Page 1: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP

[Appendixes] 1. Member List of the Study Team

2. Study Schedule

3. List of Parties Concerned in Egyptian Government

4. Minutes of Discussions

5. List of Data collected

6. Other Relevant Data and Information

Page 2: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP

Appendix 1. Member Lists of the Study Team

1-2 Study Team for Basic Design Study

Name Responsibility Position 1 Mr. Takao SHIBUSAWA

Team Leader Fourth Project Management

Division, Grant Aid Management Department, Japan International Cooperation Agency (JICA)

2 Mr. Mr. Kazufumi TAIRA Technical Adviser International Cooperation Division, General Food Policy Bureau, Ministry of Agriculture, Forestry and Fisheries

3 Mr. Kazumitsu TSUMURA Chief Consultant/Operation and Maintenance(O&M) Planning

Sanyu Consultants Inc.

4 Mr. Takao KUME Irrigation Facility Planning /Farming Planning

Sanyu Consultants Inc.

5 Mr. Fumihiko KOMADA Structural Design Planning Sanyu Consultants Inc. 6 Mr. Hisashi OURA Geological Survey Sanyu Consultants Inc. 7 Mr. Seiichi YAMAKAWA Hydrology

/Natural Condition Survey Sanyu Consultants Inc.

8 Mr. Masanori NARUKAWA Cost Estimation /Construction Planning

Sanyu Consultants Inc.

9 Mr. Eichi SHIBATA Coordinator /Baseline Survey

Sanyu Consultants Inc.

2-2 Study Team for Explanation of the Draft Basic Design Report

Name Responsibility Position 1 Mr. Norio SHIMOMURA

Team Leader Representative of JICA Egypt

Office 2 Mr. Kazumitsu TSUMURA Chief Consultant/Operation and

Maintenance(O&M) Planning Sanyu Consultants Inc.

3 Mr. Tatsuhiko MORI Irrigation Facility Planning /Farming Planning

Sanyu Consultants Inc.

4 Mr. Fumihiko KOMADA Structural Design Planning Sanyu Consultants Inc. 5 Mr. Masanori NARUKAWA Cost Estimation

/Construction Planning Sanyu Consultants Inc.

A1

Page 3: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP

Appendix 2. Study Schedule2-1 Study Team for Basic Design StudyDate Day No. Consultants

Chief Consultant/Operation andMaintenance Planning

Irrigation FacilityPlanning/FarmingPlanning

Structural DesignPlanning No. Geological Survey Hydrology/Natural

Condition Survey

Cost Estimation/ConstructionPlanning

No. Coordinator/Baseline Survey

Nagoya→SingaporeSQ981

(dep.9.50〜arr.15:50)

Narita→SingaporeSQ997

Shingapore→SQ428 (dep.23:50�arr.06:25)

Courtesy call on JICA office & Embassy of Japan, and MWRI, ID, IISExplanation of the Inception Report

Preparation ofentrust contractssurveys

2/18 Tue. 3 3 Preparration ofBaseline survey

2/19 Wed. 4 4Preparation ofentrust contractssurveys

2/20 Thu. 5 1 5 Preparration ofBaseline survey

2/22 Sat. 7 Discussion with ID, IIS and other relavant Agencies about M/M 3 Discussion with ID, IIS and other relavant Agencies about M/M 7

2/23 Sun. 8 4 8

2/24 Mon. 9Discussion with ID,IIS, Data collectionfrom ID, IIS, etc.

Negotiation with local firms for entrustcontracts surveys, Preparation of Baseline

survey5

Data collection fromID, IIS, etc.(Geological)

Data collection fromID, IIS, etc.(Hydrology)

Data collection fromID, IIS, etc.

(Construction)9

2/25 Tue. 10 Collecting Data and information from MWRI, IIS, etc 6Data collection from

ID, IIS, etc.(Geological)

Data collection fromID, IIS, etc.(Hydrology)

Data collection fromID, IIS, etc.

