium risk of impacting potentially contaminatedsites Therefore additional evaluation of the project area for potential contamination may benecessary depending on planned activities 1 The project may involve acquisition of new right-of-way An EDD-1 form has been completedfor the project and a determination made that an EDD-2 is needed 2 Project involves grading andor excavation including minor work (eg turns lanes signalfootings sign posts culvert replacement) Preliminary project information indicates that astormwater pond may be constructed This increases the chances of encounteringcontaminants that may have originated from an off-site source and migrated into project areasrequiring excavation 3 The project is in urban area within the city of Arden Hills More specifically the project is nearthe Twin Cities Army Ammunition Plant This increases the chances of encounteringcontaminants that may have originated from an off-site source and migrated into the right ofway

4 The project may require groundwater dewatering A Phase 2 drilling investigation was completed at the location of the stormwater detention pondis to be included as part of this project Based on the findings of the Phase 2 drilling investigationdid not identify conditions in soil or groundwater which would prohibit siting a pond in thislocation If new information obtained during project development or construction indicates acontaminated site may be impacted by the project the property will be evaluated and soiland groundwater testing completed as appropriate If necessary a plan will be developed forproperly handling and treating contaminated soil andor groundwater during construction inaccordance with all applicable state and federal requirements Carolyn L Boben MS PGHydrogeologistOffice of Environmental Stewardship (MS 620)Environmental Investigative GroupMinnesota Department of Transportation395 John Ireland BlvdSt Paul MN 55155Office 651-366-3621Cell 651-226-1271carolynbobenstatemnus

From Leete Peter (DOT)To Gombold Brigid (DOT)Cc Smith Christopher E (DOT) Straumanis Sarma (DOT) Joyal Lisa (DNR) Orne Benjamin G MVP Horton Becky (DNR)

DeBates TJ (DNR) Sorensen Jenifer (DNR) Hoaglund Erica (DNR) Noland Scott (DNR)Subject DNR Comments on MnDOT Early Notification TH10 Rehabilitation (SP6205-39) Ramsy CoDate Thursday July 27 2017 102031 AMAttachments Ebflyerampfactsheet2008_9pdf

re review ENMpdfDNRbasemap(July2017)pdf

BrigidThis email is the DNR response for your project records This is a re-review of the project (originally reviewed in 2015) I have notsent this Early Notification Memo (ENM) out for full DNR review However based on the information in the submitted documentsregarding the proposed rehabilitation of TH10 between I-35E and TH96 Please consider the following comments as final designsand special provisions are developed

1 For MnDOT planning purposes attached to this email is a map of the project area (DNRbasemappdf)showing nearby locations of DNR areas concern (if they exist) such as Public Waters (in blue)waterbodies designated as infested with aquatic invasive species (AIS) snowmobile Trails (in pink) andvarious green shaded polygons for Sites of Biodiversity Significance This map may be shared or includedin project documentation as all information is from publically available data layers Most of thisinformation is also available on the MnDOT georilla website (httpgeorillametrogis) in the naturalresources catalog (DNR ENM) The Natural Heritage Information System (NHIS) database has beenreviewed though in order to prevent the inadvertent release of a rare features location those detailsare not shown on the map Comments on potential impacts to rare features listed in the NHIScomments are below If you have questions regarding proposed work near any of the data shownplease give me a call

2 The project has numerous culvert repairs or replacements Rice Creek and Round Lake are the only Public Waters near

the project area Please take appropriate sediment containment and contaminant prevention measures in areas thatdrain to these waters As proposed a Public Waters Permit is not required Should plans change to include work in thesePublic Waters please contact me as further review may be required

3 A general comment on CIPP lining projects is that installation methods may temporarily alter thechemical or thermal properties in the receiving water during the installation process curing process orinitial flush These by-products of installation have potential for adverse impacts to receiving waters Inextreme cases impacts may result in a localized fish kill To help assure that suitable containment ortreatment prior to discharge to Public Waters is conducted the following is recommended

a Special Conditions to construction specifications should be written to prevent hot waterprecipitate or chemical containing precipitate (eg styrene or cement waste) from discharginginto receiving waters This will be a requirement for locations that would fall under PublicWaters jurisdiction (2 above)

4 Please remind contractors that a separate water use permit is required for withdrawal of more than

10000 gallons of water per day or 1 million gallons per year from surface water or ground waterGP1997-0005 (temporary water appropriations) covers a variety of activities associated with roadconstruction and should be applied of if applicable An individual appropriations permit may be requiredfor projects lasting longer than one year or exceeding 50 million gallons Information is located at httpwwwdnrstatemnuswaterswatermgmt_sectionappropriationspermitshtml The Minnesota Natural Heritage Information System (NHIS) has been queried to determine if any rareplant or animal species native plant communities or other significant natural features are known tooccur within an approximate one-mile radius of the project area There are records of a dozen rare

CAUTION

BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

Environmental Review Fact Sheet Series

Endangered Threatened and Special Concern Species of Minnesota

Blandingrsquos Turtle (Emydoidea blandingii)

Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

It is illegal to possess this threatened species

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

2

RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

GENERAL

A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

If a Blandingrsquos turtle nests in your yard do not disturb the nest

If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

WETLANDS

Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

ROADS

Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

Roads should be ditched not curbed or below grade

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Friday April 10 2015 422 PMTo Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn

(DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT)

Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT)Subject For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Cover Email to Early Notification Memo136205-39 (US 10)13

From Gombold Brigid (DOT)To Leete Peter (DOT) Smith Christopher E (DOT) Boben Carolyn (DOT) Vogel Mark (DOT) Voigt Paul (DOT)

Heinz Katherine (DOT) MN_DOT_CulturalResourcesCc Adams Jerome (DOT) Dalton Richard (DOT) Moynihan Debra (DOT)Subject Re-Review of ENM for SP 6205-39 TH 10Date Friday June 09 2017 90200 AM

Hi ReviewersUnfortunately the EAW did not get published during the time period that some of the reviews wouldstill be valid In addition this project has had Federal funds added to it so the state only reviews arealso invalid The good news is that there is a layout with the proposed ponding site The green onthe layout is Not MnDOT ndash it is Ramsey County Attached are all of the reviews that were receivedPlease respond if a new review is needed Approximate tree removal is in the ENM Here is the link to the ENMhttpedmscyberdocsquickstartaspshow=view1568435ampnoframes=yes CRIS 24416 The document we had discussed with FHWA prior to Emekarsquos departure and while Ryan was startingwas a EAW and separate Non-Programmatic CE If you have any questions regarding the design of the project please contact Jerome Adam the PMat 651-234-7611 Thanks Brigid Brigid GomboldMnDOT ndash Environmental Coordinator1500 Co Rd B2Roseville MN 55113(651) 234-7674

Minnesota Department of Transportation

Early Notification Memo

Metro District Office Tel 651234-7677 Waters Edge Building - Mail Stop 050 Fax 651234-7608 1500 W County Road B-2 Roseville Minnesota 55113-3175

File 6205-39 (US 10) ENM (EAW)

Date April 10 2015 Subject Early Notification Memo

SP 6205-39 (US 10) Job Number T9W076 Letting Date January 2017 Type of project Construct a two-lane exit on southbound I-35W to eastbound US 10 construct an auxiliary lane on eastbound US 10 from CR 10 to CR 96 PPMS project limits On US 10 from I-35W to CR 96 in Arden Hills Ramsey County Minnesota Funding State-only (CMSP) ENM response date May 22 2015

To The following MnDOT Functional Groups (checked with an ldquoXrdquo) (Addressees - additional information is available by clicking ldquosee belowrdquo or HPDPrdquo links in the table below) Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

X Peter Leete (MS 620) ndash DNR questionnaire (for thresholds on when to use see ldquoHPDPrdquo link to the right [links to DNRMnDOT MOU] then go to bottom of page 24)

See below HPDP ENM1040

Respond using officialletterhead

For projects near the Mississippi River IF project lies in MNRRA (map at EDMS 508748) contact Alan Robbins-Fenger Resource Management - Planning and Land Use MNRRA National Park Service 111 East Kellogg Boulevard Suite 105 St Paul Mn 55101 alan_robbins_fengernpsgov 651-290-3030 ext 250

See Below HPDP None

For projects near the St Croix River contact Jill Medland Jill_Medlandnpsgov St Croix National Scenic Riverway 401 North Hamilton Street Saint Croix Falls WI 54024 Phone715-483-2284 Fax 715-483-3288

NPS web page None

Jason Alcott (MS 620) ndash Federal TampE Species Review See below HPDP ENM1060

X Cultural Resources Unit Review (see guidance at EDMS doc 1274121 for state-funded pavement rehab projects)

See below HPDP ENM1010

X

Keri Aufdencamp (Metro West and East Areas) Carolyn Boben (Metro North Area) Sarah Jarman (Metro South Area) (MS 620) ndash Contaminated property review

See below HPDP ENM1020

Respond by Email or memo

X Mark Vogel (Metro North and East Areas) Jackie Klein (Metro South and West Areas) (MS 620) ndash Regulated Waste

See below HPDP ENM1030

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 1 of 11
gomb1bri
Text Box
Chris Smith
gomb1bri
Text Box
X
gomb1bri
Cross-Out
gomb1bri
Inserted Text
gomb1bri
Typewritten Text
Federal Funds
gomb1bri
Cross-Out
gomb1bri
Typewritten Text
July 2018
gomb1bri
Typewritten Text
Resent 692017

TO Addressees Page 2 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

(Building DemolitionRelocation and Bridge ReconstructionPainting)

X Tina Markeson (MS 620) ndash Forestry tree survey See below HPDP ENM1070

Kathryn McFadden (MS 686) - Historic Properties Program See below None Rob Williams (MS 686) - Safety Rest Area Program See below Na Vera Westrum Ostrom (MS 686) - State Entry Monuments See below Na

Gina Mitteco (Metro) ndash Bicycle and Pedestrian review Accessibility Requirements (ADA)

See below HPDP ENM1090 ENM1100

Dan Prather (MS 610) ndash Bridge Projects See Below All Bridge projects None

X Jason Richter (MS XXX) ndash Geology review for EAW Item 10 (MnDOT written EA only)

See Below None

X Jim Weatherhead (all Metro Areas) (MS 470) ndash Railroad Review (rail contacts list)

See below HPDP ENM1120

X Debra Sorenson (MS 410) -- Office of Aeronautics See below HPDP ENM1110

X Jim Henrickson (Metro) ndash Traffic Forecasts None X Peter Wasko (Metro) ndash Noise review See below HPDP ENM1050 XXXXX ndash Metro Right of Way (click here for maps) See below None

X Katherine Heinz ndash District Wetlands review See below HPDP None

X Brian Kellyndash Metro Water Resources (click here for map) Only send WRE federally-funded projects and EAW projects

See below None

XXXXX ndash Metro Traffic (click here for map) See below None

X Deb Moynihan - (MS 620) ndash Environmental Review Document See below None

X

Emeka Ezekwemba (FHWA Area Engineer) ndash Emeka Ezekwemba (East West and North Areas) Abbi Ginsberg (South Area) Environmental Review Document (EAW EA vs CAT EX) Interstate Access Request

See below See below

None

Cc X Keith Baker ndash Consultant Administration

Minnie Milkert - Value Engineering (for projects with total costs gt$20 million)

See below

X Deb Moynihan - (MS 620) ndash Environmental Review Document

X Jerome Adams ndash Metro District Project Manager (PPMS Fin Des Proj)

X XXXXX ndash Metro District Project Designer (PPMS DES ENG)

Brigid Gombold ndash Metro Environmental Coordinator (Cat_Ex and Cat_Ex_Not documents)

X Rick Dalton ndash Metro Environmental Coordinator (EAW EA and EIS documents)

For additional information about the project please contact the Project Designer or the Project Manager Project Manager Jerome Adams Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7611

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 2 of 11

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

4 The project may require groundwater dewatering A Phase 2 drilling investigation was completed at the location of the stormwater detention pondis to be included as part of this project Based on the findings of the Phase 2 drilling investigationdid not identify conditions in soil or groundwater which would prohibit siting a pond in thislocation If new information obtained during project development or construction indicates acontaminated site may be impacted by the project the property will be evaluated and soiland groundwater testing completed as appropriate If necessary a plan will be developed forproperly handling and treating contaminated soil andor groundwater during construction inaccordance with all applicable state and federal requirements Carolyn L Boben MS PGHydrogeologistOffice of Environmental Stewardship (MS 620)Environmental Investigative GroupMinnesota Department of Transportation395 John Ireland BlvdSt Paul MN 55155Office 651-366-3621Cell 651-226-1271carolynbobenstatemnus

From Leete Peter (DOT)To Gombold Brigid (DOT)Cc Smith Christopher E (DOT) Straumanis Sarma (DOT) Joyal Lisa (DNR) Orne Benjamin G MVP Horton Becky (DNR)

DeBates TJ (DNR) Sorensen Jenifer (DNR) Hoaglund Erica (DNR) Noland Scott (DNR)Subject DNR Comments on MnDOT Early Notification TH10 Rehabilitation (SP6205-39) Ramsy CoDate Thursday July 27 2017 102031 AMAttachments Ebflyerampfactsheet2008_9pdf

re review ENMpdfDNRbasemap(July2017)pdf

BrigidThis email is the DNR response for your project records This is a re-review of the project (originally reviewed in 2015) I have notsent this Early Notification Memo (ENM) out for full DNR review However based on the information in the submitted documentsregarding the proposed rehabilitation of TH10 between I-35E and TH96 Please consider the following comments as final designsand special provisions are developed

1 For MnDOT planning purposes attached to this email is a map of the project area (DNRbasemappdf)showing nearby locations of DNR areas concern (if they exist) such as Public Waters (in blue)waterbodies designated as infested with aquatic invasive species (AIS) snowmobile Trails (in pink) andvarious green shaded polygons for Sites of Biodiversity Significance This map may be shared or includedin project documentation as all information is from publically available data layers Most of thisinformation is also available on the MnDOT georilla website (httpgeorillametrogis) in the naturalresources catalog (DNR ENM) The Natural Heritage Information System (NHIS) database has beenreviewed though in order to prevent the inadvertent release of a rare features location those detailsare not shown on the map Comments on potential impacts to rare features listed in the NHIScomments are below If you have questions regarding proposed work near any of the data shownplease give me a call

2 The project has numerous culvert repairs or replacements Rice Creek and Round Lake are the only Public Waters near

the project area Please take appropriate sediment containment and contaminant prevention measures in areas thatdrain to these waters As proposed a Public Waters Permit is not required Should plans change to include work in thesePublic Waters please contact me as further review may be required

3 A general comment on CIPP lining projects is that installation methods may temporarily alter thechemical or thermal properties in the receiving water during the installation process curing process orinitial flush These by-products of installation have potential for adverse impacts to receiving waters Inextreme cases impacts may result in a localized fish kill To help assure that suitable containment ortreatment prior to discharge to Public Waters is conducted the following is recommended

a Special Conditions to construction specifications should be written to prevent hot waterprecipitate or chemical containing precipitate (eg styrene or cement waste) from discharginginto receiving waters This will be a requirement for locations that would fall under PublicWaters jurisdiction (2 above)

4 Please remind contractors that a separate water use permit is required for withdrawal of more than

10000 gallons of water per day or 1 million gallons per year from surface water or ground waterGP1997-0005 (temporary water appropriations) covers a variety of activities associated with roadconstruction and should be applied of if applicable An individual appropriations permit may be requiredfor projects lasting longer than one year or exceeding 50 million gallons Information is located at httpwwwdnrstatemnuswaterswatermgmt_sectionappropriationspermitshtml The Minnesota Natural Heritage Information System (NHIS) has been queried to determine if any rareplant or animal species native plant communities or other significant natural features are known tooccur within an approximate one-mile radius of the project area There are records of a dozen rare

CAUTION

BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

Environmental Review Fact Sheet Series

Endangered Threatened and Special Concern Species of Minnesota

Blandingrsquos Turtle (Emydoidea blandingii)

Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

It is illegal to possess this threatened species

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

2

RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

GENERAL

A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

If a Blandingrsquos turtle nests in your yard do not disturb the nest

If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

WETLANDS

Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

ROADS

Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

Roads should be ditched not curbed or below grade

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Friday April 10 2015 422 PMTo Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn

(DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT)

Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT)Subject For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Cover Email to Early Notification Memo136205-39 (US 10)13

From Gombold Brigid (DOT)To Leete Peter (DOT) Smith Christopher E (DOT) Boben Carolyn (DOT) Vogel Mark (DOT) Voigt Paul (DOT)

Heinz Katherine (DOT) MN_DOT_CulturalResourcesCc Adams Jerome (DOT) Dalton Richard (DOT) Moynihan Debra (DOT)Subject Re-Review of ENM for SP 6205-39 TH 10Date Friday June 09 2017 90200 AM

Hi ReviewersUnfortunately the EAW did not get published during the time period that some of the reviews wouldstill be valid In addition this project has had Federal funds added to it so the state only reviews arealso invalid The good news is that there is a layout with the proposed ponding site The green onthe layout is Not MnDOT ndash it is Ramsey County Attached are all of the reviews that were receivedPlease respond if a new review is needed Approximate tree removal is in the ENM Here is the link to the ENMhttpedmscyberdocsquickstartaspshow=view1568435ampnoframes=yes CRIS 24416 The document we had discussed with FHWA prior to Emekarsquos departure and while Ryan was startingwas a EAW and separate Non-Programmatic CE If you have any questions regarding the design of the project please contact Jerome Adam the PMat 651-234-7611 Thanks Brigid Brigid GomboldMnDOT ndash Environmental Coordinator1500 Co Rd B2Roseville MN 55113(651) 234-7674

Minnesota Department of Transportation

Early Notification Memo

Metro District Office Tel 651234-7677 Waters Edge Building - Mail Stop 050 Fax 651234-7608 1500 W County Road B-2 Roseville Minnesota 55113-3175

File 6205-39 (US 10) ENM (EAW)

Date April 10 2015 Subject Early Notification Memo

SP 6205-39 (US 10) Job Number T9W076 Letting Date January 2017 Type of project Construct a two-lane exit on southbound I-35W to eastbound US 10 construct an auxiliary lane on eastbound US 10 from CR 10 to CR 96 PPMS project limits On US 10 from I-35W to CR 96 in Arden Hills Ramsey County Minnesota Funding State-only (CMSP) ENM response date May 22 2015

To The following MnDOT Functional Groups (checked with an ldquoXrdquo) (Addressees - additional information is available by clicking ldquosee belowrdquo or HPDPrdquo links in the table below) Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

X Peter Leete (MS 620) ndash DNR questionnaire (for thresholds on when to use see ldquoHPDPrdquo link to the right [links to DNRMnDOT MOU] then go to bottom of page 24)

See below HPDP ENM1040

Respond using officialletterhead

For projects near the Mississippi River IF project lies in MNRRA (map at EDMS 508748) contact Alan Robbins-Fenger Resource Management - Planning and Land Use MNRRA National Park Service 111 East Kellogg Boulevard Suite 105 St Paul Mn 55101 alan_robbins_fengernpsgov 651-290-3030 ext 250

See Below HPDP None

For projects near the St Croix River contact Jill Medland Jill_Medlandnpsgov St Croix National Scenic Riverway 401 North Hamilton Street Saint Croix Falls WI 54024 Phone715-483-2284 Fax 715-483-3288

NPS web page None

Jason Alcott (MS 620) ndash Federal TampE Species Review See below HPDP ENM1060

X Cultural Resources Unit Review (see guidance at EDMS doc 1274121 for state-funded pavement rehab projects)

See below HPDP ENM1010

X

Keri Aufdencamp (Metro West and East Areas) Carolyn Boben (Metro North Area) Sarah Jarman (Metro South Area) (MS 620) ndash Contaminated property review

See below HPDP ENM1020

Respond by Email or memo

X Mark Vogel (Metro North and East Areas) Jackie Klein (Metro South and West Areas) (MS 620) ndash Regulated Waste

See below HPDP ENM1030

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 1 of 11
gomb1bri
Text Box
Chris Smith
gomb1bri
Text Box
X
gomb1bri
Cross-Out
gomb1bri
Inserted Text
gomb1bri
Typewritten Text
Federal Funds
gomb1bri
Cross-Out
gomb1bri
Typewritten Text
July 2018
gomb1bri
Typewritten Text
Resent 692017

TO Addressees Page 2 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

(Building DemolitionRelocation and Bridge ReconstructionPainting)

X Tina Markeson (MS 620) ndash Forestry tree survey See below HPDP ENM1070

Kathryn McFadden (MS 686) - Historic Properties Program See below None Rob Williams (MS 686) - Safety Rest Area Program See below Na Vera Westrum Ostrom (MS 686) - State Entry Monuments See below Na

Gina Mitteco (Metro) ndash Bicycle and Pedestrian review Accessibility Requirements (ADA)

See below HPDP ENM1090 ENM1100

Dan Prather (MS 610) ndash Bridge Projects See Below All Bridge projects None

X Jason Richter (MS XXX) ndash Geology review for EAW Item 10 (MnDOT written EA only)

See Below None

X Jim Weatherhead (all Metro Areas) (MS 470) ndash Railroad Review (rail contacts list)

See below HPDP ENM1120

X Debra Sorenson (MS 410) -- Office of Aeronautics See below HPDP ENM1110

X Jim Henrickson (Metro) ndash Traffic Forecasts None X Peter Wasko (Metro) ndash Noise review See below HPDP ENM1050 XXXXX ndash Metro Right of Way (click here for maps) See below None

X Katherine Heinz ndash District Wetlands review See below HPDP None

X Brian Kellyndash Metro Water Resources (click here for map) Only send WRE federally-funded projects and EAW projects

See below None

XXXXX ndash Metro Traffic (click here for map) See below None

X Deb Moynihan - (MS 620) ndash Environmental Review Document See below None

X

Emeka Ezekwemba (FHWA Area Engineer) ndash Emeka Ezekwemba (East West and North Areas) Abbi Ginsberg (South Area) Environmental Review Document (EAW EA vs CAT EX) Interstate Access Request

See below See below

None

Cc X Keith Baker ndash Consultant Administration

Minnie Milkert - Value Engineering (for projects with total costs gt$20 million)

See below

X Deb Moynihan - (MS 620) ndash Environmental Review Document

X Jerome Adams ndash Metro District Project Manager (PPMS Fin Des Proj)

X XXXXX ndash Metro District Project Designer (PPMS DES ENG)

Brigid Gombold ndash Metro Environmental Coordinator (Cat_Ex and Cat_Ex_Not documents)

X Rick Dalton ndash Metro Environmental Coordinator (EAW EA and EIS documents)

For additional information about the project please contact the Project Designer or the Project Manager Project Manager Jerome Adams Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7611

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 2 of 11

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

From Leete Peter (DOT)To Gombold Brigid (DOT)Cc Smith Christopher E (DOT) Straumanis Sarma (DOT) Joyal Lisa (DNR) Orne Benjamin G MVP Horton Becky (DNR)

