appendix c: examination library... · appendix c: examination library this examination library...

43
Report to the Secretary of State C1 NWWFC APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists each document that was submitted to the examination by any party and documents that were issued by the Planning Inspectorate. All documents listed are published on the National Infrastructure’s Planning website and a hyperlink is provided for each document. A reference is given to each document; these references are used within the Report on the Implications for European Sites and in the Examining Authority’s (ExA) Recommendation Report. The documents within the library are categorised either by document type or by the deadline at which they were submitted. Please note the following: Advice under section 51 of the Planning Act 2008 (as amended) (PA2008) that has been issued by the Inspectorate, is published to the National Infrastructure Website but is not included within the Examination Library as such advice is not an examination document. This document contains references to documents from the point the application was submitted. The order of documents within each sub-section is either chronological, numerical, or alphabetical and confers no priority or higher status on those that have been listed first.

Upload: others

Post on 25-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C1 NWWFC

APPENDIX C: EXAMINATION LIBRARY

This Examination Library relates to the North Wales Wind Farms Connection

(NWWFC) application. The library lists each document that was submitted to the

examination by any party and documents that were issued by the Planning

Inspectorate.

All documents listed are published on the National Infrastructure’s Planning

website and a hyperlink is provided for each document.

A reference is given to each document; these references are used within the

Report on the Implications for European Sites and in the Examining Authority’s

(ExA) Recommendation Report. The documents within the library are

categorised either by document type or by the deadline at which they were

submitted.

Please note the following:

Advice under section 51 of the Planning Act 2008 (as amended) (PA2008)

that has been issued by the Inspectorate, is published to the National

Infrastructure Website but is not included within the Examination Library

as such advice is not an examination document.

This document contains references to documents from the point the

application was submitted.

The order of documents within each sub-section is either chronological,

numerical, or alphabetical and confers no priority or higher status on

those that have been listed first.

Page 2: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C2 NWWFC

EN020014 – North Wales Wind Farms Connection

Examination Library – Index

Category

Reference

Application Documents

As submitted and amended version received before the Preliminary Meeting (PM). Any amended version

received during the Examination stage was saved under the Deadline when it was received

APP-xxx

Post-submission Changes

Includes responses to section 55 PA2008 checklist

APP-xxx

Option B Submission

OpB-xxx

Adequacy of Consultation Responses

AoC-xxx

Relevant Representations

RR-xxx

Procedural Decisions and Notifications from the Examining Authority

Includes Examining Authority’s questions, s55, and post-acceptance s51

PD-xxx

Local Impact Reports

LIR-xxx

Additional Submissions

Includes documents accepted at the PM and correspondence that is either relevant to a procedural

decision or contains factual information pertaining to the examination

AS-xxx

Events and Hearings

Includes agendas for hearings and site inspections, audio recordings, responses to notifications,

applicant’s hearing notices, and responses to Rule 6 and Rule 8 letters

EV-xxx

Representations – by Deadline

Deadline 1

Deadline for receipt of:

Comments on relevant representations (RRs)

REP1-xxx

Page 3: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C3 NWWFC

Written representations (WRs) by all interested parties

Local Impact Reports (LIRs) from any local authorities

Statements of Common Ground requested by the ExA

Responses to ExA’s first written questions

Comments by interested parties in respect of the July 2015 submissions by the applicant in response to the section 55 PA2008 Checklist.

Notification of wish to make oral representations at the issue specific hearings

Notification of wish to speak at an open floor

hearing

Notification of wish to speak at a compulsory acquisition hearing

Notification of wish to attend the accompanied site inspection, suggested locations and justifications

Notification by statutory parties of wish to be considered an interested party

Deadline 2

Deadline for receipt by the ExA of:

Comments on WRs

Comments on LIRs

Comments on responses to ExA’s first written

questions

Revised draft Development Consent Order (DCO)

from applicant

Schedule of mitigation from the applicant

REP2-xxx

Deadline 3

Deadline for receipt by the ExA of: Post-hearing documents

Applicant’s revised draft DCO Any further information requested by the ExA

REP3-xxx

Deadline 4

Deadline for receipt by the ExA of: Further post-hearing documents

Comments on post-hearing documents

REP4-xxx

Deadline 5

Deadline for receipt by the ExA of: Comments on Option B Comments on the proposed provision for the

REP5-xxx

Page 4: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C4 NWWFC

compulsory acquisition of additional land

Comments on further post-hearing documents

Deadline 6

Deadline for receipt by the ExA of: Responses to ExA’s Second Written Questions

REP6-xxx

Deadline 7

Deadline for receipt by the ExA of: Comments on responses to ExA’s Second Written

Questions

Notification of wish to make oral representations at

December hearings

REP7-xxx

Deadline 8

Deadline for receipt by the ExA of:

Written representations regarding the proposed

provision for the compulsory acquisition of rights

over additional land

REP8-xxx

Deadline 9 Deadline for receipt by the ExA of:

Post-hearing documents

Revised draft DCO from applicant

Comments on written representations regarding

the proposed provision for the compulsory

acquisition of additional land

Any further information requested by the ExA

REP9-xxx

Deadline 10

Deadline for receipt by the ExA of: Comments on ExA’s proposed revisions to the draft

DCO and Report on the Implications for European

Sites (RIES) Comments on post-hearing documents

Any further information requested by the ExA

REP10-xxx

Deadline 11 Deadline for receipt by the ExA of:

Responses to comments on ExA’s proposed revisions to the draft DCO and RIES

Comments on any further information requested by

REP11-xxx

Page 5: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C5 NWWFC

the ExA

Other Documents

Includes sections 127/131/138 information, applicant’s hearing notices, section 56, section 58 and section 59