(Construction)10

2/26 Wed. 11 Data collection from MWRI, IIS, etc 7Data collection from

ID, IIS, etc.(Geological)

Data collection fromID, IIS, etc.(Hydrology)

Data collection fromID, IIS, etc.(Equipment)

11

2/27 Thu. 12 Cairo→Minia, Preparation of site survey, Baseline and conductinglocal firms 8 Cairo→Minia, Preparation of site survey, Baseline and

conducting local firms 12

2/28 Fri. 13 Site survey of Sakoukla regulator, Conducting entrust surveys andBaseline 9 Site survey of Sakoukla regulator, Conducting entrust surveys

and Baseline 13

3/1 Sat. 14 Discussion with Minia directorate officials and data collection 10 Discussion with Minia directorate officials and data collection 14

Site survey and Collecting data and information Site survey and Collecting data and information(Operation andMaintenance) (Irrigation Facility) (Structural Design) (Regulator ) (Irrigation Facility) (Construction

Materials)3/3 Mon. 16 Ditto Ditto Ditto 12 Ditto Ditto Ditto

3/4 Tue. 17 Ditto DittoMinia→Beni Suef,

Site survey of Lahunregulator

13 Ditto DittoMinia→Beni Suef,

Site survey of Lahunregulator

3/5 Wed. 18 Ditto DittoDiscussion with

Beni Suefdirectorate officials

14 Ditto DittoDiscussion with

Beni Suefdirectorate officials

3/6 Thu. 19 Site survey of Sakoularegulator

Site survey of Mazoula regulator,Collecting data and information 15 Site survey of Sakoula regulator Site survey of

Mazoula regulator,3/7 Fri. 20 Ditto Ditto 16 Ditto Ditto

3/8 Sat 21Discussion with

MWRI, IIS etc., Datacollection

Data collection ofMazoura and Lahoun

Beni Suef→Cairo,Data collection 17 Beni Suef→Minia,

Conducting entrust surveys and BaselineBeni Suef→Cairo,

Data collection

3/9 Sun 22Discussion with Minia

IIP etc., Datacollection

18

3/10 Mon 23 Minia→Beni Suef,Data collection 19

3/11 Tue 24Discussion with

MWRI, IIS etc., Datacollection

Site Survey(Irrigation, Farmers

Organization)20

3/12 Wed 25

Data collection forO&M of Mazoura,Lahoun, Beni Suef→Minia

Data collection fromMinia IIP 21

3/13 Thu 26Minia→Cairo, Data

analysis anddocumentation

Minia→Cairo, Dataanalysis and

documentation

Data analysis anddocumentation 22 Data analysis and

documentation

3/14 Fri 27 Data analysis and documentation 23 Data analysis and documentation

3/15 Sat 28 Discussion with MWRI, IIS officials and Collecting data andinformation 24 Discussion with MWRI, IIS officials and Collecting data and

information

3/16 Sun 29 Discussion with MWRI, IIS officials and Collecting data andinformation 25 Discussion with MWRI, IIS officials and Collecting data and

information3/17 Mon 30 Data analysis and documentation 26 Data analysis and documentation

3/18 Tue 31 Data analysis and documentation 27 Data analysis and documentation

3/19 Wed 32 Report to MWRI, IIS, JICA, EOJ 28 Report to MWRI, IIS, JICA, EOJ

3/20 Thu 33 Data analysis and documentation 29 Data analysis and documentation3/21 Fri 34 303/22 Sat 35 31

:Official holiday of the Egyptian government (Thu, Fri, National holiday)

Cairo→SingaporeSQ427(dep.13:20〜arr.07:05)Singapore→Narita SQ12(dep.9:45〜arr.17:05)

Cairo→SingaporeSQ427(dep.13:20〜arr.07:05)Singapore→Narita SQ12(dep.9:45〜arr.17:05)

2

1

2 6

11

Site survey and datacollection,

Entrust surveys,Baseline survey

Site survey and datacollection,

Entrust surveys,Baseline survey

(Geological, Boring)

Site survey and datacollection,

Entrust surveys,Baseline survey(Environmental

Condition)

62/21 Fri.

