[appendixes] - jica · 4. eng. mohamed naser el-den mechanical engineer iip 1. eng. osama naguib...
TRANSCRIPT
[Appendixes] 1. Member List of the Study Team
2. Study Schedule
3. List of Parties Concerned in Egyptian Government
4. Minutes of Discussions
5. List of Data collected
6. Other Relevant Data and Information
Appendix 1. Member Lists of the Study Team
1-2 Study Team for Basic Design Study
Name Responsibility Position 1 Mr. Takao SHIBUSAWA
Team Leader Fourth Project Management
Division, Grant Aid Management Department, Japan International Cooperation Agency (JICA)
2 Mr. Mr. Kazufumi TAIRA Technical Adviser International Cooperation Division, General Food Policy Bureau, Ministry of Agriculture, Forestry and Fisheries
3 Mr. Kazumitsu TSUMURA Chief Consultant/Operation and Maintenance(O&M) Planning
Sanyu Consultants Inc.
4 Mr. Takao KUME Irrigation Facility Planning /Farming Planning
Sanyu Consultants Inc.
5 Mr. Fumihiko KOMADA Structural Design Planning Sanyu Consultants Inc. 6 Mr. Hisashi OURA Geological Survey Sanyu Consultants Inc. 7 Mr. Seiichi YAMAKAWA Hydrology
/Natural Condition Survey Sanyu Consultants Inc.
8 Mr. Masanori NARUKAWA Cost Estimation /Construction Planning
Sanyu Consultants Inc.
9 Mr. Eichi SHIBATA Coordinator /Baseline Survey
Sanyu Consultants Inc.
2-2 Study Team for Explanation of the Draft Basic Design Report
Name Responsibility Position 1 Mr. Norio SHIMOMURA
Team Leader Representative of JICA Egypt
Office 2 Mr. Kazumitsu TSUMURA Chief Consultant/Operation and
Maintenance(O&M) Planning Sanyu Consultants Inc.
3 Mr. Tatsuhiko MORI Irrigation Facility Planning /Farming Planning
Sanyu Consultants Inc.
4 Mr. Fumihiko KOMADA Structural Design Planning Sanyu Consultants Inc. 5 Mr. Masanori NARUKAWA Cost Estimation
/Construction Planning Sanyu Consultants Inc.
A1
Appendix 2. Study Schedule2-1 Study Team for Basic Design StudyDate Day No. Consultants
Chief Consultant/Operation andMaintenance Planning
Irrigation FacilityPlanning/FarmingPlanning
Structural DesignPlanning No. Geological Survey Hydrology/Natural
Condition Survey
Cost Estimation/ConstructionPlanning
No. Coordinator/Baseline Survey
Nagoya→SingaporeSQ981
(dep.9.50〜arr.15:50)
Narita→SingaporeSQ997
Shingapore→SQ428 (dep.23:50�arr.06:25)
Courtesy call on JICA office & Embassy of Japan, and MWRI, ID, IISExplanation of the Inception Report
Preparation ofentrust contractssurveys
2/18 Tue. 3 3 Preparration ofBaseline survey
2/19 Wed. 4 4Preparation ofentrust contractssurveys
2/20 Thu. 5 1 5 Preparration ofBaseline survey
2/22 Sat. 7 Discussion with ID, IIS and other relavant Agencies about M/M 3 Discussion with ID, IIS and other relavant Agencies about M/M 7
2/23 Sun. 8 4 8
2/24 Mon. 9Discussion with ID,IIS, Data collectionfrom ID, IIS, etc.
Negotiation with local firms for entrustcontracts surveys, Preparation of Baseline
survey5
Data collection fromID, IIS, etc.(Geological)
Data collection fromID, IIS, etc.(Hydrology)
Data collection fromID, IIS, etc.
(Construction)9
2/25 Tue. 10 Collecting Data and information from MWRI, IIS, etc 6Data collection from
ID, IIS, etc.(Geological)
Data collection fromID, IIS, etc.(Hydrology)
Data collection fromID, IIS, etc.
