A-1 Financial Compliance Each year the Department provides to the Governor and the Legislature summary financial information and a statement of assurance that the Department has prepared a comprehensive financial report of all funds for the preceding year. The financial report must include a report by independent public accountants attesting that the financial statements present fairly the financial position of the Department in conformity with generally accepted accounting principles (GAAP). The Department has prepared a Comprehensive Annual Financial Report (CAFR) for Fiscal Year (FY) 2012. Included in the CAFR will be a report of the independent public accountants, Rubin Brown, LLP, once all outstanding State of Kansas audits are complete. Also included is a certificate of achievement awarded to the Department for excellence in financial reporting for the 2012 CAFR. The award marks the 24th consecutive year the Department has received the award for excellence in financial reporting. The complete CAFR will be available by contacting KDOT’s Bureau of Transportation Information at 785-296-3585 (Voice)/ (TTY). The CAFR will also be available on KDOT’s Website at http://www.ksdot.org/burFiscal/default.asp, under KDOT Financial Disclosures. This appendix contains additional transportation information including: •Financial Compliance •Project Selection Criteria •Project list detailing projects scheduled for improvement during FY 2013-2020, projects completed in FY 2012 and projects under construction as of November 2012. Also list of aviation, rail and public transit projects. •Transportation Revolving Fund •Modal Information •Federal Fund Exchange Program APPENDIX 2013 Annual Report KANSAS DEPARTMENT OF TRANSPORTATIONS to the Section A

Upload: others

Post on 02-Jan-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

A-1

Financial Compliance Each year the Department provides to the Governor and the

Legislature summary financial information and a statement of assurance that the Department has prepared a comprehensive financial report of all funds for the preceding year. The financial report must include a report by independent public accountants attesting that the financial statements present fairly the financial position of the Department in conformity with generally accepted accounting principles (GAAP).

The Department has prepared a Comprehensive Annual Financial Report (CAFR) for Fiscal Year (FY) 2012. Included in the CAFR will be a report of the independent public accountants,

Rubin Brown, LLP, once all outstanding State of Kansas audits are complete. Also included is a certificate of achievement awarded to the Department for excellence in financial reporting for the 2012 CAFR. The award marks the 24th consecutive year the Department has received the award for excellence in financial reporting.

The complete CAFR will be available by contacting KDOT’s Bureau of Transportation Information at 785-296-3585 (Voice)/(TTY). The CAFR will also be available on KDOT’s Website at http://www.ksdot.org/burFiscal/default.asp, under KDOT Financial Disclosures.

This appendix contains additional transportation information including:•FinancialCompliance•ProjectSelectionCriteria•ProjectlistdetailingprojectsscheduledforimprovementduringFY2013-2020, projectscompletedinFY2012andprojectsunderconstructionasof November2012.Alsolistofaviation,railandpublictransitprojects.•TransportationRevolvingFund•ModalInformation•FederalFundExchangeProgram

APPENDIX

2013AnnualReportKansas Department of transportation’s

to the

Section A

Page 2: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

A-2

FY 2012 Financial inFormation

The following schedule is a summary of revenues and expenditures for all funds for FY 2012. All amounts are in thousands.

Percent 2012 of Total

REVENUES Motor Fuel Taxes Vehicle Registrations and Permits Intergovernmental Sales and Use Taxes Investment Earnings Motor Carrier Property Taxes Other Transfers from Other State Funds

Total revenues

$ 431,280

177,649 492,615 312,934

4,656 0

13,415

3,665

1,436,214

31

1234220

01

0

100

130,123 365,988 115,293

258,498

11,307 258,038 43,050 64,021

65,145 74,008

313,402

1,698,873

0 0

(262,659)

7 22 7

15 1

15 3 4

4 4

18 100

00

100

EXPENDITURES Current Operating Maintenance Preservation Modernization Expansion and enhancement Communications system Local Support Rail, Air and Public Trans. Management Debt Service Principal Interest and fees Transfers to Other State Funds Total expenditures

OTHER SOURCES (uses)Revenue Bond Proceeds Total other Excess (Deficiency) of Revenues and Other Sources Over Expenditures

%

%

%

%

%

%

Percent 2012 of Total

Page 3: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

A-3

Project Selection CriteriaIn May 2010, the Kansas Legislature passed the transportation

program, Transportation Works for Kansas (T-WORKS) which covers a 10- year period that began in FY 2011. In T-WORKS, the Kansas Department of Transportation (KDOT) was directed to develop a strategic approach to highway project selection that al-lowed for greater stakeholder input and flexibility. KDOT is pilot-ing this new process when selecting the construction projects for this program.

Under T-WORKS, construction projects are categorized into four core programs: Preservation, Modernization, Expansion and Local Construction. The four core programs group construction projects with similar work types and scopes together. Projects within each of these major programs are further grouped together based upon similar funding sources or project-types into more spe-cific groups or subcategories.

For the Preservation program, engineering factors continue to be an effective method for project selection. However, in the Mod-ernization and Expansion programs, engineering factors were aug-mented with other factors. In the Modernization program, project selection combined historically strong engineering-based formulas with regional priorities and in the Expansion program, project selections combined engineer-ing factors with regional priorities and econom-ic impacts. In each of the programs, proposed projects are scored and ranked based upon how well the proposed projects address the relevant criteria. Then, selections are made based upon the combined information. Project selection

for the fourth core program, Local Construction, is unchanged and is determined at the local level by local entities throughout the state with the coordination of KDOT’s Bureau of Local Projects.

Engineering factors for the preservation, modernization and expansion programs were evaluated using the engineering based formulas KDOT already has established. Regional priorities are determined through local-consult meetings held periodically throughout the state. To date, KDOT has conducted local consult meetings twice- once in late 2010 and again in late 2012. Through these meetings and through the continued interaction between the area and district engineers with local entities, KDOT maintains a dialogue with stakeholders throughout the state concerning regional focus and priorities. Potential economic impact was assessed by the agency through the piloting of the computer modeling package-Transportation Economic Development Impact System (TREDIS). TREDIS estimates the increase in jobs, income and economic out-put for a region due to a transportation improvement.

The chart below outlines the selection criteria applied to T-WORKS projects in each of the four core programs and the weight given to each criterion.

T-WORKSProjectSelectionCriteriaProgram EngineeringRegional EconomicOther Factors Priorities Impact

Preservation 100%

Modernization 80% 20%

Expansion 50% 25% 25%

Local Construction 100%

Page 4: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

A-4

The Preservation program protects the public’s investment in its highway system by maintaining the “as built” condition of roads and bridges. Projects in this group range from roadway surfacing rehabilitation and bridge repairs to pavement and bridge replacement.

The engineering factors used when selecting preservation proj-ects relate to the pavement and bridge conditions, like remaining pavement life, rutting, and cracking for roads and joint or bridge deck condition and/or load ratings for bridges. Roads and bridges are evaluated on an annual basis and projects are selected based upon this annual review. Additionally, within the Preservation program, are smaller scale set-aside projects that address such is-sues as signing, pavement markings and railroad crossing surfaces. These set-aside projects are so named because the funds to per-form the work is “set aside” or reserved specifically for the type of work designated by the set-aside category. The set-aside group of projects is selected on an annual basis like the other preservation projects. Since the Preservation program of projects is selected a year at a time, the majority of the preservation projects listed in this report are for work to be performed in fiscal year 2013 or early 2014. Selecting and programming projects on an annual basis allows KDOT to maintain flexibility and responsiveness in their project selection during the remainder of the T-WORKS program.

The second core program, Modernization, focuses on improve-ments to the existing system. Projects under this program are designed to enhance safety and/or improve roadways by adding shoulders, flattening hills, straightening curves and upgrading intersections on already existing roadways. In May 2011, the final selection of the major modernization projects to be completed under T-WORKS was made. These projects were then jointly announced in late May and June 2011 by the Governor and Sec-retary of Transportation. With the majority of the modernization program already selected, the projects to be undertaken during

T-WORKS appear in this report. In contrast to the majority of the modernization program,

the practical improvement group of modernization projects is selected on a need basis and is developed out of the preservation annual review of the roads and bridges. The projects within the practical improvement group are hybrids with elements of both the preservation and modernization program. In general, practical im-provement projects have greater complexity than preservation type projects making them a better fit within the Modernization program. Project scope pertaining to shoulder improvement is an example of the type of work that is a good candidate for the practical improve-ment approach. By employing the practical improvement approach, a project may be completed in the most cost-efficient manner feasible. The implementation of this approach enables KDOT to stretch construction dollars and provide the greatest benefit possible for the dollars spent. While most of the funds for Modernization have been programmed and projects have been selected, a small portion of funding has been reserved to fund the practical improve-ment projects as they are identified as the T-WORKS progresses. In this way, flexibility in scheduling is balanced with the need to select major modernization projects because of their complexity early in a program to ensure that sufficient time is provided for completion.

The Expansion program, the third principal group under T-WORKS, is intended for projects that expand and enhance the transportation system. Projects in this program concentrate on im-proving access by adding new lanes or interchanges, reducing com-mute time and improving air quality by relieving congestion and enhancing economic development in a region by selecting projects with high economic impact. The expansion program with the ex-ception of the economic development portion was selected in early FY 2011 and announced by the Governor and Secretary of Trans-portation in May and June 2011. The expansion projects selected to be completed under T-WORKS appear in this report- including

Page 5: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

A-5

all economic development projects selected to date. Because of the complex nature of the Expansion program of projects, early selec-tion is crucial to allow sufficient planning, design and construction time.

However, in order to maintain some flexibility in scheduling, the economic development projects have been partially selected. The remaining economic development projects will be selected on an ongoing basis throughout T-WORKS as viable projects surface. In this way, the agency maintains some flexibility to respond to new opportunities as they arise throughout the remainder of the T-WORKS program.

The fourth program, Local Construction, focuses on improve-ments to city or county roads. The work encompassed by this program is varied in nature ranging from safety oriented, to main-tenance of existing roadway, to small-scale expansion type projects but regardless of the project focus, the common denominator is that the work is always on a city or county road. Many of the subcat-egories within the Local Construction program like the City Con-necting Link Resurfacing Program (KLINK) and Transportation Enhancement (TE) to name only two are partnership programs in which KDOT or the federal government partner with local enti-ties to share the costs and enable local dollars to stretch further. To generate candidate projects, many partnership programs employ a solicitation process in which prospective projects are solicited through an application. The pool of project applications is priori-tized based on program specific criteria. Then projects are selected in order of priority and programmed until the available funds are expended. The schedule for project solicitation varies but most of the partnership programs solicit projects on an annual basis. In oth-er subcategories within the local construction program, the locals are solely responsible for project selection and development. To as-sist local entities in their selection process KDOT makes available bridge inspection data, traffic accident data and traffic count data

among other resources. For local construction, the Bureau of Local Projects is the primary point of contact within KDOT. For detailed information concerning the local construction program and specifi-cally the partnership programs visit the T-WORKS website, the link is provided below.

For an in depth look at the projects selected and undertaken during T-WORKS- including those projects in the core programs, KDOT has established a website that provides information about the entire T-WORKS program. This website is a continued effort on KDOT’s part to gain greater stakeholder input. To accomplish this goal, the website is not only a source of more information but is interactive with sites throughout that provide opportunities to submit questions, opportunities for participation in discussions and opportunities for comment submission. The T-WORKS website is located at the following link http://kdotapp.ksdot.org/TWorks/ .

Project ListingsThe project listings can be found starting on page B-1.

Transportation Revolving FundThe Transportation Revolving Fund is a statewide revolving

loan fund that provides low-cost loans to local units of government for financing road and bridge improvements.

The improvement may be on or off the State Highway System. Since the first loan in August of 2004, the fund has provided 112 loans to 56 cities and counties. The fund has $135.5 million in executed loans with interest rates ranging from 3.25 percent to 4.36 percent.

Page 6: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

A-6

Modal InformationPublic Transportation

Public transportation in Kansas is supported by one state program and five Federal Transit Administration (FTA) funding programs. These funding programs, which are augmented by local match, provide the funding for the 84 general public transit service providers and the 59 transit providers that service elderly persons and persons with disabilities throughout the state. Without these programs, many citizens would have no access to public transportation.

The FTA 49 U.S.C. 5311 program provides funding to support rural and small urban (under 50,000 population) transportation projects that serve the general public. Funds are available for both capital and operating assistance. For Federal Fiscal Year 2012, the 5311 program for the state of Kansas was funded in the amount of $9,435,575.00.

FTA 49 U.S.C. 5310 provides federal funds to private nonprofit entities or public agencies approved by the state to purchase vehicles and related equipment that meet the special needs transportation specifically for elderly persons and persons with disabilities. Urbanized areas and nonurban areas with populations under 50,000 are eligible for 5310 funds. For Federal Fiscal Year 2012, the 5310 program for the state of Kansas was funded in the amount of $1,269,778.00.

FTA 49 U.S.C. 5316 provides federal funds to local governmental agencies and nonprofit entities for capital and operating expenses of equipment, facilities, and associated capital maintenance items related to providing access to jobs. For Federal Fiscal Year 2012, the 5316 program for the state of Kansas was funded in the amount of $744,770.00.

FTA 49 U.S.C. 5317 provides federal funds to encourage services and facility improvements to address the transportation needs of persons with disabilities that go beyond those required by the Americans with Disabilities Act. Funding may be used for

associated capital and operating cost. For Federal Fiscal Year 2012, the 5317 program for the state of Kansas was funded in the amount of $436,244.00.

FTA 49 U.S.C. 5309 is a capital investment program with annual funding depending on Congressional earmarks. Assistance is available for the purchase of vehicles and vehicle related equipment and/or facility construction and/or renovation.

Funding for the state program is available from the Coordinated Public Transportation Assistance Fund. The State Highway Fund provides $6 million annually for needed transportation services in areas of the state lacking public transit services and to expand, improve and enhance existing services.

Rail Service Improvement FundMany areas of the state no longer have service from Class I

railroads. Short line railroads provide rail service to such areas, provide an alternative to trucks for freight (primarily grain) shippers, and keep rural areas of the state connected to the national rail network as well as national and international markets for Kansas grains and products. This alternative provides competition and helps keep shipping rates down. It also reduces the number of trucks that would otherwise be on Kansas roads and highways. This in turn avoids increased maintenance and rehabilitation costs for those roads.

The Rail Service Improvement Fund is administered by KDOT’s freight and rail unit. The fund makes loans available to short line railroads, port authorities operating in Kansas and shippers and local units of government. The low-interest, long-term (10-year) loans and grants are used primarily for track rehabilitation, capacity improvement and economic development projects. Funds may also be used for financing and acquisition activities and the purchase of rolling stock. Beginning July 1, 2013, the fund will receive $5 million annually.

Page 7: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

A-7

Kansas Airport Improvement ProgramWhen time is of the essence, no other means of travel can fulfill

time-sensitive requirements the way that air transportation does. Airports serve an important role in the state transportation system. The foremost role is the economic activity generated by companies that rely on airports in their daily business. According to the 2010 Kansas Aviation Economic Impact Study, aviation contributes over $20 billion to the Kansas economy each year (the highest per capita economic impact of any state).

Also important are medical services, both fly-in by professionals as well as emergency evacuations. In addition, agricultural applications, charters, a link to the national air transportation system, private air travel, and many other services are available.

The goals of the Kansas Airport Improvement Program (KAIP) include:smaintain the system’s runway condition rating of “very good;”sminimize surface travel time to air ambulance pick-up

locations;simprove safety, and;senhance airport and community economic development

appeal.The program is open to public-use airports in Kansas as defined

in K.S.A. 75-5061. Projects under this program are solicited annually to preserve or modernize facilities, to design or plan continued development and to improve or add equipment. A key element of the program is a matching requirement of between 5 and 50 percent, which is determined by community population, category of project and type of ownership. The program’s $3 million per year in state funds, combined with local matching funds, results in $4 to $4.5 million in improvements per year.

To date, the program has supported 380 projects at 110 public-use airports.

Federal Fund Exchange ProgramThe federal fund exchange program is a voluntary program

that allows a local public agency (LPA) to trade all or a portion of its federal funding allocation in a specific federal fiscal year with KDOT in exchange for state transportation dollars or with another LPA in exchange for their local funds.

Under this program the LPA may develop projects following local procedures, criteria, and standards. All work performed shall be consistent with the Kansas Statutes, applicable regulations, and normal engineering practices for the work being done. Any work performed on the state highway or city connecting link will require coordination with the local KDOT Area Office.

Only LPAs that are eligible to receive a federal funding allocation may participate in the federal fund exchange program. Eligible LPAs include all counties in the state and cities with populations greater than 5,000 that are not located in a Transportation Management Area (TMA). Currently the only TMAs in Kansas are the Mid America Regional Council (MARC – Kansas City Region) and the Wichita Area Metropolitan Planning Organization (WAMPO).

Participation in the program is optional. An eligible LPA may choose to exchange its federal funds or it may use the funds to develop a federal aid project following the established procedures.

In general, KDOT will determine the amount of state funds available for exchange annually at the time the federal funding is confirmed for a federal fiscal year (FFY). KDOT may conduct more frequent reviews of available funding when necessary as a result of funding or budgetary considerations. Around the beginning of each new FFY, KDOT’s Bureau of Local Projects will notify the LPAs in writing the amount they are eligible to receive for that FFY.

For more details on this program, see KDOT’s website at www.ksdot.org/burlocalproj/.

Page 8: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

B-1

Project Listings

The projects scheduled for improvement during FY 2013-2020, projects completed in FY 2012, and projects under construction as of November 2012 are organized in alphabetical order by county. Each one includes a project description, length, construction cost or estimated construction cost, and work type.

K.S.A. Supp. 68-2315, as amended, requires information concerning construction work completed, construction work in progress, and planned projects for future years. A detailed explanation of the methods or criteria employed in the selection of projects is also required and can be found in this Appendix.

In addition to state highway construction project lists are aviation, rail, and public transit project listings.

NOTE: This section, as well as previous Annual Reports, is available on KDOT’s Internet site at www.ksdot.org/publications.asp, in the Report and Studies listing.

The project lists are:

Projects scheduled for improvement during FY 2013-2020, pages 3 to 21.

Projects completed in FY 2012, pages 22 to 45.

Projects under construction as of November 2012, pages 46 to 66.

Aviation projects, pages 68 to 69.

Rail projects, page 70.

Public transit projects, pages 71 to 73.

Section B

Thissectioncontainstheseparateprojectlists.

Page 9: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

B-2

LC-LocalConstruction HAZ - Safety Projects (HSIP, off system) HES - Safety Projects (HSIP, on system) K1R - KLINK Resurfacing K3R - Geometric Improvements for KLINKs LOC - Local Construction (Local Administered & Let) RES - Local Construction (KDOT Administered & Let) RRX - Railroad Crossing Protection (HSIP, on system) RXR - Railroad Crossing Protection (HSIP, off system) SRT - Safe Routes To Schools (Federal) TEX - Transportation Enhancement Program

MM-Modernization-Safety&ShoulderImprovements 1RS - Resurfacing w/Improvements (Practical Design) COR - Corridor Management GFU - Guard Fence Upgrades (No Longer Used) IRI - Interstate Roadway Geometric Improvements KCC - KCC Railroad Crossing Projects LTG - Highway Lighting MPR - Miscellaneous (No Longer Used) OVC - Oil Overcharge (No Longer Used) RIM - Non Interstate Geometric Improvements SAF - Safety Projects (State) SBW - Scenic Byway

SE-Expansion/Enhancement-AddingSomethingNew EDP - Economic Development IRC - Interstate Capacity Impr (old IRI split to Exp/Enh) ITS - Intelligent Transportation Systems (ITS)

ProgrAM cAtegories

SE-Expansion/Enhancement-AddingSomethingNew RIC - Non Interstate Capacity Impr (old RIM split to Exp/Enh) RSL - Local Partnership Railroad Grade Separations RSP - New Railroad Grade Separations (State) SEB - System Enh. Bypasses SEC - System Enh. Corridors SEI - System Enh. Interchanges/Separations SEW - Systen Enh. Wichita Railroad Crossings

SM-Preservation-TakingCareofWhatWeHave 1RR - Non Interstate Resurfacing (PMS 1R) BCR - Culvert Repair BSP - Bridge Painting BSR - Bridge Repair CMN - Contract Maintenance (PMS) EMR - Emergency Repair IRP - Interstate Basic Impr (old RIM split to Preservation) ISR - Interstate Resurfacing (PMS) NHP - Miscellaneous for Preservation PBR - Bridge Replacement/Rehabilitation PCR - Culvert (to Bridge) Rehabilitation PDR - Bridge Redeck PMR - Pavement Marking RIP - Non Interstate Basic Impr (old RIM split to Preserv) RRS - Railroad Crossing Surfacing SLR - Signing & Lighting Repair and Replacement SOS - Highway Signing

ThefollowingisabreakdownoftheProgramCategoriesthatareshownintheProjectListing.

Page 10: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

B-3

PROJECTLISTINGFY2013-2020COMPREHENSIVETRANSPORTATIONPROGRAM

The following projects are scheduled for improvement during FY 2013 - 2020. The projects are listed in route/county order. The project listing includes (SM) Preservation, (MM) Modernization, (SE) Expansion and (LC) Local Construction. Not all of the Preservation Program has been identified at this time.

(FY 2013-2020 TWORKS)

FiscalYear

@ Note: Program Categories and Subcategories 12/01/2012 * Blanks indicate project does not have the construction work phase. See page B-2 for breakdown of categories and subcategories.

Route LocationDescriptionEst.FY

Const.Cost(1,000)

ProgCat&SubCat@

County Length(Miles)

TypeofWork

AllenAllenAllenAllenAllenAllenAllen

AndersonAndersonAndersonAndersonAndersonAndersonAndersonAndersonAnderson

AtchisonAtchisonAtchisonAtchisonAtchisonAtchisonAtchisonAtchisonAtchisonAtchison

BarberBarber

BartonBartonBartonBartonBartonBarton

K224U054U059U169U169

K031K031U059U059U169U169

C0000K007K007K009K074K116U059U073U159

U160

C0000K004K004U056

BRIDGE REPLACEMENT IN ALLEN COUNTYUPRR & NORTH DAKOTA ROAD NORTH OF MORANK-224 IN ALLEN COUNTY (FY 2013 1R PROJECT)MILL AND OVERLAY ON US-54 IN ALLEN COUNTYREPLACE BRIDGE ON US-59 IN ALLEN COUNTYDEEP MILL AND OVERLAY ON US-169 IN ALLEN COUNTYUS-169 IN ALLEN COUNTY (FY 2013 1R PROJECT)

BRIDGE REPLACEMENT IN ANDERSON COUNTYUPRR & 900 ROAD 1.5 MILES NORTHEAST OF SELMAUPRR & MARYLAND ROAD SOUTHWEST OF GARNETTREPLACE BRIDGE ON K-31 IN ANDERSON COUNTYREPLACE BRIDGE ON K-31 IN ANDERSON COUNTYCONSTRUCT TURN LANES AT US-59REPLACE BRIDGE ON US-59 IN ANDERSON COUNTYDEEP MILL AND INLAY ON US-169 IN ANDERSON COUNTYGRADING

UNION PACIFIC & 334TH ROAD NORTHWEST OF HURONBRIDGE REPLACEMENT IN ATCHISON COUNTYK-7 IMPROVEMENTS IN ATCHISON COUNTYK-7 IN ATCHISON COUNTY (FY 2013 1R PROJECT)K-9 IN ATCHISON COUNTY (FY 2013 1R PROJECT)CULVERT REPLACEMENT ON K-74 IN ATCHISON COUNTYK-116 IN ATCHISON COUNTY (FY 2013 1R PROJECT)US-59 IMPROVEMENTS IN ATCHISON COUNTYSLOPE PROTECTION IN ATCHISON COUNTY ON US-73BRIDGE REPLACEMENT IN ATCHISON COUNTY

REPLACE BRIDGE ON LOCAL ROAD 88 IN BARBER COUNTY.REPLACE BRIDGE ON US-160 IN BARBER COUNTY

CULVERT IMPROVEMENTS IN BARTON COUNTYKANSAS WETLANDSBRIDGE REPLACEMENT IN BARTON COUNTYBRIDGE REPLACEMENT IN BARTON COUNTYREPLACE BRIDGE ON K-4 IN BARTON COUNTYBRIDGE IMPROVEMENTS & ROAD RECONSTRUCTION

0.20.01.04.40.02.014.4

0.10.00.00.00.00.50.09.38.7

0.00.33.15.14.90.07.02.30.00.0

0.20.0

33.00.00.20.00.01.7

Bridge ReplacementFlashing Light Signal1.5 OverlayMilling And OverlayBridge ReplacementMilling And OverlayPavement Patching

Grade, Bridge & SurfacingFlashing Light SignalFlashing Light SignalBridge ReplacementFunds OnlyGrade & SurfacingBridge ReplacementMilling And OverlayGrade, Bridge & Surfacing

Flashing Light SignalBridge ReplacementSealingMilling And OverlayAsphalt PavementGrade & CulvertRecycle & O-layMilling And OverlaySlide RepairBridge Replacement

Grade, Bridge & SurfacingBridge Replacement

GradingScenic Or Historic Hwy ProgsGrade & BridgeBridge ReplacementFunds OnlyBridge Replacement

1,155280135

6,5131,6002,2952,304

2522502757441005000

10,67217,000

250408359485471432665653450

6571,026

54595470

1,234750

LC-RESLC-RXRSM-1RRSM-RIPSM-PBRSM-RIPSM-1RR

LC-RESLC-RXRLC-RXRSM-PBRSM-PBRMM-CORSM-PBRSM-RIP

MM-RIM

LC-RXRLC-RESLC-K1RSM-1RRSM-1RRSM-PCRSM-1RRLC-K1R

SM-CMNSM-PBR

LC-RESSM-PBR

LC-RESMM-SBWLC-RESSM-PBRSM-PBRSM-PBR

2014201420132013201420142013

201420132014201420142013201520142017

2013201420142013201320152013201320132017

20132014

201420132013201320142016

Page 11: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-4 (FY 2013 - 2020 TWORKS)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

BartonBartonBartonBartonBarton

BourbonBourbonBourbonBourbonBourbonBourbonBourbonBourbonBourbonBourbon

BrownBrownBrownBrownBrownBrownBrownBrownBrown

ButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButler

ChaseChase

U056U281U281U281U281

C1307K003K031K039U069U069U069U069

K020U073U073U075

C0319K177K196U054U054U054U054U054U054U077U400

ROAD IMPROVEMENTS IN GREAT BEND ON US-56CITY OF GREAT BEND: US-281 (MAIN ST.) AND 24TH ST.GEOMETRIC IMPROVEMENT IN GREAT BEND, KANSASREPLACE BRIDGE ON US-281 IN BARTON COUNTYROAD IMPROVEMENTS IN HOISINGTON ON US-281

FORT SCOTT PARK LOOP ROAD AND PARKINGSTREET IMPROVEMENTS IN FORT SCOTTGRADING, SURFACINGREPLACE BRIDGE ON K-3 IN BOURBON COUNTYREPLACE BRIDGE ON K-31 IN BOURBON COUNTYREPLACE BRIDGE ON K-39 IN BOURBON COUNTYBRIDGE #070 & #071 ON US-69 IN BOURBON COUNTYCONSTRUCT UPGRADABLE EXPRESSWAY IN BOURBON COUNTYFT SCOTT US69 IMPROVEMENTSSIGNAL IMPROVEMENTS IN BOURBON COUNTY

HIAWATHA FITNESS AND SCHOOL TRAILKICKAPOO TRIBE COMMUNITY BUILDING PARKING AREA PROJECTUNION PACIFIC & 120TH STREET NORTH OF EVERESTUNION PACIFIC & FALCON ROAD EAST OF MORRILLUPRR & 260TH ROAD 2 MILES NORTH OF HIAWATHAREPLACE BRIDGE ON K-20 IN BROWN COUNTYGEOMETRIC IMPROVEMENT PROJECT IN HORTON KANSASROAD IMPROVEMENT IN HORTON ON US-73PERMANENT SEEDING ALONG US-75 IN BROWN COUNTY

159TH STREET EAST IMPROVEMENTS IN ANDOVERBNSF RAILWAY & 60TH STREET NORTHEAST OF EL DORADOBNSF RAILWAY & PURITY SPRINGS ROAD NE OF AUGUSTABRIDGE ON ANDOVER RD OVER FOURMILE CREEKCITY OF AUGUSTA SOLAR POWERED SPEED MONITORINTERSECTION IMPROVEMENTS, ANDOVER: ANDOVER & 13THROAD IMPROVEMENTS IN BUTLER COUNTYSIDEWALK AND BIKE PATH IN THE CITY OF ROSE HILLUPGRADE SIGNAL AT KELLY AND OHIO IN BUTLER COUNTYGRADING, SURFACING & SIGNALS ON OHIO ST IN AUGUSTAK-177 IN BUTLER COUNTY (FY 2013 1R PROJECT)BRIDGE REPLACEMENTS IN BUTLER COUNTYGEOMETRIC IMPROVEMENT IN AUGUSTA, KANSASROAD IMPROVEMENTS IN AUGUSTA ON US-54ROAD IMPROVEMENTS IN EL DORADO ON US-77 AND US-54ROADWORK ON US-54 AND DIKE ROAD IN BUTLER COUNTYROADWORK ON US-54 IN BUTLER COUNTY WEST OF AUGUSTAUS 54 ANDOVER PARCELS ALONG CORRIDORUS-77 IN BUTLER COUNTY (FY 2013 1R PROJECT)PASSING LANES ON US-400 IN SOUTHEAST KANSAS

BRIDGE REPLACEMENT IN CHASE COUNTYRAIL/HIGHWAY IMPROVEMENT IN CHASE COUNTY

2.00.00.20.00.1

0.80.50.70.00.00.00.06.00.42.0

0.00.00.00.00.00.00.00.44.5

1.40.00.00.70.00.00.20.00.01.022.30.00.40.10.80.17.80.014.72.5

0.10.0

SurfacingTraffic SignalsIntersection ImprovementBridge ReplacementConcrete Pavement

SurfacingSurfacingGrade & SurfacingBridge ReplacementBridge ReplacementBridge ReplacementBridge RepairGrade, Bridge & SurfacingGrade & SurfacingIntelligent Transportation Sys

Pedestrian & Bicycle PathsSurfacingFlashing Light SignalFlashing Light SignalFlashing Light SignalBridge ReplacementIntersection ImprovementMilling And OverlaySeeding, Sodding

Grade & SurfacingFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingIntelligent Transportation SysTraffic SignalsGrade & SurfacingPedestrian & Bicycle PathsIntersection ImprovementGrade & SurfacingMilling And OverlayBridge ReplacementGrade & SurfacingMilling And OverlayMilling And OverlayFunds OnlyGrade & SurfacingRight Of Way On1.5 OverlayGrade & Surfacing

Bridge ReplacementFlashing Light Signal

589246465

1,182305

1,6551,6712,864

0716

2,608264

25,000731215

773212250250280

1,35012125530

4,780250250

7,1680

9522062256720

2,0760

858383614250

12,1730

1,9544,680

508270

LC-K1RMM-SAFLC-K3RSM-PBRLC-K1R

LC-RESLC-RESLC-RESSM-PBRSM-PBRSM-PBRSM-BSRSE-RIC

MM-CORMM-COR

LC-LOCLC-RESLC-RXRLC-RXRLC-RXRSM-PBRLC-K3RLC-K1RSM-RIP

LC-RESLC-RXRLC-RXRLC-RESSE-ITS

LC-HAZLC-RESLC-SRTLC-HAZLC-RESSM-1RRSM-PBRLC-K3RLC-K1RLC-K1RSM-RIPSM-RIP

MM-CORSM-1RRSE-RIC

LC-RESMM-KCC

20142014201520132014

2014201420132015201420142013201720142014

201320142013201320132014201520132014

20142014201420142014201320142014201320142013201620152014201420132014201320132015

20152014

Page 12: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-5 (FY 2013 - 2020 TWORKS)

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

ChaseChaseChaseChase

CherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokee

CheyenneCheyenne

ClarkClarkClark

ClayClayClayClayClay

CloudCloudCloudCloudCloudCloud

CoffeyCoffeyCoffeyCoffey

CowleyCowleyCowleyCowleyCowleyCowleyCowleyCowleyCowleyCowley

C0000U050U050

K007U069U069AU160U166U166U400U400

C0000C0000

C0000

K015K015K015K015K197

K009K009K009K009

I035K058

K015U077U077U077U077U160U166

RESTORE TRAIN DEPOT IN STRONG CITYBRIDGE REPLACEMENT IN CHASE COUNTYPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPASSING LANES ON US-50 IN SOUTHCENTRAL KANSAS

BNSF & BELLEVIEW ROAD 3 MILES SOUTH OF SCAMMONGRADING AND SURFACING OF K-7 IN CHEROKEE COUNTYUS-69 IN CHEROKEE COUNTY (FY 2013 1R PROJECT)GEOMETRIC IMPROVEMENT IN BAXTER SPRINGS, KANSASUS-160 IN CHEROKEE COUNTY (FY 2013 1R PROJECT)BUILD INTERCHANGE AND 4-LANE ON US-166 CHEROKEE COUNTYREPLACE BRIDGE ON US-166 IN CHEROKEE COUNTYPASSING LANES ON US-400 IN SOUTHEAST KANSASUS-400 IMPROVEMENTS IN CHEROKEE COUNTY

BRIDGE REPLACEMENT IN CHEYENNE COUNTYGRADING IN CHEYENNE COUNTY

CITY OF MINNEOLA (SAFE ROUTES TO SCHOOL)DOWNTOWN STREETSCAPE IN THE CITY OF MINNEOLABRIDGE REPLACEMENT IN CLARK COUNTY

BRIDGE REPLACEMENT IN CLAY COUNTYK-15 IN CLAY COUNTY (FY 2013 1R PROJECT)ROAD IMPROVEMENTS IN CLAY CENTER ON K15ROAD IMPROVEMENTS IN CLAY CENTER ON K-15K-197 IN CLAY COUNTY (SY 2013 1R PROJECT)

BNSF & INDUSTRIAL STREET IN CONCORDIABNSF & OLIVE STREET IN CONCORDIAREPLACE BRIDGE ON K-9 (COAL CREEK) IN CLOUD COUNTYREPLACE BRIDGE ON K-9 (COAL CREEK) IN CLOUD COUNTYROAD IMPROVEMENTS IN CONCORDIA ON K-9ROAD IMPROVEMENTS IN CONCORIDA ON K-9

BNSF & KANSAS STREET IN LEBOUPRR & 11TH STREET IN LE ROYSURFACING WORK ON I-35 IN COFFEY COUNTYREPLACE BRIDGE ON K-58 IN COFFEY COUNTY

GRADING & BRIDGE (OVER C ST CANAL) IN COWLEY COUNTYROAD IMPROVEMENMTS IN COWLEY COUNTYSKOL RAILROAD & 3RD AVENUE IN WINFIELDREPLACE BRIDGE ON K-15 IN COWLEY COUNTYGEOMETRIC IMPROVEMENT PROJECT IN WINFIELD KANSASMILL AND OVERLAY ON US-77 IN COWELY COUNTYREPLACE BRIDGE #010 ON US-77 IN COWLEY COUNTYUS-77 IN COWLEY COUNTY (FY 2013 1R PROJECT)ROAD IMPROVEMENTS IN WINFIELD ON US 160BRIDGE REPLACEMENT IN COWLEY COUNTY

0.00.22.11.5

0.011.17.00.412.85.70.02.013.4

0.20.2

0.00.00.2

0.016.10.50.40.3

0.00.00.00.00.80.6

0.00.011.50.0

0.20.50.00.00.29.40.09.80.70.0

Rehab & Oprtn Hist Trans BldgGrade & BridgeGrade & SurfacingGrade & Surfacing

Flashing Light SignalGrade, Bridge & SurfacingMilling And OverlayMilling And Overlay3/4 OverlayGrade, Bridge & SurfacingBridge ReplacementGrade & SurfacingMilling And Overlay

Grade & BridgeGrading

Preliminary EngineeringLandscaping And BeautificationGrade & Bridge

Bridge Replacement1.5 OverlayMilling And OverlayMilling And Overlay1.5 Overlay

Flashing Light SignalFlashing Light SignalBridge ReplacementFunds OnlyMilling And OverlayMilling And Overlay

Flashing Light SignalFlashing Light SignalUltra Thin Bonded Asphalt Surf.Bridge Replacement

Grade, Bridge & SurfacingGrade & SurfacingFlashing Light SignalBridge ReplacementGradingPavement ReconstructionBridge Replacement1.0 OverlayMilling And OverlayBridge Replacement

510790

5,4703,000

25041,668

913262907

38,00095900

9352

0437510

02,44424333446

300300891200208280

450350134425

3960

2503,15675900

9983570

LC-TEXLC-RESSE-RICSE-RIC

LC-RXRMM-RIMSM-1RRLC-K3RSM-1RRSE-RIC

SM-PBRSE-RICSM-RIP

LC-RESLC-RES

LC-SRTLC-TEXLC-RES

SM-PBRSM-1RRLC-K1RLC-K1RSM-1RR

LC-RXRLC-RXRSM-PBRSM-PBRLC-K1RLC-K1R

LC-RXRLC-RXRSM-ISRSM-PBR

LC-RESLC-RESLC-RXRSM-PBRLC-K3RSM-RIPSM-PBRSM-1RRLC-K1RSM-PBR

2013201320152015

201320162013201520132018201320152015

20132013

201320132014

20162013201320142013

201320132014201420132014

2013201420132014

2014201420142014201520162015201320132017

Page 13: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-6 (FY 2013 - 2020 TWORKS)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

CrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawford

DecaturDecatur

DickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinson

DoniphanDoniphanDoniphan

DouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglas

C0000K007K126K126K126U069U069U069U069U069U069B1U069B1U069B1U160

U036U083

I070I070K015K015K018K043K197U077

K007K007U036

K010K010K010K010

BNSF & 630 AVENUE 1 MILE NORTH OF GIRARDBNSF & 650 AVENUE 3 MILES NORTH OF GIRARDKCS RAILWAY & 250TH ROAD 3 MILES SOUTHEAST OF PITTSBURGCRAWFORD COUNTYK-7 IMPROVEMENTS IN CRAWFORD COUNTYBRIDGE REPLACEMENT IN CRAWFORD COUNTYBRIDGE REPLACEMENTS IN CRAWFORD COUNTYBRIDGE REPLACEMENTS IN CRAWFORD COUNTYCONSTRUCT UPGRADABLE EXPRESSWAY IN CRAWFORD COUNTYENVIRONMENTAL ASSESSMENT: US-69 IN CRAWFORD COUNTYROAD IMPROVEMENT IN CRAWFORD COUNTYROAD IMPROVEMENTS IN CRAWFORD COUNTYROAD IMPROVEMENTS ON US-69 IN CRAWFORD COUNTYGEOMETRIC IMPROVEMENT IN PITTSBURG, KANSASINTERSECTION UPGRADE IN PITTSBURGMILL AND OVERLAY ON US-69B IN PITTSBURGUS-69 IMPROVEMENTS IN CRAWFORD COUNTY

BRIDGE REPLACEMENTS ON US-36 IN DECATUR COUNTYBRIDGE REPLACEMENT IN DECATUR COUNTY

BNSF & 1ST STREET IN ENTERPRISEBRIDGE REPLACEMENT IN THE CITY OF HERINGTONROAD IMPROVEMENTS IN DICKENSON COUNTYUPRR & 300 AVENUE SOUTH OF HERINGTONUPRR & RAIN ROAD NORTHEAST OF RAMONAJUNCTION K-43, EAST TO DK-GE COUNTY LINEROADWAY REHAB ON I-70 IN ABILENE (DICKINSON COUNTY)GEOMETRIC IMPROVEMENT IN ABILENE, KANSASK-15 IN DICKINSON COUNTY (FY 2013 1R PROJECT)K-18 IN DICKINSON COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE ON K-43 IN DICKINSON COUNTYK-197 IN DICKINSON COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE ON US-77 IN DICKINSON COUNTY

K-7 IN DONIPHAN COUNTY (FY 2013 1R PROJECT)K-7 IN DONIPHAN COUNTY (FY 2013 PROJECT)BRIDGE #023 ON US-36 IN DONIPHAN COUNTY

CITY OF LAWRENCECITY OF LAWRENCE TRAFFIC SIGNAL COORDINATIONCITY OF LAWRENCE: 9TH AND KENTUCKY STREETSCITY OF LAWRENCE: 9TH STREET FROM EMERY TO MICHIGANK-10 CONNECTION: SOUTH LAWRENCE TRAFFICWAYSIGNAL UPGRADE AT 9TH AND TENNESSEECONSOLIDATION OF ACCESS POINTS: K-10 IN DOUGLAS COUNTYCONSTRUCT K-10 CONNECTION: SOUTH LAWRENCE TRAFFICWAYINTERCHANGE IMPROVEMENTS IN LAWRENCEK-10 IMPROVEMENTS FOR VITAMIN COTTAGE

0.00.00.00.11.10.00.00.05.518.45.46.28.90.10.00.61.2

0.00.0

0.00.26.50.00.08.58.50.111.09.00.01.70.0

5.516.60.0

1.00.00.00.00.00.03.06.00.50.5

Flashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingMilling And OverlayBridge ReplacementBridge ReplacementFunds OnlyGrade, Bridge & SurfacingPreliminary EngineeringPreliminary EngineeringGrade, Bridge & SurfacingPreliminary EngineeringGrade & SurfacingIntersection ImprovementMilling And OverlayPreliminary Engineering

Bridge ReplacementBridge Replacement

Flashing Light SignalBridge ReplacementAsphalt PavementFlashing Light SignalFlashing Light SignalPavement PatchingMilling And OverlayIntersection Improvement1.5 OverlayMilling And OverlayBridge Replacement1.5 OverlayBridge Replacement

Milling And OverlayMilling And OverlayBridge Repair

Grade & SurfacingIntelligent Transportation SysTraffic SignalsSurfacing & SignalSpecialTraffic SignalsSpecialGrade, Bridge & SurfacingGrade, Bridge & SurfacingRoadside Improvement

2502752300

7350

1,47030

22,0000000

8991,3307200

3,1030

275458690225240

2,43124,922

546600933585256

1,974

5271,594

50

5,2810

2045090

208703

150,00017,000

51

LC-RXRLC-RXRLC-RXRLC-RESLC-K1RSM-PBRSM-PBRSM-PBRSE-RICSE-RICSE-RICSE-RICSE-RICLC-K3RLC-HESLC-K1R

MM-RIM

SM-PBRSM-PBR

LC-RXRLC-RESLC-RESLC-RXRLC-RXRSM-ISRSM-IRPLC-K3RSM-1RRSM-1RRSM-PBRSM-1RRSM-PBR

SM-1RRSM-1RRSM-BSR

LC-RESSE-ITS

LC-HAZLC-HAZSE-RICLC-HAZSE-EDPSE-RICSE-RICSE-EDP

20132013201320132013201720142014201720142016201720142014201420132014

20142016

2013201420142014201420132013201420132013201320132014

201320132013

2014201320142014201420132013201420142013

Page 14: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-7 (FY 2013 - 2020 TWORKS)

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

DouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglas

Elk

EllisEllisEllisEllis

EllsworthEllsworthEllsworthEllsworthEllsworth

FinneyFinneyFinneyFinneyFinneyFinneyFinneyFinney

FordFordFordFord

FranklinFranklinFranklinFranklinFranklinFranklinFranklin

Geary

K010U040U040U056U056U056U056U059U059U059U059U059U059

K099

U183

C0238K140K140K140

K023K156K156U050U050B1U083

K094U050U050

C0000I035K068K068K068U169U169

C0000

STUDY: K-10 CONNECTION FROM US-59/K-10 TO K-10BRIDGE REPAIR ON BRIDGES #081 & #082 IN DOUGLAS COUNTYSAFETY PROJECT IN LAWRENCE AT US-40/K-10 INTERCHANGECONSTRUCT CENTER TURN LANE ON US-56 IN DOUGLAS COUNTYREPLACE BRIDGE ON US-56 IN DOUGLAS COUNTYREPLACE BRIDGES ON US-56 IN DOUGLAS COUNTYUS-56 IMPROVEMENTS IN DOUGLAS COUNTYGEOMETRIC IMPROVEMENT IN LAWRENCERECONSTRUCTION ON US-59 IN LAWRENCE (DOUGLAS COUNTY)REPLACE BRIDGE ON US-59 IN DOUGLAS COUNTYREPLACE BRIDGE ON US-59 IN DOUGLAS COUNTYUS-59 IMPROVEMENTS IN DOUGLAS COUNTYUS-59 IMPROVEMENTS IN LAWRENCE

REPLACE BRIDGE ON K-99 IN ELK COUNTY

ELLIS COUNTY SOLAR POWERED RADAR SPEED TRAILERIMPROVEMENTS ON RS-1977 IN ELLIS COUNTYROAD IMPROVEMENTS IN ELLIS COUNTYPAVEMENT RECONSTRUCT ON US-183 IN HAYS (ELLIS COUNTY)

BRIDGE REPLACEMENT IN ELLSWORTH COUNTYELLSWORTH COUNTYBRIDGE REPLACEMENT IN ELLSWORTH COUNTYBRIDGE REPLACEMENTS IN ELLSWORTH COUNTYTRAFFIC IMPACT STUDY IN ELLSWORTH

PRESERVATION OF HISTORIC WINDSOR HOTEL IN GARDEN CITYSIDEWALK AND BIKE PATH IN GARDEN CITYREPLACE BRIDGE ON K-23 IN FINNEY COUNTYGEOMETRIC IMPROVEMENT IN GARDEN CITY, KANSASK-156 IMPROVEMENTS IN GARDEN CITYDURANGO / SCHULMAN CROSSING SHOPPING CENTERROAD IMPROVEMENTS IN GARDEN CITY ON US-50/US-832-LANE PAVEMENT RECONSTRUCT ON US-83 IN FINNEY COUNTY

GRADING, BRIDGE & SURF ON CAMANCHE ST IN DODGE CITYREPLACE BRIDGE ON K-94 IN FORD COUNTYCONSTRUCT 4-LANE EXPRESSWAY ON US-50 IN FORD COUNTYROAD IMPROVEMENTS IN DODGE CITY ON US-50

BRIDGE REPLACEMENT IN FRANKLIN COUNTYCANTILEVER SIGN STRUCTURE ON I-35 IN FRANKLIN COUNTYIMPROVE INTERSECTION (K-68PAVEMENT RECONSTRUCT ON K-69 IN FRANKLIN COUNTYREPLACE BRIDGE ON K-68 IN FRANKLIN COUNTYPERMANENT SEEDING ON US-169 IN FRANKLIN COUNTYROAD IMPROVEMENTS IN FRANKLIN COUNTY

BRIDGE REPLACEMENT IN GEARY COUNTY

6.00.00.00.60.00.00.30.50.80.00.012.70.7

0.0

0.07.21.00.5

0.20.20.00.15.0

0.00.00.00.30.10.00.712.5

1.20.08.61.7

0.20.00.51.30.02.42.4

0.2

Preliminary Engineering & RowBridge RepairPreliminary EngineeringGrade & SurfacingBridge ReplacementBridge ReplacementGrade & SurfacingIntersection ImprovementGrade & SurfacingBridge ReplacementBridge ReplacementSurfacingMilling And Overlay

Bridge Replacement

Intelligent Transportation SysShouldersGrade & SurfacingPavement Reconstruction

Grade & BridgeGrade, Bridge & SurfacingBridge ReplacementBridge ReplacementLocation Study

Historic PreservationPedestrian & Bicycle PathsBridge ReplacementGrade & SurfacingConcrete PavementSurfacing & SignalSlurry SealGrade & Surfacing

Grade, Bridge & SurfacingBridge ReplacementGrade, Bridge & SurfacingMilling And Overlay

Bridge ReplacementSigningGrade & SurfacingPavement ReconstructionBridge ReplacementSeeding, SoddingMilling And Overlay

Bridge Replacement

02000

7891,5632,500773

1,2616,293418852

2,381570

695

0188

3,7141,365

2200000

750250

1,8301,091386

4,0235200

0585

37,000428

1,60331

1,4612,732

025

4,123

204

SE-RICSM-BSRMM-SAFMM-CORSM-PBRSM-PBRMM-CORLC-K3RLC-RESSM-PBRSM-PBRSE-RICLC-K1R

SM-PBR

SE-ITSLC-RESLC-RESLC-K1R

LC-RESLC-RESSM-PBRSM-PBRMM-COR

LC-TEXLC-SRTSM-PBRLC-K3RLC-K1R

MM-CORLC-K1RSM-RIP

LC-RESSM-PBRSE-RICLC-K1R

LC-RESSM-SLR

MM-CORSM-RIPSM-PBRSM-RIPSM-RIP

LC-RES

2014201320132013201320132014201420132013201320132014

2014

2013201320142013

20142014201620162014

20132013201320142014201320132017

2014201420182014

2014201320132014201520152013

2014

Page 15: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-8 (FY 2013 - 2020 TWORKS)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

GearyGearyGearyGearyGearyGearyGearyGearyGearyGeary

GoveGoveGoveGove

GrahamGrahamGraham

GrantGrant

GrayGrayGrayGrayGray

GreenwoodGreenwoodGreenwoodGreenwood

Hamilton

HarperHarperHarperHarperHarper

HarveyHarveyHarveyHarveyHarveyHarveyHarveyHarvey

C0000K177U040B3U077U077U077U077U077U077U077

I070I070K023

U024U283

K025K025

U050U050U056U056U056

K058U400U400U400

U050

K002K179U160U160

BRISGE REPLACEMENT IN GEARY COUNTYGRADING AND SURFACING ON K-177 IN GEARY COUNTYKLINK IMPROVEMENTS IN JUNCTION CITYBRIDGE #044 ON US-77 IN GEARY COUNTYCONSTRUCT 4-LANE/IMPROVEMENTS IN GEARY COUNTYROAD IMPROVEMENTS IN GEARY COUNTYROAD IMPROVEMENTS IN GEARY COUNTYSIGNAL AND TURN LANES AT US-77 AND K-57 IN GEARY CO.US-77 AND K-18 IMPROVEMENTS IN GEARY COUNTYUS-77 IMPROVEMENTS IN GEARY COUNTY

UPRR & GOVE 48 ROAD EAST EDGE OF GRAINFIELDI-70 IMPROVEMENTS IN GOVE COUNTYI-70 IMPROVEMENTS IN GOVE COUNTYBRIDGE REPLACEMENT IN GOVE COUNTY

BRIDGE REPLACEMENT IN GRAHAM COUNTYUS-24 PROJECT IN GRAHAM COUNTY (PRESERVATION)BRIDGE #045 ON US-283 IN GRAHAM COUNTY

ROAD IMPROVEMENTS ON K-25 IN ULLYSSESROAD IMPROVEMENTS ON K-25 IN ULYSSES

CONSTRUCT 4-LANE EXPRESSWAY ON US-50 IN GRAY COUNTYUS-50 IN GRAY COUNTY AT INGALLSPAVEMENT REPLACEMENT ON US-56 IN GRAY COPAVEMENT REPLACEMENT ON US-56 IN GRAY COUNTYPAVEMENT REPLACEMENT ON US-56 IN GRAY COUNTY