certificates, and transboundary documents

OD-xxx

Page 6: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C6 NWWFC

EN020014 – North Wales Wind Farms Connection Examination Library

Application Documents

APP-001 1.1 Application Letter including s55 Checklist

APP-002 1.2 Application Form

APP-003 1.3 Planning Inspectorate Application Index

APP-004 1.4 Copies of Newspaper Notices

APP-005 2.1 Location Plan

APP-006 2.2.0 Overall Location Plan and Master Key Plan for Land Plans

APP-007 2.2.1 Land Plans Sheet 1

APP-008 2.2.2 Land Plans Sheet 2

APP-009 2.2.3 Land Plans Sheet 3

APP-010 2.2.4 Land Plans Sheet 4

APP-011 2.2.5 Land Plans Sheet 5

APP-012 2.2.6 Land Plans Sheet 6

APP-013 2.2.7 Land Plans Sheet 7

APP-014 2.2.8 Land Plans Sheet 8

APP-015 2.2.9 Land Plans Sheet 9

APP-016 2.2.10 Land Plans Sheet 10

APP-017 2.2.11 Land Plans Sheet 11

APP-018 2.2.12 Land Plans Sheet 12

APP-019 2.2.13 Land Plans Sheet 13

APP-020 2.3.0 Overall Location Plan and Master Key Plan for Works Plan

APP-021 2.3.1 Works Plan Sheet 1

APP-022 2.3.2 Works Plan Sheet 2

APP-023 2.3.3 Works Plan Sheet 3

APP-024 2.3.4 Works Plan Sheet 4

APP-025 2.3.5 Works Plan Sheet 5

APP-026 2.3.6 Works Plan Sheet 6

Page 7: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C7 NWWFC

APP-027 2.3.7 Works Plan Sheet 7

APP-028 2.3.8 Works Plan Sheet 8

APP-029 2.3.9 Works Plan Sheet 9

APP-030 2.3.10 Works Plan Sheet 10

APP-031 2.3.11 Works Plan Sheet 11

APP-032 2.3.12 Works Plan Sheet 12

APP-033 2.3.13 Works Plan Sheet 13

APP-034 2.4.0 Overall Location Plan and Master Key Plan for Access and Rights

of Way Plans

APP-035 2.4.1 Access and Rights of Way Plan Sheet 1

APP-036 2.4.2 Access and Rights of Way Plan Sheet 2

APP-037 2.4.3 Access and Rights of Way Plan Sheet 3

APP-038 2.4.4 Access and Rights of Way Plan Sheet 4

APP-039 2.4.5 Access and Rights of Way Plan Sheet 5

APP-040 2.4.6 Access and Rights of Way Plan Sheet 6

APP-041 2.4.7 Access and Rights of Way Plan Sheet 7

APP-042 2.4.8 Access and Rights of Way Plan Sheet 8

APP-043 2.4.9 Access and Rights of Way Plan Sheet 9

APP-044 2.4.10 Access and Rights of Way Plan Sheet 10

APP-045 2.4.11 Access and Rights of Way Plan Sheet 11

APP-046 2.4.12 Access and Rights of Way Plan Sheet 12

APP-047 2.4.13 Access and Rights of Way Plan Sheet 13

APP-048 2.5.1 Crown Land Plan

APP-049 2.5.2 Crown Land Plan

APP-050 2.6.1 Landscaping Plan Sheet 1

APP-051 2.6.2 Landscaping Plan Sheet 2

APP-052 2.6.3 Landscaping Plan Sheet 3

APP-053 2.6.4 Landscaping Plan Sheet 4

Page 8: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C8 NWWFC

APP-054 2.6.5 Landscaping Plan Sheet 5

APP-055 2.6.6 Landscaping Plan Sheet 6

APP-056 2.6.7 Landscaping Plan Sheet 7

APP-057 2.6.8 Landscaping Plan Sheet 8

APP-058 2.6.9 Landscaping Plan Sheet 9

APP-059 2.6.10 Landscaping Plan Sheet 10

APP-060 2.6.11 Landscaping Plan Sheet 11

APP-061 2.6.12 Landscaping Plan Sheet 12

APP-062 2.6.13 Landscaping Plan Sheet 13

APP-063 2.7.0 Section Drawings Key Plan

APP-064 2.7.1 Section Drawings Sheet 1 to 9

APP-065 2.7.2 Section Drawings Sheet 10 to 19

APP-066 2.7.3 Section Drawings Sheet 20 to 29

APP-067 2.7.4 Construction Compound Layout

APP-068 2.8.1 Nature Conservation Sites Plans Sheet 1

APP-069 2.8.2 Nature Conservation Sites Plans Sheet 2

APP-070 2.8.3 Nature Conservation Sites Plans Sheet 3

APP-071 2.8.4 Nature Conservation Sites Plans Sheet 4

APP-072 2.9.1 Historic Sites Plans Sheet 1

APP-073 2.9.2 Historic Sites Plans Sheet 2

APP-074 2.9.3 Historic Sites Plans Sheet 3

APP-075 2.9.4 Historic Sites Plans Sheet 4

APP-076 3.1 Draft Development Consent Order

APP-077 3.2 Explanatory Memorandum

APP-078 4.1 Statement of Reasons

APP-079 4.2 Funding Statement

APP-080 4.3 Book of Reference

APP-081 5.1 Consultation Report

Page 9: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C9 NWWFC

APP-082 5.1.1 Consultation Report Summary Welsh Translation

APP-083 5.2.1 Consultation Report Appendices 1 to 7

APP-084 5.2.2 Consultation Report Appendix 8

APP-085 5.2.3 Consultation Report Appendices 9 to 14

APP-086 5.3 Flood Consequences Assessment

APP-087 5.5 Statement of Statutory Nuisance

APP-088 5.6 Statement of Statutory Nuisance Appendix 1

APP-089 5.7 HRA No Significant Effects Report

APP-090 5.8 HRA No Significant Effects Report Appendix 1

APP-091 5.9 Other Consents and Licences Report

APP-092 6.1 ES Chapter 1 - Introduction

APP-093 6.2 ES Chapter 2 - Description of Proposed Development

APP-094 6.3 ES Chapter 3 - Alternatives and Design Evolution

APP-095 6.4 ES Chapter 4 - EIA Methodology

APP-096 6.5 ES Chapter 5 - Planning Considerations

APP-097 6.6 ES Chapter 6 - Ecology and Biodiversity

APP-098 6.7 ES Chapter 7 - Landscape and Visual

APP-099 6.8 ES Chapter 8 - Historic Environment

APP-100 6.9 ES Chapter 9 - Flood Risk and Water Quality

APP-101 6.10 ES Chapter 10 - Land Use and Agriculture

APP-102 6.11 ES Chapter 11 - Socio-Economic and Tourism

APP-103 6.12 ES Chapter 12 - Traffic and Transport

APP-104 6.13 ES Chapter 13 - Emissions

APP-105 6.14 ES Chapter 14 - Electric and Magnetic Fields

APP-106 6.15 ES Chapter 15 - Summary of Environmental Effects

APP-107 6.16 ES Figures Document

APP-108 6.17.1 ES Chapter 1 - Introduction Technical Appendix 1.1

APP-109 6.17.2 ES Chapter 1 - Introduction Technical Appendix 1.2

Page 10: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C10 NWWFC

APP-110 6.17.3 ES Chapter 1 - Introduction Technical Appendix 1.3

APP-111 6.17.3A ES Chapter 1 - Introduction Technical Appendix 1.3 Part A

APP-112 6.17.3B ES Chapter 1 - Introduction Technical Appendix 1.3 Part B

APP-113 6.17.3C ES Chapter 1 - Introduction Technical Appendix 1.3 Part C

APP-114 6.17.3D ES Chapter 1 - Introduction Technical Appendix 1.3 Part D

APP-115 6.17.4 ES Chapter 1 - Introduction Technical Appendix 1.4

APP-116 6.17.5 ES Chapter 1 - Introduction Technical Appendix 1.5

APP-117 6.18 ES Chapter 2 - Description of Proposed Development Technical

Appendices 2.1

APP-118 6.18A ES Chapter 2 - Description of Proposed Development Technical

Appendices 2.1 Part A

APP-119 6.18B ES Chapter 2 - Description of Proposed Development Technical

Appendices 2.1 Part B

APP-120 6.18C ES Chapter 2 - Description of Proposed Development Technical

Appendices 2.1 Part C

APP-121 6.18D ES Chapter 2 - Description of Proposed Development Technical

Appendices 2.1 Part D

APP-122 6.18E ES Chapter 2 - Description of Proposed Development Technical

Appendices 2.1 Part E

APP-123 6.19.1 ES Chapter 6 - Ecology and Biodiversity Technical Appendices

6.1

APP-124 6.19.2 ES Chapter 6 - Ecology and Biodiversity Technical Appendices

6.2

APP-125 6.19.3 ES Chapter 6 - Ecology and Biodiversity Technical Appendices

6.3

APP-126 6.19.4 ES Chapter 6 - Ecology and Biodiversity Technical Appendices

6.4

APP-127 6.19.5 ES Chapter 6 - Ecology and Biodiversity Technical Appendix 6.5

APP-128 6.19.6 ES Chapter 6 - Ecology and Biodiversity Technical Appendix 6.6

APP-129 6.19.7 ES Chapter 6 - Ecology and Biodiversity Technical Appendices

6.7

APP-130 6.19.9 ES Chapter 6 - Ecology and Biodiversity Technical Appendix 6.9

APP-131 6.19.10 ES Chapter 6 - Ecology and Biodiversity Technical Appendix

6.10

Page 11: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C11 NWWFC

APP-132 6.20.1 ES Chapter 7 - Landscape and Visual Technical Appendix 7.1

APP-133 6.20.2 ES Chapter 7 - Landscape and Visual Technical Appendix 7.2

APP-134 6.20.3A ES Chapter 7 - Landscape and Visual Technical Appendix 7.3

Part A

APP-135 6.20.3B ES Chapter 7 - Landscape and Visual Technical Appendix 7.3

Part B

APP-136 6.20.3C ES Chapter 7 - Landscape and Visual Technical Appendix 7.3

Part C

APP-137 6.20.4 ES Chapter 7 - Landscape and Visual Technical Appendix 7.4

APP-138 6.20.5 ES Chapter 7 - Landscape and Visual Technical Appendix 7.5

APP-139 6.20.6 ES Chapter 7 - Landscape and Visual Technical Appendix 7.6

APP-140 6.21.1 ES Chapter 8 - Historic Environment Technical Appendix 8.1

APP-141 6.21.2 ES Chapter 8 - Historic Environment Technical Appendix 8.2

APP-142 6.22 ES Chapter 10 - Land Use and Agriculture Technical Appendices

10.1

APP-143 6.23 ES Chapter 11 - Socio-Economic and Tourism Technical

Appendices 11.1

APP-144 6.24 ES Chapter 12 - Traffic and Transport Technical Appendices 12.1

APP-145 6.25.1 ES Chapter 13 - Emissions Technical Appendix 13.1

APP-146 6.25.2 ES Chapter 13 - Emissions Technical Appendix 13.2

APP-147 6.25.3 ES Chapter 13 - Emissions Technical Appendix 13.3

APP-148 6.26 ES Chapter 14 - Electric and Magnetic Fields Technical Appendices

14.1

APP-149 6.27 ES Glossary

APP-150 6.28 ES Non-Technical Summary

APP-151 6.28.1 ES Non-Technical Summary Welsh Translation

APP-152 6.29 ES Scoping Opinion

APP-153 6.30 ES Scoping Report

APP-154 7.1 Design and Construction Report

APP-155 7.2 Design and Construction Report Technical Appendices

APP-156 7.3 Strategic Options Report

Page 12: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C12 NWWFC

APP-157 7.4 Planning Statement

APP-158 7.4.1 Planning Statement Summary Welsh Translation

APP-159 7.5 Planning Statement Technical Appendices

Application document submitted late on 11 August 2015

APP-160 6.19.11 ES Chapter 6 - Ecology and Biodiversity Technical Appendix

6.11 (excluding Badger Setts)

Post-submission changes (in response to section 55 checklist) received

3 July 2015 APP-161 Covering letter

APP-162 Photomontages A1 - VP34

APP-163 Photomontages A1 - VP34 (Wireframe)

APP-164 Photomontages A1 - VP47

APP-165 Photomontages A1 - VP47 (Wireframe)

APP-166 Appendix 1 Planning Inspectorate Section 55 Application Acceptance

Checklist

APP-167 Appendix 2 Document 1.4a Newspaper Notices (Updated)

APP-168 Appendix 3 Document 2.2.11 Land Plans Sheet 11 (Updated)

APP-169 Appendix 4 Document 6.19.9 Arboricultural Survey Figures (Updated)

APP-170 s55 Checklist SP Manweb Responses Document

APP-171 2.5.0 Overall Location Plan and Master Key Plan for Crown Land Plan

APP-172 2.5.1 Crown Land Plan Sheet 1

APP-173 2.5.2 Crown Land Plan Sheet 2

APP-174 2.5.3 Crown Land Plan Sheet 3

Post-submission changes – Option B

OpB-001 Option B Submission - Covering letter

OpB-002 Compulsory Acquisition document - Option B

OpB-003 Environmental Report - Option B

OpB-004 Statement of reasons (4.1 v2) - Option B

OpB-005 Book Of Reference Option B Schedule of Changes

Page 13: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C13 NWWFC

OpB-006 Book Of Reference Parts 1-5 Option B (Clean Version)

OpB-007 Book Of Reference Parts 1-5 Option B Tracked Changes

OpB-008 Landscaping Plans - Option B

OpB-009 Works Plan - Key Plan to Sheet 5 (Option B)