(Construction)10
2/26 Wed. 11 Data collection from MWRI, IIS, etc 7Data collection from
ID, IIS, etc.(Geological)
Data collection fromID, IIS, etc.(Hydrology)
Data collection fromID, IIS, etc.(Equipment)
11
2/27 Thu. 12 Cairo→Minia, Preparation of site survey, Baseline and conductinglocal firms 8 Cairo→Minia, Preparation of site survey, Baseline and
conducting local firms 12
2/28 Fri. 13 Site survey of Sakoukla regulator, Conducting entrust surveys andBaseline 9 Site survey of Sakoukla regulator, Conducting entrust surveys
and Baseline 13
3/1 Sat. 14 Discussion with Minia directorate officials and data collection 10 Discussion with Minia directorate officials and data collection 14
Site survey and Collecting data and information Site survey and Collecting data and information(Operation andMaintenance) (Irrigation Facility) (Structural Design) (Regulator ) (Irrigation Facility) (Construction
Materials)3/3 Mon. 16 Ditto Ditto Ditto 12 Ditto Ditto Ditto
3/4 Tue. 17 Ditto DittoMinia→Beni Suef,
Site survey of Lahunregulator
13 Ditto DittoMinia→Beni Suef,
Site survey of Lahunregulator
3/5 Wed. 18 Ditto DittoDiscussion with
Beni Suefdirectorate officials
14 Ditto DittoDiscussion with
Beni Suefdirectorate officials
3/6 Thu. 19 Site survey of Sakoularegulator
Site survey of Mazoula regulator,Collecting data and information 15 Site survey of Sakoula regulator Site survey of
Mazoula regulator,3/7 Fri. 20 Ditto Ditto 16 Ditto Ditto
3/8 Sat 21Discussion with
MWRI, IIS etc., Datacollection
Data collection ofMazoura and Lahoun
Beni Suef→Cairo,Data collection 17 Beni Suef→Minia,
Conducting entrust surveys and BaselineBeni Suef→Cairo,
Data collection
3/9 Sun 22Discussion with Minia
IIP etc., Datacollection
18
3/10 Mon 23 Minia→Beni Suef,Data collection 19
3/11 Tue 24Discussion with
MWRI, IIS etc., Datacollection
Site Survey(Irrigation, Farmers
Organization)20
3/12 Wed 25
Data collection forO&M of Mazoura,Lahoun, Beni Suef→Minia
Data collection fromMinia IIP 21
3/13 Thu 26Minia→Cairo, Data
analysis anddocumentation
Minia→Cairo, Dataanalysis and
documentation
Data analysis anddocumentation 22 Data analysis and
documentation
3/14 Fri 27 Data analysis and documentation 23 Data analysis and documentation
3/15 Sat 28 Discussion with MWRI, IIS officials and Collecting data andinformation 24 Discussion with MWRI, IIS officials and Collecting data and
information
3/16 Sun 29 Discussion with MWRI, IIS officials and Collecting data andinformation 25 Discussion with MWRI, IIS officials and Collecting data and
information3/17 Mon 30 Data analysis and documentation 26 Data analysis and documentation
3/18 Tue 31 Data analysis and documentation 27 Data analysis and documentation
3/19 Wed 32 Report to MWRI, IIS, JICA, EOJ 28 Report to MWRI, IIS, JICA, EOJ
3/20 Thu 33 Data analysis and documentation 29 Data analysis and documentation3/21 Fri 34 303/22 Sat 35 31
:Official holiday of the Egyptian government (Thu, Fri, National holiday)
Cairo→SingaporeSQ427(dep.13:20〜arr.07:05)Singapore→Narita SQ12(dep.9:45〜arr.17:05)
Cairo→SingaporeSQ427(dep.13:20〜arr.07:05)Singapore→Narita SQ12(dep.9:45〜arr.17:05)
2
1
2 6
11
Site survey and datacollection,
Entrust surveys,Baseline survey
Site survey and datacollection,
Entrust surveys,Baseline survey
(Geological, Boring)
Site survey and datacollection,
Entrust surveys,Baseline survey(Environmental
Condition)
62/21 Fri.