DeBates TJ (DNR) Sorensen Jenifer (DNR) Hoaglund Erica (DNR) Noland Scott (DNR)Subject DNR Comments on MnDOT Early Notification TH10 Rehabilitation (SP6205-39) Ramsy CoDate Thursday July 27 2017 102031 AMAttachments Ebflyerampfactsheet2008_9pdf

re review ENMpdfDNRbasemap(July2017)pdf

BrigidThis email is the DNR response for your project records This is a re-review of the project (originally reviewed in 2015) I have notsent this Early Notification Memo (ENM) out for full DNR review However based on the information in the submitted documentsregarding the proposed rehabilitation of TH10 between I-35E and TH96 Please consider the following comments as final designsand special provisions are developed

1 For MnDOT planning purposes attached to this email is a map of the project area (DNRbasemappdf)showing nearby locations of DNR areas concern (if they exist) such as Public Waters (in blue)waterbodies designated as infested with aquatic invasive species (AIS) snowmobile Trails (in pink) andvarious green shaded polygons for Sites of Biodiversity Significance This map may be shared or includedin project documentation as all information is from publically available data layers Most of thisinformation is also available on the MnDOT georilla website (httpgeorillametrogis) in the naturalresources catalog (DNR ENM) The Natural Heritage Information System (NHIS) database has beenreviewed though in order to prevent the inadvertent release of a rare features location those detailsare not shown on the map Comments on potential impacts to rare features listed in the NHIScomments are below If you have questions regarding proposed work near any of the data shownplease give me a call

2 The project has numerous culvert repairs or replacements Rice Creek and Round Lake are the only Public Waters near

the project area Please take appropriate sediment containment and contaminant prevention measures in areas thatdrain to these waters As proposed a Public Waters Permit is not required Should plans change to include work in thesePublic Waters please contact me as further review may be required

3 A general comment on CIPP lining projects is that installation methods may temporarily alter thechemical or thermal properties in the receiving water during the installation process curing process orinitial flush These by-products of installation have potential for adverse impacts to receiving waters Inextreme cases impacts may result in a localized fish kill To help assure that suitable containment ortreatment prior to discharge to Public Waters is conducted the following is recommended

a Special Conditions to construction specifications should be written to prevent hot waterprecipitate or chemical containing precipitate (eg styrene or cement waste) from discharginginto receiving waters This will be a requirement for locations that would fall under PublicWaters jurisdiction (2 above)

4 Please remind contractors that a separate water use permit is required for withdrawal of more than

10000 gallons of water per day or 1 million gallons per year from surface water or ground waterGP1997-0005 (temporary water appropriations) covers a variety of activities associated with roadconstruction and should be applied of if applicable An individual appropriations permit may be requiredfor projects lasting longer than one year or exceeding 50 million gallons Information is located at httpwwwdnrstatemnuswaterswatermgmt_sectionappropriationspermitshtml The Minnesota Natural Heritage Information System (NHIS) has been queried to determine if any rareplant or animal species native plant communities or other significant natural features are known tooccur within an approximate one-mile radius of the project area There are records of a dozen rare

CAUTION

BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

Environmental Review Fact Sheet Series

Endangered Threatened and Special Concern Species of Minnesota

Blandingrsquos Turtle (Emydoidea blandingii)

Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

It is illegal to possess this threatened species

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

2

RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

GENERAL

A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

If a Blandingrsquos turtle nests in your yard do not disturb the nest

If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

WETLANDS

Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

ROADS

Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

Roads should be ditched not curbed or below grade

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Friday April 10 2015 422 PMTo Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn

(DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT)

Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT)Subject For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Cover Email to Early Notification Memo136205-39 (US 10)13

From Gombold Brigid (DOT)To Leete Peter (DOT) Smith Christopher E (DOT) Boben Carolyn (DOT) Vogel Mark (DOT) Voigt Paul (DOT)

Heinz Katherine (DOT) MN_DOT_CulturalResourcesCc Adams Jerome (DOT) Dalton Richard (DOT) Moynihan Debra (DOT)Subject Re-Review of ENM for SP 6205-39 TH 10Date Friday June 09 2017 90200 AM

Hi ReviewersUnfortunately the EAW did not get published during the time period that some of the reviews wouldstill be valid In addition this project has had Federal funds added to it so the state only reviews arealso invalid The good news is that there is a layout with the proposed ponding site The green onthe layout is Not MnDOT ndash it is Ramsey County Attached are all of the reviews that were receivedPlease respond if a new review is needed Approximate tree removal is in the ENM Here is the link to the ENMhttpedmscyberdocsquickstartaspshow=view1568435ampnoframes=yes CRIS 24416 The document we had discussed with FHWA prior to Emekarsquos departure and while Ryan was startingwas a EAW and separate Non-Programmatic CE If you have any questions regarding the design of the project please contact Jerome Adam the PMat 651-234-7611 Thanks Brigid Brigid GomboldMnDOT ndash Environmental Coordinator1500 Co Rd B2Roseville MN 55113(651) 234-7674

Minnesota Department of Transportation

Early Notification Memo

Metro District Office Tel 651234-7677 Waters Edge Building - Mail Stop 050 Fax 651234-7608 1500 W County Road B-2 Roseville Minnesota 55113-3175

File 6205-39 (US 10) ENM (EAW)

Date April 10 2015 Subject Early Notification Memo

SP 6205-39 (US 10) Job Number T9W076 Letting Date January 2017 Type of project Construct a two-lane exit on southbound I-35W to eastbound US 10 construct an auxiliary lane on eastbound US 10 from CR 10 to CR 96 PPMS project limits On US 10 from I-35W to CR 96 in Arden Hills Ramsey County Minnesota Funding State-only (CMSP) ENM response date May 22 2015

To The following MnDOT Functional Groups (checked with an ldquoXrdquo) (Addressees - additional information is available by clicking ldquosee belowrdquo or HPDPrdquo links in the table below) Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

X Peter Leete (MS 620) ndash DNR questionnaire (for thresholds on when to use see ldquoHPDPrdquo link to the right [links to DNRMnDOT MOU] then go to bottom of page 24)

See below HPDP ENM1040

Respond using officialletterhead

For projects near the Mississippi River IF project lies in MNRRA (map at EDMS 508748) contact Alan Robbins-Fenger Resource Management - Planning and Land Use MNRRA National Park Service 111 East Kellogg Boulevard Suite 105 St Paul Mn 55101 alan_robbins_fengernpsgov 651-290-3030 ext 250

See Below HPDP None

For projects near the St Croix River contact Jill Medland Jill_Medlandnpsgov St Croix National Scenic Riverway 401 North Hamilton Street Saint Croix Falls WI 54024 Phone715-483-2284 Fax 715-483-3288

NPS web page None

Jason Alcott (MS 620) ndash Federal TampE Species Review See below HPDP ENM1060

X Cultural Resources Unit Review (see guidance at EDMS doc 1274121 for state-funded pavement rehab projects)

See below HPDP ENM1010

X

Keri Aufdencamp (Metro West and East Areas) Carolyn Boben (Metro North Area) Sarah Jarman (Metro South Area) (MS 620) ndash Contaminated property review

See below HPDP ENM1020

Respond by Email or memo

X Mark Vogel (Metro North and East Areas) Jackie Klein (Metro South and West Areas) (MS 620) ndash Regulated Waste

See below HPDP ENM1030

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 1 of 11
gomb1bri
Text Box
Chris Smith
gomb1bri
Text Box
X
gomb1bri
Cross-Out
gomb1bri
Inserted Text
gomb1bri
Typewritten Text
Federal Funds
gomb1bri
Cross-Out
gomb1bri
Typewritten Text
July 2018
gomb1bri
Typewritten Text
Resent 692017

TO Addressees Page 2 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

(Building DemolitionRelocation and Bridge ReconstructionPainting)

X Tina Markeson (MS 620) ndash Forestry tree survey See below HPDP ENM1070

Kathryn McFadden (MS 686) - Historic Properties Program See below None Rob Williams (MS 686) - Safety Rest Area Program See below Na Vera Westrum Ostrom (MS 686) - State Entry Monuments See below Na

Gina Mitteco (Metro) ndash Bicycle and Pedestrian review Accessibility Requirements (ADA)

See below HPDP ENM1090 ENM1100

Dan Prather (MS 610) ndash Bridge Projects See Below All Bridge projects None

X Jason Richter (MS XXX) ndash Geology review for EAW Item 10 (MnDOT written EA only)

See Below None

X Jim Weatherhead (all Metro Areas) (MS 470) ndash Railroad Review (rail contacts list)

See below HPDP ENM1120

X Debra Sorenson (MS 410) -- Office of Aeronautics See below HPDP ENM1110

X Jim Henrickson (Metro) ndash Traffic Forecasts None X Peter Wasko (Metro) ndash Noise review See below HPDP ENM1050 XXXXX ndash Metro Right of Way (click here for maps) See below None

X Katherine Heinz ndash District Wetlands review See below HPDP None

X Brian Kellyndash Metro Water Resources (click here for map) Only send WRE federally-funded projects and EAW projects

See below None

XXXXX ndash Metro Traffic (click here for map) See below None

X Deb Moynihan - (MS 620) ndash Environmental Review Document See below None

X

Emeka Ezekwemba (FHWA Area Engineer) ndash Emeka Ezekwemba (East West and North Areas) Abbi Ginsberg (South Area) Environmental Review Document (EAW EA vs CAT EX) Interstate Access Request

See below See below

None

Cc X Keith Baker ndash Consultant Administration

Minnie Milkert - Value Engineering (for projects with total costs gt$20 million)

See below

X Deb Moynihan - (MS 620) ndash Environmental Review Document

X Jerome Adams ndash Metro District Project Manager (PPMS Fin Des Proj)

X XXXXX ndash Metro District Project Designer (PPMS DES ENG)

Brigid Gombold ndash Metro Environmental Coordinator (Cat_Ex and Cat_Ex_Not documents)

X Rick Dalton ndash Metro Environmental Coordinator (EAW EA and EIS documents)

For additional information about the project please contact the Project Designer or the Project Manager Project Manager Jerome Adams Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7611

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 2 of 11

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

CAUTION

BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

Environmental Review Fact Sheet Series

Endangered Threatened and Special Concern Species of Minnesota

Blandingrsquos Turtle (Emydoidea blandingii)

Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

It is illegal to possess this threatened species

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

2

RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

GENERAL

A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

If a Blandingrsquos turtle nests in your yard do not disturb the nest

If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

WETLANDS

Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

ROADS

Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

Roads should be ditched not curbed or below grade

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Friday April 10 2015 422 PMTo Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn

(DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT)

Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT)Subject For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Cover Email to Early Notification Memo136205-39 (US 10)13

From Gombold Brigid (DOT)To Leete Peter (DOT) Smith Christopher E (DOT) Boben Carolyn (DOT) Vogel Mark (DOT) Voigt Paul (DOT)

Heinz Katherine (DOT) MN_DOT_CulturalResourcesCc Adams Jerome (DOT) Dalton Richard (DOT) Moynihan Debra (DOT)Subject Re-Review of ENM for SP 6205-39 TH 10Date Friday June 09 2017 90200 AM

Hi ReviewersUnfortunately the EAW did not get published during the time period that some of the reviews wouldstill be valid In addition this project has had Federal funds added to it so the state only reviews arealso invalid The good news is that there is a layout with the proposed ponding site The green onthe layout is Not MnDOT ndash it is Ramsey County Attached are all of the reviews that were receivedPlease respond if a new review is needed Approximate tree removal is in the ENM Here is the link to the ENMhttpedmscyberdocsquickstartaspshow=view1568435ampnoframes=yes CRIS 24416 The document we had discussed with FHWA prior to Emekarsquos departure and while Ryan was startingwas a EAW and separate Non-Programmatic CE If you have any questions regarding the design of the project please contact Jerome Adam the PMat 651-234-7611 Thanks Brigid Brigid GomboldMnDOT ndash Environmental Coordinator1500 Co Rd B2Roseville MN 55113(651) 234-7674

Minnesota Department of Transportation

Early Notification Memo

Metro District Office Tel 651234-7677 Waters Edge Building - Mail Stop 050 Fax 651234-7608 1500 W County Road B-2 Roseville Minnesota 55113-3175

File 6205-39 (US 10) ENM (EAW)

Date April 10 2015 Subject Early Notification Memo

SP 6205-39 (US 10) Job Number T9W076 Letting Date January 2017 Type of project Construct a two-lane exit on southbound I-35W to eastbound US 10 construct an auxiliary lane on eastbound US 10 from CR 10 to CR 96 PPMS project limits On US 10 from I-35W to CR 96 in Arden Hills Ramsey County Minnesota Funding State-only (CMSP) ENM response date May 22 2015

To The following MnDOT Functional Groups (checked with an ldquoXrdquo) (Addressees - additional information is available by clicking ldquosee belowrdquo or HPDPrdquo links in the table below) Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

X Peter Leete (MS 620) ndash DNR questionnaire (for thresholds on when to use see ldquoHPDPrdquo link to the right [links to DNRMnDOT MOU] then go to bottom of page 24)

See below HPDP ENM1040

Respond using officialletterhead

For projects near the Mississippi River IF project lies in MNRRA (map at EDMS 508748) contact Alan Robbins-Fenger Resource Management - Planning and Land Use MNRRA National Park Service 111 East Kellogg Boulevard Suite 105 St Paul Mn 55101 alan_robbins_fengernpsgov 651-290-3030 ext 250

See Below HPDP None

For projects near the St Croix River contact Jill Medland Jill_Medlandnpsgov St Croix National Scenic Riverway 401 North Hamilton Street Saint Croix Falls WI 54024 Phone715-483-2284 Fax 715-483-3288

NPS web page None

Jason Alcott (MS 620) ndash Federal TampE Species Review See below HPDP ENM1060

X Cultural Resources Unit Review (see guidance at EDMS doc 1274121 for state-funded pavement rehab projects)

See below HPDP ENM1010

X

Keri Aufdencamp (Metro West and East Areas) Carolyn Boben (Metro North Area) Sarah Jarman (Metro South Area) (MS 620) ndash Contaminated property review

See below HPDP ENM1020

Respond by Email or memo

X Mark Vogel (Metro North and East Areas) Jackie Klein (Metro South and West Areas) (MS 620) ndash Regulated Waste

See below HPDP ENM1030

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 1 of 11
gomb1bri
Text Box
Chris Smith
gomb1bri
Text Box
X
gomb1bri
Cross-Out
gomb1bri
Inserted Text
gomb1bri
Typewritten Text
Federal Funds
gomb1bri
Cross-Out
gomb1bri
Typewritten Text
July 2018
gomb1bri
Typewritten Text
Resent 692017

TO Addressees Page 2 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

(Building DemolitionRelocation and Bridge ReconstructionPainting)

X Tina Markeson (MS 620) ndash Forestry tree survey See below HPDP ENM1070

Kathryn McFadden (MS 686) - Historic Properties Program See below None Rob Williams (MS 686) - Safety Rest Area Program See below Na Vera Westrum Ostrom (MS 686) - State Entry Monuments See below Na

Gina Mitteco (Metro) ndash Bicycle and Pedestrian review Accessibility Requirements (ADA)

See below HPDP ENM1090 ENM1100

Dan Prather (MS 610) ndash Bridge Projects See Below All Bridge projects None

X Jason Richter (MS XXX) ndash Geology review for EAW Item 10 (MnDOT written EA only)

See Below None

X Jim Weatherhead (all Metro Areas) (MS 470) ndash Railroad Review (rail contacts list)

See below HPDP ENM1120

X Debra Sorenson (MS 410) -- Office of Aeronautics See below HPDP ENM1110

X Jim Henrickson (Metro) ndash Traffic Forecasts None X Peter Wasko (Metro) ndash Noise review See below HPDP ENM1050 XXXXX ndash Metro Right of Way (click here for maps) See below None

X Katherine Heinz ndash District Wetlands review See below HPDP None

X Brian Kellyndash Metro Water Resources (click here for map) Only send WRE federally-funded projects and EAW projects

See below None

XXXXX ndash Metro Traffic (click here for map) See below None

X Deb Moynihan - (MS 620) ndash Environmental Review Document See below None

X

Emeka Ezekwemba (FHWA Area Engineer) ndash Emeka Ezekwemba (East West and North Areas) Abbi Ginsberg (South Area) Environmental Review Document (EAW EA vs CAT EX) Interstate Access Request

See below See below

None

Cc X Keith Baker ndash Consultant Administration

Minnie Milkert - Value Engineering (for projects with total costs gt$20 million)

See below

X Deb Moynihan - (MS 620) ndash Environmental Review Document

X Jerome Adams ndash Metro District Project Manager (PPMS Fin Des Proj)

X XXXXX ndash Metro District Project Designer (PPMS DES ENG)

Brigid Gombold ndash Metro Environmental Coordinator (Cat_Ex and Cat_Ex_Not documents)

X Rick Dalton ndash Metro Environmental Coordinator (EAW EA and EIS documents)

For additional information about the project please contact the Project Designer or the Project Manager Project Manager Jerome Adams Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7611

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 2 of 11

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

Environmental Review Fact Sheet Series

Endangered Threatened and Special Concern Species of Minnesota

Blandingrsquos Turtle (Emydoidea blandingii)

Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

It is illegal to possess this threatened species

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

2

RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

GENERAL

A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

If a Blandingrsquos turtle nests in your yard do not disturb the nest

If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

WETLANDS

Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

ROADS

Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

Roads should be ditched not curbed or below grade

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Friday April 10 2015 422 PMTo Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn

(DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT)

Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT)Subject For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Cover Email to Early Notification Memo136205-39 (US 10)13

From Gombold Brigid (DOT)To Leete Peter (DOT) Smith Christopher E (DOT) Boben Carolyn (DOT) Vogel Mark (DOT) Voigt Paul (DOT)

Heinz Katherine (DOT) MN_DOT_CulturalResourcesCc Adams Jerome (DOT) Dalton Richard (DOT) Moynihan Debra (DOT)Subject Re-Review of ENM for SP 6205-39 TH 10Date Friday June 09 2017 90200 AM

Hi ReviewersUnfortunately the EAW did not get published during the time period that some of the reviews wouldstill be valid In addition this project has had Federal funds added to it so the state only reviews arealso invalid The good news is that there is a layout with the proposed ponding site The green onthe layout is Not MnDOT ndash it is Ramsey County Attached are all of the reviews that were receivedPlease respond if a new review is needed Approximate tree removal is in the ENM Here is the link to the ENMhttpedmscyberdocsquickstartaspshow=view1568435ampnoframes=yes CRIS 24416 The document we had discussed with FHWA prior to Emekarsquos departure and while Ryan was startingwas a EAW and separate Non-Programmatic CE If you have any questions regarding the design of the project please contact Jerome Adam the PMat 651-234-7611 Thanks Brigid Brigid GomboldMnDOT ndash Environmental Coordinator1500 Co Rd B2Roseville MN 55113(651) 234-7674

Minnesota Department of Transportation

Early Notification Memo

Metro District Office Tel 651234-7677 Waters Edge Building - Mail Stop 050 Fax 651234-7608 1500 W County Road B-2 Roseville Minnesota 55113-3175

File 6205-39 (US 10) ENM (EAW)

Date April 10 2015 Subject Early Notification Memo

SP 6205-39 (US 10) Job Number T9W076 Letting Date January 2017 Type of project Construct a two-lane exit on southbound I-35W to eastbound US 10 construct an auxiliary lane on eastbound US 10 from CR 10 to CR 96 PPMS project limits On US 10 from I-35W to CR 96 in Arden Hills Ramsey County Minnesota Funding State-only (CMSP) ENM response date May 22 2015

To The following MnDOT Functional Groups (checked with an ldquoXrdquo) (Addressees - additional information is available by clicking ldquosee belowrdquo or HPDPrdquo links in the table below) Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

X Peter Leete (MS 620) ndash DNR questionnaire (for thresholds on when to use see ldquoHPDPrdquo link to the right [links to DNRMnDOT MOU] then go to bottom of page 24)

See below HPDP ENM1040

Respond using officialletterhead

For projects near the Mississippi River IF project lies in MNRRA (map at EDMS 508748) contact Alan Robbins-Fenger Resource Management - Planning and Land Use MNRRA National Park Service 111 East Kellogg Boulevard Suite 105 St Paul Mn 55101 alan_robbins_fengernpsgov 651-290-3030 ext 250

See Below HPDP None

For projects near the St Croix River contact Jill Medland Jill_Medlandnpsgov St Croix National Scenic Riverway 401 North Hamilton Street Saint Croix Falls WI 54024 Phone715-483-2284 Fax 715-483-3288

NPS web page None

Jason Alcott (MS 620) ndash Federal TampE Species Review See below HPDP ENM1060

X Cultural Resources Unit Review (see guidance at EDMS doc 1274121 for state-funded pavement rehab projects)

See below HPDP ENM1010

X

Keri Aufdencamp (Metro West and East Areas) Carolyn Boben (Metro North Area) Sarah Jarman (Metro South Area) (MS 620) ndash Contaminated property review

See below HPDP ENM1020

Respond by Email or memo

X Mark Vogel (Metro North and East Areas) Jackie Klein (Metro South and West Areas) (MS 620) ndash Regulated Waste

See below HPDP ENM1030

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 1 of 11
gomb1bri
Text Box
Chris Smith
gomb1bri
Text Box
X
gomb1bri
Cross-Out
gomb1bri
Inserted Text
gomb1bri
Typewritten Text
Federal Funds
gomb1bri
Cross-Out
gomb1bri
Typewritten Text
July 2018
gomb1bri
Typewritten Text
Resent 692017

TO Addressees Page 2 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

(Building DemolitionRelocation and Bridge ReconstructionPainting)

X Tina Markeson (MS 620) ndash Forestry tree survey See below HPDP ENM1070

Kathryn McFadden (MS 686) - Historic Properties Program See below None Rob Williams (MS 686) - Safety Rest Area Program See below Na Vera Westrum Ostrom (MS 686) - State Entry Monuments See below Na

Gina Mitteco (Metro) ndash Bicycle and Pedestrian review Accessibility Requirements (ADA)

See below HPDP ENM1090 ENM1100

Dan Prather (MS 610) ndash Bridge Projects See Below All Bridge projects None

X Jason Richter (MS XXX) ndash Geology review for EAW Item 10 (MnDOT written EA only)

See Below None

X Jim Weatherhead (all Metro Areas) (MS 470) ndash Railroad Review (rail contacts list)

See below HPDP ENM1120

X Debra Sorenson (MS 410) -- Office of Aeronautics See below HPDP ENM1110

X Jim Henrickson (Metro) ndash Traffic Forecasts None X Peter Wasko (Metro) ndash Noise review See below HPDP ENM1050 XXXXX ndash Metro Right of Way (click here for maps) See below None

X Katherine Heinz ndash District Wetlands review See below HPDP None

X Brian Kellyndash Metro Water Resources (click here for map) Only send WRE federally-funded projects and EAW projects

See below None

XXXXX ndash Metro Traffic (click here for map) See below None

X Deb Moynihan - (MS 620) ndash Environmental Review Document See below None

X

Emeka Ezekwemba (FHWA Area Engineer) ndash Emeka Ezekwemba (East West and North Areas) Abbi Ginsberg (South Area) Environmental Review Document (EAW EA vs CAT EX) Interstate Access Request