OpB-010 Works Plan - Sheet 6 to Sheet 13 (Option B)

OpB-011 Section Drawing Sheet 1 to Sheet 14 (Option B)

OpB-012 Section Drawing Sheet 15 to Sheet 29 (Option B)

OpB-013 Comparison Plan between Option A and Option B - Sheet 1 to Sheet 5

OpB-014 Comparison Plan between Option A and Option B - Sheet 6 to Sheet 13

OpB-015 Crown Land Plan - Key Plan to Sheet 3 (Option B)

OpB-016 Land Plan - Key Plan to Sheet 5 (Option B)

OpB-017 Land Plan - Sheet 6 to Sheet 13 (Option B)

OpB-018 Access and Rights of Way Plan - Key Plan to Sheet 5 (Option B)

OpB-019 Access and Rights of Way Plan - Sheet 6 to Sheet 13 (Option B)

OpB-020 Letter of 9 October 2015 in relation to the acceptance of the proposed

provision for the compulsory acquisition of additional land to facilitate

Option B

OpB-021 Regulation 8 Press Notice

OpB-022 SP Manweb - Letter of 28 October 2015 in relation to the examination

of Option B

Adequacy of consultation responses AoC-001 Snowdonia National Park Authority

AoC-002 Denbighshire County Council

AoC-003 Conwy County Borough Council

AoC-004 Powys County Council

Relevant Representations RR-001 Alys Owen

RR-002 Ann Williams

RR-003 Ardro Limited

Page 14: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C14 NWWFC

RR-004 Benjamin Owen

RR-005 Campaign for the Protection of Rural Wales - Clwyd Branch

RR-006 Cefn Meiriadog & Glascoed Road Residents and Users Group

RR-007 Cefn Meiriadog Community Council

RR-008 Cefn Meiriadog Excludees

RR-009 Civil Aviation Authority

RR-010 Clocaenog Community Council

RR-011 Cvffylliog Community Council

RR-012 Cyngor Cymuned Llangernyw

RR-013 Cyngor Cymuned Llanrhaeadr-yng-Nghinmeirch Community Council

RR-014 David Roberts

RR-015 David Tyrer

RR-016 Denbighshire County Council

RR-017 Derwen Community Council

RR-018 Dewi Parry

RR-019 Durand Hotham

RR-020 Eirian Jones

RR-021 Eirian Jones

RR-022 Elgan Jones

RR-023 Elin Mars Jones

RR-024 Emlyn a Nicola Davies

RR-025 Eric Jones

RR-026 Farmers Union Wales

RR-027 Gerwyn Jones

RR-028 Glynne Jones

RR-029 Gordon Owen

RR-030 Henllan Community Council

RR-031 I T Jones

Page 15: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C15 NWWFC

RR-032 Ian Gardner

RR-033 Iona Jones

RR-034 Iwan & Helen Jones

RR-035 Janet Beedles

RR-036 Jannine Poletti Hughes

RR-037 John Fleet

RR-038 John Hopkinson

RR-039 Julia Owen

RR-040 Llanfair Dyffryn Clwyd Community Council

RR-041 Llannefydd Community Council

RR-042 Llanrhaeadr Community Council

RR-043 Llansannan Community Council

RR-044 Llansannan Ward within Conwy County Borough Council

RR-045 Llanynys Community Council

RR-046 Lois Williams

RR-047 Margaret Parry-Jones

RR-048 Mari Roberts

RR-049 Martin John Barlow

RR-050 Meilir Jones

RR-051 Meirick Ll. Davies

RR-052 Melin Wynt Hafodty Ddu cyf

RR-053 Menna Eluned Jones

RR-054 Mr & Mrs E G & A Edwards

RR-055 Mr A A Owen

RR-056 Mr A E M Owen

RR-057 Mr B M Roberts

RR-058 Mr D C Jones

RR-059 Mr D E Jones

Page 16: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C16 NWWFC

RR-060 Mr D G Davies

RR-061 Mr D R Owen

RR-062 Mr David Roberts

RR-063 Mr Emyr Wynne Hughes

RR-064 Mr H M Parry

RR-065 Mr Hefin Wynne Hughes

RR-066 Mr I W Jones

RR-067 Mr J E Davies

RR-068 Mr John Jones

RR-069 Mr M Jones

RR-070 Mr R Evans

RR-071 Mrs C A Owen

RR-072 Mrs J L Jones

RR-073 Mrs Jill Tyrer

RR-074 Nantglyn Community Council

RR-075 Natural Resources Wales - Cyfoeth Naturiol Cymru

RR-076 Nerys Jones

RR-077 Network Rail (Property)

RR-078 Neville Hughes

RR-079 Public Health England, Centre for Radiation, Chemical and

Environmental Hazards

RR-080 Pylon the Pressure Group

RR-081 Ramblers Association - Conwy County

RR-082 Richard Mars Jones

RR-083 Richard Owen

RR-084 Richard Parry

RR-085 Robin Barlow

RR-086 Roger Corbett-Jones

RR-087 RWE Innogy UK Ltd

Page 17: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C17 NWWFC

RR-088 Sheila Harman

RR-089 Simon Peter White

RR-090 Trefnant Community Council

Relevant Representations on option B submitted by 13 November 2015 RR-091 D Wyn Wilkinson

RR-092 Huw LL Evans

RR-093 John LL Evans

RR-094 Cyngor Cymuned Llangernyw

RR-095 Robert Lloyd Thomas

Procedural decisions and notifications from the Examining Authority

PD-001 Notification of Decision to Accept Application

PD-002 Section 55 Checklist

PD-003 Appointment of an Examining Authority

PD-004 Rule 4 and 6 letter

PD-005 Rule 4 and 6 Letter (Welsh version)

PD-006 Letter advising the Ministry of Defence of Other Party status

PD-007 Letter advising Michael Williams of Other Party status

PD-008

Rule 8 Letter

PD-009

Rule 8 Letter (Welsh version)

PD-010

Examining Authority's First Written Questions

PD-011 Notification of decision to accept proposed compulsory acquisition of

additional land as part of the application

PD-012 Notification of procedural decision on Option B

PD-013 Procedural decision on Option B

PD-014 Hysbysiad o benderfyniadau trefniadol ar Opsiwn B - Welsh Language

version of the notification of procedural decision on Option B

PD-015 Proposed provision checklist

PD-016 Examining Authority Second Questions

Page 18: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C18 NWWFC

PD-017 Examining Authority Second Questions - Table 1

PD-018 Timetable for examination of Option B

PD-019 Amserlen ar gyfer archwilio Opsiwn B - Welsh language version of the

Timetable for the examination of Option B letter

PD-020 Rule 17 letter - Request by the ExA for further information from Cadw

on 14 December 2015

PD-021 Report on the Implications for European Sites Proposed North Wales

Wind Farms Connection

PD-022 ExA’s Consultation draft Development Consent Order letter

PD-023 Notification of completion of ExA Examination

PD-024 Hysbyseb o gwblhau Arholiad y’r Awdurdod Archwillio - Notification of

completion of ExA Examination

Local Impact Reports LIR-001 Conwy County Borough Council - Local Impact Report

LIR-001a Conwy County Borough Council - Local Impact Report Appendices (This

document was not published at Deadline 1 in error and published on 1

December 2015)

LIR-002 Denbighshire County Council - Local Impact Report and Appendices

Additional submissions – submissions for Preliminary Meeting on 28 July 2015

AS-001 Davis Meade Property Consultants

AS-002 Natural Resources Wales

AS-003 Rhyl and St Asaph Angling Association

AS-004 SP Manweb

AS-005 SP Manweb - Includes s135 consent from Natural Resources Wales

AS-006 Pinsent Masons on Behalf of SP Manweb - Proposed changes to the

application

AS-007 Pinsent Masons on Behalf of SP Manweb - Letter of 26 August 2015

notifying that the connection agreement for the Nant Bach wind farm is

likely to be terminated, and that submission of the proposed scheme

‘Option B’ will be delayed

Page 19: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C19 NWWFC

Events and Hearings

Unaccompanied site inspection – 27 July 2015

EV-001 Unaccompanied site inspection note

Preliminary Meeting – 28 July 2015 EV-002 Preliminary Meeting Audio

EV-003 Preliminary Meeting Note

Accompanied site inspection – 22 and 23 September 2015 EV-004 Itinerary for the Accompanied Site Visit

EV-005 Detailed Site Visit Itinerary

Open Floor Hearing – 23 September 2015

EV-006 Agendas for the Open Floor and Compulsory Acquisition Hearings

EV-007 Open Floor Hearing Audio

Compulsory Acquisition Hearing – 24 and 25 September 2015

EV-008 Action points from Compulsory Acquisition Hearing

EV-009 Compulsory Acquisition Hearing Audio 24-09-15 Part 1

EV-010 Compulsory Acquisition Hearing Audio 24-09-15 Part 2

EV-011 Compulsory Acquisition Hearing Audio 24-09-15 Part 3

EV-012 Compulsory Acquisition Hearing Audio 25-9-15

Issue Specific Hearings – 29 September to 2 October 2015 EV-013 Agendas for the Issue Specific Hearings

