application
DESCRIPTION
199TRANSCRIPT
APCPCWM_4828539:WP_0000020WP_0000020A
PC
PC
WM
_4828539:W
P_0000020W
P_0000020
01 BOX HON KHOI POST OFFICE,
NINH HOA, KHANH HOA,
VIETNAM
Fax: +84-58-6220612015-10-16
HYUNDAI VINASHINSHIPYARD CO.,LTD.
HVS
SENDING
NO.
INSP
DATE
S41906 : 39,000DWT CLASS
PRODUCT/CHEMICAL TANKERSHIP NO.
_RA:Rejected(Bad work),RB:Rejected(Drawing mistake), RC:Rejected(Not finish work), RD:Rejected(Insp' be interrupted),RE:Rejected(Not yet cleaning),RF:Reject(Another).
_PA:Cancel(Bad weather),PB:Cancel By Prod' Dep't, PC:Cancel(QM Confirm), PD:Cancel(OW/CL busy at another location),PE:Cancel(Another process is interrupted),PF:Canceled(OW/CL not understand).
Insp' Result: _AA:Accept, AB:Accept(Delay over 4h),AC:Confirm By QM,AD:Confirm By OW/CL(Prod'dept),AE:Confirm By OW/CL(Others Dep't),AF:Accept(OW/CL not attending).
CLASS ABS
TIME COMMENTRESULTWORK GROUP
SERIAL NO.
APPLICATION FOR
INSPECTION & TEST (Painting)
OWNER CENTRAL MARE
2015-10-16
INSPECTION ITEM PLACE
1 Sejin (ZZ)D/H UPPER DK Final Insp (Dry
pro;Bon;Cold;Drying;Chan;Suez;Gym;Garba';Entra')10:00 D2
2 Sejin (ZZ)E/CASING UPPER DK Final Insp (Paint Store; S/G and Air lock room) 10:00 D2
3 Sejin (ZZ)E/CASING INSIDE Final Insp (A & B Deck: Walls & Ceiling &
Outfitting)10:00 D2
4 Sejin (ZZ)E/CASING INSIDE 3RD (Oxytilen; Acetilen) 10:00 D2
5 Paint 8 (B0)HULL OUTSIDE 1ST (As attached sketch) 10:10 D2
6 Sejin (ZZ)FUNNEL INSIDE Final Insp (Floor funnel; Damage areas) 10:20 D2
7 Sejin (ZZ)DECK HOUSE INSIDE Final Insp (Vent trunk system) 10:20 D2
8 S.K VINA (B0)NO.6 C.O.TK (S) 1ST (Main blasting) 10:30 D2
9 S.K VINA (B0)SLOP TK (S) 3RD 15:00 D2
10 Plus VN3 (B0)SLOP TK (P) 2ND 15:30 D2
11
12
13
14
15
16
17
18
19
20
GENERAL MANAGERQM. INCHARGE
F21-0001
( TEL : 2525, HP:0987786005) Tel: , HP: 016 6661 3847
Ñ.C.Quyeát KIM KI TAE
OWNER REPRESENTATIVE
201615/192.168.58.65/2015-10-15 16:07