BRIDGE REPLACEMENT IN GREENWOOD COUNTYPASSING LANES ON US-400 IN SOUTHEAST KANSASPASSING LANES ON US-400 IN SOUTHEAST KANSASPASSING LANES ON US-400 IN SOUTHEAST KANSAS

REPLACE BRIDGE ON US-50 IN HAMILTON COUNTY

BNSF RAILWAY & NW 30 ROAD SOUTHWEST OF ATTICAREPLACE BRIDGE ON K-2 IN HARPER COUNTYROAD IMPROVEMENTS IN ANTHONY ON K-179REPLACE BRIDGES ON US-160 IN HARPER COUNTYROAD IMPROVEMENTS IN THE CITY OF HARPER ON US-160

BNSF RAILWAY & SW 48TH STREET SOUTH OF NEWTONBNSF RAILWAY & SW 72ND STREET NORTHEAST OF SEDGWICKK & O RAILROAD & 24TH STREET IN NEWTONK & O RAILROAD & N. ANDERSON STREET IN NEWTONK & O RAILROAD & RANDELL STREET IN HESSTONK & O RAILROAD & RIDGE ROAD IN HESSTONKANSAS & OKLAHOMA RR & LINCOLN BOULEVARD IN HESSTONKANSAS & OKLAHOMA RR & MAIN STREET IN HESSTON

0.113.81.00.07.92.01.60.31.52.5

0.09.09.30.0

0.35.00.0

0.20.2

6.90.30.61.11.1

0.02.52.52.0

0.0

0.00.00.20.01.1

0.00.00.00.00.00.00.00.0

Grade, Bridge & SurfacingGrade & SurfacingMilling And OverlayBridge OverlayPreliminary EngineeringGrade & SurfacingGrade & SurfacingTraffic SignalsGrade, Bridge & SurfacingGrade & Surfacing

Flashing Light SignalGrade, Bridge & SurfacingGrade, Bridge & SurfacingBridge Replacement

Bridge ReplacementMilling And OverlayBridge Overlay

Milling And OverlayMilling And Overlay

Grade, Bridge & SurfacingGrade & SurfacingPavement ReconstructionPavement ReconstructionPavement Reconstruction

Bridge ReplacementGrade & SurfacingGrade & SurfacingGrade & Surfacing

Bridge Replacement

Flashing Light SignalBridge ReplacementMilling And OverlayBridge ReplacementMilling And Overlay

Flashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light Signal

13410,000

2213100

6,7506,250857

15,75012,250

26044,94143,426

0

3810

155

154272

32,000250000

4203,0002,6804,670

1,206

3501,1262390

484

250350250275275375280290

LC-RESMM-RIMLC-K1RSM-BSRSE-RICSE-RICSE-RICLC-HESSE-RICSE-RIC

LC-RXRSM-IRPSM-IRPSM-PBR

LC-RESSM-RIPSM-BSR

LC-K1RLC-K1R

SE-RICMM-SAFSM-RIPSM-RIPSM-RIP

SM-PBRSE-RICSE-RICSE-RIC

SM-PBR

LC-RXRSM-PBRLC-K1RSM-PBRLC-K1R

LC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RXR

2014201720132013201720152015201320162017

2014201720152017

201420132013

20132014

20182013201520152015

2013201520152015

2014

20142014201420152014

20142014201420142014201420132013

Page 16: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-9 (FY 2013 - 2020 TWORKS)

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

HarveyHarveyHarveyHarveyHarveyHarveyHarveyHarveyHarveyHarveyHarveyHarvey

HaskellHaskellHaskell

HodgemanHodgemanHodgeman

Jackson

JeffersonJeffersonJeffersonJeffersonJeffersonJeffersonJeffersonJefferson

JewellJewellJewellJewellJewellJewellJewellJewellJewellJewellJewellJewell

JohnsonJohnsonJohnsonJohnsonJohnson

C0305I135I135U050U050U050U050U050U050U050U050

U083U083U083

K156K156U283

K116

K004K192K237U024U024U024U024U059

K014K014K028K028K028K128U036U036U036

KANSAS & OKLAHOMA RR & SPENCER STREET IN NEWTONBRIDGE REPLACEMENT IN HARVEY COUNTYHIGH MAST WEATHERING STEEL POLES IN HARVEY COUNTYINTERCHANGE IMPROVEMENT, I-135/36TH ST IN HARVEY COUNTYBRIDGE #071 ON US-50 IN HARVEY COUNTYGEOMETRIC IMPROVEMENT IN NEWTON, KANSASPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPERMANENT SEEDING ALONG US-50 IN HARVEY COUNTY

2-LANE PAVEMENT RECONSTRUCT ON US-83 IN HASKELL COUNTY2-LANE PAVEMENT RECONSTRUCT ON US-83 IN HASKELL COUNTY2-LANE PAVEMENT RECONSTRUCT ON US-83 IN HASKELL COUNTY

REPLACE BRIDGE ON K-156 IN HODGEMAN COUNTYSURVEY ON K-156 IN HODGEMAN COUNTY EAST OF HANSTONGEOMETRIC IMPROVEMENT IN JETMORE, KANSAS

K-116 IN JACKSON COUNTY (FY 2013 1R PROJECT)

REPLACE WINGS ON CULVERT ON K-4 IN JEFFERSON COUNTYREPLACE BRIDGE ON K-192 IN JEFFERSON COUNTYUS-24 IN JEFFERSON COUNTY (FY 2013 1R PROJECT)PERMANENT SEEDING ON US-24 IN JEFFERSON COUNTYREPLACE BRIDGE ON US-24 IN JEFFERSON COUNTYUS-24 IMPROVEMENTS IN PERRYUS-24 IN JEFFERSON COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE #016 ON US-59 IN JEFFERSON COUNTY

BNSF & 250 ROAD 3 MILES NORTH OF WEBBERBNSF & DIAMOND ROAD 3.5 MILES NORTH OF WEBBERBNSF & Z ROAD .5 MILE SOUTH OF WEBBERGEOMETRIC IMPROVEMENT IN JEWELL, KANSASGEOMETRIC IMPROVEMENT IN JEWELL, KANSASCULVERT REPLACEMENT ON K-28 IN JEWELL COUNTYREPLACE BRIDGE ON K-28 IN JEWELL COUNTYREPLACE BRIDGE ON K-28 IN JEWELL COUNTYBRIDGE REPLACEMENT IN JEWELL COUNTYBRIDGE #012 ON US-36 IN JEWELL COUNTYMILLPAVEMENT REPLACEMENT ON US-36 IN JEWELL COUNTY

159TH STREET IMPROVEMENTS IN JOHNSON COUNTYADDITIONAL WESTBOUND LEFT TURN LANE ON COLLEGE BLVDBNSF & LAKECREST DRIVE IN SHAWNEEBRIDGE REPLACEMENT IN DE SOTO IN JOHNSON COUNTYCITY OF OLATHE: CLAIRBORNE ROAD AND COLLEGE WAY

0.00.10.71.00.00.11.32.10.70.51.31.4

5.09.05.1

0.015.00.3

6.0

0.00.03.45.50.00.21.00.0

0.00.00.00.20.30.00.00.00.00.05.61.4

2.10.00.00.00.0

Flashing Light SignalGrade, Bridge & SurfacingLightingGrade, Bridge & SurfacingBridge RepairIntersection ImprovementGrade & SurfacingGrade & SurfacingGrade & SurfacingGrade & SurfacingGrade & SurfacingSeeding, Sodding

Grade & SurfacingGrade & SurfacingGrade & Surfacing

Bridge ReplacementPreliminary EngineeringSurfacing

Recycle & O-lay

CulvertBridge ReplacementMilling And OverlaySeeding, SoddingBridge ReplacementTraffic Signals1.5 OverlayBridge Replacement

Flashing Light SignalFlashing Light SignalFlashing Light SignalCurb & Gutter New,repr Or ReplGrade & SurfacingGrade & CulvertBridge ReplacementFunds OnlyBridge ReplacementBridge OverlayMilling And OverlayPavement Reconstruction

SurfacingIntersection ImprovementFlashing Light SignalBridge ReplacementRoundabout

3101,170321

10,242615462

2,2403,140

01,0403,230

70

00

19,000

1,0900

697

571

1011,0594691036506211500

250250250570461405503200

1255,200

0

18,527417250726499

LC-RXRLC-RES

MM-LTGMM-IRISM-BSRLC-K3RSE-RICSE-RICSE-RICSE-RICSE-RICSE-RIC

SM-RIPSM-RIPSE-RIC

SM-PBRMM-1RSLC-K3R

SM-1RR

SM-BCRSM-PBRSM-1RRSM-RIPSM-PBRLC-HESSM-1RRSM-PBR

LC-RXRLC-RXRLC-RXRLC-K3RLC-K3RSM-PCRSM-PBRSM-PBRSM-PBRSM-BSRSM-RIPSM-RIP

LC-LOCLC-HAZLC-RXRLC-RESLC-HAZ

201320142013201420142014201520152015201520152014

201820162015

201320132014

2013

20132013201320142014201320132015

201320132013201420152015201320132016201320132015

20132013201320142015

Page 17: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-10 (FY 2013 - 2020 TWORKS)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

JohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnson

I035I035I035I035I435I435I435I435I435K007K007K007K007K007K010K010K010U056U056U056U056U069U069U069U069U169

CITY OF OVERLAND PARK: 151ST AND ENGLANDGRADING, SURF & SEEDING ON MONTICELLO RD IN SHAWNEEHOMESTEAD LANE IMPROVEMENTS IN JOHNSON COUNTYINTERSECTION IMPROVEMENT LENEXA: 95TH STREET AND I-35INTERSECTION IMPROVEMENT LENEXA: COLLEGE & LACKMANINTERSECTION IMPROVEMENT, LENEXA: 95TH STJOHNSON COUNTY GATEWAY INTERCHANGE PROJECTJOHNSON COUNTY TRANSIT VEHICLE PURCHASEJOHNSON COUNTY: ELIMINATION OF AN AT-GRADE RR CROSSINGLENEXA TRAFFIC CAMERASOVERLAND PARK:TURKEY CREEK BICYCLE AND PEDESTRIAN TRAILRESURFACING ON 143RD ST IN LEAWOOD (JOHNSON COUNTY)ROAD IMPROVEMENT IN PRAIRIE VILLAGE IN JOHNSON COUNTYROAD IMPROVEMENTS IN JOHNSON COUNTYROAD IMPROVEMENTS IN JOHNSON COUNTYROAD IMPROVEMENTS IN MERRIAMROAD IMPROVEMENTS IN MISSIONROAD IMPROVEMENTS IN THE CITY OF OLATHESAFETY PROJECT IN JOHNSON COUNTYSW JOHNSON COUNTY SUSTAINABLE FREIGHT DISTRICT PLANTRAFFIC INFORMATION IMPROVEMENTS FOR KANSAS CITYTRAFFIC SIGNALS IMPROVEMENT IN LEAWOODVIDEO DETECTION DATA INTEGRATIONBRIDGE REPLACEMENT IN JOHNSON COUNTYBRIDGES #002 THRU #005 ON I-35 IN JOHNSON COUNTYPERMANENT SEEDING ALONG I-35 IN JOHNSON COUNTYSEEDING ON I-35 IN JOHNSON COUNTYBRIDGE #222 AND #223 ON I-435 IN JOHNSON COUNTYJOHNSON COUNTY GATEWAY INTERCHANGE PROJECTJOHNSON COUNTY GATEWAY INTERCHANGE PROJECT AREARECONSTRUCT ROE BLVD INTERCHANGE IN JOHNSON COUNTYSURFACING WORK ON I-435 IN JOHNSON COUNTY (FY 2013)K-7 IN JOHNSON COUNTY (FY 2013 1R PROJECT)K-7 IN JOHNSON COUNTY (FY 2013 1R PROJECT)ROAD IMPROVEMENTS IN JOHNSON COUNTYROAD IMPROVEMENTS IN JOHNSON COUNTYROAD IMPROVEMENTS IN OLATHE ON K-7INTERCHANGE IMPROVEMENTS FOR JOCO GATEWAY PROJECTMINE REMEDIATIONROAD IMPROVEMENTS IN JOHNSON COUNTYBRIDGE #270 ON US-56 IN JOHNSON COUNTYCONSTRUCT TURN LANES AT US-56/CENTER ST IN JOHNSON COUS-56 IN JOHNSON COUNTY (2013 1R PROJECT)US-56 IN JOHNSON COUNTY (FY 2013 1R PROJECT)BRIDGE #256 ON US-69 IN JOHNSON COUNTYHIGH MAST WEATHERING STEEL POLES IN JOHNSON CO.US-69 & 159TH ST. IN JOHNSON COUNTYUS-69 IN JOHNSON COUNTY (FY 2013 1R PROJECT)INTERSECTION IMPROVEMENT IN OLATHE AT US-169

0.01.51.00.30.00.00.00.00.30.01.00.91.20.71.30.30.51.00.20.00.00.00.00.00.01.52.20.05.65.60.03.85.21.10.00.01.30.01.00.00.00.27.20.70.00.91.93.40.0

Traffic SignalsGrade & SurfacingSeeding, SoddingIntersection ImprovementIntersection ImprovementIntersection ImprovementPreliminary EngineeringFTA Funds TransferGrade & SurfacingIntelligent Transportation SysGrade & SurfacingGrade & SurfacingGrade & SurfacingGrade, Bridge & SurfacingGrade & SurfacingGrade & BridgeGrade & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingPreliminary EngineeringIntelligent Transportation SysTraffic SignalsIntelligent Transportation SysBridge ReplacementBridge OverlaySeeding, SoddingSeeding, SoddingBridge OverlayGrade, Bridge & SurfacingPreliminary EngineeringBridge ReplacementUltra Thin Bonded Asphalt Surf.Ultra Thin Bonded Asphalt Surf.Ultra Thin Bonded Asphalt Surf.Curb & Gutter New,repr Or ReplTraffic SignalsMilling And OverlayGrade & SurfacingSpecialPreliminary Engineering & RowBridge OverlayGrade & SurfacingRecycle & O-layPavement PatchingBridge RepairLightingGrade, Bridge & SurfacingOverlayIntersection Improvement

29515,510

758,69259589300

6010

1,1890

2,7722,9051,7681,6078,83812,4721,785

0450000

1,06114523

1,079218,000

010,9371,5001,3213233471417050

2,0000

514870719460

1,075207

15,3491,050774

LC-HAZLC-LOCSE-RICLC-LOCLC-HAZLC-LOCSE-IRCLC-RESLC-RESSE-ITS

LC-LOCLC-RESLC-RESLC-LOCLC-LOCLC-RESLC-RESLC-LOCLC-RES

MM-CORSE-ITS

LC-LOCSE-ITS

SM-PBRSM-BSRSE-IRCSE-IRC

SM-BSRSE-IRCSE-IRC

SM-PBRSM-ISRSM-1RRSM-1RR

MM-CORMM-CORLC-K1RSE-IRCSE-RICLC-LOCSM-BSRMM-CORSM-1RRSM-1RRSM-BSRMM-LTGMM-RIMSM-1RRLC-HES

2013201320142015201320132018201320142014201320142015201320142014201420132014201420142014201420172014201420132013201420162014201320132013201320132013201620132014201320132013201320132013201420132013

Page 18: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-11 (FY 2013 - 2020 TWORKS)

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

KearnyKearny

KingmanKingmanKingmanKingman

KiowaKiowaKiowaKiowaKiowa

LabetteLabetteLabetteLabetteLabetteLabetteLabetteLabetteLabetteLabetteLabetteLabetteLabette

Lane

LeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworth

Lincoln

LinnLinnLinn

K025K025

K014U054U054U054

U054U054U400

U059U059U059U059U059U400U400U400

K023

K032K092U024U024U024U073U073

K018

K-25 IN THE CITY OF LAKINREPLACE BRIDGE ON K-25 IN KEARNY COUNTY

REPAIR BRIDGE ON K-14 IN KINGMAN COUNTYPERMANENT SEEDING ALONG US-54 IN KINGMAN COUNTYPERMANENT SEEDING ALONG US-54 IN KINGMAN COUNTYPERMANENT SEEDING ALONG US-54 IN KINGMAN COUNTY

BRIDGE REPLACEMENT IN KIOWA COUNTYUPRR & 19 AVENUE 4 MILES NORTHEAST OF MULLINVILLECONSTRUCT INTERCHANGE ON US-54 IN KIOWA COUNTYPRESERVATION ON US-54 IN KIOWA COUNTYCULVERT REPLACEMENT ON US-400 IN KIOWA COUNTY

SIDEWALK AND BIKE PATH IN PARSONSSKOL RAILROAD & 6TH STREET IN OSWEGOSKOL RAILROAD & ROOKS ROAD 4 MILES EAST OF ALTAMONTSOUTH KANSAS & OKLAHOMA & HICKORY ST. IN MOUND VALLEYUPRR & 19500 ROAD SOUTHEAST OF PARSONSCRACK REPAIR AND PATCHING ON US-59 IN PARSONSREPAIR CULVERT #521 ON US-59 IN LABETTE COUNTYROAD IMPROVEMENTS IN PARSONS ON US-59ROAD IMPROVEMENTS ON US 59 IN PARSONSUS-59 IN LABETTE COUNTY (2013 1R PROJECT)PASSING LANES ON US-400 IN SOUTHEAST KANSASPASSING LANES ON US-400 IN SOUTHEAST KANSASUS-400 IMPROVEMENTS IN LABETTE COUNTY

GEOMETRIC IMPROVEMENT PROJECT IN DIGHTON, KANSAS

BRIDGE IMPROVEMENT IN LEAVENWORTH COUNTYBRIDGE REPLACEMENT IN LEAVENWORTH COUNTYGRADINGGRADING, SURFACING ON LIMIT STREET IN LEAVENWORTHPED/BIKE PATH IN THE CITY OF TONGANOXIERESTORATION OF UNION PACIFIC DEPOT IN LEAVENWORTHROAD/BRIDGE IMPROVEMENT IN LEAVENWORTH COUNTYBRIDGE REPLACEMENT IN LEAVENWORTH COUNTYKLINK IMPROVEMENTS IN THE CITY OF LEAVENWORTHCONSTRUCT TURN LANES IN BASEHOR LEAVENWORTH COUNTYCONSTRUCT WOLF CREEK PARKWAY IN LEAVENWORTH COUNTYTURN LANES IN BASEHOR LEAVENWORTH COUNTYGEOMETRIC IMPROVEMENT PROJECT IN LEAVENWORTH KANSASROAD IMPROVEMENTS IN LEAVENWORTH ON U-73 AND K-92

REPLACE BRIDGE ON K-18 IN LINCOLN COUNTY

BNSF & 400 ROAD 1 MILE NORTH OF PRESCOTTRAIL IMPROVEMENTS FOR LA CYGNE INDUSTRIAL PARKUPRR & W 1250 ROAD SOUTHWEST OF CENTERVILLE

0.70.0

0.04.61.51.7

0.00.01.815.90.0

0.00.00.00.00.00.20.00.60.311.62.52.00.6

0.7

0.00.00.10.41.30.02.10.00.60.40.40.40.11.0

0.0

0.00.00.0

Slurry SealBridge Replacement

Bridge RepairSeeding, SoddingSeeding, SoddingSeeding, Sodding

Bridge ReplacementFlashing Light SignalGrade & SurfacingOverlayGrade & Culvert

Pedestrian & Bicycle PathsFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalPavement PatchingCulvertMilling And OverlayMilling And OverlayRecycle & O-layGrade & SurfacingGrade & SurfacingMilling And Overlay

Pavement Patching

BridgeBridgeBridge SuperstructureGrade & SurfacingPedestrian & Bicycle PathsHistoric PreservationGrade, Bridge & SurfacingBridge ReplacementOverlayGrade & SurfacingGrade & SurfacingGrade & SurfacingIntersection ImprovementMilling And Overlay

Bridge Replacement

Flashing Light SignalRailroad ImprovementFlashing Light Signal

2121,029

2901004064

2242600

12,500665

22527525025027540258526260

1,5254,020

00

89

361481

2,5751,5641,0151,4178,553

0287458

1,2001,200967324

821

250120250

LC-K1RSM-PBR

SM-BSRSE-RICSE-RICSE-RIC

LC-RESLC-RXRMM-RIMSM-RIPSM-PCR

LC-SRTLC-RXRLC-RXRLC-RXRLC-RXRLC-K1RSM-BCRLC-K1RLC-K1RSM-1RRSE-RICSE-RICSM-RIP

LC-K3R

LC-RESLC-RESLC-RESLC-RESLC-TEXLC-TEXLC-RESSM-PBRLC-K1R

MM-CORMM-CORMM-CORLC-K3RLC-K1R

SM-PBR

LC-RXRSE-EDPLC-RXR

20132014

2013201420142014

20142014201320132015

2013201420142013201420132013201420132013201520152015

2015

20132013201420132013201320142016201320132013201320152014

2014

201320132014

Page 19: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-12 (FY 2013 - 2020 TWORKS)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

LinnLinn

LoganLogan

LyonLyonLyonLyonLyonLyonLyon

MarionMarionMarionMarionMarionMarionMarionMarionMarion

MarshallMarshallMarshallMarshallMarshallMarshallMarshallMarshall

McphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcpherson

K007K052

U083

I035K130U050U050U050U056U056

K256U056U056U077

C0000K009K087K099K099U036U036U077

I135K004K061K061K153K153SK260K260U056U056U081B1U081B1U081B2

REPLACE BRIDGE #012 ON K-7 IN LINN COUNTYCULVERT REPLACEMENT ON K-52 IN LINN COUNTY

BRIDGE REPLACEMENT IN LOGAN COUNTY HISTORIC BYWAY KIOSK ON US-83 IN LOGAN COUNTY

SURFACING WORK ON I-35 IN LYON COUNTYK-130 IN LYON COUNTY (FY 2013 1R PROJECT)CONSTRUCT 4-LANE EXPRESSWAY ON US-50 IN LYON COUNTYUS-50 IMPROVEMENTS IN EMPORIAUS-50 IN LYON COUNTY (FY 2013 1R PROJECT)BRIDGE #148 ON US-56 IN LYON COUNTYUS-56 IN LYON COUNTY (FY 2013 PROJECT)

BNSF RAILWAY & LIMESTONE ROAD SOUTHWEST OF PEABODYBNSF RAILWAY & OLD MILL ROAD EAST EDGE OF PEABODYSIDEWALK AND BIKE PATH IN CITY OF HILLSBOROUPRR & 370TH STREET NORTHEAST OF RAMONAUPRR & F STREET IN RAMONAROAD IMPROVEMENTS IN MARION ON K-256GEOMETRIC IMPROVEMENT IN HILLSBORO KANSASSAFETY PROJECT ON US-56 IN MARION COUNTYUS-77 IN MARION COUNTY (FY 2013 1R PROJECT)

BRIDGE REPLACEMENT IN MARSHALL COUNTYREPLACE BRIDGE #021 ON K-9 IN MARSHALL COUNTYREPLACE BRIDGE #032 ON K-87 IN MARSHALL COUNTYREPLACE BRIDGE #042 ON K-99 IN MARSHALL COUNTYREPLACE BRIDGE ON K-99 IN MARSHALL COUNTYCULVERT REPLACEMENT ON US-36 IN MARSHALL COUNTYUS-36 BRIDGE REPLACEMENT IN MARSHALL COUNTYREPLACE BRIDGE #009 ON US-77 IN MARSHALL COUNTY

KANSAS & OKLAHOMA RR & CHRISTIAN AVENUE IN MOUNDRIDGEUNION PACIFIC & A AVENUE IN MCPHERSONUPRR & 29TH AVENUE NORTHEAST OF CANTONCONSTRUCT INTERCHANGE ON I-135 IN MCPHERSON COUNTYROAD IMPROVEMENTS IN LINDSBORG ON K-4K-61 IN MCPHERSON COUNTY (FY 2013 1R PROJECT)TURNBACK WORK IN MCPHERSON COUNTYK-153 IN MCPHERSON COUNTY (FY 2013 1R PROJECT)K-153 SPUR IN MCPHERSON COUNTY (FY 2013 1 R PROJECT)REPLACE BRIDGE #107 ON K-260 IN MCPHERSON COUNTYROAD IMPROVEMENTS IN MOUNDRIDGE ON K-2604-LANE PAVEMENT REPLACEMENT ON US-56 IN MCPHERSON COROAD IMPROVEMENTS IN MCPHERSON ON US-56ROAD IMPROVEMENTS IN MCPHERSON ON US 81US-81B IN MCPHERSON COUNTY (FY 2013 1R PROJECT)TURNBACK WORK IN MCPHERSON COUNTY

0.00.0

0.80.0

10.37.81.11.30.60.022.1

0.00.00.00.00.00.40.30.419.7

0.20.00.00.00.00.00.00.0

0.00.00.01.00.50.36.12.91.10.00.01.70.51.03.90.0

Bridge ReplacementCulvert

Bridge ReplacementScenic Or Historic Hwy Progs

2in OverlayMilling And OverlayGrade, Bridge & SurfacingMilling And OverlayMilling And OverlayBridge OverlayConv Seal

Flashing Light SignalFlashing Light SignalPedestrian & Bicycle PathsFlashing Light SignalFlashing Light SignalMilling And OverlayIntersection ImprovementRoundaboutMilling And Overlay

Grade & BridgeBridge ReplacementBridge ReplacementBridge ReplacementBridge ReplacementGrade & CulvertBridge ReplacementBridge Replacement

Flashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingSurfacingMilling And OverlaySurfacingMilling And OverlayMilling And OverlayBridge ReplacementConcrete PavementPavement ReconstructionMilling And OverlaySurfacingMilling And OverlayRight Of Way On

1,182575

22069

2,800746

5,00046757152930

250250225290260216528

3,3262,384

45500

1,017815732

1,4380

280250210

10,000225507703591210

2350

3132257910

SM-PBRSM-PCR

LC-RESMM-SBW

SM-ISRSM-1RRSE-RICLC-K1RSM-1RRSM-BSRSM-1RR

LC-RXRLC-RXRLC-SRTLC-RXRLC-RXRLC-K1RLC-K3RLC-HESSM-1RR

LC-RESSM-PBRSM-PBRSM-PBRSM-PBRSM-PCRSM-PBRSM-PBR

LC-RXRLC-RXRLC-RXRSE-IRCLC-K1RSM-1RRSE-SECSM-1RRSM-1RRSM-PBRLC-K1RSM-RIPLC-K1RLC-K1RSM-1RRSE-RIC

20142015

20132013

2013201320182014201320132013

201420142014201420142013201520152013

20142015201520142014201520132015

2013201320142016201320132013201320132015201420162014201320132013

Page 20: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-13 (FY 2013 - 2020 TWORKS)

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

Meade

MiamiMiamiMiamiMiamiMiamiMiamiMiamiMiamiMiamiMiamiMiami

MitchellMitchellMitchellMitchell

MontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomery

MorrisMorrisMorrisMorris

Morton

NemahaNemahaNemahaNemahaNemaha

NeoshoNeosho

K023

K068K068K068U169U169U169

K014K014K181

U075U075U075U075U160U166U166U166U166U166U169

K149K177U056

K051

K063U036U036U036U075

BRIDGE REPLACEMENT IN MEADE COUNTY

BRIDGE REPLACEMENT IN MIAMI COUNTYLOWER ROADWAY ELEVATION IN MIAMI COUNTYUNION PACIFIC & MULBERRY STREET IN PAOLAUPRR & 311TH STREET SOUTHWEST OF PAOLA (EAST XING)UPRR & 311TH STREET SOUTHWEST OF PAOLA (WEST XING)FRONTAGE ROAD SOUTH OF K-68 IN LOUISBURG.INTERIM IMPROVEMENTS ON K-68 IN MIAMI COUNTYK-68 INTERSECTION IMPROVMENTS IN LOUISBURGBRIDGE REPAIR ON BRIDGE #054 IN MIAMI COUNTYPERMANENT SEEDING ON US-169 IN MIAMI COUNTYROAD IMPROVEMENTS ON US-169 IN MIAMI COUNTY

CITY OF BELOIT (SAFE ROUTES TO SCHOOL)GEOMETRIC IMPROVEMENT IN BELOIT, KANSASROAD IMPROVEMENTS IN BELOIT ON K-14BRIDGE REPLACEMENT IN MITCHELL COUNTY

CULVERT IMPROVEMENTS IN MONTGOMERY COUNTYGRADINGSKOL RAILROAD & 7TH STREET IN COFFEYVILLEUPRR & 2225 ROAD NORTHWEST OF DEARINGCONSTRUCT 4-LANE ON US-75 IN MONTGOMERY COUNTYGEOMETRIC IMPROVEMENT IN INDEPENDENCE, KANSASROAD IMPROVEMENTS IN INDEPENDENCE ON US-75US-75 ACCESS MANAGEMENT PLANREPLACE BRIDGE ON US-160 IN MONTGOMERY COUNTYBRIDGE #038 ON US-166 IN MONTGOMERY COUNTYCULVERT REPLACEMENT ON US-166 IN MONTGOMERY COUNTYGEOMETRIC IMPROVEMENT IN COFFEYVILLE, KANSASGEOMETRIC IMPROVEMENT IN COFFEYVILLE, KANSASROAD IMPROVEMENTS IN COFFEYVILLE ON US-166US-169 IMPROVEMENTS IN MONTGOMERY COUNTY

REMOVAL OF CONCRETE HEADWALLS IN MORRIS COUNTYCULVERT REPLACEMENT ON K-149 IN MORRIS COUNTYGRADING AND SURFACING ON K-177 IN MORRIS COUNTYBRIDGE REPLACEMENTIN MORRIS COUNTY

REPLACE CULVERTS ON K-51 IN MORTON COUNTY

REPLACE BRIDGE ON K-63(WILD CAT CREEK) IN NEMAHA COUNTYENGINEERING ASSISTANCE FOR US-36 IN SENECAGEOMETRIC IMPROVEMENT PROJECT IN SENECA KANSASROAD IMPROVEMENTS IN NEMAHA COUNTYPERMANENT SEEDING ALONG US-75 IN NEMAHA COUNTY

BRIDGE REPLACEMENT IN NEOSHO COUNTYCITY OF ERIE (SAFE ROUTES TO SCHOOL)

0.0

0.20.80.00.00.00.07.60.20.06.06.0

0.00.20.30.0

4.51.00.00.00.70.10.27.60.00.00.00.00.01.01.9

0.00.09.70.0

0.0

0.00.60.70.61.1

0.10.0

Bridge Replacement

Grade, Bridge & SurfacingGrade & SurfacingFlashing Light SignalFlashing Light SignalFlashing Light SignalGrade & SurfacingGrade, Bridge & SurfacingGrade & SurfacingFunds OnlySeeding, SoddingMilling And Overlay

Preliminary EngineeringGrade & SurfacingMilling And OverlayBridge Replacement

GradingGrade & SurfacingFlashing Light SignalFlashing Light SignalGrade & SurfacingIntersection ImprovementMilling And OverlayPreliminary EngineeringBridge ReplacementBridge OverlayCulvertIntersection ImprovementIntersection ImprovementSurfacingGrade, Bridge & Surfacing

Grade, Bridge & SurfacingCulvertGrade & SurfacingBridge Replacement

Culvert

Bridge ReplacementIntersection ImprovementCurb & Gutter New,repr Or ReplIntersection ImprovementSeeding, Sodding

Bridge ReplacementPreliminary Engineering

0

1,071386250275400268

10,0001,17610855

10,477

0758154842

441837275260

5,0006802580

3,480193450583355454

10,000

406550

19,0000

283

8570

6462,000

35

4960

SM-PBR

LC-RESLC-RESLC-RXRLC-RXRLC-RXR

MM-CORSE-RIC

MM-CORSM-BSRSM-RIPSM-RIP

LC-SRTLC-K3RLC-K1RSM-PBR

LC-RESLC-RESLC-RXRLC-RXRSE-RICLC-K3RLC-K1R

MM-CORSM-PBRSM-BSRSM-PCRLC-K3RLC-K3RLC-K1RSE-RIC

LC-RESSM-PCRMM-RIMSM-PBR

SM-PCR

SM-PBRMM-CORLC-K3R

MM-CORSM-RIP

LC-RESLC-SRT

2016

20142014201320142014201520182014201320152013

2013201520132014

201420132014201420172015201420132014201320152014201520142017

2014201520172016

2013

20142013201420132014

20142013

Page 21: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-14 (FY 2013 - 2020 TWORKS)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

NeoshoNeoshoNeoshoNeoshoNeoshoNeosho

NessNessNessNessNess

NortonNortonNortonNortonNortonNorton

OsageOsageOsageOsageOsageOsageOsageOsageOsageOsageOsageOsageOsage

OsborneOsborneOsborneOsborneOsborne

OttawaOttawaOttawaOttawa

Pawnee

PhillipsPhillipsPhillips

K039K039K039K047

K096K096K096K096U283

K009K009K383U036U036U036

C0000C0000K031K031K170K268U056U075U075U075U075

K181K181K181U024U024

K041K106K106U081

U056

K009K383

REPLACE BRIDGE ON RS 1942 IN NEOSHO COUNTYSIDEWALK AND BIKE PATH IN CITY OF CHANUTEREPLACE BRIDGE ON K-39 IN NEOSHO COUNTYREPLACE BRIDGE ON K-39 IN NEOSHO COUNTYREPLACE BRIDGES #025 AND #026 IN NEOSHO COUNTYK-47 IN NEOSHO COUNTY (FY 2013 1R PROJECT)

K-96 IN NESS COUNTY (FY 2013 1R PROJECT)K-96 IN NESS COUNTY (FY 2013 1R PROJECT)ROAD IMPROVEMENTS IN NESS CITY ON K-96ROAD IMPROVEMENTS IN NESS ON K-96GEOMETRIC IMPROVEMENT PROJECT IN NESS CITY, KANSAS

BRIDGE REPLACEMENT IN NORTON COUNTYBRIDGE REPLACEMENT IN NORTON COUNTYGRADING AND SURFACING ON K-383 IN NORTON COUNTYGEOMETRIC IMPROVEMENT IN NORTON KANSASGEOMETRIC IMPROVEMENT IN NORTON, KANSASPERMANET SEEDING ON US-36 IN NORTON COUNTY

BIKE/PED PATH IN OSAGE COUNTYCITY OF LYNDON (SAFE ROUTES TO SCHOOL)BRIDGE REPLACEMENT IN OSAGE COUNTYBRIDGE REPLACEMENT IN OSAGE COUNTYK-31 IMPROVEMENTS IN OSAGERECONSTRUCT & ADD SHOULDERS ON K-31 IN OSAGE COUNTYBRIDGE REPLACEMENTS ON K-170 IN OSAGE COUNTYBRIDGE REPLACEMENT IN OSAGE COUNTYUS-56 IN OSAGE COUNTY (FY 2013 1R PROJECT)MILLROAD IMPROVEMENTS ON US-75 IN OSAGE COUNTYROUNDABOUT AT U75 AND K31/K268, NORTH OF LYNDONVARIOUS BRIDGES ON US-75 IN OSAGE COUNTY

BRIDGE REPLACEMENT IN OSBORNE COUNTYBRIDGE REPLACEMENT IN OSBORNE COUNTYGEOMETRIC IMPROVEMENT IN DOWNS, KANSASBRIDGE REPAIR ON BRIDGE #006 IN OSBORNE COUNTYCULVERT REPAIR ON US-24 IN OSBORNE COUNTY

K-41 IN OTTAWA COUNTY (FY 2013 1R PROJECT)K-106 IN OTTAWA COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE ON K-106 IN OTTAWA COUNTYUS-81 IN OTTAWA COUNTY (2013 1R PROJECT)

ROAD IMPROVEMENTS IN LARNED ON K-156 AND U-56

BRIDGE REPLACEMENT IN PHILLIPS COUNTYBRIDGE REPLACEMENT IN PHILLIPS COUNTYGRADING AND SURFACING ON K-383 IN PHILLIPS COUNTY

0.30.00.00.00.011.1

5.016.90.50.40.2

0.00.010.30.20.24.4

2.50.00.20.20.56.70.00.06.27.26.50.50.0

0.00.00.40.00.0

5.014.70.011.4

0.8

0.20.015.4

Grade, Bridge & SurfacingPedestrian & Bicycle PathsBridge ReplacementBridge ReplacementBridge ReplacementMilling And Overlay

1.5 OverlayMilling And OverlayMilling And OverlayMilling And OverlayIntersection Improvement

Bridge ReplacementBridge ReplacementGrade & SurfacingCurb & Gutter New,repr Or ReplGrade & SurfacingSeeding, Sodding

Prsrv And Railway For TrailsPreliminary EngineeringBridgeBridge ReplacementMilling And OverlayGrade, Bridge & SurfacingBridge ReplacementBridge ReplacementConv SealMilling And OverlayMilling And OverlayRoundaboutBridge Repair

Bridge ReplacementFunds OnlyGrade & SurfacingBridge RepairCulvert

Milling And Overlay3/4 OverlayBridge ReplacementUltra Thin Bonded Asphalt Surf.

Milling And Overlay

Grade & BridgeBridge ReplacementGrade & Surfacing

953225909

1,9320

884

7071,691289206544

00

22,00057166057

1,4900

492480231

14,0001,6121,295259

3,2146,3672,984550

3,220100582141171

4661,208579

2,057

447

4560

31,000

LC-RESLC-SRTSM-PBRSM-PBRSM-PBRSM-1RR

SM-1RRSM-1RRLC-K1RLC-K1RLC-K3R

SM-PBRSM-PBRMM-RIMLC-K3RLC-K3RSM-RIP

LC-TEXLC-SRTLC-RESLC-RESLC-K1R

MM-RIMSM-PBRSM-PBRSM-1RRSM-RIPSM-RIPLC-HESSM-BSR

SM-PBRSM-PBRLC-K3RSM-BSRSM-BCR

SM-1RRSM-1RRSM-PBRSM-1RR

LC-K1R

LC-RESSM-PBRMM-RIM

201420142013201420162013

20142013201420132015

201620172018201420152014

2013201320142014201420172014201320132013201320142013

20132013201520132013

2013201320142013

2014

201420162018

Page 22: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-15 (FY 2013 - 2020 TWORKS)

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

Phillips

PottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomie

PrattPrattPrattPrattPrattPrattPratt

RenoRenoRenoRenoRenoRenoRenoRenoRenoRenoReno

RepublicRepublicRepublicRepublicRepublicRepublicRepublicRepublic

RiceRiceRiceRice

U183

K063K063K063U024U024U024U024U024U024U024U024U024U024

K042U054U054U281

K014K061K061K061K061K061U050U050U050

K148K148K266U036U036U036U036

C0000K014K014

ROAD IMPROVEMENTS IN PHILLIPSBURG ON US-183

BRIDGE REPLACEMENT IN POTTAWATOMIE COUNTYBRIDGE REPLACEMENT ON K-63 IN POTTAWATOMIE COUNTYBRIDGE REPLACEMENT ON K-63 IN POTTAWATOMIE COUNTYREPLACE BRIDGE ON K-63 IN POTTAWATOMIE COUNTYCONSTRUCT TURN LANE ON US-24 IN POTTAWATOMIE COINTERSECTION IMPROVEMENTS @ FLUSH RD IN POTTAWATOMIE COPATHS NEAR WWTPREPLACE BRIDGE ON US-24 IN POTTAWATOMIE COUNTYREPLACE BRIDGE ON US-24 IN POTTAWATOMIE COUNTYROAD IMPROVEMENTS IN POTTAWATAMIE COUNTYROAD IMPROVEMENTS IN POTTAWATAMIE COUNTYUS-24 IMPROVEMENTS IN POTTAWATOMIE COUNTYUS-24 IN POTTAWATOMIE COUNTY (FY 2013 1R PROJECT)US-24 IN POTTAWATOMIE COUNTY (FY 2013 1R PROJECT)

UPRR & NE 40TH AVENUE AT NATRONAUPRR & SW 110TH AVENUE WEST OF CULLISONUPRR & SW 40TH AVENUE WEST OF PRATTREPLACE BRIDGE ON K-42 IN PRATT COUNTY4-LANE EXPRESSWAY ON US-54 IN PRATT COUNTYCONSTRUCT 4-LANE EXPRESSWAY ON US-54 IN PRATT COUNTYROAD IMPROVEMENTS IN PRATT ON US-281

CITY OF HUTCHINSON (SAFE ROUTES TO SCHOOL)K-14(K-96) TURNBACK WORK FOR RENO COUNTYK-14 (K-96) IMPROVEMENTS IN RENO COUNTYBRIDGES #078 AND #079 ON K-61 IN RENO COUNTYMILLREPLACE BRIDGE ON K-61 IN RENO COUNTYROAD IMPROVEMENTS IN HUTCHINSON ON K-61TURNBACK WORK IN RENO COUNTYPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPERMANENT SEEDING FOR US-50 IN RENO COUNTY.SEEDING PROJECT IN RENO COUNTY: US-50

BRIDGE REPLACEMENT IN REPUBLIC COUNTYBRIDGE REPLACEMENTS ON K-148 IN REPUBLIC COUNTYCULVERT REPLACEMENT ON K-148 IN REPUBLIC COUNTYREPLACE BRIDGE ON K-266 IN REPUBLIC COUNTYPAVEMENT RECONSTRUCT ON US-36 IN REPUBLIC COUNTYREPLACE BRIDGE #001 ON US-36 IN REPUBLIC COUNTYREPLACE BRIDGE ON US-36 IN REPUBLIC COUNTYUS-36 IMPROVEMENTS IN REPUBLIC COUNTY

K-14(K-96) TURNBACK WORK FOR RICE COUNTYBRIDGE REPLACEMENT IN RICE COUNTYK-14 (K-96) IMPROVEMENTS IN RICE COUNTYROAD IMPROVEMENTS IN STERLING ON K-14/K-96

0.2

0.20.00.00.00.21.00.00.00.00.50.00.53.98.9

0.00.00.00.05.05.00.1

0.00.07.30.00.00.01.922.71.51.73.1

0.00.00.00.00.90.00.015.8

0.00.18.10.4

Milling And Overlay

Grade, Bridge & SurfacingBridge ReplacementFunds OnlyBridge ReplacementIntersection ImprovementGrade & SurfacingPedestrian & Bicycle PathsBridge ReplacementBridge ReplacementGrade & SurfacingIntersection ImprovementGrade & Surfacing1.5 Overlay1.5 Overlay

Flashing Light SignalFlashing Light SignalFlashing Light SignalBridge ReplacementSeeding, SoddingGrade, Bridge & SurfacingConcrete Pavement

Preliminary EngineeringOverlayGrade, Bridge & SurfacingBridge RepairMilling And OverlayBridge ReplacementSurfacingFunds OnlyGrade & SurfacingSeeding, SoddingSeeding, Sodding

Bridge ReplacementBridge ReplacementCulvertBridge ReplacementPavement ReconstructionBridge ReplacementBridge ReplacementMilling And Overlay

OverlayGrade & BridgeGrade, Bridge & SurfacingMilling And Overlay

126

5251,085

130

478984170751757557382653933977

200220220819350

31,496274

02,90030,000

685597

1,0964810

2,94051100

4731,8975877120

1,2940

13,500

1,798423

33,000323

LC-K1R

LC-RESSM-PBRSM-PBRSM-PBRSE-EDP

MM-CORMM-CORSM-PBRSM-PBRMM-CORMM-CORMM-CORSM-1RRSM-1RR

LC-RXRLC-RXRLC-RXRSM-PBRSE-RICSE-RICLC-K1R

LC-SRTMM-RIMMM-RIMSM-BSRLC-K1RSM-PBRLC-K1RSE-SECSE-RICSE-RICSE-RIC

LC-RESSM-PBRSM-PCRSM-PBRSM-RIPSM-PBRSM-PBRSM-RIP

MM-RIMLC-RES

MM-RIMLC-K1R

2014

20132013201320152013201420132014201420132013201320132013

2013201420142014201620132014

20132019201720132013201420142013201520142014

20142014201520132015201420152014

2019201420172013

Page 23: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-16 (FY 2013 - 2020 TWORKS)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

Rice

RileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRiley

RooksRooksRooksRooksRooksRooksRooksRooksRooks

RussellRussellRussellRussellRussellRussell

SalineSalineSalineSalineSalineSalineSalineSalineSalineSaline

Scott

U056

K018K018K018K018K018K018K113U024U024U024U024

K018K258U024U024U024U183

C0000I070U040B2U281

I070I135K140K143K143U081

U083

ROAD IMPROVEMENTS ON US-56 IN RICE COUNTY

CITY OF MANHATTAN TRAFFIC SIGNAL COORDINATIONDRAINAGE DITCH ON US-24 IN RILEY COUNTYMEDIAN FOR BLUEMONT AVENUE IN MANHATTANREPLACE BRIDGE ON WEST 40TH AVENUE IN RILEY COUNTYREPLACE GUARD FENCES AND BRIDGE RAILS IN RILEY COUNTYWEST ANDERSON / WEST CLAFLIN SIGNAL COORDINATIONBRIDGE REPLACEMENTS IN RILEY COUNTYCITY OF MANHATTAN: K-18 AND POLISKA LANEGEOMETRIC IMPROVEMENT IN MANHATTAN KANSASREPLACE BRIDGE #034 ON K-18 IN RILEY COUNTYROAD IMPROVEMENTS IN MANHATTAN ON K-18SEEDING PROJECT ON K-18 IN RILEY COUNTYCITY OF MANHATTAN: K-113 AND KIMBALLGEOMETRIC IMPROVEMENT IN MANHATTAN KANSASMILL AND INLAY ON US-24 IN RILEY COUNTYUS-24 IMPROVEMENTS IN RILEY COUNTYUS-24 IN RILEY COUNTY (FY 2013 1R PROJECT)

BRIDGE REPLACEMENT IN ROOKS COUNTYCITY OF STOCKTON (SAFE ROUTES TO SCHOOL)REMOVE CONCRETE HANDRAILS AND TREES IN ROOKS COUNTYBRIDGES #034 AND #035 ON K-18 IN ROOKS COUNTYREMOVE BRIDGE #006 ON K-258 IN ROOKS COUNTYMILL AND OVERLAY ON US-24 IN ROOKS COUNTYREPLACE BRIDGE ON US-24 IN ROOKS COUNTYREPLACE BRIDGE ON US-24 IN ROOKS COUNTYROADWAY IMPROVEMENT IN STOCKTON, KANSAS

UPRR & HOMER ROAD 2 MILES SOUTHEAST OF RUSSELLUPRR & MAIN STREET IN DORRANCEBRIDGE REPLACEMENT IN RUSSELL COUNTYREPLACE LIGHTS ON I-70 IN RUSSELL COUNTYROAD IMPROVEMENTS IN RUSSELL ON US 40GRADING AND SURFACING ON US-281 IN RUSSELL COUNTY

IMPROVEMENTS TO SALINE COUNTY ROADS AND GUARDRAILINTERSECTION IMPROVEMENT, SALINA: CLOUD ST AND 9TH STK & O RAILROAD & OLD 40 HIGHWAY NW EDGE OF SALINASALINA SIGNAL COORDINATIONHIGH PERFOMANCE SHEETING SIGN PROJECTSURFACING WORK ON I-135 IN SALINE COUNTYBRIDGE REPLACEMENT IN SALINE COUNTYK-143 IN SALINE COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE ON K-143 IN SALINE COUNTYUS-81 IN SALINE COUNTY (FY 2013 1R PROJECT)

ROAD IMPROVEMENTS ON US 83 IN SCOTT CITY

0.3

0.00.00.00.40.50.00.00.10.10.00.34.00.10.15.60.49.6

0.30.00.00.00.018.20.00.00.5

0.00.00.50.01.114.5

10.50.00.00.0

117.018.80.04.70.05.8

0.6

Grade, Bridge & Surfacing

Intelligent Transportation SysLandscaping And BeautificationIntersection ImprovementGrade, Bridge & SurfacingGore & Guard FenceIntelligent Transportation SysBridge ReplacementIntersection ImprovementIntersection ImprovementBridge ReplacementMilling And OverlaySeeding, SoddingTraffic SignalsIntersection ImprovementMilling And OverlayGrade & Surfacing1.5 Overlay

Bridge ReplacementPreliminary EngineeringReg. MaintanceBridge OverlayBridge ReplacementMilling And OverlayBridge ReplacementBridge ReplacementGrade & Surfacing

Flashing Light SignalFlashing Light SignalGrade & BridgeLightingMilling And OverlayGrade & Surfacing

Grade, Bridge & SurfacingIntersection ImprovementFlashing Light SignalIntelligent Transportation SysSigningPavement PatchingBridge ReplacementMilling And OverlayBridge ReplacementMilling And Overlay

Pavement Patching

1,285

01,0871,0711,3482920094

1,5580

279155455186

6,426199

1,052

1660212750

13,541886

1,142591

200210676200657

32,000

1,7684162250

8322,000

0657

1,2021,334

263

LC-K3R

SE-ITSLC-TEXLC-HAZLC-RESLC-RESSE-ITS

SM-PBRLC-HESLC-K3RSM-PBRLC-K1RSM-RIPLC-HESLC-K3RSM-RIP

MM-CORSM-1RR

LC-RESLC-SRTLC-RESSM-BSRSM-PBRSM-RIPSM-PBRSM-PBRLC-K3R

LC-RXRLC-RXRLC-RESSM-SLRLC-K1R

MM-RIM

LC-RESLC-HAZLC-RXRSE-ITS

SM-SOSSM-ISRSM-PBRSM-1RRSM-PBRSM-1RR

LC-K1R

2014

20132013201320142013201420172015201520152014201420152014201420142013

201320132013201320162014201320132014

201420142013201420132018

2014201320142013201320132016201320132013

2013

Page 24: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-17 (FY 2013 - 2020 TWORKS)