See below See below

None

Cc X Keith Baker ndash Consultant Administration

Minnie Milkert - Value Engineering (for projects with total costs gt$20 million)

See below

X Deb Moynihan - (MS 620) ndash Environmental Review Document

X Jerome Adams ndash Metro District Project Manager (PPMS Fin Des Proj)

X XXXXX ndash Metro District Project Designer (PPMS DES ENG)

Brigid Gombold ndash Metro Environmental Coordinator (Cat_Ex and Cat_Ex_Not documents)

X Rick Dalton ndash Metro Environmental Coordinator (EAW EA and EIS documents)

For additional information about the project please contact the Project Designer or the Project Manager Project Manager Jerome Adams Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7611

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 2 of 11

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

2

RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

GENERAL

A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

If a Blandingrsquos turtle nests in your yard do not disturb the nest

If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

WETLANDS

Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

ROADS

Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

Roads should be ditched not curbed or below grade

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Friday April 10 2015 422 PMTo Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn

(DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT)

Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT)Subject For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Cover Email to Early Notification Memo136205-39 (US 10)13

From Gombold Brigid (DOT)To Leete Peter (DOT) Smith Christopher E (DOT) Boben Carolyn (DOT) Vogel Mark (DOT) Voigt Paul (DOT)

Heinz Katherine (DOT) MN_DOT_CulturalResourcesCc Adams Jerome (DOT) Dalton Richard (DOT) Moynihan Debra (DOT)Subject Re-Review of ENM for SP 6205-39 TH 10Date Friday June 09 2017 90200 AM

Hi ReviewersUnfortunately the EAW did not get published during the time period that some of the reviews wouldstill be valid In addition this project has had Federal funds added to it so the state only reviews arealso invalid The good news is that there is a layout with the proposed ponding site The green onthe layout is Not MnDOT ndash it is Ramsey County Attached are all of the reviews that were receivedPlease respond if a new review is needed Approximate tree removal is in the ENM Here is the link to the ENMhttpedmscyberdocsquickstartaspshow=view1568435ampnoframes=yes CRIS 24416 The document we had discussed with FHWA prior to Emekarsquos departure and while Ryan was startingwas a EAW and separate Non-Programmatic CE If you have any questions regarding the design of the project please contact Jerome Adam the PMat 651-234-7611 Thanks Brigid Brigid GomboldMnDOT ndash Environmental Coordinator1500 Co Rd B2Roseville MN 55113(651) 234-7674

Minnesota Department of Transportation

Early Notification Memo

Metro District Office Tel 651234-7677 Waters Edge Building - Mail Stop 050 Fax 651234-7608 1500 W County Road B-2 Roseville Minnesota 55113-3175

File 6205-39 (US 10) ENM (EAW)

Date April 10 2015 Subject Early Notification Memo

SP 6205-39 (US 10) Job Number T9W076 Letting Date January 2017 Type of project Construct a two-lane exit on southbound I-35W to eastbound US 10 construct an auxiliary lane on eastbound US 10 from CR 10 to CR 96 PPMS project limits On US 10 from I-35W to CR 96 in Arden Hills Ramsey County Minnesota Funding State-only (CMSP) ENM response date May 22 2015

To The following MnDOT Functional Groups (checked with an ldquoXrdquo) (Addressees - additional information is available by clicking ldquosee belowrdquo or HPDPrdquo links in the table below) Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

X Peter Leete (MS 620) ndash DNR questionnaire (for thresholds on when to use see ldquoHPDPrdquo link to the right [links to DNRMnDOT MOU] then go to bottom of page 24)

See below HPDP ENM1040

Respond using officialletterhead

For projects near the Mississippi River IF project lies in MNRRA (map at EDMS 508748) contact Alan Robbins-Fenger Resource Management - Planning and Land Use MNRRA National Park Service 111 East Kellogg Boulevard Suite 105 St Paul Mn 55101 alan_robbins_fengernpsgov 651-290-3030 ext 250

See Below HPDP None

For projects near the St Croix River contact Jill Medland Jill_Medlandnpsgov St Croix National Scenic Riverway 401 North Hamilton Street Saint Croix Falls WI 54024 Phone715-483-2284 Fax 715-483-3288

NPS web page None

Jason Alcott (MS 620) ndash Federal TampE Species Review See below HPDP ENM1060

X Cultural Resources Unit Review (see guidance at EDMS doc 1274121 for state-funded pavement rehab projects)

See below HPDP ENM1010

X

Keri Aufdencamp (Metro West and East Areas) Carolyn Boben (Metro North Area) Sarah Jarman (Metro South Area) (MS 620) ndash Contaminated property review

See below HPDP ENM1020

Respond by Email or memo

X Mark Vogel (Metro North and East Areas) Jackie Klein (Metro South and West Areas) (MS 620) ndash Regulated Waste

See below HPDP ENM1030

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 1 of 11
gomb1bri
Text Box
Chris Smith
gomb1bri
Text Box
X
gomb1bri
Cross-Out
gomb1bri
Inserted Text
gomb1bri
Typewritten Text
Federal Funds
gomb1bri
Cross-Out
gomb1bri
Typewritten Text
July 2018
gomb1bri
Typewritten Text
Resent 692017

TO Addressees Page 2 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

(Building DemolitionRelocation and Bridge ReconstructionPainting)

X Tina Markeson (MS 620) ndash Forestry tree survey See below HPDP ENM1070

Kathryn McFadden (MS 686) - Historic Properties Program See below None Rob Williams (MS 686) - Safety Rest Area Program See below Na Vera Westrum Ostrom (MS 686) - State Entry Monuments See below Na

Gina Mitteco (Metro) ndash Bicycle and Pedestrian review Accessibility Requirements (ADA)

See below HPDP ENM1090 ENM1100

Dan Prather (MS 610) ndash Bridge Projects See Below All Bridge projects None

X Jason Richter (MS XXX) ndash Geology review for EAW Item 10 (MnDOT written EA only)

See Below None

X Jim Weatherhead (all Metro Areas) (MS 470) ndash Railroad Review (rail contacts list)

See below HPDP ENM1120

X Debra Sorenson (MS 410) -- Office of Aeronautics See below HPDP ENM1110

X Jim Henrickson (Metro) ndash Traffic Forecasts None X Peter Wasko (Metro) ndash Noise review See below HPDP ENM1050 XXXXX ndash Metro Right of Way (click here for maps) See below None

X Katherine Heinz ndash District Wetlands review See below HPDP None

X Brian Kellyndash Metro Water Resources (click here for map) Only send WRE federally-funded projects and EAW projects

See below None

XXXXX ndash Metro Traffic (click here for map) See below None

X Deb Moynihan - (MS 620) ndash Environmental Review Document See below None

X

Emeka Ezekwemba (FHWA Area Engineer) ndash Emeka Ezekwemba (East West and North Areas) Abbi Ginsberg (South Area) Environmental Review Document (EAW EA vs CAT EX) Interstate Access Request

See below See below

None

Cc X Keith Baker ndash Consultant Administration

Minnie Milkert - Value Engineering (for projects with total costs gt$20 million)

See below

X Deb Moynihan - (MS 620) ndash Environmental Review Document

X Jerome Adams ndash Metro District Project Manager (PPMS Fin Des Proj)

X XXXXX ndash Metro District Project Designer (PPMS DES ENG)

Brigid Gombold ndash Metro Environmental Coordinator (Cat_Ex and Cat_Ex_Not documents)

X Rick Dalton ndash Metro Environmental Coordinator (EAW EA and EIS documents)

For additional information about the project please contact the Project Designer or the Project Manager Project Manager Jerome Adams Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7611

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 2 of 11

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Friday April 10 2015 422 PMTo Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn

(DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT)

Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT)Subject For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Cover Email to Early Notification Memo136205-39 (US 10)13

From Gombold Brigid (DOT)To Leete Peter (DOT) Smith Christopher E (DOT) Boben Carolyn (DOT) Vogel Mark (DOT) Voigt Paul (DOT)

Heinz Katherine (DOT) MN_DOT_CulturalResourcesCc Adams Jerome (DOT) Dalton Richard (DOT) Moynihan Debra (DOT)Subject Re-Review of ENM for SP 6205-39 TH 10Date Friday June 09 2017 90200 AM

Hi ReviewersUnfortunately the EAW did not get published during the time period that some of the reviews wouldstill be valid In addition this project has had Federal funds added to it so the state only reviews arealso invalid The good news is that there is a layout with the proposed ponding site The green onthe layout is Not MnDOT ndash it is Ramsey County Attached are all of the reviews that were receivedPlease respond if a new review is needed Approximate tree removal is in the ENM Here is the link to the ENMhttpedmscyberdocsquickstartaspshow=view1568435ampnoframes=yes CRIS 24416 The document we had discussed with FHWA prior to Emekarsquos departure and while Ryan was startingwas a EAW and separate Non-Programmatic CE If you have any questions regarding the design of the project please contact Jerome Adam the PMat 651-234-7611 Thanks Brigid Brigid GomboldMnDOT ndash Environmental Coordinator1500 Co Rd B2Roseville MN 55113(651) 234-7674

Minnesota Department of Transportation

Early Notification Memo

Metro District Office Tel 651234-7677 Waters Edge Building - Mail Stop 050 Fax 651234-7608 1500 W County Road B-2 Roseville Minnesota 55113-3175

File 6205-39 (US 10) ENM (EAW)

Date April 10 2015 Subject Early Notification Memo

SP 6205-39 (US 10) Job Number T9W076 Letting Date January 2017 Type of project Construct a two-lane exit on southbound I-35W to eastbound US 10 construct an auxiliary lane on eastbound US 10 from CR 10 to CR 96 PPMS project limits On US 10 from I-35W to CR 96 in Arden Hills Ramsey County Minnesota Funding State-only (CMSP) ENM response date May 22 2015

To The following MnDOT Functional Groups (checked with an ldquoXrdquo) (Addressees - additional information is available by clicking ldquosee belowrdquo or HPDPrdquo links in the table below) Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

X Peter Leete (MS 620) ndash DNR questionnaire (for thresholds on when to use see ldquoHPDPrdquo link to the right [links to DNRMnDOT MOU] then go to bottom of page 24)

See below HPDP ENM1040

Respond using officialletterhead

For projects near the Mississippi River IF project lies in MNRRA (map at EDMS 508748) contact Alan Robbins-Fenger Resource Management - Planning and Land Use MNRRA National Park Service 111 East Kellogg Boulevard Suite 105 St Paul Mn 55101 alan_robbins_fengernpsgov 651-290-3030 ext 250

See Below HPDP None

For projects near the St Croix River contact Jill Medland Jill_Medlandnpsgov St Croix National Scenic Riverway 401 North Hamilton Street Saint Croix Falls WI 54024 Phone715-483-2284 Fax 715-483-3288

NPS web page None

Jason Alcott (MS 620) ndash Federal TampE Species Review See below HPDP ENM1060

X Cultural Resources Unit Review (see guidance at EDMS doc 1274121 for state-funded pavement rehab projects)

See below HPDP ENM1010

X

Keri Aufdencamp (Metro West and East Areas) Carolyn Boben (Metro North Area) Sarah Jarman (Metro South Area) (MS 620) ndash Contaminated property review

See below HPDP ENM1020

Respond by Email or memo

X Mark Vogel (Metro North and East Areas) Jackie Klein (Metro South and West Areas) (MS 620) ndash Regulated Waste

See below HPDP ENM1030

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 1 of 11
gomb1bri
Text Box
Chris Smith
gomb1bri
Text Box
X
gomb1bri
Cross-Out
gomb1bri
Inserted Text
gomb1bri
Typewritten Text
Federal Funds
gomb1bri
Cross-Out
gomb1bri
Typewritten Text
July 2018
gomb1bri
Typewritten Text
Resent 692017

TO Addressees Page 2 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

(Building DemolitionRelocation and Bridge ReconstructionPainting)

X Tina Markeson (MS 620) ndash Forestry tree survey See below HPDP ENM1070

Kathryn McFadden (MS 686) - Historic Properties Program See below None Rob Williams (MS 686) - Safety Rest Area Program See below Na Vera Westrum Ostrom (MS 686) - State Entry Monuments See below Na

Gina Mitteco (Metro) ndash Bicycle and Pedestrian review Accessibility Requirements (ADA)

See below HPDP ENM1090 ENM1100

Dan Prather (MS 610) ndash Bridge Projects See Below All Bridge projects None

X Jason Richter (MS XXX) ndash Geology review for EAW Item 10 (MnDOT written EA only)

See Below None

X Jim Weatherhead (all Metro Areas) (MS 470) ndash Railroad Review (rail contacts list)

See below HPDP ENM1120

X Debra Sorenson (MS 410) -- Office of Aeronautics See below HPDP ENM1110

X Jim Henrickson (Metro) ndash Traffic Forecasts None X Peter Wasko (Metro) ndash Noise review See below HPDP ENM1050 XXXXX ndash Metro Right of Way (click here for maps) See below None

X Katherine Heinz ndash District Wetlands review See below HPDP None

X Brian Kellyndash Metro Water Resources (click here for map) Only send WRE federally-funded projects and EAW projects

See below None

XXXXX ndash Metro Traffic (click here for map) See below None

X Deb Moynihan - (MS 620) ndash Environmental Review Document See below None

X

Emeka Ezekwemba (FHWA Area Engineer) ndash Emeka Ezekwemba (East West and North Areas) Abbi Ginsberg (South Area) Environmental Review Document (EAW EA vs CAT EX) Interstate Access Request

See below See below

None

Cc X Keith Baker ndash Consultant Administration

Minnie Milkert - Value Engineering (for projects with total costs gt$20 million)

See below

X Deb Moynihan - (MS 620) ndash Environmental Review Document

X Jerome Adams ndash Metro District Project Manager (PPMS Fin Des Proj)

X XXXXX ndash Metro District Project Designer (PPMS DES ENG)

Brigid Gombold ndash Metro Environmental Coordinator (Cat_Ex and Cat_Ex_Not documents)

X Rick Dalton ndash Metro Environmental Coordinator (EAW EA and EIS documents)

For additional information about the project please contact the Project Designer or the Project Manager Project Manager Jerome Adams Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7611

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 2 of 11

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Friday April 10 2015 422 PMTo Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn

(DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT)

Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT)Subject For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Cover Email to Early Notification Memo136205-39 (US 10)13

From Gombold Brigid (DOT)To Leete Peter (DOT) Smith Christopher E (DOT) Boben Carolyn (DOT) Vogel Mark (DOT) Voigt Paul (DOT)

Heinz Katherine (DOT) MN_DOT_CulturalResourcesCc Adams Jerome (DOT) Dalton Richard (DOT) Moynihan Debra (DOT)Subject Re-Review of ENM for SP 6205-39 TH 10Date Friday June 09 2017 90200 AM

Hi ReviewersUnfortunately the EAW did not get published during the time period that some of the reviews wouldstill be valid In addition this project has had Federal funds added to it so the state only reviews arealso invalid The good news is that there is a layout with the proposed ponding site The green onthe layout is Not MnDOT ndash it is Ramsey County Attached are all of the reviews that were receivedPlease respond if a new review is needed Approximate tree removal is in the ENM Here is the link to the ENMhttpedmscyberdocsquickstartaspshow=view1568435ampnoframes=yes CRIS 24416 The document we had discussed with FHWA prior to Emekarsquos departure and while Ryan was startingwas a EAW and separate Non-Programmatic CE If you have any questions regarding the design of the project please contact Jerome Adam the PMat 651-234-7611 Thanks Brigid Brigid GomboldMnDOT ndash Environmental Coordinator1500 Co Rd B2Roseville MN 55113(651) 234-7674

Minnesota Department of Transportation

Early Notification Memo

Metro District Office Tel 651234-7677 Waters Edge Building - Mail Stop 050 Fax 651234-7608 1500 W County Road B-2 Roseville Minnesota 55113-3175

File 6205-39 (US 10) ENM (EAW)

Date April 10 2015 Subject Early Notification Memo

SP 6205-39 (US 10) Job Number T9W076 Letting Date January 2017 Type of project Construct a two-lane exit on southbound I-35W to eastbound US 10 construct an auxiliary lane on eastbound US 10 from CR 10 to CR 96 PPMS project limits On US 10 from I-35W to CR 96 in Arden Hills Ramsey County Minnesota Funding State-only (CMSP) ENM response date May 22 2015

To The following MnDOT Functional Groups (checked with an ldquoXrdquo) (Addressees - additional information is available by clicking ldquosee belowrdquo or HPDPrdquo links in the table below) Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

X Peter Leete (MS 620) ndash DNR questionnaire (for thresholds on when to use see ldquoHPDPrdquo link to the right [links to DNRMnDOT MOU] then go to bottom of page 24)

See below HPDP ENM1040

Respond using officialletterhead

For projects near the Mississippi River IF project lies in MNRRA (map at EDMS 508748) contact Alan Robbins-Fenger Resource Management - Planning and Land Use MNRRA National Park Service 111 East Kellogg Boulevard Suite 105 St Paul Mn 55101 alan_robbins_fengernpsgov 651-290-3030 ext 250

See Below HPDP None

For projects near the St Croix River contact Jill Medland Jill_Medlandnpsgov St Croix National Scenic Riverway 401 North Hamilton Street Saint Croix Falls WI 54024 Phone715-483-2284 Fax 715-483-3288

NPS web page None

Jason Alcott (MS 620) ndash Federal TampE Species Review See below HPDP ENM1060

X Cultural Resources Unit Review (see guidance at EDMS doc 1274121 for state-funded pavement rehab projects)

See below HPDP ENM1010

X

Keri Aufdencamp (Metro West and East Areas) Carolyn Boben (Metro North Area) Sarah Jarman (Metro South Area) (MS 620) ndash Contaminated property review

See below HPDP ENM1020

Respond by Email or memo

X Mark Vogel (Metro North and East Areas) Jackie Klein (Metro South and West Areas) (MS 620) ndash Regulated Waste

See below HPDP ENM1030

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 1 of 11
gomb1bri
Text Box
Chris Smith
gomb1bri
Text Box
X
gomb1bri
Cross-Out
gomb1bri
Inserted Text
gomb1bri
Typewritten Text
Federal Funds
gomb1bri
Cross-Out
gomb1bri
Typewritten Text
July 2018
gomb1bri
Typewritten Text
Resent 692017

TO Addressees Page 2 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

(Building DemolitionRelocation and Bridge ReconstructionPainting)

X Tina Markeson (MS 620) ndash Forestry tree survey See below HPDP ENM1070

Kathryn McFadden (MS 686) - Historic Properties Program See below None Rob Williams (MS 686) - Safety Rest Area Program See below Na Vera Westrum Ostrom (MS 686) - State Entry Monuments See below Na

Gina Mitteco (Metro) ndash Bicycle and Pedestrian review Accessibility Requirements (ADA)

See below HPDP ENM1090 ENM1100

Dan Prather (MS 610) ndash Bridge Projects See Below All Bridge projects None

X Jason Richter (MS XXX) ndash Geology review for EAW Item 10 (MnDOT written EA only)

See Below None

X Jim Weatherhead (all Metro Areas) (MS 470) ndash Railroad Review (rail contacts list)

See below HPDP ENM1120

X Debra Sorenson (MS 410) -- Office of Aeronautics See below HPDP ENM1110

X Jim Henrickson (Metro) ndash Traffic Forecasts None X Peter Wasko (Metro) ndash Noise review See below HPDP ENM1050 XXXXX ndash Metro Right of Way (click here for maps) See below None

X Katherine Heinz ndash District Wetlands review See below HPDP None

X Brian Kellyndash Metro Water Resources (click here for map) Only send WRE federally-funded projects and EAW projects

See below None

XXXXX ndash Metro Traffic (click here for map) See below None

X Deb Moynihan - (MS 620) ndash Environmental Review Document See below None

X

Emeka Ezekwemba (FHWA Area Engineer) ndash Emeka Ezekwemba (East West and North Areas) Abbi Ginsberg (South Area) Environmental Review Document (EAW EA vs CAT EX) Interstate Access Request

See below See below

None

Cc X Keith Baker ndash Consultant Administration

Minnie Milkert - Value Engineering (for projects with total costs gt$20 million)

See below

X Deb Moynihan - (MS 620) ndash Environmental Review Document

X Jerome Adams ndash Metro District Project Manager (PPMS Fin Des Proj)

X XXXXX ndash Metro District Project Designer (PPMS DES ENG)

Brigid Gombold ndash Metro Environmental Coordinator (Cat_Ex and Cat_Ex_Not documents)

X Rick Dalton ndash Metro Environmental Coordinator (EAW EA and EIS documents)

For additional information about the project please contact the Project Designer or the Project Manager Project Manager Jerome Adams Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7611

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 2 of 11

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Friday April 10 2015 422 PMTo Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn

(DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT)

Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT)Subject For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Cover Email to Early Notification Memo136205-39 (US 10)13

From Gombold Brigid (DOT)To Leete Peter (DOT) Smith Christopher E (DOT) Boben Carolyn (DOT) Vogel Mark (DOT) Voigt Paul (DOT)

Heinz Katherine (DOT) MN_DOT_CulturalResourcesCc Adams Jerome (DOT) Dalton Richard (DOT) Moynihan Debra (DOT)Subject Re-Review of ENM for SP 6205-39 TH 10Date Friday June 09 2017 90200 AM

Hi ReviewersUnfortunately the EAW did not get published during the time period that some of the reviews wouldstill be valid In addition this project has had Federal funds added to it so the state only reviews arealso invalid The good news is that there is a layout with the proposed ponding site The green onthe layout is Not MnDOT ndash it is Ramsey County Attached are all of the reviews that were receivedPlease respond if a new review is needed Approximate tree removal is in the ENM Here is the link to the ENMhttpedmscyberdocsquickstartaspshow=view1568435ampnoframes=yes CRIS 24416 The document we had discussed with FHWA prior to Emekarsquos departure and while Ryan was startingwas a EAW and separate Non-Programmatic CE If you have any questions regarding the design of the project please contact Jerome Adam the PMat 651-234-7611 Thanks Brigid Brigid GomboldMnDOT ndash Environmental Coordinator1500 Co Rd B2Roseville MN 55113(651) 234-7674

Minnesota Department of Transportation

Early Notification Memo

Metro District Office Tel 651234-7677 Waters Edge Building - Mail Stop 050 Fax 651234-7608 1500 W County Road B-2 Roseville Minnesota 55113-3175

File 6205-39 (US 10) ENM (EAW)

Date April 10 2015 Subject Early Notification Memo

SP 6205-39 (US 10) Job Number T9W076 Letting Date January 2017 Type of project Construct a two-lane exit on southbound I-35W to eastbound US 10 construct an auxiliary lane on eastbound US 10 from CR 10 to CR 96 PPMS project limits On US 10 from I-35W to CR 96 in Arden Hills Ramsey County Minnesota Funding State-only (CMSP) ENM response date May 22 2015