Issue Specific Hearing on Principles of Development – 29 September

2015 EV-014 Action points from Day 1

EV-015 Issue Specific Hearing Audio - Part 1

EV-016 Issue Specific Hearing Audio - Part 2

EV-017 Issue Specific Hearing Audio - Part 3

Page 20: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C20 NWWFC

Issue Specific Hearing on Landscape and Visual Impact; Heritage

Impacts and Biodiversity – 30 September 2015 EV-018 Action points from Day 2

EV-019

Issue Specific Hearing Audio - Part 1

EV-020

Issue Specific Hearing Audio - Part 2

EV-021

Issue Specific Hearing Audio - Part 3

EV-022

Issue Specific Hearing Audio - Part 4

Issue Specific Hearing on Land use, Land take and Land management

impacts – 1 October 2015 EV-023 Action points from Day 3

EV-024 Issue Specific Hearing Audio - Part 1

EV-025 Issue Specific Hearing Audio - Part 2

EV-026 Issue Specific Hearing Audio - Part 3

EV-027 Pylon the Pressure Group - Letter submitted in advance of the Issue

Specific Hearing on 1 October 2015

Issue Specific Hearing on the draft Development Consent Order – 2 October 2015 EV-028 Action points from Day 4

EV-029 Issue Specific Hearing Audio - Part 1

EV-029a Issue Specific Hearing Audio - Part 2

Issue Specific Hearing on the principles of the development and

environmental issues – 8 December 2015 EV-030 Applicant's Hearing (Rule 13) Newspaper Notice for hearings in

December 2015

EV-031 Agendas for the Issue Specific and Compulsory Acquisition Hearings

taking place on 8 December to 10 December 2015

EV-032 Issue Specific Hearing Audio Recording Session 1

EV-033 Issue Specific Hearing Audio Recording Session 2

EV-034 Issue Specific Hearing Audio Recording Session 3

EV-035 Issue Specific Hearing Audio Recording Session 4

EV-036 Action points from the Issue Specific Hearing on the Principles of

Page 21: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C21 NWWFC

Development and Environmental Issues held on 8 December 2015

Compulsory Acquisition Hearing – 9 December 2015

EV-037 Natural Resources Wales - Covering letter - Written submission in lieu

of attendance at the Compulsory Acquisition Hearing 9 December 2015

and DCO Hearing 10 December 2015

EV-038 Natural Resources Wales - Submission concerning Crown Land - Written

submission in lieu of attendance at the Compulsory Acquisition Hearing

9 December 2015 and DCO Hearing 10 December 2015

EV-039 Natural Resources Wales - Submission concerning Article 33 of the DCO

- Written submission in lieu of attendance at the Compulsory

Acquisition Hearing 9 December 2015 and DCO Hearing 10 December

2015

EV-040 Natural Resources Wales - Note (Covering letter) - Written submission

in lieu of attendance at the Compulsory Acquisition Hearing 9 December

2015 and DCO Hearing 10 December 2015

EV-041 Natural Resources Wales - Note on Article Crown Land section 135 -

Written submission in lieu of attendance at the Compulsory Acquisition

Hearing 9 December 2015 and DCO Hearing 10 December 2015

EV-042 Option B Compulsory Acquisition Hearing Audio Recording 9 December

2015 - in relation to the proposed provision for the compulsory

acquisition of rights and the imposition of restrictions over additional

land in relation to Option B

EV-043 Option A Compulsory Acquisition Hearing Audio Recording 9 December

2015 - in relation to the compulsory acquisition of rights and the

imposition of restrictions over land in relation to Option A (the original

application). Session 1 of 2

EV-044 Option A Compulsory Acquisition Hearing Audio Recording 9 December

2015 - in relation to the compulsory acquisition of rights and the

imposition of restrictions over land in relation to Option A (the original

application). Session 2 of 2

EV-045 Action points from the Compulsory Acquisition Hearing held on 9

December 2015

Option A and option B Issue Specific and Open Floor Hearings – 9 and

10 December 2015

EV-046 Option B Open Floor Hearing Audio Recording 9 December 2015

EV-047 Option A Open Floor Hearing Audio Recording 9 December 2015

EV-048 Option B Issue Specific Hearing Audio Recording 10 December 2015 - in

relation to the Issue Specific Hearing on the draft Development Consent

Order for Option B

EV-049 Option A Issue Specific Hearing Audio Recording 10 December 2015 - in

relation to the Issue Specific Hearing on the draft Development Consent

Page 22: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C22 NWWFC

Order for Option A (the original application)

EV-050 Action points from the Issue Specific Hearing on the draft Development

Consent Order held on 10 December 2015

Unaccompanied site inspections – 7 and 10 December 2015

EV-051 Unaccompanied Site Inspection Note 7 December 2015

EV-052 Unaccompanied Site Inspection Note 10 December 2015

Representations

Deadline 1 – 1 September 2015

Comments on relevant representations Written representations (WRs) by all interested parties

Statements of Common Ground requested by the ExA Responses to ExA’s first written questions

Comments by interested parties in respect of the July 2015 submissions by the applicant in response to the s55 Checklist

Notifications of: wish to speak at Issue Specific Hearings, an Open Floor

Hearing, a Compulsory Acquisition Hearing Notification of wish to attend the accompanied site inspection, suggested

locations and justifications Notification by statutory parties of wish to be considered as interested

parties

REP1-001 Abergele Town Council - Written Representation

REP1-002 Campaign for the Protection of Rural Wales Clwyd Branch - Written

Representation

REP1-003 Cefn Meiriadog and Glascoed Road Residents and Users Group -

Response to ExA’s First Written Questions.

REP1-004 Cefn Meiriadog and Glascoed Road Residents and Users Group -

Representation relating to the submission of a Statement of Common

Ground

REP1-005 Cefn Meiriadog and Glascoed Road Residents and Users Group -

Notification of wish to attend the accompanied site inspection,

suggested locations and justifications

REP1-006 Cefn Meiriadog and Glascoed Road Residents and Users Group - Written

Representation

REP1-007 Conwy County Borough Council covering letter

REP1-008 Conwy County Borough Council - Written Representation

REP1-009 Conwy County Borough Council - Response to ExA’s First Written

Questions

Page 23: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C23 NWWFC

REP1-010 Conwy County Borough Council - Notification of wish to attend the

accompanied site inspection, suggested locations and justifications, and

decision notice for the Mwchwl Eithin (Nant Bach) windfarm

REP1-011 Dafydd I Jones - Response to ExA’s First Written Questions

REP1-012 David Roberts - Notification of wish to make oral representations at the

Issue Specific Hearings

REP1-013 David Roberts - Notification of wish to attend the accompanied site

inspection, suggested locations and justifications

REP1-014 David Roberts - Notification of wish to speak at an Open Floor Hearing

REP1-015 David Roberts - Written Representation

REP1-016 David Roberts - Response to ExA’s First Written Questions

REP1-017 D E Tyrer - Response to ExA’s First Written Questions.

REP1-018 Denbighshire County Council - Response to ExA’s First Written

Questions

REP1-019 Denbighshire County Council - Written Representation

REP1-020 Denbighshire County Council - Covering Letter

REP1-021 Dewi Parry - Response to ExA’s First Written Questions

REP1-022 Dewi Parry - Written Representation

REP1-023 Dewi Parry - Representation regarding position of Pylons

REP1-024 Durand Hotham - Response to ExA’s First Written Questions

REP1-025 Durand Hotham - Written Representation

REP1-026 Mr Eifion Bibby - Preliminary Written Representation on behalf of clients

REP1-027 Gas Transportation Company and Others - Written Representation

REP1-028 Guthrie Jones & Jones on behalf of Richard Glynne Jones - Written

Representation

REP1-029 Ms Iona Edwards-Jones - Response to ExA’s First Written Questions

REP1-030 Iwan Wynne Jones - Written Representation

REP1-031 Iwan Wynne Jones - Notification of wish to attend the accompanied site

inspection, suggested locations and justifications

REP1-032 J. Bradburne Price & Co on behalf of H LL Evans - Written

Representation

REP1-033 J. Bradburne Price & Co on behalf of J LL Evans - Written

Page 24: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C24 NWWFC

Representation

REP1-034 Dr Jannine Poletti Hughes - Response to ExA's written questions

REP1-035 John Hopkinson - Written Representation

REP1-036 John Mars Jones - Written Representation

REP1-037 Llanrhaeadr-yng-Nghinmeirch Community Council - Response to ExA's

written questions

REP1-038 Lois Williams - Written Representation

REP1-039 Mari Roberts - Written Representation

REP1-040 Meirick Ll. Davies - Written Representation

REP1-041 Natural Resources Wales - Representation relating to the submission of

a Statement of Common Ground

REP1-042 Natural Resources Wales - Written Representation and Response to

ExA’s First Written Questions

REP1-043 Nerys Jones - Response to ExA’s First Written Questions

REP1-044 Pylon the Pressure Group - Response to ExA’s First Written Questions

REP1-045 Pylon the Pressure Group - Notification of wish to make oral

representations at the hearings and attend the accompanied site

inspection

REP1-046 Rhyl & St Asaph Angling Association - Written Representation

REP1-047 Robin Barlow - Written Representation

REP1-048 Sheila Harman - Response to ExA’s First Written Questions

REP1-049 Sheila Harman - Written Representation

REP1-050 Sheila Harman - Notification of wish to make oral representations at the