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

SedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwick

I135I135I135I135I135I135I235I235I235I235I235I235I235K015K096K096K254K254U054U054U054U054U054U054U054U054U054U081

BRIDGE REPLACEMENT IN SEDGWICK COUNTYBRIDGE REPLACEMENT IN SEDGWICK COUNTYBRIDGE REPLACEMENT ON 23RD ST. SOUTH IN SEDGWICK COUNTYBRIDGE, GRADING, SEEDING ON CENTRAL AVE IN WICHITABROADWAY BRIDGE IMPROVEMENTS IN WICHITACITY OF WICHITA: 13 STREETGRADING & SURFACING IN VARIOUS LOCATIONS IN SEDGWICK COINTERSECTION IMPROVEMENT, WICHITA: MT VERNON & OLIVERPED/BIKE PATH IN THE CITY OF WICHITARECONSTRUCTION ON EAST GRAND AVENUE IN HAYSVILLEREPLACE BRIDGE ON 87TH STREET SOUTH IN SEDGWICK CO.ROAD IMPROVEMENTS IN SEDGWICK COUNTYROAD IMPROVEMENTS IN SEDGWICK COUNTYROAD IMPROVEMENTS IN SEDGWICK COUNTYROAD IMPROVEMENTS IN WICHITASIDEWALK AND BIKE PATH IN MULVANESURFACING ON MADISON AVE IN DERBY (SEDGWICK COUNTY)TRAFFIC INFORMATION IMPROVEMENTS IN WICHITAUPRR & E 85TH STREET N. NORTHEAST OF KECHIUPRR & E. 69TH STREET N. NORTHEAST OF KECHIWICHITA REGIONAL AIR QUALITYWICHITA TRAFFIC MGT. CENTER PHASE IIBBRIDGE REPAIR ON BRIDGES #043 & #044 IN SEDGWICK COUNTYBRIDGES #339, #341 & #349 ON I-135 IN SEDGWICK COUNTYHIGH MAST WEATHERING STEEL POLES IN SEDGWICK COUNTYPAVEMENT MARKING ON I-135 IN SEDGWICK COUNTYROADWAY REHAB ON I-135 IN SEDGWICK COUNTYSURFACING WORK ON I-135 IN SEDGWICK COUNTYBRIDGE REPAIR ON BRIDGE # 098 IN SEDGWICK COUNTYBRIDGE REPLACEMENTS IN SEDGWICK COUNTYBRIDGE REPLACEMENTS IN SEDGWICK COUNTYDEFINE PROJECT SCOPE AT I-235/I-135 IN SEDGWICK COUNTYI-235 AND THE INTERCHANGES AT I-235/US-54(KELLOGG)INTERCHANGE IMPROVEMENTS I-235/US-54 IN SEDGWICK COUNTYPERMANENT SEEDING PROJECT IN SEDGWICK COUNTYCITY OF DERBY: K-15K-96 IN SEDGWICK COUNTY (FY 2013 1R PROJECT)KA-96 IN SEDGWICK COUNTY (FY 2013 1R PROJECT)RIGHT OF WAY ACQUISITION FOR NORTHWEST WICHITA BYPASSRIGHT OF WAY ACQUISITION FOR NORTHWEST WICHITA BYPASSCONTRACT MAINTENANCE PROJ ON US-54 IN SEDGWICK COUNTYRECONSTRUCT 4-LANE ON US-54 IN SEDGWICK COUNTYRECONSTRUCT 4-LANE ON US-54 IN SEDGWICK COUNTYRIGHT OF WAY ACQUISITION FOR NORTHWEST WICHITA BYPASSROAD IMPROVEMENTS IN SEDGWICK COUNTYROAD IMPROVEMENTS IN WICHITA ON US 54ROAD IMPROVEMENTS IN WICHITA ON US-54 AND K-42US-54 CENTRAL BUSINESS DISTRICT (CBD) VIADUCT (WICHITA)US-54 IN SEDGWICK COUNTY (FY 2013 1R PROJECT)SEDGWICK CO.: US-81 AND 79TH STREET

0.10.20.10.80.50.00.00.02.61.00.00.10.00.41.00.00.70.00.00.00.00.00.00.01.24.66.92.60.00.00.02.92.62.61.00.06.06.57.53.910.51.01.46.80.61.00.80.12.10.0

Grade, Bridge & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingBridge ReplacementIntersection ImprovementGrade & SurfacingIntersection ImprovementPrsrv And Railway For TrailsGrade & SurfacingGrade, Bridge & SurfacingGrade & SurfacingGrade & SurfacingGrade & SurfacingGrade & SurfacingPedestrian & Bicycle PathsMilling And OverlayIntelligent Transportation SysFlashing Light SignalFlashing Light SignalFunds OnlyIntelligent Transportation SysBridge RepairBridge RepairLightingPavement MarkingMilling And OverlayPavement PatchingBridge RepairBridge ReplacementBridge ReplacementPreliminary EngineeringPreliminary Engineering & RowGrade, Bridge & SurfacingSeeding, SoddingIntersection ImprovementMilling And OverlayPavement PatchingRight Of Way OnRight Of Way OnCrack RepairGrade, Bridge & SurfacingGrade, Bridge & SurfacingRight Of Way OnGrade & SurfacingMilling And OverlayMilling And OverlayBridge RepairUltra Thin Bonded Asphalt Surf.Traffic Signals

166406302

9,97816,749

482111

1,0712,2842,101336

1,3412,0001,8694,761225

2,4397752002400

797466235476518

20,0001,2001100000

116,00085440

1,2261,296

00

10967,00095,000

02,000383436

2,600420643

LC-RESLC-RESLC-RESLC-LOCLC-LOCLC-HAZLC-RESLC-HAZLC-TEXLC-RESLC-RESSE-EDP

MM-CORLC-LOCLC-LOCLC-SRTLC-RESSE-ITS

LC-RXRLC-RXRLC-RESSE-ITS

SM-BSRSM-BSRMM-LTGSM-PMRSM-IRPSM-ISRSM-BSRSM-PBRSM-PBRSE-IRCSE-IRCSE-IRCSE-IRCLC-HESSM-1RRSM-1RRSE-SEBSE-SEB

SM-CMNSE-RICSE-RICSE-SEB

MM-CORLC-K1RLC-K1RSM-BSRSM-1RRLC-HES

20132013201420132013201420132013201320152015201320132013201320132014201420142014201320132013201320132013201420132013201620172013201520162014201620132013202020202013201420192020201320132014201320132014

Page 25: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-18 (FY 2013 - 2020 TWORKS)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

Sedgwick

SewardSewardSewardSewardSewardSeward

ShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawnee

SheridanSheridanSheridanSheridanSheridan

Sherman

SmithSmithSmith

StevensStevensStevens

SumnerSumnerSumnerSumnerSumnerSumnerSumnerSumnerSumner

U081

U054U054U054U054U054U083

I070I070I470K004K004U024U024U024U075

K023K383U024U024U083

I070

K009

K051K051

C0644K053K053U081

US-81 IN SEDGWICK COUNTY (FY 2013 1R PROJECT)

CONSTRUCT 4-LANE ON US-54 IN SEWARD COUNTYGEOMETRIC IMPROVEMENT PROJECT IN LIBERAL, KANSASINTERSECTION IMPROVEMENT IN LIBERALINTERSECTION OF US-54/NEW COUNTY ROAD IN SEWARD COUNTYPLAN DEVELOPMENT ON US-54 IN SEWARD COUNTYPRESERVATION AND REVIEW ON US-83 IN SEWARD COUNTY

CITY OF TOPEKA TRAFFIC SIGNAL CORDINATIONIMPROVE BIKE/PED PATH ON SHUNGA TRAIL IN SHAWNEE COUNTYTOPEKA SIGN AND CAMERA INSTALLATIONUPRR & NW ARN ROAD NORTHWEST OF ROSSVILLEUPRR & NW DAVIS ROAD 2 MILES SOUTHEAST OF ROSSVILLEUPRR & NW HALL ROAD 1 MILE NORTHWEST OF ROSSVILLEI-70 POLK/QUINCY VIADUCT AND APPROACH ROADWAYREHABILITATE BRIDGE ON I-70 IN SHAWNEE COUNTYBRIDGES #056;057;171;172 ON I-470 IN SHAWNEE COUNTYK-4 IN SHAWNEE COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE ON K-4 IN SHAWNEE COUNTYROAD AND BRIDGE REHAB ON US-24 IN SHAWNEE COUNTYROAD AND BRIDGE REHAB ON US-24 IN SHAWNEE COUNTYROAD IMPROVEMENTS IN SHAWNEE COUNTYROAD IMPROCVEMENTS ON US-75 IN SHAWNEE COUNTY

K-23 PROJECT IN SHERIDAN COUNTYMILL, INLAY & OVERLAY ON K-383 IN SHERIDAN COUNTYREPLACE BRIDGE ON US-24 IN SHERIDAN COUNTYREPLACE BRIDGE ON US-24 IN SHERIDAN COUNTYUS-83 IMPROVEMENTS IN SHERIDAN COUNTY

PERMANENT SEEDING PROJECT IN SHERMAN COUNTY

BRIDGE REPLACEMENT IN SMITH COUNTYSMITH COUNTY BRIDGE GIS SYSTEMBRIDGE REPLACEMENT IN SMITH COUNTY

SIDEWALK AND BIKE PATH IN CITY OF HUGOTONHUGOTON DAIRY TRAFFIC IMPACT STUDYPAVEMENT REPLACEMENT ON K-51 IN STEVENS COUNTY(HUGOTON)

REPLACE BRIDGE OVER HARGIS CREEK IN WELLINGTONROAD IMPROVEMENTS IN SUMNER COUNTYSIDEWALK AND BIKE PATH IN WELLINGTONUNION PACIFIC & 130TH STREET 2 MILES SOUTH OF PECKUPRR & N. WEST ROAD SOUTH OF PECKSUMNER COUNTYROAD IMPROVEMENTS IN MULVANE ON K-53SUMNER COUNTY: ROAD IMPROVEMENTS IN MULVANEBRIDGE REPLACEMENT IN SUMNER COUNTY

1.2

9.50.00.21.011.113.7

0.00.50.00.00.00.04.10.00.01.90.01.31.30.22.5

18.81.30.00.011.3

12.8

0.20.00.0

0.01.40.9

0.01.10.00.00.00.10.71.30.0

Pavement Patching

Grade, Bridge & SurfacingGrade & SurfacingGrade & SurfacingGrade & SurfacingPreliminary EngineeringMilling And Overlay

Intelligent Transportation SysPedestrian & Bicycle PathsIntelligent Transportation SysFlashing Light SignalFlashing Light SignalFlashing Light SignalPreliminary EngineeringBridgeBridge Overlay1.5 OverlayBridge ReplacementBridge ReplacementSeeding, SoddingGrade, Bridge & SurfacingMilling And Overlay

Pavement ReconstructionMilling And OverlayBridge ReplacementBridge ReplacementGrade & Surfacing

Seeding, Sodding

Grade, Bridge & SurfacingIntelligent Transportation SysBridge Replacement

Pedestrian & Bicycle PathsPreliminary EngineeringPavement Reconstruction

Grade, Bridge & SurfacingGrade & SurfacingPedestrian & Bicycle PathsFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingMilling And OverlayMilling And OverlayBridge Replacement

749

59,0001,6941,4214,428

00

01,20022726022526000

837273

1,08839,818

2002,2422,955

11,3000

2,0332,731

0

230

38100

22500

2331,635225250225

1,7534236440

SM-1RR

SE-RICLC-K3RLC-K3RSE-EDPSE-RICSM-RIP

SE-ITSLC-TEXSE-ITS

LC-RXRLC-RXRLC-RXRSE-IRC

SM-PBRSM-BSRSM-1RRSM-PBRSE-RICSE-RIC

SM-PBRSM-RIP

MM-1RSSM-RIPSM-PBRSM-PBRSM-RIP

SM-IRP

LC-RESSE-ITS

SM-PBR

LC-SRTMM-CORSM-RIP

LC-RESLC-RESLC-SRTLC-RXRLC-RXRLC-RESLC-K1RLC-K1RSM-PBR

2013

201820152013201320182016

201420132013201420142014201720152013201320142013201520132013

20142015201320132015

2014

201420132017

201420132015

201320132013201320142016201420142016

Page 26: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-19 (FY 2013 - 2020 TWORKS)

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

SumnerSumnerSumnerSumnerSumnerSumnerSumnerSumner

ThomasThomasThomasThomasThomasThomasThomasThomasThomasThomasThomasThomasThomas

Trego

WabaunseeWabaunseeWabaunseeWabaunseeWabaunseeWabaunsee

WallaceWallaceWallaceWallace

WashingtonWashingtonWashingtonWashington

WilsonWilsonWilsonWilson

WoodsonWoodsonWoodson

U081U081U081U081U081U081U160U160

I070I070I070I070I070K025U024U083U083U083U083U083

I070I070K004K099K099K099

K027K027K027K027

K009K015K148

U400U400

BRIDGE REPLACEMENT IN SUMNER COUNTYCITY OF WELLINGTON; S JCT US-81 AND US-160 (8TH AND G)REPLACE BRIDGE ON US-81 IN SUMNER COUNTYROAD IMPROVEMENTS IN WELLINGTON ON US 160/81ROAD IMPROVEMENTS IN WELLINGTON ON US-81US-81 IN SUMNER COUNTY (FY 2013 1R PROJECT)GEOMETRIC IMPROVEMENT IN WELLINGTONWELLINGTON: US-160 (16TH ST) & WOODLAWN ST

SIDEWALK AND BIKE PATH IN CITY OF COLBYPERMANENT SEEDING PROJECT ON I-70 IN THOMAS COUNTYPERMANENT SEEDING PROJECT ON I-70 IN THOMAS COUNTYREPLACE BRIDGE ON I-70 IN THOMAS COUNTYROADWAY REHAB ON I-70 IN COLBY (THOMAS COUNTY)ROADWAY REHAB ON I-70 IN THOMAS COUNTYAREA TRANSPORTATION PLAN: I-70 IN COLBYMILLBRIDGE REPLACEMENT IN THOMAS COUNTYREPLACE BRIDGE #036 ON US-83 IN THOMAS COUNTYREPLACE BRIDGE #037 ON US-83 IN THOMAS COUNTYREPLACE BRIDGE #039 ON US-83 IN THOMAS COUNTYUS-83 PROJECT IN THOMAS AND LOGAN COUNTIES

UPRR & 390 AVENUE IN TREGO COUNTY

EMERGENCY REPAIR ON BRIDGE #097 (I-70 IN WABAUNSEE CO)REPLACE HIGH MAST TOWER IN WABUNSEE COUNTYCULVERT REPLACEMENTS ON K-4 IN WABAUNSEE COUNTYK-99 IN WABAUNSEE COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE #056 ON K-99 IN WABAUNSEE COUNTYROAD IMPROVEMENTS IN THE CITY OF ALMA

GEOMETRIC IMPROVEMENT IN SHARON SPRINGS, KANSASK-27 FROM WA/GL COUNTY LINE NORTH TO WA/SH COUNTY LINEREPLACE BRIDGE ON K-27 IN WALLACE COUNTYROAD IMPROVEMENTS IN WALLACE COUNTY

BRIDGE REPLACEMENT IN WASHINGTON COUNTYBRIDGES #039 AND #042 ON K-9 IN WASHINGTON COUNTYBRIDGE #024 ON K-15 IN WASHINGTON COUNTYBRIDGE PAINTING OF #018 ON K-148 IN WASHINGTON COUNTY

UPRR & 800 ROAD SOUTH OF ALTOONAUPRR & PRATT ROAD NORTHWEST OF ALTOONAPASSING LANES ON US-400 IN SOUTHEAST KANSASPASSING LANES ON US-400 IN SOUTHEAST KANSAS

BRIDGE REPLACEMENT IN WOODSON COUNTYREMOVAL OF CONCRETE HEADWALLS IN WOODSON COUNTYREPLACE BRIDGE ON RS-291 IN WOODSON COUNTY

0.00.40.00.20.918.90.30.2

0.00.011.50.09.811.50.62.10.00.00.00.019.0

0.0

0.00.00.912.80.00.4

0.130.80.95.5

0.20.00.00.0

0.00.02.02.5

0.20.00.2

Bridge ReplacementTraffic SignalsBridge ReplacementSurfacingMilling And OverlayMilling And OverlayMilling And OverlayIntersection Improvement

Pedestrian & Bicycle PathsSeeding, SoddingSeeding, SoddingBridge ReplacementMilling And OverlayMilling And OverlayPreliminary EngineeringMilling And OverlayBridge ReplacementBridge ReplacementBridge ReplacementBridge ReplacementMilling And Overlay

Flashing Light Signal

Bridge RepairLightingCulvertMilling And OverlayBridge ReplacementMilling And Overlay

SurfacingLocation StudyGrade, Bridge & SurfacingGrade & Surfacing

Grade & BridgeBridge OverlayBridgeBridge Paint

Flashing Light SignalFlashing Light SignalGrade & SurfacingGrade & Surfacing

Bridge ReplacementGradingGrade, Bridge & Surfacing

0295990309259

2,582567503

2214

1083,93422,49232,003

06470000

6,600

220

2554913

1,8320

236

4160

2,6408,789

622293202195

275260

1,3403,710

31160

SM-PBRMM-SAFSM-PBRLC-K1RLC-K1RSM-1RRLC-K3RLC-HES

LC-SRTSM-PBRSM-IRPSM-PBRSM-IRPSM-IRP

MM-CORLC-K1RSM-PBRSM-PBRSM-PBRSM-PBRSM-RIP

LC-RXR

SM-EMRSM-SLRSM-PCRSM-1RRSM-PBRLC-K1R

LC-K3RMM-RIMSM-PBRMM-RIM

LC-RESSM-BSRSM-BSRSM-BSP

LC-RXRLC-RXRSE-RICSE-RIC

LC-RESLC-RESLC-RES

20172014201420132014201320142014

2014201920192018201520182014201320162015201520152013

2014

201320132014201320152013

2014201320142015

2014201320132013

2014201420152015

201420132013

Page 27: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-20 (FY 2013 - 2020 TWORKS)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

WoodsonWoodson

WyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotte

StatewideStatewideStatewideStatewideStatewideStatewideStatewide

U054

I035I035I035I070I070I070I070I070I070I070I070I070I070I070I070I070I070I070I070I070I435I435I435I635I635K005K007K032K032U024U069U069U069U073

UPRR & 90TH ROAD SOUTHEAST OF YATES CENTERREPLACE BRIDGE #005 ON US-54 IN WOODSON COUNTY

IMPROVE INTERSECTION IN WYANDOTTE COUNTYROAD IMPROVEMENTS IN WYANDOTTE COUNTYSIDEWALK/BIKE PATH IN WYANDOTTE COUNTYVILLAGE WEST SIGN AND CAMERA INSTALLATIONWYANDOTTE COUNTY BRIDGE REPLACEMENTSBUS OPERATION ON SHOULDERSEMERGENCY REPAIR FOR BRIDGE ON I-35 IN WYANDOTTE COUNTYEMERGENCY REPAIR FOR BRIDGE ON I-35 IN WYANDOTTE COUNTY118TH ST OVERPASS AT I-70/K-7 INTERCH IN WYANDOTTE COBRIDGE #096 ON I-70 IN WYANDOTTE COUNTYBRIDGES FOR THE LEWIS & CLARK VIADUCT, KANSAS CITY, KSCONSTRUCT I-70 AND K-7 INTERCHANGE IN WYANDOTTE COCONSTRUCT I-70 AND K-7 INTERCHANGE IN WYANDOTTE COCONSTRUCT I-70 AND K-7 INTERCHANGE IN WYANDOTTE COUNTYCONSTRUCT WEST K-7/I-70 INTERCHANGE IN WYANDOTTE COUNTYI-70 & 38TH STREET (MATOON RD), WYANDOTTE CO.I-70 AND K-7 INTERCHANGEI-70 AND K-7 INTERCHANGE IMPROVEMENTSI-70 AND K-7 INTERCHANGE IN WYANDOTTE COUNTYI-70 AND K-7 INTERCHANGE IN WYANDOTTE COUNTYPERMANENT SEEDING AT I-70 AND K-7 IN WYANDOTTE COUNTYPERMANENT SEEDING AT I-70/K-7 IN WYANDOTTE CO.RIVERVIEW AVE REALIGNMENT ON I-70/K-7 IN WYANDOTTE COROAD IMPROVEMENTS AT I-70/K-7 IN WYANDOTTE COUNTYUPGRADE WEATHERING STEEL POLES IN WYANDOTTE COUNTYBRIDGE REPAIR ON #235 & #240 (MISSOURI RIVER) I-435HIGH MAST WEATHERING STEEL POLES IN WYANDOTTE CO.I-435REDECK BRIDGES ON I-635 IN WYANDOTTE COUNTYREPLACE BRIDGE OVER I-635 IN WYANDOTTE COUNTYMILLI-70 AND K-7 INTERCHANGE IMPROVEMENTSBRIDGE REPLACEMENT IN WYANDOTTE COUNTYROAD IMPROVEMENTS IN KANSAS CITY ON K-32CONSTRUCT I-70 AND K-7 INTERCHANGE IN WYANDOTTE COUNTY:BRIDGE IMPROVEMENTS IN WYANDOTTE COUNTYROAD IMPROVEMENTS IN KANSAS CITY ON US-69US-69 IN WYANDOTTE COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE ON US-73 (SB LANES) IN WYANDOTTE COUNTY

2013 KANSAS SCENIC BYWAY CONFERENCEDIST MAINT CONTRACT FOR R/W EASEMENTS, STATEWIDEDIST MAINT CONTRACT FOR REST AREA SERVICS STATEWIDEDIST MAINTENANCE CONTRACT FOR MAINTENANCE STATEWIDEDISTRICT WIDE, DISTRICT 1DISTRICT WIDE, DISTRICT 2DISTRICT WIDE, DISTRICT 3

0.00.0

0.51.30.00.01.33.70.00.00.00.00.62.30.80.81.51.20.02.10.03.11.71.50.01.71.50.00.50.00.00.06.51.00.00.41.00.10.50.30.0

0.00.00.00.00.00.00.0

Flashing Light SignalBridge Replacement

Grade & SurfacingGrade, Bridge & SurfacingPedestrian & Bicycle PathsIntelligent Transportation SysGrade, Bridge & SurfacingSpecialBridge RepairBridge RepairGrade, Bridge & SurfacingBridgeBridge ReplacementGrade & SurfacingGrade & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingLightingRight Of Way OnGrade, Bridge & SurfacingPreliminary EngineeringGrade, Bridge & SurfacingSeeding, SoddingSeeding, SoddingGrade, Bridge & SurfacingGrade, Bridge & SurfacingLightingBridge RepairLightingLightingBridge DeckBridge ReplacementOverlayGrade, Bridge & SurfacingBridge ReplacementSurfacingGrade, Bridge & SurfacingPreliminary EngineeringMilling And OverlayUltra Thin Bonded Asphalt Surf.Bridge Replacement

Scenic Or Historic Hwy ProgsSpecialSpecialSpecialPreliminary EngineeringPreliminary EngineeringPreliminary Engineering

2500

2,3525,1564310

64821920150

4,1352750000

22,6164660000

115105

5,39629,843

5363,300145482

3,6422,8721,139

00

55400

406145

1,604

0020160000

LC-RXRSM-PBR

LC-RESLC-RESLC-SRTSE-ITSLC-RESMM-IRI

SM-EMRSM-EMRSE-IRC

SM-BSRSM-PBRSE-IRCSE-RICSE-RICSE-IRC

MM-LTGSE-IRCSE-IRCSE-IRCSE-IRCSE-IRCSE-IRCSE-IRCSE-IRC

MM-LTGSM-BSRMM-LTGMM-LTGSM-PDRSM-PBRLC-K1RSE-RIC

SM-PBRLC-K1RSE-RIC

SM-PBRLC-K1RSM-1RRSM-PBR

MM-SBWSM-CMNSM-CMNSM-CMNSM-1RRSM-1RRSM-1RR

20142015

201520142013201320132013201320132014201320172018201820182013201320132018201420172017201520132015201420152013201420132014201320182017201320182014201420132014

2013201320132013201320132013

Page 28: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-21 (FY 2013 - 2020 TWORKS)

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

StatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewide

I035I070K061K099U036U036U050U050U400

DISTRICT WIDE, DISTRICT 4DISTRICT WIDE, DISTRICT 5DISTRICT WIDE, DISTRICT 6ECONOMIC RESEARCHFROM 47TH ST. TO EISENHOWER RD.HIGHWAY LIGHTING PROJECTSHIGHWAY LIGHTING PROJECTSHIGHWAY USE TAX EVASION PROJECTI-435 REAL TIME TRAVELER INFORMATIONINSTALLATION OF COMPRESSED NATURAL GAS FUELING STATIONINTERPRETIVE MANAGEMENT PLAN FOR KANSAS SCENIC BYWAYSKANSAS CITY LIVABLE COMMUNITIES PILOT PROGRAMKANSAS CITY METRO REGIONAL AIR QUALITY PUBLIC EDUCATIONKANSAS CITY METRO REGIONAL RIDESHARE PROGRAMKANSAS CITY METRO REGIONAL RIDESHARE PROGRAMKANSAS CITY METROREGIONAL ACTIVE TRANS PROGRAMKC METRO OZONE ALERT DAY REDUCED FARE PROGRAMKC OPERATION GREEN LIGHT COORDINATED TRAFFIC SIGNALSKDOT PROVIDED EQUIPMENT FOR FY14 CONSTRUCTION PROJECTSKS BYWAYS STATEWIDE BICYCLE/PEDESTRIAN STRATEGIC PLANMOTORIST ASSISTANCE PROGRAM FISCAL YEAR 2013NATIVE STONE SCENIC BYWAY INTERPRETIVE KIOSKSOPERATION GREEN LIGHT IMPROVEMENTPAVEMENT MARKING MASTER PROJECTSAFE ROUTES TO SCHOOLSAFE ROUTES TO SCHOOLSIGN INVENTORY FOR THE STATE HIGHWAY SYSTEM.SIGNING PROJECTSSIGNING PROJECTSSKILLED LABOR TRAINING PROGRAM (2013)STATEWIDE BRIDGE INSPECTIONSTATEWIDE PE FOR RR INSPECTIONSSTATEWIDE PE FOR RR INSPECTIONSSTATEWIDE PE FOR RR INSPECTIONSSTATEWIDE PLAN REVIEW OF ROUNDABOUTSSTATEWIDE SIGN AND LIGHT TOWER INSPECTIONSTATEWIDE:UPDATE KDOT ROUNDABOUT GUIDETAX EVASION PROJECTTAX EVASION PROJECTTRAFFIC INFORMATION IMPROVEMENTS FOR RURAL KANSASHIGH MAST WEATHERING STEEL POLES: JOHNSON/WYANDOTTE COSKTA SIGNS, CAMERAS BETWEEN TOPEKA AND KANSAS CITYINSTALL CONDUITK-99 IMPROVEMENTS IN CITY OF WAMEGOSIGN IMPROVEMENTS IN NORTH-CENTRAL KANSASSIGN IMPROVMENT PROJECT FOR NORTHWEST KANSASPASSING LANES EVALUATION ON US-50PASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPASSING LANE EVALUATION ON US-400 IN SOUTHEAST KANSAS

0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.140.724.99.6

174.6317.899.32.4

131.9

Preliminary EngineeringPreliminary EngineeringPreliminary EngineeringPreliminary EngineeringIntelligent Transportation SysLightingLightingSpecialIntelligent Transportation SysFunds OnlyScenic Or Historic Hwy ProgsFunds OnlyFunds OnlyFunds OnlyFunds OnlyFunds OnlyFTA Funds TransferIntelligent Transportation SysSafety Emerg. Med. ServicesScenic Or Historic Hwy ProgsPreliminary EngineeringScenic Or Historic Hwy ProgsIntelligent Transportation SysPavement MarkingSpecialSpecialSigningSigningSigningPreliminary EngineeringBridgeFlashing Light SignalFlashing Light SignalFlashing Light SignalPreliminary EngineeringPreliminary EngineeringPreliminary EngineeringSpecialSpecialIntelligent Transportation SysLightingIntelligent Transportation SysIntelligent Transportation SysLocation StudySigningSigningPreliminary EngineeringGrade & SurfacingPreliminary Engineering

000000

6780

1,02300000000

13900050

3,985000

99600000000000

680321500

2,5720

4754160

3,7300

SM-1RRSM-1RRSM-1RRSE-EDPSE-ITS

MM-LTGMM-LTGMM-RIM

SE-ITSLC-RES

MM-SBWLC-LOCLC-RESLC-RESLC-RESLC-RESLC-RESLC-RESSE-ITS

MM-SBWSE-ITS

MM-SBWSE-ITS

SM-PMRLC-SRTLC-SRTSM-SOSSM-SOSSM-SOSSM-ISRLC-RESLC-RRXLC-RRXLC-RRXMM-SAFSM-SLRMM-SAFMM-RIMMM-RIM

SE-ITSMM-LTGSE-ITSSE-SEC

MM-RIMSM-SOSSM-SOSSE-RICSE-RICSE-RIC

2013201320132013201420132014201320132013201320132013201320132013201320142014201420132013201320132013201420132013201420132015201320142015201620132016201320142014201320132013201320132013201520152015

Page 29: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route LocationDescription Length(Miles)

TypeofWorkCounty

B-22

FiscalYear

Est.FYConst.Cost(1,000)

ProgCat&SubCat@

PROJECTSCOMPLETEDINFISCALYEAR2011

(Projects Completed in FY 2012)

AllenAllenAllenAllenAllen

AndersonAndersonAndersonAndersonAndersonAndersonAnderson

AtchisonAtchisonAtchisonAtchisonAtchisonAtchisonAtchisonAtchisonAtchisonAtchison

BarberBarberBarberBarberBarberBarberBarberBarberBarberBarberBarber

BartonBartonBartonBartonBartonBartonBartonBartonBartonBarton

C0000U054U169

K031K031U059U059U169U169

C0000C0017U059U059U059U073

C1381K002K00801U160U160

C0042C0462C0979C2179K096

HUMBOLDT: BRIDGE AND CENTRAL STIOLA: COTTONWOOD FROM MADISON TO GARFIELD4.2 MI W & 1.0 MI S OF ELSMOREUS-54 IN ALLEN COUNTY (CRACK REPAIR) PART PROJECTUS169 & HUMBOLT/CHANUTE IC,K-224,MINNESOTA RD INTERCHGS

UPRR & NE 2000 ROAD NORTHEAST OF GARNETTBRIDGE 31-02 (20);5.14 MILES WEST OF NORTH JCT US-59SOUTH JCT US-59, ANDERSON-LINN COUNTY LINEN JCT US-59/US-169, 1.25 MILES S OF GARNETTUS-59 IN ANDERSON COUNTY (2011 1R PROJECT)BRIDGE #011 ON US-169 IN ANDERSON COUNTYEXISTING BR ON SW OLD COLONY WELDA ROAD; DISTRICT 4

0.5 MI W OF CUMMINGSATCHISON: 4TH STREET, KANSAS TO DIVISIONUPRR & GREELEY ROAD NW OF LANCASTERUPRR & HAMILTON ROAD NW OF LANCASTER4.0 MILES N & 4.4 MILES E OF SHANNON1.3 MI S OF ARRINGTONBRIDGE 59-3-16.363(013); 0.31 MILES EAST 4TH STREETCORRIDOR: AMELIA EARHART BRIDGE (013) OVER MO RIVERK-116(CUMMINGS), NORTHEAST TO WEST JUNCTION US-59/US-73ATCHISON: US-73 IN ATCHISON COUNTY - KLINK PROJECT

BNSF & BLUESTEM ROAD BARBER COUNTYBNSF & D AVENUE IN HAZELTONBNSF & LONE TREE ROAD IN BARBER COUNTYBNSF & MINCO ROAD NORTHEAST OF HAZELTONBNSF & T-101,STATELINE ROAD SOUTH OF KIOWABNSF CORRIDOR BARBER COUNTY2.0 E OF HAZELTON ON RS-1381K-2 IN BARBER COUNTY (2011 1R PROJECT)K-8 IN BARBER COUNTY (2011 1R PROJECT)2L TO 4L (WEST OF JCT US-281/US-169) E TO BA/HP CO LNBR 010, ELM CREEK, 0.78 MILE EAST OF EAST JCT US-281

GREAT BEND: MULTIPLE LOCATIONS ON US-56/US-281/K-96GREAT BEND:FEDERAL FUND EXCHANGEMCKINLEY ST RECONSTRUCTIONPAWNEE ROCK HISTORIC SITE RESTORATIONSCENIC BYWAY AT CHEYENNE BOTTOMS AND QUIVIRA WL REBOYD ROAD (WEST) 2.5 MILES S & 4 MILES W OF HOISINGTONRS-462 FROM GREAT BEND W. CITY LIMTS W. TO NW 60TH AVEBOYD RR CROSSING SEC 2&3, T18S, R14W3.0 MI E & 1.0 MI S OF HEIZERK-96 IN BT CO RH/BT COUNTY LN EAST TO NCL GREAT BEND

0.50.80.55.80.0

0.00.05.10.59.10.00.0

0.30.80.00.00.10.60.03.79.31.8

0.00.00.00.00.00.00.216.31.313.70.0

7.40.00.20.076.70.52.50.20.313.6

Grade & SurfacingGrade & SurfacingGrade & BridgeCrack RepairLighting

Flashing Light SignalBridge Repair1.0 OverlayIntersection Improvement3/4 OverlaySeeding, SoddingFunds Only

Grade, Bridge & SurfacingGrade & SurfacingFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingGrade, Bridge & SurfacingBridge RepairPreliminary EngineeringMilling And OverlayMilling And Overlay

Flashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalGrade & SurfacingGrade, Bridge & SurfacingMilling And OverlayMilling And Overlay3/4 OverlayBridge Deck

SealingFunds OnlySurfacingHistoric PreservationScenic Or Historic Hwy ProgsGrade, Bridge & SurfacingSurfacingSurfacingGrade & BridgeSealing

3211,19053120467

32093343

1,6001,512

30147

4691,61926026027782212400

628

200400200225225650327

1,92798

1,1151,201

4980

5571710

1,06767530156668

LC-RESLC-RESLC-RES

SM-CMNMM-LTG

LC-RXRSM-BSRSM-1RRLC-HESSM-1RRSM-PBRSM-PBR

LC-RESLC-RESLC-RXRLC-RXRLC-RESLC-RES

SM-EMRSE-SECSM-RIPLC-K1R

LC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RESSM-1RRSM-1RRSM-1RRSM-PDR

LC-K1RLS-LFTLC-RESLC-TEX

MM-SBWLC-RESLC-RESLC-RESLC-RES

SM-CMN

20112008200720112008

2011200820072005201120112010

2009200720092009201020082010200320112011

20092009200920092009200720102011201120092008

2011201120102010200820102010200920102010

Page 30: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-23 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

BartonBartonBartonBarton

BourbonBourbonBourbonBourbonBourbonBourbonBourbonBourbon

BrownBrownBrownBrownBrownBrownBrownBrown

ButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButler

K156U056U056U281

K003K031K065U054U054

C0000U036U073U073U073U159

C1012K177K196K254K254U054U054U054U054U054U054U077U077

0.00.50.00.2

0.00.00.03.06.110.920.71.2

0.30.00.30.00.10.011.60.8

0.20.80.40.00.00.00.00.10.00.20.00.00.00.00.20.018.612.20.00.20.00.10.08.59.012.712.5

CHEYENNE BOTTOMS WILDLIFE AREA VISITOR CENTERFROM W OF HARRISON ST, E TO WASHINGTON ST IN GREAT BENDGREAT BEND: INTERSECTION OF FREY ST AND 10TH ST (US-56)US-281 FROM 3RD ST TO 6TH ST

BNSF & 225TH STREET SOUTH OF HAMMONDBNSF & HACKBERRY ROAD SOUTH OF FT. SCOTTCITY OF FORT SCOTTBOURBON/CRAWFORD COUNTY LINE NORTH TO EAST JCT K-39BOURBON/LINN COUNTY LINE TO EAST JUNCTION K-7/K-31JUNCTION K-3 EAST TO JUNCTION K-31 (MAPLETON)AL/BB COUNTY LINE TO 0.7 MILES W OF N JCT US-69 (PCCP)FORT SCOTT:JCT US-69/K-7 TO BROWN ST ON WALL ST (US-54)

2.5 MI SOUTH & 0.8 MI WEST OF HIAWATHAUPRR & BITTERSWEET ROAD EAST OF SABETHA2.5 MI S & 1.8 MI W OF HIAWATHABRIDGE 36-7(045); 1.08 MILES EAST OF US-73BR#8(.42 MI E OF E JCT US-159) #9(4 MI N OF W JCT K-20)EMERGENCY REPAIR ON US-73 CULVERT IN BROWN COUNTYNCL HORTON, N TO SCL HIAWATHAHORTON: SOUTH CITY LIMITS, NORTH TO K-20

1.5 MILES W OF BENTON & 1.7 MILES N OVER WHITEWATER CKANDOVER: ANDOVER RD FROM HARRY ST TO 1100 FT S OF US-54AUGUSTA:WBL OF 7TH ST BT BNSF RR TO 250 FT W OF BLUFFBNSF & DIAMOND ROAD SOUTHWEST OF AUGUSTABNSF & ELLIS ROAD, NORTHEAST OF EL DORADOBNSF & NE 80TH STREET, 7 MILES SW OF CASSODAYBNSF & SW 120TH STREET, SOUTHWEST OF AUGUSTAEL DORADO: NINTH AVENUE OVER W BRANCH OF WALNUT RIVEREL DORADO:FEDERAL FUND EXCHANGEELDORADO: 6TH AVE & BOYER AVE FROM K-254 TO METCALF RDK196/K254; US-54/HAVERHILL ROAD; AND US54/US400/US77UNION PACIFIC & 2ND STREET IN WHITEWATERUNION PACIFIC & NW BUTLER RD NORTH OF WHITEWATERUPRR & 160TH STREET NORTH EDGE OF ELBING3.0 MILES E & 0.7 MILES N OF EL DORADOBRIDGE #126 LOCATED 8.17 MILES NORTH OF US-54BU/HV COUNTY LINE EAST TO CONC PAVEMENT (18.598 MILES)BUTLER/SEDGWICK COUNTY LINE EAST TO PCCP WEST OF K-196K-254 FROM SCHOOL RD TO HAVERHILL RDAUGUSTA: E EWS OF BNSF RR BR TO ECL ON 7TH ST (US-54)BR # 127 & 128; 1.21 MILE EAST OF WEST JUNCTION US-77BRIDGE #25; 0.55 MILES EAST OF US-77 NORTH JUNCTIONBRIDGE 54-08 (119); 0.40 MILES EAST OF US-77 WEST JCTN OF US-400 INTERCHANGE, N TO WHERE 4-LANES ENDSUS-54 IN BUTLER CO; SG/BU CO LINE EAST TO AUGUSTA CLCL/BU CO LINE N TO 1 MILE S OF S CITY LIMITS OF AUGUSTACL-BU COUNTY LINE, N TO SOUTH CITY LIMITS OF AUGUSTA

Landscaping And BeautificationGrade & SurfacingGrade & SurfacingGrade & Surfacing

Flashing Light SignalFlashing Light SignalPreliminary Engineering1.0 Overlay1.0 Overlay1.0 Overlay3/4 OverlayMilling And Overlay

Grade, Bridge & SurfacingFlashing Light SignalGrade, Bridge & SurfacingBridge RepairBridge RepairCulvert40 Mm Overlay (1-1/2 Inches)Overlay

Grade, Bridge & SurfacingGrade & SurfacingSurfacingFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingFunds OnlyGrade & SurfacingLightingFlashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingBridge RepairMilling And Overlay3/4 OverlayGrade & SurfacingMilling And OverlayBridge RepairBridge RepairBridge RepairGrade, Bridge & SurfacingSealing3/4 OverlayDetour(s)

2,7883,270423994

2502000

224297596

1,740613

3132402952021455

1,401221

1,0023,9107952252008

2259010

2,912225240225200596105

1,7493,0181,757261219178950

12,23845

1,0062,761

LC-TEXMM-RIMLC-K1RLC-K3R

MM-KCCLC-RXRLC-SRTSM-1RRSM-1RRSM-1RRSM-1RRLC-K1R

LC-RESLC-RXRLC-RESSM-BSRSM-BSRSM-EMRSM-1RRLC-K1R

LC-RESLC-RESLC-RESLC-RXRLC-RXRLC-RXRLC-RXRLC-RESLS-LFTLC-RES

MM-LTGLC-RXRLC-RXRLC-RXRLC-RESSM-BSRSM-1RRSM-1RRLC-K3RLC-K1RSM-BSRSM-BSRSM-BSRMM-RIMSM-CMNSM-1RRMM-RIM

2007200920072009

20112009200820102010201020092009

20102009200920102011201120032010

201020102011201020102012201020072011201020092009200920102011201020102008200820102010200920082004201020092003

Page 31: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-24 (Projects Completed in FY 2012)

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

ButlerButler

ChaseChaseChaseChaseChase

ChautauquaChautauquaChautauqua

CherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokee

Cheyenne

ClarkClarkClark

ClayClayClayClayClay

CloudCloud

U077U077

K177K177K177K177

C0000C0000C0097

C0000C0000C1791K026K066K066K102U069U069U069U166U166U400U400

U160U183U283

C0123K015K015U024U024

C0000

0.89.6

0.00.00.00.00.0

0.10.13.5

1.80.00.00.00.00.00.00.00.20.13.03.60.00.00.00.57.09.10.018.30.00.5

0.4

0.00.02.0

0.20.911.911.98.1

0.00.3

EL DORADO: 4TH TO 12TH AVENUE ON MAIN STREET (US-77)NCL EL DORADO, N TO RS 862

CHASE:FEDERAL FUND EXCHANGEBRIDGE 033,OVER ROCK CREEK, 14.1 MI N BU/CS COUNTY LINECULVERTS(521&522);12.35 & 13.21 MI N OF CS/BU COUN LINESCENIC BYWAYTHE FLINT HILLS SCENIC NATIONAL BYWAY (K-177)

2.0 MI N & 3.5 MI E OF SEDAN2.0 MI NORTH & 2.0 MI EAST OF PERUSEDAN: INDEPENDENCE RD RS 97 E 3.5 MILES

RS 107 FROM HWY 66 AT RIVERTON SOUTH TO LOWELL KSBNSF & BEASLEY ROAD NE OF BAXTER SPRINGSBNSF & MAIN STREET IN GALENABNSF & MESSER ROAD SOUTH OF COLUMBUSBNSF & N 10TH ROAD NORTHWEST OF BAXTER SPRINGSBNSF & QUAKER ROAD NE OF BAXTER SPRINGSKCS & 110TH STREET SOUTH OF PITTSBURGKCS & WEIR ROAD SOUTH OF PITTSBURG1.5 MI W & 3.25 MI S OF HALLOWELL3.0 MI E & 1.5 MI S OF SCAMMONRS 1791 FROM US-400 E. TO 100TH STREETK-26 IN CHEROKEE COUNTY (2011 1R PROJECT)BNSF & K-66 IN GALENABRIDGE 66-11 (005);1.00 MILES EAST OF US-400/K-66 JCTSKO & K-102 AT CARONACOLUMBUS: N SIDE OF RR XING TO MAPLE ST ON US-69JCT K-7/US-69 EAST TO SOUTH JCT US-400/US-69OKLAHOMA/KANSAS STATE LINE; NORTH TO COLUMBUSSPRING RIVER DRAINAGE BR 034, 5.3 MILES E OF JCT US-69US-166 IN CHEROKEE CO LB/CK CO LINE EAST TO BAXTER SPRBRIDGES 74 AND 76, 2.5 MILE E OF JUNCTION K-126US-400/K-66/BEASLEY INTERSECTION W OF RIVERTON; CK CO

13 MILES W & 11 MILES S OF ST FRANCIS

BRIDGE #006 IN CLARK CO (3.58 MI E OF S JCT US-283)BR 18, CIMARRON RV & 19 CIM RV OVFL, 4.39 & 4.87 M N OKUS-283 IN CLARK COUNTY (2011 1R PROJECT)

5.2 MI S OF CLIFTONCLAY CENTER: BLUNT STREET, NORTH TO NORTH CITY LIMITSK-15 FROM NORTH CITY LIMITS OF CLAY CENTER N 11.936 MIUS-24 IN CLAY COUNTY (2011 1R PROJECT)US-24 IN CLAY COUNTY (2011 1R PROJECT)

CONCORDIA:FEDERAL FUND EXCHANGE2.0 MI S & 4.5 MI W OF CONCORDIA

Grade, Bridge & SurfacingGrade, Bridge & Surfacing

Funds OnlyJoint RepairCulvertScenic Or Historic Hwy ProgsScenic Or Historic Hwy Progs

Grade, Bridge & SurfacingGrade & BridgeSurfacing

SurfacingFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingGrade, Bridge & SurfacingOverlay1.0 OverlayFlashing Light SignalBridge RepairFlashing Light SignalGrade & Surfacing3/4 OverlaySeeding, SoddingBridge ReplacementConv SealBridge OverlayGrade & Surfacing

Grading

Bridge OverlayGrade, Bridge & SurfacingRecycle & O-lay

Grade, Bridge & SurfacingOverlayConv SealMilling And OverlayRecycle & O-lay

Funds OnlyGrade & Bridge

2,74915,957

01195721570

292591469

250170200250250280250250423321695226300374230

1,67958480750

1,001210

2,181

63

1248,642348

586195359

1,5791,044

0284

LC-RESMM-RIM

LS-LFTSM-BSRSM-PCR

MM-SBWMM-SBW

LC-RESLC-RESLC-RES

LC-RESLC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RESLC-RESLC-RESSM-1RRLC-RRXSM-BSRLC-RRXLC-K3RSM-1RRMM-RIMSM-PBRSM-CMNSM-BSRMM-SAF

LC-RES

SM-BSRSM-PBRSM-1RR

LC-RESLC-K1R

SM-CMNSM-1RRSM-1RR

LS-LFTLC-RES

20072004

20112010201120112008

200820072010

2010200920102010201120092010201020112009201020112008200820102009200820102007201020072008

2012

201020102011

20082010201020112011

20112008

Page 32: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-25 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

CloudCloudCloudCloudCloudCloudCloudCloudCloudCloudCloud

CoffeyCoffeyCoffeyCoffeyCoffeyCoffeyCoffeyCoffeyCoffeyCoffey

CowleyCowleyCowleyCowleyCowleyCowleyCowleyCowleyCowleyCowleyCowleyCowley

CrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawford

DecaturDecatur

C0000K009K189U024U024U024U081U081U081U081U081

C0010C0149I035K031K058U075U075U075

C0786K015U077U077U160U160

K003K047K047K126K146U160

C0000C0000

0.20.80.90.00.04.21.50.77.60.08.9

0.20.00.20.21.80.213.20.01.20.3

2.80.00.00.00.00.00.412.20.10.60.07.6

0.00.00.00.20.011.57.012.50.00.00.0

0.20.2

3.0 MI S & 1.75 MI W OF AMESK-9; CITY OF CLYDE IN CLOUD COUNTY KLINK PROJECTK-189 IN CLOUD COUNTY (2011 1R PROJECT)BR 011, WEST PIPE CREEK DRAINAGE, 0.2 MI EAST OF US-81BRIDGES #002&012; EAST OF MC COUNTY LN & EAST OF US-81US-24 IN CLOUD COUNTY (2011 1R PROJECT)0.494 MILES NORTH OF OT/CD COUNTY LINE NORTH 1.45 MILES2.424 MILES SOUTH OF K-9 JCT;NORTH TO 1.769 MILES SOUTH5.085 MILES NORTH OF OT/CD CO LINE NORTH 7.595 MILESBRIDGE 053, 1.28 MILES NORTH OF JUNCTION K-9OTTAWA/CLOUD COUNTY LINE NORTH 8.92 MILES ON US-81

BURLINGTON: 3RD STREET OVER ROCK CREEKUPRR & 9TH STREET IN LEROY7.0 MI N & 0.5 MI W OF LEROY6.2 MI N OF LEROYAPPROX 1.1 KM(0.7 MI) W OF US-75, NE TO CF-OS CO LWAVERLY: PIERSON STREET(K-31), 6TH TO 1STK-58 IN COFFEY COUNTY (2011 1R PROJECT)0.2KM S OF OLD US-50(RS 2066), NO TO 1.6KM N OLD US-50BR 021, NEOSHO RIV, 13.7 KM N K-57 N JCTBURLINGTON: FROM POTOMAC ST N TO SOUTH OF NEOSHO ST

ALONG LEVEE:PARIS PRK TO S SUMMIT & ACPC PRK - ARK CITYSKORR & 132ND ROAD NORTH OF WINFIELDSKORR & 151ST ROAD EAST OF NEW SALEMSKORR & ANDREWS STREET IN WINFIELDSKORR & HARTER STREET IN WINFIELDSKORR & MANNING STREET IN WINFIELD5.0 MI S & 2.3 MI E OF WINFIELDWEST US-166/K-15 JUNCTION WEST TO EAST US-160/K-15 JCTARKANSAS CITY(GI):INTERSECTION OF US-77B AND KANSAS AVEWINFIELD: NORTH OF 15TH ST, NORTH TO NORTH OF 6TH AVESKORR & US-160 WEST OF BURDENUS-160 IN COWLEY COUNTY; OXFORD EAST TO WINFIELD

BNSF & GOODING ROAD SOUTH OF GIRARDBNSF & MAGNOLIA STREET IN CHEROKEEBNSF & PINE STREET IN CHEROKEEPITTSBURG: BROADWAY ST CENTENNIAL TO WILLIAMSSOUTH KANSAS & OKLAHOMA RR & ELM STREET IN PITTSBURGJUNCTION K-47 NORTH TO BOURBON/CRAWFORD COUNTY LINEEAST CITY LIMITS OF GIRARD EAST TO JUNCTION US-69NEOSHO/CRAWFORD CO LINE E TO W CITY LIMITS OFGIRARDBRIDGE 058, LITTLE COW CREEK DR. 1.2 MI W KS/MO ST LINEBRIDGE 146-19 (52) EAST OF WALNUT ON K-146BR NO 160-19-12.025(078), 2.53 MI WEST OF KS/MO ST LINE

3.4 MI S & 9.1 MI W OF DRESDEN4.7 MI S & 4.4 MI W OF OBERLIN

Grade & BridgeMilling And OverlayMilling And OverlayGrade, Bridge & SurfacingBridge RepairMilling And OverlaySlurry SealSlurry SealSlurry SealBridge RepairSpecial

Grade, Bridge & SurfacingFlashing Light SignalGrade, Bridge & SurfacingGrade, Bridge & SurfacingPavement ReconstructionGrade & Surfacing3/4 OverlayFunds OnlyBridge ReplacementGrade & Surfacing

Pedestrian & Bicycle PathsFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingRecycle & O-layGrade & SurfacingOverlayFlashing Light SignalConv Seal

Flashing Light SignalFlashing Light SignalFlashing Light SignalSurfacingFlashing Light Signal1.0 Overlay3/4 Overlay3/4 OverlayGrade & SurfacingBridge ReplacementBridge Repair

Grade & BridgeGrade & Bridge

35520219472721162510950570650145

1,033300423390

6,44084266655

6,8151,886

1,849250250250250270

1,4251,466692391250189

180120180224300862870

1,0215337748

291231

LC-RESLC-K1RSM-1RRSM-PBRSM-BSRSM-1RRSM-1RRSM-1RRSM-1RRSM-BSRSM-CMN

LC-RESLC-RXRLC-RESLC-RESSM-IRPLC-K1RSM-1RRSM-RIPSM-PBRLC-K3R

LC-TEXLC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RESSM-1RRLC-K3RLC-K1RLC-RRXSM-CMN

LC-RXRLC-RXRLC-RXRLC-RESLC-RXRSM-1RRSM-1RRSM-1RRSM-BSRSM-PCRSM-BSR

LC-RESLC-RES

20102012201120102011201120102010201020072010

2008201120042007200420092011201020052010

201120102010201020112010200720102006201120092010

20102010201020102011201020102010201020112009

20102011

Page 33: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-26 (Projects Completed in FY 2012)