To The following MnDOT Functional Groups (checked with an ldquoXrdquo) (Addressees - additional information is available by clicking ldquosee belowrdquo or HPDPrdquo links in the table below) Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

X Peter Leete (MS 620) ndash DNR questionnaire (for thresholds on when to use see ldquoHPDPrdquo link to the right [links to DNRMnDOT MOU] then go to bottom of page 24)

See below HPDP ENM1040

Respond using officialletterhead

For projects near the Mississippi River IF project lies in MNRRA (map at EDMS 508748) contact Alan Robbins-Fenger Resource Management - Planning and Land Use MNRRA National Park Service 111 East Kellogg Boulevard Suite 105 St Paul Mn 55101 alan_robbins_fengernpsgov 651-290-3030 ext 250

See Below HPDP None

For projects near the St Croix River contact Jill Medland Jill_Medlandnpsgov St Croix National Scenic Riverway 401 North Hamilton Street Saint Croix Falls WI 54024 Phone715-483-2284 Fax 715-483-3288

NPS web page None

Jason Alcott (MS 620) ndash Federal TampE Species Review See below HPDP ENM1060

X Cultural Resources Unit Review (see guidance at EDMS doc 1274121 for state-funded pavement rehab projects)

See below HPDP ENM1010

X

Keri Aufdencamp (Metro West and East Areas) Carolyn Boben (Metro North Area) Sarah Jarman (Metro South Area) (MS 620) ndash Contaminated property review

See below HPDP ENM1020

Respond by Email or memo

X Mark Vogel (Metro North and East Areas) Jackie Klein (Metro South and West Areas) (MS 620) ndash Regulated Waste

See below HPDP ENM1030

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 1 of 11
gomb1bri
Text Box
Chris Smith
gomb1bri
Text Box
X
gomb1bri
Cross-Out
gomb1bri
Inserted Text
gomb1bri
Typewritten Text
Federal Funds
gomb1bri
Cross-Out
gomb1bri
Typewritten Text
July 2018
gomb1bri
Typewritten Text
Resent 692017

TO Addressees Page 2 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

(Building DemolitionRelocation and Bridge ReconstructionPainting)

X Tina Markeson (MS 620) ndash Forestry tree survey See below HPDP ENM1070

Kathryn McFadden (MS 686) - Historic Properties Program See below None Rob Williams (MS 686) - Safety Rest Area Program See below Na Vera Westrum Ostrom (MS 686) - State Entry Monuments See below Na

Gina Mitteco (Metro) ndash Bicycle and Pedestrian review Accessibility Requirements (ADA)

See below HPDP ENM1090 ENM1100

Dan Prather (MS 610) ndash Bridge Projects See Below All Bridge projects None

X Jason Richter (MS XXX) ndash Geology review for EAW Item 10 (MnDOT written EA only)

See Below None

X Jim Weatherhead (all Metro Areas) (MS 470) ndash Railroad Review (rail contacts list)

See below HPDP ENM1120

X Debra Sorenson (MS 410) -- Office of Aeronautics See below HPDP ENM1110

X Jim Henrickson (Metro) ndash Traffic Forecasts None X Peter Wasko (Metro) ndash Noise review See below HPDP ENM1050 XXXXX ndash Metro Right of Way (click here for maps) See below None

X Katherine Heinz ndash District Wetlands review See below HPDP None

X Brian Kellyndash Metro Water Resources (click here for map) Only send WRE federally-funded projects and EAW projects

See below None

XXXXX ndash Metro Traffic (click here for map) See below None

X Deb Moynihan - (MS 620) ndash Environmental Review Document See below None

X

Emeka Ezekwemba (FHWA Area Engineer) ndash Emeka Ezekwemba (East West and North Areas) Abbi Ginsberg (South Area) Environmental Review Document (EAW EA vs CAT EX) Interstate Access Request

See below See below

None

Cc X Keith Baker ndash Consultant Administration

Minnie Milkert - Value Engineering (for projects with total costs gt$20 million)

See below

X Deb Moynihan - (MS 620) ndash Environmental Review Document

X Jerome Adams ndash Metro District Project Manager (PPMS Fin Des Proj)

X XXXXX ndash Metro District Project Designer (PPMS DES ENG)

Brigid Gombold ndash Metro Environmental Coordinator (Cat_Ex and Cat_Ex_Not documents)

X Rick Dalton ndash Metro Environmental Coordinator (EAW EA and EIS documents)

For additional information about the project please contact the Project Designer or the Project Manager Project Manager Jerome Adams Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7611

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 2 of 11

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

From Gombold Brigid (DOT)To Leete Peter (DOT) Smith Christopher E (DOT) Boben Carolyn (DOT) Vogel Mark (DOT) Voigt Paul (DOT)

Heinz Katherine (DOT) MN_DOT_CulturalResourcesCc Adams Jerome (DOT) Dalton Richard (DOT) Moynihan Debra (DOT)Subject Re-Review of ENM for SP 6205-39 TH 10Date Friday June 09 2017 90200 AM

Hi ReviewersUnfortunately the EAW did not get published during the time period that some of the reviews wouldstill be valid In addition this project has had Federal funds added to it so the state only reviews arealso invalid The good news is that there is a layout with the proposed ponding site The green onthe layout is Not MnDOT ndash it is Ramsey County Attached are all of the reviews that were receivedPlease respond if a new review is needed Approximate tree removal is in the ENM Here is the link to the ENMhttpedmscyberdocsquickstartaspshow=view1568435ampnoframes=yes CRIS 24416 The document we had discussed with FHWA prior to Emekarsquos departure and while Ryan was startingwas a EAW and separate Non-Programmatic CE If you have any questions regarding the design of the project please contact Jerome Adam the PMat 651-234-7611 Thanks Brigid Brigid GomboldMnDOT ndash Environmental Coordinator1500 Co Rd B2Roseville MN 55113(651) 234-7674

Minnesota Department of Transportation

Early Notification Memo

Metro District Office Tel 651234-7677 Waters Edge Building - Mail Stop 050 Fax 651234-7608 1500 W County Road B-2 Roseville Minnesota 55113-3175

File 6205-39 (US 10) ENM (EAW)

Date April 10 2015 Subject Early Notification Memo

SP 6205-39 (US 10) Job Number T9W076 Letting Date January 2017 Type of project Construct a two-lane exit on southbound I-35W to eastbound US 10 construct an auxiliary lane on eastbound US 10 from CR 10 to CR 96 PPMS project limits On US 10 from I-35W to CR 96 in Arden Hills Ramsey County Minnesota Funding State-only (CMSP) ENM response date May 22 2015

To The following MnDOT Functional Groups (checked with an ldquoXrdquo) (Addressees - additional information is available by clicking ldquosee belowrdquo or HPDPrdquo links in the table below) Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

X Peter Leete (MS 620) ndash DNR questionnaire (for thresholds on when to use see ldquoHPDPrdquo link to the right [links to DNRMnDOT MOU] then go to bottom of page 24)

See below HPDP ENM1040

Respond using officialletterhead

For projects near the Mississippi River IF project lies in MNRRA (map at EDMS 508748) contact Alan Robbins-Fenger Resource Management - Planning and Land Use MNRRA National Park Service 111 East Kellogg Boulevard Suite 105 St Paul Mn 55101 alan_robbins_fengernpsgov 651-290-3030 ext 250

See Below HPDP None

For projects near the St Croix River contact Jill Medland Jill_Medlandnpsgov St Croix National Scenic Riverway 401 North Hamilton Street Saint Croix Falls WI 54024 Phone715-483-2284 Fax 715-483-3288

NPS web page None

Jason Alcott (MS 620) ndash Federal TampE Species Review See below HPDP ENM1060

X Cultural Resources Unit Review (see guidance at EDMS doc 1274121 for state-funded pavement rehab projects)

See below HPDP ENM1010

X

Keri Aufdencamp (Metro West and East Areas) Carolyn Boben (Metro North Area) Sarah Jarman (Metro South Area) (MS 620) ndash Contaminated property review

See below HPDP ENM1020

Respond by Email or memo

X Mark Vogel (Metro North and East Areas) Jackie Klein (Metro South and West Areas) (MS 620) ndash Regulated Waste

See below HPDP ENM1030

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 1 of 11
gomb1bri
Text Box
Chris Smith
gomb1bri
Text Box
X
gomb1bri
Cross-Out
gomb1bri
Inserted Text
gomb1bri
Typewritten Text
Federal Funds
gomb1bri
Cross-Out
gomb1bri
Typewritten Text
July 2018
gomb1bri
Typewritten Text
Resent 692017

TO Addressees Page 2 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

(Building DemolitionRelocation and Bridge ReconstructionPainting)

X Tina Markeson (MS 620) ndash Forestry tree survey See below HPDP ENM1070

Kathryn McFadden (MS 686) - Historic Properties Program See below None Rob Williams (MS 686) - Safety Rest Area Program See below Na Vera Westrum Ostrom (MS 686) - State Entry Monuments See below Na

Gina Mitteco (Metro) ndash Bicycle and Pedestrian review Accessibility Requirements (ADA)

See below HPDP ENM1090 ENM1100

Dan Prather (MS 610) ndash Bridge Projects See Below All Bridge projects None

X Jason Richter (MS XXX) ndash Geology review for EAW Item 10 (MnDOT written EA only)

See Below None

X Jim Weatherhead (all Metro Areas) (MS 470) ndash Railroad Review (rail contacts list)

See below HPDP ENM1120

X Debra Sorenson (MS 410) -- Office of Aeronautics See below HPDP ENM1110

X Jim Henrickson (Metro) ndash Traffic Forecasts None X Peter Wasko (Metro) ndash Noise review See below HPDP ENM1050 XXXXX ndash Metro Right of Way (click here for maps) See below None

X Katherine Heinz ndash District Wetlands review See below HPDP None

X Brian Kellyndash Metro Water Resources (click here for map) Only send WRE federally-funded projects and EAW projects

See below None

XXXXX ndash Metro Traffic (click here for map) See below None

X Deb Moynihan - (MS 620) ndash Environmental Review Document See below None

X

Emeka Ezekwemba (FHWA Area Engineer) ndash Emeka Ezekwemba (East West and North Areas) Abbi Ginsberg (South Area) Environmental Review Document (EAW EA vs CAT EX) Interstate Access Request

See below See below

None

Cc X Keith Baker ndash Consultant Administration

Minnie Milkert - Value Engineering (for projects with total costs gt$20 million)

See below

X Deb Moynihan - (MS 620) ndash Environmental Review Document

X Jerome Adams ndash Metro District Project Manager (PPMS Fin Des Proj)

X XXXXX ndash Metro District Project Designer (PPMS DES ENG)

Brigid Gombold ndash Metro Environmental Coordinator (Cat_Ex and Cat_Ex_Not documents)

X Rick Dalton ndash Metro Environmental Coordinator (EAW EA and EIS documents)

For additional information about the project please contact the Project Designer or the Project Manager Project Manager Jerome Adams Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7611

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 2 of 11

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

Minnesota Department of Transportation

Early Notification Memo

Metro District Office Tel 651234-7677 Waters Edge Building - Mail Stop 050 Fax 651234-7608 1500 W County Road B-2 Roseville Minnesota 55113-3175

File 6205-39 (US 10) ENM (EAW)

Date April 10 2015 Subject Early Notification Memo

SP 6205-39 (US 10) Job Number T9W076 Letting Date January 2017 Type of project Construct a two-lane exit on southbound I-35W to eastbound US 10 construct an auxiliary lane on eastbound US 10 from CR 10 to CR 96 PPMS project limits On US 10 from I-35W to CR 96 in Arden Hills Ramsey County Minnesota Funding State-only (CMSP) ENM response date May 22 2015

To The following MnDOT Functional Groups (checked with an ldquoXrdquo) (Addressees - additional information is available by clicking ldquosee belowrdquo or HPDPrdquo links in the table below) Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

X Peter Leete (MS 620) ndash DNR questionnaire (for thresholds on when to use see ldquoHPDPrdquo link to the right [links to DNRMnDOT MOU] then go to bottom of page 24)

See below HPDP ENM1040

Respond using officialletterhead

For projects near the Mississippi River IF project lies in MNRRA (map at EDMS 508748) contact Alan Robbins-Fenger Resource Management - Planning and Land Use MNRRA National Park Service 111 East Kellogg Boulevard Suite 105 St Paul Mn 55101 alan_robbins_fengernpsgov 651-290-3030 ext 250

See Below HPDP None

For projects near the St Croix River contact Jill Medland Jill_Medlandnpsgov St Croix National Scenic Riverway 401 North Hamilton Street Saint Croix Falls WI 54024 Phone715-483-2284 Fax 715-483-3288

NPS web page None

Jason Alcott (MS 620) ndash Federal TampE Species Review See below HPDP ENM1060

X Cultural Resources Unit Review (see guidance at EDMS doc 1274121 for state-funded pavement rehab projects)

See below HPDP ENM1010

X

Keri Aufdencamp (Metro West and East Areas) Carolyn Boben (Metro North Area) Sarah Jarman (Metro South Area) (MS 620) ndash Contaminated property review

See below HPDP ENM1020

Respond by Email or memo

X Mark Vogel (Metro North and East Areas) Jackie Klein (Metro South and West Areas) (MS 620) ndash Regulated Waste

See below HPDP ENM1030

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 1 of 11
gomb1bri
Text Box
Chris Smith
gomb1bri
Text Box
X
gomb1bri
Cross-Out
gomb1bri
Inserted Text
gomb1bri
Typewritten Text
Federal Funds
gomb1bri
Cross-Out
gomb1bri
Typewritten Text
July 2018
gomb1bri
Typewritten Text
Resent 692017

TO Addressees Page 2 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

(Building DemolitionRelocation and Bridge ReconstructionPainting)

X Tina Markeson (MS 620) ndash Forestry tree survey See below HPDP ENM1070

Kathryn McFadden (MS 686) - Historic Properties Program See below None Rob Williams (MS 686) - Safety Rest Area Program See below Na Vera Westrum Ostrom (MS 686) - State Entry Monuments See below Na

Gina Mitteco (Metro) ndash Bicycle and Pedestrian review Accessibility Requirements (ADA)

See below HPDP ENM1090 ENM1100

Dan Prather (MS 610) ndash Bridge Projects See Below All Bridge projects None

X Jason Richter (MS XXX) ndash Geology review for EAW Item 10 (MnDOT written EA only)

See Below None

X Jim Weatherhead (all Metro Areas) (MS 470) ndash Railroad Review (rail contacts list)

See below HPDP ENM1120

X Debra Sorenson (MS 410) -- Office of Aeronautics See below HPDP ENM1110

X Jim Henrickson (Metro) ndash Traffic Forecasts None X Peter Wasko (Metro) ndash Noise review See below HPDP ENM1050 XXXXX ndash Metro Right of Way (click here for maps) See below None

X Katherine Heinz ndash District Wetlands review See below HPDP None

X Brian Kellyndash Metro Water Resources (click here for map) Only send WRE federally-funded projects and EAW projects

See below None

XXXXX ndash Metro Traffic (click here for map) See below None

X Deb Moynihan - (MS 620) ndash Environmental Review Document See below None

X

Emeka Ezekwemba (FHWA Area Engineer) ndash Emeka Ezekwemba (East West and North Areas) Abbi Ginsberg (South Area) Environmental Review Document (EAW EA vs CAT EX) Interstate Access Request

See below See below

None

Cc X Keith Baker ndash Consultant Administration

Minnie Milkert - Value Engineering (for projects with total costs gt$20 million)

See below

X Deb Moynihan - (MS 620) ndash Environmental Review Document

X Jerome Adams ndash Metro District Project Manager (PPMS Fin Des Proj)

X XXXXX ndash Metro District Project Designer (PPMS DES ENG)

Brigid Gombold ndash Metro Environmental Coordinator (Cat_Ex and Cat_Ex_Not documents)

X Rick Dalton ndash Metro Environmental Coordinator (EAW EA and EIS documents)

For additional information about the project please contact the Project Designer or the Project Manager Project Manager Jerome Adams Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7611

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 2 of 11

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

TO Addressees Page 2 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Person ndash Area of Concern See below

HPDP Thresholds P6 Activity

(Building DemolitionRelocation and Bridge ReconstructionPainting)

X Tina Markeson (MS 620) ndash Forestry tree survey See below HPDP ENM1070

Kathryn McFadden (MS 686) - Historic Properties Program See below None Rob Williams (MS 686) - Safety Rest Area Program See below Na Vera Westrum Ostrom (MS 686) - State Entry Monuments See below Na

Gina Mitteco (Metro) ndash Bicycle and Pedestrian review Accessibility Requirements (ADA)

See below HPDP ENM1090 ENM1100

Dan Prather (MS 610) ndash Bridge Projects See Below All Bridge projects None

X Jason Richter (MS XXX) ndash Geology review for EAW Item 10 (MnDOT written EA only)

See Below None

X Jim Weatherhead (all Metro Areas) (MS 470) ndash Railroad Review (rail contacts list)

See below HPDP ENM1120

X Debra Sorenson (MS 410) -- Office of Aeronautics See below HPDP ENM1110

X Jim Henrickson (Metro) ndash Traffic Forecasts None X Peter Wasko (Metro) ndash Noise review See below HPDP ENM1050 XXXXX ndash Metro Right of Way (click here for maps) See below None

X Katherine Heinz ndash District Wetlands review See below HPDP None

X Brian Kellyndash Metro Water Resources (click here for map) Only send WRE federally-funded projects and EAW projects

See below None

XXXXX ndash Metro Traffic (click here for map) See below None

X Deb Moynihan - (MS 620) ndash Environmental Review Document See below None

X

Emeka Ezekwemba (FHWA Area Engineer) ndash Emeka Ezekwemba (East West and North Areas) Abbi Ginsberg (South Area) Environmental Review Document (EAW EA vs CAT EX) Interstate Access Request

See below See below

None

Cc X Keith Baker ndash Consultant Administration

Minnie Milkert - Value Engineering (for projects with total costs gt$20 million)

See below

X Deb Moynihan - (MS 620) ndash Environmental Review Document

X Jerome Adams ndash Metro District Project Manager (PPMS Fin Des Proj)

X XXXXX ndash Metro District Project Designer (PPMS DES ENG)

Brigid Gombold ndash Metro Environmental Coordinator (Cat_Ex and Cat_Ex_Not documents)

X Rick Dalton ndash Metro Environmental Coordinator (EAW EA and EIS documents)

For additional information about the project please contact the Project Designer or the Project Manager Project Manager Jerome Adams Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7611

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 2 of 11

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

TO Addressees Page 3 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Project Designer XXXX Phone 651-234-XXXX

For additional information about this Early Notification Memo please contact the Report Writer

Report Writer Candyce Clayton Project Documentation Metro District

1500 W Co Rd B2 Roseville Mn 55113

Phone 651-234-7676

PLEASE RETURN REVIEW RESPONSE TO THE PROJECT DESIGNER AND REPORT WRITER The Metro District Project Documentation Unit is providing early notification of the proposed project described in the subject line (above) and is requesting your review of the project (and coordination with other agencies where needed) following guidance on the Highway Project Development Process (HPDP) web site Please reply by Friday May 22 2015 (Typically 45 days from the date the ENM is sent) If this date is not possible please reply estimating when this review can be completed Information available at this time in regard to the project may be limited therefore MnDOT recognizes that the responses you provide are preliminary and may change after reviews of other documents or if the highway plan change However your early input will help assure that all environmental concerns and interests relating to this project are considered in the development of this project

Project Description

This state-funded construction project on eastbound US 10 will create a two-lane exit from southbound I-35W onto eastbound US 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on eastbound US 10 from the County Road 10 entrance ramp to the exit onto County Road 96 in Ramsey County in the city of Arden Hills Minnesota The proposed 1-mile + auxiliary lane will require that a Type 1 noise analysis be conducted preliminary to constructing any voter-approved noise barriers This project comes under the programming category of safetycapacity [See attached maps for project location and details] Need Statement The 2013 Metropolitan Freeway System Congestion Report identifies this segment of US 10 as having greater than three hours of daily congestion The demand for exit maneuvers exceeds capacity at I-35W and at County Road 96 There is also a demand during the high-volume am peak for gaps to allow entrance onto US 10 by vehicles operating out of a local business (Scherer Brothers) Purpose Statement The project purpose is to improve capacity and decrease congestion along this segment of US 10

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 3 of 11
gomb1bri
Cross-Out
gomb1bri
Cross-Out
gomb1bri
Callout
federal
gomb1bri
Text Box
Brigid Gombold
gomb1bri
Text Box
The pond will remove spot trees - 5-8 trees The possible noise walls will be 05 acres if all possible wall were installed

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

TO Addressees Page 4 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Anticipated Project Features Road Surface WRE Design

A reconstruction or major grading section Culvert replacement with same size X Guardrail replacement

Pavement mill and overlay Culvert replacement with larger size X Guardrail improvement

Jointcrack repair X Culvert extension or lining Bicycle and Pedestrian

Realignment Temporary Stream diversion Elimination of bicycle access

X Construct 2-lane exit Permanent Stream diversion Right of Way

X Construct auxiliary lane X Storm water pond construction Work outside existing RW

Roadway widening curve correction etc Erosion repair Temporary easement

X Work outside the existing shoulder PI Wetland fill or excavation Building demolitionrelocation

Curb and gutter work (or replacement) Disturb more than 1 acre land Right-of-way acquisition

Resurfacing rehabilitation Add more than 1 acre impervious surfaces Relocations

Traffic DNR streamwater crossings

Turn lane or bypass construction Bridge Other

Turn lane construction Bridge painting X Conduct noise analysis

Traffic Management System (TMS) install Bridge demolition rehabilitation or replacement X Add noise barriers if approved

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 4 of 11

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

TO Addressees Page 5 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

General Project Information

District Metro County(ies) Ramsey City(s) Arden Hills

Legal Description Twp T31N

Range R23W

Section(s) 17 16 21

Location and Reference Points

From CR 10 (238+005) To CR 96 (239+002)

Planned Letting Date 012017

Is Project in the currently approved STIP ( X ) No ( ) Yes

Document being prepared ( ) CAT EX ( ) EIS ( ) EA ( X ) EAW ( ) NONE [ CAT EX not needed ]

Funding types ( X ) State funds ( ) FHWA funds (X) Uncertain for Historical review assume federal funds unless the project will be let in the next 9 months with state funds

Project is in ( ) scoping stage ( X ) pre-design stage

Plan drawings are ( ) available ( X ) not yet available

Tribal Lands Is project within a Reservation ( X ) No ( ) Yes If yes Reservation name XX

The project does does not require a permit from ( ) DNR ( ) Federal ( ) PCA ( ) Other ( X ) Unknown

Bridge no (if applicable) XX

Feature bridge crosses (eg railroad river stream) XX

PONTIS Bird Nest Report lists bridges by highway and Ref Point and lists feature crossed ndash print appropriate pages and attach if this helps answer the questions above There are no borrow areas associated with this project If Yes give description of location including Twp Range Section(s) XXXX There are no disposal areas associated with this project If Yes give description of location including give Twp Range Section(s) XXXX