Issue Specific and Open Floor Hearings

REP1-051 Mr Simon P White - Written Representation

REP1-052 SP Manweb - Covering Letter

REP1-053 SP Manweb - Response to Relevant Representations

REP1-054 SP Manweb - Statement of Common Ground Position Statement

REP1-055 SP Manweb - 6.18c v2 Updated Hedgerow Management Plan

REP1-056 SP Manweb - Response to ExA’s First Written Questions

Page 25: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C25 NWWFC

REP1-057 SP Manweb - Statement of Common Ground between SP Manweb and

Civil Aviation Authority

REP1-058 SP Manweb - Statement of Common Ground between SP Manweb and

Snowdonia National Park Authority

REP1-059 SP Manweb - 4.3 Book of Reference Parts 1-5 Tracked Changes

between v1 and v2

REP1-060 SP Manweb - 4.3 Book of Reference Parts 1-5 version 2

REP1-061 SP Manweb - 4.3 Schedule of changes relating to Book of Reference

version 2

REP1-062 SP Manweb - 7.3 Strategic Options Report - Addendum - August 2015

REP1-063 SP Manweb NWWFC ExA1 Q0.1 Appendix 0.1 plans to accompany site

visit

REP1-064 SP Manweb NWWFC ExA1 Q1.1 Appendix 1.1 Wider Scheme Plan

REP1-064 SP Manweb NWWFC ExA1 Q11.22 Appendix 11.22 Glossary FINAL V2

REP1-066 SP Manweb NWWFC ExA1 Q2.10 Appendix 2.10 SP Manweb Llandinam

Closing Statement

REP1-067 SP Manweb NWWFC ExA1 Q2.12 Appendix 2.12 Route of Tir Mostyn

Wind Farm 33kV Underground Cable

REP1-068 SP Manweb NWWFC ExA1 Q2.9 Appendix 2.9a Inspectors Report

REP1-069 SP Manweb NWWFC ExA1 Q3.12 Appendix 3.12 Construction

Programme

REP1-070 SP Manweb NWWFC ExA1 Q3.13 Appendix 3.13a CFAppDoc04 Chapter

12 FINAL

REP1-071 SP Manweb NWWFC ExA1 Q6.3 Appendix 6.3 SAC,SPA and RAMSAR

Sites assessed

REP1-072 SP Manweb - Responses to ExA’s First Written Questions. Appendix 13

– Section Drawings Sheets 13-20

REP1-073 SP Manweb - Responses to ExA’s First Written Questions. Appendix 13

– Section Drawings Sheets 1-12

REP1-074 SP Manweb - Responses to ExA’s First Written Questions. Appendix

11.13a Consolidated Report and Accounts Scottish Power UK plc 2014

and Appendix 11.13b SP Manweb Regulatory Accounts 2015

REP1-075 SP Manweb - Responses to ExA’s First Written Questions. Appendix

11.12 Landowner and Part 3 of the Book of Reference Interest

Negotiations

REP1-076 SP Manweb - Responses to ExA’s First Written Questions. Appendix

11.9 Hirwaun Power Station SoS Decision Letter and Statement of

Page 26: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C26 NWWFC

Reasons

REP1-077 SP Manweb - Responses to ExA’s First Written Questions. Appendix

11.7 Table Showing Unknown Land Interests

REP1-078 SP Manweb - Responses to ExA’s First Written Questions. Appendix

11.5 Book of Reference and Land Plans Tracker

REP1-079 SP Manweb - Responses to ExA’s First Written Questions. Appendix

11.1 s135 Consent

REP1-080 SP Manweb - Responses to ExA’s First Written Questions. Appendix

9.1a Natural Resources Wales Response to Statutory Consultation and

Appendix 9.1b Welsh Government Response to Statutory Consultation

REP1-081 SP Manweb - Responses to ExA’s First Written Questions. Appendix

3.14 Brenig wind farm planning permission

REP1-082 SP Manweb - Responses to ExA’s First Written Questions. Appendix

3.33 Updated Construction Environmental Management Plan

REP1-083 SP Manweb - Appendix 4.5 Annex 7.3 Clocaenog Forest Wind Farm

Environmental

REP1-084 SP Manweb - Responses to ExA’s First Written Questions. Appendix 4.7

Agricultural Land Classification Grade 3 Land Plan

REP1-085 SP Manweb - Responses to ExA’s First Written Questions. Appendix

4.13a, Appendix 4.13b, Appendix 4.13c – Extracts from Welsh

Government website

REP1-086 SP Manweb - Statement of Common Ground with Civil Aviation

Authority (Responses to ExA’s First Written Questions. Appendix 4.15)

REP1-087 SP Manweb - Responses to ExA’s First Written Questions. Appendix

4.17 Electro-Magnetic Field Study

REP1-088 SP Manweb - Responses to ExA’s First Written Questions. Appendix 5.1

Wind Farms Planning Permissions

REP1-089 SP Manweb - Responses to ExA’s First Written Questions. Appendix

6.16a Updated Hedgerow Management Plan and 6.16b. Hedgerow

Impacts Map

REP1-090 SP Manweb - Responses to ExA’s First Written Questions. Appendix

6.19 Local Wildlife Sites Intersecting the Route

REP1-091 SP Manweb - Responses to ExA’s First Written Questions. Appendix

6.20 Dormouse European Protection of Species Licence and Method

Statement

REP1-092 SP Manweb - Responses to ExA’s First Written Questions. Appendix

7.15 COSHH Sheets

REP1-093 SP Manweb - Responses to ExA’s First Written Questions. Appendix 8.3

Appendix 7.3 D Viewpoint Assessment Operational Effects

Page 27: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C27 NWWFC

REP1-094 SP Manweb - Responses to ExA’s First Written Questions. Appendix 8.9

Cumulative Scenario 2 Developments

REP1-095 SP Manweb - Responses to ExA’s First Written Questions. Appendix

8.16 Location of Proposed Crematorium

REP1-096 SP Manweb - Responses to ExA’s First Written Questions. Appendix 13

– Section Drawings Sheets 21 to 29 and Construction Compound

Layout

REP1-097 Tir Mostyn Wind and Foel Goch Limited-Written Representation

REP1-098 Welsh Government - Response to ExA’s First Written Questions

Deadline 1 – Late submissions REP1-099 Eifion Bibby on behalf of Messrs EW,PA&EW Hughes

REP1-100 Eifion Bibby on behalf of Messrs HW,EA& GW Hughes

REP1-101 Eifion Bibby on behalf of Mr AA & Mrs CA Owen

REP1-102 Eifion Bibby on behalf of Mr AA Owen

REP1-103 Eifion Bibby on behalf of Mr AEM Owen

REP1-104 Eifion Bibby on behalf of Mr DR & Mrs EM Owen

REP1-105 Eifion Bibby on behalf of Mr HM Parry

REP1-106 Eifion Bibby on behalf of Mr JE Davies

REP1-107 Eifion Bibby on behalf of Mr M Jones

REP1-108 John Fleet

REP1-109 Pylon the Pressure Group (3)

Deadline 2 – 17 September 2015 Comments on WRs

Comments on Local Impact Reports Revised draft DCO from applicant

Comments on responses to ExA’s first written questions Schedule of mitigation from the applicant

REP2-001 Robin Barlow - Response to Applicant’s Response to Relevant

Representations Document

REP2-002 Eifion Bibby - Response to Applicant’s ‘Response to Relevant

Representations’ Document

REP2-003 D E Tyrer - Response to Deadline 1

Page 28: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C28 NWWFC

REP2-004 Cefn Meiriadog and Glascoed Road Residents and Users Group -

Comments on responses to the ExA's First Written Questions

REP2-005 Dewi Parry - Response to Applicant’s ‘Response to Relevant

Representations’ Document

REP2-006 Dafydd I Jones - Comments on responses to the ExA's First Written

Questions

REP2-007 Simon White - Comments on responses to the ExA's First Written

Questions

REP2-008 JP Hughes - Comments on responses to the ExA's First Written

Questions

REP2-009 Jill Tyrer - Written representation

REP2-010 Iwan W Jones - Comments on responses to written representations

REP2-011 John Mars Jones - Response to Deadline 1

REP2-012 Pylon the Pressure Group - Comments on responses to the ExA’s First

Written Questions

REP2-013 SP Manweb - Covering letter

REP2-014 SP Manweb - Comments on responses to ExA's First Written Questions

REP2-015 SP Manweb - Responses to written representations

REP2-016 SP Manweb - Key Plans for Viewpoints in Technical Appendix 7.3 Part A,

response to the ExA’s First Written Question 8.5

REP2-017 SP Manweb - Key Plans for Viewpoints in Technical Appendix 7.3 Parts

B in response to the ExA’s First Written Question 8.5

REP2-018 SP Manweb - Key Plans for Viewpoints in Technical Appendix 7.3 Part C,

in response to the ExA’s First Written Question 8.5

REP2-019 SP Manweb - Further photomontages submitted in accordance with the

commitment contained in respect of the ExA’s First Written question

8.15

REP2-020 SP Manweb - Revised draft of the DCO (Version 2) (Document reference

3.1 (v.2))

REP2-021 SP Manweb - Tracked change version of the DCO showing amendments

made between version 1 and version 2 of the draft DCO

REP2-022 SP Manweb - Responses to written representations and Local Impact

Report received from Denbighshire County Council

REP2-023 SP Manweb - Responses to written representations and Local Impact

Report received from Conwy County Borough Council

Page 29: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C29 NWWFC

REP2-024 SP Manweb - Statement of Common Ground between SP Manweb and

the Local Health Board of North Wales

REP2-025 SP Manweb - Addendum to the Book of reference (version 2) August

2015

REP2-026 SP Manweb - Schedule of mitigation

REP2-027 Durand Hotham (late submission accepted at the discretion of the ExA)

REP2-028 Natural Resources Wales (late submission accepted at the discretion of

the ExA)

Deadline 3 – 16 October 2015

Post-hearing documents

Applicant’s revised draft DCO Any further information requested by the ExA

REP3-001 Civil Aviation Authority - Post-hearing submission

REP3-002 Conwy County Borough - Post-hearing submission

REP3-003 Dafydd Jones - Post-hearing submission. Representation made at the

Compulsory Acquisition Hearing of 25 September 2015

REP3-004 Denbighshire County Council - Post-hearing submission. Representation

made at the Issue Specific Hearing on Landscape and Visual Impact on

30 September 2015

REP3-005 Denbighshire County Council - Post-hearing submission. Representation

made at the Issue Specific Hearing on Socio-economic Impacts on 1

October 2015

REP3-006 Denbighshire County Council - Post-hearing submission. Representation

made at the Issue Specific Hearing on the draft Development Consent

Order on 2 October 2015

REP3-007 Denbighshire County Council - Post-hearing submission. Representation

made at the Issue Specific Hearing on Land use, land management and

land take on 1 October 2015

REP3-008 Denbighshire County Council - Post-hearing submission. Note from

County Councillor Alice Jones on Land use and agriculture

REP3-009 Eifion Bibby - Post-hearing submission. Representations made at the

Compulsory Acquisition Hearings of 24 and 25 September 2015

REP3-010 Iwan Jones various hearings - Post-hearing submission.