3/2 Sun. 15
Narita→Singapore SQ997(dep.12:00〜arr.18:20)
22/17 Mon.
12/16 Sun.
Narita→London BA006(dep.11:05〜arr.14:35)
London→Cairo BA155(dep.16:25〜arr.23:15)
Minia→Cairo,Data analysis and documentation
Singapore→CairoSQ428
Cairo→SingaporeSQ427(dep.13:20〜arr.07:05)Singapore→NaritaSQ12(dep.9:45〜
arr.17:05)
Discussion with ID, IIS and other relavant Agencies about M/MSignature of M/M
Cairo→Paris AF503(dep.07:15〜arr.11:05)Pasris→Tokyo JL405
(dep.18:05〜arr.14:00)
Discussion with ID, IIS, Data collection from ID, IIS, etc.
Discussion with ID, IIS and other relevant Agencies deemed to be necessary.Cairo→Beni Suef
Discussion with ID Minia and other relevant Agencies deemed to be necessary. Site Survey(Dairout, Manshat El Dahab) if possible Minia→Cairo Preparation of entrust contracts
Preparation ofentrust contracts
Officials
Conducting localfirm and Baseline
survey team
Negotiation withlocal firms forentrust contractssurveys
Discussion withMWRI, IIS etc.,Data collection
Discussion withMWRI, IIS etc.,Data collection(Construction
Schedule)
Narita→Singapore SQ997(dep.12:00〜arr.18:20)Shingapore→SQ428
(dep.23:50〜arr.06:25)
Data collection from Minia IIP
Site survey (Mazoura, Lahoun)Beni Suef→Minia
Discussion with ID Minia and other relevant Agencies deemed to be necessary. Site survey(Sakoula)
A2-1
6/13 Fri. 1
Arranging Data
6/15Sun.
3
6/16 Mon. 4
6/17Tue.
5
6/18Wed.
6
6/19 Thu. 76/20 Fri. 8
:Official holiday of the Egyptian government (Thu, Fri)
Kuala Lumpur→Cairo
Cairo→Kuala LumpurKuala Lumpur→Narita
Discussion with JICA office, Courtesy call on Embassy of Japan and IISExplanation of the Basic Design Report to IIS, Conference
Discussion with IIS about M/MExplanation of the Basic Design Report to ID, Conference
Discussion with IIS about M/MDiscussion with IIS about M/M,
Report to JICA and Embassy of Japan, Discussion with JICA office
Date Day No.
Narita→Kuala Lumpur
2
2-2 Study Team for Explanation of the Draft Basic Design Report
OfficialsChief Consultant /
Operation andMaintenance
Planning
Irrigation FacilityPlanning / Farming
Planning
Hydrology /Structural Design
Planning
Cost Estimation /Construction
Planning
6/14Sat.