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

DecaturDecaturDecaturDecaturDecaturDecatur

DickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinson

DoniphanDoniphanDoniphanDoniphan

DouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglas

C0000K009K123K223K383U083

C1816I070I070I070K004K015K015K015K015K018K018K043K043K218U056U056BU077

C2128C2163K007U036

K010K010K010K010K010K010K010U024U024U040U040U040U040U056U059

0.27.23.51.67.38.0

0.00.00.10.06.28.88.40.80.026.70.39.09.00.019.61.74.31.23.8

0.20.90.00.0

0.00.00.00.52.00.10.10.71.30.00.00.40.00.00.211.212.00.0

8.5 MI N & 4.4 MI W OF NORCATURPART PROJECT OF HOST PROJECT KA-1450-01PART PROJECT OF HOST PROJECT KA-1450-01SD/DC COUNTY LINE NORTH TO JUNCTION K-383ASPHALT SEAL ON K-383 IN DECATUR COUNTY (7.313 MILES)US-83 IN DECATUR COUNTY (2011 1R PROJECT)

BR #15:2.55 MI E OF K-15 & BR #61:2.3 MI N E JCT K-18BRIDGE #091; CURTIS CREEK TRIBUTARY AT MILFORD ST PARK1.5 MI W OF CHAPMAN (RS 1816)BR 026, OVER LOCAL RD, 5.4 KM E K-43PATCH & SEAL ON I-70 IN DICKINSON COUNTYSALINE-DICKINSON COUNTY LINE, EAST 14.1 KILOMETERSK-4 IN DICKINSON COUNTY (2011 1R PROJECT)ABILENE: S 5TH ST, N TO N 8TH ST (EXCEPT UP RR TRACKS)BRIDGE #057 IN DICKINSON CO (3.53 MILES SOUTH OF I-70)CRACK REPAIR ON K-15 IN DICKINSON COUNTYN OF I-70 RAMPS TO 130M N OF ROLLER COASTER RDCRACK ROUT & SEAL ON K-18 IN DICKINSON COUNTYK-18 IN DICKINSON COUNTY: COUNTY LINE EAST TO K-15/K-18BRIDGE #85;3.76 MILES SOUTH OF I-70K-43 IN DICKINSON COUNTY: K-4 JCT NORTH TO I-70 JCTK-218 IN DICKINSON COUNTY (2011 1R PROJECT)US-56 IN DICKINSON COUNTY (2011 1R PROJECT)2011 1R PROJECT ON US-56B IN DICKINSON COUNTYUS-77 IN DICKINSON COUNTY (2011 1R PROJECT)

HIGHLAND: OLD US-36 (RS-2128) JUST WEST OF ELM STTROY: RS-2163(LOCUST) FROM LAST CHANCE TO N. CITY LIMTSJCT K-20, N ON NEW ALIGNMENT TO EXIST K-7 N OF U-36US-36 & E JCT K-7; W JCT K-7; K-120 IN DONIPHAN COUNTY

BNSF & 11TH STREET IN LAWRENCEBNSF & E 1850 ROAD EAST OF LAWRENCECITY OF BALDWIN CITYBRIDGE #070; 7.04 MILES EAST OF US-59BRIDGES 10-23 (073,074,075,078); W OF JOHNSON CO LNLAWRENCE ED: K-10 FROM US-59(IOWA ST) EAST TO LOUISIANALAWRENCE ED:K-10 FROM US-59(IOWA ST) E. TO LOUISIANALAWRENCE: HASKELL AVENUE, EAST TO EAST CITY LIMITSLAWRENCE: K-10 (23RD ST), FROM OUSDAHL TO BARKERSLIDE REPAIR ON K-10 IN DOUGLAS COUNTYBR 001, MUD CR, 2.32 MILES E OF S JCT US-59US-24 IN DOUGLAS COUNTY (2011 1R PROJECT)BOWERSOCK DAM IN LAWRENCE KANSASBR #081 & 082;1.45 MILES EAST OF S JCT US-59LAWRENCE:INTERSECTION OF N 2ND STREET AND LOCUST STREETUS-40 IN DOUGLAS COUNTY (2011 1R PROJECT)US-56 SURFACE RECYCLE IN DOUGLAS COUNTYBRIDGE #066 LOCATED 8.97 MILES NORTH OF US-56

Grade & BridgeMilling And OverlayMilling And OverlayConv SealConv SealMilling And Overlay

Bridge RepairGrade, Bridge & SurfacingGrade, Bridge & SurfacingBridge ReplacementPavement PatchingGrade, Bridge & SurfacingMilling And OverlayOverlayBridge RepairCrack RepairGrade & SurfacingCrack RepairCrack RepairBridge RepairCrack RepairMilling And OverlayConv SealConv SealConv Seal

Grade & CulvertGrade & SurfacingConstruction ContractsLighting

Flashing Light SignalFlashing Light SignalPedestrian & Bicycle PathsBridge RepairBridge RepairSpecialSpecialOverlayMilling And OverlaySlide RepairGrade & BridgeRecycle & O-layBridge RepairBridge RepairIntersection ImprovementConv SealConv SealBridge Repair

36898139133229

2,040

321112156

1,024591

34,7047654705938772156820014719914047118

193661497532

35017521425372710615547528801

1,35229100755

3,000320

1,221171

LC-RESSM-1RRSM-1RRSM-1RRSM-CMNSM-1RR

SM-BSRSM-PBRLC-RESSM-PBRSM-ISRSM-IRPSM-1RRLC-K1RSM-BSRSM-CMNLC-K3R

SM-CMNSM-CMNSM-BSRSM-CMNSM-1RRSM-1RRSM-1RRSM-1RR

LC-RESLC-RES

MM-RIMMM-LTG

LC-RXRLC-RXRLC-SRTSM-BSRSM-BSRSE-EDPSE-EDPLC-K1RLC-K1R

SM-CMNSM-PBRSM-1RRSM-BSRSM-BSRLC-RESSM-1RRSM-1RRSM-BSR

201120112011201020102011

2009201120092007201120052011201120102011200620112010200920102011201120112011

2010201020062009

201020102010201020082009200920102010201120102011201020112009201120112011

Page 34: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-27 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

Douglas

EdwardsEdwardsEdwards

EllisEllisEllisEllisEllisEllisEllisEllisEllis

EllsworthEllsworthEllsworthEllsworthEllsworthEllsworthEllsworthEllsworthEllsworthEllsworthEllsworthEllsworthEllsworthEllsworthEllsworthEllsworth

FinneyFinneyFinneyFinneyFinney

FordFordFordFordFordFordFordFordFordFordFord

U059

U050U183

C0000I070I070U183U183

C0238C1002C1388I070I070K004K004K111K140K141K156K156K156K156K232

K156U050U050B1U083

K034K034U050U050U056U283U400U400U400

1.3

0.022.70.0

7.21.00.00.00.20.013.90.515.3

0.03.51.50.10.523.20.06.75.30.513.55.010.710.715.13.3

0.70.50.00.37.9

0.20.60.03.58.21.60.017.10.010.20.5

US-59; CITY OF LAWRENCE IN DOUGLAS COUNTY KLINK PROJECT

EDWARDS:FEDERAL FUND EXCHANGEUS-50 IN EDWARDS COUNTY (2011 1R PROJECT)BRIDGE 183-24(008); 1.84 MILES SOUTH OF US-50(KINSLEY)

CITY LIMIT OF ELLIS EAST 7.2 MILES TO YOCEMENTOHAYS: 22ND ST FROM CANTERBURY DR TO COMMERCE PARKWAYUNION PACIFIC & 130TH AVENUE EAST OF ELLISUNION PACIFIC & YOCEMENTO ROAD WEST OF HAYS5.6 MI S & 0.8 MI W OF WALKERBR # 038 & 039; AROUND 3.6 MILES EAST OF JCT K-255/I-70TR-EL COUNTY LINE, EAST TO JUNCTION US-183HAYS: 22ND ST TO 27TH ST ON N VINE ST(US-183)JCT 55TH ST, N OF HAYS, N TO EL-RO CO LINE

BRIDGES #10(I-70) #11(K-14) #56(K-232) ELLSWORTH COUNTYLOW RD FROM ELLSWORTH TO KANOPOLISRS1002 FROM 1.8 MILES E OF ECL KANOPOLIS TO K1403.0 MILE SOUTH WILSON AT SMOKEY HILL RIVERBRIDGE #2; LOCATED EXIT 209 RS 236 OVERRUSSELL-ELLSWORTH CO L, EAST TO ELLSWORTH-LINCOLN CO LBRIDGE #031; 0.18 MILES EAST OF K-141RICE COUNTY LINE EAST TO MCPHERSON COUNTY LINENORTH CITY LIMITS OF KANOPOLIS NORTH EAST TO K-156BRIDGE NUMBER 59; 0.4 MILES EAST OF K-156K-4/K-141 JUNCTION NORTH TO K-141/K-140 JUNCTIONBARTON CO LINE NORTH EAST TO N CITY LIMITS OF HOLYROODCRACK SEAL ON K-156 IN ELLSWORTH COUNTYK-140 NORTH EAST TO I-70MAIN STREET IN HOLYROOD, NORTHEAST TO JCT K-140OLD HIGHWAY 40 NORTH TO LINCOLN COUNTY LINE

JENNY BARKER ROAD,US-50/400 N TO 140 M N OF SCHULMAN RDINTRSECT K-156, MARY ST & JENNIE BARKER RD-GARDEN CITYUS-50/US-83 AND MARY STREET AT GARDEN CITYGARDEN CITY: US-50B/83B, FROM CAMPBELL ST TO JENNY AVEUS-83 IN FINNEY COUNTY (2011 1R PROJECT)

14TH AVE. OVER ARKANSAS RIVERPED/BIKE PATH:US-50-6TH TO 14TH & 2 SPURS IN DODGE CITYBRIDGE 052, W FORK RATTLESNAKE CR, 0.4 MI S OF BUCKLINNORTH OF JCT UA-54/K-34 NORTH TO JCT US-400/K-34GRAY/FORD CO LINE EAST TO US-50/US400 JCT AT DODGE CITYUS-50 FROM US-400 TO WEST CITY LIMITS OF DODGE CITYBRIDGE #60;0.30 MILES NORTH OF JUNCTION US-56/US-400US-283 IN FORD COUNTY (2011 1R PROJECT)BRIDGE #57; 1 MI NORTH OF FORD (ARKANSAS RIVER BRIDGE)NORTH CITY LIMITS OF FORD SOUTHEAST TO FORD/KIOWA CO LNUS-400, FROM US56/283 JCT EAST TO EAST CITY LIMITS

Milling And Overlay

Funds OnlyMilling And OverlayBridge Repair

Traf.study - Road Safety AuditGrade, Bridge & SurfacingFlashing Light SignalFlashing Light SignalGrade & BridgeBridge RepairSurface & BridgeGrade & SurfacingSurface & Bridge

Bridge RepairSurfacingSurfacingBridgeBridge RepairOverlayBridge RepairRecycle & O-lay3/4 OverlayBridge RepairConv Seal3/4 OverlayCrack Repair3/4 OverlayGrade, Bridge & SurfacingConv Seal

Grade & SurfacingGrade & SurfacingInterchange/sGrade & SurfacingMilling And Overlay

BridgePedestrian & Bicycle PathsGrade, Bridge & Surfacing3/4 Overlay3/4 Overlay3/4 OverlayBridge RepairRecycle & O-layBridge Repair3/4 OverlayRecycle & O-lay

756

02,461613

02,531230230631584

16,8831,45513,286

7985423000

2583,397261474133380

1,27893646

1,92517,795

116

2,1013,6716,489698

1,188

244352

1,206201

1,417299324

2,850263700118

LC-K1R

LS-LFTSM-1RRSM-BSR

LC-RESLC-RESLC-RXRLC-RXRLC-RESSM-BSRSM-ISRLC-K1R

MM-RIM

SM-BSRLC-RESLC-RESLC-RESSM-BSRSM-ISRSM-BSRSM-1RRSM-1RRSM-BSRSM-1RRSM-1RRSM-CMNSM-1RRMM-RIMSM-1RR

LC-RESSE-EDPSE-RICLC-K1RSM-1RR

LC-RESLC-TEXSM-PBRSM-1RRSM-1RRSM-1RRSM-BSRSM-1RRSM-BSRSM-1RRLC-K1R

2011

201120112008

201220082011201120102010200020112008

2009201020112009200920062011201020102009201120102011201020062010

20072011200220102011

20102010201020082010201020092011200920082009

Page 35: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-28 (Projects Completed in FY 2012)

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

FordFordFord

FranklinFranklinFranklinFranklinFranklinFranklinFranklinFranklinFranklinFranklinFranklinFranklinFranklinFranklinFranklinFranklinFranklin

GearyGearyGearyGearyGearyGearyGearyGearyGearyGearyGearyGearyGearyGearyGearyGearyGeary

GoveGoveGoveGoveGove

GrahamGrahamGrahamGraham

U400U400U400

C0266I035I035I035I035I035K068K068K068K068U059U059U059

I070I070I070K018K057K057K057K057K057K157K177K177K244K244U077

I070K023K023K023

C0718K018K085U024

US50 1.5 M W US50/50B S TO US-56(DODGE CITY SW BYPASS)US50 1.5M W US50/50B S TO US-56(BYPASS)SW OF DODGE CITYUS50/50B, S & E TO JCT US56/283(BYPASS)- W OF DODGECITY

MIDLAND RAILWAY: MONTANA RD TO PAWNEE RD IN FRANKLIN COMONTANA RD FROM SAND CR RD N. TO FUTURE US-59 INTCHG.OTTAWA:FEDERAL FUND EXCHANGEPRAIRIE SPIRIT RT BETWEEN 5TH AND 23RD STS IN OTTAWA1.8 MI N OF RANTOUL0.4 KM W OF W JUNCTION U50B, NE AND N TO 0.5 KM N K680.4 KM W OF W JUNCTION U50B, NE AND N TO 0.5 KM N K680.5 KM NORTH K-68, NORTHEAST 11.7 KM12.2 KM NE K-68, NE TO FR-MI COUNTY LINEBRIDGE 35-30 (12);8.33 MILES EAST OF OSAGE COUNTY LINEBRIDGE #72;11.86 MILES EAST OF OSAGE COUNTY LINEBRIDGES #073 (K-68) & #028 (I-35) IN FRANKLIN COUNTYK-68 & BNSF WEST OF OTTAWAOTTAWA: K-68 FROM POPLAR TO JUNCTION I-35 CONC PAVEMENTI-35 NE OF OTTAWA, N TO FRANKLIN-DOUGLAS COUNTY LINEMISSOURI ROAD, STAFFORD ROAD NORTH TO STAFFORD TERRACEUS-59 IN FRANKLIN COUNTY (2011 1R PROJECT)

GEARY:FEDERAL FUND EXCHANGEJUNCTION CITY:E CHESTNUT STREET,E OF US-40B,W OF I-70BRIDGE #15;2.04 MILES EAST OF WEST JUNCTION US-40INTERCHANGE: EXIT 298, N RAMP TERM, I-70/EAST/CHESTNUTPATCH & SEAL ON I-70 IN GEARY COUNTYCRACK ROUT & SEAL ON K-18 IN GEARY COUNTYK-244/K-7 4 LN SOUTH EAST TO K-57 4 LN DIV/4 LNK-57 IN GEARY COUNTY (2011 1R PROJECT)K-57 IN GEARY COUNTY (2011 1R PROJECT)K-57 IN GEARY COUNTY US-77 JCT SOUTHEAST TO K-244 JCTK-57 IN MORRIS COUNTY (2011 1R PROJECT)K-157 IN GEARY COUNTY (2011 1R PROJECT)CRACK SEAL ON K-177 IN GEARY COUNTYEMERGENCY REPAIR ON K-177 IN GEARY COUNTYK-244 SPUR JUNCTION NORTH TO K-57/K-244 SPUR JUNCTIONK-244/RS 270 JUNCTION EAST TO K-57/K-244 JUNCTIONUS-77 IN GEARY COUNTY (2011 1R PROJECT)

3.5 MI S AND 1.3 MI W OF GRAINFIELDLG/GO CO LN; EAST TO 19.254 MILES (0.985 MI E OF K-23)8 MILES NORTH OF LANE/GOVE CO LN THEN 9.5 MILES NORTHGOVE (GI): K-23 FROM 6TH STREET TO 3RD STREETLANE/GOVE COUNTY LINE, NORTH 8 MILES

JCT US-24 & RS-718, THENCE N 14.25 MI(FA)K-18 IN GRAHAM COUNTY (2011 1R PROJECT)K-85 IN GRAHAM COUNTY (2012 1R PROJECT)STOCKPILE PROJECT ON US-24 IN GRAHAM COUNTY

0.02.50.6

0.00.50.00.00.35.40.07.34.10.00.00.00.01.77.60.512.9

0.00.40.00.027.45.32.30.417.65.02.13.90.80.00.83.125.6

0.219.39.60.28.0

14.26.00.80.0

LightingSeeding, Sodding1.5 Overlay

Historic PreservationGrade & SurfacingFunds OnlyPrsrv And Railway For TrailsGrade, Bridge & SurfacingPavement ReconstructionBridge RemovalPavement ReconstructionPavement ReconstructionBridge RepairBridge RepairJoint RepairSurfacingMilling And OverlaySeeding, SoddingGrade, Bridge & Surfacing3/4 Overlay

Funds OnlyGrade & SurfacingBridge RepairInterchange/sPavement PatchingCrack Repair1.5 OverlayConv SealConv SealCrack RepairConv SealConv SealCrack RepairBridge Repair1.5 Overlay1.5 Overlay3/4 Overlay

Grade & BridgeMilling And OverlayPavement ReconstructionOverlayPavement Reconstruction

SurfacingConv SealMilling And OverlayStockpile Bituminous Material

5080237

2947770

4192,15927,567

76524,35713,893

82812956295637988572

1,368

03,029114

1,3731,363

1047514838938709974083409

2,837

2729,3406,021391

5,018

1,0311857679

SE-SEBSE-SEBSE-SEB

LC-TEXSE-EDPLS-LFTLC-TEXLC-RESSM-IRPSM-IRPSM-IRPSM-IRPSM-BSRSM-BSRSM-BSRSM-RRSSM-1RRSE-RICSE-RICSM-1RR

LS-LFTLC-RESSM-BSRSE-SEISM-ISR

SM-CMNSM-1RRSM-1RRSM-1RRSM-CMNSM-1RRSM-1RRSM-CMNSM-EMRSM-1RRSM-1RRSM-1RR

LC-RESSM-ISRMM-1RSLC-K3RMM-1RS

LC-RESSM-1RRSM-1RRSM-CMN

201020102010

20102010201120102010200120012001200220082009201120112010200920072011

20112008201020082011201120102011201120102011201120112012201020102011

20122010200920102009

2010201120122012

Page 36: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-29 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

GrahamGrahamGraham

GrantGrantGrantGrantGrant

GrayGrayGrayGrayGrayGrayGray

GreeleyGreeleyGreeley

GreenwoodGreenwoodGreenwoodGreenwoodGreenwoodGreenwoodGreenwood

HamiltonHamiltonHamilton

HarperHarperHarperHarperHarperHarper

HarveyHarveyHarveyHarveyHarveyHarveyHarveyHarveyHarvey

U024U283U283

K025K190U160U160

C1452K144K144U050U050U050U050

K027K027K096

C0150K058K099K099U054U054

K027U050

K002K044K044K179U160U160

C0304C0304I135

US-24 IN GRAHAM COUNTY (2011 1R PROJECT)BR #21(.59 MI N OF TREGO CO LN) SALINE RIVER DRAINAGEUS-283 IN GRAHAM COUNTY (2012 1R PROJECT)

GRANT CO: RD K FROM US-160 N. 3.1 MI & W. 1 MI TO K-25SV/GT COUNTY LINE NORTH TO SOUTH CITY LIMITS OF ULYSSESK-190 (GRANT CO) FROM JCT US-160 EAST TO GT/HS CO LINEEAST CITY LIMITS OF ULYSSES EAST TO GT/HS COUNTY LINEULYSSES: US160, FROM W. OF MAIN ST, EAST TO MISSOURI ST

9.0 MI N OF INGALLS, THENCE N 3.0 MIBITUMINOUS SEAL ON K-144 IN GRAY COUNTYK-144 & CIMARRON VALLEY RAILROAD N.E. OF COPELANDAPPROX 252M E OF 7TH ST, E 0.36 KM- CIMARRONCIMARRON:2ND ST. TO 5TH ST. ON US-50 (AVENUE A)EAST CITY LIMITS OF CIMARRON EAST TO GRAY/FORD CO LINEHWY 50 IN CIMARRON KANSAS

K-27 FROM NEWTON ST TO HARPER STNCL TRIBUNE, N TO GL-WA CO LJUNCTION K-96/K-27 AT TRIBUNE EAST TO GL/WH COUNTY LINE

GREENWOOD HOTEL BUS DEPOT @ 300 N MAIN IN EUREKANCL OF EUREKA, THENCE N 4.5 MIK-58 IN GREENWOOD COUNTY (2011 1R PROJECT)BR #10(1.2 MI S OF LY CO LN) #11(1.63 MI S OF LY CO LN)HOMER CREEK BR (035), 5 MILES NORTH OF US-54EUREKA: US-54 & JEFFERSON ST.US-54 IN GREENWOOD COUNTY (CRACK REPAIR) PART PROJECT

RS308 FROM 1.93 MILES S OF US-50 N TO US-50BRIDGE #39;15.77 MILES NORTH OF SOUTH COUNTY LINEWEST CITY LIMITS OF SYRACUSE, E TO HM-KE COUNTY LINE

K-2 IN HARPER COUNTY (2011 1R PROJECT)ANTHONY(GI):K-44 FR K-2 TO LAWRENCE AND PENNSYL TO KSK-44 IN HARPER COUNTY (2012 1R PROJECT)K-179; CITY OF ANTHONY IN HARPER COUNTY KLINK PROJECTBRIDGE #019; 7.62 MILES EAST OF NORTH JUNCTION K-2US-160 IN HARPER COUNTY (2011 1R PROJECT)

BNSF & 8TH ST/N. HIGH ST. IN NEWTONBNSF & HARVEST HILL ROAD NE OF WALTONBR #076(0.380 MI E OF I-135);#079(3.92 MI E OF K-89)FROM SAND CR & KS AVE TO 36TH ST & K-15 IN N NEWTONHALSTEAD: MAIN STREET BRIDGES OF I-135, W OF K-15, N OF 36TH ST IN HARVEY CO5.25 MI S OF HESSTON7.0 MI S OF HESSTON0.48 KM S S JCT K-15, N AND NW TO 0.48 KM N N JCT K-15

5.00.00.7

4.013.45.814.20.3

3.04.80.00.20.06.60.2

0.215.910.2

0.04.512.50.50.00.05.5

3.00.00.0

23.40.111.80.30.02.8

0.00.00.00.00.20.00.10.10.0

Conv SealBridge RepairMilling And Overlay

Grade & SurfacingMilling And OverlaySealing3/4 OverlayMilling And Overlay

SurfacingConv SealSurfacingGrade & SurfacingPavement Reconstruction3/4 OverlayGrade & Surfacing

Grade & SurfacingGrade, Bridge & Surfacing3/4 Overlay

Rehab & Oprtn Hist Trans BldgGrade & Surfacing3/4 OverlayBridge RepairGrade, Bridge & SurfacingCulvertCrack Repair

SurfacingBridge RepairPreliminary Engineering & Row

Milling And OverlayGrade & Surfacing1.0 OverlayMilling And OverlayBridge RepairMilling And Overlay

Flashing Light SignalFlashing Light SignalBridge RepairHistoric PreservationBridge RepairLandscaping And BeautificationGrade, Bridge & SurfacingGrade, Bridge & SurfacingFunds Only

1286885

2,3531,739180

1,231431

010372879735

1,081881

1,23411,764

866

1,2781,127696172

1,36112527

3959320

1,632598707156269248

2001754051541661978667951

SM-1RRSM-BSRSM-1RR

SE-EDPSM-1RRSM-CMNSM-1RRLC-K1R

LC-RESSM-CMNSM-RRSLC-K3RLC-K3RSM-1RRLC-RES

LC-K3RMM-RIMSM-1RR

LC-TEXLC-RESSM-1RRSM-BSRSM-PBRLC-K3R

SM-CMN

LC-RESSM-BSRMM-RIM

SM-1RRLC-K3RSM-1RRLC-K1RSM-BSRSM-1RR

LC-RXRLC-RXRSM-BSRLC-TEXLC-RESLC-TEXLC-RESLC-RESMM-IRI

201120112012

20092010201020092010

2007201120072010200720102010

200920032010

2010200820112009201020092011

201020092000

201120072012201220102011

200920092011201120102008200920082003

Page 37: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-30 (Projects Completed in FY 2012)

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

HarveyHarveyHarveyHarveyHarveyHarveyHarvey

HaskellHaskellHaskellHaskellHaskellHaskellHaskell

HodgemanHodgemanHodgemanHodgeman

JacksonJacksonJacksonJacksonJacksonJacksonJacksonJacksonJackson

JeffersonJeffersonJeffersonJeffersonJeffersonJeffersonJeffersonJeffersonJefferson

JewellJewellJewellJewellJewellJewellJewellJewellJewell

I135I135I135I135I135U050U050

C1962K144K190K190U083U160

C0255K156U283U283

C0000C0000C0324K016K016K016U075U075

C0000C0000K016K016K016U024U024U024U059

K014K028K128K128U036U036U036U036U036

0.01.00.07.414.44.818.9

2.56.012.03.86.30.012.1

11.09.10.212.1

0.40.30.30.10.09.818.31.00.0

0.10.10.08.37.74.414.52.224.9

0.00.00.037.86.40.08.78.78.5

Bridge RepairGrade & SurfacingBridge RepairPavement PatchingPavement MarkingPavement MarkingSealing

Pedestrian & Bicycle PathsSurfacingConv SealConv SealSealingFlashing Light Signal3/4 Overlay

Grade & Surfacing1.5 OverlayGrade & SurfacingRecycle & O-lay

Grade, Bridge & SurfacingGrade & BridgeGrade, Bridge & SurfacingGrade & BridgeCulvertConv SealMilling And OverlayInterchange/sIntelligent Transportation Sys

Grade, Bridge & SurfacingGrade & BridgeBridge RepairConv SealConv SealGrade, Bridge & SurfacingGuard FenceOverlayMilling And Overlay

Bridge RepairBridge RepairGrade, Bridge & SurfacingMilling And OverlayCrack RepairCulvertGrade, Bridge & SurfacingSeeding, SoddingCrack Repair

107688788333469295

1732,40225578189229

1,021

2,9221,171515

2,292

541509388261200235

1,7487,879505

3832832221901800

246888

3,968

6296

1,2822,540

9743

6,4827426

SM-BSRMM-IRI

SM-EMRSM-ISR

SM-PMRSM-PMRSM-CMN

LC-SRTLC-RES

SM-CMNSM-CMNSM-CMNLC-RRXSM-1RR

LC-RESSM-1RRLC-K3RSM-1RR

LC-RESLC-RESLC-RESLC-RESSM-PCRSM-1RRSM-1RRSE-SEISE-ITS

LC-RESLC-RESSM-BSRSM-1RRSM-1RRMM-RIMSM-CMNSM-1RRSM-1RR

SM-BSRSM-BSRSM-PBRSM-1RRSM-CMNSM-PCRMM-RIMSM-RIP

SM-CMN

2010201120122011200920092010

2008200920112009201020092009

2010201020072011

201120092008201120062011201120062009

200720112008201120112002200520092011

200920112010201020112008200820102009

BRIDGE #024; 0.04 MILES SOUTH OF JUNCTION US-50/I-135I-135/36TH ST, 2 MILES SOUTH OF SO. JUNCT I-135/US-50I-135: EMERGENCY REPAIRS ON BR. #044 IN HARVEY COUNTYPAVEMENT REPAIR ON I-135 IN HARVEY COUNTYSOUTH JCT US-50 TO THE HARVEY/MCPHERSON COUNTY LINEN JCT I-135 TO 0.5 MILES W OF CITY LIMITS OF WALTONUS-50 IN HARVEY CO; RN/HV CO LINE EAST TO NEWTON

VARIOUS LOCATIONS IN THE CITY OF SATANTA8.0 MI N & 6.0 MI W OF SUBLETTE, N 6.0 MIBITUMINOUS SEAL ON K-144 IN HASKELL COUNTYJCT US-56/K-190; SOUTH TO HASKELL/SEWARD COUNTY LINEK-190 (HASKELL CO) FROM GT/HS CO LINE TO W JCT US-56CIMARRON VALLEY RR & US-83 WEST OF SUBLETTEGT/HS COUNTY LINEEAST TO JCT US-83/US-160/K-144

RS 255 FROM THE FORD/HG CO LINE, N. TO 1 MI S OF K-156JCT RS-314/K-156 THENCE EAST TO HODGEMAN/PAWNEE CO LNJETMORE: US-283 FROM BUCKNER CR BR. NORTH TO TUCKER STUS-283 IN HODGEMAN COUNTY (2011 1R PROJECT)

2.0 MI W & 0.2 MI S OF NETAWAKA3.0 MI S & 2.2 MI E OF HOLTON4.3 MI E & 0.5 MI N OF HOYTRS324 WEST EDGE OF CIRCLEVILLECULV 523, NORTH CEDAR CR DRG, 5.4 MI SE OF JCT K-116MICHIGAN STREET IN HOLTON EAST TO JA/JF COUNTY LINEPART PROJECT OF HOST PROJECT KA-1352-01INTERCHANGE: US-75 AND CO RD 150 (1 M S OF MAYETTA)US-75 AT PRAIRIE BAND NATION, SIGNS AND CAMERA

2.0 MI E & 3.2 MI S OF NORTONVILLE2.0 MILES N & 1.3 MILES W OF OSKALOOSABRIDGE 16-44 (22);5.76 MI SOUTH EAST OF JA/JF CO LNJACKSON/JEFFERSON COUNTY LN EAST TO SOUTH JCT K-16/K-4NORTH JUNCTION K-4 EAST TO NORTH JUNCTION US-59N JCT US-59, SE TO JF-DG CO LUS-24 FROM MP 372.0 TO MP 386.5WEST COUNTY LINE EAST TO MUDDY CREEK - JEFFERSON COUNTYMILL & INLAY ON US-59 IN JEFFERSON COUNTY

BR 18,LOVEWELL RESERVOIR 7 MI S KS/NE STATE LINE ON K14BRIDGE #039; 3.41 MILES EAST OF SOUTH JUNCTION K-14BRS:LIMESTONE CR DR (030) & LIMESTONE CR (031)MITCHELL/JEWELL COUNTY LINE NORTH TO KS/NB BORDERCRACK ROUT & SEAL ON US-36 IN JEWELL COUNTYCULVERT 516, LIMESTONE CR DRG, 2.89 MILES EAST OF K-112E END OF CURB & GUTTER @ MANKATO, E TO 1.0 KM E RS 1446E END OF CURB & GUTTER @ MANKATO, E TO 1.0 KM E RS 1446JEWELL/SMITH COUNTY LINE; EAST TO JUNCTION US-36/K-128

Page 38: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-31 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

JewellJewell

JohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnson

U036U036

C0346C0347I035I035I035I035

0.46.4

0.00.00.00.00.00.00.00.01.02.30.21.00.12.10.00.00.00.01.22.00.72.00.60.50.00.00.01.40.31.01.10.02.32.00.00.00.50.51.00.50.01.31.50.00.01.40.3

Curb & Gutter New,repr Or ReplSeeding, Sodding

Intersection ImprovementFlashing Light SignalFlashing Light SignalPurchase Equipment, Etc.Purchase Equipment, Etc.Preliminary EngineeringPurchase Equipment, Etc.Funds OnlyPedestrian & Bicycle PathsPedestrian & Bicycle PathsGrade, Bridge & SurfacingPedestrian & Bicycle PathsGrade & SurfacingPedestrian & Bicycle PathsPedestrian & Bicycle PathsIntelligent Transportation SysFunds OnlyPreliminary EngineeringGrade & SurfacingTraffic SignalsMilling And OverlayMilling And OverlayMilling And OverlayGrade & SurfacingIntersection ImprovementBridgeFunds OnlyGrade & SurfacingGrade, Bridge & SurfacingGrade & SurfacingGrade & SurfacingFunds OnlyGrade & SurfacingGrade & SurfacingPurchase Equipment, Etc.Purchase Equipment, Etc.SurfacingSurfacingSurfacingGrade & Surfacing3/4 OverlaySurfacingGrade & SurfacingSpecialBridge RepairConcrete PavementPavement Patching

42922

6302104501331330

1000

1,2751,5752,2411,03552494978857700

1,507371266371227

1,414717

1,0140

5,4214,8186,7067,256

02,80010,036

00

230245720

1,4601,060395

8,009249103512200

LC-K3RMM-RIM

LC-HAZLC-RXRLC-RXRLC-LOCLC-LOCLC-SRTLC-LOCLC-RESLC-TEXLC-TEXLC-RESLC-TEXLC-RESLC-TEXLC-TEXSE-ITSLC-RESLC-SRTLC-LOCLC-LOCLC-RESLC-RESLC-RESLC-RESLC-HAZLC-LOCLC-RESLC-RESLC-LOCLC-LOCLC-RESLC-RESLC-RESLC-LOCLC-RESLC-RESLC-RESLC-RESLC-RESLC-LOCSM-1RRLC-RESLC-RESSM-ISRSM-BSRSM-ISR

SM-EMR

20072008

20072007200920092008200920082006201020082008200920102010201020072004200920102007201020102010201020112010200720082008200520062007201020092010201120102010201020062010201020072010200820112010

MANKATO: US-36 FROM LINCOLN ST TO LEBOW STW JCT K-128, E TO BEGINNING OF 4-LANE SECT W OF MANKATO

107TH & LACKMAN RD, CITY OF LENEXABNSF & 215TH ST. SOUTH OF EDGERTONBNSF & OLATHE CORRIDOR 8 CROSSINGSCITY OF OLATHE: VARIOUS LOCATIONSCITY OF OLATHE: VARIOUS LOCATIONSCITY OF OVERLAND PARKCITY OF OVERLAND PARK: VARIOUS LOCATIONSCITY OF SHAWNEE: CITYWIDECLEAR CR PATH:MONTICELLO RD TO WOODSTOCK RD IN SHAWNEEDENNIS AVE & FERREL ST TO HEDGE LN & 131ST ST IN OLATHEFAIRWAY: MISSION RD 0.125 MI S OF US-56 OVER ROCK CREEKGAMBLIN PARK TO K-7 IN SHAWNEE- CLEAR CREEK TRAILGARDNER: INTERSECTION OF US 56 & OLD 56 HWYHERITAGE TRAIL: 151ST ST S TO S OF 159TH ST IN OLATHEINDIAN CR TR EXT FROM SOUTHDOWNS TO HAMPTON PRKS:OLATHEJOHNSON CO SECTIONS OF I-435, I-35, K-10 AND US-69JOHNSON COUNTYKANSAS CITY METRO AREALEAWOOD: 103RD ST STATE LINE RD TO MISSION RDLENEXA:87TH STREET FROM PFLUMM RD TO RENNER RD(CA)MERRIAM: 55TH ST FROM MERRIAM DR TO SWITZER RDMERRIAM: MERRIAM DR FROM 57TH ST TO ANTIOCH RDMERRIAM: MERRIAM DR FROM JOHNSON DR TO SHAWNEE MIS PKWYMISSION: ROE AVE W 63RD ST N TO SHAWNEE MISSION PKWYOLATHE: 119TH & STRANG LINEOLATHE: BR OVER LITTLE CEDAR CR/LAKESHORE DR & ROBINSONOLATHE: CITYWIDEOVERLAND PARK: 119TH ST FROM US-69 TO RILEY ST(CA)OVERLAND PARK: 132ND STREET OVER US-69(CA)OVERLAND PARK: 135TH ST FROM ANTIOCH TO METCALF(CA)OVERLAND PARK: 151ST FROM SWITZER RD TO ANTIOCH RD(CA)OVERLAND PARK: CITYWIDEOVERLAND PARK: COLLEGE BLVD FROM BENSON ST TO NALL AVEOVERLAND PARK: COLLEGE BLVD FROM PFLUMM RD TO US-69(CA)OVERLAND PARK:VARIOUS LOCATIONSOVERLAND PARK:VARIOUS LOCATIONSSHAWNEE: 83RD ST FROM HEDGE LANE TERR TO MONTICELLO TERSHAWNEE: NIEMAN RD FROM 59TH ST TO SN MISSION PKWYSHAWNEE: QUIVIRA RD FROM 64TH ST TO 77TH STSHAWNEE:47TH STREET FROM MUND ROAD TO WOODLAND RD(CA)US-169 IN JOHNSON CO (215TH STREET NORTH TO 175TH ST)DESOTO: KILL CREEK ROAD(RS-346) FROM 83RD TO K-10199TH STREET FROM US-169 TO RIDGEVIEW100 FT RIGHT OF I-35; JO/WY CO LN (NEAR LAMAR AVE EXIT)BRIDGE 35-46 (009);5.75 MI NORTH EAST MIAMI COUNTY LNI-35 IN JOHNSON COUNTY CONCRETE PAVEMENT REPLACEMENTI-35 NB AT K-150 (SANTA FE) EMERGENCY REPAIR

Page 39: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-32 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

JohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnson

KingmanKingmanKingmanKingman

KiowaKiowa

LabetteLabetteLabetteLabetteLabetteLabetteLabetteLabette

I035I035I435I435I435I435I435I435I435I435I435I435K007K007K007K007K010K010K010K010K010K010K010K010K010K010U056U069U069U069U069U169U169

K042U054U054

U054U400

K101U059U059U160U160

JOHNSON/MIAMI COUNTY LINE NE TO I-35/I635 JUNCTIONSPRAY PATCH & OVERLAY ON I-35 IN JOHNSON COUNTYBIRDGES #054, 055 & 274 1.76 MILES WEST OF STATE LINEBRIDGE #216; I-135 AND JOHNSON DRIVE IN SHAWNEE KSBRIDGE #221, RAMP K-10 EASTBOUND TO I-435 NORTHBOUNDBRIDGE 435-46 (227);JCT 79TH ST/I-435I-435 IN JOHNSON COUNTY 87TH STREET TO MIDLAND DRIVEI-435 JOHNSON COUNTY 87TH STREET TO ANTIOCHINTERCHANGE IN THE CITY OF LENEXA.INTERCHANGE: I-435 AND ANTIOCH ROAD IN OVERLAND PARKJOHNSON COUNTY: I-435 & SHAWNEE MISSION/67TH ST.RAMP METERING I-435 @ METCALF TO KANSAS/MO STATE LINE67TH ST, CITY OF SHAWNEE; & 83RD STREET, CITY OF LENEXABRIDGE REPAIR ON BRIDGE #299 IN JOHNSON COUNTYK-7 & JOHNSON DRIVE/55TH STREET IN SHAWNEEOLATHE: K-7 FROM OLD 56 HIGHWAY TO DENNIS AVEBRIDGE #180; 5.96 MILES NORTH EAST OF DOUGLAS COUNTY LNBRIDGE 10-46 (237);2.46 MI EAST OF K-7BRIDGES 10-46 (183,185,197); EAST OF DOUGLAS CO LNEMERGENCY REPAIR ON BRIDGE #0236EMERGENCY REPAIR ON K-10 IN JOHNSON COUNTY BRIDGE #237EMERGENCY REPAIRS ON K-10 IN JOHNSON COUNTYJOHNSON COUNTY; CITY OF DESOTO; K-10 & LEXINGTON ROADK-10 ELECTRONIC SIGNS, CAMERAS, AND RADAR DETECTIONLENEXA: ALONG K-10 FROM WOODLAWN TO LONE ELMWESTBOUND EXIT RAMP AT THE K-10/WOODLAND ROAD INTERCHUS-56 IN JOHNSON COUNTY (2011 1R PROJECT)167TH ST, 179TH ST, & 199TH ST - CITY OF OVERLAND PARKBLUE VALLEY PARKWAY TO COLLEGE BLVD-OVERLAND PARK, KAUS-69 ELECTRONIC SIGNS, CAMERAS, AND RADAR DETECTIONUS-69/159TH STREET NORTH TO 135TH STREET/US-6999TH ST TO 86TH ST & 75TH TO SH MISSION PKWY ON US-169US-169(METCALF) FROM 86TH ST TO 75TH ST

BRIDGES: RED CREEK (049) AND ROSE BUD CREEK (050)JUNCTION K-14/K-42 EAST TO KM/SU COUNTY LINE5.77 MI E OF PR/KM CO LN EAST TO W KINGMAN CITY LIMITSPRATT/KINGMAN COUNTY LINE, EAST FOR 5.82 MILES

FO/KW CO LINE EAST TO WEST CITY LIMITS OF GREENSBURGWEST CITY LIMITS MULLINVILLE EAST TO EAST CITY LIMITS

31ST & BELMONT E TO 10TH & ALONG NEOSHO RV DIKE:PARSONSPARSONS:JOTHI AVE, US-59 W TO 32NDSKORR & NESS ROAD AT ALTAMONTCULVERT 1.34 MILES NORTH OF BRIDGE (050)PARSONS: S OF CORNING TO N OF MAIN ON 16TH ST (US-59)PARSONS: US 59 & FLYNN DRIVEBRIDGE #048; 1.03 MILES EAST OF EAST JUNCTION US-59US-59/US-160 THENCE EAST TO EWS OF BR.#160-11-092

29.42.70.00.00.00.02.06.00.40.00.00.00.00.00.00.10.00.00.00.00.00.00.04.01.50.03.70.02.710.33.13.21.4

5.09.412.75.8

14.40.5

3.50.60.00.00.20.00.02.0

Pavement Marking3/4 OverlayBridge RepairBridge RepairBridge RepairBridge RepairPavement PatchingPavement PatchingSeeding, SoddingGrade & SurfacingLightingIntelligent Transportation SysLightingBridge RepairSeeding, SoddingGrade & SurfacingBridge RepairBridge RepairBridge RepairBridge RepairBridge RepairBridge RepairLightingIntelligent Transportation SysPedestrian & Bicycle PathsGrade & Surfacing3/4 OverlayLightingGrade & SurfacingIntelligent Transportation SysMilling And OverlayMilling And OverlayMilling And Overlay

Overlay1.0 Overlay1.5 OverlaySeeding, Sodding

Milling And OverlayMilling And Overlay

Pedestrian & Bicycle PathsGrade & SurfacingFlashing Light SignalCulvertJoint RepairIntersection ImprovementBridge RepairOverlay

7931,8811,59575624263

2,8246,400

601,2014141754089969228335387684507220018533056063774611

4,44564

1,1941,511694

259828

1,802144

2,523214

1,1491,877270629374437343754

SM-PMRSM-ISRSM-BSRSM-BSRSM-EMRSM-BSRSM-ISRSM-ISRMM-IRISE-SEI

MM-LTGSE-ITS

MM-LTGSM-BSRSE-RICLC-K3RSM-BSRSM-BSRSM-BSRSM-EMRSM-EMRSM-EMRMM-LTGSE-ITS

LC-LOCMM-SAFSM-1RRMM-LTGSM-1RRSE-ITS

SM-1RRLC-K1RLC-K1R

SM-PBRSM-1RRSM-1RRSE-RIC

SM-1RRSM-1RR

LC-TEXLC-RESLC-RXRSM-PCRLC-K1RLC-RESSM-BSRSM-1RR

200920112011201020122008201120102010200520112010201020122012201020102008200820102011201220092011201020102011201020092011201020102009

2011201120092011

20102010

20092008201120112008201020102008

Page 40: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-33 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

LabetteLabetteLabette

LaneLaneLane

LeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworth

LincolnLincolnLincolnLincoln

LinnLinnLinnLinnLinnLinnLinnLinnLinnLinnLinnLinnLinnLinnLinnLinnLinnLinnLinn

U166U400U400

K023K023K096

C0000C0209C0383C0384C1400K005K192U024U024U073U073U073U073U073

C0000C0000K181K232

K007K031K031K152U069U069U069U069U069

US-166 IN LABETTE COUNTY FROM BR 085 TO LB/CK CO LINE5.0 MI W OF LB/CK CO LN (END PCCP) E TO LB/CK CO LNPARSONS(GI): INTERSECTION OF US-400 AND 32ND ST

FI/LE CO LINE NORTH TO LE/GO CO LINE (EXCLUDES K-4)KANSAS & OKLAHOMA RR & K-23, MAIN STREET IN DIGHTON316FT W OF JCT K-96/K-23 IN DIGHTON E TO LE/NS CO LINE

150TH ST, CRAIG ST NORTH TO PARALLEL RAOD, IN BASEHORCITY OF LEAVENWORTHTONGANOXIE: US HWY 24 AT NORTHSTAR DRON PLEASANT ST BETWEEN 5TH & 6TH ST: CITY OF TONGANOXIEINTERSECTION OF COUNTY ROAD 1 AND K-32FROM 1.5 MI W & 2.0 MI N OF TONGANOXIE, N 2.5 MI1.5 MI S & 4.2 MI W OF LANSING1.2 MI W & 1.5 MI N OF EASTONWYANDOTTE/LEAVENWORTH COUNTY LINE NORTH 7.56 MILESK-192 FROM JF/LV COUNTY LINE EAST TO JUNCTION US-73K-16 JUNCTION EAST TO WY/LV COUNTY LINEUS-24 IN LEAVENWORTH COUNTY (2011 1R PROJECT)BRIDGE #10;1.78 MILES NORTH OF WY/LV COUNTY LINEK-92 NORTH JUNCTION NORTH EAST TO LOWEMONTLEAVENWORTH: INTERCHANGE US-73/K-7 AND 20TH STPENNSYVANIA AVE TO LINN ST ON 4TH STREET (US-73/K-7)WY/LV COUNTY LINE NORTH TO GILMAN ROAD

4.5 MI W & 1.0 MI N OF WESTFALL5.0 MI W & 1.0 MI N OF WESTFALLBRIDGE 181-53-7.925(031) 8.06 MILES NORTH OF K-232LINCOLN COUNTY LINE NORTH TO RUSSELL COUNTY LINE

BNSF & 1650 ROAD AT BOICOURTBNSF & 2ND STREET IN PLEASANTONBNSF & 500 ROAD NORTH OF PRESCOTTBNSF & 700 ROAD SOUTH OF PLEASANTONBNSF & 800 ROAD SOUTH OF PLEASANTONBNSF & INDUSTRIAL STREET IN LA CYGNEBNSF & SWAN STREET IN LA CYGNEUNION PACIFIC & W. 1600 ROAD 5 MILE SOUTH OF PARKERUNION PACIFIC & W. 2000 ROAD 1 MILE SOUTHWEST OF PARKERUPRR & W 2400 ROAD NORTH OF PARKERCULVERT #514, 2.4 KM N OF NCL MOUND CITYANDERSON-LINN COUNTY LINE EAST TO JCT K-52JUNCTION K-52 TO LINN/BOURBON COUNTY LINECULVERT #521, 2.09 KM E OF RS 4030.3 M S OF RS 1204 INTERCHANGE, N TO 0.7 M N OF RS 12030.5KM S OF RS 1204 INTERCHANGE, TO 1.2 KM N OF RS 12030.7 MILE NORTH OF RS 1203, NORTH TO LN-MI COUNTY LINE1.7KM S OF NEW K-52 INTERCH, N TO 0.5KM S OF RS1204LINN COUNTY SAFETY REST AREA AT THE N JCT K-52

0.55.40.1

30.10.012.3

0.40.00.00.00.52.50.10.17.67.910.38.80.09.80.40.71.9

0.10.10.05.0

0.00.00.00.00.00.00.00.00.00.00.012.34.50.06.40.06.46.00.0

Conv Seal3/4 OverlayIntersection Improvement

OverlayFlashing Light Signal3/4 Overlay

Grade & SurfacingPreliminary EngineeringTraffic SignalsGrade, Bridge & SurfacingIntersection ImprovementGrade & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingConv SealCrack Repair3/4 OverlayRecycle & O-layBridge RepairPavement PatchingIntersection ImprovementMilling And Overlay3/4 Overlay

Grade & BridgeGrade & BridgeBridge RepairConv Seal

Flashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalCulvert1.0 Overlay1.0 OverlayCulvertSigningSeeding, SoddingSigningSeeding, SoddingPedestrian & Bicycle Paths

28401492

4,866250

1,933

82002744644693862986915666

2,431869172

1,9656,124100439

289411355175

200200280280180200170275300200297578227496311033112714

SM-CMNSM-1RRLC-K3R

SM-1RRLC-RRXSM-1RR

MM-CORLC-SRTLC-RESLC-RESLC-RESLC-RESLC-RESLC-RES

SM-CMNSM-CMNSM-1RRSM-1RRSM-BSRSM-1RRLC-K3RLC-K1RSM-1RR

LC-RESLC-RESSM-BSRSM-1RR

LC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RXRLC-RXRSM-PCRSM-1RRSM-1RRSM-PCRSE-RICSE-RICSE-RICSE-RIC

MM-RIM

201020082009

201020122010

20092007201020112009200720082009200920102010201120092009200920102010

2009200820102010

2010200820092009201020092008201220122009200420072010200420112010201120102007

Page 41: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-34 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

LinnLinnLinn

LoganLoganLoganLoganLogan

LyonLyonLyonLyonLyonLyonLyonLyonLyonLyonLyon

MarionMarionMarionMarionMarionMarionMarionMarion

MarshallMarshallMarshallMarshallMarshallMarshallMarshallMarshallMarshall

McphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcpherson

U069U069U069

I070U083U083

C0000C0000C1570I035I035K099K099K130U050U050

C1263K256

C0000C0433K009U036U036

C0307C0319I135K004

LINN COUNTY SAFETY REST AREA. KS-04(001)N OF K-239 INTERCH, N TO 1.7 KM S OF NEW K-52 INTERCHNORTH JUNCTION K-52, NORTH TO LN-MI COUNTY LINE

UNION PACIFIC & A STREET AT WINONAUNION PACIFIC & COUNTY ROAD 450 EAST OF OAKLEYTHOMAS/LOGAN CO LINE;EAST TO LOGAN/GOVE COUNTY LINELOGAN/SCOTT COUNTY LINE NORTH TO EAST JUNCTION US-40US-83 IN LOGAN COUNTY; ASPHALT SEAL ON MAINLINE

CITY OF EMPORIA2.5 MILES S & 2.0 MILES E OF BUSHONGEMPORIA: 18TH AVENUE BRIDGE OVER KTA6.4 MI N & 4.5 MI E OF OLPEASPHALT SURFACING ON I-35 IN LYON COUNTYI-35 IN LYON CO FROM STATION 361+25 NORTH BR OVER US-50EMPORIA: KANSAS AVE TO 3RD AVE & 12TH AVE TO I-35K-99; CITY OF EMPORIA KLINK PROJECTBR 057, NEOSHO RIV, 7.6 MI (12.23 KM) S I-35LYON CO: JCT US-50 AND ROAD FUS-50 IN LYON CO PAVEMENT MARKING (VARIOUS)