Representations made at hearings

REP3-011 Iwan Jones - Post-hearing submission on costings analysis of overhead

and underground line

Page 30: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C30 NWWFC

REP3-012 Iwan Jones - Post-hearing submission. Investigation into the potential

impact of wind farms on tourism in Wales - Summary Report

REP3-013 John Fleet - Post-hearing submission

REP3-014 John Hopkinson - Post-hearing submission. Representation made at the

Open Floor Hearing of 23 September 2015

REP3-015 John Mars Jones - Post-hearing Submission

REP3-016 John Mars Jones - Representation made at the Compulsory Acquisition Hearing held 24 and 25 September 2015

REP3-017 John Mars Jones - Post-hearing submission. Letter from SP Manweb to

John Mars Jones

REP3-018 John Mars Jones - Post-hearing submission. Representation made at the

Open Floor Hearing held on 23 September 2015

REP3-019 John Mars Jones - Post-hearing submission relating to Planting of Trees

and Ecological Mitigation Measures

REP3-019a John Mars Jones - Updated version of Deadline 3 submission on

planting of trees and ecology mitigation measures (Rep 3-019)

REP3-020 John Mars Jones - Post-hearing submission. Works Plan Sheet 10 -

modified to show possible areas for undergrounding for Berain

REP3-021 John Mars Jones - Post-hearing submission relating to Underground

Cabling

REP3-021a John Mars Jones - Updated version of Deadline 3 submission on

underground cabling (Rep3-021)

REP3-022 JP Hughes - Post-hearing submission

REP3-023 Meilir Jones - Representation

REP3-024 Meirick Lloyd Davies - Post-hearing submission; Letter from Ann Jones

AM

REP3-025 Peris G Jones - Post-hearing submission (accepted at the discretion of

the ExA)

REP3-026 Pylon the Pressure Group – Post-hearing submission

REP3-027 Robin Barlow - Post-hearing document. Routeing Consultation

Document for the Loch Urr Grid Connection project

REP3-028 Simon P White - Post-hearing submission

REP3-029 SP Manweb - Covering letter

REP3-030 SP Manweb - Post-hearing submission. Representations made at Issue

Specific Hearing on Principles of development (including assessment

approach, costs and policy), construction impacts and decommissioning

Page 31: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C31 NWWFC

REP3-031 SP Manweb - Draft DCO - Document reference 3.1 v3

REP3-032 SP Manweb - Post-hearing submission. Representation made at the

Issue Specific Hearing on the draft Development Consent Order

REP3-033 SP Manweb - Response to submission of John Mars Jones

REP3-034 SP Manweb - DCO track changed

REP3-035 SP Manweb - Post-hearing submission. Post-hearing submission.

Representation made at the Compulsory Acquisition Hearings of 24 and

25 October 2015

REP3-036 SP Manweb - Post-hearing submission. Representation made at the

Issue Specific Hearing on Land use, land take and land management

impacts

REP3-037 SP Manweb - Post-hearing submission. Representation made at the

Issue Specific Hearing on Landscape and visual impact; heritage

impacts and biodiversity

REP3-038 SP Manweb - Overall Location Plan, Master Key Plan and Land Plan

sheet 1 to 6

REP3-039 SP Manweb - Land Plan sheet 7 to 13

REP3-040 SP Manweb - Post-hearing submission. Inspector's Report on the

Conjoined Public Inquiry

REP3-041 David Roberts – Post-hearing submission (late submission accepted at

the discretion of the ExA)

Deadline 4 – 2 November 2015

Further post-hearing documents

Comments on post-hearing documents

REP4-001 Dafydd I Jones - Post-hearing representation (late submission accepted

at the discretion of the ExA)

REP4-002 Dewi Parry - Post-hearing documents

REP4-003 Iwan Jones – Post-hearing document

REP4-004 Natural Resources Wales - Response to Action Point 11 from the Issue

Specific Hearing held on 29 September 2015

REP4-005 Peris G Jones - Comments on Deadline 3 submissions

REP4-006 Robin Barlow - Comments raised at the Issue Specific Hearing held on

30 September 2015

REP4-007 SP Manweb - Covering letter

Page 32: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C32 NWWFC

REP4-008 SP Manweb - Appendices to the written summary of oral

representations made at the Compulsory Acquisition Hearings dated 24

and 25 September 2015

REP4-009 SP Manweb - Appendices to the written summary of oral

representations made at the Issue Specific Hearing (day 1) dated 29

September 2015

REP4-010 SP Manweb - Appendices to the written summary of oral

representations made at the Issue Specific Hearing (day 2) dated 30

September 2015

REP4-011 SP Manweb - Appendices to the written summary of oral

representations made at the Issue Specific Hearing (day 3) dated 1

October 2015

REP4-012 SP Manweb - Revised draft of the Construction Environmental

Management Plan (CEMP) (Version 3)

REP4-013 SP Manweb - Comparite showing amendments made to the CEMP

between Version 2 and Version 3

REP4-014 SP Manweb- Revised draft of the Outline Traffic Management Plan

(TMP) (Version 2)

REP4-015 SP Manweb - Comparite showing amendments made to the TMP

between Version 1 and Version 2

REP4-016 SP Manweb- Schedule of changes to the Outline Hedgerow Management

Plan (HMP)

REP4-017 SP Manweb - Revised draft of the Ecological Management Plan (EcMP)

(Version 2)

REP4-018 SP Manweb - Comparite showing amendments made to the EcMP

between Version 1 and Version 2

REP4-019 SP Manweb - A revised draft of the Outline Landscape Management

Plan (OLMP) (Version 2) This has been submitted to remove references

to Ash

REP4-020 SP Manweb - Comparite showing amendments made to the OLMP

between Version 1 and Version 2

REP4-021 SP Manweb - Responses to late Deadline 2 representations, providing a

summary of the representations provided and signposting to previous

submissions made

REP4-022 SP Manweb - A document summarising and confirming the versions of

the CEMP, TMP, EcMP, HMP and OLMP

REP4-023 SP Manweb - Response to action point 8 from the Compulsory

Acquisition Hearings - Landowner and Part 3 Interest Negotiations

REP4-024 SP Manweb - Response to action point 9b from day 1 of the Issue

Specific Hearings - Lifetime Costs Report

Page 33: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C33 NWWFC

REP4-025 SP Manweb - Guidance document on Working Safely Near Overhead

Electric Power Lines (Health and Safety Executive)

REP4-026 SP Manweb - Note on the operation of Section 135 of the Planning Act

2008

REP4-027 SP Manweb - Landscaping Plans (Sheet 1-13)

REP4-028 SP Manweb - Response to the written submission provided by Mr John

Fleet at Deadline 1

REP4-029 SP Manweb - Response to the written submission relating to Option A

matters provided by Mr Eifion Bibby at Deadline 1

REP4-030 SP Manweb - Response to the written submission provided by the Pylon

the Pressure Group at Deadline 1

REP4-031 SP Manweb - Response to the written submission provided by Mr Robin

Barlow at Deadline 2

REP4-032 SP Manweb - Updated photomontages in response to Action point 1-

Issue specific hearing day 2

REP4-033 SP Manweb - Covering letter (late submission to accepted at the

discretion of the ExA)

REP4-034 SP Manweb - Response to Post-hearing submission from Conwy County

Borough Council submitted at Deadline 3 (late submission accepted at

the discretion of the ExA)

REP4-035 SP Manweb - Response to Post-hearing submission from Interested

Parties submitted at Deadline 3 (Meilir Jones, Meirick Lloyd Davies,

Peris G Jones, Pylon the Pressure Group, Robin Barlow, Simon P White)

(late submission accepted at the discretion of the ExA)

REP4-036 SP Manweb - Response to Post-hearing submission from Interested

Parties submitted at Deadline 3 (Civil Aviation Authority, Dafydd Jones,

Eifion Bibby, Iwan Jones, John Hopkinson, John Mars Jones, JP Hughes)

(late submission accepted at the discretion of the ExA)

REP4-037 SP Manweb - Response to late Deadline 1 and Deadline 3

Representation on Option B from Eifion Bibby (late submission accepted

at the discretion of the ExA)

REP4-038 SP Manweb - Response to Post-hearing submission from Denbighshire

County Council submitted at Deadline 3 (late submission accepted at

the discretion of the ExA)

REP4-039 SP Manweb - Response to Post-hearing submissions at Deadline 3

Index (late submission accepted at the discretion of the ExA)

Deadline 5 – 13 November 2015

Comments on option B Comments on the proposed provision for the compulsory acquisition of

Page 34: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C34 NWWFC

additional land

Comments on further post-hearing documents

REP5-001 Canal & River Trust - Comments on the notice of Provision for Powers of

Compulsory application in respect of additional land

REP5-002 Carter Jonas LLP on behalf of Mrs J W Smith - Written representation

REP5-003 Dafydd I Jones - Comments on Option B

REP5-004 Dafydd I Jones - Comments on post-hearing documents

REP5-005 Dewi Parry - Submission

REP5-006 Mr Eifion Bibby - Comments on Option B on behalf of clients

REP5-007 Iwan Jones - Comments on Life Time Cost Analysis

REP5-008 Iwan Jones - Comments on further post-meeting documents

REP5-009 Iwan Jones - Comments on the applicant’s photomontages

REP5-010 Iwan Jones - Comments on applicant’s answer to AP31 - Timing of

surveys (late submission accepted at the discretion of the ExA)