Consultants
A2-2
Appendix 3. List of Parties Concerned in the Egyptian Government
Name Position
Ministry of Foreign Affairs
1. Eng. Mohamed El-Amir Osman
Ministry of Water Resources and Irrigation
1. Ms. Sanaa Hegazi Undersecretary, Asia & Australia, International Cooperation Sector
Irrigation Improvement Sector: IIS
1. Eng. Kamal Enany Undersecretary & Head of Irrigation Improvement Sector
2. Eng. Adel Hashem Technical Advisor to IIS
3. Eng. Shoukry El-Gamal Undersecretary
4. Eng. Aly Abd El-Razk General Director
5. Eng. Alaa Ismail Director of Technical office
6. Eng. Ali Kamal Director of Design
7. Eng. Gamal M. Ayad Senior Economist
8. Eng. Mohamed El-fetyany Technical Office
9. Eng. Ahmed Abd El-Rassoul Design Engineer
10. Eng. Samir Eweada Design Engineer
11. Eng. Hussein Aly Morsy Design Engineer
12. Eng. Tarek Kamal El-Din Design Engineer
13. Eng. Ahmed Mahdy Design Engineer
14. Eng. Tarek El-Tayeb Monitoring and Evaluation Engineer
15. Eng. Mohamed Abd El-Moneim Construction Engineer
16. Eng, Osama Hazzaa Construction Engineer
17. Eng. Adel Diab Agronomist
18. Mr. Kagiwara Chikanobu JICA Specialist
Irrigation Sector: IS
1. Ms. Eng. Lila Undersecretary, Planning & Follow up
2. Ms. Eng. Somaya Assistant Undersecretary, Planning & Follow up
3. Eng. Resk El-Menshawiy Head of Planning Sector
4. Eng. Maher El-Khodary Head of Irrigation Sector
5. Eng. Gamal El-Shafee Head of Central Directorate for Water Distribution, IS
Reservoirs and Ground Barrages Sector: RGBS
1. Dr. M. Bahaa El-Din Ahmed First Undersecretary, Head of RGBS, MWRI
2. Eng. Mohamed Rafea Technical office
Mechanical and Electrical Department: MED
A3-1
1. Eng. Mohamed Abded Fatouh Director, Works, Studies and Specification Department
Irrigation Directorate : IDir.
1. Eng. Tolba Ahmed Undersecretary, Minia Central Directorate, Irrigation & Water Resources
Eng. Hany Galaf Sadek Director General, West Minia Irrigation Directorate
Eng. Yehyeih Ali Director General, East Minia Irrigation Directorate
Eng. Naseh Solfman Inspector, West Samalout Inspectorate
Eng. Saad Basta Inspector, West Bahr Yusef Inspectorate
Eng. Adel Zaki Inspector, East Bahr Yusef Inspectorate
Irrigation Improvement Project: IIP
1. Eng. Nagi Sabra Abd El-Hassib General Director, Minia
2. Eng. William Zaki Hanna Director of Works
3. Eng. Hossam Sayed Afifi Business Manager
4. Eng. Magdi Israel Salama Assistant Business Manager
5. Eng. Hossam Fawzy Shehata Assistant Business Manager
6. Eng. Hany Gamal Hassanen Assistant Business Manager
7. Eng. Wagih Michael Samuel Business Manager
MED
1. Eng. Abd El-Fattuh Suyed Director, Minia MED General Directorate
IDir.
1. Eng. Mohamed Zaky Al-Badry Undersecretary, Beni Suef Central Directorate, Irrigation & Water Resources
2. Eng. Abdu Larhim Ata General Director, Beni Suef Irrigation Directorate
3. Eng. Atef Fahkury Vice General Director, Beni Suef Irrigation Directorate
4. Eng. Mohamed Naser El-Den Mechanical Engineer
IIP
1. Eng. Osama Naguib Head of Beni Suef IIP
2. Eng. Mohamed Kamal Head of Irrigation Advisory Sector, IIP
IDir.
1. Eng. Louis Saleeb Noor Director General of Water Distribution Department
Embassy of Japan
1. Mr. Noguchi Tetsuaki Secretary
JICA Office in Egypt
1. Mr. Shimomura Norio Resident Representative
2. Mr. Iwama Toshiyuki Deputy Resident Representative
3. Mr. Hanadate Daimin Assistant Resident Representative
4. Alfred Zoser Development Project Officer
A3-2
Appendix 4. Minutes of Discussion
4-1 Basic Design Study .............................................................................................................. A4-2 4-2 Explanation of the Draft Basic Design Report .......................................................................A4-18
A4-1
App
endi
x 5.
L
ist o
f Dat
a C
olle
cted
No.
N
ame
Form
O
rigin
al /
Cop
yPu
blis
her
Year
1 R
einf
orce
d C
oncr
ete
Des
ign
Han
dboo
k B
ooks
O
rigin
al
By
Prof
. Dr.