Current land use see Georilla under the layers LAND USE AND FEATURESGeneralized Land Use for land use in the project area Mixed-use industrial (Twin Cities Army Ammunition Plant) Retailcommercial office Mixed-use residential Single family Undeveloped Parkrecreation

1 Are there any parks trails wildlife refuges andor recreation areas in the project vicinity ( ) No ( X ) Yes

2 If Yes will this project have any impacts on this parks trails refuges andor recreation area ( X ) No ( ) Yes

If Yes please explain and since there could be Section 4(f) impacts contact Rick Dalton and or Deb Moynihan (OES) (In Metro the Georilla map displaying Metro Council annotated base-map is helpful or review park and trail maps posted on city web-pages)

1 Are there any Manufactured Home Parks andor Apartment Buildings in the project vicinity ( ) No ( X )Yes Manufactured home park located at US 10 and CR 96 NW quadrant

2 If Yes will this project have any impacts [direct or indirect (eg noise)] on any Manufactured Home Parks andor Apartment Buildings ( X ) No ( ) Yes Maybe Some temporary traffic impacts could occur during project construction however these impacts would occur equally throughout the project corridor not only within this neighborhood

If Yes please explain and since there could be environmental justice considerations contact Rick Dalton and or Deb Moynihan (OES)

Note Before answering ldquoyesrdquo to 2 above ldquoimpactsrdquo need to exceed the thresholds listed in Attachment B of the Programmatic Categorical Exclusion Agreement between FHWA and MnDOT View these in the ldquoAttachment ldquoBrdquo Checklistrdquo at httpdotapp7dotstatemnusedmsdownloaddocId=617753

(In Metro the Georilla map displaying Metro Council Generalized Land Use (2010) is helpful it shows areas with manufactured and multifamily residences)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 5 of 11

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

TO Addressees Page 6 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Additional information by subject area X DNR Review and Determination Peter Leete

Please complete a DNR Questionnaire for this highway project

Federal TampE Species Review

This is a federally funded project or an Interstate project requiring an Interstate Access Request (IAR)

Explain other reasons for sending project to Jason -

X Cultural Resources Review and Determination CRU Staff

The Early Notification Memo will NOT be sent to CRU for this state funded project because the project meets the work type criteria set in EDMS doc 1361058 CRU has determined this work type is a low risk

This project is on TH 55 or TH 62 and within the sensitivity zones of Coldwater Spring listed in the report Safeguarding Coldwater Spring Requirements for Projects Conducted on MnDOT Right-of-Way at EDMS doc 1523387

Request for ArchaeologicalHistorical Review to meet federal and state requirements (the normal review

unless the project will be let in the next nine (9) months with state funds ndash then use state-only review below)

X Request for ArchaeologicalHistorical Review state only (state funded project with no likelihood of federal funds) But may need COE permit

X Contaminated Properties or Regulated Materials (including asbestos) Carolyn Boben

The Early Notification Memo will NOT be sent to the Environmental Investigation Unit (EIU) for this project because the project meets the RTMC work-type criteria set in EDMS doc 1362394 regarding contaminated properties review EIU has determined this work type is a low risk

Cable median barrier projects do not need ENM review by EIU (CMMT) unless other earthwork (such as culvert replacement) is associated with the project (see EDMS doc 1483765 for background)

Crack Seal Fog Seal and Surface Rehab project that are programmed from Maintenance do not need ENM review by CMMT This work type has been determined low risk See EDMS doc 1535639 for confirmation

Sign panel replacement projects or sign structure Type A projects as described in EDMS doc 1545443 do not need ENM review by CMMT This work has been determined low risk See EMDS doc 1545443

X Project involves grading andor excavation including minor work (eg turns lanes signal footings sign posts

culvert replacement)

X Project is in or near a commercialindustrial area

X District has information that indicates potentially contaminated sites are located along the corridor (eg filling stations dumps manufacturing scrap yards dry cleaners etc) Army ammunition plant

Project requires groundwater dewatering

Regulated Materials Mark Vogel

Project will include building demolition or relocation

Project will include bridge demolition deck replacement or renovation

Project will include bridge painting or painting of any steel structure (Check for PCBrsquos in paint system)

X Project will include treated wood materials (such as noise walls guardrail posts etc)

Project will include acquisition of property with above ground discarded regulated materials or waste

Other

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 6 of 11

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

TO Addressees Page 7 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Forestry (tree survey) and Vegetation Tina Markeson This project may impact trees and vegetation Please provide recommendations for trees listed at the sites below that may be affected by this project

Location Reference Point

Cause of potential impact

X Geology Review for (new) EAW Item 10 Jason Richter Please provide responses to EAW Item 10

X Railroad Review ndash Jim Weatherhead See attached map for railroad locations one of the conditions below is true Please review the attached map and provide your response

Construction activity is expected within 50-ft of the centerline of an individual pair of railroad (RR) tracks Project limits are estimated to be within 600-ft of any RR tracks Project has a detour that directs traffic across a RR grade crossing

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 7 of 11

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

TO Addressees Page 8 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Noise Peter Wasko Send email to the FHWA Area Engineer and ask them which of the following statements apply

I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I consider this to be a Type I project because it meets one of the definition criteria below (1) The construction of a highway on new location or (2) The physical alteration of an existing highway where there is either

(i) Substantial Horizontal Alteration A project that halves the distance between the traffic noise source and the closest receptor between the existing condition to the future build condition or

(ii) Substantial Vertical Alteration A project that removes shielding therefore exposing the line-of-sight between the receptor and the traffic noise source This is done by either altering the vertical alignment of the highway or by altering the topography (not including the addition or removal of vegetation) between the highway traffic noise source and the receptor or

(3) Bridge replacement projects that satisfy item (2) above (4) The addition of a through-traffic lane( s) This includes the addition of a through-traffic lane that functions

as a HOV lane contraflow lane High-Occupancy Toll (HOT) lane bus lane or truck climbing lane or (5) The addition of an auxiliary lane except for when the auxiliary lane is a tum lane (6) The addition or relocation of interchange lanes or ramps added to a quadrant to complete an existing partial

interchange or (7) Restriping existing pavement for the purpose of adding a through traffic lane or an auxiliary lane or (8) The addition of a new or substantial alteration of a weigh station rest stop ride-share lot or toll plaza (9) If a project is determined to be a Type I project as defined above then the entire project area as defined in

the environmental document is a Type I project OR I have reviewed your request for an FHWA determination under 23 CFR 772 for project type to be used for noise analysis in the subject project After reviewing the material I would not consider this to be a Type 1 project and no noise analysis is required

Contact Anne Claflin (651-297-8324) at MPCA and ask for MPCArsquos opinion as to whether if a noise analysis is required under state statute and rules

Right of Way

This project involves one of the following right-of-way actions permanent acquisitions easements leasespermits Commissionerrsquos Orders on roadways of other jurisdictions transfers of custodial control excess acquisition Railbank shared facilities partnership projects that acquire property for which MnDOT will become the owner and Right of way Acquisition Loan Fund (RALF) projects at the time the EMN is sent

If yes (box to left is checked) Metro Project Manager should have contacted Metro Right of Way to complete an EDD-1 form in REALMS (please check to see that you have received this if not contact the Project Manager)

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 8 of 11

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

TO Addressees Page 9 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Wetlands Katie Heinz

Katie - Please respond to the following questions

- Are there wetlands within the project corridor

- What is your timeline for completing the Level 1 wetland delineation

If further wetland field delineation work is needed Katie please ask the Project Manager (and cc Cynthia Krumsieg) to add PPMS activity 1082 and 1083 (Wetlands) to the project schedule Project Schedules can be viewed on the internet at httpihubprojectmanagementproject-developmentpmsumetroindexhtml

Process for completing the Environmental Document this text is taken form EDMS doc 961236

- Katie reviews available wetland information for a Level 1 Wetland Delineation and marks (maps) Level 1 Wetland Delineation lines on a Microstation file

- Katie completes her portions of Environmental Document write-up and a pdf map of the delineation lines to Writer and WRE Squad Leader

- Katie sends Microstation file location and Environmental Document write-up (see below) to Design (the Project Manager andor Project Designer) and the WRE Squad Leader

- Project Designer measures wetland impacts completes wetland impact table creates a pdf-figure identifying wetland impacts and describes wetland avoidance and minimization sections for Environmental Document write-up and returns to Writer and Katie

- Katie requests Sarma to write wetland replacement mitigation letter (see EDMS doc 1347838 for sample letter)

- Sarma prepares wetland replacement mitigation letter and sends to Writer

- WRE Squad Leader working with Katie completes permits and mitigation section of Environmental Document write-up and returns to Writer

- Writer assembles the wetland write-up for the Environmental Document

Water Resources The Early Notification Memo will NOT be sent to the Water Resources squad leader for this state funded

project because the project is state funded and does not require an EAW See e-mail in EDMS doc 1224389 for more information Water Resources will obtain all necessary permits as noted in in EDMS doc 1224389

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 9 of 11

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

TO Addressees Page 10 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

X Water Resources ndash Brian Kelly (state-funded project requiring EAW) Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is a DNR Public Waters Work Permit needed (Public Waters maps) PWI XXX XXX

Is a US Army Corps of Engineers Section 404 permit needed If yes What Type

NPDES (gt 1 acre of soil disturbed) Will NPDES permit amp SWPPP be required

NPDES (gt 1 acre new impervious)

Will storm water ponds or other water quality mitigation be required

Where would you like them to be located on the project

Is RW needed for ponds

Is project within 1 mile of TMDL or Special water and do we drain to it (TDML = Total Daily Maximum Load)

Do we have a WLA for this TMDL (WLA = Waste Load Allocation such as phosphorous or suspended solids)

100-year floodplain impacts

Does the project cross any floodplains ( Map available at httpmscfemagovwebappwcsstoresservletCategoryDisplaycatalogId=10001ampstoreId=10001ampcategoryId=12001amplangId=-1ampuserType=6amptype=1ampdfirmCatId=12009ampfuture=false

If yes will the project do any work below the 100-year floodplain elevation

If yes what agency regulates floodplain impacts for this waterbody

What replacement requirements does this agency have

Are any waters within the project limits infested with an aquatic invasive species according to DNR Designation of Infested Waters guidance

Note water from infested waters may not be transported on a public road or off riparian property on infested waters except in emergencies or under permit ($200 civil penalty or misdemeanor)

Does the project discharge to a Prohibited Water (SNA) ( Cannot have new or expanded discharge to these areas)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to a Restricted Water (Calcareous Fen or a Wild Scenic or Recreational River (Try to avoid new or expanded discharge and get permission for discharge from PCA if new discharge or expanded discharge ndash follow steps)

If yes how will you mitigate

( Map available at SWREMS4ORVW_ Special _Waters)

Does the project discharge to Special Water ( Trout Lake or Trout Stream)

( Map available at SWREMS4ORVW_ Special _Waters)

If yes how will you mitigate

Does the project discharge to an Impaired (TMDL) Water

( Map available at SWREMS4TMDLs2008 TMDL ArcMapMetro2008TMDLpdf)

If yes how will you mitigate

Is the project within a Watershed District Name of district(s) ( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 10 of 11

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

TO Addressees Page 11 of 11 SP 6205-39 (US 10)

CDocuments and Settingsshek1haiApplication DataHummingbirdDMTempMNDOT_DOCS-382345-v32-EARLY_NOTIFICATION_MEMO__FORMERLY_CALLED_THE_FUNCTIONAL_GROUP_ENVIRONMENTAL_REVIEW_REQUEST_DOC

Check project scoping information Has any of that information changed If so please explain Should any WRE items be added to this project

Yes No Please review the table below check the appropriate boxes and provide the information requested

Is the project within a Watershed Management Organization (WMO map) (Name of WMO)

( Map available at SWRES7GISWD-WMO2007WD-WMOmappdf)

If yes what are requirements

Does the project lie within a Drinking Water Supply Management Area (DWSMA) (Map available at SWREMS4Drinking Water Info2008 DWSMApdf)

If yes what is the Drinking Water Supply (DWS) vulnerability (Very high High Moderate Low Very Low)

If moderate to very low vulnerability then contact city for final decision on whether treatment device can be located in DWSMA area If in very high or high vulnerability area ndash do not infiltrate

X Aeronautics Review Deb Sorenson This project (corridor) is within an Airport Influence area (see Metro Publicly Owned Airports map then click on an airport)

X Metro Traffic Jim Henricksen X If the purpose of this project is safety (HES) please provide HES worksheet(s) for alternatives considered or

other justification for this work

X If the purpose of this project is capacity please provide LOS analysis (write-up) for alternatives considered or other justification for this work

For Resurfacing projects please identify crash clusters and crash problems where crash clusters and crash problems exist provide potential solutions and whether these solution will be included in the project scope

OES and FHWA Area Engineer - Environmental Review Project Path Deb Moynihanndash based on the information presented thus far would you recommend an Environmental Assessment Worksheet The auxiliary lane length is about 1 mile long Please call me if you would like to discuss this or we can set up a meeting to discuss the environmental review document Interstate Access Request FHWA Area Engineer ndash Checked items listed below are included in this project Please respond as to whether an Interstate Access Request will be needed for this project An Interstate Access Request federalizes a state-funded project and a federal environmental document (Cat Ex EA EIS) will be required for the project

This project will add a new access point to an Interstate highway

X This project will add lanes (an auxiliary lane) or relocate entrance or exit ramp noses on an Interstate highway

Attachments

Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Early Notification Memo136205-39 (US 10)13Page 11 of 11

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

1

Clayton Candyce (DOT)

From Clayton Candyce (DOT)Sent Thursday April 16 2015 923 AMTo Markeson Tina (DOT)Subject Revised ENM P6 Table FW For Review 6205-39 (US 10) ENM Response Date 52015Attachments 6205-39 (US 10) ENM (EAW)doc 6205-39 Project Location Mappdf 6205-39 USGS

Mappdf 6205-39 Concept Mappdf

Hi Tina Thanks for your email of 41515 which I copied into this message below If you scroll down you will see that I have now added your ENM 1070 review task to the P6 table At the time that I filled out the table I didnrsquot know your task number ndash so thanks for sending it Also you should know that at this point there is no P6 schedule as Jerome hasnrsquot created it yet I will forward the revised table to him (and to Wendy) so he will know to include ENM 1070 Thanks again ‐‐ Candyce From Tina Markeson on 41515 Candyce‐ I am a little confused You do not list ENM 1070 in your table as a P6 activity to keep however on the ENM my name is checked indicating you would like a Vegetation Review If we are to complete an ENM Review I would like to have ENM1070 in the P6 schedule Please let me know which way you would like to go on this Tina Tina Markeson Office of Environmental Stewardship Roadside Vegetation Management Unit Superivsor 651‐366‐3619

From Clayton Candyce (DOT) Sent Friday April 10 2015 422 PM To Peter Leete (PeterLeetedotstatemnus) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) NnaemekaEzekwembadotgov Moynihan Debra (DOT) Markeson Tina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 1 of 2
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Text Box
See revised P6 table on p2

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

2

Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM 1070 Review amp Respond to ENM by

Vegetation Unit Tina Markeson

ENM1120 Review amp Respond to ENM by Rail Office

Jim Weatherhead

ENM1140 Review amp Respond to ENM by WRE Brian Kelly Thank you for your assistance (NOTE Individuals listed under the ldquoCcrdquo heading above are not expected to respond) Candyce Clayton Project Documentation Metro District

clay1can
Text Box
Revised Cover Email to Tina Markeson (ENM P6 Table Update)136205-39 (US 10)13Page 2 of 2
clay1can
Text Box
Revised P6 Table

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject FW SP 6205-39 US 10 eastbound auxiliary lane

For your records Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Adams Jerome (DOT) [mailtojeromeadamsstatemnus] Sent Friday April 17 2015 817 AM To Ezekwemba Nnaemeka (FHWA) Cc Dalton Richard (DOT) Kauppi Sheila (DOT) Subject SP 6205-39 US 10 eastbound auxiliary lane Emeka We just spoke by phone I explained that MnDOT intends to develop SP 6205‐39 US 10 for a Jan 2017 letting The scope of this project will add the second lane to the southbound I35W to eastbound US 10 exit ramp and then add a 3rd lane on the right on eastbound US 10 from I35W and drop it at CR 96 MnDOT intends to use state funds and do a State EAW We will be doing a noise wall process We plan on closing the median openings in front of Scherer Brothers and Big 10 and keep those entrances open as right inright out only In our conversation today you said that we did not need an IAR and do not need full federal oversight We will of course involve you in layout development and I will try to keep you informed in general As always feel free to contact me anytime with questions or comments Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

1

Clayton Candyce (DOT)

From NnaemekaEzekwembadotgovSent Thursday April 23 2015 313 PMTo Clayton Candyce (DOT)Subject RE For Review 6205-39 (US 10) ENM Response Date 52015

Candyce ndash FYI Jerome and I covered this project via phone No IARno NEPA Nnaemeka U Ezekwemba PE Area Engineer Federal Highway Administration ‐ Minnesota Division direct (651)‐291‐6108 | nnaemekaezekwembadotgov 380 Jackson Street Suite 500 St Paul MN 55101 wwwfhwadotgovmndiv

From Clayton Candyce (DOT) [mailtocandyceclaytonstatemnus] Sent Friday April 10 2015 422 PM To Leete Peter (DOT) DOT_CulturalResources Boben Carolyn (DOT) Vogel Mark (DOT) Richter Jason (DOT) Kelly Brian (DOT) Weatherhead James (DOT) Ezekwemba Nnaemeka (FHWA) Moynihan Debra (DOT) Markeson Christina (DOT) Sorenson Debra (DOT) Heinz Katherine (DOT) Henricksen Jim (DOT) Wasko Peter (DOT) Cc Dalton Richard (DOT) Baker Keith (DOT) Adams Jerome (DOT) Subject For Review 6205-39 (US 10) ENM Response Date 52015 Dear Addressees Please respond to the attached Early Notification Memo (ENM) Environmental Review Request for SP 6205-39 on EB US 10 in the city of Arden Hills in Ramsey County This is a state-funded safety and capacity project including the construction of a one-mile-long auxiliary lane on EB US 10 between Co Rd 10 and Co Rd 96 The project will require a noise analysis and a noise barrier solicitation process The environmental document is an EAW See the ldquoProject Descriptionrdquo in the attached ENM Your response is requested by Friday May 22 2015 Also attached Project Location Map USGS Map Project Concept Map Letting Date January 2017 P6 Update for Wendy Kufner amp Jerome Adams Only the following ENM activities are needed in the P6 schedule for 6205-39 Wendy Please delete any other ENM activities showing on this project Activity Activity Name Activity OwnerENM1000 Prepare amp Distribute ENM Candyce ClaytonENM1010 Review amp Respond to ENM by CRU Kristen

ZschomlerENM1020 Review amp Respond to ENM by CMMT

(Contaminated Properties)Carolyn Boben

ENM1030 Review amp Respond to ENM for Regulated Waste

Mark Vogel

ENM1040 Review amp Respond to ENM by DNR Candyce ClaytonENM1120 Review amp Respond to ENM by Rail

Office Jim Weatherhead

clay1can
Text Box
Per FHWA No IAR or NEPA Required136205-39 (US 10)13

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

1

Clayton Candyce (DOT)

From Dalton Richard (DOT)Sent Thursday March 26 2015 1249 PMTo Clayton Candyce (DOT)Cc Gombold Brigid (DOT) Jung Paul (DOT) Fischer Jose (DOT)Subject 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Follow Up Flag Follow upFlag Status Flagged

Hi Candyce ndash this one is a rush Letting is 072216 Please prepare an ENM ASAP It has State‐funds (CMSP) Project Description ‐ SCOPE15‐17 EB US10 FROM SB I35W TO RAMSEY‐CR96 IN ARDEN HILLS ‐ CONSTURCT 2‐LANE See scoping map‐booklet at httpgeorillascoping_mapbooks2017jung_paul_alanscope_1542pdf Tony can give you the purpose and need or you may find it in the Scoping Data base See me with questions

clay1can
Text Box
Project Assignment Memo 32615136205-39 (US10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

1

Clayton Candyce (DOT)

From Krumsieg Cynthia (DOT)Sent Friday April 03 2015 242 PMTo Clayton Candyce (DOT)Subject RE 6205-39 in STIP

Hi Candyce This project is not in the STIP and is not going in the Draft 2016‐2019 STIP that will be submitted by April 15th What I know is this is a CMSP project that Tony Fischer is asking to be scoped for consideration for FY17 Cindy

From Clayton Candyce (DOT) Sent Friday April 03 2015 237 PM To Krumsieg Cynthia (DOT) Subject 6205-39 in STIP Hi Cindy Could you please let me know whether 6205‐39 on US 10 is in the current STIP Letting is 72216 Thanks Candyce

clay1can
Text Box
Project Not in STIP136205-39 (US 10)
clay1can
Highlight

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Wednesday April 01 2015 1208 PMTo Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAWAttachments SB35W_to_EB10_AuxTo96pdf

Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

EB US 10 at Scherer BrosBig Ten 2 3

East of CR 96 exit 2 2 Aux lane along US 10 begins at CR 10 and ends at exit to CR 96

Tony

From Clayton Candyce (DOT) Sent Wednesday April 01 2015 1016 AM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Tony Could you clarify something for me please ndash where exactly does the aux lane begin Is the aux lane separate from the 2 proposed SB 35W exit lanes Or does one of the 2 SB exit lanes from 10 onto 35 become the aux lane on 10 to 96 Thanks Candyce

From Fischer Jose (DOT) Sent Thursday March 26 2015 409 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce The first page on Rickrsquos link has what I put in the scoping database I hope this is a good place to start but let me know if you want to refine it

From Dalton Richard (DOT) Sent Thursday March 26 2015 1249 PM

clay1can
Text Box
Table of Project Lanes 136205-39 (US 10)

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

1

Clayton Candyce (DOT)

From Fischer Jose (DOT)Sent Thursday April 02 2015 322 PMTo Clayton Candyce (DOT)Cc Adams Jerome (DOT)Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW

Jerome is scoping this and that is intended to be completed in fall The intent is not to take any right of way but that depends largely on probably not building 6rsquo standard shoulders and not needing right of way for ponding If we do need right of way the most likely locations in order are

1) West of US 10 for a right turn lane into Big Ten 2) West of US 10 east of Scherer Bros entrance to provide improved exit 3) West of US 10 throughout project limits to match in slopes 4) Irsquod like to stay out of ROW for ponding but I really have no idea how that might play out

Tony

From Clayton Candyce (DOT) Sent Thursday April 02 2015 317 PM To Fischer Jose (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Tony Thanks for the table and map Will there be any ROW taken on this project on US 10 If so where Thanks again Candyce

From Fischer Jose (DOT) Sent Wednesday April 01 2015 1208 PM To Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Documentation assignment - EAW Hi Candyce Hopefully this table and the attached concept picture helps The solid blue shows what is proposed

lanes Existing Proposed Notes

SB 35W exit to US 10 EB 1 2 New decision lane so not much impact to 35W

EB CR 10 to EB US 10 1 1

EB US 10 east of 35W 2 3

clay1can
Text Box
Possible ROW Areas136205-39 (US 10)
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight
clay1can
Highlight