3/2 Sun. 15

Narita→Singapore SQ997(dep.12:00〜arr.18:20)

22/17 Mon.

12/16 Sun.

Narita→London BA006(dep.11:05〜arr.14:35)

London→Cairo BA155(dep.16:25〜arr.23:15)

Minia→Cairo,Data analysis and documentation

Singapore→CairoSQ428

Cairo→SingaporeSQ427(dep.13:20〜arr.07:05)Singapore→NaritaSQ12(dep.9:45〜

arr.17:05)

Discussion with ID, IIS and other relavant Agencies about M/MSignature of M/M

Cairo→Paris AF503(dep.07:15〜arr.11:05)Pasris→Tokyo JL405

(dep.18:05〜arr.14:00)

Discussion with ID, IIS, Data collection from ID, IIS, etc.

Discussion with ID, IIS and other relevant Agencies deemed to be necessary.Cairo→Beni Suef

Discussion with ID Minia and other relevant Agencies deemed to be necessary. Site Survey(Dairout, Manshat El Dahab) if possible Minia→Cairo Preparation of entrust contracts

Preparation ofentrust contracts

Officials

Conducting localfirm and Baseline

survey team

Negotiation withlocal firms forentrust contractssurveys

Discussion withMWRI, IIS etc.,Data collection

Discussion withMWRI, IIS etc.,Data collection(Construction

Schedule)

Narita→Singapore SQ997(dep.12:00〜arr.18:20)Shingapore→SQ428

(dep.23:50〜arr.06:25)

Data collection from Minia IIP

Site survey (Mazoura, Lahoun)Beni Suef→Minia

Discussion with ID Minia and other relevant Agencies deemed to be necessary. Site survey(Sakoula)

A2-1

Page 4: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP

6/13 Fri. 1

Arranging Data

6/15Sun.

3

6/16 Mon. 4

6/17Tue.

5

6/18Wed.

6

6/19 Thu. 76/20 Fri. 8

:Official holiday of the Egyptian government (Thu, Fri)

Kuala Lumpur→Cairo

Cairo→Kuala LumpurKuala Lumpur→Narita

Discussion with JICA office, Courtesy call on Embassy of Japan and IISExplanation of the Basic Design Report to IIS, Conference

Discussion with IIS about M/MExplanation of the Basic Design Report to ID, Conference

Discussion with IIS about M/MDiscussion with IIS about M/M,

Report to JICA and Embassy of Japan, Discussion with JICA office

Date Day No.

Narita→Kuala Lumpur

2

2-2 Study Team for Explanation of the Draft Basic Design Report

OfficialsChief Consultant /

Operation andMaintenance

Planning

Irrigation FacilityPlanning / Farming

Planning

Hydrology /Structural Design

Planning

Cost Estimation /Construction

Planning

6/14Sat.