CITY OF MARIONHILLSBORO: ASH STREET 1ST ST TO 3RD STUNION PACIFIC & 6TH STREET IN LINCOLNVILLEUNION PACIFIC & 8TH STREET IN PEABODYUNION PACIFIC & SUNRISE ROAD NORTH OF MARIONUP & 360 ROAD 2 MILES NORTH OF LOST SPRINGS3.5 MI W OF RAMONAMARION: LOCUST TO W OF CEDAR ST & TO E OF COBLE ST

UPRR & 18TH ROAD NORTHEAST OF HOME CITYUPRR & 23RD ROAD SOUTHEAST OF FRANKFORTUPRR & 3 CROSSINGS IN AXTELLUPRR & 5TH ROAD WEST OF HERKIMER1.5 MI W OF FRANKFORTFROM 2.0 MI E OF MARYSVILLE THENCE N 8.0 MIEAST JCT US-77/K-9 EAST TO W CITY LIMITS OF FRANKFORT4TH TO 20TH ON US-36/77 & OAK TO CENTER ON 10TH US-77EAST CITY LIMITS OF MARYSVILLE EAST TO JUNCTION K-87

CITY OF LINDSBORGMCPHERSON:FEDERAL FUND EXCHANGEUNION PACIFIC & ARAPAHO ROADUNION PACIFIC & BUCKSKIN ROAD S. OF INMANUNION PACIFIC & EISENHOWER ROAD SW OF MCPHERSON4.0 MI N OF MOUNDRIDGE2.0 MI E & 0.1 MI N OF ELYRIABR #043,044,048&049; NORTH OF US-56ELLSWORTH CO LINE EAST TO WEST CITY LIMTS OF LINDSBORG

0.03.20.0

0.00.00.829.11.0

0.00.10.20.110.55.11.30.70.00.66.4

0.00.20.00.00.00.00.10.4

0.00.00.00.00.38.011.91.316.0

0.00.00.00.00.00.10.10.013.0

Scenic Or Historic Hwy ProgsSeeding, SoddingSafety Rest Area

Flashing Light SignalFlashing Light SignalMilling And OverlaySlurry SealConv Seal

Preliminary EngineeringGrade, Bridge & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingUltra Thin Bonded Asphalt SurfPavement MarkingOverlayMilling And OverlayBridge ReplacementGrade & SurfacingPavement Marking

Pedestrian & Bicycle PathsGrade & SurfacingFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingOverlay

Flashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingSurfacingCrack RepairMilling And OverlayMilling And Overlay

Preliminary EngineeringFunds OnlyFlashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingGrade, Bridge & SurfacingBridge RepairRecycle & O-lay

16496330

260220353

2,98929

0426

2,982892

1,854151447396

4,8761,291101

227300250200260260343250

250250135270357

1,73521855

1,649

00

250250200681472195

1,502

MM-SBWSE-RIC

MM-RIM

LC-RXRLC-RXRSM-ISRSM-1RRSM-CMN

LC-SRTLC-RESLC-RESLC-RESSM-ISR

SM-PMRLC-K1RLC-K1RSM-PBRSE-EDP

SM-PMR

LC-SRTLC-RESLC-RXRLC-RXRLC-RXRLC-RXRLC-RESLC-K1R

LC-RXRLC-RXRLC-RXRLC-RXRLC-RESLC-RESSM-1RRLC-K1RSM-1RR

LC-SRTLS-LFTLC-RXRLC-RXRLC-RXRLC-RESLC-RESSM-BSRSM-1RR

200820102008

20112011201020102010

20092011201020102012201020112012200720102010

20102010201120092011201220112010

201120112008200820092011201020092010

200920112009200920092007201120112010

Page 42: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-35 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

McphersonMcphersonMcphersonMcphersonMcpherson

MeadeMeadeMeade

MiamiMiamiMiamiMiamiMiamiMiamiMiamiMiamiMiamiMiamiMiamiMiamiMiamiMiami

MitchellMitchellMitchellMitchellMitchellMitchellMitchellMitchell

MontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomery

K061K061U056U081B1U081B2

C0285K098U160

C0000C0000C0259I035K068U069U069U169

C0457C0466K014K014K128U024U024

C0000C0000U075U075U160U160U166U166U169U400U400

CORRIDOR: RENO/MCPHERSON CO LN NE TO 4 LANECORRIDOR: RENO/MCPHERSON CO LN NE TO 4 LANEMCPHERSON: US-56/81B FROM MAPLE EAST TO WEST OF CHERRYUS-81B FROM K-4 TO SWENSSON STREETBRIDGE #116; 0.23 MILES NORTH ACADEMY (LINDSBORG)

FROM 8.0 MI N OF PLAINS, N 4.0 MIFOWLER GI: K-98 FROM 6TH ST NORTH TO 10TH STSW-ME CO LINE, E TO W JCT US-54

223RD STREET FROM WOODLAND ROAD TO METCALF ROADBNSF & LONE ELM RD. S. OF FONTANABNSF CROSSING AT 223RD STREET IN MIAMI COUNTYFROM WEST OF 6TH & MAIN ST TO E OF 5TH ST IN OSAWATOMIEPAOLA:FEDERAL FUND EXCHANGEUPRR & W 335TH ROAD AT RINGER0.9 MI N & 3.5 MI W OF NEW LANCASTER2.4 MI N & 1.0 MI E OF BEAGLEJOHN BROWN HWY & PRESSONVILLE RD (INT) 4 MI W OF OSWTMFR-MI COUNTY LINE, NE TO MI-JO COUNTY LINELOUISBURG: INT OF K-68 AND EAST CRESTVIEW CIRCLEBRIDGE 69-61 (78);4.09 MILES NORTH OF K-68LINN-MIAMI CO L, N 7.48KM(4.65 MILES)BR NUMBERS 087; 089; 092; 093; 095 IN MIAMI COUNTY

KYLE RAILROAD & ASHERVILLE ROAD IN BELOITFROM 6.0 MI E OF HUNTER, THENCE E 7.0 MIS OF GLEN ELDER RS 466 & RS 1029 THENCE N 3 MILESBELOIT GI:K-14 FROM SOUTH OF 9TH ST, NORTH .2 MIBELOIT: SOUTH CITY LIMITS, NORTH TO SOLOMON RIVER BRUS-24 JUNCTION NORTH TO MITCHELL/JEWELL COUNTY LINEBRIDGE #037 LOCATED 3.67 MILES SOUTH EAST OF K-9CULVERT, 24.08 MILES EAST OF OSBORNE-MITCHELL CO LINE

5.0 MILES S & 2.0 MILES E OF COFFEYVILLE AIRPORTPAVEMENT MARKING AT VARIOUS LOCATIONS IN DISTRICT 4SKO & 5100 ROAD (SUNFLOWER ROAD) NORTH OF COFFEYVILLEUPRR & 3900 ROAD NORTH OF SYCAMORE1.0 MI N & 1.0 MI W OF CANEY6.0 MI S & 1.6 MI E OF INDEPENDENCEINDEPENDENCE: WEST MAIN FROM 21ST TO 27THINDEPENDENCE:LOCUST TO OAK ON PENNSYLVANIA (US-75)BRIDGE REPAIR ON BRIDGE #023 IN MONTGOMERY COUNTYSOUTH KANSAS & OKLAHOMA RR & US-160 SOUTH OF CHERRYVALEBR 40-NL OVER UP RR, 14.2 MILES EAST S JCT US-75COFFEYVILLE: 8TH ST, NE TO THE VERDIGRIS RIVER BRIDGECOR: US-169, INCLUDING JCT US-166, N TO APPR CO RD 3000BR #80,81,83 EAST OF US-75/US-400;#84 JCT US-169/US-400US-400 PCCP PATCH IN MONTGOMERY COUNTY

7.47.00.30.70.0

4.00.33.8

7.90.00.00.00.00.00.20.20.42.80.20.04.60.0

0.07.03.00.21.03.60.00.0

0.20.00.00.00.20.10.70.60.00.00.00.70.08.40.1

Seeding, SoddingSeeding, SoddingGrade & SurfacingPavement ReconstructionBridge Repair

SurfacingGrade & SurfacingGrade & Surfacing

Traf.study - Road Safety AuditFlashing Light SignalGrade, Bridge & SurfacingLandscaping/BeautificationFunds OnlyFlashing Light SignalGrade, Bridge & SurfacingGrade, Bridge & SurfacingGrade & SurfacingPavement ReconstructionGrade & SurfacingBridge RepairGrade & SurfacingMudjacking

Flashing Light SignalSurfacingSurfacingGrade & SurfacingOverlayMilling And OverlayBridge RepairCulvert

Grade & BridgePavement MarkingFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingGrade & BridgeGrade & SurfacingMilling And OverlayBridge RepairFlashing Light SignalBridge ReplacementOverlayGrade & SurfacingBridge RepairPavement Reconstruction

484463

1,603721239

3721,1722,226

0180

6,3306840

250603746

1,15010,0531,037

9621,298

83

185770405908467465131157

379100300280647517

1,604446109230

4,581307

2,389415285

SE-SECSE-SECLC-K3RLC-K3RSM-BSR

LC-RESLC-K3R

MM-RIM

LC-RESLC-RXRSE-RSLLC-TEXLS-LFTLC-RXRLC-RESLC-RESLC-RESSM-IRPLC-K3RSM-BSRSE-RIC

SM-CMN

LC-RXRLC-RESLC-RESLC-K3RLC-K1RSM-1RRSM-BSRSM-BCR

LC-RESSM-PMRLC-RXRLC-RXRLC-RESLC-RESLC-RESLC-K1RSM-BSRLC-RRXSM-PDRLC-K1RSE-SECSM-BSRSM-1RR

20122012200820082011

200620102009

20122009200920102011201020062010201020022010200820042009

20112008201020102011201020112008

201120112011201120092009200320072012201220062010200920112011

Page 43: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-36 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

MorrisMorrisMorrisMorrisMorrisMorrisMorris

MortonMortonMorton

NemahaNemahaNemahaNemahaNemahaNemahaNemahaNemaha

NeoshoNeoshoNeoshoNeoshoNeoshoNeoshoNeoshoNeoshoNeoshoNeosho

NessNessNessNess

NortonNorton

OsageOsageOsageOsageOsageOsageOsage

OsborneOsborne

C0000C0000C1756K177U056U077U077

K027K027

C0000C0687K178U036

C0168K039K047K047K047K108U059U059

K004K096K147U283

K009U036

I035K031K068K170U075U075

C0000K018

2.0 MILES SOUTH & 1.8 MILES EAST OF DWIGHT3.0 MI E & 3.4 MI S OF WILSEY3.5 MILES N & 2.2 E OF COUNCIL GROVECITY OF COUNCIL GROVE-SCENIC BYWAY PROGRAMCULVERT REPLACEMENT 0.73 MILES W OF W JCT US-56/K-177US-77 IN MORRIS COUNTY (2011 1R PROJECT)US-77 IN MORRIS COUNTY (2011 1R PROJECT)

NORTH ST FROM BACA AVE EAST TO BORDER AVE IN ELKHART0.972 MILES NORTH OF CO ROAD F;THENCE NORTH 2.579 MILESPERMANENT SEEDING FOR K-27 HEAVY REHAB PROJ K-5753-01

UPRR & 5 CROSSINGS IN SABETHAUPRR & 7 CROSSINGS IN SENECAUPRR & E ROAD EAST OF BAILEYVILLEUPRR & N ROAD EAST OF SENECA3.5 MILES SOUTH AND 3.0 MILES WEST OF BERN1.0 MI N & 0.5 MI E OF SENECABRIDGE NUMBER 30; 3.11 MILES NORTH OF US-36JUNCTION K-63/US-36 EAST TO NEMAHA/BROWN COUNTY LINE

CHANUTE: PLUMMER STREET FROM MAIN STREET N TO K-39UP & SOUTH STREET IN ERIERS 168 E OF SHAW RD FOR 3.5 MILESBR 015, OVER SKO RR IN CHANUTE(2.6 KM E JCT US-169)AREA OF BR 47-67 17.17(079), 2.3 MI E OF US-59/K-37 JCTBRIDGE NO. 47-67 (043), 3 MILES E OF SO JCT US-59/K-47FRONT STREET IN ST. PAUL EAST TO NEOSHO/CRAWFORD CO LNERIE(GI): FROM MAIN ST TO N JCT OF US-59/K-108 ON K-108EAST SIDE OF US-59 EMBANK. N OF THE S JCT K-47/US-59JUNCTION K-146, NORTH TO WEST JUNCTION K-39

JCT US-283/K-4 EAST TO NESS/RUSH COUNTY LINEN FK WALNUT CR BRS 032 & 033, 1.2 & 0.5 KM W OF US-283JUNCTION K-4/K-147 NORTH TO NESS/TREGO COUNTY LINEHODGEMAN/NESS CO LINE NORTH TO BRICK PAVE IN NESS CITY

NT/DC COUNTY LINEEAST TO WEST JUNCTION K-9/US-283AG VALLEY COOP FACILITY TRAFFIC IMPACT STUDY

BURLINGAME:US56 S CTY LIM TO SANTA FE AVE W ON K31CF-OS CO L, E TO APPROX 0.6 KM(0.4 MI) E E JCT K-31BRIDGE 31-70 (101);3.05 MI E OF W OS CO LN;DRAGOON CRKK-68 IN OSAGE CO; JCT K-68/US-75 EAST TO JCT K-68/K-268K-170 IN OSAGE CO; LYON/OSAGE CO LINE EAST 13.72 MILESABANDONNED MOPAC RR BRIDGE (035), 0.28 MI N US-75/K268OSAGE COUNTY: US-75 & US-56

0.5 MI S & 4.0 MI E OF ALTONK-18 IN OSBORNE COUNTY (2011 1R PROJECT)

0.40.30.20.00.06.85.3

0.22.60.0

0.00.00.00.00.20.30.114.3

0.50.03.50.00.00.05.00.50.05.5

17.20.03.913.2

16.22.5

1.06.50.011.413.70.01.0

0.27.8

Grade, Bridge & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingScenic Or Historic Hwy ProgsCulvertConv SealConv Seal

Milling And OverlayLandscaping And BeautificationSeeding, Sodding

Flashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingGrade, Bridge & SurfacingBridge RepairMilling And Overlay

Grade & SurfacingFlashing Light SignalGrade, Bridge & SurfacingBridge ReplacementFlood DamageBridge Repair3/4 OverlayGrade & SurfacingGradingOverlay

1.5 OverlayBridge Replacement1.5 OverlayMilling And Overlay

Conv SealPreliminary Engineering

SurfacingPavement ReconstructionBridge RepairConv SealOverlayGrade, Bridge & SurfacingLighting

Grade & BridgeRecycle & O-lay

29532724756364193152

3991984

225315225180730418114

2,658

1,573240

4,7394,635270150897

1,306269

2,056

1,5322,236335

1,394

1,7600

73021,185

161275

1,4211,789129

514996

LC-RESLC-RESLC-RES

MM-SBWSM-PCRSM-1RRSM-1RR

LC-RESMM-RIMMM-RIM

LC-RXRLC-RXRLC-RXRLC-RXRLC-RESLC-RESSM-BSRSM-1RR

LC-RESLC-RXRLC-RESSM-PBRSM-CMNSM-EMRSM-1RRLC-K3R

SM-CMNSM-1RR

SM-1RRSM-PBRSM-1RRSM-1RR

SM-1RRMM-COR

LC-RESSM-IRPSM-BSRSM-1RRSM-1RRMM-RIMMM-LTG

LC-RESSM-1RR

2008200920112008201120112011

201020082010

20082008200920082010200820112010

2007201120102007200820102010200620092008

2010200620102010

20102011

2010200420082011201120102011

20102011

Page 44: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-37 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

OsborneOsborneOsborneOsborne

OttawaOttawaOttawaOttawaOttawaOttawa

PawneePawneePawneePawnee

PhillipsPhillipsPhillipsPhillips

PottawatomiePottawatomiePottawatomiePottawatomiePottawatomie

PrattPrattPrattPrattPrattPrattPrattPrattPrattPrattPratt

RawlinsRawlins

RenoRenoRenoRenoRenoRenoReno

K181U024U024U024

C0000K041K106U081U081

C0000C0976K019S

C0529U036

K013K016U024U024U024

C0000K042K061K061U054U054U281U281U281

BR #45; 0.5 MI N OF JCT US-24; NORTH FORK SOLOMON RIVERBRIDGE #12; 3.98 MILES WEST OF SOUTH JUNCTION US-281DOWNS: US-24 FROM 2ND ST. EAST TO CLARK ST.US-24 IN OSBORNE COUNTY

MINNEAPOLIS: ROCK ST INTER K-106 TO NCL OF MINNEAPOLIS2.5 MI S OF BENNINGTONEAST CITY LIMITS OF DELPHOS EAST TO US-81EAST CITY LIMITS OF MINNEAPOLIS EAST TO US-816 MILES SOUTH OF OT/CD CO LINE NORTH 6 MILES (CO LN)US-81 & K-18 IN OTTAWA COUNTY

NE TRAIL ST JCT WITH US-56 HWY E TO 11TH STREET2 MI N & 3.75 MI W OF ROZEL5 MI N & 1 MI E OF GARFIELD(RS-976)LARNED: N EWS OF PAWNEE RV BR TO NORTH OF 5TH ST (K-19S

KYLE RR & N 1600 RD EAST OF PHILLIPSBURGPHILLIPSBURG: INTERSECTION STATE STREET & 2ND STREET15.0 MILES NORTH & 10.0 MILES EAST OF PHILLIPSBURGNT/PL CO LINE EAST TO WEST CITY LIMITS OF PHILLIPSBURG

EAST RILEY/POTTAWATOMIE CO LN NORTH TO JCT K-16/K-13PART PROJECT OF HOST PROJECT KA-1352-010.693 MI W OF W CL OF WAMEGO;E TO1 MI E OF E CL WAMEGOMANHATTAN: INTERSECTION US 24 & MCCALL ROADWCL TO ECL ON BERTRAND(US-24)/US-24 TO ELM ON 6TH(K-63)

UP & NE 120TH AVENUE NORTHEAST OF PRESTONUP & NE 140TH AVENUE NORTHEAST OF PRESTON7.0 MI E & 1.0 MI N OF PRATTJUNCTION US-281/K-42 EAST TO PR/BA COUNTY LINEJUNCTION US-54/K-61; NORTH 1.3 MILESK-61 IN PRATT COUNTY (2011 1R PROJECT)NEAR PROPOSED INTERCHANGE E OF PRATT, E TO PR-KM CO LPERMANENT SEEDING PROJECT IN PRATT COUNTY (US-54)PRATT GI:US-281 FROM 4TH ST, N TO US-54/400 (1ST ST)PRATT: MAIN ST (US-281), FROM 6TH TO 4TH ST.US-281 IN PRATT COUNTY (2011 1R PROJECT)

3.5 MI S AND 4.0 MI W OF ATWOODRAWLINS COUNTY USD 105

E OF WALNUT ST, N TO AVENUE B IN HUTCHINSONHUTCHINSON:FEDERAL FUND EXCHANGEK&O & AVENUE G IN HUTCHINSONK&O & RED ROCK ROAD AT YODERKANSAS & OKLAHOMA RR & KANSAS AVENUE IN HAVENKANSAS & OKLAHOMA RR & MAPLE STREET IN HUTCHINSONRENO COUNTY MUSEUM, 100 S WALNUT IN HUTCHINSON

0.00.00.23.9

0.70.15.01.46.00.0

0.20.10.10.5

0.00.10.217.1

13.33.22.50.01.9

0.00.00.39.01.316.910.74.00.20.15.5

0.20.0

0.00.00.00.00.00.00.0

Bridge RepairBridge RepairGrade & SurfacingMilling And Overlay

SurfacingGrade, Bridge & SurfacingSlurry SealSlurry SealSlurry SealLighting

SurfacingGrade & BridgeGrade & BridgeMilling And Overlay

Flashing Light SignalIntersection ImprovementGrade & BridgeO-lay & Shoulder

Recycle & O-layMilling And OverlaySlurry SealIntersection ImprovementCrack Repair

Flashing Light SignalFlashing Light SignalGrade & Bridge1.0 OverlayConv SealRecycle & O-layPrel Engr, Row & UtilitiesSeeding, SoddingGrade & SurfacingPavement ReconstructionMilling And Overlay

Grade & BridgePreliminary Engineering

Mitigation Of Water PollutionFunds OnlyFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalHistoric Preservation

33285478

1,180

2111,14512434

1,200197

246372478676

225266299

4,800

1,342204374

1,360109

280280471767113

1,863075862540

1,067

2130

7000

180250220220100

SM-BSRSM-BSRLC-K3RSM-1RR

LC-RESLC-RESSM-1RRSM-1RRSM-1RRMM-LTG

LC-RESLC-RESLC-RESLC-K1R

LC-RXRLC-RESLC-RESSM-1RR

SM-1RRSM-1RRSM-1RRLC-RESLC-K1R

LC-RXRLC-RXRLC-RESSM-1RRSM-CMNSM-1RRSE-SECSE-SECLC-K3RLC-K1RSM-1RR

LC-RESLC-SRT

LC-TEXLS-LFTLC-RXRLC-RXRLC-RXRLC-RXRLC-TEX

2011200920092011

201020062010201020102009

2010201020112010

2010201020102010

20102011200920102010

20112011201120102009201120082011201120112011

20112009

2009201120102010201120112009

Page 45: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-38 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

RenoRenoRenoRenoRenoRenoRenoRenoRenoRenoRenoReno

RepublicRepublicRepublicRepublicRepublic

RiceRiceRiceRice

RileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRiley

Rooks

RushRushRush

Russell

C0000K017K061K061K096K096U050U050U050U050U050U050

C0000K139K148K148

K004K014K014

C0000C1925C2154I070K013K018K018K113K113K177U024U077U077

U183

C0000K004U183

5.0 MI E & 2.2 MI S OF NICKERSONK-17 IN RENO CO; KM/RN COUNTY LN NORTH TO JCT K-96AVE G TO LORRAINE ON KEN KENNEDY FRWY (K-61)K-61 IN RENO COUNTY (2011 1R PROJECT)K&O RR & K-96 @ NICKERSONRENO COUNTY;CITY OF YODER;K-96 AND YODER ROAD0.5 MI W OF US-50/K-96 INTERCHANGE TO K-61/US-50 E JUNC1:W JT K96, E TO E JT K96;2:E OF E JT K96,E TO W OF K61BRIDGE #023; 10.33 MILES EAST OF EAST JUNCTION K-61INTERCHANGE: EAST JCT K-96/US-50 IN SOUTH HUTCHINSONK-61 JUNCTION EAST TO VALLEY PRIDE ROADUS-50 IN RENO CO; E JCT K-61 EAST TO RH/HV CO LINE

BNSF & RS-563 SOUTH OF COURTLAND3.0 MILES SOUTH AND 3.0 MILES EAST MUNDENBR 027, SOUTH FORK MILL CREEK, 0.9 KM SOUTH OF US-36CULVERT 148-79 (523); 7.52 MILES EAST OF US-81JCT US-81/K-148 EAST TO REPUBLIC/WASHINGTON COUNTY LINE

NORTH AND SOUTH ENDS AND DOWNTOWN AREA OF STERLINGK-4 IN RICE COUNTY; BT/RC CO LN EAST TO RC/EW CO LINELYONS: K-14/96 FROM AMERICAN RD TO US-56/K-96 (MAIN ST)LYONS:K-14, US56, N. TO NCL; US-56, DOUGLAS AVE TO ECL

CLAFLIN AND SUNSET/JARVIS (MANHATTAN, KS)GOODNOW HOUSE HSTRCL SITE @ 2309 CLAFLIN RD:MANHATTANJULIETTE & BLUEMONT MANHATTANMANHATTAN: KIMBALL & CANDLEWOODRILEY CO: WILDCAT CR. RD, FROM EUREKA DR SOUTH .8 KMEUREKA DRIVE FROM SCENIC DRIVE WEST 2.0 MILES1.6 MI EAST OF KEATSSCENIC DR 1/8 MI W OF ANDERSON AVEBRIDGES #001 & 002 ON I-70 IN RILEY COUNTYNORTH JCT US/24 NORTH TO EAST RILEY/POTTAWATOMIE CO LNE EWS OF WILDCAT CR BR TO WESTWOOD ON FT RL BLVD (K-18)K-18:FROM WALNUT ST. (OGDEN) NE TO 0.3MI W K-113/SETH C(MAN) CLAFLIN, K-113 TO APPROX 300’ E OF BEECHWOD TERRJUNCTION K-113/K-18 NORTH TO JUNCTION K-113/US-24CRACK SEAL ON K-177 IN RILEY COUNTYMANHATTAN: US-24 AND MARLATT AVENUEBRIDGE #13; 1.31 MI W OF W JCT US-24/US-77 AT RILEY, KSEAST JCT US-24/US-77 NORTH TO WEST JCT K-16

END OF CONCRETE IN STOCKTON NORTH TO PL/RO COUNTY LINE

0.25 MILES NORTH & 1.3 MILES WEST OF ALEXANDERNESS/RUSH COUNTY LINE EAST TO BARTON/RUSH COUNTY LINEBRIDGE NUMBER 1; 3.74 MILES NORTH OF PN/RH COUNTY LINE

RUSSELL: US 281 HWY FOSSIL STREET FROM E 9TH TO UPRR

0.316.40.917.10.00.01.60.00.00.35.610.0

0.00.20.00.016.7

0.025.31.02.2

0.00.00.00.00.51.20.40.00.01.00.20.00.05.67.00.10.09.4

8.5

0.236.70.1

0.1

Grade, Bridge & SurfacingSealingMilling And OverlayRecycle & O-laySurfacingLightingMillingGrade, Bridge & SurfacingBridge RepairInterchange/s3/4 OverlaySealing

Flashing Light SignalGrade & BridgeBridge ReplacementCulvertRecycle & O-lay

Landscaping/BeautificationSealingIntersection ImprovementOverlay

Intersection ImprovementRehab/Oprtn Hist Trans BldgIntersection ImprovementTraffic SignalsGrade, Bridge & SurfacingGrade & SurfacingGrade, Bridge & SurfacingFlood DamageBridge RepairRecycle & O-layMilling And OverlayBridgeGrade & Surfacing3/4 OverlayCrack RepairGrade & SurfacingBridge Repair1.5 Overlay

Milling And Overlay

Grade, Bridge & SurfacingMilling And OverlayBridge Repair

Surfacing

1,16183736

1,7863718513

24,106202

7,8911,310106

3750

780215

1,796

87127685512

400175601172973

2,89442815377339107

1,009502

1,13334

3,008109

1,573

1,078

3893,777201

401

LC-RESSM-CMNLC-K1RSM-1RRSM-RRSMM-LTGSM-CMNSE-RIC

SM-BSRSE-SEI

SM-1RRSM-CMN

LC-RXRLC-RESSM-PBRSM-PCRSM-1RR

LC-TEXSM-CMNLC-K3RLC-K1R

LC-HAZLC-TEXLC-HAZLC-HAZSE-EDPLC-RESLC-RESLC-RESSM-BSRSM-1RRLC-K1RSE-RIC

MM-CORSM-1RRSM-CMNLC-K3RSM-BSRSM-1RR

SM-1RR

LC-RESSM-1RRSM-BSR

LC-RES

200820102011201120072009200920072010200720102010

20082007200820112011

2010201020092011

200820102009201120072010200720082011201020102011201120102011200920092009

2011

200920102009

2010

Page 46: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-39 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

RussellRussellRussellRussell

SalineSalineSalineSalineSalineSalineSaline

SedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwick

I070K018U281

C0595I070

C0998C1651C2060C2197C2203I135

UPRR & 177 ST 1 MI E OF GORHAMI-70 IN RUSSELL COUNTY UBAS & ASPHALT SEAL SHOULDERSK-18 IN RUSSELL COUNTY (2011 1R PROJECT)WEST FORK WOLF CREEK BR (044), 0.2 MI W OF WALDO

N 9TH:I-70-CRAWFORD & W CRAWFORD:I-135 TO ECL OF SALINAROAD SAFETY AUDIT/ASSESSMENT ON NON-STATE HWY SYSTMSALINA: N OHIO ST OVER THE UP RR & CK RW TRACKSSALINA: N OHIO ST OVER THE UP RR & CK RW TRACKSSALINE:FEDERAL FUND EXCHANGE0.1 MILES N & 0.5 MILES E OF KIPPLINCOLN/SALINE CO LN E TO 0.373 MI WEST OF I-135 INTERC

295TH ST W. FROM 21ST ST N. TO 61ST ST N.53RD ST W AND .25 MI W OF 151ST ST N IN COLWICHBNSF & 95TH STREET NORTH IN SEDGWICK COUNTYBUCKNER & 71ST/MEADOWLARK (DERBY, KS)CITY OF ANDALECITY OF GARDEN PLAINCOLWICH: 167TH ST FROM WICHITA AVE TO 57THST NDERBY: MADISON AVE BETWEEN K15 & ROCK ROADHAYSVILLE: 71ST ST S FROM US-81 TO KTA RAMPHAYSVILLE: W GRAND AVE MERIDIAN AVE TO NORTH MAIN STK&O & 119TH STREET NORTHWEST OF MAIZEK&O & 45TH STREET SOUTH EDGE OF MAIZEKANSAS & OKLAHOMA & 151ST STREET 1 MILE EAST OF COLWICHKANSAS & OKLAHOMA RR & 61ST STREET WEST EDGE OF ANDALEMADISON AVE:PANTHER STADIUM W TO WOODLAWN BLVD NORTHWEST BELTWAY AROUND WICHITAPARK CITY: BROADWAY BRIDGE OVER CHISHOLM CREEKUNION PACIFIC & WOODLAWN RD NE OF KECHIUPRR & 87TH STREET SOUTH OF HAYSVILLEUPRR & HILLSIDE AVE. IN WICHITAWICHITA METRO AUTOMATED VEHICLE LOCATIONWICHITA: 21ST ST N BRIDGE OVER ARKANSAS RIVER(CA)WICHITA: 29TH ST N FROM MAIZE RD TO 119TH ST W(CA)WICHITA: 37TH STREET N FROM TYLER RD TO RIDGE RD(CA)WICHITA: CENTRAL AND TYLERWICHITA: CENTRAL FROM WOODLAWN TO ROCK ROAD(CA)WICHITA: CENTRAL, OLIVER TO WOODLAWN (CA)WICHITA: HILLSIDE BRIDGE AT RANGE ROAD(CA)WICHITA:21ST ST N BRIDGE AT LITTLE ARKANSAS RIVER(CA)WICHITA:25TH ST N BRIDGE OVER LITTLE ARKANSAS RIVER(CA)WICHITA:MACARTHUR RD - MERIDIAN AVE TO SENECA ST(CA)RIDGE ROAD FROM K-96 TO 53RD STREET NROCK ROAD FROM OAK KNOLL .5 MILES N OF 63RD ST SBROADWAY OVER BNSF RR AT 45TH STREET NBRIDGE ON 143 ST E OVR KS TRNPKE BETWEEN US54 & CENTRAL135TH STREET W FROM 0.5 MI N OF US-54, S TO K-42BRIDGE #006, 007, 015 AND 016 ON I-135 IN SEDGWICK CO

0.010.04.80.0

0.00.00.60.00.00.214.7

5.00.00.00.00.00.00.31.40.41.00.00.00.00.00.213.70.20.00.00.00.00.11.01.00.00.81.00.20.00.11.01.54.50.60.34.50.0

Flashing Light Signal3/4 OverlayRecycle & O-layBridge Replacement

Landscaping/BeautificationSpecialGrade, Bridge & SurfacingGradingFunds OnlyGrade, Bridge & SurfacingPavement Marking

Milling And OverlayMitigation Of Water PollutionFlashing Light SignalIntersection ImprovementPreliminary EngineeringPreliminary EngineeringGrade & SurfacingMilling And OverlayGrade & SurfacingGrade & SurfacingFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalPedestrian & Bicycle PathsPreliminary EngineeringGrade & BridgeFlashing Light SignalFlashing Light SignalFlashing Light SignalIntelligent Transportation SysGrade, Bridge & SurfacingGrade & SurfacingGrade, Bridge & SurfacingIntersection ImprovementGrade, Bridge & SurfacingGrade & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingGrade & SurfacingGrade & SurfacingMilling And OverlayGrade, Bridge & SurfacingGrade, Bridge & SurfacingGrade & SurfacingBridge Overlay

2251,881531770

6410

13,8286000

636513

66076215060000

847442

1,1097862502502302401280

1,9092252251200

2,9214,2194,559800

3,9264,0591,5031,199639

4,5387,9541,9755,8863,6464,6962,151

LC-RXRSM-ISRSM-1RRSM-PBR

LC-TEXMM-SAFSE-RSLSE-RSLLS-LFTLC-RESSM-PMR

LC-RESLC-TEXLC-RXRLC-HAZLC-SRTLC-SRTLC-RESLC-RESLC-RESLC-RESLC-RXRLC-RXRLC-RXRLC-RXRLC-TEXSE-SEBLC-RESLC-RXRLC-RXRLC-RXRSE-ITS

LC-LOCLC-RESLC-LOCLC-HAZLC-LOCLC-LOCLC-LOCLC-LOCLC-LOCLC-LOCLC-RESLC-RESLC-RESLC-RESLC-RESSM-BSR

2010201120112011

2009201020062005201120102009

2010200720082009200820082007201020082010201120122011201120102001201020092010200720092008200720072009200720072008200920092008200920102004200920102011

Page 47: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-40 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

SedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwick

SewardSewardSewardSewardSewardSewardSewardSewardSewardSewardSewardSeward

ShawneeShawneeShawnee

I135I135I235I235I235K096K096K254K254K254K254U054U054U054U054U054U054U054U054U054U054U054U054U054U054U054U054U054U054U054U054U081U081

C0939C1984C1987K190U054U083U083U083U160

I-135/US-54 INTERCHANGE & SB I-135(LINCOLN TO HARRIS)WICHITA TMC DEPLOYMENT PHASE IBRIDGES 32 AND 33 WICHITA (INTERCHANGE)I-235/K-96 & MERIDIAN AVE., SEDGWICK CO.I-235/K-96 INTERCHANGEBR #316(0.57 MILES E OF W ST)#329(0.65 MILES E OF W ST)BRIDGE #280; JUNCTION K-96/TYLER ROADMIDDLE FORK CHISHOLM CREEK EAST TO SG/BU COUNTY LINENW BYPSS:NEAR US-54/151ST W,N & E TO K96 NEAR 45TH ST NNW BYPSS:NEAR US-54/151ST W,N & E TO K96 NEAR 45TH ST NOVERLAY ON K-254 IN SEDGWICK COUNTY.25 MILE WEST OF WEBB TO ECL ON KELLOGG(US-54/400)BRIDGE #149 & 150; JUNCTION US-54/I-35BRIDGE #317 LOCATED 0.25 MILES EAST OF TOPEKA AVENUEBRIDGE #336;13.97 MILES EAST OF JUNCT US-54/K-163BRIDGE #380&384;APPROX 2 MILES EAST OF JCT US-54/I-235INTERCHANGE: MISSION RD TO HEATHER ST-E SIDE OF WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST -E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST -E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST-E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST-E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST-E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST-E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST-E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST-E SIDE WICHITAINTERCHANGE: SYLVAN LANE TO MISSION RD-E SIDE WICHITAKINGMAN/SEDGWICK COUNTY LINE EAST TO 0.5 MI E OF K-163US-54 & WASHINGTON, SEDGWICK CO.US-54 FROM EAST CITY LIMITS OF WICHITA TO BUTLER CO LNUS-54/US-400 (KELLOGG AVE), ELLISON TO ZELTAWICHITA: 119TH STREET, EAST TO 111TH STREETCOWSKIN CR BR (157) 3.08 MI (5.0 KM) N SU-SG CO LUS-81 WIDEN & OVERLAY PROJECT IN SEDGWICK COUNTY

HWY 83 1 MI N OF LIBERAL THEN EAST 5 MI TO HWY 54LIBERAL: 8TH STREET FROM US-83 W TO CALVERTLIBERAL:15TH ST W-CTTNWD;CTTNWD-SCCC;NEW YORK ST-11TH7.5 MI E OF LIBERAL, THENCE E 5.0 MI & S 2.71 MIFROM JCT US-160 & US-83 THENCE W & S 4.5 MIRS-1987 FROM US-54, WEST 0.75 MILES & NORTH 3.0 MILESHASKELL/SEWARD COUNTY LINE; EAST TO JCT US-83/K-190OKLAHOMA/KANSAS STATE LN; NE TO WESTERN AVE IN LIBERALKANSAS/OKLAHOMA STATE LINE; NORTH TO END OF PCCPKANSAS/OKLAHOMA STATE LINE; NORTH TO SOUTH END PCCPUS-83 IN SEWARD COUNTY (2011 1R PROJECT)JCT US-83/US-160; EAST TO THE SEWARD/MEADE COUNTY LINE

I-470 OFF RAMP @ HUNTOON/ARVONIA; TOPEKA (SHAWNEE CO)LANDON TRAIL EXT: 25TH TO 45TH STS IN TOPEKASHUNGA TRAIL EXTENSION: 10TH ST TO GOLDEN IN TOPEKA

0.041.70.00.50.40.00.05.67.50.04.62.30.00.00.21.50.00.00.00.80.00.00.00.00.00.07.50.72.00.30.50.05.8

0.20.41.54.84.53.77.04.45.02.97.912.9

0.00.71.8

Pavement ReconstructionIntelligent Transportation SysBridge RepairLightingSeeding, SoddingBridge RepairBridge Repair3/4 OverlayPreliminary EngineeringPreliminary EngineeringMilling And OverlayMilling And OverlayBridge RepairBridge RepairBridge RepairBridge RepairInterchange/sInterchange/sInterchange/sInterchange/sBridgeBridgeSurfacingGrade & SurfacingGrade & SurfacingInterchange/sPavement MarkingLightingSealingGrade & CulvertOverlayBridge ReplacementO-lay & Shoulder

Grade & SurfacingGrade & SurfacingPedestrian & Bicycle PathsSurfacingSurfacingSurfacingConv SealSeeding, SoddingPavement MarkingConv Seal3/4 OverlaySurfacing

Traffic SignalsPrsrv And Railway For TrailsPedestrian & Bicycle Paths

17,5334,9371326215098495

1,16300

2,37768047

2,867433671

3,00110,000

77028,0005,9012,200801

1,6328,20042,449

30831138

1,284336

1,272804

4169275108625106261445174102692

1,798

250890904

SE-IRCSE-ITS

SM-BSRMM-LTGMM-IRISM-BSRSM-BSRSM-1RRSE-SEBSE-SEBSM-1RRLC-K1RSM-BSRSM-BSRSM-BSRSM-BSRSE-SEISE-SEISE-SEISE-SEISE-SEISE-SEISE-SEISE-SEISE-SEISE-SEI

SM-PMRMM-LTGSM-CMNMM-RIMLC-K1RSM-PBRMM-1RS

LC-RESLC-RESLC-TEXLC-RESLC-RESLC-RES

SM-CMNSE-RIC

SM-PMRSM-CMNSM-1RRMM-RIM

MM-SAFLC-TEXLC-TEX

200920112008201220102011201020082005200520112007201020112009200920052006200620072003200420052004200420032009201120102009201020072012

201020062008200620082009200920092009200920112009

200820112010

Page 48: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-41 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

ShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawnee

SheridanSheridanSheridanSheridanSheridan

ShermanShermanShermanShermanShermanShermanShermanShermanSherman

SmithSmithSmithSmith

C0614C0614C1254C1540C1540C1540I070I070I070I070I070I070I470I470I470U024U024U024U024U040U075U075U075U075

C0000K009K023K123K223

C0000I070I070I070K027U024B

U036U281U281

TOPEKA: GAGE BTW 12TH & 10THTOPEKA: HUNTOON & WANAMAKERTOPEKA: SW 29TH STREET & FAIRLAWN ROADUP & VALENCIA ROAD WEST OF SILVER LAKEUPRR & HUMPHREY ROAD 2 MI E OF SILVER LAKESE CROCO ROAD & SE 45TH STREET INTERSECTIONSOUTH EAST CROCO ROAD FROM 39TH TO 31TH STREETSNW 46TH STREET BETWEEN US HWY 75 AND NW FIELDING ROADINTERSECTION OF SW 53RD STREET & SW WANAMAKER ROADSW 41ST & WANAMAKER ROAD INTERSECTIONSW WANAMAKER ROAD FROM SW 39TH TO SW 41ST.8 KM WEST WB-SN COUNTY LINE, E TO 0.5 KM W VALENCIA RDEMERGENCY REPAIR AT BRIDGE #219 ON I-70 IN SHAWNEE COI-70 DOWNTOWN BEAUTIFICATION PROJECT IN TOPEKAINTERCHANGE IN THE CITY OF TOPEKAPAVEMENT MARKING PROJECTPAVEMENT REPAIR ON I-70 IN SHAWNEE COUNTYBRIDGE #047; JUNCTION 10TH STREET/I-470BRIDGES 470-89 (54&151);1.01 MI SE W JCT US-75(21ST ST)FROM 21ST STREET EAST TO GAGE BOULEVARD; CITY OF TOPEKABRIDGE #082; 1.56 MILES EAST OF JCT US-24/TOPEKA BLVDEAST OF KANSAS AVE EAST TO THE EAST COUNTY LINE-SHAWNEEEMERGENCY REPAIR; BRIDGE #073 ON US-24 IN SN COUNTYUS-24 IN SHAWNEE COUNTY 1R PROJECT FY 2011US-40 IN SHAWNEE COUNTY (2011 1R PROJECT)EMERGENCY REPAIR FOR PAVEMENT MUDJACKING ON US-75EMERGENCY REPAIR ON US-75 IN SHAWNEE COUNTYJOINT SEAL ON US-75 IN SHAWNEE COUNTYPAVEMENT MARKING IMPROVEMENT ON US-75 IN SN COUNTY

14.2 MILES N AND 7.0 MILES E OF HOXIEPART PROJECT OF HOST PROJECT KA-1450-01JUNCTION US-24/K-23 NORTH TO JUNCTION US-83/K-383PART PROJECT OF HOST PROJECT KA-1450-01K-23 JUNCTION NORTH TO SD/DC COUNTY LINE

GOODLAND: K27 N OF I70 FROM 800 FT N TO US24 INTERGOODLAND: K27/US24 BUS NORTH OF I70SH CO. RS1668 FROM N OF I-70 EXIT 12 N TO SH CO RD 6515.0 MILES N AND 5.4 MILES W OF GOODLANDBRIDGE #031; 5.01 MILES TO EAST JUNCTIONK-27I-70 IN SHERMAN COUNTY FROM STATE LINE EAST 12 MILESREPLACE ROW FENCE ON I-70 IN SHERMAN COUNTY (2 MILES)REPLACE ROW FENCE ON K-27 IN SHERMAN COUNTYGOODLAND GI: US-24B/K-27 FROM I-70 NORTH .15 MI

0.6 M SOUTH AND 1.2 M WEST OF KENSINGTONPL/SM COUNTY LINE E TO E CITY LIMITS OF SMITH CENTERUS-281 IN SMITH COUNTY (2011 1R PROJECT)WHITE ROCK CREEK NORTH BRANCH (029), 12 MI N US-36

0.00.00.20.00.00.10.90.40.10.10.24.20.00.40.44.73.90.00.02.10.03.30.03.96.10.40.05.94.8

0.26.418.82.01.0

0.50.11.00.20.012.02.04.50.1

0.216.016.90.0

SurfacingTraffic SignalsIntersection ImprovementFlashing Light SignalFlashing Light SignalGrade & SurfacingGrade & SurfacingRoundaboutIntersection ImprovementIntersection ImprovementGrade & SurfacingPavement ReconstructionMudjackingLandscaping/BeautificationSeeding, SoddingPavement MarkingPavement PatchingBridge RepairBridge RepairPavement PatchingBridge RepairOverlayBridge RepairMilling And OverlayConv SealMudjackingBridge RepairJoint RepairPavement Marking

Grade & BridgeMilling And OverlayConv SealMilling And OverlayConv Seal

SurfacingSurfacingGrade & SurfacingGrade & BridgeBridge RepairMilling And OverlayFencingFencingGrade & Surfacing

Grade & BridgeMilling And OverlayMilling And OverlayGrade, Bridge & Surfacing

800201

2,139250200

3,8604,4652,5142,0641,056826

22,9002976440234452309167

2,308126

1,356144

1,26617550224318235

42870542223421

699677

2,34319236520144121669

3263,1553,572715

LC-HAZLC-HAZLC-RESLC-RXRLC-RXRLC-RESLC-RESLC-RESLC-RESLC-RESLC-RESSM-IRP

SM-EMRLC-TEXMM-IRISM-PMRSM-ISRSM-BSRSM-BSRSM-ISRSM-BSRSM-1RRSM-EMRSM-1RRSM-1RRSM-EMRSM-EMRSM-CMNSM-PMR

LC-RESSM-1RRSM-1RRSM-1RRSM-1RR

LC-RESLC-RESSE-EDPLC-RESSM-BSRSM-ISRSM-ISR

SM-CMNLC-K3R

LC-RESSM-1RRSM-1RRSM-PBR

20092011201020122010200820102010200720062006200220102010201020112011201120082009200920092010201020112010201120112011

20112011201020112010

201120102009201120112010201020102010

2011201020112010

Page 49: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-42 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

StaffordStafford

StantonStantonStanton

StevensStevensStevensStevens

SumnerSumnerSumnerSumnerSumnerSumnerSumnerSumnerSumnerSumnerSumnerSumner

ThomasThomasThomasThomasThomasThomasThomasThomasThomasThomasThomasThomas

TregoTregoTregoTregoTrego

WabaunseeWabaunsee

WallaceWallace

U050

U160

C0480K025U056U056

C0000C0395K042K044K053U081U081U160U177

I070I070I070I070I070K025U024U024U083U083U083

C0000I070I070U283

I070I070

U040

CITY OF STAFFORDUS-50 IN STAFFORD CO; ED/SF CO LN EAST TO US-281 JCT

RS 1664STANTON:FEDERAL FUND EXCHANGECVRR & US-160 AT SAUNDERS

9.0 MI NORTH & 7.5 MI WEST OF HUGOTONEAST JUCNTION K-25/US-56 NORTH TO STEVENS/GRANT CO LINEEAST JUNCTION K-25/US-56 EAST 5.099 MILESINTERSECTION OF US-56 AND 6TH STREET IN HUGOTON

CITY OF OXFORDVARIOUS LOCATIONS IN SUMNER COUNTYWELLINGTON; HILLSIDE ST. BRIDGE OVER ROCK ISLAND SLOUGH1.0 MILES N AND 2.1 MILES E OF MILTON5 MI W & 1 M S OF CALDWELL OVER BLUFF CREEKKM/SU COUNTY LINE EAST TO JUNCTION K-42/K-2K-44 IN SUMNER COUNTY (2012 1R PROJECT)BEGINNING OF K-53 EAST TO WEST CITY LIMITS OF MULVANEOK/KS STATE LINE EAST TO .25 MILES NORTH OF US-166 JCTWELLINGTON: VANDENBURGH TO 15TH & WASHNGTN ON US-81/160US-160 IN SUMNER COUNTY; AK RIVER EAST TO COUNTY LINEOK/KS STATE LINE NORTH TO END OF US-177

COLBY: 1090 FT N OF COLLEGE DR TO 4TH ST ON K-25 HWYBRIDGES NO 22,23 & 26 LOCATED SE OF COLBY ON I-70I-70 EXIT NO.54 (COUNTRY CLUB ROAD) CITY OF COLBYI-70 IN THOMAS CO; SHERMAN/THOMAS CO LINE E 10.623 MII-70 IN THOMAS COUNTY; EXIT 54 RAMPS (MILL AND OVERLAY)REPLACE ROW FENCE ON I-70 IN THOMAS COUNTY (7 MILES)COLBY:K-25, FROM I-70 ROW, NORTH TO COLLEGE DRIVECOLBY EAST CITY LIMITS EAST TO JUNCTION US-24/US-83JCT US-24/I-70 EAST TO START CONCRETE PAVEMENT COLBYJCT US-24/US-83 NORTH TO SHERIDAM/THOMAS COUNTY LINEUS-83 IN THOMAS COUNTY; ASPHALT SEAL (8.018 MILES)US-83 IN THOMAS COUNTY; ASPHALT SEAL ON MAINLINE

12.0 MILES S & 8.6 MILES W OF WAKEENEY4.0 MI S & 3.6 MI E OF WAKEENEYGOVE COUNTY LINE EAST TO WEST JUNCTION US-283/I-70JCT US-283/I-70;EAST 16.581 MILES TO TR/EL COUNTY LINEBR #41(3.09 MI S OF GH CO LN) TREGO CREEK

0.62 KM E OF JCT K-30, E TO 0.8 KM W WB-SN CO LINEBRIDGE #003 IN WABAUNSEE CO (2 MI E OF RILEY CO LINE)

SHARON SPRINGS:HWY K-27 FROM NORTH FRONT ST TO THIRD STBR #5(6.54 MI E OF E JCT K-27) POND CREEK

0.015.0

0.20.00.0

0.113.15.10.0

0.00.00.10.10.11.011.64.712.10.20.63.5

1.00.00.010.60.07.01.18.68.411.58.010.0

0.00.214.016.60.0

4.10.0

0.20.0

Pedestrian & Bicycle PathsSealing

Grade & SurfacingFunds OnlySurfacing

Bridge OverlayMilling And OverlayMilling And OverlayLandscaping/Beautification

Pedestrian & Bicycle PathsSigningGrade, Bridge & SurfacingGrade & BridgeGrade, Bridge & Surfacing1.0 Overlay1.0 OverlayConv SealRecycle & O-layPavement PatchingConv SealRecycle & O-lay

SurfacingBridge RepairLightingConv Seal3/4 OverlayFencingMilling And Overlay1.5 OverlayMilling And Overlay1.5 OverlayConv SealConv Seal

Grade & BridgeGrade & BridgeMilling And Overlay3/4 OverlayBridge Repair

Pavement ReconstructionBridge Repair

SurfacingBridge Repair

22475

1,749071

2371,734484

1,369

20721330436

1,46452695525

1,68928916386

334114189503

3,296205465852

1,1202,526219282

172401

5,4903,334126

21,20157

13234

LC-SRTSM-CMN

LC-RESLS-LFTSM-RRS

LC-RESSM-1RRSM-1RRLC-TEX

LC-SRTLC-RXRLC-RESLC-RESLC-RESSM-1RRSM-1RRSM-1RRSM-1RRLC-K1R

SM-CMNSM-1RR

LC-RESSM-BSRMM-LTGSM-ISRSM-ISRSM-ISRLC-K1RSM-1RRSM-1RRSM-1RRSM-CMNSM-CMN

LC-RESLC-RESSM-ISRSM-ISRSM-BSR

SM-IRPSM-BSR

LC-RESSM-BSR

20092010

201020112009

2008201020102010

201020072010201220102011201220092010201020102010

201120112008201020102010201020102011201020102010

20112010201120102011

20022010

20102011

Page 50: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-43 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

Wallace

WashingtonWashingtonWashingtonWashingtonWashingtonWashingtonWashingtonWashingtonWashingtonWashingtonWashingtonWashingtonWashington

WilsonWilsonWilsonWilsonWilsonWilson

WoodsonWoodsonWoodsonWoodsonWoodson

WyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotte

U040

C0000C1418K009K009K015K015K015K022K148U036U036U036U036

C0375K039U075U400

K105U054U075U075

C0000C0000C2238I035I070I070I070I070I070I070

EAST CITY LIMITS OF SHARON SPRINGS EAST TO WA/LG CO LN

0.8 MI S & 1.5 W MI OF HADDAM3.5 MI N & 2.2 MI E OF GREENLEAFCLAY/WASHINGTON COUNTY LINE NORTH TO JUNCTION K-148K-9 FROM JCT K-9/K-15/K-148 EAST TO WS/MS COUNTY LINEBRIDGE 025, MELVIN CREEK, 0.68 MILE N OF WEST JCT US-36JUNCTION K-148/K-9/K-15 NORTH TO JUNCTION US-36/K-15K-15 FROM APPROX 1 MI S US-36 N .5 MI TO MILL CRK BRCRACK ROUT & SEAL ON K-22 IN WASHINGTON COUNTYREPUBLIC/WASHINGTON CO LINE EAST TO K-9/K-15/K-148JCTCRACK ROUT & SEAL ON US-36 IN WASHINGTON COUNTYUS-36 IN WASHINGTON COUNTY (2011 1R PROJECT)US-36 IN WASHINGTON COUNTY 2/4 LANE TO WS/MS CO LNWASHINGTON: US-36 FROM W OF D ST. EAST TO JCT US36/K15

SOUTH KANSAS & OKLAHOMA RR & 11TH STREET IN NEODESHAUPRR & QUEEN ROAD NW OF ALTOONA1.5 MILES SOUTH & 4.5 MILES EAST OF NEODESHABRIDGE #21; 7.12 MILES EAST OF JUNCTION US-400/K-39WEST JUNCTION K-39 TO WILSON/WOODSON COUNTY LINEUS-400 & K-47 EAST OF FREDONIA, WILSON COUNTY.