Shak
er E
l-Beh
airy
Fa
culty
of E
ngin
eerin
g
Ain
Sha
ms U
nive
rsity
Si
xth
Editi
on
2002
2 D
esig
n Te
xtbo
oks i
n C
ivil
Engi
neer
ing:
Vol
ume
I IR
RIG
ATIO
N E
NG
INEE
RIN
G: C
AN
AL
AN
D B
AR
RA
GES
Boo
ks
Cop
y B
y Se
rge
Lelia
vsky
Ph
. D.,
M.I.
C.E
., F.
Am
. Soc
. C.E
.
1983
3 Eg
yptia
n C
ode
for
Load
ing
in
Con
stru
ctio
n B
uild
ing,
Roa
dway
Brid
ges &
Rai
lway
Boo
ks
Cop
y M
inis
try o
f Hou
sing
& U
tiliti
es
Eng.
Moh
amed
Sal
ah E
l-Dee
n H
assa
bAlla
1993
/12/
28
4 Pr
oble
m b
ased
D
esig
n Te
xtbo
oks i
n C
ivil
Engi
neer
ing
Reg
ulat
ors
Boo
ks
Cop
y Ph
. D, N
azei
h A
ssaa
d Yo
unan
Pr
ofes
sor,
Civ
il En
gine
erin
g D
ep.
Uni
vers
ity o
f Ale
xand
ria
1986
5 St
ruct
ural
Bric
k W
ork
Boo
ks
Orig
inal
A
rnoi
d W
. Hen
dry
B.,
Sc.,
Ph.D
., D
.Sc.
, F.I.
C.E
., F.
I.Stru
ct.E
., F.
R.S
.E.
Prof
esso
r of C
ivil
Engi
neer
ing,
U
nive
rsity
of E
dinb
urgh
1981
6 Th
e In
com
e Ta
x Lo
w
Boo
ks
Orig
inal
Th
e M
iddl
e of
Eas
t Lib
rary
for
Econ
omic
Ser
vice
s N
ot C
lear
7 Ir
rigat
ion
Syst
ems:
Pre
parin
g fo
r the
21st
Cen
tury
B
ooks
O
rigin
al
Min
istry
of P
ublic
Wor
ks a
nd W
ater
R
esou
rces
N
ot C
lear
8 In
vest
ing
in E
gypt
B
ooks
O
rigin
al
Min
istry
of F
orei
gn T
rade
20
03
9 Im
plem
enta
tion
Proc
edur
e fo
r Irr
igat
ion
Law
B
ooks
C
opy
Min
istry
of P
ublic
Wor
ks a
nd W
ater
R
esou
rces
19
95
10
Mai
n Fe
atur
es o
f the
Wat
er P
olic
y B
ooks
C
opy
Min
istry
of W
ater
Res
ourc
es
2000
11
Nat
iona
l Wat
er R
esou
rces
Pla
n fo
r Egy
pt
Boo
ks
Cop
y M
inis
try o
f Pu
blic
Wor
ks a
nd W
ater
R
esou
rces
19
99
12
Man
shaa
t Nia
zy B
ridge
: Dra
win
g of
Bor
ing(
BH1、
BH
2)D
raw
ing
Cop
y N
ubar
ia C
ompa
ny
1995
13
Ben
i Kal
d B
ridge
: Dra
win
g of
Bor
ing(
BH
1、B
H2)
D
raw
ing
Cop
y G
orge
Hal
em
Not
Cle
ar
A5-1
14
Land
Map
aro
und
Sako
ula
S =
1/2
500
Map
C
opy
Irrig
atio
n D
epar
tmen
t
Min
ia D
irect
rate
19
06
15
Land
Map
aro
und
Sako
ula
S =
1/2
500
Map
C
opy
Irrig
atio
n D
epar
tmen
t
Min
ia D
irect