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

1

Clayton Candyce (DOT)

From Adams Jerome (DOT)Sent Thursday March 26 2015 211 PMTo Fischer Jose (DOT) Jung Paul (DOT) Dalton Richard (DOT)Cc Clayton Candyce (DOT)Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawingAttachments SB35W_to_EB10_AuxTo96pdf

Yes I am going to scope 6205‐39 which is US 10 east of I35W Yes I am including the US 10 west of I35W into 6284‐172 Jerome Adams PE PMP MnDOT 1500 Co Rd B2 Roseville MN 55113 O 651‐234‐7611 C 651‐775‐5069

From Fischer Jose (DOT) Sent Thursday March 26 2015 205 PM To Jung Paul (DOT) Dalton Richard (DOT) Cc Clayton Candyce (DOT) Adams Jerome (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Letrsquos be clear I thought Jerome was picking up the scoping for 0214‐45 US 10 west of 35W Rick is referring to 6205‐39 US 10 east of 35W concept attached Note that this will have to touch mainline 35W to match in the 2‐lane exit Scoping maps show a bit short of that Tony

From Jung Paul (DOT) Sent Thursday March 26 2015 201 PM To Dalton Richard (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject RE 6205-39 (TH 10I-35W) - Layout Concept drawing Hi Rick There is a late‐breaking development Per the attached e‐mail as of today Jerome has taken over scoping responsibility for this project from me Paul

From Dalton Richard (DOT) Sent Thursday March 26 2015 158 PM To Jung Paul (DOT) Fischer Jose (DOT) Cc Clayton Candyce (DOT) Subject 6205-39 (TH 10I-35W) - Layout Concept drawing

clay1can
Text Box
Email Jerome Adams Is PM136205-39 (US 10)

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

Project Location Desc US 10 EB from 35W to CR 96

Begin Reference Point True miles End Reference Point True miles

GIS location

Location amp approximate TH termini

State Plan Policy CodeNeed Statement

Purpose Statement

Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Proposed Project Scope Work Description

Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Preliminary Cost Estimate These are functional area budgeted amounts + risk factor + inflation

I have reviewed this report

Date

Recommendation Approval of ProjectFirst PreLetting Job (not yet assigned)

Needs

Project

Project Contacts

Project Documentation

Timothy Quinn Resource Engineer

Paul Jung Project Manager

Documentation for the Need(s)

Length

Need Details

$2184000Lane Construct4766 CMSP General 2017

$2184000Project Preliminary Estimate

US10 238+005 239+002240432 241132 I 070

US10 238+005 239+002240432 2411324766 LaneConstruct 6205 070I

Type emailFirst Name Last Name Sema4 DeptEmail only Jose Fischer Program SupportTraffic Engineering Gayle Gedstad Program SupportTraffic Engineering Lars Impola Program Support

Page 1 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 1 of 2

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

TH US10 Primary SP 6205-39 MSD PID 1542 Fiscal Yr 2017

Project Planning Report 3262015Date Printed

Element ID 122861 Sponsor KauppiSheila Complexity 2-Moderat

4766Functional Area of Object Traffic Engineering

FA Custom Info Auxiliary Lane

Target FY 2017

Area N

Object Lane

Action Construct Locking Status PM Lock Full LockNot Locked

Location Desc US 10 EB from 35W to CR 96

Work Desc Construct 2-lane exit from SB 35W additional lane from decision lane carries as aux lane alon g EB US 10 drops at exit to CR 96

Need Stmt Greater than 3 hours of daily congestion (Metropolitan Freeway System 2013 Congestion Report) Scherer Brothers along US 10 is not able to enter the highway during the morning due to high volumes and lack of gaps

Purpose Stmt Demand for exit exceeds capacity a 2-lane exit will reduce congestion along SB 35W The auxiliary lane will provide a lover volume lane for Schere Brothers to access providing more gaps in traffic to enter the highway

Mapping LocationsFunding Set Asides Total Cost Est $2000000

Creators Func Area Traffic Engineerin

Created By FischerJose ADETAILS FOR NEED ID

US10 238+005 239+002240432 241132 0LIMITSType Subtype FndgFY CostCMSP General 2017 $2000000

Page 2 of 2Rpt rptProjectPlanningReport 3262015

clay1can
Text Box
Planning Report136205-39 (US 10) Page 2 of 2

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

CHISAGO

ANOKA

N

A

Dalt1Ric
SP 6205-39 (US 10) between 35W 13and CR 96
Dalt1Ric
Project Location Map
clay1can
Line

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

CREEK

11

44

3

10

45

12

45

44

45

45

3

51

88

11

Creek

Rice

DR

SP

RIN

GL

AK

ER

D

KN

OL

LW

OO

DD

R

GR

OV

EL

AN

DR

D

RD

RD

FAIR

CHIL

DA

VE

DR

DR

DR

EA

ST

WO

OD

GR

EE

NW

OO

D

LA

KE

LO

NG

AR DAN AVE

SHERWOOD RD

LAPORT

DR LAPORT DR

WO

OD

LA

WN

DR

DR

ED

GE

WO

OD

KNOLL

DR

LOIS

DR

ST S

TEP

HE

N

ST M

IC

HA

EL

HILL VIEW RD

BO

NA

RD

OAK WOOD

DR

KN

OL

LW

OO

D

RD

COUNTYRD

AV

E

CT

WOOD DR

SIL

VE

RL

AK

ER

D

EA

ST

WO

OD

RD

LOUISA AVE

DR

CLEARVIEW AVE

RIDGE

GR

EE

NW

OO

D

DR

IR

ON

DA

LE

RD

BO

NA

RD

WOOD ALE DR

ED

GE

WO

OD

DR

GR

EE

NFIE

LD

SKIB

A

DR

BRONSON

JA

CKS

ON

SO

N

RD

QUIN

CY

COUNTY

RD

CLIF

TO

ND

R

BELLE

RA

YM

ON

DA

VE

OAKWOOD

PINEWOOD

DR

DR

DRST

HILLVIEW RD

TER

VALLEY VIEW

SU

NB

OW O

RIO

LE

DR

CT

ST NW

RD

WA

LN

UT

AV

E

CT

S

CT

N

LE

ON

A

ERIN CT

TH

OR

ND

AL

E

DAISY

CT

POPPYSEED ST

FOX WOOD

CT

LA

KE

BROOK CT

MISSISSIPPI

CIR

AVE

ST

GREENVIEW

HAMILTON

CT

DR

LO

NG

LA

KE

RD

ST NW

15th

TER

Long

Lake

AV

E

NW

NW

AV

E

AV

E

AV

EA

VE

AV

E

ST

14 ST NW

ST NW

LA

KE

RD

SIL

VE

R

AV

E

NN

A

VALE

RIE

STNW

RCHWOOD

CT

CIR

MIM

OSA

TO DR

RE

DW

OO

D

ST

NO

R

TH

TH

OR

ND

ALE

HIG

HVIE

WD

R

FREDEENRD

PIK

EL

AK

E

PIKE

LA

KE

CT

KA

RI

12thTER

LA

KE

PIK

E

CIR

ST

PA

TT

ON

RD

WO

OD

DR

Pike

AV

E

ST

AV

E

AV

E

AV

E

RoundLake

RushLake

ST

AV

E

NW

NW

MUS

TA

NG

CIR

MUSTANG DR

NEW BRIGHTON

STATE

DRIVERS

EXAM

STATION

INDIAN OAKS

OAKS

INDIAN

CT

TR

AVE

CIR

EIDE

CIR

GA

LE

CIR

CRYSTAL

VALENTINE

CREST

JA

NET CIR

RD

AV

E

DR

CT

AMBLE RD

NURSERY

HIL

L

KARTHLAKE DR

AM

BLE

DR

LAKE

LAKE

SC

HU

TT

AR

D

LOIS

DR

VIEW

RD

FAIR

VIE

W

AVE

OAKWOOD

TERRACE

AL

DIN

ES

T

DR

DR

KNOLL DR

ST

RK

LE

XIN

GT

ON

AV

E

HA

MLIN

EA

VE

RICE

HA

MLIN

EA

VE

COUNTY

77

ARDEN HILLS

44

3

ValentineLake

ST

ST

KNIG

HTST

KarthLake

RD

RD

CO

RA

LS

EA

ST

WOOD

DR

BRONSON

AV

E

I

PINEWOOD

CIR

STLAKE

CT

AV

E

AS

BU

RY

A

ST

DRAR

O

NA ST

PA

SC

AL

DR

RT ST

SH

ELD

ON ST

OAKW OODTER

SN

EL

LIN

G

AV

E

CREEK

CR

EE

KR

D

VIL

LA

DR

CREEK

TR

CT

CT

45

AV

E

AV

E

AV

E

EM

ER

AL

DC

T

SP

RIN

GL

AK

E

ST

H-2

LA

KE COURT

DR

DSVIEW

NUM

DR

O

DR

OAKWO OD

DR

KN

OL

L

DR

CT

ST

ST

45

SunfishLake

22nd

TER

19th TERNW

16th 16th

TERTER

15th

14th

TER

13th TER

NW

DRCT

WO

OD

DU

CK

CT

BUCHER

ST

LHIL

LS

DR

E

N

VISTA

CT

BE

RR

Y

PARKSHORE DR

WEDGE

WOO

D

CIR

21st21st

RE

D

OA

K

AVE

W OAKS

CT

SI

LO

CT

DU

NL

AP

SILVH

OR

N

DR

CT

PL

35W

51

19th

OA

KR

ED

99

PR

OG

RA

MA

VE

DR

WO

OD

ALE

QUI

NC

YS

T

88

17th

25th

26th

19th

20th

18th

17th

16th

17th

23rd

21st

20th

19th

18th

26th

15th

26th

27th

28th

17th

29th

16th

8th

12th

13th ST

12th

AV

E

23rd

AV

E

22nd

AV

E

10th

11th

10th

9th

8th

7th

8th

4th

3rd

2nd

1st

10th

1st

14th

26th

18th

SU

NN

YSID

E

RED O

AK

CT

ST

LO

RR

AIN

EC

T

RID

GE

NW

14th

TER

CT

18

19

20

21

24

22 PARK VIEW DR

2223

25 SILVER VIEW DR

25

36 BRIARKNOLL CIR

36

3

OA

K

KN

OL

LW

OO

D

HILL

BR

UE

ST

ARD

A

ARDEN

DR

VIE

W

ARDEN

DR

NO

RM

A

5W

ROSEWOOD

CT

18 29th AVE

19 27th AVE

20 INNSBRUCK CT

ROSE

82

Diane

MISSISSIPPI

ST

CT

StonyL

NW

BEACHRD

INDIAN OAKS

CIR

N

N

61 WALDECK CROSSING

GL

ORIA

CIR

DR

WOO DCREST DR

MO

NT

CL

AIR

AV

E

CHESHIRE

BUCKINGHAM

CIR

AV

TERRACEDR

DR

ST

ST

6768

69

70

71

67

73

74

75

LOW

EL

LIN

GT

ON

70 TROY DR

72

74 ARDMORE AVE

76

AV

E

DICKENS

KINGWAY

SCOTLAND CT

T

FERN

WOOD

TREE DR

OA

K

LINDEN DR

ST

4 3

9 10

T30N R23W

T30N R23W

10 11

15 14

T30N R23W

16 15

21 22

T30N R23W

8 9

17 16

24 PARK VIEW TER

69 BURKER DR

75 STRATFORD AVE

16 BROOKSHIRE CT

AVE

CT

H

96

96

RN

FE

HILLS DR

RD

DR

AV

TA

NY

BRIT

68 CORNELL DR

76 WINDSOR WAY

62 BOHNHOF JUCTION

63 N OBERLIN CIR

64 S OBERLIN CIR

65 E OBERLIN CIR

Minnesota

Com

mercial

Railway

Co

EM L

L

AKESHORE

PL

COLLEEN

COLLEE

N

COLLEEN

CT

JA

MES

AV

E

DE

LL

WO

OD

ST

9th ST12th

AV

E

9th ST

EMERALD DR

VA

LE

NTIN

EC

T

AVELAMBERT

DR

ST

ST

SHERWOOD

PL

PLGRE ENFIELD

DR

SU

NN

YSID

E

RD

EW

LO

NG

VI

RO

BIN

EAST MAN

SUNNYSIDE

BRI

G

HTON

CEDAR DR

VE

A

93

94

BENT

BL

AC

K

AV

AV

AV

16 th TER

14th

AVE

NW

AV

E

17 th

ST

15th

AV

E

AV

E

PALMER

DR

RO

BIN

CT

ST

PALMER DR

STth13

BRIG

HTON

S

Q

27th

AV

E

32

nd

SE

RE

NDIPIT

Y

CT

WA

V

AL

NU

T

DI

ANE

AV

AV

ORIO

LE

AV

RA

IN

BO

W

L

RO

C

K

15th

AV

AV

16th

CLIFT

ON

DR

ESHIRECH

17th TER

TER

PASS

FO

R

EST

DA

LE

RD

DA

LE AVECT

DRWOODCR EST

W ICO RD

COUNTY RD G

50

50

PRIO

R

AV

PR

IO

R

CT

PRIO

RAVET

OD

D

LIS

AL

TO

DD

CIR

CIR

JOHNS

PINEWOOD

CE

AL

BE

TERR

ALBERT ST

WIL

LO

W

RD

VEWCRE

I

RID

GE

RIC

E

BU

FF

AL

O

WI

OW

RE

BIR

CH

WO

OD

ST

CH

UR

CHIL

L

OD FERNWO

ALROY

PA

RK

AVE

RESTCD

K

CRE

EK

SUNVIEW

ERT

CO

RO

LA

WN

V

DRPINEWOOD

Mc CLUNG

DR

DR

Lake

L

CHELSEA CT

BR

OO

KS

HIR

E

CTB

RO

OKS

HIR

E

AV

E

SPRINGCREEKDR

16

6th

AV

E

27

17

VE

A

16 KNIGHTS BRIDGE RD

26 QUEENS GATE

27 OLD TOWN DR

DR

CREEK

GREGOR Y

DR

DR

LO

NG

VIE

W

DR

NW

AV

E

ST7th

TH

OR

N

TER

MOUNDS

OL

VI

ET

ST

27th

AV

E

ST

PL

N W

12

CT

BLVD

GATEWAY

CT

16th

TER

COU NTY

13th

12th ST

18th

ST

AV

E

28th

LONG LAKE

TER

STONE

NW

8

SN

EL

LIN

GA

VE

OL

DH

WY

10

CIR

AM

BLE

KARTH

LA

KE

CIR PLEASANT

CIR

40

VALENTINELAKE

RD

BRON SON DR

BRONSON

DR

AV

E

OAKWOOD DR

RD I

RD

84th AVE

GR

EE

NFIE

LD

CIR

CO

UR

T

LA

KE

LAW

ND

OO

ED

GE

W

DR

CR

EE

K

PARK

DR

VIEW

WILDFLOWERCT

RI

DG

E

PRAIRI

E

DR

BLUESTEM

LEXINGT

DR

PO

ND

VIE

W

10

10

10

SE

Y

RIC

E

LIN

DS

EY

CT

TEN

PL

EA

SA

VIE

WN

T

VIE

W

PL

EA

SA

NT

VIE

W

CT

EA

SA

N

DR

TR

SBRUCKINN

S

CUMMINGS

RA

M

HID

DE

N

HO

LL

OW

CT

EP

ST

HE

N

LA

ND

MA

RK

CIR

GR

EE

NFIE

LD

GROBERG

ERIC

K

PI

WO

OD

NE

ST

NO

RM

AA

VE

LL

RK

BRIA

NO

PARK

DR

WYNCREST

NC

ST

WY

RE

RDILEPAK CT

G ROVE LAND

QUIN

CY

STCourt

Trailer

Trailer

Court

COUN TY

AD

AM

S

SPR ING VIEW

LONG VIEW

68

LNDTSUR A

ARDAN AVE

RD

DE

LL

VIE

W

VAL

AVE

ENINE

AV

E

EW

IV

RFAI

17 OLD STEINE CIR

T

GATEWAY

ALE

VI

PL

EA

SA

NT JEFF

ER

Y

OC

ON

NE

LL

DR

AV

E

OL

D

HIG

HW

AY

SPRIN

G

CT

RAVENS

WOOD

NS WOODVA

HAVEN

OOW

EIOMEAD

O

MEAD

WCT

W

AE

BUCHER V

LL

TS

AN

LE

AP

DR

ST10th

NO

RT

HW

ES

TP

KW

Y

CENTRALPARK BLVD

RING RD

I

ON

RO

XA

NW

AV

E

7th ST NW

SHERWO OD

AV

E

50

ROY

VI

EW

CT

DAWN CIR

FLORAL DR

CIR

JA

MES

CIR

77

Trailer

Court

ND

ON

DA

RY

76

76 10

Trailer

Court

35W

10

51

DR

CT

DR

9797 BANYAN ST

N

SN

EL

LIN

GA

VE

RO

UN

DR

D

W

LA

KE

694

26

NW

RD

RIN

G

13th

ST

77

2010 POP

12155

2010 POP

21456

2010 POP 9552

KEITHSON

DR

SCIENTIFIC

BOSTON

DR

IN

NO

VA

TIO

N

WA

Y

SHERWOOD

LN

LN

LN

LN

23 HODGES LN

LN

LN

67 SQUIRE LN

72 QUAKER LN

73 GLENHAVEN LN

17 BROOKSHIRE LN

LN

LN

LN

LN

21 VALLEY VIEW LN

LN

LN

LN

RAIN

BO

W

LN

BRIG

H

TO

N

LN

LNLN

LN

LN

LN

N

N

LN

LN

LN

LN

RO

BIN

LN

LN

LNLN

LN

LN

ROYAL LN

LN

LN

82nd LN NE

84th LN NE51

A VE86

MOUNDS VIEW

SHOREVIEW

1A

2014

amp

1140

10

FR

OM

10

6205-39

Co

py

To

For

SP

TH

AJ

SP

TH

AJ

SP

TH

AJ

PP

MS

Activit

y

PP

MS

Activit

y

PP

MS

Activit

y

TH

VICINIT

Y

OF

Pre

pare

d20

Scale

Hor 1 in

ch

=ft

May

17

100

DESIG

N

FIL

E

DA

TE

The align

me

nt and

grades sho

wn o

n

this

map are te

ntativ

e

and subject to change

wit

ho

ut notic

e

Staff

Appro

val

The traffic volu

mes sho

wn are

By

CO

PY

No

Date

Peter

Her

BW

T9

F15

PW

Docu

me

nts

Projects

DM

_R

OS

LA

YO

UT

HIS

TO

RY

DA

TE

Metro

District

Preli

min

ary

Desig

n

Engin

eer

Re

vie

we

d

By

Re

vie

we

d

By

Pro

gra

mm

ed

Lettin

g

Date July

27th 2018

Le

vel 1 L

AY

OU

T

AP

PR

OV

AL

20

20

20

20

20

Re

vie

we

d

By

Appro

ve

d

By

Appro

ve

d

By

State

Desig

n

Engin

eer

State

Ge

om

etric

s

Engin

eer

Re

vie

we

d

By

20

20

Metro

District

Engin

eer

Metro

District

Traffic

Engin

eer

Metro

District

Mainte

nance

Operatio

ns

Engin

eer

AN

D

TH

AT I A

M

A

DU

LY

LIC

EN

SE

D

PR

OF

ES

SIO

NA

L

EN

GIN

EE

R

UN

DE

R

TH

E

LA

WS

OF

TH

E

ST

AT

E

OF

MIN

NE

SO

TA

I H

ER

EB

Y

CE

RTIF

Y

TH

AT

THIS

LA

YO

UT

WA

S

PR

EP

AR

ED

BY

ME

OR

UN

DE

R

MY

DIR

EC

T

SU

PE

RVISIO

N

NA

ME

LIC

NO

0106205

039

Pre

desig

n

Lay

outs

P620539_cl1d

gn

TH 35

W to

TH 96

Rep

ort)

Co

ngestio

n

2

01

3

Syste

m

Free

way

(

Metro

politan

co

ngestio

n daily

of

h

ours

3

than

greater

in

results

an

d capacity

excee

ds

exit

for

de

man

d current

I-35

W

S

B off

exit

lane

o

ne

just

With

2

03

6

in

vehicles

4

23

9 of

projectio

nfuture

a

with

vehicles

3

60

6 ap

pro

xi

mately

is

seg

ment

sa

me

the

alo

ng

E

B 1

0

TH

for

v

ol

ume

h

our

peak

A

M

20

16

The

day

per

vehicles

5

20

00

ap

pro

xi

mately

is

9

6

CS

AH

an

d I-3

5W

bet

ween

1

0

TH

o

n

AD

T 2

01

5

The

mp

h

5

5 of

speed

p

osted

with

hig

hway

divided

lane

4

a

is

1

0

TH

9

6

C

SA

H an

d I-3

5W

Bet

ween

H

Road

Co

unty

at

la

ne

o

ne

with

exits

an

d

SB

I-3

5W

an

d 1

0

TH

of

ju

nctio

n the

to

in

co

min

g

la

nes

2

has

1

0

TH

EB

Metro

politan

Cities

T

win

the

in

metro

north

west

the

with

metro

so

utheast

the

co

nnects

that

road

arterial

major

a

is

1

0T

H

maintained

be

will

entrance

Brot

hers

Schere

at

lane

acceleratio

n an

d lane

turn

rig

ht

Existin

g

accesses

local

the

fro

m

EB

1

0

TH

enter

to

vehicles

for

lane

v

olu

me

lo

wer

a

pro

vide

will

lane

au

xiliary

the

an

d 3

5W

S

B alo

ng

co

ngestio

n red

uce

will

exit

2-lane

The

9

6

C

SA

H an

d 1

0

Road

Co

unty

bet

ween

lane

au

xiliary

an

ad

d

SB

I-3

5W

fro

m exit

E

B 1

0

TH

the

at

lane

seco

nd

a

ad

d

will

project

This

PROJECT LOCATION

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

860

870

880

890

900

910

920

BR NO 62058

EXISTING

SP 6284-172 (TH 35W MNPASS)

COLOR KEY

ROADWAY

EXISTING SIGNAL

CURB amp GUTTER RAISED MEDIAN

MEDIAN BARRIER

INPLACE RIGHT-OF-WAY

POND

PAVED SHOULDER

CONSTRUCTION LIMITS

SP 6284-172 (TH 35W MNPASS)

100

SCALE IN FEET

100

SCALE IN FEET

2015

Data and

Analy

sis

MN

DO

T

Offic

e

of

Transportatio

n

POSSIBLE NOISE WALL

POSSIBLE NOISE WALL

LA

YO

UT

amp

PR

OFIL

E

No

Add

EB

TH 10

Auxilliary

Lane fro

m

TH 35

W to

CS

AH 96

PROFILES - GTH10RAMP TH10RAMPALIGNMENT - TH10RAMPGPK - P39

UNDER CONSTRUCTIONSP 6284-162 (CR H ROUNDABOUTS)