REP5-011 Martin Barlow - Post-hearing documents (late submission accepted at

the discretion of the ExA)

REP5-012 Natural Resources Wales - Comments on post-hearing documents

REP5-013 Natural Resources Wales - Comments on Option B

REP5-014 Peris Jones - Response to Deadline 4 submission

REP5-015 Pylon the Pressure Group - Further post-hearing documents

REP5-016 Robin Barlow - Response to the new submission by SP Manweb on

Lifetime Costs of Undergrounding / Overgrounding

REP5-017 Rostons Limited on behalf of Mrs M Jones - Update relating to

compulsory acquisition

REP5-018 Welsh Government - Comments on the change in timetable

REP5-019 Network Rail - Comments on Option B

Deadline 6 – 18 November 2015

Responses to ExA’s second written questions

REP6-001 Denbighshire County Council - Response to ExA’s Second Written

Questions

REP6-002 Dewi Parry - Response to ExA’s Second Written Questions

Page 35: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C35 NWWFC

REP6-003 Eifion Bibby - Response to ExA’s Second Written Questions

REP6-004 Iwan Jones - Response to ExA’s Second Written Questions

REP6-005 John Hopkinson - Response to ExA’s Second Written Questions

REP6-006 Martin Barlow - Response to ExA’s Second Written Questions

REP6-007 Natural Resources Wales - Response to ExA’s Second Written Questions

REP6-008 Robin Barlow - Comment on original Deadline 5 submission

REP6-009 Robin Barlow - Response to the Applicant's Deadline 4 submission (late

submission accepted at the discretion of the ExA)

REP6-010 Sheila Harman - Response to ExA’s Second Written Questions

REP6-011 SP Manweb - Covering letter

REP6-012 SP Manweb - 3.1 DCO Option A v4 (Clean)

REP6-013 SP Manweb - 3.1 DCO Option A v4 (tracked)

REP6-014 SP Manweb - 3.1 DCO Option B (Clean)

REP6-015 SP Manweb - 3.1 DCO Option B (Tracked)

REP6-016 SP Manweb - Draft DCO (Doc Ref 3.1) - Option B (Clean)

REP6-017 SP Manweb - Draft DCO (Doc Ref 3.1) - Option B (Tracked)

REP6-018 SP Manweb - 4.3 Book of Reference Pt 1-5 Option A v3 (Clean)

REP6-019 SP Manweb - 4.3 Book of Reference Pt 1-5 Option A v3 (Tracked)

REP6-020 SP Manweb - 4.3 Book of Reference Pt 1-5 Option B (Clean)

REP6-021 SP Manweb - 4.3 Book of Reference Pt 1-5 Option B (Tracked)

REP6-022 SP Manweb - Appendix 0.2 - Table of Landowner Suggestions

REP6-023 SP Manweb - Appendix 0.4 - Statement from Gareth Roberts

REP6-024 SP Manweb - Appendix 11.2(a)

REP6-025 SP Manweb - Appendix 11.2(b)

REP6-026 SP Manweb - Appendix 11.2(c)

REP6-027 SP Manweb - Appendix 11.2(d)

REP6-028 SP Manweb - Appendix 11.2(e)

REP6-029 SP Manweb - Appendix 11.2(f)

Page 36: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C36 NWWFC

REP6-030 SP Manweb - Appendix 12.3 - E-mail response to Denbighshire County

Council

REP6-031 SP Manweb - Appendix 4.10 - The latest correspondence received from

NATS

REP6-032 SP Manweb - Land plans - Option A - Key Plan and Sheets 1-13

REP6-033 SP Manweb - Land plans - Option B - Key Plan and Sheets 1-13

REP6-034 SP Manweb - Landscaping Plans and Important Hedgerows v3 - Sheet 3

REP6-035 SP Manweb - Response to the ExA's Second Written Questions

REP6-036 SP Manweb - Response to the ExA's Second Written Questions - Index

REP6-037 SP Manweb - Tracker document (Summary tracker for the Book of

Reference)

REP6-038 SP Manweb - Covering letter 23 November 2015 (late submission

accepted at the discretion of the ExA)

REP6-039 SP Manweb - Response to Post-hearing submissions from Interested

Parties submitted at Deadline 4 (late submission accepted at the

discretion of the ExA)

REP6-040 SP Manweb - Index to accompany response to post-hearing

submissions from Interested Parties submitted at Deadline 4 (late

submission accepted at the discretion of the ExA)

REP6-041 SP Manweb - Appendix to SP Manweb’s response to post-hearing

submissions from Interested Parties at Deadline 4: Guidance on the

application of separation distances from residential properties (May

2014) - Full report (late submission accepted at the discretion of the

ExA)

REP6-042 SP Manweb - Covering letter 25 November 2015 (late submission

accepted at the discretion of the ExA)

REP6-043 SP Manweb - Landscaping plans: Landscaping and reinstatement

planting - Option B (Sheets 1-13) (late submission accepted at the

discretion of the ExA)

REP6-044 SP Manweb - Appendix to the response to the ExA's Second Written

Question NWWFC SWQ12.7 (The "Berain Paper") (late submission

accepted at the discretion of the ExA)

REP6-045 SP Manweb - Correspondence with BT regarding protective provisions

(late submission accepted at the discretion of the ExA)

REP6-046 Amber Real Estate Investments Limited - Response to ExA’s second

written questions (late submission accepted at the discretion of the

ExA)

Page 37: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C37 NWWFC

Deadline 7 – 3 December 2015

Comments on responses to ExA’s second written questions Notification of wish to make oral representations at December hearings

REP7-001 SP Manweb - Covering letter

REP7-002 SP Manweb - Letter to the ExA

REP7-003 SP Manweb - Response to submissions from Interested Parties

submitted at Deadline 5

REP7-004 SP Manweb - Index to accompany response to submissions from

Interested Parties submitted at Deadline 5

REP7-005 SP Manweb - Responses to Second Written Questions submissions

REP7-006 SP Manweb - Index to accompany responses to Second Written

Questions Submissions

REP7-007 SP Manweb - Strategic Options Report Addendum 2

REP7-008 SP Manweb - Funding Statement Addendum (with appendices)

REP7-009 SP Manweb - Statement on option B in relation to question 0.4

REP7-010 Natural Resources Wales - Submission

REP7-011 Wales and West Utilities - Submission

REP7-012 Eifion Bibby - Comments on the applicant’s response to second round of

written questions (late submission accepted at the discretion of the

ExA)

Deadline 8 – 8 December 2015

Written representations regarding the proposed provision for the compulsory

acquisition of rights over additional land

No Documents were received for this Deadline

Deadline 9 – 21 December 2015

Post-hearing documents

Revised draft DCO from applicant Comments on written representations regarding the proposed provision for

the compulsory acquisition of additional land

Any further information requested by the ExA

REP9-001 Mr Conrad Proudlock - Hearing submission

REP9-002 Dewi Parry – Post-hearing submission

REP9-003 Eifion Bibby - Action Points from the Compulsory Acquisition Hearing of

Page 38: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C38 NWWFC

9 December 2015

REP9-004 Eifion Bibby - Response to Action Points 1 and 11 from the Compulsory

Acquisition Hearing of 9 December 2015

REP9-005 John Mars Jones – Post-hearing submission - request for the ExA to

undertake an unaccompanied site inspection

REP9-006 Iwan Jones - Response to Action Points from day 1

REP9-007 Iwan Jones - Note on single post design/earthing substation and;

‘serious concern’ at Eriviat/A543 and suggested cable options. Post-

hearing submission

REP9-008 Iwan Jones - Notes provided at the hearings on the definition of

'Serious Concern' and 'Agricultural Land Matrix' in relation to the

examination of the application for the Brechfa Forest Connection

project. Not published in error

REP9-009 John Fleet - Request for undergrounding (late submission accepted at

the discretion of the ExA)

REP9-010 John Hopkinson - Written submission of oral representation made at the

Open Floor Hearing of 9 December 2015 submission

REP9-011 John Mars Jones - Response to the Applicant’s letter of 2 December

2015, the Strategic Options Report (Addendum 2) and Addendum to

the Explanation from SP Manweb (dated 30 September 2015) (JMJ3)

REP9-012 John Mars Jones - Comments on the draft Development Consent Order

v4 (JMJ4)

REP9-013 John Mars Jones - Visualisation of the location of wood poles numbers

159 to 174 at Berain (JMJ5)

REP9-014 Lois Williams - Objection to the connection as a permanent

infrastructure (late submission accepted at the discretion of the ExA)

REP9-015 Martin Barlow - Responses to further documents and submissions made

at hearings (late submission accepted at the discretion of the ExA)

REP9-016 Pylon the Pressure Group - Elaboration of evidence presented at the

Open Floor Hearing of 9 December 2015

REP9-017 Robin Barlow - Written submission of oral representation made at the

Open Floor Hearing 9 December 2015 submission

REP9-018 Sheila Harman – Post-hearing submission

REP9-019 SP Manweb - Agreed Statement of Common Ground between SP

Manweb and Natural Resources Wales

REP9-020 SP Manweb - Correspondence from the Crown Estate, which provides

consent pursuant to s.135(1) and (2) Planning Act 2008

Page 39: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C39 NWWFC

REP9-021 SP Manweb - Signed Statement of Common Ground between SP

Manweb and Conwy County Borough Council

REP9-022 SP Manweb - Covering Letter

REP9-023 SP Manweb - Written Summaries of Oral Evidence (IS Hearing 8th

December 2015) including Action Notes (Document reference SPM

NWWFC SISH01)