rate
N
ot C
lear
16
Bro
chur
e fo
r New
ISN
A B
arra
ge
Pam
phle
t C
opy
Res
ervo
ir an
d G
rand
Bar
rage
Sec
tor
Not
Cle
ar
17
Bro
chur
e fo
r New
ISN
A,
Add
ition
al N
avig
atio
n Lo
ck
Pam
phle
t C
opy
Res
ervo
ir an
d G
rand
Bar
rage
Sec
tor
Not
Cle
ar
18
Bro
chur
e fo
r New
NA
GA
HA
MM
AD
I B
arra
ge
Pam
phle
t O
rigin
al
Res
ervo
ir an
d G
rand
Bar
rage
Sec
tor
Not
Cle
ar
19
Bro
chur
e fo
r MO
NO
UFY
and
TA
FIK
Y H
ead
Reg
ulat
or
Pam
phle
t O
rigin
al
Res
ervo
ir an
d G
rand
Bar
rage
Sec
tor
Not
Cle
ar
20
Bro
chur
e fo
r New
ISM
AIL
IA
Hea
d R
egul
ator
Pa
mph
let
Cop
y R
eser
voir
and
Gra
nd B
arra
ge S
ecto
r N
ot C
lear
21
List
of
Nile
Gra
nd B
arra
ges
, R
egul
ator
s an
d N
avig
atio
n
Can
als
List
C
opy
Res
ervo
ir an
d G
rand
Bar
rage
Sec
tor
Not
Cle
ar
22
Dra
win
gs a
nd S
truct
ure
calc
ulat
ion
for M
inia
regu
lato
r B
ooks
C
opy
IIP、
Min
ia
Dire
ctra
te
Not
Cle
ar
23
Egyp
t 200
3 B
ooks
O
rigin
al
Min
istry
of F
orei
gn T
rade
20
03
24
New
Nag
a H
amm
adi B
arra
ge &
Hyd
ropo
wer
Pla
nt
PRE-
CO
NST
RU
CTI
ON
BA
SELI
NE
ATLA
S B
ooks
C
opy
Proj
ect I
mpl
emen
tatio
n U
nit
MW
RI (
RG
BS)
M
ay
2002
25
N
aga
Ham
mad
i Bar
rage
Dev
elop
men
t FE
ASI
BIL
ITY
STU
DY
FIN
AL
REP
ORT
VO
LUM
E 7.
1 EN
VIR
ON
MEN
TAL
IMPA
CT
ASS
ESSM
ENT
MA
IN
REP
ORT
Boo
ks
Cop
y N
aga
Ham
mad
i Bar
rage
Dev
elop
men
t C
onsu
ltant
s A
ugus
t 19
97
26
Nag
a H
amm
adi B
arra
ge D
evel
opm
ent
FEA
SIB
ILIT
Y S
TUD
Y F
INA
L R
EPO
RT V
OLU
ME
7.2
ENV
IRO
NM
ENTA
L IM
PAC
T A
SSES
SMEN
T A
NN
EXES
Boo
ks
Cop
y N
aga
Ham
mad
i Bar
rage
Dev
elop
men
t C
onsu
ltant
s A
ugus
t 19
97
27
MO
NTH
LY N
OR
MA
L FO
R S
OM
E M
ETEO
RO
LOG
ICA
L EL
EMEN
T,
STAT
ION
: EL
MIN
IA
Han
dout
C
opy
EGY
PTIA
N
MET
EOR
OLO
GIC
AL
AU
THO
RIT
Y
19
Mar
ch,
2003
28
CLI
MAT
OLO
GIC
AL
AVER
AG
ES O
F SO
ME
ELEM
ENTS
, O
CC
UR
REN
CE
OF
SOM
E PH
ENO
MEN
A, A
ND
WIN
D
RO
SE F
OR
STA
TIO
N M
INIA
38
7 P
ERIO
D: 1
973
- 200
1
Han
dout
C
opy
EGY
PTIA
N
MET
EOR
OLO
GIC
AL
AU
THO
RIT
Y
A5-2