Arde

n

Hills

amp

Mo

unds

Vie

w

for year

UNDER CONSTRUCTION

SP 6284-162 (CR H ROUNDABOUTS)

ON THE TH 10 EXIT RAMP FROM 35W WHERE THE STANDARD IS 50 MPH

3 41 MPH HORIZONTAL STOPPING SIGHT DISTANCE DUE TO THE BRIDGE RAIL

WHERE THE STANDARD IS 0025

2 A 004 CROSS SLOPE ON THE TH 10 AUXILIARY LANE

1 11 LANES ON TH 10 WHERE THE STANDARD IS 12

- THERE ARE THE FOLLOWING PROPOSED DESIGN EXCEPTIONS

- TH 10 IS AN OVERSIZED OVERWEIGHT CORRIDOR

- TH 10 FROM TH 35W TO TH 694 IS AN APPROVED HOUSE MOVING ROUTE

LAYOUT NOTES

ft

10

Vert 1 in

ch

=

CLOSED

-

Adva

nce

d t

he

La

yout a

nd

Pr

ofile

No t

o

1A

- I

nc

or

porate

d

GD

SU c

om

me

nts fr

om

April

26t

h

20

17 i

nt

o t

he la

yo

ut an

d

pr

ofile

- I

nc

or

porate

d

LA

C c

om

me

nts fr

om

April

13

20

17 i

nt

o t

he la

yo

ut a

nd pr

ofile

MA

Y

2017

582017

16 T

HR

U I

NP

12 T

HR

U I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

12 AUX LANE

6 SHLD INP

4 SHLD INP

18 INP

12 THRU

12 THRU

4 SHLD

4 SHLD

12 THRU

11 THRU

115 TAPER

12 THRU INP

11 THRU INP

4 SHLD INP 4 SHLD INP

12 THRU INP

11 THRU INP

11 AUX LANE

4 SHLD

11 AUX LANE11 AUX LANE

12 AUX L

ANE

18 INP

10 S

HL

D I

NP

115

AU

X I

NP

115

AU

X I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

12 THRU INP

12 THRU INP

730

735740745750755760765

770

775

780

785

12

THRU LANE SHLD

10

14

6-8

VAR VAR VAR

166

VAR

BRIDGE NO 62058

SHLD

6

SHLD

4

035 035035

035 035

THRU LANE

12

THRU LANE

12

THRU LANE

12

THRU LANE

1414

TH 10 EB

8 84 4

AUX LANE

12

AUX LANE

11 - 12 11 - 12

SHLD SHLD

VAR VAR VAR VAR VAR

12

1414

TH 10 EB

4

04 02 02 04

12

12

14

TH 10 EB

4

04 02 02 04

11

10

11

AUX LANE RT TURNACCEL LANE

12

04

1

12

14

TH 10 EB

4

04 02 02 04

11 11

AUX LANE

1

4

SHLD

04

WB-62

AASHTO 2011 (

US)(c) 2015 Transof

t Solutions Inc

All rights reserved

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

765 755

TH 10TH 10

TH 10 TH 10

S-BUS-36AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

S-

BU

S-

36

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

WB-

62

AAS

HTO 2011 (U

S)

(c) 2

015

Trans

oft S

olutio

n s I

n c A

ll r ig

ht s re

serve

d

WB-62AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reservedCR H

I-35W

CSAH 10

TH 10

CSA

H 96

Arden HillsRAMSEY COUNTY

RAMSEY COUNTY

RAMSEY COUNTY

New Brighton

10

MAINLINE

60 55

DESIGN

SPEED

POSTED

SPEED

50

DESIGN

SPEED

ROUND LAKE

BR NO 62057

BR NO 62732

BR NO 62058

BR NO 62072

BR NO 62071

CLOSED CLOSED

2015 HCAADT = 17002015 AADT = 52000

2015 HCAADT = 7400

2015 AADT = 102000

2014 A

ADT = 23100

2014 HCAADT = 7500

2014 AADT = 111000

2036 AMPM PEAK VOLUMES = 42393091

2016 AMPM PEAK VOLUMES = 36062770

OLD HWY 8

115

13 R

144 R

28 R

22918 R

881 R

875 R

3098 R

1348 R

115

12 X 300 RT TURN LN 12 X 671 ACCELRT TURN LN

66

TH 10 RAMP

TH 10 RAMP

13

3

8 3

10

025

REMOVE C amp G -

8 4

- TYPE F BARRIER

MIN242

2

NW RAMP CSAH 96

16 INP 4

2

405

410

2

- PROPOSED NOISEWALL

16

INP FRONTAGE RDINPINPINP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP

12

TH 10 RAMP

2865 R

4749ACE SUPPLY

4759MIDWAY SUPPLY

2151WASH

BIOCLEAN MOBILE

4889SKYLINE

2159BAUER WELDING

4703BIG TEN TAVERN

Mounds View

4797SCHEHER BROTHERS

THRU LANE THRU LANE SHLD

02 02 02 04

TH 35W SB

115 135

MnPASS LANE

115

THRU LANE

02

115

THRU LANESHLD

10 10

02502504

14

8

1149 R

MIN

NESO

TA

COM

MERCI

AL

RR

10 S

HL

D I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

115 T

HR

U I

NP

135

MNP

ASS I

NP

10 S

HL

D I

NP

115

115

10 S

HL

D16 T

HR

U I

NP

12 T

HR

U

10 S

HL

D

10 S

HL

D

D424 CampG

B424 CampG B424 CampG

B424 CampG

B424 CampG

B624 CampG

B424 CampG

SU-

30

AAS

HTO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

38 R44 R

9 R

42 R

5 R

1 R

22

18

DESIGN VEHICLES

S-BUS-36

SU-30

P

BIG TEN TAVERN

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

PAASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

SU-

30

AA

SH

TO 2011 (U

S)

(c) 2

015 T

ransof

t Solu

tions

Inc

All ri

ghts

reserv

ed

SU-30AASHTO 2011 (US)

(c) 2015 Transoft Solutions Inc All rights reserved

15

20

25

30

35

40

45

STA 24+20 - 28+12

STA 41+34 - 48+21

STA 404+22 - 408+73

115

THRU LANE

115 VAR

GORE

02

EXISTING (DIRECTION OF TRAFFIC)

STA 761+20 - 755+90 (DIRECTION OF TRAFFIC)

STA 751+57 - 745+27 (DIRECTION OF TRAFFIC)

SHLD

4

THRU LANE (INP)

12

THRU LANE (INP)

12

INTERIM SHLD (INP)

18

(INP)

SCHEHER BROTHERS

TH 10 I-35W

TH 10 RAMP

STA 550+23 - 559+45

32

SHLDINP INP THRU LANE INP THRU LANE

SHLDINP INP THRU LANE INP THRU LANE

SPRIN

G 2015

ELE 8817

PO

ND S

URF

ACE

40 45

91071

VPI

+2883

EL 90272

-202+111

42600 VC

K = 136

90597

VP

C

+1583

EL 90703

VP

T

+4183

EL 90509

60 MPH HSD

BE

GI

N

PR

OFI

L

ST

A 41

+3363

EN

D

PR

OFI

LE

ST 48

+2130

1348 R HORIZONTAL CURVE (RIGHT)

DIRECTION OF TRAVEL

  • ENM-email
  • ENM
    • 41515 Revsd ENM cover includes TMarkeson updated P6 table (2 pgs)
    • 41015 Cover email to ENM sent (Response Date 52215) EAW will go to consultant State funding
    • 41015 ENM sent (11 pgs)
      • Maps
        • Project Location Map
        • Project Layout
          • Project NotesCorrespondence
            • 42315 Project Summary from JeromeEmeka
            • 42315 Per Emeka No IAR No NEPA
            • 4215 ROW Email Possible ROW (Tony)
            • 4315 Cindy not in STIP not going in 2016-19 STIP
            • 4115 Table of Project Lanes from Tony
            • 32615 Email Jerome Is PM Is including 6284-172 on 10 w of 35W
            • 32615 Project Planning Report (2 pgs)
            • 32615 Project Assgmt Memo w link State funds Let 72216 Project on US 10 E of 35W Rush EAW
              • Untitled
                  1. SedgeMeadow

                    Oak -(Red Maple)Woodland

                    Dry Sand -Gravel Prairie

                    (Southern)

                    UnnamedStream

                    Unna

                    med

                    Strea

                    mUnnamedStream

                    UnnamedStream

                    Rice Creek

                    Unnamed (62017900)W

                    Pike (62006900)P

                    Round (62007000)P

                    Unnamed (62006600)W

                    Valentine (62007100)P

                    Sunfish (62006500)P

                    Rush (62006800)P

                    Karth (62007200)P

                    Farrels (62018400)WFarrels (62018400)W

                    Unnamed (62017200)W

                    Long (62006700)P

                    Unnamed (62017300)W

                    Unnamed (62021900)W

                    Polynesian (62018600)W

                    Unnamed (62018100)W

                    Unnamed (62017100)W Marsden (62005900)P

                    Marsden (62005900)P

                    Wood (62006000)W

                    Unnamed (62018000)W

                    Unnamed (62018300)WUnnamed (62018500)W

                    US10

                    US10

                    US810AUS810A

                    I694

                    I35W

                    I694

                    I35W

                    237

                    239

                    027

                    041

                    000

                    238

                    040

                    028

                    042

                    240

                    029

                    TH10 Rehabilitation (SP6205-39)

                    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                    y Public Access - Trailer Launch

                    Site of Biodiversity Significance - Moderate

                    DNR Native Plant Communities (wdescription)

                    sup30 025 050125 Miles

                    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                    leet1pet
                    Callout
                    project limits
                    leet1pet
                    Line

                      species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

                      a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

                      For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

                      The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

                      5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

                      listed species

                      a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

                      b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

                      listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

                      The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

                      Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

                      6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

                      httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

                      This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

                      SedgeMeadow

                      Oak -(Red Maple)Woodland

                      Dry Sand -Gravel Prairie

                      (Southern)

                      UnnamedStream

                      Unna

                      med

                      Strea

                      mUnnamedStream

                      UnnamedStream

                      Rice Creek

                      Unnamed (62017900)W

                      Pike (62006900)P

                      Round (62007000)P

                      Unnamed (62006600)W

                      Valentine (62007100)P

                      Sunfish (62006500)P

                      Rush (62006800)P

                      Karth (62007200)P

                      Farrels (62018400)WFarrels (62018400)W

                      Unnamed (62017200)W

                      Long (62006700)P

                      Unnamed (62017300)W

                      Unnamed (62021900)W

                      Polynesian (62018600)W

                      Unnamed (62018100)W

                      Unnamed (62017100)W Marsden (62005900)P

                      Marsden (62005900)P

                      Wood (62006000)W

                      Unnamed (62018000)W

                      Unnamed (62018300)WUnnamed (62018500)W

                      US10

                      US10

                      US810AUS810A

                      I694

                      I35W

                      I694

                      I35W

                      237

                      239

                      027

                      041

                      000

                      238

                      040

                      028

                      042

                      240

                      029

                      TH10 Rehabilitation (SP6205-39)

                      Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

                      y Public Access - Trailer Launch

                      Site of Biodiversity Significance - Moderate

                      DNR Native Plant Communities (wdescription)

                      sup30 025 050125 Miles

                      Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

                      leet1pet
                      Callout
                      project limits
                      leet1pet
                      Line

                      CAUTION

                      BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

                      IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

                      BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

                      IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

                      Environmental Review Fact Sheet Series

                      Endangered Threatened and Special Concern Species of Minnesota

                      Blandingrsquos Turtle (Emydoidea blandingii)

                      Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

                      HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

                      bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

                      It is illegal to possess this threatened species

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      2

                      RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

                      List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

                      GENERAL

                      A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

                      Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

                      Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

                      Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

                      If a Blandingrsquos turtle nests in your yard do not disturb the nest

                      If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

                      Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

                      Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

                      WETLANDS

                      Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

                      Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

                      Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

                      Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

                      ROADS

                      Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

                      Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

                      Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

                      Roads should be ditched not curbed or below grade

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      3

                      ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

                      Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

                      Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

                      Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

                      Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

                      Roads crossing streams should be bridged

                      UTILITIES

                      Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

                      Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

                      LANDSCAPING AND VEGETATION MANAGEMENT

                      Terrain should be left with as much natural contour as possible

                      As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

                      Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

                      Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

                      Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

                      Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

                      Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

                      Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

                      Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

                      Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

                      4

                      REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

                      Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

                      Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

                      Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

                      ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

                      Preventing Entanglement by Erosion Control Blanket

                      Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

                      Potential Problems Plastic netting remains a hazard long after other components have decomposed

                      Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

                      Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

                      Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

                      Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

                      Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

                      DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

                      Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

                      Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

                      The plastic mesh component of erosion control blanket becomes a net for entrapment

                      Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

                      Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

                      Herpetological Conservation and Biology 61-9

                      Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

                      Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

                      Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

                      Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

                      • Untitled

SedgeMeadow

Oak -(Red Maple)Woodland

Dry Sand -Gravel Prairie

(Southern)

UnnamedStream

Unna

med

Strea

mUnnamedStream

UnnamedStream

Rice Creek

Unnamed (62017900)W

Pike (62006900)P

Round (62007000)P

Unnamed (62006600)W

Valentine (62007100)P

Sunfish (62006500)P

Rush (62006800)P

Karth (62007200)P

Farrels (62018400)WFarrels (62018400)W

Unnamed (62017200)W

Long (62006700)P

Unnamed (62017300)W

Unnamed (62021900)W

Polynesian (62018600)W

Unnamed (62018100)W

Unnamed (62017100)W Marsden (62005900)P

Marsden (62005900)P

Wood (62006000)W

Unnamed (62018000)W

Unnamed (62018300)WUnnamed (62018500)W

US10

US10

US810AUS810A

I694

I35W

I694

I35W

237

239

027

041

000

238

040

028

042

240

029

TH10 Rehabilitation (SP6205-39)

Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

y Public Access - Trailer Launch

Site of Biodiversity Significance - Moderate

DNR Native Plant Communities (wdescription)

sup30 025 050125 Miles

Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

leet1pet
Callout
project limits
leet1pet
Line

    species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

    a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

    For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

    The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

    5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

    listed species

    a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

    b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

    listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

    The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

    Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

    6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

    httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

    This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

    SedgeMeadow

    Oak -(Red Maple)Woodland

    Dry Sand -Gravel Prairie

    (Southern)

    UnnamedStream

    Unna

    med

    Strea

    mUnnamedStream

    UnnamedStream

    Rice Creek

    Unnamed (62017900)W

    Pike (62006900)P

    Round (62007000)P

    Unnamed (62006600)W

    Valentine (62007100)P

    Sunfish (62006500)P

    Rush (62006800)P

    Karth (62007200)P

    Farrels (62018400)WFarrels (62018400)W

    Unnamed (62017200)W

    Long (62006700)P

    Unnamed (62017300)W

    Unnamed (62021900)W

    Polynesian (62018600)W

    Unnamed (62018100)W

    Unnamed (62017100)W Marsden (62005900)P

    Marsden (62005900)P

    Wood (62006000)W

    Unnamed (62018000)W

    Unnamed (62018300)WUnnamed (62018500)W

    US10

    US10

    US810AUS810A

    I694

    I35W

    I694

    I35W

    237

    239

    027

    041

    000

    238

    040

    028

    042

    240

    029

    TH10 Rehabilitation (SP6205-39)

    Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

    y Public Access - Trailer Launch

    Site of Biodiversity Significance - Moderate

    DNR Native Plant Communities (wdescription)

    sup30 025 050125 Miles

    Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

    leet1pet
    Callout
    project limits
    leet1pet
    Line

    CAUTION

    BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

    IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

    BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

    IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

    Environmental Review Fact Sheet Series

    Endangered Threatened and Special Concern Species of Minnesota

    Blandingrsquos Turtle (Emydoidea blandingii)

    Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

    HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

    bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

    It is illegal to possess this threatened species

    Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

    2

    RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

    List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

    GENERAL

    A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

    Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

    Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

    Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

    If a Blandingrsquos turtle nests in your yard do not disturb the nest

    If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

    Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

    Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

    WETLANDS

    Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

    Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

    Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

    Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

    ROADS

    Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

    Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

    Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

    Roads should be ditched not curbed or below grade

    Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

    3

    ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

    Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

    Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

    Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

    Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

    Roads crossing streams should be bridged

    UTILITIES

    Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

    Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

    LANDSCAPING AND VEGETATION MANAGEMENT

    Terrain should be left with as much natural contour as possible

    As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

    Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

    Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

    Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

    Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

    Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

    Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

    Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

    Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

    4

    REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

    Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

    Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

    Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

    ________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

    Preventing Entanglement by Erosion Control Blanket

    Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

    Potential Problems Plastic netting remains a hazard long after other components have decomposed

    Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

    Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

    Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

    Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

    Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

    DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

    Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

    Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

    The plastic mesh component of erosion control blanket becomes a net for entrapment

    Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

    Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

    Herpetological Conservation and Biology 61-9

    Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

    Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

    Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

    Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

    • Untitled

species (Endangered Threatened or Special Concern) and two types of native vegetation (Oak ndash (redmaple) Woodland and Dry Sand ndash Gravel Prairie) identified in this query In order to prevent theinadvertent release of the location of specific listed or rare species contained in the NHIS I have notidentified the species or their location on the attached lsquoDNRbasemappdfrsquo If these details are neededfor documentation please contact me Please note that the following rare features were identified inthe query and may be impacted by the proposed project Suggested avoidance andor protectionmeasures are also identified

a Blandingrsquos turtles (Emydoidea blandingii) a state-listed threatened species have been reportedfrom the vicinity of the proposed project and may be encountered on site If Blandingrsquos turtlesare found on the site please remember that state law and rules prohibit the destruction ofthreatened or endangered species except under certain prescribed conditions If turtles are inimminent danger they should be moved by hand out of harms way otherwise they should be leftundisturbed

For your information I have attached a Blandingrsquos turtle fact sheet that describes the habitat useand life history of this species The fact sheet also provides two lists of recommendations foravoiding and minimizing impacts to this rare turtle Please refer to the first list ofrecommendations for your project Please note the items for road design These include newcurb being a mountable design (Type D or Type S) in order to also allow animals to exit theroadway should they attempt to cross the road On culverts between wetlands and on streamsthey should be oversized (min 36rdquo) to allow them opportunity to utilize these structures for safepassage under the road If greater protection for turtles is desired the second list of additionalrecommendations can also be implemented The attached flyer should be given to all contractorsworking in the area Any use of Category 3 or 4 erosion control blanket shall be limited to lsquobio-nettingrsquo orlsquonaturalnettingrsquo types (category 3N or 4N) and specifically not allow plastic mesh netting Attached is a page that outlines the issue of entanglement This is from Chapter one in themanual rsquo Best Practices for Meeting GP 2004-0001rsquo athttpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml

The Natural Heritage Information System (NHIS) is not an exhaustive inventory and thus does notrepresent all of the occurrences of rare features within the state If information becomes availableindicating additional listed species or other rare features further review may be necessary

5 MnDOT projects should be coordinated with MnDOT Wildlife Ecologist Chris Smith regarding federally

listed species

a This project occurs in a county that USFWS identified as having rusty-patched bumble bees(Bombus affinis) a species recently listed as endangered under the federal Endangered SpeciesAct The rusty-patched bumble bee typically occurs in grasslands and urban gardens withflowering plants from April through October underground in abandoned rodent cavities or inclumps of grasses above ground as nesting sites and in undisturbed soils for hibernating queensduring the winter Where practicable reseed areas of disturbed soils with seed mixes containingnative species of grasses and forbs Please utilize the native recommendations developed byBWSR (httpwwwbwsrstatemnusnative_vegetation) or MnDOT in thelsquoVegetation Establishment Recommendationsrsquo(httpwwwdotstatemnusenvironmenterosionseedmixeshtml)

b The northern long-eared bat (Myotis septentrionalis) federally listed as threatened and state-

listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

SedgeMeadow

Oak -(Red Maple)Woodland

Dry Sand -Gravel Prairie

(Southern)

UnnamedStream

Unna

med

Strea

mUnnamedStream

UnnamedStream

Rice Creek

Unnamed (62017900)W

Pike (62006900)P

Round (62007000)P

Unnamed (62006600)W

Valentine (62007100)P

Sunfish (62006500)P

Rush (62006800)P

Karth (62007200)P

Farrels (62018400)WFarrels (62018400)W

Unnamed (62017200)W

Long (62006700)P

Unnamed (62017300)W

Unnamed (62021900)W

Polynesian (62018600)W

Unnamed (62018100)W

Unnamed (62017100)W Marsden (62005900)P

Marsden (62005900)P

Wood (62006000)W

Unnamed (62018000)W

Unnamed (62018300)WUnnamed (62018500)W

US10

US10

US810AUS810A

I694

I35W

I694

I35W

237

239

027

041

000

238

040

028

042

240

029

TH10 Rehabilitation (SP6205-39)

Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

y Public Access - Trailer Launch

Site of Biodiversity Significance - Moderate

DNR Native Plant Communities (wdescription)

sup30 025 050125 Miles

Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

leet1pet
Callout
project limits
leet1pet
Line

CAUTION

BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

Environmental Review Fact Sheet Series

Endangered Threatened and Special Concern Species of Minnesota

Blandingrsquos Turtle (Emydoidea blandingii)

Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

It is illegal to possess this threatened species

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

2

RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

GENERAL

A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

If a Blandingrsquos turtle nests in your yard do not disturb the nest

If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

WETLANDS

Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

ROADS

Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

Roads should be ditched not curbed or below grade

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

Preventing Entanglement by Erosion Control Blanket

Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

Potential Problems Plastic netting remains a hazard long after other components have decomposed

Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

The plastic mesh component of erosion control blanket becomes a net for entrapment

Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

Herpetological Conservation and Biology 61-9

Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

  • Untitled

listed as special concern can be found throughout Minnesota During the winter this specieshibernates in caves and mines and during the active season (approximately April-October) itroosts underneath bark in cavities or in crevices of both live and dead trees Pup rearing isduring June and July Activities that may impact this species include but are not limited to anydisturbance to hibernacula and destructiondegradation of habitat (including tree removal)

The US Fish and Wildlife Service (USFWS) has published a final 4(d) rule that identifiesprohibited take To determine whether you need to contact the USFWS please refer to theUSFWS Key to the Northern Long-Eared Bat 4(d) Rule (see links below) Please note that theNHIS does not contain any known occurrences of northern long-eared bat roosts or hibernaculawithin an approximate one-mile radius of the proposed project

Links USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Non-Federal Activities httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBhtml USFWS Key to the Northern Long-Eared Bat 4(d) Rule for Federal Actions httpwwwfwsgovmidwestendangeredmammalsnlebKeyFinal4dNLEBFedProjectshtml USFWS Northern Long-eared Bat Website httpwwwfwsgovmidwestendangeredmammalsnlebindexhtml USFWS Northern Long-eared Bat Fact Sheet httpwwwfwsgovmidwestendangeredmammalsnlebnlebFactSheethtml