REP9-024 SP Manweb - Written Summaries of Oral Evidence (CA Hearing 9th

December 2015) Including Action Notes (Document Reference SPM

NWWFC SCAH02)

REP9-025 SP Manweb - Written Summaries of Oral Evidence (DCO Hearing 10th

December 2015) Including Action Notes (Document Reference SPM

NWWFC SDCOH03)

REP9-026 SP Manweb - Draft Development Consent Order for Option A v5

(Document reference 3.1 v5)

REP9-027 SP Manweb - Draft Development Consent Order for Option A v5 -

Document showing the tracked changes between the Development

Consent Order for Option A v4 (submitted November 2015) and

Development Consent Order for Option A v5 (submitted December

2015) (Document reference 3.1 v5 - Tracked)

REP9-028 SP Manweb - Draft Development Consent Order for Option B v2

(Document reference 3.1 Option B v2)

REP9-029 SP Manweb - Draft Development Consent Order for Option B v2 -

Document showing the tracked changes between the Development

Consent Order for Option B v1 (submitted November 2015) and

Development Consent Order for Option B v2 (submitted December

2015) (Document reference 3.1 Option B v2 - Tracked)

REP9-030 SP Manweb - Outline Construction Environmental Management Plan

Version 4 (Document Reference 6.18 v4)

REP9-031 SP Manweb - Outline Construction Environmental Management Plan

Version 4 - Tracked Change Version (Document Reference 6.18 v4 -

Tracked)

REP9-032 SP Manweb - Outline Hedgerow Management Plan Version 4 (Document

reference 6.18C v4)

REP9-033 SP Manweb - Outline Hedgerow Management Plan Version 4 - Tracked

Change Version (Document reference 6.18C v4 - Tracked)

REP9-034 SP Manweb - Outline Ecological Management Plan Version 3 (Document

reference 6.18D v3)

REP9-035 SP Manweb- Outline Ecological Management Plan Version 3 - Tracked

Change Version (Document reference 6.18D v3 - Tracked)

REP9-036 SP Manweb- CEMP, HMP and EcMP Tracker (Document reference SPM

NWWFC DL9 EMT)

Page 40: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C40 NWWFC

REP9-037 SP Manweb - Statement of Common Ground between SP Manweb and

Denbighshire County Council (Document reference NWWFC DL9 SOCG

DCC)

REP9-038 SP Manweb - Appendix 6 to Action Point 6: Summary Landowner and

Part 3 of the Book of Reference Interest Negotiations SPM NWWFC DL9

Day 2 AP6

REP9-039 SP Manweb - Written Summary of the Oral Case in relation to Berain

(Document reference SPM NWWFC DL9 AI 5.2 Berain)

REP9-040 Mr S P White - Written submission following the Compulsory Acquisition

Hearing of 9 December 2015

REP9-041 Welsh Water - Confirming withdrawal of objection in respect of the

Application

Deadline 10 – 21 January 2016

Comments on ExA’s proposed revisions to the draft DCO and RIES

Comments on post-hearing documents Any further information requested by the ExA

REP10-001 Dewi Parry - Comments on post-hearing documents

REP10-002 Eifion Bibby - Comments on the ExA’s Consultation Draft DCO

REP10-003 Iwan Jones - Comments on the ExA’s Consultation Draft DCO

REP10-004 Natural Resources Wales - Letter concerning Section 135 of the

Planning Act 2008

REP10-005 Pylon the Pressure Group - Comments on further post-hearing

documents

REP10-006 Robin Barlow - Submission regarding the Clocaenog substation

REP10-007 Sheila Harman - Comments on the ExA’s Consultation Draft DCO

REP10-008 SP Manweb - Covering letter

REP10-009 SP Manweb - Updated Book of Reference (BOR) for Option A Version 4

(Document Reference 4.3 v4) Clean version

REP10-010 SP Manweb - Updated Book of Reference (BOR) for Option A Version 4

(Document Reference 4.3 4) Track changed version

REP10-011 SP Manweb - Responses to submissions made by Interested Parties and

Statutory Consultees during and after the Oral Hearings that took place

in December 2015, with associated Appendices 1 and 2

REP10-012 SP Manweb - Index to accompany the responses to submissions made

by Interested Parties and Statutory Consultees during and after the

Oral Hearings that took place in December 2015

Page 41: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C41 NWWFC

REP10-013 SP Manweb Heritage Assessment: Effects on Berain, Llanefydd, Conwy

REP10-014 SP Manweb - Statement of Common Ground between SP Manweb and

Cefn Group

REP10-015 SP Manweb - Email between SP Manweb and the MOD relating to a

Statement of Common Ground

REP10-016 Email between SP Manweb and NRW relating to the Statement of

Common Ground

REP10-017 SP Manweb - Statement of Common Ground between SP Manweb and

the Ramblers Association

REP10-018 SP Manweb - Statement of Common Ground between SP Manweb and

RWE Innogy UK Ltd and Brenig Wind Ltd

REP10-019 SP Manweb - Comments on the ExA's consultation draft DCO

REP10-020 SP Manweb - Comments on the ExA’s Report on the Implications for

European Sites (RIES)

REP10-021 SP Manweb - Updated Book of Reference (BOR) for Option B Version 2

(Document Reference 4.3 v2) Clean version

REP10-022 SP Manweb - Updated Book of Reference (BOR) for Option B Version 2

(Document Reference 4.3 v2) Track changed version

REP10-023 Welsh Government (Cadw) - Response to the request for further

information issued by the ExA on 14 December 2015

REP10-024 Dr James Davies MP (late submission from a non-interested party

accepted at the discretion of the ExA)

Deadline 11 – 28 January 2016 Responses to comments on ExA’s proposed revisions to the draft DCO and

RIES Comments on any further information requested by the ExA

REP11-001 Cefn Meririadog and Glascoed Road Users Group - Responses to

Deadline 10 comments and responses

REP11-002 Dewi Parry - Responses to Deadline 10 comments and responses

REP11-003 Durand Hotham - Letter concerning Plas Newydd, Cefn Meiriadog

REP11-004 Iwan Jones - Responses to Deadline 10 comments and responses

REP11-005 John Mars Jones - Responses to Deadline 10 comments and responses

REP11-006 Robin Barlow - Responses to Deadline 10 comments and responses

REP11-007 SP Manweb - Covering letter

Page 42: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C42 NWWFC

REP11-008 SP Manweb - Statement of Common Ground between SP Manweb and

the Welsh Government

REP11-009 SP Manweb - Addendum to the Book of Reference Option A Version 4

(Document Reference 4.3 Option A V.4 (addendum))

REP11-010 SP Manweb - Addendum to the Book of Reference Option B Version 2

(Document Reference 4.3 Option B V.2 (addendum))

REP11-011 SP Manweb - Response to CADW’s submission at Deadline 10

REP11-012 SP Manweb - Responses to submissions made by Interested Parties and

Statutory Consultees at Deadline 10

REP11-013 SP Manweb - Summary of Landowner and Part 3 Interest Negotiations

REP11-014 SP Manweb - Excel spreadsheet summarising negotiations to Date;

version 2

REP11-015 SP Manweb - Signed Statement of Common Ground between SP

Manweb and NRW

REP11-016 SP Manweb - Correspondence from Wardell Armstrong in relation to

negotiation updates from the Crown

REP11-017 SP Manweb - Draft Development Consent Order for Option A v6.

Document showing the tracked changes between the Development

Consent Order for Option A v5 (submitted December 2015) and

Development Consent Order for Option A v6 (submitted January 2016)

(Document Reference 3.1 v6 Tracked)

REP11-018 SP Manweb - Draft Development Consent Order for Option A v6

(Document Reference 3.1 v6)

REP11-019 SP Manweb - Draft Development Consent Order for Option B v3.

Document showing the tracked changes between the Development

Consent Order for Option B v2 (submitted December 2015) and

Development Consent Order for Option B v3 (submitted January 2016)

(Document Reference 3.1 Option B v3 Tracked)

REP11-020 SP Manweb - Draft Development Consent Order for Option B v3

(Document Reference 3.1 Option B v3)

REP11-021 SP Manweb - Comparison draft Development Consent Order (Option A)

showing the tracked changes between the DCO submitted in the

application and Deadline 11

REP11-022 SP Manweb - Comparison draft Development Consent Order (Option B)

showing the tracked changes between the DCO submitted in the

application for Option B and Deadline 11

REP11-023 Welsh Government - Comments on the ExA’s Report on the

Implications for European Sites

Page 43: APPENDIX C: EXAMINATION LIBRARY... · APPENDIX C: EXAMINATION LIBRARY This Examination Library relates to the North Wales Wind Farms Connection (NWWFC) application. The library lists

Report to the Secretary of State C43 NWWFC

Other documents

OD-001 Transboundary Screening Matrix

Certificates and Book of Reference – 10 June 2015 OD-002 Applicant's cover letter for the certificates of compliance

OD-003 Certificate of Compliance Regulation 13

OD-004 Certificate of Compliance Section 56

OD-005 Certificate of Compliance Section 59

OD-006 Submission to accompany Certificates of Compliance v1

OD-007 4.3 Book of Reference Parts 1-5 submitted with s59 certificates

OD-008 4.3 Book of Reference Parts 1-5 tracked changes v0-v1

OD-009 Schedule of Changes relating to the Updated Book of Reference v1

OD-010 SP Manweb – Regulation 9a Notice for NWWFC Project Option B dated

16 November 2015

OD-011 SP Manweb – Regulation 9b Certificate for NWWFC Project Option B

dated 16 November 2015