YATES CENTER: SOUTH CITY LIMITS 700 FT NORTH ON US75JUNCTION US-54/K-105 TO WEST SIDE OF TORONTO DAMUS-54 IN WOODSON COUNTY (CRACK REPAIR) PART PROJECTSEAL BITUMINOUS CRACKS ON US-75 IN WOODSON COUNTYWILSON/WOODSON CO LINE N TO S CITY LIMITS YATES CENTER

BONNER SPRINGS: K-32(KUMP), NETTLETON TO S PARK AVENUEEDWARDSVILLE: 110TH FROM RIVERVIEW N TO I-70I-435 FROM I-70 NORTH TO K-5/LEAVENWORTH RD, INCL I-70KANSAS SPEEDWAY CAMERA AND FIBER UPGRADEQUINDARO ELEMENTARY, UNFD GOV WY CO/KANSAS CITY, KSUNIFIED GOVERNMENT OF WYANDOTTE COUNTY/KANSAS CITYUNIFIED GOVERNMENT OF WYANDOTTE COUNTY/KANSAS CITYUPRR & 49TH DRIVE IN WYANDOTTE COUNTYUS 73 & DONAHOO RD INTERSECTIONUS 73 (K7) AND POLFER RD INTERSECTIONVICTORY DR RAMP @ 46TH & PARALLEL PRKWY KCK142ND STREET BRIDGE OVER I-70BONNER SPRINGS:WOODEND ROAD OVER WOLF CREEK142ND STREET OVER KAW CREEKPAVEMENT MARKING PROJECT19.399 KM E LV-WY CL E 2.113 KMBRIDGE #031 IN WYANDOTTE CO (0.34 MI W OF MO ST LINE)BRIDGE #24;US-69 & 7TH ST (I-70 & I-670 INTERCHANGE)BRIDGE #70-105-418.99(0152); I-70/I-635 INTERCHANGEBRIDGE 70-105 (238);WEST BOUND I-70 OVER 18TH STREETBRIDGES #301 & 303; INTRCHANGE I-70/I-635

15.4

0.10.212.110.80.07.00.53.117.017.34.14.80.4

0.00.00.20.13.00.5

0.29.611.810.510.7

0.30.21.913.60.00.00.00.00.30.20.00.11.00.01.71.30.00.00.00.00.0

Conv Seal

Grade & BridgeGrade & BridgeMilling And OverlayCrack RepairGrade, Bridge & SurfacingMilling And OverlayGrade & SurfacingCrack RepairRecycle & O-layCrack RepairConv SealCrack RepairGrade & Surfacing

Flashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingBridge RepairMilling And OverlayGrade & Surfacing

SurfacingMilling And OverlayCrack RepairCrack RepairMilling And Overlay

Grade & SurfacingGrade & SurfacingLocation StudyIntelligent Transportation SysPedestrian & Bicycle PathsPedestrian & Bicycle PathsPedestrian & Bicycle PathsFlashing Light SignalGrade & SurfacingGrade & SurfacingTraffic SignalsGrade, Bridge & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingPavement MarkingPavement ReconstructionBridge RepairBridge RepairBridge OverlayBridge RepairBridge Repair

343

544273

1,051100980

1,4303652

1,8286

30561

1,208

25027553377479

2,100

36779057134

1,523

7624100

487476221221220

1,055633778

2,281597472144

8,017123130312478197

SM-1RR

LC-RESLC-RESSM-1RRSM-CMNSM-PBRSM-1RRSE-EDP

SM-CMNSM-1RRSM-CMNSM-1RRSM-CMNLC-K3R

LC-RXRLC-RXRLC-RESSM-BSRSM-1RRMM-SAF

LC-RESSM-1RRSM-CMNSM-CMNSM-1RR

LC-RESLC-RES

MM-CORSE-ITSLC-SRTLC-SRTLC-SRTLC-RXRLC-RESLC-RESLC-HAZLC-RESLC-RESLC-RESSM-PMRMM-IRISM-BSRSM-BSRSM-ISRSM-BSRSM-BSR

2010

2009201120102010201020102009201120112011201120102009

201120092010200920102008

20102010201120102010

200920112010201120122010201020082011201120062011200820072012200320102009200920082010

Page 51: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-44 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

WyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotte

StatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewide

I070I070I070I070I435I435I435I435I435I435I435I435I435I635I635I670K005K005K005K007K032K032K032K032K032U024U069U069U073

I-70 & OHIO STREET (LEWIS & CLARK VIADUCT)I-70 AND K-7 INTERCHANGEI-70 EXIT 417 (57TH ST.); KANSAS CITY, WYANDOTTE COI-70 FROM 78TH STREET TO MISSOURI STATE LINEBRIDGE #195; KANSAS RIVER-1-435BRIDGE #234;0.37 MILES NORTH OF EAST JUNCTION K-5BRIDGE 435-105 (220) OVER PARALLEL PARKWAYCRACK SEAL ON I-435 FROM KS RIVER BR TO 98TH STREET BRI-435 AND DONAHOO ROADI-435 BETWEEN STATE AVENUE AND LEAVENWORTH RDI-435 OVERLAY IN WYANDOTTE COUNTYPAVEMENT MARKING ON I-435 IN WYANDOTTE COUNTYWOODEND AVE/I-435, SB RAMP TO NB RAMP-EDWARDSVILLEGEORGIA AVE (WYANDOTTE CO) NORTH TO KS/MO STATE LINEJCT K-32, N TO 0.5 KM N US-24(43RD ST BR)(EL & WL)I-670 FROM I-70 JCT TO WEST EWS OF BRIDGES OVER I-70APPROX JCT HUTTON/K-5; NORTH 1.79 MI TO WY/LV CO LINEI-435 NORTH WEST TO WOLCOTT ROADKANSAS CITY: FROM I-435 TO 77TH ON LEAVENWORTH RD(K-5)BRIDGE #077; 0.03 MILES NORTH OF JOHNSON COUNTY LINEBONNER SPRINGS: K-32 FROM S PARK AVENUE TO 138THBRIDGE #277 IN WYANDOTTE CO (1.25 MILES EAST OF I-635)ELM ST TO THE SB OFF RAMP OF K-7 ON FRONT ST (K-32)JUNCTION K-7/K-32 EAST TO TURNER DIAGONALK-32/(FRONT ST):SB K-7 OFF-RAMP TO ELM ST:BONNER SPRNGSCORR:(STATE AVE)-142ND E TO 118TH ST,INCLDE K-7 INTCHNGI-35 NORTH TO STEELE ROADSIMPSON AVENUE TO SUNSHINE ROAD ON 7TH STREET (US-69)3000 FEET NORTH OF US-24-40 NORTH TO WY/LV COUNTY LINE

2011 1R PROGRAM IN DISTRICT 2 (MILLING SAMPLES)2011 1R PROGRAM IN DISTRICT 5 (MILLING SAMPLES)AMBER ALERT FUNDED ITS FIELD DEVICESAQUIRE RAP SAMPLES FOR 2011 1R PROGRAM IN DISTRICT IIIBNSF KS/OK LINE TO AUGUSTA AND WINFIELD TO NEWTONBNSF LOST SPRINGS NORTH TO KS/NE STATE LINEDIST 1 JA,PT,RL,LY,WB,MS,NEMAHA COUNTIESDIST 6 FI,HS,SW,GT,SV,MT,LE,NS,GRAY COUNTIESDIST MAINT CONTRACT FOR R/W EASEMENTS, STATEWIDEDIST MAINT CONTRACT FOR REST AREA SERVICS STATEWIDEDIST MAINTENANCE CONTRACT FOR MAINTENANCE STATEWIDEDIST2: WASHINGTON, REPUBLIC, MCPHERSON, GEARY,ELLSWORTHDISTRICT 4 CR, FR, NO, WL, WO COUNTIESDISTRICT 5 COUNTIES BU, KW, PN, PR, RH, SUDISTRICT WIDE, DISTRICT 1DISTRICT WIDE, DISTRICT 2DISTRICT WIDE, DISTRICT 3DISTRICT WIDE, DISTRICT 4DISTRICT WIDE, DISTRICT 5DISTRICT WIDE, DISTRICT 6

0.00.00.011.00.00.00.03.20.00.03.34.00.12.02.30.81.91.13.40.00.50.00.59.10.03.31.33.05.6

0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0

LightingGrade & SurfacingLightingPavement PatchingBridge RepairBridge RepairBridge RepairCrack RepairSeeding, SoddingLightingSurfacingPavement MarkingGrade & SurfacingPavement MarkingPavement ReconstructionPavement PatchingConv Seal1.5 OverlayMilling And OverlayBridge RepairGrade & SurfacingBridge RepairMilling And Overlay3/4 OverlayLandscaping/BeautificationSeeding, SoddingJoint RepairMilling And Overlay3/4 Overlay

MillingMillingIntelligent Transportation SysMillingSigningSigningMillingMillingSpecialSpecialSpecialMillingMillingMillingPreliminary EngineeringPreliminary EngineeringPreliminary EngineeringPreliminary EngineeringPreliminary EngineeringPreliminary Engineering

1763950

9971971622103037364

1,500194

1,847145

61,2536250272

1,033875

3,44674399

2,0452876241

1,2261,306

436785481105132563020160192960000000

MM-LTGMM-CORMM-LTGSM-ISRSM-BSRSM-BSRSM-BSRSM-ISRSE-IRC

MM-LTGSM-IRP

SM-PMRSE-EDP

SM-PMRMM-IRISM-ISR

SM-CMNSM-1RRLC-K1RSM-BSRLC-RESSM-BSRLC-K1RSM-1RRLC-TEXSE-SEC

SM-CMNLC-K1RSM-1RR

SM-1RRSM-1RRSE-ITS

SM-1RRLC-RXRLC-RXRSM-CMNSM-CMNSM-CMNSM-CMNSM-CMNSM-CMNSM-CMNSM-CMNSM-1RRSM-1RRSM-1RRSM-1RRSM-1RRSM-1RR

20112009200820102010200920082010200920102011201120102010200320102009200920102010200920102011201020102008200420102010

20112011201020112009200920102010201120112011201020102010201120112011201120112011

Page 52: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-45 (Projects Completed in FY 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

StatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewide

I070I070K010U036U050U056U056U059U069U081U166U281

FLINT HILLS OF KS-BUTLER,CHASE,MORRIS COUNTIESKANSAS CITY OPERATION GREEN LIGHTKANSAS CITY OPERATION GREEN LIGHTKC OPERATION GREEN LIGHTKDOT WORK ZONE SAFTY PUBLIC AWARENESS CAMPKIOSKS FOR NATIVE STONE & PRAIRIE TRAIL SCENIC BYWAYSMILLING FOR RAP SAMPLES AT MULTIPLE LOCATIONS IN DIST 4MILLING IN DISTRICT ONE FOR EACH NINE UPCOMING PROJECTSMILLING SAMPLES (DIST 6) 2011 1R PROGRAMSCENIC BYWAYSTATEWIDESTATEWIDESTATEWIDESTATEWIDE INTERSTATES AND FREEWAYS (LOGO SG)STATEWIDE MOTORIST ASSISTANCE PROGRAMSTATEWIDE SCENIC BYWAY PROGRAMVAR LOC (JA, SH, WB, LY, DG, OS, RL, LV, WY COUNTIESVARIOUS LOCALS, OK ST LINE, N TO LEAVENWORTHVARIOUS LOCATIONS IN DISTRICT 2VARIOUS LOCATIONS IN DISTRICT 4WETLANDS & WILDLIFE SCENIC BYWAY (SB-2009-KS-55545)GOVE CO: EXIT 85(K-216),RUSSELL CO: EXIT 180(BALTA RD)I-70, I-135 AND US-81 IN DISTRICT TWOK-10 FROM THE ECL OF LAWRENCE, EAST TO I-435PAVEMENT MARKING CITY PROJECTSMILLED RUMBLE STRIPS IN DISTRICT SIXRUMBLE STRIPS IN VARIOUS LOCATIONS IN DISTRICT SIXUS-56 HWY COR FROM US-59(DG COUN) EAST TO I-35(JO COUN)MILLING PROJECT AT VARIOUS LOCATIONS IN DISTRICT 4FROM JCT K-103, NO. TO NORTH OF ARMA (CK/ CR CO LINE)MUDJACKING FOR VARIOUS LOCATIONS IN DISTRICT 2RUMBLE STRIP PROJECT FOR VARIOUS ROUTES IN DISTRICT 5GRIND RUMBLE STRIPS AT VARIOUS LOCATIONS IN DISTRICT 5

0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0

142.5157.70.00.00.00.03.235.00.022.262.90.00.07.30.0

Scenic Or Historic Hwy ProgsIntelligent Transportation SysIntelligent Transportation SysIntelligent Transportation SysPreliminary EngineeringScenic Or Historic Hwy ProgsMillingMillingMillingScenic Or Historic Hwy ProgsPavement MarkingLightingLightingSigningPreliminary EngineeringScenic Or Historic Hwy ProgsMudjackingScenic Or Historic Hwy ProgsSigningSigningScenic Or Historic Hwy ProgsLightingIntelligent Transportation SysSigningPavement MarkingMillingMillingPreliminary EngineeringMillingPreliminary EngineeringMudjackingMillingMilling

01,819

00064165280000

92900

620101141280

408555

1,02367762340

1510

2064555

MM-SBWSE-ITSSE-ITSSE-ITS

MM-RIMMM-SBWSM-1RRSM-1RRSM-1RR

MM-SBWSM-PMRMM-LTGMM-LTGMM-RIMMM-RIMMM-SBWSM-CMNMM-RIMSM-SOSSM-SOS

MM-SBWMM-LTGSE-ITS

SM-SOSSM-PMRSM-1RRSM-1RR

MM-CORSM-1RRMM-RIMSM-CMNSM-1RRSM-1RR

200820072005200420082010201120112011200920092008200920012010201020102008200220022010200920072001201120122011200920112007201020112012

Page 53: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route LocationDescriptionCounty

B-46 (Projects Under Construction as of November 2012)

Length(Miles) TypeofWork

FiscalYear

Est.FYConst.Cost(1,000)

ProgCat&SubCat@

PROJECTSUNDERCONSTRUCTIONASOFOCTOBER2011

AllenAllenAllen

AndersonAnderson

AtchisonAtchisonAtchisonAtchisonAtchisonAtchisonAtchison

BarberBarberBarberBarberBarber

BartonBartonBartonBartonBartonBartonBartonBartonBartonBartonBartonBarton

BourbonBourbonBourbonBourbonBourbonBourbonBourbonBourbonBourbonBourbonBourbonBourbon

U054

K031U169

K074U059U059U073U073

K002K002K002U281

K004U056U056U056U056U056U056U281U281U281

C0000K003K007K007K007K039K039K039U054

PED/BIKE PATH IN THE CITY OF IOLAUNION PACIFIC & SOUTH DAKOTA ROAD SOUTH OF MILDREDCRACK ROUT AND SEAL ON US-54 IN ALLEN COUNTY

CF-AN CO LINE, EAST TO NORTH JCT US-59US-169: NO JCT US-169/US-59, NO TO AN/FR COUNTY LINE

ATCHISON: 4TH ST FROM KANSAS AVE TO MAIN STUPRR & CONGRESS AVENUE IN LANCASTERK-74 IN ATCHISON COUNTY (2012 1R PROJECT)CORRIDOR: AMELIA EARHART BRIDGE (013) OVER MO RIVERPREVENTIVE MAINTENANCE ON US-59 IN ATCHISON COUNTY6.4 KM N OF AT-LV CO L, N TO SCL ATCHISONUS-73 IN ATCHISON COUNTY (2012 1R PROJECT)

BNSF & KOCHIA ROAD 4 MILES NORTHEAST OF HAZELTONBR 31, MEDICINE RIVER, 2.11 MILES NORTHEAST OF JCT K-8CULV 522, MULE CR DRG, CULV XXX & NEW BRIDGEDRAINAGE STRUCTURES IN BARBER COUNTY ON K-2JUNCTION US-281/US-160 NORTH TO BA/PR COUNTY LINE

CITY OF HOISINGTONGREAT BEND: KANSAS AVENUE AND BROADWAY AVENUEK-4 IN BARTON COUNTY (FY 2013 1R PROJECT)CONTRACT MAINTENANCE PROJECT ON US-56 IN BARTON COUNTYCULVS 504 & 505, 6.2 & 1 KM W OF BT-RC COLELLINWOOD 2L/4L EAST TO BT/RC COUNTY LINEUS-56 & K&O RAILROAD AT PAWNEE ROCKUS-56 IN BARTON COUNTY (2012 1R PROJECTS)US-56 IN BARTON COUNTY (FY 2013 1R PROJECT)BRIDGE REPAIR IN BARTON COUNTY ON US-281PRESERVATION PROJECT ON US-281 IN BARTON COUNTYUS-281 IN BARTON COUNTY (FY 2013 1R PROJECT)

BNSF & OSAGE ROAD NORTH OF FT. SCOTTBNSF & YELLOWSTONE ROAD 1.5 MILES NORTH OF FULTONDOWNTOWN FORT SCOTT1.6 KM N & 5.8 KM E OF FORT SCOTTCONVENTIONAL SEAL ON K-3 IN BOURBON COUNTYCONVENTIONAL SEAL ON K-7 IN BOURBON COUNTYCR-BB CO L, N & E TO S JCT US-69K-7 IN BOURBON COUNTY (2012 1R PROJECT)CONVENTIONAL SEAL ON K-39 IN BOURBON COUNTYCONVENTIONAL SEAL ON K-39 IN BOURBON COUNTYNO-BB CO L, E TO JCT K-7PAVEMENT MARKING PROJECT

1.10.05.8

20.612.7

0.10.03.43.712.55.85.2

0.00.00.00.016.2

0.00.826.14.70.04.70.00.711.50.015.54.6

0.00.00.00.20.511.111.113.96.08.314.71.5

Prsrv And Railway For TrailsFlashing Light SignalCrack Repair

1.0 OverlayMilling And Overlay

Grade & SurfacingFlashing Light Signal1.5 OverlayBridge ReplacementConv Seal40 Mm Overlay (1-1/2 Inches)1.5 Overlay

Flashing Light SignalBridge DeckCulvertCulvert1.5 Overlay

Pedestrian & Bicycle PathsSurfacingRecycle & O-layCrack RepairCulvert1.5 OverlaySurfacingO-lay & ShoulderMilling And OverlayBridge RepairMilling And OverlayMilling And Overlay

Flashing Light SignalFlashing Light SignalLandscaping And BeautificationGrade, Bridge & SurfacingConv SealConv Seal40 Mm Overlay (1-1/2 Inches)3/4 OverlayConv SealConv SealOverlayPavement Marking

47227520

1,1397,635

5338

31063,228

3712,589802

3002,125735354

1,843

225546

3,384234433789874

2,177185

1,678847

200350

2,4311,042

14278565697161224

1,073152

LC-TEXLC-RXRSM-CMN

SM-1RRSM-RIP

LC-RESLC-RXRSM-1RRSE-SEC

SM-CMNSM-1RRSM-1RR

LC-RXRSM-PDRSM-PCRSM-PCRSM-1RR

LC-SRTLC-RESSM-1RRSM-CMNSM-PCRSM-1RRSM-RRSSM-1RRSM-1RRSM-BSRSM-1RRSM-1RR

LC-RXRLC-RXRLC-RESLC-RES

SM-CMNSM-CMNSM-1RRSM-1RRSM-CMNSM-CMNSM-1RRSM-PMR

201220122012

20072012

2011201220122009201220022012

20122006200720122009

201320132013201220022009201120122013201320122013

200920132008201220122012200220122012201220032012

Page 54: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-47 (Projects Under Construction as of November 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

BourbonBourbon

BrownBrownBrownBrownBrownBrownBrownBrownBrown

ButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButlerButler

ChaseChaseChaseChaseChaseChaseChaseChaseChaseChase

ChautauquaChautauquaChautauqua

CherokeeCherokeeCherokeeCherokeeCherokeeCherokeeCherokee

U054U069

K020K246U036U036U073U073U075U075

C0000C0071C0072C0083C0089K177K254U054U077U077U077U077U400

K150K177K177K177U050U050U050

K099K099U166B

C0000K066U069

US-54 & US-69 NORTH JUNCTION, BOURBON COPAVEMENT MARKING PROJECT

STREETSCAPE IN THE CITY OF HIAWATHAK-20 IN BROWN COUNTY (FY 2013 1R PROJECT)K-246 IN BROWN COUNTY (FY 2013 1R PROJECT)CULVERT REPAIR IN BROWN COUNTY ON US-36US-36 IN BROWN COUNTY (FY 2013 1R PROJECT)BR 73-7-6.05 (007); OTTER CREEK, 2.8 MI E US-73/US-159US-73 IN BROWN COUNTY (2012 1R PROJECT)0.5 MILES NORTH OF NCL SABETHA, NO TO BR/NM COUNTY LINEUS-75 IN BROWN COUNTY (2012 1R PROJECT)

4.5 MI S OF WHITEWATER21ST STREET N FROM 159TH ST TO 1000 FT E OF ANDOVER RD2 MILES S OF ROSE HILL5 MILES N OF HWY 254 AT NW 30TH5 MILES E OF ANDOVERFROM 6.5 MI WEST OF DOUGLASS, THENCE EAST 4.5 MIBRIDGE REPAIR ON BRIDGE #124 IN BUTLER COUNTYEL DORADO: K-254 FROM HAVERHILL RD, EAST TO JONES ST.US-54 IN BUTLER COUNTY (2012 1R PROJECT)BRIDGE #030 ON US-77 IN BUTLER COUNTYEL DORADO GI: INT OF US-77 & 6TH AVEJCT RS 862, N TO BU-MN CO LINEUS-77; CITY OF AUGUSTA IN BUTLER COUNTY KLINK PROJECT0.8 MILES E OF LEON CL TO BUTLER/GREENWOOD COUNTY LINE

BNSF & C-28 3MI WEST OF STRONG CITYBNSF & C-36 2MI SE OF STRONG CITYBNSF & CAMPWOOD ROAD 1.5 MILES EAST OF CLEMENTSPRESERVATION PROJECT ON K-150 IN CHASE COUNTYBR 031, NICKEL CREEK, 10.52 M N OF CHASE/BUTLER CO LINEBRIDGE (036), FOX CREEK, 0.2 MILES WEST OF STRONG CITYK-177 & UNION; CITY OF COTTONWOOD FALLS IN CHASE COUNTYPRESERVATION PROJECT ON US-50 IN CHASE COUNTYUS-50 IN CHASE COUNTY (2011 1R PROJECT)US-50 IN CHASE COUNTY (2012 1R PROJECT)

K-99 IN CHAUTAUQUA COUNTY (FY 2013 1R PROJECT)K-99 IN CHAUTAUQUA COUNTY (FY 2013 1R PROJECT)US-166B IN CHAUTAUQUA COUNTY (FY 2013 1R PROJECT)

BAXTER SPRINGS USD 508BNSF & 30TH STREET SOUTHEAST OF BAXTER SPRINGSBNSF & 7TH STREET IN GALENABNSF & LAWTON ROAD 3 MILES NORTH OF COLUMBUS2.0 MI N & 3.0 MI W OF HALLOWELL1.1KM E OF JCT US-400, E TO WCL GALENAJCT K-7, E TO JCT US-400

21.613.0

0.010.44.70.013.70.023.23.013.0

0.31.10.30.50.34.50.00.517.20.00.27.30.513.8

0.00.00.08.60.00.00.01.08.85.6

5.913.92.7

0.00.00.00.00.23.07.0

LightingPavement Marking

Landscaping And BeautificationAsphalt PavementConv SealBridge Repair1.5 OverlayFlood Damage1.5 OverlayMilling And OverlayO-lay & Shoulder

Grade & BridgeGrade & SurfacingIntersection ImprovementGrade & SurfacingIntersection ImprovementGrade, Bridge & SurfacingBridge RepairMilling And Overlay1.5 OverlayBridge RepairGrade & SurfacingGrade & SurfacingMilling And OverlayPavement Patching

Flashing Light SignalFlashing Light SignalFlashing Light Signal3in OverlayBridge ReplacementGrade & CulvertSpecialConcrete Pavement1.5 OverlayUltra Thin Bonded Asphalt Surf.

1.0 OverlayUltra Thin Bonded Asphalt Surf.1.0 Overlay

Preliminary EngineeringFlashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & Surfacing25 Mm Overlay (1 Inch)40 Mm Overlay (1-1/2 Inches)

45507

5971,423186134

1,9838

2,3202,8802,029

5593,459

2571856

4,794176285

1,887154

1,48122,119

2386,324

175300325

2,2051,011

1515

1,5302,907594

4621,148253

0375250350523507588

SM-SLRSM-PMR

LC-TEXSM-1RRSM-1RRSM-BCRSM-1RRSM-EMRSM-1RRSM-RIPSM-1RR

LC-RESLC-RESLC-RESLC-RESLC-RESLC-RESSM-BSRLC-K1RSM-1RRSM-BSRLC-K3R

MM-RIMLC-K1RSM-1RR

LC-RXRLC-RXR

MM-KCCSM-1RRSM-PBRSM-PBRMM-SAFSM-1RRSM-1RRSM-1RR

SM-1RRSM-1RRSM-1RR

LC-SRTLC-RXRLC-RXRLC-RXRLC-RESSM-1RRSM-1RR

20122012

201220132013201220132008201220122012

20132011201220132012201020122012201220132012200320122008

2009200920122012201220112009201220112012

201320132013

2012201220112012201320032002

Page 55: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-48

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

(Projects Under Construction as of November 2012)

CherokeeCherokee

CheyenneCheyenneCheyenne

ClarkClarkClarkClarkClarkClarkClarkClark

ClayClayClayClayClay

CloudCloudCloudCloudCloudCloudCloudCloud

CoffeyCoffeyCoffeyCoffeyCoffeyCoffey

ComancheComancheComanche

CowleyCowleyCowleyCowleyCowleyCowleyCowleyCowley

U069U400

K027K217U036

K034U054U160U183U283U283

C0000K082U024U024U024

K009K009K189U024U024U081U081

C0010I035I035K031U075U075

C0000K001U160

K015U077U077

OKLAHOMA/KANSAS STATE LINE; NORTH TO COLUMBUSUS-400: BRIDGE NO. 104 IN CHEROKEE COUNTY

K-27 IN CHEYENNE COUNTY (FY 2013 1R PROJECT)K-217 IN CHEYENNE COUNTY (FY 2013 1R PROJECT)US-36 IN CHEYENNE COUNTY (FY 2013 1R PROJECT)

CITY OF MINNEOLA (SAFE ROUTES TO SCHOOL)UPRR & 7 ROAD 1 MILE NORTHEAST OF MINNEOLAK-34 IN CLARK COUNTY (2013 1R PROJECT)US-54 IN CLARK COUNTY (2012 1R PROJECT)ASHLAND WEST CITY LIMITS WEST THEN NORTH TO JCT US-283US-183 IN CLARK COUNTY (FY 2013 1R PROJECT)CRACK ROUT AND SEAL ON US-283 IN CLARK COUNTYOK/KS STATE LINE NORTH TO SOUTH JUNCTION US-160

2.0 MI S & 1.5 MI E OF MORGANVILLECRACK ROUT AND SEAL ON K-82 IN CLAY COUNTYBR (004), ABANDONED RR & HUNTRESS CREEK IN CLAY CENTERCRACK ROUT AND SEAL ON US-24 IN CLAY COUNTYUS-24; CITY OF CLAY CENTER IN CLAY COUNTY KLINK PROJECT

BNSF & WEST 4TH STREET IN MILTONVALEK-9 IN CLOUD COUNTY (FY 2013 1R PROJECT)PREVENTIVE MAINTENANCE ON K-9 IN CLOUD COUNTYCRACK ROUT AND SEAL ON K-189 IN CLOUD COUNTYCRACK ROUT AND SEAL ON US-24 IN CLOUD COUNTYUS-24 IN CLOUD COUNTY (FY 2013 1R PROJECT)US-81 IN CLOUD COUNTY (2011 1R PROJECT)US-81 IN CLOUD COUNTY (2012 1R PROJECT)

7.0 MI N & 0.4 MI E OF LEROY0.31 MILE EAST OF JCT K-131, EAST TO 0.31 MILE W US-75LYON-COFFEY CO L, EAST TO 0.31 MILE EAST OF JCT K-131OS-CF CO LINE, EAST TO CF-AN CO LINENCL BURLINGTON, TO 1.0KM S OF I-35WO-CF CO L, N TO SCL BURLINGTON

1.0 MI W OF COLDWATERK-1 IN COMANCHE COUNTY (FY 2013 1R PROJECT)US-160 IN COMANCHE COUNTY (FY 2013 1R PROJECT)

BNSF & 202 ROAD 2 MILES SOUTH OF WINFIELDBNSF & 232 ROAD SOUTH OF HACKNEYBNSF & 71ST STREET 3.5 MILES SOUTH OF WINFIELDBNSF CROSSING AT KANSAS AVENUE IN ARKANSAS CITYRUBBERMAID RAIL IMPROVEMENTSK-15 IN COWLEY COUNTY (2012 1R PROJECT)RIGHT & LEFT TURN LANES ON US-77 AT 242ND ROADSE ARK CITY:US-77 & SUMMIT, E & N TO JCT US-166

9.10.0

13.00.516.2

0.00.019.610.117.513.511.513.6

0.19.20.011.90.3

0.019.51.20.94.227.117.12.9

0.26.45.57.714.910.3

0.213.435.9

0.00.00.01.00.03.10.02.2

Pavement ReconstructionBridge Overlay

Milling And Overlay1.5 OverlayMilling And Overlay

Preliminary EngineeringFlashing Light SignalRecycle & O-layUltra Thin Bonded Asphalt Surf.Overlay2in OverlayCrack RepairOverlay

Grade & BridgeCrack RepairBridge ReplacementCrack RepairMilling And Overlay

Flashing Light SignalAsphalt PavementCrack RepairCrack RepairCrack RepairMilling And OverlayOverlayOverlay

Grade, Bridge & SurfacingGrade & SurfacingGrade & Surfacing1.0 Overlay25 Mm Overlay (1 Inch)1.5 Overlay

Grade & BridgeMilling And OverlayMilling And Overlay

Flashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingRailroad ImprovementUltra Thin Bonded Asphalt Surf.Grade & SurfacingGrade, Bridge & Surfacing

36,929572

1,76684

2,161

0275

1,5331,3162,0641,158

402,136

16944

3,69657152

2202,831

6619

3,84610,029

289

41514,24010,346

5351,003726

4092,5855,411

275200325

5,0131,240328720

13,365

MM-RIMSM-BSR

SM-1RRSM-1RRSM-1RR

LC-SRTLC-RXRSM-1RRSM-1RRSM-1RRSM-1RRSM-CMNSM-1RR

LC-RESSM-CMNSM-PBRSM-CMNLC-K1R

LC-RXRSM-1RRSM-CMNSM-CMNSM-CMNSM-1RRSM-1RRSM-1RR

LC-RESSM-ISRSM-ISRSM-1RRSM-1RRSM-1RR

LC-RESSM-1RRSM-1RR

LC-RXRLC-RXRLC-RXRSE-RSLSE-EDPSM-1RR

MM-CORSE-SEB

20082012

201320132013

20132013201320122009201320132009

20122012201220122012

20132013201220122012201320112012

201020062006200720032004

201320132013

20122010201220102012201220122003

Page 56: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-49 (Projects Under Construction as of November 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

CowleyCowleyCowleyCowleyCowleyCowleyCowleyCowley

CrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawfordCrawford

DecaturDecaturDecaturDecaturDecaturDecatur

DickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinsonDickinson

Doniphan

DouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglasDouglas

U077U077U077U160U160U166U166U166

K007K007K007K047K126K277U069

C0000U036U036U083U083U083

I070K015K015K018K018K043K043U056

U036

K010K010K010K010K033

SE ARK CITY:US-77 & SUMMIT, E & N TO JCT US-166US-77 BY-PASS & US-166/KS AVE - ARKANSAS CITYUS-77; CITY OF WINFIELD IN COWLEY COUNTY KLINK PROJECTBRIDGE REPAIR ON BRIDGE #032 IN COWLEY COUNTYRT TURN LANE AT NEW INDUSTRAL PARK ENT AND INTERNAL RDBRIDGE REPAIR ON BRIDGE #089 IN COWLEY COUNTYE EWS ARKANSAS RVR BR TO SUMMIT ON MADISON AVE (US-166)EAST US-77/US-166 JCT EAST TO CL/CQ COUNTY LINE

BNSF & 680 AVENUE 1 MILE SOUTH OF FARLINGTONCITY OF GIRARDCONVENTIONAL SEAL ON K-7 IN CRAWFORD COUNTYJUNCTION K-126, NORTH TO SOUTH OF SCL OF GIRARDNCL GIRARD, N TO CR-BB CO LBRS 022,023 & 028; 1.75, 1.93 & 6.56 MILES EAST OF K-7BRIDGE REPAIR IN CRAWFORD COUNTY ON K-126JCT K-7, E TO WEST LAKE ROADUS-69 & SOUTH KANSAS & OKLAHOMA AT PITTSBURG

1.0 MILES N & 7.1 MILES W OF DRESDENRAWLINS/DECATUR COUNTY LINE EAST TO JCT US-36/US-83US-36 IN DECATUR COUNTY (2012 1R PROJECT)BRIDGE REPAIR ON BRIDGE #031 IN DECATUR COUNTYSHERIDAN/DECATUR COUNTY LINE NORTH 9 MILESUS-83 IN DECATUR COUNTY 2011 1R PROJECT

RS 191: 8.0 MILES S. OF SOLOMON AT 138 1400 AVE.UP & 400 AVENUE SOUTH OF HERINGTONPAVEMENT MARKING PROJECT ON I-70ABILENE: KLINK ON K-15MN/DK CO LN NORTH TO K-15/K-18 JCT(EXCEPT ABILENE)BNSF & K-18 NORTHWEST OF TALMAGECONVENTIONAL SEAL ON K-18 IN DICKINSON COUNTYPRESERVATION PROJECT ON K-43 IN DICKINSON COUNTYREPLACE PIPEUS-56 IN DICKINSON COUNTY (2012 1R PROJECT)

PRESERVATION PROJECT ON US-36 IN DONIPHAN COUNTY

5.5 MI E OF CO. LINE AND 11.5 MI N OF CO. LINEBNSF & E 950TH ROAD 3.5 MILES EAST OF LECOMPTONDOUGLAS COUNTY CHIPKASOLD DR FROM CLINTON PRKY 23RD ST TO 31ST STRS-1374, APPROXIMATELY 1/2 MI S OF K-10 HIGHWAYTURNING LANES (DOUGLAS CO., BERRY PLASTICS EXPANSION)BRIDGE (023) OVER BNSF RR IN LAWRENCE NEAR HASKELL UNIVK-10 IN DOUGLAS COUNTY (2012 1R PROJECT)K-10 IN DOUGLAS COUNTY FROM E LAWRENCE TO COUNTY LINELAWRENCE ED:K-10 FROM US-59(IOWA ST) E. TO LOUISIANACULVERT #502, 1.5 KM N OF FR-DG CO LINE

0.00.50.70.00.00.01.00.0

0.00.011.06.011.00.00.00.90.0

0.211.011.40.09.09.0

0.10.014.71.026.70.09.09.00.00.1

14.6

0.40.00.00.90.00.00.08.48.70.10.0

Grade & SurfacingGrade & SurfacingMilling And OverlayBridge RepairGrade & SurfacingBridge RepairMilling And Overlay1.5 Overlay

Flashing Light SignalPedestrian & Bicycle PathsConv SealGrade, Bridge & Surfacing40 Mm Overlay (1-1/2 Inches)Bridge ReplacementBridge Repair40 Mm Overlay (1-1/2 Inches)Surfacing

Grade & BridgeOverlayConv SealBridge RepairOverlayMilling And Overlay

Grade, Bridge & SurfacingFlashing Light SignalPavement MarkingMilling And Overlay1.5 OverlayFlashing Light SignalConv SealSpecialCulvert1.5 Overlay

Pavement Patching

Grade & SurfacingFlashing Light SignalPreliminary EngineeringGrade & SurfacingGrade, Bridge & SurfacingGrade & SurfacingBridge ReplacementUltra Thin Bonded Asphalt Surf.O-lay & ShoulderSpecialCulvert

1,8532,410387182

1,449110424

2,423

350223296

21,352455

2,6553204258

2591,360342161832

1,742

329250344307

3,181275242

2,0505016

604

2962500

6,5612,282362

4,7601,0124,918

20297

SE-SEBMM-SAFLC-K1RSM-BSRSE-EDPSM-BSRLC-K1RSM-1RR

LC-RXRLC-SRT

SM-CMNMM-RIMSM-1RRSM-PBRSM-BSRSM-1RRSM-RRS

LC-RESSM-1RRSM-1RRSM-BSRSM-1RRSM-1RR

LC-RESLC-RXRSM-PMRLC-K1RSM-1RRLC-RRXSM-CMNSM-1RRSM-BSRSM-1RR

SM-1RR

LC-RESMM-KCCLC-SRTLC-RESLC-RESSE-EDPSM-PBRSM-1RRMM-1RSSE-EDPSM-PCR

20032009201220122012201220102009

201220132012200720022012201220022013

201320082012201220082011

2012201220122013200920122012201220082012

2012

20122013201220112012201220122012201220082004

Page 57: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-50

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

(Projects Under Construction as of November 2012)

DouglasDouglasDouglasDouglasDouglasDouglas

EdwardsEdwards

ElkElkElkElkElk

EllisEllisEllisEllisEllis

EllsworthEllsworthEllsworthEllsworthEllsworthEllsworthEllsworthEllsworthEllsworth

FinneyFinneyFinneyFinneyFinneyFinneyFinneyFinneyFinneyFinneyFinneyFinneyFinneyFinneyFinneyFinney

Ford

U040U056U059U059U059U059

U050U056

K099U160U160U160U160

I070I070U183U183U183Y

I070I070I070I070I070I070I070I070K014

K023K156K156K156U050U050U050U050U050U050B1U083U083U083BU083B

LAWRENCE: KLINK ON US-40CONST LT/RT TURN LANES ON6TH ST(RTE 1055) AT US-56BR 017, WAKARUSA RIVER DRG, 6.1 MI. NO. OF JUNCT US-56FRANKLIN-DOUGLAS COUNTY LINE, NORTH TO 2L/4L DIVIDEDFRANKLIN-DOUGLAS COUNTY LINE, NORTH TO 2L/4L DIVIDEDFRANKLIN-DOUGLAS COUNTY LINE, NORTH TO 2L/4L DIVIDED

ARKANSAS RIVER BRIDGE (004), 1 MILE EAST OF KINSLEYKINSLEY, KS; NORTHEAST OF SOUTH JUNCTION US-56/US-183

K-99 IN ELK COUNTY (FY 2013 1R PROJECT)0.8 MILES WEST OF EK/MG COUNTY LINE TO EK/ME COUNTY LNCULVS 501 & 502 12.2 & 14.8 KM E OF CL-EK COLE JCT K-99, E TO 1.6 KM W OF EK-MG CO LUS-160 IN ELK COUNTY (FY 2013 1R PROJECT)

ASPHALT SEAL ON I-70 IN ELLIS COUNTYBR NOS. 004, 005, 040, 041 AND 044 IN ELLIS COUNTY1.8 KM N OF JCT I-70, N TO EL-RO CO LUS-183 IN ELLIS COUNTY (FY 2013 1R PROJECT)US-183B IN ELLIS COUNTY (FY 2013 1R PROJECT)

0.745 MI WEST OF K-14(E JCT) EAST TO EW/LC COUNTY LINEEMERGENCY REPAIR ON I-70, ELLSWORTH COUNTY BRIDGE #013EW CO: EXIT 206(K-232), 219(W JCT K-14), 225(K-156)I-70 IN ELLSWORTH CO 8.3 MI E OF RS/EW CO LN E 7.9 MIPERMANENT SEEDING FOR PROJECT KA-0729-01 (I-70)PERMANENT SEEDING IN ELLSWORTH COUNTY ALONG I-70RUSSELL-ELLSWORTH COUNTY LINE EAST 8.3 MILESSEEDING PROJECT FOR KA-0730-01ELLSWORTH: K-14 SMOKY HILL RIVER BRIDGE N. TO K-140

CAMPUS DRIVE IN GARDEN CITY EAST TO TOWNS ROADCORRIDOR: FROM KE/FI CO LINE, E TO NO JCT US-50/US-83GRAY/FINNEY CO LINE NORTH TO EAST JUNCTION K-23/US-156CRACK ROUT AND SEAL ON K-156 IN FINNEY COUNTYK-156 IN FINNEY COUNTY (FY 2013 1R PROJECT)PRESERVATION PROJECT ON K-156 IN FINNEY COUNTYBR 023 AT K-156, EAST OF GARDEN CITYCORRIDOR:FROM KE-FI COL, EAST TO NORTH JUNCTION US-83KE-FI CO L, E TO CONC PVMTUS-50 IN FINNEY COUNTY (FY 2013 1R PROJECT)US-50 IN FINNEY COUNTY (FY 2013 1R PROJECT)US-50B IN FINNEY COUNTY (FY 2013 1R PROJECT)JCT US-50/US-83 NORTH TO FINNEY/SCOTT COUNTY LINEUS-83 IN FINNEY COUNTY (FY 2013 1R PROJECT)US-83B IN FINNEY COUNTY (FY 2013 1R PROJECT)US-83B; CITY OF GARDEN CITY KLINK PROJECT

BNSF & TRAIL STREET IN DODGE CITY

1.50.30.011.14.24.2

0.00.0

12.00.70.019.50.6

15.60.015.215.24.9

7.00.016.07.97.98.38.37.01.0

3.00.04.013.00.521.40.00.05.70.92.60.417.78.11.70.2

0.0

Milling And OverlayGrade & SurfacingBridge ReplacementGrade & BridgeGrade & SurfacingSeeding, Sodding

Bridge ReplacementCulvert

Ultra Thin Bonded Asphalt Surf.1.0 OverlayCulvert25 Mm Overlay (1 Inch)Ultra Thin Bonded Asphalt Surf.

Conv SealBridge Overlay25 Mm Overlay (1 Inch)Conv Seal1.5 Overlay

Grade, Bridge & SurfacingBridge RepairLightingMilling And OverlaySeeding, SoddingSeeding, SoddingGrade, Bridge & SurfacingSeeding, SoddingSlurry Seal

1.5 OverlayGrade & SurfacingMilling And OverlayCrack Repair2in OverlayMilling And OverlaySpecialGrade, Bridge & Surfacing25 Mm Overlay (1 Inch)2in Overlay2in Overlay2in Overlay1.5 OverlayUltra Thin Bonded Asphalt Surf.Ultra Thin Bonded Asphalt Surf.Pavement Reconstruction

Flashing Light Signal

1,032433418

68,82520,806

197

4,047280

1,075266684

1,15896

1,558676

1,110422994

15,1591690

15,2002740

12,25590145

68054034755166

1,658120

68,100666216927219

2,700751217647

250

LC-K1RMM-CORSM-PBRSE-RICSE-RICSE-RIC

SM-PBRSM-PCR

SM-1RRSM-1RRSM-PCRSM-1RRSM-1RR

SM-ISRSM-BSRSM-1RRSM-1RRSM-1RR

SM-IRPSM-EMRSM-SLRSM-IRPSM-IRPSM-IRPSM-IRPSM-IRPLC-K1R

SM-1RRMM-RIMSM-1RRSM-CMNSM-1RRSM-1RRMM-SAFSE-SECSM-1RRSM-1RRSM-1RRSM-1RRSM-1RRSM-1RRSM-1RRLC-K1R

LC-RXR

201320122013200920122013

20112012

20132009200320032013

20122012200320132013

201220112012201120132013201220132012

2008201220112013201320122000200920032013201320132008201320132012

2011

Page 58: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-51 (Projects Under Construction as of November 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

FordFordFordFordFordFordFordFordFordFord

FranklinFranklinFranklinFranklinFranklinFranklinFranklinFranklinFranklin

GearyGearyGearyGearyGearyGearyGearyGearyGeary

GoveGove

GrahamGrahamGraham

GrantGrantGrant

GrayGrayGrayGrayGrayGrayGrayGray

K034U050U050U050U054U056U400U400U400

I035I035I035K068K068K068K068U059

I070I070I070K018K057K057

I070K023

K084U024U283

K025U160U160

K023K023K144U050U050U050U056U056

DODGE CITY: WYATT EARP BLVD FROM 14TH AVE WEST TO WCLK-34 IN FORD COUNTY (2012 1R PROJECT)CRACK ROUT AND SEAL ON US-50 IN FORD COUNTYSTOCKPILE IN FORD COUNTY ALONG US-50US-50 IN FORD COUNTY (2012 1R PROJECT)US-54 IN FORD COUNTY (2012 1R PROJECT)END PCCP E OF N JCT US400 NE TO .5 MI E OF US-50/US-283E CITY LIMITS OF DODGE CITY SE TO N CITY LIMITS OF FORDUS50 1.5M W US50/50B S TO US-56(BYPASS)SW OF DODGE CITYUS50/50B, S & E TO JCT US56/283(BYPASS)- W OF DODGECITY

CITY OF OTTAWABRIDGE #028 & #029 ON I-35 IN FRANKLIN COUNTYBRIDGE 35-30 (28);2.93 MILES NORTH EAST OF US-59SURFACING WORK ON I-35 IN FRANKLIN COUNTY (FY 2013)JUNCTION K-33, EAST TO FRANKLIN-MIAMI COUNTY LINEK-68 IN FRANKLIN COUNTY (2012 1R PROJECT)K-68 IN FRANKLIN COUNTY (2013 1R PROJECT)OTTAWA: W CITY LIMITS, E TO MARAIS DES CYNES RIVER BRI-35 NE OF OTTAWA, N TO FRANKLIN-DOUGLAS COUNTY LINE

CITY OF JUNCTION CITYGEARY CO: HENRY DR FROM I70 IC TO FT RILEY GATEHENRY DRIVE, NOR I-70 RAMP TERMINAL, NO INTO FORT RILEYBRS US-77 (40), I-70 (14 & 15), US-40B (37)CRACK FILLING ON I-70 IN GEARY COUNTYPAVEMENT MARKING PROJECTCONVENTIONAL SEAL ON K-18 IN GEARY COUNTYBRS 055 & 065 DRY CR DRGCRACK ROUT AND SEAL ON K-57 IN GEARY COUNTY

0.985 MILES E OF JCT K-23, EAST TO GO-TR COUNTY LINEK-23 IN GOVE COUNTY (FY 2013 1R PROJECT

BRIDGE (032), SOUTH FORK SOLOMON RIVER, NO. OF PENOKEEUS-24: SD/GH CO LINE,E TO EAST CITY LIMITS OF HILL CITYUS-283 IN GRAHAM COUNTY (FY 2013 1R PROJECT)

CULVERT #512, 7.22 MILES NORTH OF GT/SV COUNTY LINESTANTON/GRANT COUNTY LINE E TO W CL OF ULYSSESUS-160 FROM RAILROAD TRACKS EAST OF K-25 650FT EAST.