6 Round Lake is a Unit of the Minnesota Valley National Wildlife Refuge

httpwwwfwsgovrefugesprofilesindexcfmid=32590 Contact the USFWS should work beproposed that could impact this area Typically the concern when working adjacent to these areas isthat invasive species not be introduced with any fill or seed mixes If there is soil disturbance the thisarea revegetate disturbed soils with native species suitable to the local habitat For recommended seedmixes see the MnDOT turf establishment recommendations dated November 13 2015httpwwwdotstatemnusenvironmenterosionseedmixeshtml

This ENM has not been circulated to DNR field staff for comment I will let you know if any additional commentson design requirements are returned to me due to this email DNR folks if Irsquove missed anything or have any suggestions for MnDOT to consider please respond ASAP toBrigid and myself Contact me if you have questions Peter LeeteTransportation Hydrologist (DNR-MnDOT Liaison) | Division of Ecological amp Water ResourcesMinnesota Department of Natural ResourcesOffice location MnDOT Office of Environmental Stewardship395 John Ireland Blvd MS 620St Paul MN 55155Phone 651-366-3634Email peterleetestatemnus

SedgeMeadow

Oak -(Red Maple)Woodland

Dry Sand -Gravel Prairie

(Southern)

UnnamedStream

Unna

med

Strea

mUnnamedStream

UnnamedStream

Rice Creek

Unnamed (62017900)W

Pike (62006900)P

Round (62007000)P

Unnamed (62006600)W

Valentine (62007100)P

Sunfish (62006500)P

Rush (62006800)P

Karth (62007200)P

Farrels (62018400)WFarrels (62018400)W

Unnamed (62017200)W

Long (62006700)P

Unnamed (62017300)W

Unnamed (62021900)W

Polynesian (62018600)W

Unnamed (62018100)W

Unnamed (62017100)W Marsden (62005900)P

Marsden (62005900)P

Wood (62006000)W

Unnamed (62018000)W

Unnamed (62018300)WUnnamed (62018500)W

US10

US10

US810AUS810A

I694

I35W

I694

I35W

237

239

027

041

000

238

040

028

042

240

029

TH10 Rehabilitation (SP6205-39)

Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

y Public Access - Trailer Launch

Site of Biodiversity Significance - Moderate

DNR Native Plant Communities (wdescription)

sup30 025 050125 Miles

Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

leet1pet
Callout
project limits
leet1pet
Line

CAUTION

BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

Environmental Review Fact Sheet Series

Endangered Threatened and Special Concern Species of Minnesota

Blandingrsquos Turtle (Emydoidea blandingii)

Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

It is illegal to possess this threatened species

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

2

RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

GENERAL

A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

If a Blandingrsquos turtle nests in your yard do not disturb the nest

If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

WETLANDS

Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

ROADS

Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

Roads should be ditched not curbed or below grade

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

Preventing Entanglement by Erosion Control Blanket

Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

Potential Problems Plastic netting remains a hazard long after other components have decomposed

Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

The plastic mesh component of erosion control blanket becomes a net for entrapment

Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

Herpetological Conservation and Biology 61-9

Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

  • Untitled

SedgeMeadow

Oak -(Red Maple)Woodland

Dry Sand -Gravel Prairie

(Southern)

UnnamedStream

Unna

med

Strea

mUnnamedStream

UnnamedStream

Rice Creek

Unnamed (62017900)W

Pike (62006900)P

Round (62007000)P

Unnamed (62006600)W

Valentine (62007100)P

Sunfish (62006500)P

Rush (62006800)P

Karth (62007200)P

Farrels (62018400)WFarrels (62018400)W

Unnamed (62017200)W

Long (62006700)P

Unnamed (62017300)W

Unnamed (62021900)W

Polynesian (62018600)W

Unnamed (62018100)W

Unnamed (62017100)W Marsden (62005900)P

Marsden (62005900)P

Wood (62006000)W

Unnamed (62018000)W

Unnamed (62018300)WUnnamed (62018500)W

US10

US10

US810AUS810A

I694

I35W

I694

I35W

237

239

027

041

000

238

040

028

042

240

029

TH10 Rehabilitation (SP6205-39)

Designated Infested (Aquatic Invasive Species - AIS)National Wildlife RefugesPublic Water WatercoursePublic DitchAltered Natural WatercoursePublic Waters Basins

y Public Access - Trailer Launch

Site of Biodiversity Significance - Moderate

DNR Native Plant Communities (wdescription)

sup30 025 050125 Miles

Date 7272017Peter Leete Transportation Hydrologist (MnDNR-MnDOT Liaison)

leet1pet
Callout
project limits
leet1pet
Line

CAUTION

BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

Environmental Review Fact Sheet Series

Endangered Threatened and Special Concern Species of Minnesota

Blandingrsquos Turtle (Emydoidea blandingii)

Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

It is illegal to possess this threatened species

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

2

RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

GENERAL

A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

If a Blandingrsquos turtle nests in your yard do not disturb the nest

If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

WETLANDS

Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

ROADS

Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

Roads should be ditched not curbed or below grade

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

Preventing Entanglement by Erosion Control Blanket

Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

Potential Problems Plastic netting remains a hazard long after other components have decomposed

Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

The plastic mesh component of erosion control blanket becomes a net for entrapment

Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

Herpetological Conservation and Biology 61-9

Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

  • Untitled

CAUTION

BLANDINGrsquoS TURTLES MAY BE ENCOUNTERED

IN THIS AREA The unique and rare Blandingrsquos turtle has been found in this area Blandingrsquos turtles are state-listed as Threatened and are protected under Minnesota Statute 84095 Protection of Threatened and Endangered Species Please be careful of turtles on roads and in construction sites For additional information on turtles or to report a Blandingrsquos turtle sighting contact the DNR Nongame Specialist nearest you Bemidji (218-308-2641) Grand Rapids (218-327-4518) New Ulm (507-359-6033) Rochester (507-280-5070) or St Paul (651-259-5764) DESCRIPTION The Blandingrsquos turtle is a medium to large turtle (5 to 10 inches) with a black or dark blue dome-shaped shell with muted yellow spots and bars The bottom of the shell is hinged across the front third enabling the turtle to pull the front edge of the lower shell firmly against the top shell to provide additional protection when threatened The head legs and tail are dark brown or blue-gray with small dots of light brown or yellow A distinctive field mark is the bright yellow chin and neck

BLANDINGrsquoS TURTLES DO NOT MAKE GOOD PETS

IT IS ILLEGAL TO KEEP THIS THREATENED SPECIES IN CAPTIVITY

Environmental Review Fact Sheet Series

Endangered Threatened and Special Concern Species of Minnesota

Blandingrsquos Turtle (Emydoidea blandingii)

Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

It is illegal to possess this threatened species

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

2

RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

GENERAL

A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

If a Blandingrsquos turtle nests in your yard do not disturb the nest

If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

WETLANDS

Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

ROADS

Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

Roads should be ditched not curbed or below grade

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

Preventing Entanglement by Erosion Control Blanket

Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

Potential Problems Plastic netting remains a hazard long after other components have decomposed

Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

The plastic mesh component of erosion control blanket becomes a net for entrapment

Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

Herpetological Conservation and Biology 61-9

Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

  • Untitled

Environmental Review Fact Sheet Series

Endangered Threatened and Special Concern Species of Minnesota

Blandingrsquos Turtle (Emydoidea blandingii)

Minnesota Status Threatened State Rank1 S2 Federal Status none Global Rank1 G4

HABITAT USE Blandingrsquos turtles need both wetland and upland habitats to complete their life cycle The types of wetlands used include ponds marshes shrub swamps bogs and ditches and streams with slow-moving water In Minnesota Blandingrsquos turtles are primarily marsh and pond inhabitants Calm shallow water bodies (Type 1-3 wetlands) with mud bottoms and abundant aquatic vegetation (eg cattails water lilies) are preferred and extensive marshes bordering rivers provide excellent habitat Small temporary wetlands (those that dry up in the late summer or fall) are frequently used in spring and summer -- these fishless pools are amphibian and invertebrate breeding habitat which provides an important food source for Blandingrsquos turtles Also the warmer water of these shallower areas probably aids in the development of eggs within the female turtle Nesting occurs in open (grassy or brushy) sandy uplands often some distance from water bodies Frequently nesting occurs in traditional nesting grounds on undeveloped land Blandingrsquos turtles have also been known to nest successfully on residential property (especially in low density housing situations) and to utilize disturbed areas such as farm fields gardens under power lines and road shoulders (especially of dirt roads) Although Blandingrsquos turtles may travel through woodlots during their seasonal movements shady areas (including forests and lawns with shade trees) are not used for nesting Wetlands with deeper water are needed in times of drought and during the winter Blandingrsquos turtles overwinter in the muddy bottoms of deeper marshes and ponds or other water bodies where they are protected from freezing LIFE HISTORY Individuals emerge from overwintering and begin basking in late March or early April on warm sunny days The increase in body temperature which occurs during basking is necessary for egg development within the female turtle Nesting in Minnesota typically occurs during June and females are most active in late afternoon and at dusk Nesting can occur as much as a mile from wetlands The nest is dug by the female in an open sandy area and 6-15 eggs are laid The female turtle returns to the marsh within 24 hours of laying eggs After a development period of approximately two months hatchlings leave the nest from mid-August through early-October Nesting females and hatchlings are often at risk of being killed while crossing roads between wetlands and nesting areas In addition to movements associated with nesting all ages and both sexes move between wetlands from April through November These movements peak in June and July and again in September and October as turtles move to and from overwintering sites In late autumn (typically November) Blandingrsquos turtles bury themselves in the substrate (the mud at the bottom) of deeper wetlands to overwinter IMPACTS THREATS CAUSES OF DECLINE

bull loss of wetland habitat through drainage or flooding (converting wetlands into ponds or lakes) bull loss of upland habitat through development or conversion to agriculture bull human disturbance including collection for the pet trade and road kills during seasonal movements bull increase in predator populations (skunks raccoons etc) which prey on nests and young

It is illegal to possess this threatened species

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

2

RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

GENERAL

A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

If a Blandingrsquos turtle nests in your yard do not disturb the nest

If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

WETLANDS

Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

ROADS

Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

Roads should be ditched not curbed or below grade

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

Preventing Entanglement by Erosion Control Blanket

Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

Potential Problems Plastic netting remains a hazard long after other components have decomposed

Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

The plastic mesh component of erosion control blanket becomes a net for entrapment

Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

Herpetological Conservation and Biology 61-9

Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

  • Untitled

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

2

RECOMMENDATIONS FOR AVOIDING AND MINIMIZING IMPACTS These recommendations apply to typical construction projects and general land use within Blandingrsquos turtle habitat and are provided to help local governments developers contractors and homeowners minimize or avoid detrimental impacts to Blandingrsquos turtle populations List 1 describes minimum measures which we recommend to prevent harm to Blandingrsquos turtles during construction or other work within Blandingrsquos turtle habitat List 2 contains recommendations which offer even greater protection for Blandingrsquos turtles populations this list should be used in addition to the first list in areas which are known to be of state-wide importance to Blandingrsquos turtles (contact the DNRrsquos Natural Heritage and Nongame Research Program if you wish to determine if your project or home is in one of these areas) or in any other area where greater protection for Blandingrsquos turtles is desired List 1 Recommendations for all areas inhabited by Blandingrsquos turtles

List 2 Additional recommendations for areas known to be of state-wide importance to Blandingrsquos turtles

GENERAL

A flyer with an illustration of a Blandingrsquos turtle should be given to all contractors working in the area Homeowners should also be informed of the presence of Blandingrsquos turtles in the area

Turtle crossing signs can be installed adjacent to road-crossing areas used by Blandingrsquos turtles to increase public awareness and reduce road kills

Turtles which are in imminent danger should be moved by hand out of harms way Turtles which are not in imminent danger should be left undisturbed

Workers in the area should be aware that Blandingrsquos turtles nest in June generally after 4pm and should be advised to minimize disturbance if turtles are seen

If a Blandingrsquos turtle nests in your yard do not disturb the nest

If you would like to provide more protection for a Blandingrsquos turtle nest on your property see ldquoProtecting Blandingrsquos Turtle Nestsrdquo on page 3 of this fact sheet

Silt fencing should be set up to keep turtles out of construction areas It is critical that silt fencing be removed after the area has been revegetated

Construction in potential nesting areas should be limited to the period between September 15 and June 1 (this is the time when activity of adults and hatchlings in upland areas is at a minimum)

WETLANDS

Small vegetated temporary wetlands (Types 2 amp 3) should not be dredged deepened filled or converted to storm water retention basins (these wetlands provide important habitat during spring and summer)

Shallow portions of wetlands should not be disturbed during prime basking time (mid morning to mid- afternoon in May and June) A wide buffer should be left along the shore to minimize human activity near wetlands (basking Blandingrsquos turtles are more easily disturbed than other turtle species)

Wetlands should be protected from pollution use of fertilizers and pesticides should be avoided and run-off from lawns and streets should be controlled Erosion should be prevented to keep sediment from reaching wetlands and lakes

Wetlands should be protected from road lawn and other chemical run-off by a vegetated buffer strip at least 50 wide This area should be left unmowed and in a natural condition

ROADS

Roads should be kept to minimum standards on widths and lanes (this reduces road kills by slowing traffic and reducing the distance turtles need to cross)

Tunnels should be considered in areas with concentrations of turtle crossings (more than 10 turtles per year per 100 meters of road) and in areas of lower density if the level of road use would make a safe crossing impossible for turtles Contact your DNR Regional Nongame Specialist for further information on wildlife tunnels

Roads should be ditched not curbed or below grade If curbs must be used 4 inch high curbs at a 31 slope are preferred (Blandingrsquos turtles have great difficulty climbing traditional curbs curbs and below grade roads trap turtles on the road and can cause road kills)

Roads should be ditched not curbed or below grade

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

Preventing Entanglement by Erosion Control Blanket

Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

Potential Problems Plastic netting remains a hazard long after other components have decomposed

Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

The plastic mesh component of erosion control blanket becomes a net for entrapment

Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

Herpetological Conservation and Biology 61-9

Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

  • Untitled

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

3

ROADS cont Culverts between wetland areas or between wetland areas and nesting areas should be 36 inches or greater in diameter and elliptical or flat-bottomed

Road placement should avoid separating wetlands from adjacent upland nesting sites or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details)

Wetland crossings should be bridged or include raised roadways with culverts which are 36 in or greater in diameter and flat-bottomed or elliptical (raised roadways discourage turtles from leaving the wetland to bask on roads)

Road placement should avoid bisecting wetlands or these roads should be fenced to prevent turtles from attempting to cross them (contact your DNR Nongame Specialist for details) This is especially important for roads with more than 2 lanes

Culverts under roads crossing streams should be oversized (at least twice as wide as the normal width of open water) and flat-bottomed or elliptical

Roads crossing streams should be bridged

UTILITIES

Utility access and maintenance roads should be kept to a minimum (this reduces road-kill potential)

Because trenches can trap turtles trenches should be checked for turtles prior to being backfilled and the sites should be returned to original grade

LANDSCAPING AND VEGETATION MANAGEMENT

Terrain should be left with as much natural contour as possible

As much natural landscape as possible should be preserved (installation of sod or wood chips paving and planting of trees within nesting habitat can make that habitat unusable to nesting Blandingrsquos turtles)

Graded areas should be revegetated with native grasses and forbs (some non-natives form dense patches through which it is difficult for turtles to travel)

Open space should include some areas at higher elevations for nesting These areas should be retained in native vegetation and should be connected to wetlands by a wide corridor of native vegetation

Vegetation management in infrequently mowed areas -- such as in ditches along utility access roads and under power lines -- should be done mechanically (chemicals should not be used) Work should occur fall through spring (after October 1st and before June 1st )

Ditches and utility access roads should not be mowed or managed through use of chemicals If vegetation management is required it should be done mechanically as infrequently as possible and fall through spring (mowing can kill turtles present during mowing and makes it easier for predators to locate turtles crossing roads)

Protecting Blandingrsquos Turtle Nests Most predation on turtle nests occurs within 48 hours after the eggs are laid After this time the scent is gone from the nest and it is more difficult for predators to locate the nest Nests more than a week old probably do not need additional protection unless they are in a particularly vulnerable spot such as a yard where pets may disturb the nest Turtle nests can be protected from predators and other disturbance by covering them with a piece of wire fencing (such as chicken wire) secured to the ground with stakes or rocks The piece of fencing should measure at least 2 ft x 2 ft and should be of medium sized mesh (openings should be about 2 in x 2 in) It is very important that the fencing be removed before August 1st so the young turtles can escape from the nest when they hatch REFERENCES 1Association for Biodiversity Information ldquoHeritage Status Global National and Subnational Conservation

Status Ranksrdquo NatureServe Version 13 (9 April 2001) httpwwwnatureserveorgrankinghtm (15 April 2001)

Coffin B and L Pfannmuller 1988 Minnesotarsquos Endangered Flora and Fauna University of Minnesota Press Minneapolis 473 pp

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

Preventing Entanglement by Erosion Control Blanket

Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

Potential Problems Plastic netting remains a hazard long after other components have decomposed

Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

The plastic mesh component of erosion control blanket becomes a net for entrapment

Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

Herpetological Conservation and Biology 61-9

Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

  • Untitled

Minnesota DNR Division of Ecological Resources Environmental Review Fact Sheet Series Blandingrsquos Turtle

4

REFERENCES (cont) Moriarty J J and M Linck 1994 Suggested guidelines for projects occurring in Blandingrsquos turtle habitat

Unpublished report to the Minnesota DNR 8 pp Oldfield B and J J Moriarty 1994 Amphibians and Reptiles Native to Minnesota University of Minnesota

Press Minneapolis 237 pp Sajwaj T D and J W Lang 2000 Thermal ecology of Blandingrsquos turtle in central Minnesota Chelonian

Conservation and Biology 3(4)626-636 Compiled by the Minnesota Department of Natural Resources Division of Ecological Resources Updated March 2008 Endangered Species Environmental Review Coordinator 500 Lafayette Rd Box 25 St Paul MN 55155 651-259-5109

________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

Preventing Entanglement by Erosion Control Blanket

Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

Potential Problems Plastic netting remains a hazard long after other components have decomposed

Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

The plastic mesh component of erosion control blanket becomes a net for entrapment

Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

Herpetological Conservation and Biology 61-9

Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

  • Untitled

________________________________________________________________________________________________________________________________________________ (httpwwwdnrstatemnuswaterswatermgmt_sectionpwpermitsgp_2004_0001_manualhtml) Best Practices for Meeting DNR GP 2004-0001 (version 4 October 2014) Chapter 1 Page 25

Preventing Entanglement by Erosion Control Blanket

Plastic mesh netting is a common component in erosion control blanket It is utilized to hold loose fibrous materials in place (EG straw) until vegetation is established Erosion control blanket is being utilized extensively and is effective for reducing soil erosion benefitting both soil health and water quality Unfortunately there is a negative aspect of the plastic mesh component It is increasingly being documented that its interaction with reptiles and amphibians can be fatal (Barton and Kinkead 2005 Kapfer and Paloski 2011) Mowing machinery is also susceptible to damage due to the long lasting plastic mesh

Potential Problems Plastic netting remains a hazard long after other components have decomposed

Plastic mesh netting can result in entanglement and death of a variety of small animals The most vulnerable group of animals are the reptiles and amphibians (snakes frogs toads salamanders turtles) Ducklings small mammals and fish have also been observed entangled in the netting

Road maintenance machinery can snag the plastic mesh and pull up long lengths into machinery thus binding up machinery and causing damage andor loss of time cleaning it out

Suggested Alternatives Do not use in known locations of reptiles or amphibians that are listed as Threatened or Endangered species

Limit use of blanket containing welded plastic mesh to areas away from where reptiles or amphibians are likely (near wetlands lakes watercourses or rock outcrops) or habitat transition zones (prairie ndash woodland edges rocky outcrop ndash woodland edges steep rocky slopes etc)

Select products with biodegradable netting (preferably made from natural fibers though varieties of biodegradable polyesters also exist on the market) Biodegradable products will degrade under a variety of moisture and light conditions

DO NOT use products that require UV-light to degrade (also called ldquophotodegradablerdquo) as they do not degrade properly when shaded by vegetation

Solution Most categories of erosion control blanket and sediment control logs are available in natural net options Specify lsquoNatural Nettingrsquo for rolled erosion control products per MnDOT Spec 3885 See Table 3885-1

Specify lsquoNatural Nettingrsquo for sediment control logs per MnDOT Spec 3897

The plastic mesh component of erosion control blanket becomes a net for entrapment

Literature Referenced Barton C and K Kinkead 2005 Do erosion control and snakes mesh Soil and Water Conservation Society 6033A-35A

Kapfer JM and RA Paloski 2011 On the threat to snakes of mesh deployed for erosion control and wildlife exclusion

Herpetological Conservation and Biology 61-9

Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

  • Untitled

Office of Environmental Stewardship Office Tel (651) 366-4291 Mail Stop 620 Fax (651) 366-3603 395 John Ireland Boulevard St Paul MN 55155-1899

Jerome Adams MnDOT Metro District 1500 W Co Rd B2 Roseville MN 55113 July 14 2017 Re SP 6205-39 TH 10 Lane Construction Arden Hills Ramsey County Dear Mr Adams We have reviewed the above-referenced undertaking pursuant to our FHWA-delegated responsibilities for compliance with Section 106 of the National Historic Preservation Act as amended (36 CFR 800) and as per the terms of the applicable Programmatic Agreements between the FHWA and the Minnesota State Historic Preservation Office (SHPO) The Section 106 review fulfills MnDOTrsquos responsibilities under the Minnesota Historic Sites Act (MS 138665-666) the Field Archaeology Act of Minnesota (MS 13840) and the Private Cemeteries Act (MS 30708 Subd 9 and 10) This project will construct a two-lane exit from southbound I-35W onto eastbound TH 10 by adding a second exit lane left of the existing exit lane An auxiliary lane will be constructed on TH 10 from the CR 10 entrance ramp to the exit onto CR 96 in Arden Hills The project will additionally include the construction of a pond southwest of US 10 and east of I-35W where they intersect The pond will remove five to eight spot trees Noise walls may also be installed

Based on our existing programmatic agreements with various tribal groups we sent a consultation letter to the following tribes Fort Peck Tribes Lower Sioux Indian Community Santee Sioux Nation Sisseton-Wahpeton Oyate Community Turtle Mountain Band of Chippewa and Upper Sioux Community We did not receive any response within the allotted time The area of potential effects (APE) for direct effects of the project consists of the proposed construction limits There are no known archaeological sites in the APE Much of the APE has been disturbed by previous roadway construction The APE has low potential for containing unidentified significant archaeological resources The APE for indirect effects of the project consist of properties adjacent to the proposed project There are no eligible or potentially- eligible buildings or structures in the APE The finding of this office is that there will be no historic properties affected by the project as currently proposed If the project scope changes please provide our office with the revised information and we will conduct an additional review Sincerely

Reneacutee Hutter Barnes Historian Cultural Resources Unit reneebarnesstatemnus cc MnDOT CRU Project File Brigid Gombold MnDOT Metro District

  • Untitled