Consultants

A2-2

Page 5: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP

Appendix 3. List of Parties Concerned in the Egyptian Government

Name Position

Ministry of Foreign Affairs

1. Eng. Mohamed El-Amir Osman

Ministry of Water Resources and Irrigation

1. Ms. Sanaa Hegazi Undersecretary, Asia & Australia, International Cooperation Sector

Irrigation Improvement Sector: IIS

1. Eng. Kamal Enany Undersecretary & Head of Irrigation Improvement Sector

2. Eng. Adel Hashem Technical Advisor to IIS

3. Eng. Shoukry El-Gamal Undersecretary

4. Eng. Aly Abd El-Razk General Director

5. Eng. Alaa Ismail Director of Technical office

6. Eng. Ali Kamal Director of Design

7. Eng. Gamal M. Ayad Senior Economist

8. Eng. Mohamed El-fetyany Technical Office

9. Eng. Ahmed Abd El-Rassoul Design Engineer

10. Eng. Samir Eweada Design Engineer

11. Eng. Hussein Aly Morsy Design Engineer

12. Eng. Tarek Kamal El-Din Design Engineer

13. Eng. Ahmed Mahdy Design Engineer

14. Eng. Tarek El-Tayeb Monitoring and Evaluation Engineer

15. Eng. Mohamed Abd El-Moneim Construction Engineer

16. Eng, Osama Hazzaa Construction Engineer

17. Eng. Adel Diab Agronomist

18. Mr. Kagiwara Chikanobu JICA Specialist

Irrigation Sector: IS

1. Ms. Eng. Lila Undersecretary, Planning & Follow up

2. Ms. Eng. Somaya Assistant Undersecretary, Planning & Follow up

3. Eng. Resk El-Menshawiy Head of Planning Sector

4. Eng. Maher El-Khodary Head of Irrigation Sector

5. Eng. Gamal El-Shafee Head of Central Directorate for Water Distribution, IS

Reservoirs and Ground Barrages Sector: RGBS

1. Dr. M. Bahaa El-Din Ahmed First Undersecretary, Head of RGBS, MWRI

2. Eng. Mohamed Rafea Technical office

Mechanical and Electrical Department: MED

A3-1

Page 6: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP

1. Eng. Mohamed Abded Fatouh Director, Works, Studies and Specification Department

Irrigation Directorate : IDir.

1. Eng. Tolba Ahmed Undersecretary, Minia Central Directorate, Irrigation & Water Resources

Eng. Hany Galaf Sadek Director General, West Minia Irrigation Directorate

Eng. Yehyeih Ali Director General, East Minia Irrigation Directorate

Eng. Naseh Solfman Inspector, West Samalout Inspectorate

Eng. Saad Basta Inspector, West Bahr Yusef Inspectorate

Eng. Adel Zaki Inspector, East Bahr Yusef Inspectorate

Irrigation Improvement Project: IIP

1. Eng. Nagi Sabra Abd El-Hassib General Director, Minia

2. Eng. William Zaki Hanna Director of Works

3. Eng. Hossam Sayed Afifi Business Manager

4. Eng. Magdi Israel Salama Assistant Business Manager

5. Eng. Hossam Fawzy Shehata Assistant Business Manager

6. Eng. Hany Gamal Hassanen Assistant Business Manager

7. Eng. Wagih Michael Samuel Business Manager

MED

1. Eng. Abd El-Fattuh Suyed Director, Minia MED General Directorate

IDir.

1. Eng. Mohamed Zaky Al-Badry Undersecretary, Beni Suef Central Directorate, Irrigation & Water Resources

2. Eng. Abdu Larhim Ata General Director, Beni Suef Irrigation Directorate

3. Eng. Atef Fahkury Vice General Director, Beni Suef Irrigation Directorate

4. Eng. Mohamed Naser El-Den Mechanical Engineer

IIP

1. Eng. Osama Naguib Head of Beni Suef IIP

2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP

IDir.

1. Eng. Louis Saleeb Noor Director General of Water Distribution Department

Embassy of Japan

1. Mr. Noguchi Tetsuaki Secretary

JICA Office in Egypt

1. Mr. Shimomura Norio Resident Representative

2. Mr. Iwama Toshiyuki Deputy Resident Representative

3. Mr. Hanadate Daimin Assistant Resident Representative

4. Alfred Zoser Development Project Officer

A3-2

Page 7: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP

Appendix 4. Minutes of Discussion

4-1 Basic Design Study .............................................................................................................. A4-2 4-2 Explanation of the Draft Basic Design Report .......................................................................A4-18

A4-1

Page 8: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 9: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 10: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 11: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 12: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 13: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 14: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 15: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 16: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 17: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 18: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 19: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 20: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 21: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 22: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 23: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 24: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 25: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 26: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 27: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 28: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 29: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 30: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 31: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 32: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 33: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 34: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 35: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 36: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 37: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 38: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 39: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 40: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
Page 41: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP

App

endi

x 5.

L

ist o

f Dat

a C

olle

cted

No.

N

ame

Form

O

rigin

al /

Cop

yPu

blis

her

Year

1 R

einf

orce

d C

oncr

ete

Des

ign

Han

dboo

k B

ooks

O

rigin

al

By

Prof

. Dr.