CITY OF CIMARRON: K-23 IN GRAY COUNTYNORTH CITY LIMITS OF CIMARRON N TO GRAY/FINNEY CO LINEHASKELL/GRAY COUNTY LINE EAST TO JUNCTION US-56/K144CIMARRON: KLINK ON US 50CRACK ROUT AND SEAL ON US-50 IN GRAY COUNTYUS-50 IN GRAY COUNTY (FY 2013 1R PROJECT)US-56 IN GRAY COUNTY (2012 1R PROJECT)US-56 IN GRAY COUNTY (2012 1R PROJECT)

1.05.96.50.012.822.34.414.52.51.8

0.00.00.03.11.012.31.30.77.6

0.00.00.00.04.426.25.30.017.6

18.317.4

0.017.52.7

0.08.40.2

1.112.94.80.46.92.611.813.2

Grade & SurfacingAsphalt PavementCrack RepairStockpile Bituminous MaterialO-lay & ShoulderRecycle & O-layConv Seal3/4 OverlayGrade, Bridge & SurfacingSpecial

Pedestrian & Bicycle PathsBridge RepairBridge RepairSpecial1.5 OverlayO-lay & Shoulder1.5 OverlayOverlayGrade & Bridge

Pedestrian & Bicycle PathsTraffic Study-intersectionConcrete PavementBridge RepairUltra Thin Bonded Asphalt Surf.Pavement MarkingConv SealBridge PaintCrack Repair

OverlayConv Seal

Bridge ReplacementMilling And OverlayMilling And Overlay

Culvert3/4 OverlayRailroad Improvement

Milling And OverlayMilling And OverlayOverlayMilling And OverlayCrack Repair2in OverlayRecycle & O-lay3.5in Overlay

4,55671039147

1,9204,022712

2,30027,7762,751

2271371020256

1,847172275

48,180

2270

6531047457501424589

8,809586

2,14512,212

414

75492931

2341,11062730143234

2,1382,615

LC-RESSM-1RRSM-CMNSM-CMNSM-1RRSM-1RRSM-1RRSM-1RRSE-SEBSE-SEB

LC-SRTSM-BSRSM-BSRSM-ISRSM-1RRMM-1RSSM-1RRLC-K1RSE-RIC

LC-SRTMM-SAFSM-CMNSM-BSRSM-ISR

SM-PMRSM-CMNSM-BSP

SM-CMN

SM-ISRSM-1RR

SM-PBRSM-RIPSM-1RR

SM-PCRSM-1RRLC-RES

LC-K1RSM-1RRSM-1RRLC-K1R

SM-CMNSM-1RRSM-1RRSM-1RR

2008201220132012201220122008200920082006

201320132007201320062012201320112007

201220122013200720122012201220032012

20092013

201220122013

201320082010

20112011200920132013201320122012

Page 59: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-52

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

(Projects Under Construction as of November 2012)

GreeleyGreeley

GreenwoodGreenwoodGreenwoodGreenwood

HamiltonHamilton

HarveyHarveyHarveyHarperHarveyHarveyHarveyHarvey

HaskellHaskellHaskellHaskellHaskell

HodgemanHodgemanHodgeman

JacksonJacksonJacksonJacksonJacksonJackson

JeffersonJeffersonJeffersonJeffersonJefferson

JewellJewellJewellJewellJewellJewell

K096K096

K099K099U054U400

K027U050

U160I135K015U050U050

K144U056U056U083U083

K156K156U283

K062U075U075U075U075U075

K004K004K245U024U059

K014K014K028K148U036U036

CRACK ROUT AND SEAL ON K-96 IN GREELEY COUNTYK-96 IN GREELEY COUNTY (FY 2013 1R PROJECT)

BR 036, BERNARD CR, 8.08 KM N OF JCT US-54BRIDGE #011 ON K-99 IN GREENWOOD COUNTYUS-54 IN GREENWOOD COUNTY (2012 1R PROJECT)US-400 IN GREENWOOD COUNTY (2013 1R PROJECT)

BRIDGE # 039 ON K-27 IN HAMILTON COUNTYPRESERVATION PROJECT ON US-50 IN HAMILTON COUNTY

BNSF & WEST STREET SOUTHWEST OF NEWTONCITY OF NEWTONNEWTON: ASH ST OVER SAND CREEKBRIDGE 050, CAMP CREEK, 0.2 MI WEST OF ATTICABRIDGE #023 ON I-135 IN HARVEY COUNTYRR TRACKS IN N NEWTON, N TO HV-MN CO LINE (EXCEPTION)CONTRACT MAINTENANCE PROJECT ON US-50 IN HARVEY COUNTYCOR:US-50, 1 MI W OF ANDERSON AVE, EAST TO OLD MAIN ST.

JUNCTION US-83/US-160 EAST TO HASKELL/GRAY COUNTY LINEBRIDGE REPAIR ON BRIDGE #001 IN HASKELL COUNTYUS-56 IN HASKELL COUNTY (FY 2013 1R PROJECT)US-83 IN HASKELL COUNTY (2013 1R PROJECT)US-83 IN HASKELL COUNTY (FY 2013 1R PROJECT)

JUNCTION K-156 & RS-283/255PRESERVATION PROJECT ON K-156 IN HODGEMAN COUNTYUS-283 IN HODGEMAN COUNTY (FY 2013 1R PROJECT)

K-62 IN JACKSON COUNTY (2012 1R PROJECT)INTERCHANGE: US-75 AND COUNTY RD 150(1 MI S OF MAYETTA)SHAWNEE/JACKSON COUNTY LINE NORTH TO JCT K-16/US-75US-75 & COLUMBINE DRIVE, NORTH OF HOLTON, JA COUS-75 IN JACKSON COUNTY (2012 1R PROJECT)US-75 IN JACKSON COUNTY (2012 1R PROJECT)

BRIDGE REPAIR ON #017 & #018 IN JEFFERSON COUNTYK-4 IN JEFFERSON COUNTY (2012 1R PROJECT)K-245 IN JEFFERSON COUNTY (2012 1R PROJECT)US-24: 1.8 MI E OF SN/JF CO LN, E TO 4-L/2-L TRANSITIONUS-59 IN JEFFERSON COUNTY (2012 1R PROJECT)

K-14 IN JEWELL COUNTY (2012 1R PROJECT)K-14 IN JEWELL COUNTY (FY 2013 1R PROJECT)CULVERT XXX, 5 MILES EAST OF JCT K-14CRACK ROUT AND SEAL ON K-148 IN JEWELL COUNTYCRACK ROUT & SEAL ON US-36 IN JEWELL COUNTYW JCT K-128, E TO BEGINNING OF 4-LANE SECT W OF MANKATO

10.215.9

0.00.012.09.4

0.011.3

0.00.00.00.00.07.66.41.4

12.00.025.20.412.0

0.210.211.5

7.30.017.30.010.22.7

0.026.60.35.50.5

15.315.20.07.08.76.4

Crack RepairAsphalt Pavement

Bridge RepairBridge Repair1.0 OverlayUltra Thin Bonded Asphalt Surf.

Bridge RepairMilling And Overlay

Flashing Light SignalPedestrian & Bicycle PathsBridgeFunds OnlyBridge Overlay1.5 OverlayCrack RepairGrade, Bridge & Surfacing

OverlayBridge RepairMilling And OverlayMilling And OverlayUltra Thin Bonded Asphalt Surf.

Intersection ImprovementOverlayMilling And Overlay

Conv SealFunds OnlyPavement PatchingGrade & Surfacing2in OverlayO-lay & Shoulder

Bridge RepairRecycle & O-layHeater Scarification (no overlay)Pavement ReconstructionRecycle & O-lay

Asphalt PavementMilling And OverlayCulvertCrack RepairCrack RepairGrade, Bridge & Surfacing

771,326

99198842992

292,237

500222

1,44915022243961

30,019

1,550400

3,461111

1,086

376766

1,503

219100

2,801298

1,428421

2864,605

338,591

96

1,5271,8761753844

10,181

SM-CMNSM-1RR

SM-BSRSM-BSRSM-1RRSM-1RR

SM-BSRSM-1RR

LC-RXRLC-SRTLC-RESSM-PBRSM-BSRSM-1RRSM-CMNSE-RIC

SM-1RRSM-BSRSM-1RRSM-1RRSM-1RR

MM-RIMSM-1RRSM-1RR

SM-1RRSE-SEI

SM-1RRMM-SAFSM-1RRSM-1RR

SM-BSRSM-1RRSM-1RRSM-RIPSM-1RR

SM-1RRSM-1RRSM-PCRSM-CMNSM-CMNMM-RIM

20122013

2003201320122013

20132012

20122010201220092013200520122012

20092012201320132013

201120122013

201220102010200320122012

20122012201220122012

201220132006201220122007

Page 60: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-53 (Projects Under Construction as of November 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

JohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnsonJohnson

C0000I035I035I035I035I035I035I035I035I035I035I435I435I435I635K007K007K010K010U056U069U069U069

191ST ST, JOHNSON CO.;NEAR GARDNER,BNSF INTERMODAL FAC.ANTIOCH RD FROM I-435 TO 119TH STREET(CA)GARDNER: MOONLIGHT ROAD FROM WARREN ST TO MADISON STHOMESTEAD LANE FROM 199TH ST. NORTH TO 191ST ST.LENEXA: 79TH AND LACKMANLENEXA: 87TH ST PARKWAY, PFLUMM RD TO RENNER BLVDLENEXA: I-435 AND 95TH ST MIXED USE TRAILLENEXA: LACKMAN AND COLLEGE BLVD.LENEXA: MONTICELLO ROAD FROM 83RD TO 91ST STREETS(CA)LENEXA:87TH PKWY,PFLUMM TO QUIVIRA;QUIVIRA,85TH TO 87THLENEXA:PRAIRIE STAR PKWY,FALCON VALLEY TO RIDGEVIEW(CA)MARTWAY/LAMAR TO N SIDE OF SHAWNEE MISS PKWY IN MISSIONMOONLIGHT RD, FROM MADISON ST. N TO PRAIRIE VILLAGE DROLATHE: MAHAFFIE AT 151ST STREETOLATHE: 127TH STREET MUR-LEN TO BLACK BOBOLATHE: COLLEGE BLVD OVER BN & SFR W OF RIDGEVIEW RDOLATHE: DENNIS AVENUE OVER CEDAR CREEK(CA)OLATHE: MULTIPLE LOCATIONSOLATHE-RIDGEVIEW, SANTA FE, PARK & LOULA-BNSF TRACKSOVERLAND PARK: 159TH ST ANTIOCH TO METCALFOVERLAND PARK: 2070 SIGNAL CONTROLLERSOVERLAND PARK: PEDESTRIAN WALKABILITY ENHANCEMENTSOVERLAND PARK: QUIVIRA RD FROM I-435 TO 99TH STOVERLAND PARK: QUIVIRA RD., COLLEGE BLVD TO 119TH ST.PED/BIKE PATH IN THE CITY OF SHAWNEESHAWNEE: SHAWNEE MIS PKWY & LACKMANLENEXA: 87TH ST FROM RENNER BLVD TO RIDGEVIEW RDI-35 & 159TH ST & LONE ELM RD IN OLATHEI-35 & 75TH ST., JOHNSON CO.I-35 SW JOHNSON COUNTY INTERCHANGE PROJECTI-35 SW JOHNSON COUNTY INTERCHANGE PROJECT STUDY AREAI-435 FROM 95TH STREET E TO QUIVIRA ROAD, I-35 & K-10INTERCHANGE: I-35 AND US-69 WITH 87TH STREET.KC SCOUT EXTENSION ON I-35 FROM OLATHE TO EDGERTONOVERLAY ON I-35 IN JOHNSON COUNTYPAVEMNET PATCHING ON I-35 IN JOHNSON COUNTYSW JOHNSON COUNTY INTCH PROJECT AT I-35/HOMESTEAD LANEBRIDGE REPAIR IN JOHNSON COUNTY ON I-435PAVEMENT MARKING PROJECTSURFACING WORK ON I-435 IN JOHNSON COUNTYPAVEMENT RECONSTRUCTION ON I-635 IN JOHNSON COUNTYK-7 FROM 0.5 MI S OF 183RD ST, N TO 0.5 M N OF 119TH STK-7 FROM 0.5 MI S OF 183RD ST, N TO 0.5 M N OF 119TH STBRIDGE #236 & #237 ON K-10 IN JOHNSON COUNTYBRIDGE REPAIR ON BRIDGE #177 IN JOHNSON COUNTYUS-56 IN JOHNSON COUNTY (2012 1R PROJECT)CORRIDOR: FROM 119TH ST, N TO I-35 & K-35, N TO 75THCORRIDOR: FROM 119TH STREET, N TO I-35 & I-35 N TO 75THCORRIDOR:FROM 119TH ST, N TO I-35 & I-35 N TO 75TH ST

2.61.50.71.00.01.90.42.41.01.10.91.50.70.11.00.40.00.00.00.60.00.01.01.21.00.00.60.00.21.51.02.20.014.04.51.71.50.04.33.10.410.65.60.00.02.50.00.00.0

Grade & SurfacingGrade & SurfacingGrade & SurfacingGrade, Bridge & SurfacingIntersection ImprovementGrade & SurfacingGrade & SurfacingTraffic SignalsGrade & SurfacingGrade & SurfacingGrade, Bridge & SurfacingPedestrian & Bicycle PathsGrade & SurfacingSurfacingGrade & SurfacingGrade, Bridge & SurfacingGrade & BridgeIntelligent Transportation SysGrade, Bridge & SurfacingGrade, Bridge & SurfacingGradingGradingSurfacingGrade & SurfacingPedestrian & Bicycle PathsIntersection ImprovementGrade & SurfacingInterchange/sLightingInterchange/sLocation StudyGrade & SurfacingInterchange/sIntelligent Transportation SysOverlayPavement PatchingSpecialBridge RepairPavement MarkingUltra Thin Bonded Asphalt Surf.Pavement ReconstructionLocation StudyPreliminary EngineeringBridge RepairBridge RepairPavement PatchingCare Agt(maint New Landscape)Grade, Bridge & SurfacingBridge Repair

11,4369,8826,6665,659216

9,128414288

4,7989,80717,9191,3084,754259

7,53312,7614,1641,19621,5038,75810154

5,7917,9691,295125

12,39681,713

25922,664

013,94449,4391,2506,841507

1,5001,059449

1,6921,422

00

50332

1,050150

57,735800

MM-RIMLC-LOCLC-RESSE-RICLC-HAZLC-LOCLC-LOCLC-LOCLC-RESLC-RESLC-RESLC-TEXSE-EDPLC-LOCLC-RESSE-RSLLC-RESLC-LOCSE-RSLLC-LOCLC-RESLC-RESLC-LOCLC-LOCLC-TEXLC-HAZLC-RESSE-IRC

MM-LTGSE-IRCSE-IRCSE-IRCSE-SEISE-ITSSM-ISRSM-ISRSE-IRC

SM-BSRSM-PMRSM-ISRSM-ISRSE-RICSE-RIC

SM-BSRSM-BSRSM-1RRSE-SECSE-RIC

SM-PDR

2012201020092012201220122011201220072006200420102009201320102007200820072006201120112011201220122013200920102008201220122011201220042012201220122012201220122012201220122012201220132012200620092012

Page 61: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-54

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

(Projects Under Construction as of November 2012)

JohnsonJohnsonJohnsonJohnson

Kearny

KingmanKingmanKingmanKingmanKingmanKingmanKingmanKingman

LabetteLabetteLabetteLabetteLabetteLabetteLabette

Lane

LeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworthLeavenworth

LincolnLincolnLincolnLincoln

LinnLinnLinnLinnLinnLinnLinnLinn

U069U069U069U069

U050

K014K042U054U054U054U054U054U054

U059U400U400

K004

K092K092U024U024U073U073U073

C0000I070I070K181

K007K007K052U069U069U069U069U069

CORRIDOR:FROM 119TH ST, NO TO I-35 & I-35 NO TO 75TH STCORRIDOR:FROM 119TH ST, NO TO I-35 & I-35 NO TO 75TH STCORRIDOR:FROM 119TH ST, NO TO I-35 & I-35 NO TO 75TH STCORRIDOR:FROM 119TH ST, NO TO I-35 & I-35 NO TO 75TH ST

PRESERVATION PROJECT ON US-50 IN KEARNY COUNTY

K-14 IN KINGMAN COUNTY (FY 2013 1R PROJECT)BRIDGES: RED CREEK (049) AND ROSE BUD CREEK (050)3.2 M W OF K-14 W JCT, EAST TO 1 M W OF K-14 W JCT5.82 MILES E OF PR/KM CO LN, E TO 7 M E OF PR/KM CO LNBYRON WALKER WILDLIFE AREACORRIDOR: PR-KM CO LINE, E 5.82 MILESFROM THE 2L/4L DIVISION EAST TO 0.16KM EAST OF JCT K-17PRESERVATION PROJECT ON US-54 IN KINGMAN COUNTY

2.0 MI N & 1.7 MI E OF ANGOLASOUTH KANSAS & OKLAHOMA RR & 4TH STREET IN OSWEGOSOUTH KANSAS & OKLAHOMA RR & OHIO STREET IN OSWEGOUNION PACIFIC & 20000 ROAD 3 MILES SOUTHEAST OF PARSONSPARSONS: US-59, FROM SOUTHERN AVE NORTH TO THORNTON ST.BRIDGE #071 ON US-400 IN LABETTE COUNTYECL PARSONS, E TO LB-CK CO L

K-4 IN LANE COUNTY (FY 2013 1R PROJECT)

2.5 MI S AND 1.0 MI W OF LANSINGCITY OF LANSINGCITY OF LEAVENWORTHBRIDGE #92-52-18.480(026); MISSOURI RIVERLEAVENWORTH: KLINK ON K-92 AND K-7BASHOR: U24 & 158THUS-24;WOLFCREEK PKWY FR 153RD ST TO 150TH ST IN BASEHORLV: 3 LOCATIONS ON US-73 & K-92PAVEMENT MARKING PROJECTUS-73 IN LEAVENWORTH COUNTY (2013 1R PROJECT)

4.0 MILES S & 1.5 MILES E OF WESTFALLELLSWORTH/LINCOLN CO LN EAST TO LINCOLN/SALINE CO LNPERMANENT SEEDING SPLIT OUT OF PROJECT KA-0731-01CULVERT #530; 2.572 MILES NORTH OF JCT K-18/K-181

CRACK ROUT AND SEAL ON K-7 IN LINN COUNTYREPAIR ON BRIDGE #014 ON K-7 IN LINN COUNTYJCT K31,E TO S JCT US69(EXCLD K-7) & 3RD TO 6TH-MOUND C0.5KM S OF RS 1204 INTERCHANGE, TO 1.2 KM N OF RS 12031.7KM S OF NEW K-52 INTERCH, N TO 0.5KM S OF RS1204N OF K-239 INTERCH, N TO 1.7 KM S OF NEW K-52 INTERCHNORTH JUNCTION K-52, NORTH TO LN-MI COUNTY LINEPAVEMENT MARKING PROJECT

1.83.01.81.2

15.0

12.10.02.21.24.95.86.47.1

0.20.00.00.00.80.08.6

12.3

0.20.00.00.00.60.10.50.84.02.8

0.17.27.20.0

26.90.010.36.46.03.20.03.7

Grade, Bridge & SurfacingGrade, Bridge & SurfacingSeeding, SoddingSpecial

Milling And Overlay

Milling And OverlayBridge ReplacementGrade, Bridge & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingGrade & BridgeO-lay & ShoulderMilling And Overlay

Grade & BridgeFlashing Light SignalFlashing Light SignalFlashing Light SignalOverlayBridge Overlay40 Mm Overlay (1-1/2 Inches)

Recycle & O-lay

Grade & SurfacingPedestrian & Bicycle PathsPedestrian & Bicycle PathsBridge RepairOverlayTraffic SignalsGrade & SurfacingMilling And OverlayPavement MarkingUltra Thin Bonded Asphalt Surf.

Grade & BridgeMilling And OverlaySeeding, SoddingCulvert

Crack RepairBridge Repair1.5 OverlayGrade, Bridge & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingSafety Rest AreaPavement Marking

35,793106,886

1470

1,429

1,2741,61411,5257,20025,62218,8189,4582,130

179280280290378303

1,142

1,201

235189210

3,177307523

1,774420162615

48215,923

55249

94190794

55,08849,07522,1772,512129

SE-RICSE-RICSE-RICSE-RIC

SM-1RR

SM-1RRSM-PBRSE-RICSE-RICSE-RICSE-SECSM-RIPSM-1RR

LC-LOCLC-RXRLC-RXRLC-RXRLC-K1RSM-BSRSM-1RR

SM-1RR

LC-RESLC-SRTLC-SRTSM-BSRLC-K1RMM-SAFMM-CORLC-K1RSM-PMRSM-1RR

LC-RESSM-IRPSM-IRPSM-PCR

SM-CMNSM-BSRSM-1RRSE-RICSE-RICSE-RIC

MM-RIMSM-PMR

2009201120122012

2012

20132012201220122012200920062012

2012201220122012201220132003

2013

2012201220132011201320122009201220132013

2012201120132012

20122012200620072007200720072012

Page 62: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-55 (Projects Under Construction as of November 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

LoganLoganLoganLogan

LyonLyonLyonLyonLyonLyonLyonLyonLyon

MarionMarionMarionMarionMarionMarionMarionMarion

MarshallMarshallMarshallMarshallMarshallMarshallMarshallMarshallMarshall

McphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcphersonMcpherson

MeadeMeadeMeadeMeade

K025K025U040

C0415I035I035I035I035K099U050U050

K015K150K168U050U050U056U056

K009K087K099K110K233U036U036U077U077

I135K061K061U056U056U056U081B1

K023K023U054U054

VISITOR INFORMATION CENTER IN OAKLEY (LOGAN COUNTY)K-25 IN LOGAN COUNTY (FY 2013 1R PROJECT)K-25: NCL OF RUSSELL SPRINGS, N TO WEST JCT US-40/K-25WA-LG CO L, E TO 0.2 KM W OF W JCT US-83

CITY OF EMPORIA0.1 MILES N OF ALLENBRIDGE REPAIR IN LYON COUNTY ON I-35EMERGENCY REPAIR ON BRIDGE #119 IN LYON COUNTYI-35/KTA/US-50 INTERCHANGESURFACING WORK ON I-35 IN LYON COUNTYBRIDGE 99-56 (051); K-99 & KTA NORTH JUNCTIONEMPORIA: KLINK PROJECT ON US-50US-50/I-35 ROUNDABOUTS AND CONNECTOR ROAD IN EMPORIA

CITY OF HILLSBOROBRIDGE #034 ON K-15 IN MARION COUNTYPRESERVATION PROJECT ON K-150 IN MARION COUNTYK-168 IN MARION COUNTY (2011 1R PROJECT)US-50 IN MARION COUNTY (2011 1R PROJECT)US-50 IN MARION COUNTY (2011 1R PROJECT)MARION CO: JUNCTION US-56, US-77 AND K-150US-56 IN MARION COUNTY (2011 1R PROJECT)

K-9 IN MARSHALL COUNTY (FY 2013 1R PROJECT)K-87 IN MARSHALL COUNTY (FY 2013 1R PROJECT)K-99 IN MARSHALL COUNTY (FY 2013 1R PROJECT)BR REPLACE; NF BLACK VERMILLION RIVER DRAINAGE BR (043)K-233 IN MARSHALL COUNTY (FY 2013 1R PROJECT)US-36 IN MARSHALL COUNTY (2012 1R PROJECT)US-36 IN MARSHALL COUNTY (2012 1R PROJECT)BIG BLUE RIVER BR (013), 0.5 MILES EAST OF BLUE RAPIDSUS-77 IN MARSHALL COUNTY (FY 2013 1R PROJECT)

INTER. OF FAS1065/FAS1064, THEN EAST 6 MILES TO FAS1961INTERSECTION OF IRON HORSE ROAD AND FAS 307UP & 19TH AVENUE 2 MILES WEST OF GALVA1.61 KM S OF JCT K-61, N 14.84 KMCORRIDOR: RN-MP COL NE TO BEGIN OF 4-LANE S OF MCPHERSNCORRIDOR: RN-MP COL NE TO BEGIN OF 4-LANE S OF MCPHERSNUS-56 & KANSAS AVE(S OF CANTON), MCPHERSON COUNTYUS-56 IN MCPHERSON COUNTY (2011 1R PROJECT)US-56 IN MCPHERSON COUNTY (2011 1R PROJECT)I-135/US-81B INTERHCANGE NORTH TO SALINE COUNTY LINE

CIMARRON RIVER BRIDGE #015 ON K-23OK/KS STATE LINE NORTH TO NORTH CITY LIMITS OF MEADEUS-54 IN MEADE COUNTY (2011 1R PROJECT)US-54 IN MEADE COUNTY (2011 1R PROJECT)

0.02.311.335.7

0.00.20.00.00.210.30.00.60.3

0.00.08.00.513.05.70.28.4

12.38.69.60.03.56.75.00.011.2

6.01.00.09.27.47.00.213.213.16.3

0.025.613.714.4

Landscaping And Beautification3in OverlayPavement Reconstruction40 Mm Overlay (1-1/2 Inches)

Pedestrian & Bicycle PathsGrade, Bridge & SurfacingBridge RepairBridge RepairInterchange/s2in OverlayBridge DeckMilling And OverlayIntersection Improvement

Preliminary EngineeringBridge Overlay3in OverlayMilling And OverlayOverlay1.5 OverlayPreliminary EngineeringMilling And Overlay

Asphalt PavementAsphalt PavementAsphalt PavementBridge Replacement2in OverlayAsphalt PavementRecycle & O-layBridge ReplacementRecycle & O-lay

GradingGradingFlashing Light SignalSurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingIntersection ImprovementMilling And OverlayMilling And Overlay1.0 Overlay

Bridge ReplacementConv SealMilling And OverlayMilling And Overlay

925452

4,9683,769

25059411361

11,4042,640800443155

0122

2,04592

4,4441,847

0814

3,0532,0272,402867500

1,8831,10011,7341,422

5720275

6,79938,01948,383

3001,2041,421621

5,2391,5393,4133,372

LC-TEXMM-1RSMM-1RSSM-1RR

LC-SRTLC-RESSM-BSRSM-EMRSE-IRCSM-ISRSM-PDRLC-K1RMM-SAF

LC-SRTSM-BSRSM-1RRSM-1RRSM-1RRSM-1RRMM-SAFSM-1RR

SM-1RRSM-1RRSM-1RRSM-PBRSM-1RRSM-1RRSM-1RRSM-PBRSM-1RR

LC-RESLC-RESLC-RXRSM-ISRSE-SECSE-SEC

MM-SAFSM-1RRSM-1RRSM-1RR

SM-PBRSM-1RRSM-1RRSM-1RR

2012201320122002

201220122012201120072013201120132013

20122013201220112011201120122011

201320132013201220132012201220112013

2012201220122003200920092002201120112009

2011200820112011

Page 63: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-56

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

(Projects Under Construction as of November 2012)

MiamiMiamiMiamiMiamiMiamiMiamiMiamiMiamiMiamiMiamiMiami

MitchellMitchellMitchellMitchellMitchellMitchellMitchellMitchell

MontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomeryMontgomery

MorrisMorrisMorrisMorrisMorris

MortonMortonMorton

NemahaNemahaNemaha

K007K068K068K068U069U169U169

K009K014K014K181K181U024

C0000U075U075U160U160U166U169U169U169U169U169U169

K004K057U056U056

K027K051U056

K009K062

CITY OF LOUISBURGLAMBETH SALVAGE YARDLAMBETH SALVAGE YARD, NORTH OF I-35 IN MIAMI COUNTYRS 1604 AT 287TH ST., 1.1 MILES SOUTH OF K-68CRACK ROUT AND SEAL ON K-7 IN MIAMI COUNTYFRANKLIN-MIAMI COUNTY LINE, EAST TO JUNCTION US-169JCT US-169, EAST TO KANSAS-MISSOURI STATE LINEK-68;JUST EAST OF US-69/K-68 INTERCHANGE, IN LOUISBURG7.6 KM N LN-MI CO LINE, N TO 2L/4L DIVCRACK ROUT AND SEAL ON US-169 IN MIAMI COUNTYUS-169 IN MIAMI COUNTY (2013 1R PROJECT)

BRIDGE (005): 1.95 MILES EAST OF K-128, LIMESTONE CREEKCITY OF BELOIT (SAFE ROUTES TO SCHOOL)K-9 IN MITCHELL COUNTY (FY 2013 1R PROJECT)K-14 IN MITCHELL COUNTY (2012 1R PROJECT)K-14 IN MITCHELL COUNTY (2012 1R PROJECT)CULVERT #523; 4.19 MILES NORTHWEST OF LINCOLN COUNTY LNCULVERT 522, BACON CR DRG, 0.94 MI N LC-MC CO LBRIDGE (005; 1.95 MILES EAST OF K-128 (LIMESTONE CREEK)

2.0 MILES S & 1.2 MILES W OF COFFEYVILLE AIRPORTUNION PACIFIC & 5000 ROAD EAST OF LE HUNT6.5 MI N & 2.3 MI E OF ELK CITYOK/KS STATE LINE TO WEST JUNCTION US-160/US-75OK-KS ST L, N TO W JCT US-160ELK/MONTGOMERY COUNTY LINE TO WEST JUNCTION US-75INDEPENDENCE: 10TH ST TO PARK BLVD. ON MAIN ST (US-160)BRIDGE 031, BEE CREEK, 0.2 MILES EAST OF CQ/MG CO. LINE.2 KM S OF N JCT US-160, NE TO 0.3KM S OF JCT US-400COR: US-169, INCLDNG JCT US-166, N TO APPROX CO RD 3000E JCT US-166, N TO 0.4 KM S OF S JCT US-160US-169 IN MONTGOMERY COUNTY (2012 1R PROJECT)US-169 IN MONTGOMERY COUNTY (2012 1R PROJECT)US-169; CITY OF COFFEYVILLE KLINK PROJECT

UP & 2800 ROAD SW OF LATIMERBRIDGE #033 ON K-4 IN MORRIS COUNTYCRACK ROUT AND SEAL ON K-57 IN MORRIS COUNTYCOUNCIL GROVE: KLINK PROJECT ON US-56US-56 IN MORRIS COUNTY (2012 1R PROJECT)

NCL OF ELKHART, N TO S JCT K-51 AND NE BYPASSCHIP SEAL ON K-51 IN MORTON COUNTY7.9 KM NE RS1488, E TO MT-SV CO L

RESTORATION OF HISTORIC BRICK STREET IN SENECAK-9 IN NEMAHA COUNTY (FY 2013 1R PROJECT)CULVERT 502, SOLDIER CR DRG, 3.8 MI N OF JA-NM CO LINE

0.00.00.00.47.911.30.00.010.922.310.8

0.00.09.316.77.80.00.00.0

0.20.00.220.720.717.00.50.09.55.511.36.410.61.0

0.00.02.10.429.4

9.87.98.0

0.05.00.0

Pedestrian & Bicycle PathsSpecialPreliminary EngineeringGrade & SurfacingCrack Repair1.0 Overlay1.5 OverlayGrade & SurfacingGrade, Bridge & SurfacingCrack RepairUltra Thin Bonded Asphalt Surf.

Detour(s)Preliminary EngineeringAsphalt PavementAsphalt PavementAsphalt PavementCulvertCulvertBridge Replacement

Grade & BridgeFlashing Light SignalGrade & Bridge1.0 Overlay25 Mm Overlay (1 Inch)1.0 OverlayMilling And OverlayBridge ReplacementOverlayGrade, Bridge & Surfacing40 Mm Overlay (1-1/2 Inches)Ultra Thin Bonded Asphalt Surf.Ultra Thin Bonded Asphalt Surf.Overlay

Flashing Light SignalBridge OverlayCrack RepairOverlay1.5 Overlay

Grade, Bridge & SurfacingConv SealGrade & Surfacing

Historic Preservation2in OverlayCulvert

1993110

76628590

1,039169

35,38078

2,399

3730

1,4471,675782224424

1,441

880300437

2,3581,1402,313509

1,5641,589

106,1611,051510

1,002303

27511713228

3,827

9,753153

5,995

2,068681400

LC-SRTSM-RIPSM-RIPLC-RES

SM-CMNSM-1RRSM-1RR

MM-CORSE-RIC

SM-CMNSM-1RR

SM-PBRLC-SRTSM-1RRSM-1RRSM-1RRSM-PCRSM-PCRSM-PBR

LC-RESLC-RXRLC-RESSM-1RRSM-1RRSM-1RRLC-K1RSM-PBRSM-1RRSE-SECSM-1RRSM-1RRSM-1RRLC-K1R

LC-RXRSM-BSRSM-CMNLC-K1RMM-1RS

MM-RIMSM-CMNMM-RIM

LC-TEXSM-1RRSM-PCR

20102011201220132012200620062010200220122013

20122013201320122012201220072013

20122012201220092003200920112012200320092003201220122012

20122013201220122012

200220122002

201220132008

Page 64: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-57 (Projects Under Construction as of November 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

NemahaNemahaNemahaNemahaNemahaNemahaNemaha

NeoshoNeoshoNeoshoNeoshoNeoshoNeoshoNeoshoNeoshoNeoshoNeoshoNeosho

NessNessNessNessNessNess

NortonNortonNortonNortonNorton

OsageOsageOsageOsageOsageOsageOsageOsageOsageOsage

OsborneOsborneOsborneOsborneOsborneOsborne

K062K063K178K236U036U036U075

C0168K039K039K047K047K047

C0000K004U283U283U283

K060K383U036U036U036

K031K031K068U056U075

C0000K181K181K181U024U281

K-62 IN NEMAHA COUNTY (2012 1R PROJECT)K-63 IN NEMAHA COUNTY (FY 2013 1R PROJECT)K-178 IN NEMAHA COUNTY (FY 2013 1R PROJECT)K-236 IN NEMAHA COUNTY (FY 2012 1R PROJECT)SLOPE PROTECTION IN NEMAHA COUNTYUS-36 IN NEMAHA COUNTY (2012 1R PROJECT)BROWN/NEMAHA COUNTY LINE NORTH TO NEBRASKA STATE LINE

CITY OF CHANUTECITY OF ERIE (SAFE ROUTES TO SCHOOL)SOUTH KANSAS & OKLAHOMA RR & ASH STREET IN CHANUTEUNION PACIFIC & 130TH ROAD SOUTH OF ERIEUNION PACIFIC & 20TH ROAD SOUTHEAST OF SOUTH MOUND0.25 MILES WEST OF SHAWCONVENTIONAL SEAL ON K-39 IN NEOSHO COUNTYW OF US-169, EAST TO PLUMMER AVE - CHANUTEBRIDGE (043), NEOSHO RIVER, 3 MILES EAST OF US-59WILSON-NEOSHO CO LINE E TO .05 MI W OF JCT K-47/US-169WILSON-NEOSHO CO LINE E TO .05 MI W OF JCT K-47/US-169

3.8 MI N OF K-96 AN 1.0 MI E OF COUNTY LINE5.9 MI S OF K-4 & 1.0 MI E OF COUNTY LINEK-4 IN NESS COUNTY (FY 2013 1R PROJECT)CRACK ROUT AND SEAL ON US-283 IN NESS COUNTYK&O & US-283 IN NESS CITYUS-283 IN NESS COUNTY (FY 2013 1R PROJECT)

K-60 IN NORTON COUNTY (2012 1R PROJECT)K-383 IN NORTON COUNTY (2012 1R PROJECT)0.528KM E OF WCL NORTON, E TO NT-PL CO L (EXCPT 1.2KM)US-36 IN NORTON COUNTY (2012 1R PROJECT)US-36 IN NORTON COUNTY(EAST NORTON LIMITS TO K-383 JCT)

BNSF & 217TH STREET 2 MILES NORTH OF OSAGE CITYBNSF & E 293RD ROAD BETWEEN QUENEMO AND MELVERNBNSF & LEWELLING ROAD 1 MILE EAST OF OLIVETCITY OF LYNDON (SAFE ROUTES TO SCHOOL)CITY OF OVERBROOKEAST JCT I-35, EAST TO OS-CF CO LINEOSAGE CITY: E OF MARTIN ST(K-31/170), E TO E OF 4TH STK-68 IN OSAGE COUNTY (2012 1R PROJECT)BRIDGE #025 ON US-56; 110 MILE CREEK IN OSAGE COUNTYABANDONNED MOPAC RR BRIDGE (035) 0.28 MI N US-75/K268

0.3 MILES S AND 5.2 MILES E OF ALTONBRIDGE #043 ON K-181 IN OSBORNE COUNTYCARR CREEK DRAINAGE BR (041), 1 MI W OF OB-MC CO LINEK-181 IN OSBORNE COUNTY (FY 2013 1R PROJECT)US-24 IN OSBORNE COUNTY (FY 2013 1R PROJECT)CITY OF OSBORNE: KLINK ON US 281

6.06.13.51.50.09.72.6

0.00.00.00.00.00.52.50.70.02.92.9

0.10.219.013.20.016.7

4.313.513.80.84.4

0.00.00.00.00.01.30.41.00.00.0

0.20.00.04.04.00.2

Conv Seal2in Overlay1.5 Overlay1.5 OverlaySlide RepairRecycle & O-laySurface & Bridge

Preliminary EngineeringPreliminary EngineeringFlashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingConv SealGrade & SurfacingBridge ReplacementGrade & SurfacingSeeding, Sodding

Grade & BridgeGrade & BridgeRecycle & O-layCrack RepairFlashing Light SignalRecycle & O-lay

Conv SealUltra Thin Bonded Asphalt Surf.40 Mm Overlay (1-1/2 Inches)Milling And OverlayGrade, Bridge & Surfacing

Flashing Light SignalFlashing Light SignalFlashing Light SignalPreliminary EngineeringPreliminary Engineering1.0 OverlayOverlay2in OverlayGrade, Bridge & SurfacingBridge Removal

Grade & BridgeBridge RepairBridge ReplacementAsphalt Pavement2in OverlayMilling And Overlay

151798338156269

2,1413,512

00

250275250

5,03368

2,1475,2443,644

55

384388

1,75044160

2,646

1071,08994781

4,471

28035028000912541212430

6355034035470364

SM-1RRSM-1RRSM-1RRSM-1RRSM-CMNSM-1RRSM-RIP

LC-SRTLC-SRTLC-RXRLC-RXRLC-RXRLC-RES

SM-CMNMM-RIMSM-PBRMM-RIMMM-RIM

LC-RESLC-RESSM-1RRSM-CMNLC-RRXSM-1RR

SM-1RRSM-1RRSM-1RRSM-1RRSM-RIP

LC-RXRLC-RXRLC-RXRLC-SRTLC-SRTSM-1RRLC-K1RSM-1RRSM-PBRMM-RIM

LC-RESSM-BSRSM-PBRSM-1RRSM-1RRLC-K1R

2012201320132013201320122012

20122013201220122012201220122002201220112013

201320132013201320052013

20122012200320122012

2012201120122013201220072012201220112008

201220132012201320132013

Page 65: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-58

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

(Projects Under Construction as of November 2012)

Osborne

OttawaOttawaOttawaOttawaOttawa

Pawnee

PhillipsPhillipsPhillipsPhillipsPhillipsPhillips

PottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomiePottawatomie

PrattPrattPrattPrattPrattPrattPrattPratt

Rawlins

RenoRenoRenoRenoRenoRenoRenoRenoRenoReno

U281

K018U081U081U081U081

U056

K121U036U036U183U183U183

C0000C0000K016K063K063K099K099K099U024U024U024

K042K061K064K064U054U054U054U281

K025

K061K061K096K096K096U050U050U050

US-281 IN OSBORNE COUNTY (FY 2013 1R PROJECT)

K-18 IN OTTAWA COUNTY (2012 1R PROJECT)6 MI S OF OTTAWA/CLOUD CO LN; N TO OTTAWA/CLOUD CO LNMINNEAPOLIS (RS 518); NORTH 6 MILESUS-81 IN OTTAWA COUNTYUS-81 IN OTTAWA COUNTY (2011 1R PROJECT)

US-56 IN PAWNEE COUNTY (2012 1R PROJECTS)

K-121 IN PHILLIPS COUNTY (2012 1R PROJECT)PHILLIPSBURG: FROM 220 FT E. OF US-36/183 JCT TO 5TH STUS-36 IN PHILLIPS COUNTY (2012 1R PROJECT)STOCKPILE ON US-183 IN PHILLIPS COUNTYUS-183 IN PHILLIPS COUNTY (2012 1R PROJECT)US-183 IN PHILLIPS COUNTY (2012 1R PROJECT)

2.0 MI N & 1.0 MI E OF DULUTH5.0 MI S & 1.0 MI E OF ONAGAK-16 IN POTTAWATOMIE COUNTY (FY 2013 1R PROJECT)COMMERCIAL ST FROM SCL TO NCL - HAVENSVILLENCL ST MARYS, N TO PT-NM CO LBRIDGE REPLACEMENT; BRUSH CREEK BRIDGE (036)K-99 IN POTTAWATOMIE COUNTY (FY 2013 1R PROJECT)K-99 IN POTTAWATOMIE COUNTY (FY 2013 1R PROJECT)(MAN)REALIGN THE WWTP ACCESS RD TO ALIGN WITH LEVEE DR.BRIDGE REPAIR ON BRIDGE #001 IN POTTAWATOMIE COUNTYPREVENTIVE MAINTENANCE ON US-24 IN POTTAWATOMIE CO

CONTRACT MAINTENANCE PROJECT ON K-42 IN PRATT COUNTYK-61: FROM K-61/US-54 JUNCTION, NORTH 1.3 MILEBRIDGE #024; 2.74 MILES NORTH EAST OF US-281K-64 IN PRATT COUNTY (FY 2013 1R PROJECT)1.0 MI E OF CAIRO INTERSECTION, E TO PR-KM CO LUS-54 IN PRATT COUNTY (FY 2013 1R PROJECT)US-54: FROM PR/KW CO LINE, EAST TO WEST CL OF PRATTUS-281 IN PRATT COUNTY (2012 1R PROJECT)

K-25 IN RAWLINS COUNTY (FY 2013 1R PROJECT)

BNSF & MAIN STREET IN PARTRIDGECITY OF HUTCHINSON (SAFE ROUTES TO SCHOOL)CORRIDOR: 4L/2L, N OF 17TH IN HUTCH, NE TO RN-MP COLCORRIDOR: 4L/2L, N OF 17TH IN HUTCH., NE TO RN/MP CO LNECL NICKERSON, EAST 3.96 MILES TO CONCRETE PAVEMENTK-96 IN RENO COUNTY (2012 1R PROJECT)SCL HUTCHINSON, EAST TO .8 MILE E OF HAVEN/BUHLER RDSTAFFORD/RENO COUNTY LINE EAST TO RS-360(PLEVNA)US-50 AND AIRPORT RD(YODER RD), SOUTH OF HUTCHINSONUS-50: RS-360 (PLEVNA) EAST TO JUNCTION US-50/K-14

4.0

14.66.06.011.50.2

7.4

0.50.213.60.013.217.7

0.10.118.60.426.80.04.621.60.00.010.7

9.01.30.03.64.04.514.26.7

13.2

0.00.08.08.64.04.914.18.80.08.0

2in Overlay

O-lay & Shoulder1.5 Overlay1.5 OverlayMilling And OverlayOverlay

O-lay & Shoulder

Conv SealOverlay4in OverlayStockpile Bituminous Material4in OverlayConv Seal

Grade, Bridge & SurfacingGrade, Bridge & SurfacingMilling And OverlayMilling And Overlay25 Mm Overlay (1 Inch)Bridge ReplacementAsphalt Pavement1.0 OverlayIntersection ImprovementBridge RepairConv Seal

Crack RepairPavement ReconstructionBridge RepairMilling And OverlayGrade & Surfacing1.5 OverlayOverlay1.5 Overlay

1.5 Overlay

Flashing Light SignalPreliminary EngineeringGrade, Bridge & SurfacingSeeding, SoddingOverlay1.5 OverlayConv SealMilling And OverlayTraffic SignalsMilling And Overlay

629

2,043386288

9,672795

812

11381

3,395138

3,302531

619436

2,193565

1,4171,0121,1161,581775155388

452,381

90288

29,661847

7,606838

1,331

5400

54,287161259489317

7,90861

12,244

SM-1RR

MM-1RSSM-1RRSM-1RRSM-RIPSM-1RR

SM-1RR

SM-1RRLC-K1RSM-1RRSM-CMNSM-1RRSM-1RR

LC-RESLC-RESSM-1RRLC-K3RSM-1RRSM-PBRSM-1RRSM-1RR

MM-CORSM-BSRSM-CMN

SM-CMNSM-RIPSM-BSRSM-1RRSE-SECSM-1RRSM-RIPSM-1RR

SM-1RR

LC-RXRLC-SRTSE-SECSE-SECSM-1RRSM-1RRSM-CMNSM-RIP

MM-SAFSM-RIP

2013

20122008200820112011

2012

201220122012201220122012

20122012201320042003201220132013201220132012

20122012201120132009201320122012

2013

2012201320092013200520122005201220052012

Page 66: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-59 (Projects Under Construction as of November 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

Reno

RepublicRepublicRepublicRepublicRepublicRepublicRepublicRepublicRepublicRepublicRepublicRepublicRepublic

RiceRiceRiceRiceRiceRiceRiceRiceRice

RileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRileyRiley

RooksRooksRooksRooksRooks

U050

K139K148K148K148K266U036U036U081U081U081U081U081U081

K004K004K014K014K046U056U056U056

I070K016K018K018K018K018K018K082K082K113K113K114U024U077U077

K018U183U183U183

WEST OF JUNCTION K-61, EAST TO EAST OF YODER/AIRPORT RD

CRACK ROUT & SEAL ON K-139 IN REPUBLIC COUNTY4 CULVERTS PLUS ELK CREEK DRAINAGE CULVERTS 519 AND 521BRIDGE #043 IN REPUBLIC COUNTY ON K-148CRACK ROUT AND SEAL ON K-148 IN REPUBLIC COUNTYK-266 AT MILEPOST 4.53 IN REPUBLIC COUNTYBRIDGE REPAIR IN REPUBLIC COUNTY ON US-36CRACK ROUT & SEAL ON US-36 IN REPUBLIC COUNTYUS-81 IN REPUBLIC COUNTY (2012 1R PROJECT)US-81 IN REPUBLIC COUNTY (2012 1R PROJECT)US-81 IN REPUBLIC COUNTY (2012 1R PROJECT)US-81 IN REPUBLIC COUNTY (2012 1R PROJECT)US-81 IN REPUBLIC COUNTY (2012 1R PROJECT)US-81 IN REPUBLIC COUNTY (2012 1R PROJECT)

CITY OF LYONSJCT K-14, E TO RC-EW CO LK-4 IN RICE COUNTY (2013 1R PROJECT)CLEVELAND AVE TO FOREST AVE ON BROADWAY AVE (K-14/K-96)COW CR BR (033):LITTLE COW CR BR (034)1.5&2.2 M S LYONSK-46 IN RICE COUNTY (2012 1R LIST)BT/RC COUNTY LINE EAST TO WEST CITY LIMITS OF LYONSCONTRACT MAINTENANCE PROJECT ON US-56 IN RICE COUNTYUS-56 IN RICE COUNTY (2012 1R PROJECT)

4TH & BLUEMONT; RILEY COUNTY; CITY OF MANHATTANMANHATTAN:ANDERSON AVE,SETH CHILD RD TO CONNECTICUT AVESTABILIZE BANK OF LITTLE DEEP CREEK (I-70) RLCOUNTYK-16 IN RILEY COUNTY (FY 2013 1R PROJECT)GE-RL CO L, NORTHEAST TO SOUTH OF WALNUT ST @ OGDENK-18 FROM WALNUT ST.(OGDEN) NE TO 0.3MI W K-113/SETH CHK-18 FROM WALNUT ST.(OGDEN) NE TO 0.3MI W K-113/SETH CHK-18 FROM WALNUT ST.(OGDEN) NE TO 0.3MI W K-113/SETH CHK-18 FROM WALNUT ST.(OGDEN) NE TO 0.3MI W K-113/SETH CHCRACK ROUT AND SEAL ON K-82 IN RILEY COUNTYK-82 IN RILEY COUNTY (FY 2013 1R PROJECT)BRIDGE REPAIR ON BRIDGES #040 & #051 IN RILEY COUNTYJCT K-18, N TO JCT US-24OGDEN E CITY LIMITS, E 0.256 KMPRESERVATION PROJECT ON US-24 IN RILEY COUNTYBR 015, FANCY CR, 3.4 KM N K-16US-77 IN RILEY COUNTY (FY 2013 1R PROJECT)

CITY OF STOCKTON (SAFE ROUTES TO SCHOOL)K-18 IN ROOKS COUNTY FY 2013 1R PROJECT)1.5KM S OF JCT US24, N TO RO-PL CO L(EXCPT PCCP)US-183 IN ROOKS COUNTY (2012 1R PROJECT)US-183 IN ROOKS COUNTY (FY 2013 1R PROJECT)

3.1

1.00.00.015.50.00.013.61.41.20.80.98.51.6

0.010.124.90.40.01.314.114.114.5

0.00.50.11.80.81.94.01.41.91.54.00.05.60.211.70.011.4

0.021.08.914.11.0

Grade, Bridge & Surfacing

Crack RepairCulvertBridge RepairCrack RepairSpecialBridge RepairCrack RepairOverlayOverlayOverlayOverlayOverlayOverlay

Pedestrian & Bicycle Paths40 Mm Overlay (1-1/2 Inches)Milling And OverlaySlurry SealGrade, Bridge & Surfacing1.5 Overlay1.5 OverlayCrack Repair1.5 Overlay

Intersection ImprovementGrade & SurfacingSlide RepairMilling And OverlayGrade, Bridge & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingRailroad ImprovementCrack RepairConv SealBridge Repair25 Mm Overlay (1 Inch)OverlayMilling And OverlayBridge ReplacementConv Seal

Preliminary EngineeringMilling And Overlay40 Mm Overlay (1-1/2 Inches)2in Overlay1.5 Overlay

49,633

55003827649211705514708291707165

2251,0232,787

855,045

961,171

711,448

6241,961104192

66,35465,70546,51316,99015,804

6144299

1,09495

2,3387,437381

01,802638

1,973180

SE-RIC

SM-CMNSM-PCRSM-BSRSM-CMNSM-EMRSM-BSRSM-CMNSM-1RRSM-1RRSM-1RRSM-1RRSM-1RRSM-1RR

LC-SRTSM-1RRSM-1RRLC-K1RSM-PBRSM-1RRSM-1RRSM-CMNSM-1RR

LC-HAZLC-RES

SM-CMNSM-1RRSE-RICSE-RICSE-RICSE-RICSE-RIC

SM-CMNSM-1RRSM-BSRSM-1RRSM-1RRSM-1RRSM-PBRSM-1RR

LC-SRTSM-1RRSM-1RRSM-1RRSM-1RR

2011

2012200620112012200420122012201220122012201220122012

201320022013201120112012200920122012

20102006201120132009201020112011201020122013201220032003201220072013

20132013200320122013

Page 67: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-60

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

(Projects Under Construction as of November 2012)

RushRushRushRushRush

RussellRussellRussellRussellRussellRussellRussellRussellRussell

SalineSalineSalineSalineSalineSalineSalineSalineSalineSalineSalineSalineSalineSalineSaline

ScottScottScottScott

SedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwick

K004K004K096U183U183

I070I070I070I070K018K232K232U281U281

I070I070I070I070I070I070I070I070I070I070I070I135K004K004U081

K096U083U083U083

CONTRACT MAINTENANCE PROJECT ON K-4 IN RUSH COUNTYJCT US-183, E TO RH-BT CO LBRIDGE REPAIR ON BRIDGE #049 IN RUSH COUNTYSOUTH CITY LIMITS OF LACROSSE NORTH TO RH/EL COUNT LINEUS-183 IN RUSH COUNTY (FY 2013 1R PROJECT)

EL-CO L, EAST 13.28 MILESEL-RS CO L, EAST 21.365 KMFAS48 FROM OLD US40, S 7.2KM (EXEPT 0.2KM BALTA INTCH)JUNCTION US-281, EAST TO RS-EW CO LINEPRESERVATION PROJECT ON K-18 IN RUSSELL COUNTYPRESERVATION PROJECT ON K-232 IN RUSSELL COUNTYSTOCKPILE ALONG K-232 IN RUSSELL COUNTYUS-281 IN RUSSELL COUNTY (2012 1R PROJECT)US-281 IN RUSSELL COUNTY (2012 1R PROJECT)

.6KM W OF I-135/US-81, E TO .5KM W RS 10500.5 MILE WEST OF RS 1050, EAST TO SA/DK COUNTY LINE0.5 MILE WEST OF RS 1050, EAST TO SA/DK COUNTY LINE2 MILES WEST OF I-135, EAST TO NEW CONCRETE PAVEMENTBRIDGE REPAIR IN SALINE COUNTY ON I-70BRIDGE REPAIR ON BRIDGE #065 IN SALINE COUNTYBRIDGE REPAIR ON BRS #076 & #077(I-70 IN SALINE COUNTY)HEDVILLE RD (EXIT 244) & HALSTEAD RD (EXIT 249), SALINELC-SA CO LINE, E TO JUNCTION I-135PAVEMENT MARKING PROJECT ON I-70SURFACING ON I-70 IN SALINE COUNTYWATERWELL RD. (EXIT 88) INTERCHANGE, SALINE COUNTYBRIDGE REPAIR IN SALINE COUNTY ON K-4K-104 JUNCTION EAST TO SOUTH CITY LIMITS OF GYPSUMMP/SA COUNTY LINE NORTH EAST TO I-135/US-81 JUNCTION

K-96 IN SCOTT COUNTY (2012 1R LIST)FINNEY/SCOTT COUNTY LINE NORTH TO BEGING PCCP @ 12THRR TRACKS IN SCOTT CITY NORTH TO SC/LG COUNTY LINEUS-83 IN SCOTT COUNTY (FY 2013 1R PROJECT)

ARKANSAS RV/GYPSUM CR PATH CONNECTION IN WICHITABYPASS: W OF GODDARD E & N TO K-96 NEAR 45TH ST NCITY OF CHENEYCITY OF COLWICH PEDESTRIAN ACTIV SCHOOL CROSSING SIGNALHAYSVILLE: GRAND AVE/UNION PACIFIC RR GRADE SEPARATIONK&O & ATHENIAN STREET IN WICHITAK&O & MAIZE ROAD IN MAIZEK&O & ST. PAUL STREET IN WICHITAKANSAS & OKLAHOMA RR & DODGE AVENUE IN WICHITAKANSAS & OKLAHOMA RR AND 2ND AVENUE IN ANDALEMAIZE: MAIZE RD N. OF 45TH ST TO N. OF 53RD STPED/BIKE PATH IN THE CITY OF DERBYVALLEY CENTER: 5TH ST. WICHITA-VALLEY CENTER FLOODWAY

36.715.10.012.112.0

0.013.34.419.813.39.09.09.011.7

9.41.61.61.00.00.00.05.013.79.114.70.20.010.71.1

11.814.815.315.3

4.916.30.00.01.80.00.00.00.00.01.50.00.0

Crack Repair25 Mm Overlay (1 Inch)Bridge RepairOverlayUltra Thin Bonded Asphalt Surf.