Shak

er E

l-Beh

airy

Fa

culty

of E

ngin

eerin

g

Ain

Sha

ms U

nive

rsity

Si

xth

Editi

on

2002

2 D

esig

n Te

xtbo

oks i

n C

ivil

Engi

neer

ing:

Vol

ume

I IR

RIG

ATIO

N E

NG

INEE

RIN

G: C

AN

AL

AN

D B

AR

RA

GES

Boo

ks

Cop

y B

y Se

rge

Lelia

vsky

Ph

. D.,

M.I.

C.E

., F.

Am

. Soc

. C.E

.

1983

3 Eg

yptia

n C

ode

for

Load

ing

in

Con

stru

ctio

n B

uild

ing,

Roa

dway

Brid

ges &

Rai

lway

Boo

ks

Cop

y M

inis

try o

f Hou

sing

& U

tiliti

es

Eng.

Moh

amed

Sal

ah E

l-Dee

n H

assa

bAlla

1993

/12/

28

4 Pr

oble

m b

ased

D

esig

n Te

xtbo

oks i

n C

ivil

Engi

neer

ing

Reg

ulat

ors

Boo

ks

Cop

y Ph

. D, N

azei

h A

ssaa

d Yo

unan

Pr

ofes

sor,

Civ

il En

gine

erin

g D

ep.

Uni

vers

ity o

f Ale

xand

ria

1986

5 St

ruct

ural

Bric

k W

ork

Boo

ks

Orig

inal

A

rnoi

d W

. Hen

dry

B.,

Sc.,

Ph.D

., D

.Sc.

, F.I.

C.E

., F.

I.Stru

ct.E

., F.

R.S

.E.

Prof

esso

r of C

ivil

Engi

neer

ing,

U

nive

rsity

of E

dinb

urgh

1981

6 Th

e In

com

e Ta

x Lo

w

Boo

ks

Orig

inal

Th

e M

iddl

e of

Eas

t Lib

rary

for

Econ

omic

Ser

vice

s N

ot C

lear

7 Ir

rigat

ion

Syst

ems:

Pre

parin

g fo

r the

21st

Cen

tury

B

ooks

O

rigin

al

Min

istry

of P

ublic

Wor

ks a

nd W

ater

R

esou

rces

N

ot C

lear

8 In

vest

ing

in E

gypt

B

ooks

O

rigin

al

Min

istry

of F

orei

gn T

rade

20

03

9 Im

plem

enta

tion

Proc

edur

e fo

r Irr

igat

ion

Law

B

ooks

C

opy

Min

istry

of P

ublic

Wor

ks a

nd W

ater

R

esou

rces

19

95

10

Mai

n Fe

atur

es o

f the

Wat

er P

olic

y B

ooks

C

opy

Min

istry

of W

ater

Res

ourc

es

2000

11

Nat

iona

l Wat

er R

esou

rces

Pla

n fo

r Egy

pt

Boo

ks

Cop

y M

inis

try o

f Pu

blic

Wor

ks a

nd W

ater

R

esou

rces

19

99

12

Man

shaa

t Nia

zy B

ridge

: Dra

win

g of

Bor

ing(

BH1、

BH

2)D

raw

ing

Cop

y N

ubar

ia C

ompa

ny

1995

13

Ben

i Kal

d B

ridge

: Dra

win

g of

Bor

ing(

BH

1、B

H2)

D

raw

ing

Cop

y G

orge

Hal

em

Not

Cle

ar

A5-1

Page 42: [Appendixes] - JICA · 4. Eng. Mohamed Naser El-Den Mechanical Engineer IIP 1. Eng. Osama Naguib Head of Beni Suef IIP 2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP

14

Land

Map

aro

und

Sako

ula

S =

1/2

500

Map

C

opy

Irrig

atio

n D

epar

tmen

t

Min

ia D

irect

rate

19

06

15

Land

Map

aro

und

Sako

ula

S =

1/2

500

Map

C

opy

Irrig

atio

n D

epar

tmen

t

Min

ia D

irect

rate

N

ot C

lear

16

Bro

chur

e fo

r New

ISN

A B

arra

ge

Pam

phle

t C

opy

Res

ervo

ir an

d G

rand

Bar

rage

Sec

tor

Not

Cle

ar

17

Bro

chur

e fo

r New

ISN

A,

Add

ition

al N

avig

atio

n Lo

ck

Pam

phle

t C

opy

Res

ervo

ir an

d G

rand

Bar

rage

Sec

tor

Not

Cle

ar

18

Bro

chur

e fo

r New

NA

GA

HA

MM

AD

I B

arra

ge

Pam

phle

t O

rigin

al

Res

ervo

ir an

d G

rand

Bar

rage

Sec

tor

Not

Cle

ar

19

Bro

chur

e fo

r MO

NO

UFY

and

TA

FIK

Y H

ead

Reg

ulat

or

Pam

phle

t O

rigin

al

Res

ervo

ir an

d G

rand

Bar

rage

Sec

tor

Not

Cle

ar

20

Bro

chur

e fo

r New

ISM

AIL

IA

Hea

d R

egul

ator

Pa

mph

let

Cop

y R

eser

voir

and

Gra

nd B

arra

ge S

ecto

r N

ot C

lear

21

List

of

Nile

Gra

nd B

arra

ges

, R

egul

ator

s an

d N

avig

atio

n

Can

als

List

C

opy

Res

ervo

ir an

d G

rand

Bar

rage

Sec

tor

Not

Cle

ar

22

Dra

win

gs a

nd S

truct

ure

calc

ulat

ion

for M

inia

regu

lato

r B

ooks

C

opy

IIP、

Min

ia

Dire

ctra

te

Not

Cle

ar

23

Egyp

t 200

3 B

ooks

O

rigin

al

Min

istry

of F

orei

gn T

rade

20

03

24

New

Nag

a H

amm

adi B

arra

ge &

Hyd

ropo

wer

Pla

nt

PRE-

CO

NST

RU

CTI

ON

BA

SELI

NE

ATLA

S B

ooks

C

opy

Proj

ect I

mpl

emen

tatio

n U

nit

MW

RI (

RG

BS)

M

ay

2002

25

N

aga

Ham

mad

i Bar

rage

Dev

elop

men

t FE

ASI

BIL

ITY

STU

DY

FIN

AL

REP

ORT

VO

LUM

E 7.

1 EN

VIR

ON

MEN

TAL

IMPA

CT

ASS

ESSM

ENT

MA

IN

REP

ORT

Boo

ks

Cop

y N

aga

Ham

mad

i Bar

rage

Dev

elop

men

t C

onsu

ltant

s A

ugus

t 19

97

26

Nag

a H

amm

adi B

arra

ge D

evel

opm

ent

FEA

SIB

ILIT

Y S

TUD

Y F

INA

L R

EPO

RT V

OLU

ME

7.2

ENV

IRO

NM

ENTA

L IM

PAC

T A

SSES

SMEN

T A

NN

EXES

Boo

ks

Cop

y N

aga

Ham

mad

i Bar

rage

Dev

elop

men

t C

onsu

ltant

s A

ugus

t 19

97

27

MO

NTH

LY N

OR

MA

L FO

R S

OM

E M

ETEO

RO

LOG

ICA

L EL

EMEN

T,

STAT

ION

: EL

MIN

IA

Han

dout

C

opy

EGY

PTIA

N

MET

EOR

OLO

GIC

AL

AU

THO

RIT

Y

19

Mar

ch,

2003

28

CLI

MAT

OLO

GIC

AL

AVER

AG

ES O

F SO

ME

ELEM

ENTS

, O

CC

UR

REN

CE

OF

SOM

E PH

ENO

MEN

A, A

ND

WIN

D

RO

SE F

OR

STA

TIO

N M

INIA

38

7 P

ERIO

D: 1

973

- 200

1

Han

dout

C

opy

EGY

PTIA

N

MET

EOR

OLO

GIC

AL

AU

THO

RIT

Y

A5-2