Preliminary EngineeringSurface & Bridge40 Mm Overlay (1-1/2 Inches)Overlay1.5 OverlayMilling And OverlayStockpile Bituminous Material3in Overlay1.5 Overlay

Pavement ReconstructionInterchange/sSeeding, Sodding1.5 OverlayBridge RepairBridge RepairBridge RepairLightingOverlayPavement MarkingUltra Thin Bonded Asphalt Surf.LightingBridge Repair1.5 Overlay1.0 Overlay

Cold Recycle and Overlay1.5 OverlayOverlayUltra Thin Bonded Asphalt Surf.

Pedestrian & Bicycle PathsPreliminary EngineeringPedestrian & Bicycle PathsSpecialGrade, Bridge & SurfacingFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalGrade & SurfacingPedestrian & Bicycle PathsGrade, Bridge & Surfacing

183871129

1,5731,147

014,420

1743,5431,4702,165

121,5751,288

41,8003,980

163191427319160

4,040312

8,59830276845208

2,6002,2412,3362,460

1,6240

22742

4,935250260250230250

8,393180880

SM-CMNSM-1RRSM-BSRSM-1RRSM-1RR

SM-ISRSM-ISRSM-ISRSM-ISRSM-1RRSM-1RRSM-CMNSM-1RRSM-1RR

SM-IRPSM-IRPSM-IRPSM-ISRSM-BSRSM-BSRSM-BSRSM-SLRSM-ISR

SM-PMRSM-ISRSM-SLRSM-BSRSM-1RRSM-1RR

SM-1RRSM-1RRSM-1RRSM-1RR

LC-TEXSE-SEBLC-SRTSE-ITS

SE-SEWLC-RXRLC-RXRLC-RXRLC-RXRLC-RXRSE-EDPLC-TEXLC-RES

20122003201220092013

200420042004200720122012201220122012

200320122013200620122013201320122004201220122012201220092009

2012200820092013

2012200120132009200320122012201220122012201220122013

Page 68: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-61 (Projects Under Construction as of November 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

SedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwickSedgwick

C2059I135I135I135I135I135I135I235I235I235I235I235I235K015K015K015K042K042K096K096U054U054U054U054U054

VALLEY CENTER: FORD STREET BRIDGEWICHITA METRO AUTOMATED VEHICLE LOCATION FOR TRANSITWICHITA TMC DEPLOYMENT PHASE IIAWICHITA: 119TH STREET W FROM KELLOGG TO MAPLE(CA)WICHITA: 13TH ST, MAIZE RD TO TYLER RDWICHITA: 13TH STREET N & MOSLEY(CA)WICHITA: 17TH ST N & HILLSIDE INTERSECTIONWICHITA: 21ST ST N FROM K-96 E TO 159TH ST E(CA)WICHITA: 2ND & WESTWICHITA: 47TH ST., LULU ST. TO HYDRAULIC AVE.WICHITA: 47TH STREET S FROM MERIDIAN TO SENECA(CA)WICHITA: CENTRAL CORRIDORWICHITA: GREENWICH ROAD FROM HARRY ST TO KELLOGG(CA)WICHITA: HARRY & BROADWAY, INTERSECTION IMPROVEMENTWICHITA: HARRY & WOODLAWN, INTERSECTION IMPROVEMENTWICHITA: HARRY STREET FROM KTA TO E OF ROCK ROAD(CA)WICHITA: HARRY, GREENWICH RD TO 127TH ST E.WICHITA: HYDRAULIC AVE HARRY ST TO KELLOGGWICHITA: LINCOLN BRIDGE OVER ARKANSAS RIVER(CA)WICHITA: OLIVER ST FROM HARRY TO KELLOGG(CA)WICHITA: PAWNEE AND BROADWAY.WICHITA: SENECA, I-235 TO 31ST S(CA)WICHITA: WOODLAWN, HARRY ST TO LINCOLN STWICHITA:CITYWIDE63RD STREET S FROM ROCK ROAD TO BUTLER COUNTY LINE37TH STREET TO 85TH STREETBRIDGE #010 ON I-135 IN SEDGWICK COUNTYBRIDGE #330 ON I-135 IN SEDGWICK COUNTYEND VIADUCT, NORTH TO 0.1 KM NORTH OF 37TH STREETI-135/KTA/47TH ST INTERCHANGEPAVEMENT MARKING PROJECTBRIDGE #106 ON I-235 IN SEDGWICK COUNTYBRIDGE REPAIR ON BRIDGE # 105 IN SEDGWICK COUNTYI-235 & 13TH STREET CONNECTION ON WEST SIDE OF WICHITAI-235, K-254 & I-135, SEDGWICK CO.PATCHING ON I-235 IN SEDGWICK COUNTYSOUTH END I-235, NORTH, 14.5 MILES TO BROADWAY BRIDGEK-15; CITY OF WICHITA IN SEDGWICK COUNTY KLINK PROJECTPAVEMENT MARKING PROJECTWICHITA: SCL TO JCT WITH I-135/US-81 ON K-15JCT WITH K-49, NORTHEAST TO RIDGE ROAD ON K-42PRESERVATION PROJECT ON K-42 IN SEDGWICK COUNTYK-96: BR NOS. 421, 422, 427 AND 428 IN SEDGWICK COUNTYSLIDE REPAIR ON K-96 IN SEDGWICK COUNTYBRIDGE #354 ON US-54 IN SEDGWICK COUNTYE BOUND US-54 IN WICHITA AT RP 218.6 NEAR HILLSIDE EXITINSTALL SIGNAL AT U54 & 159TH AT SEDGWICK/BUTLER COUNTYS ACCESS RD FROM CINDY ST TO 183 RD ST WEST IN GODDARDUS-54 CENTRAL BUSINESS DISTRICT (CBD) VIADUCT (WICHITA)

0.00.00.00.91.00.20.22.50.00.31.12.61.00.00.00.51.00.90.61.00.00.50.50.05.06.60.00.02.60.034.20.00.01.00.515.614.51.04.51.215.92.00.00.00.00.00.40.80.0

BridgeIntelligent Transportation SysIntelligent Transportation SysGrade & SurfacingMilling And OverlayGrade & SurfacingIntersection ImprovementGrade & SurfacingIntersection ImprovementGrade & SurfacingGrade & SurfacingGrade, Bridge & SurfacingGrade & SurfacingIntersection ImprovementIntersection ImprovementGrade & SurfacingGrade & SurfacingGrade & SurfacingGrade, Bridge & SurfacingGrade & SurfacingIntersection ImprovementGrade & SurfacingMilling And OverlayFunds OnlyGrade, Bridge & SurfacingOverlayBridge RepairBridge RepairPavement ReconstructionLocation StudyPavement MarkingBridge RepairBridge RepairGrade, Bridge & SurfacingLightingPavement PatchingPavement PatchingMilling And OverlayPavement MarkingMilling And Overlay1.5 OverlayMilling And OverlayBridge OverlaySlide RepairBridge RepairSpecialTraffic SignalsGrade & SurfacingPreliminary Engineering

1,233531450

3,873562

1,4733,8828,968601650

4,50260,4135,0861,0231,6126,3703,0003,0005,7416,7332,0954,5242480

11,0902,944225434

28,6470

258657446

37,260466

4,3201,238349283362

1,5683656062758326

1,6071,176

0

LC-RESSE-ITSSE-ITS

LC-LOCLC-LOCLC-LOCLC-LOCLC-LOCLC-HAZSM-RIPLC-LOCSE-SEWLC-LOCLC-HAZLC-HAZLC-LOCLC-LOCLC-LOCLC-LOCLC-LOCLC-HAZLC-LOCLC-LOCLC-RESLC-RESSM-ISRSM-BSRSM-BSRSM-IRPMM-IRISM-PMRSM-BSRSM-BSRSE-IRC

MM-LTGSM-ISRSM-ISRLC-K1RSM-PMRLC-K1RSM-1RRSM-1RRSM-BSRSM-CMNSM-BSRSM-EMRLC-HES

MM-CORSM-PBR

2010200920122011201120102010200920092010201120052010201320122011201020102011200920122012201120102006200920132013200220082013201220122013201220112007201220132011200420122012201220132009201220102012

Page 69: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-62

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

(Projects Under Construction as of November 2012)

SewardSewardSewardSewardSewardSewardSewardSewardSewardSeward

ShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawneeShawnee

SheridanSheridanSheridanSheridanSheridanSheridan

U054U054U056U083U083U083

I070I070I070I070I070I070I070I470I470I470K004K004K004U024U024U024U024U024U024U024U024U040U075U075U075U075U075

K023K186K188U024U083U083

LIBERAL: 8TH STREET FROM US-54 TO US 83UP & COUNTY ROAD 2 SOUTHWEST OF LIBERALUPRR & R ROAD 7 MILES SOUTHWEST OF KISMETUPRR & X ROAD 3 MILES NORTHEAST OF KISMET0.1 MI E US-83, EAST TO WEST EWS CIMARRON RIVER BRIDGEBRIDGE REPAIR ON BRIDGE #006 IN SEWARD COUNTYUS-56 IN SEWARD COUNTY (FY 2013 1R PROJECT)BRIDGE # 005 ON US-83 IN SEWARD COUNTYNCL OF LIBERAL, PT 3, N TO 0.9 MILE NORTHOF JCT K-51OK-KS STATE LINE, N TO 1.52 KM N OF JCT K-51

CITY OF TOPEKA CCTV CAMERASDEER CR TRAIL; 6TH ST TO 10TH ST IN TOPEKAINNOVATION PKWY FROM GARY ORMSBY DR TO S. TOPEKA BLVDKANZA FIRE COMMERCE PARK, RAIL PORTIONTOPEKA: KANSAS AVE EXTENSION FROM 37TH TO TOPEKA BLVDFROM URISH TO DANBERRY & CARNAHAN TO KS TURNPIKE BOOTHGAGE BLVD E 2.37 MI TO JCT I-470/KTA (EXCEPT BRIDGES)I-70 FROM DANBURY LANE TO ADAMS TRAFFICWAYI-70: FROM SN/WB COUNTY LINE, EAST TO VALENCIA ROADI-70; BEG. @ ML POST 362.952 TO 364.852 E & W BOUND LNSMULTIPLE BRIDGE REPAIRS IN SHAWNEE COUNTY ON I-70REPAIR A SIGN TRUSS ON I-70 IN SHAWNEE COUNTYI-470 FROM I-70 JUNCTION EAST TO 21ST STREET IN TOPEKAI-470: BR NOS. 200, 201, 183, 055 AND 195 IN SN COUNTYPATCHING ON I-470 IN SHAWNEE COUNTYK-4 IN SHAWNEE COUNTY (2012 1R PROJECT)K-4: BRIDGE NO. 233 IN SHAWNEE COUNTYWB-SN COUNTY LINE, NORTHEAST TO RS 514 (AUBURN ROAD)BOURBONAIS CR BR (069), 3 MILES NORTHWEST OF ROSSVILLEENSIGN CREEK BR (071), 2 MILES WEST OF SILVER LAKEPRESERVATION PROJECT ON US-24 IN SHAWNEE COUNTYUS-24 IN SHAWNEE COUNTY (2012 1R PROJECT)US-24 IN SHAWNEE COUNTY (2012 1R PROJECT)US-24, CROSS CR BR TO ECL, AND ORANGE ST INT.US-24, FROM COUNTRYSIDE ROAD, EAST TO EXISTING 4-LANEUS-24/MAIN & US-24/ORANGE IN ROSSVILLENORTHBOUND US-40 & K-4 OFFRAMP3690 FT S OF JCT 62ND ST/US-75 N TO SN/JA COUNTY LINE46TH STREET, NORTH TO SN-JA COUNTY LINE ON US-75PAVEMENT MARKING PROJECTPRESERVATION PROJECT ON US-75 IN SHAWNEE COUNTYUS-75 IN SHAWNEE COUNTY (2013 1R PROJECT)

GOVE/SHRIDAN COUNTY LINE N TO S CITY LIMITS HOXIEK-186 IN SHERIDAN COUNTY (2012 1R PROJECT)K-188 IN SHERIDAN COUNTY (2012 1R PROJECT)US-24 IN SHERIDAN COUNTY (2012 1R PROJECT)JCT K-383/US-83 NORTH TO DECATUR/SHERIDAN COUNTY LINEUS-83 IN SHERIDAN COUNTY 2011 1R PROJECT

0.70.00.00.011.40.00.80.08.513.7

0.00.70.80.60.54.02.44.34.01.90.00.01.80.05.62.80.010.10.00.00.00.76.70.31.30.00.04.75.87.12.76.0

14.71.63.130.50.60.6

Grade & SurfacingFlashing Light SignalFlashing Light SignalFlashing Light SignalOverlayBridge RepairMilling And OverlayBridge RepairOverlay25 Mm Overlay (1 Inch)

Intelligent Transportation SysPedestrian & Bicycle PathsGrade & SurfacingRailroad ImprovementGrade & SurfacingPavement PatchingPavement PatchingPavement PatchingOverlayPavement PatchingBridge RepairLightingPavement PatchingBridge OverlayPavement PatchingRecycle & O-layBridge Overlay1.5 OverlayBridge ReplacementBridge ReplacementSpecialMilling And OverlayMilling And OverlayCurb & Gutter New,repr Or ReplBridge ReplacementTraffic SignalsTraffic SignalsPavement PatchingPavement MarkingPavement Marking3in OverlayUltra Thin Bonded Asphalt Surf.

1.0 Overlay1.5 Overlay1.5 Overlay1.5 OverlayOverlayMilling And Overlay

1,800280250225

1,889555151110699753

423375

2,4081,2423,6993,7641,3844,4003,4243,43286775

2,001424

4,166150

1,365640

1,3991,140250131800

1,07039,818

1825

1,83846262

3,562978

2,220144264

2,89965118

LC-RESLC-RXRLC-RXRLC-RXRSM-1RRSM-BSRSM-1RRSM-BSRSM-1RRSM-1RR

SE-ITSLC-TEXSE-EDPSE-EDPSE-EDPSM-ISRSM-ISRSM-ISRSM-ISRSM-ISRSM-BSRSM-SLRSM-ISRSM-BSRSM-ISRSM-1RRSM-BSRSM-1RRSM-PBRSM-PBRSM-1RRSM-1RRSM-1RRLC-K3RSE-RIC

MM-SAFMM-SAFSM-1RRSM-PMRSM-PMRSM-1RRSM-1RR

SM-1RRSM-1RRSM-1RRSM-1RRSM-1RRSM-1RR

2009201120132013200720122013201320072002

20092012201220122008200920112010201220072012201220102013201220122012200520122012201220122012200820132006200920102005201320122013

200920122012201220082011

Page 70: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-63 (Projects Under Construction as of November 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

ShermanShermanShermanShermanShermanSherman

SmithSmithSmith

StaffordStaffordStafford

StantonStantonStanton

Stevens

SumnerSumnerSumnerSumnerSumnerSumnerSumnerSumnerSumnerSumner

ThomasThomasThomasThomasThomasThomasThomasThomasThomas

TregoTregoTregoTregoTregoTrego

I070I070I070I070I070

K00802K181K248

U050U281U281

K027K027U160

U056

K015K042U081U081U160U166

I070I070I070I070I070K025K025K025U024

I070I070U040B1U283U283

REPLACEMENT OF HISTORIC BRICK STREET IN GOODLANDBEGIN AT GOODLAND EXIT 17;THENCE E 10.2004 MI TO EDSONCO-KS ST L, E TO JCT K-27COLORADO STATE LINE EAST TO 0.5 MI E OF RS-1668(CARUSO)K-253 (EDSON) E TO 0.5 MI E OF SHERMAN/THOMAS COUN LINEK-253 (EDSON) E TO 0.5 MI E OF SHERMAN-THOMAS COUN LINE

K-8 IN SMITH COUNTY (FY 2013 1R PROJECT)K-181 IN SMITH COUNTY (FY 2013 1R PROJECT)K-248 IN SMITH COUNTY (2012 1R PROJECT)

US-50 IN STAFFORD COUNTY (2012 1R PROJECT)US-281 IN STAFFORD COUNTY (2012 1R PROJECT)US-281 IN STAFFORD COUNTY (2012 1R PROJECT)

CIMARRON VALLEY RR & K-27 AT JOHNSON CITYS JCT US-160, N TO ST-HM CO LNORTH JCT K-27/US-160 EAST TO STANTON/GRANT COUNTY LINE

US-56 IN STEVENS COUNTY (FY 2013 1R PROJECT)

BNSF & BLUFF ROAD 1 MILE WEST OF MILANBNSF & DRURY ROAD 4MI WEST OF WELLINGTONBNSF & SUMNER ROAD 1 MILE WEST OF MAYFIELDBNSF & TYLER ROAD 2MI WEST OF WELLINGTONK-15 IN SUMNER COUNTY (2012 1R PROJECT)PRESERVATION PROJECT ON K-42 IN SUMNER COUNTYBR 052, NINNESCAH RIVER DR, 3.5 MI SO. OF SG-SU CO LINES MAIN (JCT US-81/K49) TO ECL ON E CENTRAL AVE (US-81)US-160 IN THE CITY OF WELLINGTONUS-166 IN SUMNER COUNTY (2012 1R PROJECT)

.55 KM W OF JCT US-24, E TO .55 KM E OF JCT K-250.337 MI W OF I-70/US-24; 0.355 E OF I-70/K-25 @ COLBY0.34 MILES E OF JCT K-25, SE 9.042 MILES TO MINGO INTERSH-TH CO LINE, EAST 10.623 MILESUBAS ON I-70 IN THOMAS COUNTYK-25 IN THOMAS COUNTY (FY 2013 1R PROJECTK-25 IN THOMAS COUNTY (FY 2013 1R PROJECT)NORTH FORK SOLOMON RIVER BR (042), 3 MI SOUTH OF COLBYUS-24 IN THOMAS COUNTY (2012 1R PROJECT)

3.0 MILES N & 6.9 MILES E OF TREGO CENTERBRIDGE REPAIR ON BRIDGES #008 - #011 IN TREGO COUNTYJCT US-283, EAST TO TR-EL COUNTY LINEUS-40B IN TREGO COUNTY (FY 2013 1R PROJECT)US-283 IN TREGO COUNTY (FY 2013 1R PROJECT)WAKEENEY: US-283/40B FROM FIRST ST EAST TO 13TH ST

0.010.217.112.88.48.4

16.015.21.0

15.07.19.1

0.012.012.9

15.2

0.00.00.00.05.56.60.00.30.69.1

8.78.79.110.68.211.515.50.08.3

0.20.016.80.79.11.0

Historic Preservation3/4 OverlayOverlayGrade, Bridge & SurfacingSeeding, SoddingMilling And Overlay

Milling And OverlayAsphalt PavementConv Seal

O-lay & Shoulder2in Overlay1.5 Overlay

Surfacing40 Mm Overlay (1-1/2 Inches)3/4 Overlay

Milling And Overlay

Flashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalUltra Thin Bonded Asphalt Surf.Milling And OverlayBridge ReplacementMilling And OverlayOverlayPavement Patching

SurfacingConv SealOverlayOverlayUltra Thin Bonded Asphalt Surf.Asphalt Pavement3in OverlayBridge Replacement1.5 Overlay

Grade & BridgeBridge RepairSurface & Bridge2in OverlayMilling And OverlayGrade & Surfacing

810731

5,93447,190

757,730

1,2941,320

0

2,7081,3461,137

1051,421748

2,734

275300375250551

1,2521,161206310

1,140

7,7011,5382,5424,6781,8521,5303,104838791

228334

21,534263

1,0582,102

LC-TEXSM-ISRSM-ISRSM-IRPSM-IRPSM-IRP

SM-1RRSM-1RRSM-1RR

SM-1RRSM-1RRSM-1RR

SM-RRSSM-1RRSM-1RR

SM-1RR

LC-RXRLC-RXRLC-RXRLC-RXRSM-1RRSM-1RRSM-PBRLC-K1RLC-K1RSM-1RR

SM-ISRSM-ISRSM-ISRSM-ISRSM-ISRSM-1RRMM-1RSSM-PBRSM-1RR

LC-RESSM-BSRSM-ISRSM-1RRSM-1RRLC-K3R

201220082005201120132012

201320132012

201220122012

200620022008

2013

2012200920122009201220122011201220122012

200220072004200620122013201320122012

201320122002201320132009

Page 71: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-64

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

(Projects Under Construction as of November 2012)

WabaunseeWabaunseeWabaunseeWabaunseeWabaunseeWabaunseeWabaunseeWabaunseeWabaunseeWabaunseeWabaunseeWabaunseeWabaunsee

WallaceWallace

WashingtonWashingtonWashingtonWashingtonWashingtonWashingtonWashingtonWashingtonWashingtonWashingtonWashingtonWashington

WichitaWichitaWichita

WilsonWilsonWilsonWilsonWilson

WoodsonWoodsonWoodsonWoodsonWoodson

WyandotteWyandotteWyandotteWyandotte

I070I070I070I070K004K004K004K018K031K099K099K099

K027U040

K009K015K022K148K148K234K234K243K243U036U036U036

K025K096K167

K039K039K047K047U075

U054U054U054U054U075

DOWNTOWN STREETSCAPE IN THE CITY OF ALMABRIDGE REPAIR ON BRIDGE #020 IN WABAUNSEE COUNTYI-70 @ WEIGH STATION WEST OF MCFARLAND RD.I-70 PAXICO REST AREAI-70: EAST OF I-70/K-30 JCT., E TO WB/SN COUNTY LINECULVERT 534, MISSION CR DRG, 2.88 MILES W WB-SN CO LINEJUNCTION K-177, NE TO WB-SN COUNTY LINESOUTH BRANCH MISSION CREEK BR (041), 3 MI N OF ESKRIDGEBR & CUL REPL;DEEP CR BR(049) ANTELOPE BR(050), CUL 512BRIDGE #075; 4.18 MILES EAST OF JUNCTION K-99/K-31CULVERT 545, SOUTH BRANCH MILL CR DRG, 1.73 MI N OF K-4TRIBUTARY TO SOUTH FORK MILL CR BRIDGE (063), W JCT K-4W JCT K-4, N TO SCL ALMA

K-27 IN WALLACE COUNTY (FY 2013 1R PROJECT)CO-KS ST L, E TO 0.538 KM W OF W JCT K-27

PREVENTIVE MAINTENANCE ON K-9 IN WASHINGTON & CLAY COPREVENTIVE MAINTENANCE ON K-15 IN WASHINGTON COUNTYUS-36 JUNCTION NORTH TILL ROUTE ENDSEAST JCT K-148/K-9, N TO KANSAS-NEBRASKA STATE LINEK-148 IN WASHINGTON COUNTY (2012 1R PROJECT)ECL HANOVER, EAST TO JUNCTION K-148K-234 IN WASHINGTON COUNTY (2012 1R PROJECT)JUNCTION K-148, EAST TO PONY EXPRESS STATIONK-243 IN WASHINGTON COUNTY (2012 1R PROJECT)EAST CITY LIMITS WASHINGTON, EAST TO THE 2 LANE/4 LANERP/WS COUNTY LINE EAST TO WASHINGTON EAST CITY LIMITSUS-36 IN WASHINGTON COUNTY (2012 1R PROJECT)

LEOTI GI: K-25 FROM SOUTH ST NORTH TO A STLEOTI: K-96 FROM INDIAN ST TO WATERS STK&O & K-167 AT MARIENTHAL

CONVENTIONAL SEAL ON K-39 IN WILSON COUNTYJUNCTION US-400/K-39 WEST TO JUNCTION K-39/US-750.18 MI E OF JCT K-47/US-75 E TO WILSON-NEOSHO CO LINE0.18 MI E OF JCT K-47/US-75 E TO WILSON-NEOSHO CO LINEUS-75, APPROX 1.5 MI S OF S JCT OF K-39, WILSON COUNTY

BR 002, MOPAC RR OVER US-54BRIDGE REPAIR IN WOODSON COUNTY ON US-54CRACK ROUT AND SEAL ON US-54 IN WOODSON COUNTYUS-54 IN WOODSON COUNTY (2012 1R PROJECT)NCL YATES CENTER, N TO WO-CF CO L

BONNER SPRINGS: WALKING TRAIL SHADYSIDE TO W.MORSE AVE.KANSAS CITY: MERRIAM LANE BICYCLE LANESKC: 5TH ST FROM RIVERFRONT HERITAGE TR TO JERSEY CR TRPAVEMENT MARKING PROJECT

0.00.00.10.04.50.039.50.00.00.00.00.08.5

29.616.1

25.27.03.120.420.40.30.30.90.99.217.69.4

1.20.90.0

8.014.47.07.00.4

0.80.011.812.710.5

0.90.90.510.5

Landscaping And BeautificationBridge RepairLightingUltra Thin Bonded Asphalt Surf.OverlayCulvert1.5 OverlayBridge ReplacementBridge ReplacementCulvertCulvertBridge Replacement25 Mm Overlay (1 Inch)

1.5 Overlay25 Mm Overlay (1 Inch)

Crack RepairCrack Repair1.5 Overlay1.5 OverlayAsphalt Pavement1.5 OverlayAsphalt Pavement1.5 OverlayAsphalt Pavement1.5 Overlay1.5 OverlayConv Seal

Curb & Gutter New,repr Or ReplCurb & Gutter New,repr Or ReplSurfacing

Conv Seal1.5 OverlayGrade, Bridge & SurfacingSeeding, SoddingPavement Marking

Bridge RemovalBridge RepairCrack Repair1.0 Overlay1.5 Overlay

SurfacingPedestrian & Bicycle PathsPedestrian & Bicycle PathsPavement Marking

696226124257

5,689207

2,817653

1,459446525

1,604526

2,771593

12638413

1,6132,041

33358494

1,0911,976275

512466123

2161,47512,514

11124

1,14013941889825

141466425397

LC-TEXSM-BSRMM-LTGSM-ISRSM-ISRSM-PCRSM-1RRSM-PBRSM-PBRSM-PCRSM-PCRSM-PBRSM-1RR

SM-1RRSM-1RR

SM-CMNSM-CMNSM-1RRSM-1RRSM-1RRSM-1RRSM-1RRSM-1RRSM-1RRSM-1RRSM-1RRSM-1RR

LC-K3RLC-K3RSM-RRS

SM-CMNSM-1RRMM-RIMMM-RIMSM-PMR

SM-BSRSM-BSRSM-CMNSM-1RRSM-1RR

LC-RESLC-RESLC-TEXSM-PMR

2012201220122012201220072005201120122012200720122003

20132003

201220122009200620122006201220062012200720092012

201220122006

20122009201120132006

20082012201220122004

2013201320132012

Page 72: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location Description Length(Miles)

Type of WorkCounty

B-65 (Projects Under Construction as of November 2012)

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

WyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotteWyandotte

StatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewide

C0000I035I035I035I070I070I070I070I070I070I070I070I070I070I070I435I435I435I435I435I435I635I635K007K007K032K032U069U069U169

STATE AVENUE FROM 94TH ST TO 82ND STBRIDGES #007 AND #008 ON I-35 IN WYANDOTTE COUNTYE OF SW BLVD, NE TO KS-MO ST L (NL & SL)MISSION RD, 7TH ST. TRFWY, & EATON ST., WYANDOTTE CO SURFACING WORK ON I-70 IN WYANDOTTE COUNTY94TH ST, EAST TO LEWIS AND CLARK VIADUCT(EXCPT I-635)BR REPAIR ON BRS #269, #128 & #096 IN WYANDOTTE COUNTYBRIDGE REPAIR IN WYANDOTTE COUNTY ON I-70BRIDGE REPAIR IN WYANDOTTE COUNTY ON I-70EMERGENCY REPAIR ON I-70, 18TH ST. EXPRESSWAY INTERCHI-70 @ 3RD/FAIRFAX TRFWY, WYANDOTTE CO.I-70 REAL TIME TRAVELER INFORMATION KC METROI-70 STUDY FOR THE LEWIS & CLARK VIADUCTI-70, STAGING AREA WEST OF 72ND STREET, WYANDOTTE CO.I-70: BRIDGE NOS. 029, 031 IN WYANDOTTE COUNTYBRIDGE REPAIR ON BRIDGE #204 IN WYANDOTTE COUNTYBRIDGE REPAIR ON BRIDGES #198&199 IN WYANDOTTE COUNTYI-435 & K-32, WYANDOTTE CO.I-435 & WOODEND RD.I-435: BRIDGE NO. 195 IN WYANDOTTE COUNTYPAVEMENT MARKING PROJECTI-635 & K-5, WYANDOTTE CO.I-635 MISSOURI RIVER BRIDGE, BR NO 635-105-8.91(166)BRIDGE REPAIR ON BRIDGE #258 IN WYANDOTTE COUNTYPRESERVATION PROJECT ON K-7 IN WYANDOTTE COUNTYBONNER SPRINGS: KLINK- TWO LOCATIONS ON K-32PAVEMENT MARKING PROJECTBR NO 69-105-156.66(136) 18TH ST OVER KANSAS RIVERBR. NO.(136), 18TH ST. EXPRESSWAY OVER THE KANSAS RIVERBR #181 & #070 ON US-169 IN WYANDOTTE COUNTY

DISTRICT ONE, AREA FOURDISTRICTS 3, 2 & 6KANSAS & OKLAHOMA RAILROAD IN KM, SG, AND SU COUNTIESKANSAS CITY LIVABLE COMMUNITIES PILOT PROGRAMKANSAS STATE HISTORICAL HIGHWAY MARKERSKDOT WORK ZONE SAFETY PUBLIC AWARENESS CAMPAIGNMILLING AT MULTIPLE LOCATIONS IN DISTRICT FOURMILLING AT MULTIPLE LOCATIONS IN DISTRICT ONEMILLING AT MULTIPLE LOCATIONS IN DISTRICT TWOMILLING AT MULTIPLE LOCATIONS IN DISTRICT TWOMOTORIST ASSISTANCE PROGRAM FISCAL YEAR 2013MUDJACKING AT VARIOUS LOCATIONS IN DISTRICT ONEOPERATION GREEN LIGHT SYSTEM IN KANSAS CITY METRO AREASAFE KIDS OF KANSASSCHOOL ZONE SIGNING AND PAVEMENT MARKINGSTATEWIDESTATEWIDESTATEWIDESTATEWIDE

1.50.31.91.71.310.50.00.00.00.00.110.00.90.20.00.00.00.00.10.03.60.10.00.03.50.61.10.00.00.0

0.00.00.00.00.00.027.70.068.030.80.00.00.00.00.00.00.00.00.0

Grade, Bridge & SurfacingSpecialPavement ReconstructionLightingPavement PatchingPavement PatchingBridge RepairBridge RepairBridge RepairSpecialLightingIntelligent Transportation SysLocation StudyLightingBridge OverlayBridge RepairBridge RepairLightingLightingBridge OverlayPavement MarkingLightingBridge RepairBridge RepairUltra Thin Bonded Asphalt Surf.Milling And OverlayPavement MarkingBridge RepairBridge RepairBridge Repair

SpecialSpecialSigningFunds OnlyScenic Or Historic Hwy ProgsPreliminary EngineeringMillingMillingMillingMillingPreliminary EngineeringMudjackingIntelligent Transportation SysPreliminary EngineeringSpecialSpecialSpecialPreliminary EngineeringSigning

6,182100

40,908110648

11,1352801837217

2466250

1042,307717832214155

1,205327536

1,6001,18177023863200822166

103142380

17401720145340

3083960

15524165000

LC-RESSM-CMNSM-IRPSM-SLRSM-ISRSM-ISRSM-BSRSM-BSRSM-BSRSM-EMRMM-LTGSE-ITSMM-IRI

MM-LTGSM-BSRSM-BSRSM-BSRMM-LTGMM-LTGSM-BSRSM-PMRMM-LTGSM-BSRSM-BSRSM-1RRLC-K1RSM-PMRSM-BSRSM-BSRSM-BSR

SM-EMRMM-SAFLC-RXRLC-LOCLC-TEXMM-RIMSM-1RRSM-1RRSM-1RRSM-1RRSE-ITS

SM-CMNSE-ITSLC-SRT

MM-SAFMM-SAFMM-SAFMM-LTGSM-SOS

201320132004201220132005201220122012201220132012201220122012201220122013201220122012201320122012201220132013200820132013

2006200820022013201220122013201320122013201320132010201220122002200620012006

Page 73: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

Route Location DescriptionCounty

B-66

Length(Miles) Type of Work

FiscalYear

Est. FYConst. Cost

(1,000)

Prog Cat& SubCat @

(Projects Under Construction as of November 2012)

StatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewideStatewide

I070I070I070I070I635K005K009K010K023K025K042K096K156K156U036U040U400

STATEWIDESTATEWIDE - STANDING FUND FOR ITS RESEARCHSTATEWIDE INTERSTATES AND FREEWAYS LOGO SIGNING & TODSSTATEWIDE KCA (KANSAS CONTRACTORS ASSOCIATION)STATEWIDE-PAVEMENT MARKING RESEARCHUNION PACIFIC LED LENS UPGRADEVARIOUS LOCATIONS IN DISTRICT 1VARIOUS LOCATIONS IN DISTRICT 1VARIOUS LOCATIONS IN DISTRICT 1VARIOUS LOCATIONS IN DISTRICT 2VARIOUS LOCATIONS IN DISTRICT 2VARIOUS LOCATIONS IN DISTRICT 2VARIOUS LOCATIONS IN DISTRICT 3VARIOUS LOCATIONS IN DISTRICT 4VARIOUS LOCATIONS IN DISTRICT 4VARIOUS LOCATIONS IN DISTRICT 4HIGH PERFOMANCE SHEETING PROJECT I-70 - DISTRICT 3I-70 @ US-281 EXIT 184 (RS CO) & K-247 EXIT 145 (EL CO)I-70 IN SHERMAN COUNTY (2013 1R PROJECT)TR CO EXIT 135(K-147); EL CO 161(RS 2166), 163(RS 1877)I635 FROM MERRIAM LN TO GEORGIA IN JO/WYFRONTIER MILITARY SCENIC BYWAY SIGNINGVARIOUS LOCATIONS IN DISTRICT 3K-10: DOUGLAS CO. NEAR EUDORA & JOHNSON CO. AT K-7VARIOUS LOCATIONS IN DISTRICT 6VARIOUS LOCATIONS ON K-25 IN DISTRICT 3VARIOUS LOCATIONS IN DISTRICT 5K-96 FROM SE OF NICKERSON, N & W TO NORTH OF STERLINGDISTRICT 5 HIGH PERFORMANCE PROJECT - FY 2012DISTRICT 6 HIGH PERFORMACE PROJECT - FY 2012DISTRICT 1 HIGH PERFORMANCE PROGRAM PROJECT.WESTERN VISTAS HISTORIC BYWAY SIGNINGPRESERVATION ON US-400 IN BU, GW, WL, MG & LB COUNTIES

0.00.00.00.00.00.0

212.7423.3328.4334.6150.2338.8153.6332.40.0

218.1175.02.08.535.86.7

152.0194.14.0

132.4106.4137.618.470.875.8110.161.883.5

SigningIntelligent Transportation SysSigningPreliminary EngineeringSpecialFlashing Light SignalSigningSigningSigningSigningSigningSigningSigningSigningSigningSigningSigningLightingMillingLightingPavement MarkingSigningSigningGuard FenceSigningSigningSigningLocation StudySigningSigningSigningSigningPavement Patching

00

2,65000

126213479408295164405153331148269776362226089452265

1,0101311191690

23045957331

6,000

SM-SOSSE-ITS

MM-RIMSM-ISR

MM-SAFLC-RXRSM-SOSSM-SOSSM-SOSSM-SOSSM-SOSSM-SOSSM-SOSSM-SOSSM-SOSSM-SOSSM-SOSSM-SLRSM-1RRSM-SLRSM-PMRSM-SOSSM-SOSMM-RIMSM-SOSSM-SOSSM-SOSSM-RIPSM-SOSSM-SOSSM-SOSSM-SOSSM-1RR

200720122008201220122010200820102011200420092012200820082009201120112012201320122010201220122012200820092012201120122012201220112012

Page 74: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

C-67

ProjectListingsforAviation,

RailandPublicTransit

Page 75: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

KansasAirportImprovementProgramProjectSummarybyCounty-FY2013

County Project TotalCost StateFunds LocalFunds FY

B-68 (Aviation)

Butler

Dickinson

Gove

Hamilton

Harper

Haskell

Hodgeman

Kiowa

Labette

Lane

Lincoln

Norton

Phillips

Rooks

Sedgwick

Sheridan

Sherman

Smith

Airport Development Plan at BeaumontWiden & O-Lay Runway 17-35 at BentonRelocate Fuel System at Benton

Remark Runway at Abilene

Airport Development Plan Ph. II at Quinter

Seal Cracks Rwy 13-31 and Twys at SyracuseEmergency Fuel Syst Repair at Syracuse

Install PAPIs at HarperReplace Fueling Syst at Harper

Self-Service Fueling Syst at SatantaReplace Airfield Lighting Syst at Satanta

Repair Airfield Pavements at Jetmore

Bury Overhead Power Lines at Greensburg

Install Fueling Syst at Oswego

Airport Development Plan Ph II at DightonLand Acquisition; Remove Tower at Dighton

Replace Restrooms at Lincoln

Repair and Remark Runway at Norton

Self-Service Fueling Syst at Phillipsburg

Self-Service Fueling Syst at Rooks Co

Tree Removal at Rose HillAirport Development Plan at Rose HillRemove Bldg; Reroute Road at Rose Hill

Repair Airfield Pavements at Hoxie

Reconst Barrel Hangar Apron at GoodlandReconst T-Hangar Apron at Goodland

Self-Service Fueling Syst at Smith Center

$38,000$449,955$28,319

$15,000

$38,000

$7,920$40,500

$166,500$99,000

$92,250$186,300

$257,940

$270,000

$90,000

$28,500$609,516

$26,100

$89,226

$45,000

$82,800

$7,025$38,000$8,550

$67,500

$112,500$315,000

$16,612

$2,000$49,995$3,147

$5,000

$2,000

$880$4,500

$18,500$11,000

$10,250$20,700

$28,660

$30,000

$10,000

$1,500$67,724

$3,046

$11,101

$5,000

$17,325

$781$2,000$950

$7,500

$37,500$105,000

$1,845

201320132013

2013

2013

20132013

20132013

20132013

2013

2013

2013

20132013

2013

2013

2013

2013

201320132013

2013

20132013

2013

$40,000$499,950$31,467

$20,000

$40,000

$8,800$45,000

$185,000$110,000

$102,500$207,000

$286,600

$300,000

$100,000

$30,000$677,240

$29,146

$100,327

$50,000

$100,125

$7,806$40,000$9,500

$75,000

$150,000$420,000

$18,457

Page 76: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

County Project Total Cost State Funds Local Funds FY

B-69 (Aviation)

Stafford

Sumner

Thomas

Airport Development Feasibility Study at Stafford

Fuel Tank Leak Detection at Wellington

Repair Joints & Pvmt, Taxiways & Ramp at Colby

TOTALS:

$38,000

$11,438

$54,000

$3,317,332

$2,000

$3,812

$18,000

$480,369

2013

2013

2013

$40,000

$15,250

$72,000

$3,797,701

Page 77: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

B-70

RailServiceImprovementFund Many areas of the state no longer have service from Class I railroads. Short line railroads provide rail service to such areas, provide an alternative to trucks for freight (primarily grain) shippers, and keep rural areas of the state connected to the national rail network as well as national and international markets for Kansas grains and products. This alternative provides competition and helps keep shipping rates down. It also reduces the number of trucks that would otherwise be on Kansas roads and highways. This in turn avoids increased maintenance and rehabilitation costs for those roads.

The Rail Service Improvement Fund component of the CTP is administered by KDOT’s freight and rail unit. The fund makes available to short line railroads and port authorities operating in Kansas, and shippers and local units of government in coordination with the serving railroad, low-interest, long-term (ten-year) loans and grants to be used primarily for track rehabilitation, capacity improvementand economic development projects. Funds may also be used for financing and acquisition activities and the purchase of rolling stock.

(Rail)

ARRARailProjects

ProjectNumber RailLineSegment

GrantAmount ProjectDescription

LoanAmount

106 RF 0001-01

106 KA 2637-01

Cimarron Valley Railroad

Kyle Railroad Tiger III project

$3,000,000

$8,210,119

Total project included $15,000,000 for 100,000 ties, 560 carloads of ballast, 150 miles of tamping and 10 miles of rail replacement. KDOT, CVR and Port Authority of the Southwest contributed $5,000,000 each to the total project. All tie work and instal-lation of ballast and tamping will be done by year end 2012. Rail installation will continue to proceed over the next two years.

The project goes from Solomon to Downs (84 miles) and includes 50,000 ties, 50,000 tons of ballast and upgrades of 24 crossings and 14 bridges. The work will be done by third quarter calendar year 2013.

$2,000,000

($408,283 state,

$1,233,741 Kyle railroad,

$6,568,095 in Federal

funds)

Page 78: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

CountiesServed LocalShare

TotalVehicleCosts

CoordinatedTransitDistrict(CTD)Operating

FederalShare

StateShare

FederalShare

StateShare

LocalShare

TotalOperatingCosts

State/FederalPublicTransitPrograms-ARRAContracts

FY2013CoordinatedTransitDistrict(CTD)Operating

B-71(Public Transit)

Four-County Paratransit Council, Inc. (CTD 1)

Topeka/SN Co. Paratransit Council, Inc. (CTD 2)

North East Kansas Transit Council, Inc. (CTD 3)

Two Lakes Coordinated Transit Alliance, Inc. (CTD 4)

Flint Hills Transit Council (CTD 5)

Marion/McPherson CTD (CTD 6)

North Central Kansas Transit Council, Inc. (CTD 7)

Northwest Kansas Area Transit Coordinating Council, Inc. (CTD 8)

Kansas Area Transit District, Inc. (CTD 9)

Southeast Kansas Area Transit Coordinating Council, Inc. (CTD 10)

South Central KSTransit Council, Inc. (CTD 11)

Central Plains Coordinated Transit District, Inc. (CTD 12)

Mid-Kansas Transit District, Inc. (CTD 13)

West Central Kansas Regional Transportation Council, Inc. (CTD 14)

Southwest Kansas Regional Transportation Council, Inc. (CTD 15)

Totals

Douglas, Johnson, Leavenworth, Wyandotte

Shawnee

Atchinson, Brown, Doniphan, Jackson, Jefferson, Nemaha

Clay, Geary, Marshall, Pottawatomie, Riley, Washington

Chase, Lyon, Morris, Osage, Wabaunsee

Marion, McPherson

Cloud, Dickenson, Ellsworth, Jewell, Lincoln, Mitchell, Ottawa, Republic, Saline

Cheyenne, Decatur, Ellis, Gove, Graham, Logan, Norton, Osborne, Phillips, Rawlins, Rooks, Russell, Sheridan, Sherman, Smith, Thomas, Trego, Wallace

Franklin, Miami, Coffey, Anderson

Linn, Woodson, Allen, Bourbon, Wilson, Neosho, Crawford, Montgomery, Labette, Cherokee

Greenwood, Elk, Chatauqua, Cowley

Butler, Sedgwick, Harvey

Rice, Reno, Kingman, Harper, Sumner

Rush, Barton, Pawnee, Stafford, Edwards, Pratt, Kiowa, Comanche, Barber

Greeley, Wichita, Scott, Lane, Ness, Hamilton, Kearny, Finneym Hodgeman, Stanton, Grant, Haskell, Gray, Ford, Seward, Morton, Stevens, Meade, Clark

$940,400.86

$39,486.45

$579,894.17

$1,966,554.47

$578,767.25

$230,642.87

$2,146,732.16

$857,676.79

$684,349.29

$1,946,098.62

$485,230.37

$711,035.71

$1,458,671.08

$688,553.58

$1,746,612.50

$15,060,706.17

$326,693.45

$12,571.44

$196,570.36

$688,716.09

$196,278.24

$89,642.86

$740,032.15

$290,626.79

$254,163.87

$692,973.41

$174,630.36

$264,915.20

$493,833.07

$232,528.57

$583,182.50

$5,237,358.36

$144,204.32

$20,000.02

$84,630.10

$263,249.58

$91,090.51

$30,000.01

$304,900.01

$123,550.00

$89,368.31

$254,675.41

$67,650.01

$98,091.27

$210,926.01

$102,800.01

$235,110.00

$2,120,245.56

$469,503.10

$6,915.00

$298,693.70

$1,014,588.80

$291,398.50

$111,000.00

$1,101,800.00

$443,500.00

$340,817.10

$998,449.80

$242,950.00

$348,029.24

$753,912.00

$353,225.00

$928,320.00

$7,703,102.25

$303,435.00

$110,071.00

$85,089.00

$118,183.00

$60,388.00

$85,569.00

$97,510.00

$173,265.00

$178,124.00

$479,103.00

$112,383.00

$365,261.00

$151,066.00

$331,080.00

$0.00

$2,650,527.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$242,748.00

$88,056.80

$68,071.20

$94,546.40

$48,310.40

$68,455.20

$78,008.00

$138,612.00

$142,499.20

$383,282.40

$89,906.40

$292,208.80

$120,852.80

$264,864.00

$0.00

$2,120,421.60

These amounts include all federal and state operating monies given to the CTDs, CTD Federal Administration dollars and 5310 State operating expenses.

$60,687.00

$22,014.20

$17,017.80

$23,636.60

$12,077.60

$17,113.80

$19,502.00

$34,653.00

$35,624.80

$95,820.60

$22,476.60

$73,052.20

$30,213.20

$66,216.00

$0.00

$530,105.40

Page 79: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

FY2013OtherMisc.Contracts

CountiesServed LocalShare

TotalVehicleCosts

FederalShare

StateShare

FederalShare

StateShare

LocalShare

TotalOperatingCosts

OtherMisc.Contracts

Totals:

FY2013UrbanMetropolitanContractsCountiesServed Local

ShareTotalVehicleCosts

FederalShare

StateShare

FederalShare

StateShare

LocalShare

TotalOperatingCosts

UrbanMetropolitanContracts

Totals:

Wichita Transit

Johnson County Transit

Unified Govt. of Wyandotte County/Kansas City Kansas

Topeka Transit

City of Lawrence/Lawrence Transit

Wichita Urbanized Area

Johnson County Urbanized Area

Kansas City Kansas Urbanized Area

Topeka Urbanized Area

Lawrence Urbanized Area

$1,085,375.00

$1,282,715.00

$460,462.00

$460,462.00

$250,986.00

$3,540,000.00

Kansas University Center for Research

Kansas Public Transit Association

Kansas CTD Council

Statewide Projects

Statewide Project

Statewide Project

$210,000.00

$55,125.00

$22,500.00

$287,625.00

$20,000.00

$5,125.00

$0.00

$25,125.00

$0.00

$0.00

$4,500.00

$4,500.00

$190,000.00

$50,000.00

$18,000.00

$258,000.00

B-72 (Public Transit)

Project LocalShare

TotalVehicleCosts

FederalShare

StateShare

FederalShare

StateShare

LocalShare

TotalOperatingCosts

ARRAContracts

TheseARRAContractsspanFiscalYears2010-2014

Johnson County Transit

Riley County Area Transit Agency

Lyon County Area Transit

OCCK, Inc,

Purchase vehicle equipment

Construction of maintance facility, bus stops/shelters and the purchase of mobile data terminals, radios, and software

Construction bus stops/shelters, mobile data terminals, radios, and software

Renovation of maintenance facility, bus stops/shelters, shop equipment, mobile data terminals, radios, and software.

$15,690.00

$2,105,000.00

$210,500.00

$651,387.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$15,690.00

$2,105,000.00

$210,500.00

$651,387.00

Page 80: APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation

B-73 (Public Transit)

LocalShare

TotalVehicleCosts

ARRAContracts FederalShare

StateShare

FederalShare

StateShare

LocalShare

TotalOperatingCosts

Totals:

Project

Developmental Services of Northwest Kansas

Reno County Area Transit

HDR Engineering

Purchase mobile data terminals

Purchase mobile data terminals

Intercity Bus Study

$45,000.00

$72,000.00

$213,285.00

$3,312,862.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$45,000.00

$72,000.00

$213,285.00

$3,312,862.00